JPS6351596A - Method of muddy water shielding construction - Google Patents

Method of muddy water shielding construction

Info

Publication number
JPS6351596A
JPS6351596A JP19280186A JP19280186A JPS6351596A JP S6351596 A JPS6351596 A JP S6351596A JP 19280186 A JP19280186 A JP 19280186A JP 19280186 A JP19280186 A JP 19280186A JP S6351596 A JPS6351596 A JP S6351596A
Authority
JP
Japan
Prior art keywords
cutter
water
face plate
muddy water
chamber
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP19280186A
Other languages
Japanese (ja)
Other versions
JPH0663425B2 (en
Inventor
幸男 藤本
俊夫 鈴木
本多 哲史
広幸 伊藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
IHI Corp
Original Assignee
IHI Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by IHI Corp filed Critical IHI Corp
Priority to JP19280186A priority Critical patent/JPH0663425B2/en
Publication of JPS6351596A publication Critical patent/JPS6351596A/en
Publication of JPH0663425B2 publication Critical patent/JPH0663425B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。
(57) [Abstract] This bulletin contains application data before electronic filing, so abstract data is not recorded.

Description

【発明の詳細な説明】 [産業上の利用分野] 本発明は泥水シールド工法に係り、特に清水圧を利用し
、カッタ面板の背面部に形成されるカッタチャンバに立
入って掘進方向前方の杭等の障害物を除去することので
きる泥水シールド工法に関する。
[Detailed Description of the Invention] [Industrial Application Field] The present invention relates to a muddy water shield construction method, and in particular, utilizes fresh water pressure to penetrate into a cutter chamber formed on the back side of a cutter face plate and remove piles in the forward direction of excavation. The present invention relates to a muddy water shield construction method that can remove obstacles such as.

[従来の技術] 地下鉄のトンネル等を形成すべく土砂を掘削し、掘進す
る場合において、掘進方向前方の杭等の障害物はその位
置が事前に予測でき、地上環境が許容される場合には地
上から引きI友く等して除去されるがこれが不可能であ
る場合にはシールド内部から除去される。
[Prior Art] When excavating earth and sand to form a subway tunnel, etc., the position of obstacles such as piles in front of the excavation direction can be predicted in advance, and if the ground environment allows, It is removed by pulling it from the ground or, if this is not possible, from inside the shield.

従来、掘削した土砂を泥水と混ぜて系外に搬出する泥水
シールド工法においてはシールド内部から杭等の障害物
を除去するために、第4図に示すごとき構成が採用され
ていた。
Conventionally, in the muddy water shield construction method in which excavated earth and sand are mixed with muddy water and transported out of the system, a configuration as shown in Figure 4 has been adopted in order to remove obstacles such as piles from inside the shield.

図示するように、シールド促進穀aが切羽すに臨んで設
けられ、このシールド2進fiaはその前部に切羽すを
掘削するカッタ面板Cを有している。
As shown in the figure, a shield promoting grain a is provided facing the face, and this shield binary fia has a cutter face plate C for excavating the face at its front part.

このカッタ面板Cの背面部には泥水を導入し、掘削土砂
と温合して排出するためのノJツタチャンバdがバルク
ヘッドeに仕切られて形成されている。 このような掘
進機aにおいて、掘進方向前方に抗f等の障害物が出現
した場合、その杭[の位置を検知し、その杭fの手前で
カッタ面板Cを停止ざ吐る。この後、切羽すおよびカッ
クチ1!ンバdに切羽水圧に抗する圧気を導入し、バル
クヘッドeに形成されたマンロックgからカンタチャン
バd内に立入って掘進方向前方の抗「が除去されていた
On the back side of the cutter face plate C, there is formed a chamber d partitioned by a bulkhead e into which muddy water is introduced, warmed with excavated earth and sand, and then discharged. In such an excavator a, when an obstacle such as a resistor f appears in front of the excavator in the excavation direction, the position of the pile is detected and the cutter face plate C is stopped in front of the pile f. After this, Kiribasu and Kakchi 1! Pressurized air that resists the water pressure of the face was introduced into the chamber d, and the canter chamber d was entered from the manlock g formed in the bulkhead e to remove the anti-tank in the forward direction of excavation.

[発明が解決しようとする問題点] ところで、このようにシールドの内部から障害物を除去
寸べく部分圧気を採用する従来の工法においては地山か
らの圧気の漏気を防ぎ、切羽すを安定させるために地山
に十分な薬液注入を行なうことが必要となり、このため
にコストアップを余義なくされると共にシールド作業が
遅延化する問題があった。
[Problems to be solved by the invention] By the way, in the conventional construction method that employs partial pressure air to remove obstacles from inside the shield, it is difficult to prevent pressure air from leaking from the ground and stabilize the face. In order to do this, it is necessary to inject a sufficient amount of chemical liquid into the ground, which inevitably increases costs and delays shielding work.

そこで、本発明はこれらの問題を有効に解決すべく創案
されたものであり、掘進方向前方の杭等の障害物を容易
に除去し、シールド作業時間及びコストを節減できる泥
水シールド工法を提供することを目的とする。
Therefore, the present invention was devised to effectively solve these problems, and provides a muddy water shield construction method that can easily remove obstacles such as piles in front of the excavation direction and save shield work time and cost. The purpose is to

[問題点を解決するための手段] 本発明は掘進方向に臨んで地山を掘削するカッタ面板の
背面部に、泥水を導入して切羽水圧に対抗すると共に掘
削土砂を泥水により系外に移送するためのカッタチャン
バを有する泥水シールド工法において、上記カッタ面板
の掘進方向前方の地山に杭等の障害物が現われたことを
検出した後、カッタ面板の地山に臨んで開口されたカッ
タスリットを閉じると共に上記カッタチャンバ内を泥水
から切羽水圧に抗する清水に置換させた後、カッタチャ
ンバ内に立入ってカッタスリットを開放させて上記障害
物を除去するものである。
[Means for Solving the Problems] The present invention introduces muddy water into the back side of the face plate of a cutter that faces the excavation direction and excavates the ground to counter the face water pressure, and also transports the excavated soil out of the system by the muddy water. In the muddy water shield construction method, which has a cutter chamber for cutting, after detecting that an obstacle such as a pile has appeared in the ground in front of the cutter face plate in the excavation direction, the cutter slit is opened facing the ground on the cutter face plate. After closing the cutter chamber and replacing the muddy water in the cutter chamber with fresh water that resists the face water pressure, the operator enters the cutter chamber and opens the cutter slit to remove the obstruction.

[作 用] まず、杭等の障害物の位置が予測され、カッタスリット
を開成しカッタ面板の前面が全閉される。
[Operation] First, the position of an obstacle such as a pile is predicted, the cutter slit is opened, and the front face of the cutter face plate is completely closed.

カッタ面板が全開された後、カッタチャンバ内の泥水が
清水と置換され、この清水内で掘進方向前方の障害物を
除去する。
After the cutter face plate is fully opened, the muddy water in the cutter chamber is replaced with fresh water, and obstacles ahead in the excavation direction are removed within this fresh water.

[実施例] 以下本発明の一実施例を添付図面に従って詳述する。[Example] An embodiment of the present invention will be described in detail below with reference to the accompanying drawings.

第1図に示すように、掘進方向に臨/vで地山Aを掘削
するカッタ面板1が設けられる。
As shown in FIG. 1, a cutter face plate 1 is provided for excavating the ground A at a direction of /v in the excavation direction.

このカッタ面板゛1の背面部にはバルクヘッド2により
仕切られたカッタチャンバ3が形成されている。このカ
ッタチャンバ3には送泥管4および排泥管5が接続され
、カッタチャンバ3内に導入される泥水はその水圧によ
りカッタ面板1に作用する切羽水圧に対抗すると共に痴
削した土砂と混合されて排泥管5より糸外に移送される
ようになっている。また、カッタチャンバ3を仕切るバ
ルクヘッド2にはカッタチャンバ3内に出入りするだめ
の潜水用ロック6が設けられる。
A cutter chamber 3 partitioned off by a bulkhead 2 is formed on the back side of the cutter face plate 1. A mud feed pipe 4 and a mud drainage pipe 5 are connected to the cutter chamber 3, and the mud water introduced into the cutter chamber 3 counteracts the water pressure acting on the cutter face plate 1 by its water pressure and mixes with the milled earth and sand. The sludge is then transferred to the outside of the thread through the sludge draining pipe 5. Further, the bulkhead 2 that partitions the cutter chamber 3 is provided with a submersible lock 6 for entering and exiting the cutter chamber 3.

また、カッタ面板1には複数のカッタスリット7が形成
されている。
Further, a plurality of cutter slits 7 are formed in the cutter face plate 1.

これらカッタスリット7は第2図に示寸ように、掘削土
砂をカッタチャンバ3内に導入すべくカッタ面板1の前
面に地山Aに臨んで開口され、シリンダ等のスリットr
i8閑装置8により開閉されるように構成されている。
These cutter slits 7 are opened in front of the cutter face plate 1 facing the ground A in order to introduce the excavated earth and sand into the cutter chamber 3, as shown in FIG.
It is configured to be opened and closed by an i8 opening device 8.

また充填材を注入するための注入弁9が、カッタ面板1
に設けられる。
In addition, an injection valve 9 for injecting the filler is connected to the cutter face plate 1.
established in

この注入弁9は第3図に示すように、油圧力により弁箱
9a内のスプール9bを11復動させて充填材をカッタ
面板1に供給するようになっている。
As shown in FIG. 3, this injection valve 9 is configured to supply filler material to the cutter face plate 1 by reciprocating the spool 9b inside the valve box 9a by hydraulic pressure.

たとえば、塑性流動性のある水ガラス、ウレタン等の高
分子注入材、繊維を混ぜたパテ、貧配合モルタル等が充
填材として採用される。
For example, water glass with plastic fluidity, polymer injection materials such as urethane, putty mixed with fibers, poorly mixed mortar, etc. are used as fillers.

なお、10は切羽およびシールド周辺の地山の状態を検
知する地山探査注入装置である。
Note that 10 is a ground exploration and injection device that detects the condition of the ground around the face and the shield.

このような構成において、掘進方向前方の他山△に杭B
等の障害物がある場合にはこれを除去するために、まず
抗Bが出現したことを地山探査注入装置10等により検
出し、抗日の手前でカッタ面板1を停止する。
In such a configuration, pile B is placed on the other mountain △ in front of the excavation direction.
If there is an obstacle such as the above, in order to remove it, first, the appearance of the resistance B is detected by the rock exploration injection device 10 or the like, and the cutter face plate 1 is stopped in front of the resistance.

この後、これまでII!准土砂を導入すべく開口された
カッタスリット7をスリット開閉装置8で開成し、カッ
タ面板1全域に亘って閉塞する。したかって、カッタ面
板の背面部には密1ff+されたカッタチャンバ3が形
成されることになる。
After this, until now II! The cutter slit 7 opened to introduce the soil and sand is opened by a slit opening/closing device 8, and the entire area of the cutter face plate 1 is closed. Therefore, the cutter chamber 3 with a density of 1ff+ is formed on the back side of the cutter face plate.

次いで、注入弁9よりカッタ面板3に充填材を注入し、
カッタ面板1の前面に充填壁Cを形成する。すなわち、
カッタ面板1の前面と切羽との間に充填された充填壁C
により切羽を安定させることになる。
Next, filler is injected into the cutter face plate 3 through the injection valve 9,
A filling wall C is formed on the front surface of the cutter face plate 1. That is,
A filling wall C filled between the front surface of the cutter face plate 1 and the face
This will stabilize the face.

このようにカッタ面板1に充填材が注入され、充填壁C
が形成された後、密閉されたカッタチャンバ3内の泥水
を送泥管4を介して送水系から供給される清水に置換す
る。この際、切羽水圧に対抗するように清水の圧力が設
定される。すなわち後述するようにカッタチャンバ3内
に立入って杭Bを除去するために視界を確保すべくカッ
タチャンバ3内を清水に置換する。
In this way, the filler is injected into the cutter face plate 1, and the filler wall C
After this is formed, the muddy water in the sealed cutter chamber 3 is replaced with fresh water supplied from the water supply system via the mud supply pipe 4. At this time, the fresh water pressure is set so as to oppose the face water pressure. That is, as will be described later, the inside of the cutter chamber 3 is replaced with fresh water in order to secure visibility in order to enter the cutter chamber 3 and remove the pile B.

カッタチャンバ3内が清水に置換された後はバルクヘッ
ド2に設けられた潜水ロック6を開放し、これよりカッ
タチャンバ3内に立入ってB進方向前方に位置する杭B
に対して最も近いカッタスリット7を開放する。このカ
ッタスリット7が開放されることにより、障害物たる抗
Bは水中で溶断されて除去される。
After the inside of the cutter chamber 3 has been replaced with fresh water, open the submersible lock 6 provided on the bulkhead 2, enter the cutter chamber 3 from this, and enter the pile B located forward in the direction of B.
The cutter slit 7 closest to the cutter slit 7 is opened. By opening this cutter slit 7, the resistor B, which is an obstacle, is melted and removed in water.

口のようにして障害物を除去し、カッタチャンバ3から
退去した後はカッタ面板1を、掘進させて掘削土砂をカ
ッタチャンバ3に導入すべくすべてのカッタスリット7
を開口させることになる。
After removing obstacles like a mouth and leaving the cutter chamber 3, the cutter face plate 1 is moved through all the cutter slits 7 in order to dig and introduce the excavated earth and sand into the cutter chamber 3.
will be opened.

このように本発明はカッタチャンバ3内の泥水を切羽水
圧に対抗する清水に置換し、清水内で障害物を除去する
ことにより従来のような部分圧気等の工法より安定で、
かつ、シールド作業時間の短縮化およびコストダウンを
達成できる。
In this way, the present invention replaces the muddy water in the cutter chamber 3 with fresh water that counteracts the face water pressure, and removes obstacles in the fresh water, making it more stable than conventional construction methods such as partial pressure air.
In addition, it is possible to shorten shielding work time and reduce costs.

また、予測困難な不意の障害物に遭遇した場合でも地上
環境に影響されることなく障害物に対応でき、信頼性が
高い。
Furthermore, even if it encounters an unexpected obstacle that is difficult to predict, it can respond to the obstacle without being affected by the ground environment, making it highly reliable.

[発明の効果] 以上型するに本発明によれば次のごとき優れた効果を発
揮する。
[Effects of the Invention] In summary, the present invention exhibits the following excellent effects.

(1)  カッタチャンバ内の泥水を清水に置換し、清
水内で障害物を除去するので、薬液注入は少なく、部分
圧気による補助工法が不要になり、シールド作業時間の
短縮化およびコストダウンを達成できる。
(1) Mud water in the cutter chamber is replaced with clean water and obstacles are removed in the clean water, so there is less chemical injection and auxiliary construction methods using partially pressurized air are no longer required, shortening shield work time and reducing costs. can.

(2)  予測困難な不意の障害物に遭遇しても地上環
境に影響されることな(障害物に対処でき、信頼性が高
い。
(2) It is not affected by the ground environment even if it encounters unexpected obstacles that are difficult to predict (it can deal with obstacles and is highly reliable).

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は本発明の一実施例を示す概略断面図、第2図は
第1図のIf−II線矢視図、第3図は注入弁を示す断
面図、第4図は従来のシールドを示す概略図である。 図中、1はカッタ面板、3はカッタチャンバ、7はカッ
タスリット、Aは地山、Bは杭である。 特許出願人  石川島播磨重工業株式会社代理人弁理士
  絹  谷  信  雄第1図 ソ 第2図 第3図 第4図
Fig. 1 is a schematic sectional view showing an embodiment of the present invention, Fig. 2 is a view taken along the line If-II in Fig. 1, Fig. 3 is a sectional view showing an injection valve, and Fig. 4 is a conventional shield. FIG. In the figure, 1 is a cutter face plate, 3 is a cutter chamber, 7 is a cutter slit, A is a ground, and B is a stake. Patent Applicant: Ishikawajima-Harima Heavy Industries Co., Ltd. Representative Patent Attorney: Nobuo Kinuya Figure 1 Figure 2 Figure 3 Figure 4

Claims (1)

【特許請求の範囲】[Claims] 掘進方向前方に臨んで地山を掘削するカッタ面板の背面
部に、泥水を導入して切羽水圧に対抗すると共に掘削土
砂を泥水により系外へ移送するためのカッタチャンバを
有する泥水シールド工法において、上記カッタ面板の掘
進方向前方の地山に杭等の障害物が現われたことを検出
した後、カッタ面板の地山に臨んで開口されたカッタス
リットを閉じると共に上記カッタチャンバ内を泥水から
切羽水圧に抗する清水に置換させた後、カッタチャンバ
内に立入って上記カッタスリットを開放させて上記障害
物を除去するようにしたことを特徴とする泥水シールド
工法。
In the muddy water shield construction method, a cutter chamber is provided on the back side of the cutter face plate facing forward in the excavation direction to excavate the ground, for introducing muddy water to counter the face water pressure and for transporting the excavated earth and sand to the outside of the system using the muddy water. After detecting that an obstacle such as a pile has appeared in the ground in front of the cutter face plate in the excavation direction, the cutter slit opened facing the ground in the cutter face plate is closed, and the inside of the cutter chamber is changed from muddy water to face water pressure. A muddy water shield construction method characterized in that after the water is replaced with clean water that resists the water, the obstacle is removed by entering the cutter chamber and opening the cutter slit.
JP19280186A 1986-08-20 1986-08-20 Muddy water shield method Expired - Fee Related JPH0663425B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP19280186A JPH0663425B2 (en) 1986-08-20 1986-08-20 Muddy water shield method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP19280186A JPH0663425B2 (en) 1986-08-20 1986-08-20 Muddy water shield method

Publications (2)

Publication Number Publication Date
JPS6351596A true JPS6351596A (en) 1988-03-04
JPH0663425B2 JPH0663425B2 (en) 1994-08-22

Family

ID=16297215

Family Applications (1)

Application Number Title Priority Date Filing Date
JP19280186A Expired - Fee Related JPH0663425B2 (en) 1986-08-20 1986-08-20 Muddy water shield method

Country Status (1)

Country Link
JP (1) JPH0663425B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015140623A (en) * 2014-01-30 2015-08-03 株式会社奥村組 Inspection method for cutter disc of shield machine

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015140623A (en) * 2014-01-30 2015-08-03 株式会社奥村組 Inspection method for cutter disc of shield machine

Also Published As

Publication number Publication date
JPH0663425B2 (en) 1994-08-22

Similar Documents

Publication Publication Date Title
US5199816A (en) System for isolating a dump
JPH11107686A (en) Long distance driving method in semishield method
JPS604358B2 (en) A shield excavation device for excavating a graben using an open sheet pile enclosure and laying pipe rows within the graben.
JPS6351596A (en) Method of muddy water shielding construction
JPH11152986A (en) Protection method for shielding excavation in section covered with thin soil layer
JP2842236B2 (en) Grout injection method into back of underground continuous wall and its injection device
JPH11241593A (en) Ground collapse preventing method in shield construction
JP3923973B2 (en) Open shield machine
JPH04203093A (en) Sludge pressure type shield machine
JPH09217589A (en) Tunnel excavator and its driving method
JP6884897B2 (en) Tunnel structure manufacturing method and water stoppage method
JP2017218776A (en) Shield machine having back injector, and cut-off method of tunnel
JP3131119B2 (en) How to stop water at a pipe propulsion wellhead
JP2001011849A (en) Liquefaction prevention structure of ground, its construction method, and ground improving method
JPH0258697A (en) Hydraulic balance type force feed earth discharging shield construction method and shield excavator
JPH08333987A (en) Open shield tunneling method and open shield machine
JP2683820B2 (en) Subsea tunnel construction method and construction equipment
JP3818763B2 (en) Obstacle removal method for muddy water shield machine
JP2609178B2 (en) Open shield machine
JP2657716B2 (en) Water stop device of open shield machine
JPS63223215A (en) In-situ concrete piling work
JP2641618B2 (en) Pilot tunnel construction method
JPS62202117A (en) Formation work of cement mortar pile in ground with wooden pile
JP4015658B2 (en) How to demolish existing waterways
JPH085134Y2 (en) Sediment carry-out device

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees