JPS6348622B2 - - Google Patents

Info

Publication number
JPS6348622B2
JPS6348622B2 JP19963382A JP19963382A JPS6348622B2 JP S6348622 B2 JPS6348622 B2 JP S6348622B2 JP 19963382 A JP19963382 A JP 19963382A JP 19963382 A JP19963382 A JP 19963382A JP S6348622 B2 JPS6348622 B2 JP S6348622B2
Authority
JP
Japan
Prior art keywords
mold
line
frame
making line
mold making
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP19963382A
Other languages
Japanese (ja)
Other versions
JPS5987969A (en
Inventor
Kunyasu Mori
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHINTO IND
Original Assignee
SHINTO IND
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHINTO IND filed Critical SHINTO IND
Priority to JP19963382A priority Critical patent/JPS5987969A/en
Publication of JPS5987969A publication Critical patent/JPS5987969A/en
Publication of JPS6348622B2 publication Critical patent/JPS6348622B2/ja
Granted legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D47/00Casting plants

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Casting Devices For Molds (AREA)

Description

【発明の詳細な説明】 本発明は2次冷却プールライン付循環鋳型造型
ラインに関する。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a circulating mold making line with a secondary cooling pool line.

一般に、注湯後、鋳型内での鋳造品の冷却時間
を長くとり、鋳造品の材質安定化をはかるように
している。しかし、冷却プール時間が長いため
に、多数の上・下枠が必要となる問題があつた。
一方製品によつては、注湯後、早い時期に型バラ
シしても材質の安定化には影響ないものもあり、
そのような製品は砂の老化、砂温度の上昇を防止
する観点から、早くばらす必要がある。
Generally, after pouring, the casting is allowed to cool down in the mold for a long time in order to stabilize the material quality of the casting. However, there was a problem in that a large number of upper and lower frames were required due to the long cooling pool time.
On the other hand, depending on the product, even if the mold is broken early after pouring, it will not affect the stability of the material.
Such products need to be released quickly to prevent aging of the sand and increase in sand temperature.

本発明はこれらの問題点を解決するためになさ
れたものであつて、1次冷却後、冷却時間がさら
に必要なものは、上枠を分離し下枠のみを2次冷
却プールラインに送つて所要時間冷却し、また、
1次冷却のみで良い場合には、そのまま2次冷却
プールラインに送り込まないようにして、上枠数
が少なくて済むようにした2次冷却プールライン
付循環鋳型造型ラインを提供することを目的とす
るものである。
The present invention has been made to solve these problems, and in cases where additional cooling time is required after primary cooling, the upper frame is separated and only the lower frame is sent to the secondary cooling pool line. Cool for the required time, and
The purpose of the present invention is to provide a circulating mold making line with a secondary cooling pool line, which does not feed the mold directly into the secondary cooling pool line when only primary cooling is required, and which requires fewer upper frames. It is something to do.

以下に、本発明の構成を実施例に基づき説明す
る。1は循環鋳型造型ラインで、この循環鋳型造
型ライン1上面には、端部を互いにピンで連鎖状
に連結した多数の図示されない鋳型台車が移動自
在に載置されている。2と3は、循環鋳型造型ラ
イン1における対向した直線状の長手ライン間に
所定間隔をおいて並行して架設された上型造型ラ
インと下型造型ラインで、上型造型ライン2の中
間位置には、上型造型機4が設置してあると共
に、上型造型ライン2終端と循環鋳型造型ライン
1の交差位置には、枠合せ装置5が、また上型造
型ライン2始端と循環鋳型造型ライン1の交差位
置には、上枠分離装置6がそれぞれ配置してあ
る。さらに、上型造型機4と上枠分離装置6の間
には、空の上枠内面を清掃するための上枠清掃装
置7が設けてある。また、下型造型ライン3の中
間位置には、下型造型機8が設置してあると共
に、下型造型機8の枠進行方向前方位置には、下
型反転装置9が配置してあり、下型造型ライン3
終端と循環鋳型造型ライン1の交差位置には、下
型乗せ替え装置10が設置してある。また、下型
造型ライン3始端と循環鋳型造型ライン1の交差
位置には、下枠送り装置11が、さらにこの下枠
送り装置11と下型造型機8の間には、枠清掃装
置付下型バラシ装置12がそれぞれ設置してあ
る。13は2次冷却プールラインで、この2次冷
却プールライン13上には、第2図に示す如く、
台車14が車輪15を介して移動自在に載置して
あつて、台車14は多数個端部をピンで連鎖状に
連結してある。該台車14上面には、上枠を取外
したあとの鋳型16を保持した下枠17が載置し
てあつて、鋳型16内には、鋳造品18が内蔵し
てある。19と20は、下枠送り装置11手前位
置の循環鋳型造型ライン1と2次冷却プールライ
ン13との間に、並行に架設された鋳型移し替え
装置で、上型造型ライン2側の鋳型移し替え装置
19は、1次冷却後、さらに冷却するために上枠
を分離したあと、下枠17に保持された鋳型16
を2次冷却プールライン13に送り込むために設
けられており、また、下型造型ライン3側の鋳型
移し替え装置20は、下枠17に保持されて2次
冷却された鋳型16を循環鋳型造型ライン1に戻
すように設けられている。
The configuration of the present invention will be explained below based on examples. Reference numeral 1 denotes a circulating mold making line, and on the upper surface of the circulating mold making line 1, a number of mold carts (not shown) whose ends are connected to each other in a chain with pins are movably mounted. 2 and 3 are an upper mold making line and a lower mold making line constructed in parallel with each other at a predetermined interval between opposing linear longitudinal lines in the circulation mold making line 1, and are located at an intermediate position of the upper mold making line 2. An upper mold making machine 4 is installed in the , and a frame aligning device 5 is installed at the intersection of the end of the upper mold making line 2 and the circulation mold making line 1, and a frame matching device 5 is installed at the intersection of the end of the upper mold making line 2 and the circulation mold making line 1. Upper frame separating devices 6 are arranged at the intersections of the lines 1, respectively. Further, an upper frame cleaning device 7 for cleaning the inner surface of the empty upper frame is provided between the upper molding machine 4 and the upper frame separation device 6. Further, a lower mold making machine 8 is installed at an intermediate position of the lower mold molding line 3, and a lower mold reversing device 9 is installed at a position forward of the lower mold molding machine 8 in the frame advancing direction. Lower molding line 3
A lower mold changing device 10 is installed at the intersection of the terminal end and the circulating mold making line 1. In addition, at the intersection of the starting end of the lower mold making line 3 and the circulation mold making line 1, a lower frame feeding device 11 is provided, and between this lower frame feeding device 11 and the lower mold making machine 8, a lower frame cleaning device is attached. A mold breaking device 12 is installed respectively. 13 is a secondary cooling pool line, and on this secondary cooling pool line 13, as shown in FIG.
A cart 14 is mounted so as to be movable via wheels 15, and a plurality of ends of the cart 14 are connected in a chain with pins. A lower frame 17 holding a mold 16 after the upper frame has been removed is placed on the upper surface of the truck 14, and a cast product 18 is housed inside the mold 16. 19 and 20 are mold transfer devices installed in parallel between the circulating mold making line 1 and the secondary cooling pool line 13 in front of the lower mold feeding device 11, and are used to transfer molds on the upper mold making line 2 side. The changing device 19 removes the mold 16 held in the lower frame 17 after the primary cooling and after separating the upper frame for further cooling.
The mold transfer device 20 on the lower mold making line 3 side circulates the secondary cooled mold 16 held in the lower frame 17 to form the secondary cooling pool line 13. It is provided to return to line 1.

尚、鋳造品が薄肉で、早く型ばらしをする必要
があつて、型ばらしをパンチアウト方式にする
と、鋳造品に傷がついたり、曲つたりする場合に
は、循環鋳型造型ライン1と2次冷却プールライ
ン13間の空間に、製品搬送コンベヤ21を設
け、この製品搬送コンベヤ21始端と上枠分離装
置6通過直後の循環鋳型造型ライン1との間に、
製品吊り出し装置22を設けるようにしてもよ
い。23は鋳造品18と鋳造品18に付着した砂
を分離、搬送するための振動コンベヤで、該振動
コンベヤ23は砂と分離された鋳造品18を搬送
するための搬送コンベヤ24に接続されている。
In addition, if the cast product is thin and needs to be demolded quickly, and if the punch-out method is used for demolding, the cast product will be damaged or bent. A product conveyor 21 is provided in the space between the next cooling pool lines 13, and between the starting end of this product conveyor 21 and the circulation mold making line 1 immediately after passing through the upper frame separation device 6,
A product lifting device 22 may also be provided. 23 is a vibrating conveyor for separating and transporting the cast product 18 and the sand attached to the cast product 18, and the vibrating conveyor 23 is connected to a conveyor 24 for transporting the cast product 18 separated from the sand. .

次に、このように構成されたものの作動につい
て説明する。
Next, the operation of the device configured as described above will be explained.

下型造型機8で造型された下型を保持した下枠
17は、下型造型ライン3上を下型反転装置9に
送られ、下型反転装置9で反転されたあとと、下
型乗せ替え装置10により、循環鋳型造型ライン
1上の鋳型台車(図示せず)上面に乗せ替えら
れ、循環鋳型造型ライン1上を枠合せ装置5に送
られる。一方、上型造型機4で造型された上型を
保持した上枠(図示せず)は上型造型ライン2上
を枠合せ装置5に送られ前記下枠17と枠合せさ
れる。枠合せ後、上・下1対の鋳型16を保持し
た上・下枠17(上枠は図示せず)は、鋳型台車
(図示せず)上面に載置されて循環鋳型造型ライ
ン1上を注湯位置(図示せず)に送られる。注湯
後、注湯済鋳型16は該鋳型台車上に載置されて
循環鋳型造型ライン1上を、さらに前進移動され
ると、上・下枠17内に保持された鋳型16内の
鋳造品18は1次冷却されながら上枠分離装置6
に送られて上枠が取外される。取外された該上枠
は上型造型ライン2上を上空枠清掃装置7に送ら
れると共に、上枠内周面が清掃されて上型造型機
4に搬入され、再び上型の造型操作が行なわれ
る。一方、上枠と分離されて鋳造品18を内蔵し
た鋳造16を保持した下枠17は、鋳造台車(図
示せず)上面に載置されて循環鋳型造型ライン1
上を前進移動され製品吊り出し装置22の下方を
通つて鋳型移し替え装置19位置まで送られてく
る。ここで、厚肉の鋳造品18で、さらに冷却時
間が必要な場合には、鋳型移し替え装置19によ
り、鋳型16を保持した下枠17は前記鋳型台車
上面から2次冷却プールライン13上の台車14
上面に、第2図に示す如く、移し替えられる。下
枠17が台車14上面に移し替えられると、下枠
17を上面に載置した台車14は、図示されない
駆動装置により、2次冷却プールライン13上
を、1ピツチ(隣接した下型台車14の中心間距
離)前進移動されると共に、続いて循環鋳型造型
ライン1上を送られてきた下枠を載置した台車に
よつて、2次冷却プールライン13上を、さらに
1ピツチ前進移動される。このようにして、下枠
17を載置した台車14が2次冷却プールライン
13上を1ピツチずつ前進移動され鋳型移し替え
装置20まで送られてくると、鋳型移し替え装置
20により、台車14上面の下枠17は循環鋳型
造型ライン1上の鋳造台車上面に移し替えられ
る。鋳型16を保持した下枠17が、該鋳型台車
上面に移し替えられ循環鋳型造型ライン1上を下
枠送り装置11まで送られてくると、この下枠送
り装置11により、下枠17は鋳型16を保持し
たまま該鋳型台車上面から下型造型ライン3上に
移送されると共に、枠清掃装置付下型バラシ装置
12により、型ばらしと枠清掃が行なわれる。型
ばらしされた鋳造品18は砂型と一緒に下方の振
動コンベヤ23上に落下し、付着砂と分離されな
がら前進移動し搬送コンベヤ24を介して取出さ
れる。一方空の上枠は清掃後、下型造型機8に送
られ、再び造型操作が行なわれ、以後、前記操作
が繰返される。また、2次冷却が不必要な鋳造品
の場合には、上枠分離装置6で上枠が分離された
あと、鋳型を保持した下枠は循環鋳型造型ライン
1上を鋳型台車に載置されて鋳型移し替え装置1
9,20を素通りして下枠送り装置11に送られ
ると共に下枠送り装置11により、下枠は鋳型を
保持したまま該鋳型台車上面から下型造型ライン
3に移送され、途中、前記同様に枠清掃装置付下
型バラシ装置12で型ばらしされると共に枠清掃
され、清掃後、空の下枠は再び下型造型機8に送
られ造型操作が行なわれる。
The lower frame 17 holding the lower mold molded by the lower mold molding machine 8 is sent to the lower mold reversing device 9 on the lower mold molding line 3, and after being reversed by the lower mold reversing device 9, the lower mold is placed on the lower mold. The changing device 10 transfers the mold onto the upper surface of a mold truck (not shown) on the circulating mold making line 1 and sends it to the frame matching device 5 on the circulating mold making line 1 . On the other hand, the upper frame (not shown) holding the upper mold molded by the upper mold molding machine 4 is sent on the upper mold molding line 2 to the frame matching device 5 and is mated with the lower frame 17. After the frames are assembled, the upper and lower frames 17 (the upper frame is not shown) holding the pair of upper and lower molds 16 are placed on the upper surface of a mold truck (not shown) and run on the circulation mold making line 1. The molten metal is sent to a pouring position (not shown). After pouring, the poured mold 16 is placed on the mold truck and moved further forward on the circulation mold making line 1, and the cast product in the mold 16 held in the upper and lower frames 17 is removed. 18 is the upper frame separation device 6 while undergoing primary cooling.
The upper frame is removed. The removed upper frame is sent to the upper frame cleaning device 7 on the upper mold molding line 2, and the inner peripheral surface of the upper frame is cleaned and carried into the upper mold molding machine 4, where the upper mold molding operation is performed again. It is done. On the other hand, the lower frame 17, which is separated from the upper frame and holds the casting 16 containing the cast product 18, is placed on the upper surface of a casting cart (not shown) and is placed on the circulation mold making line 1.
The mold transfer device 19 is moved forward through the product lifting device 22 and sent to the mold transfer device 19 position. Here, if the cast product 18 is thick and requires additional cooling time, the mold transfer device 19 moves the lower frame 17 holding the mold 16 from the upper surface of the mold truck to the secondary cooling pool line 13. Trolley 14
It is transferred onto the top surface as shown in FIG. When the lower frame 17 is transferred to the upper surface of the truck 14, the truck 14 with the lower frame 17 placed on the upper surface moves one pitch (adjacent lower truck 14) on the secondary cooling pool line 13 by a drive device (not shown). center-to-center distance), and then moved forward one pitch further on the secondary cooling pool line 13 by the cart on which the lower frame that had been sent on the circulating mold making line 1 was placed. Ru. In this way, when the trolley 14 on which the lower frame 17 is mounted is moved forward one pitch at a time on the secondary cooling pool line 13 and sent to the mold transfer device 20, the trolley 14 is moved forward by the mold transfer device 20. The lower frame 17 on the upper surface is transferred to the upper surface of the casting cart on the circulating mold making line 1. When the lower frame 17 holding the mold 16 is transferred to the upper surface of the mold truck and sent on the circulation mold making line 1 to the lower frame feeding device 11, the lower frame 17 is moved to the mold by this lower frame feeding device 11. While holding the mold 16, it is transferred from the upper surface of the mold truck onto the lower mold making line 3, and the lower mold dismantling device 12 with a frame cleaning device performs mold disassembly and frame cleaning. The demolded cast product 18 falls together with the sand mold onto the vibrating conveyor 23 below, moves forward while being separated from the adhered sand, and is taken out via the conveyor 24. On the other hand, after the empty upper frame is cleaned, it is sent to the lower molding machine 8, where the molding operation is performed again, and the above-mentioned operation is repeated thereafter. In addition, in the case of a cast product that does not require secondary cooling, after the upper frame is separated by the upper frame separation device 6, the lower frame holding the mold is placed on a mold truck on the circulation mold making line 1. Mold transfer device 1
9 and 20 and is sent to the lower frame feeder 11, and the lower frame is transferred from the upper surface of the mold truck to the lower mold making line 3 while holding the mold, and on the way, the lower frame is transferred in the same manner as described above. The lower mold disassembly device 12 with a frame cleaning device removes the mold and cleans the frame. After cleaning, the empty lower mold is sent to the lower molding machine 8 again and a molding operation is performed.

尚、薄肉の鋳造品で、型ばらしする際、パンチ
アウトすると、鋳造品に傷がついたり、曲つたり
する場合には、1次冷却後、上枠分離装置6で上
枠を分離したあと、製品吊り出し装置22によ
り、下枠から鋳造品を製品搬送コンベヤ21上に
吊り出すようにしても良い。
In addition, if a thin-walled cast product is damaged or bent when punched out when breaking the mold, after the first cooling and after separating the upper frame with the upper frame separation device 6. The cast product may be lifted onto the product conveyor 21 from the lower frame by the product lifting device 22.

また、前記実施例においては、循環鋳型造型ラ
イン1と2次冷却プールライン13との間に、2
連の鋳型移し替え装置19,20を架設するよう
にしたが、一連の鋳型移し替え装置でも良い。
In addition, in the above embodiment, there is a
Although a series of mold transfer devices 19 and 20 are installed, a series of mold transfer devices may be used.

以上の説明によつて明らかなように、本発明に
よれば、鋳造品の冷却時間が長、短両方に効率的
に使用できると共に、長い冷却時間を必要とする
場合には、1次冷却後、上枠を分離したあと、注
湯済鋳型を下枠のみに保持させて2次冷却するよ
うにしたため、上枠の数が少なくて済み、設備費
が経済的であるなどの効果を有し、この種の業界
に寄与する効果は著大である。
As is clear from the above description, according to the present invention, it is possible to efficiently use both long and short cooling times for cast products, and when a long cooling time is required, after the primary cooling, After separating the upper frame, the poured mold is held only in the lower frame for secondary cooling, which has the effect of reducing the number of upper frames and reducing equipment costs. , the effect of contributing to this type of industry is significant.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は本発明の実施例を示す全体平面図、第
2図は第1図におけるA―A矢視断面図である。 1…循環鋳型造型ライン、2…上型造型ライ
ン、3…下型造型ライン、6…上枠分離装置、1
3…2次冷却プールライン、19,20…鋳型移
し替え装置。
FIG. 1 is an overall plan view showing an embodiment of the present invention, and FIG. 2 is a sectional view taken along the line AA in FIG. 1... Circulating mold making line, 2... Upper mold making line, 3... Lower mold making line, 6... Upper frame separation device, 1
3... Secondary cooling pool line, 19, 20... Mold transfer device.

Claims (1)

【特許請求の範囲】[Claims] 1 循環鋳型造型ラインの隣りに、2次冷却プー
ルラインを設けると共に該循環鋳型造型ラインに
おける2次冷却プールラインと対向するライン
と、これに対向するライン間に、所定間隔をおい
て上型造型ラインと下型造型ラインを架設し、該
上型、下型造型ライン間における前記循環鋳型造
型ラインと前記2次冷却プールラインの間に、鋳
型移し替え装置を架設し、また前記上型造型ライ
ン始端と循環鋳型造型ラインの交差位置には、上
枠分離装置を設けたことを特徴とする2次冷却プ
ールライン付循環鋳型造型ライン。
1. A secondary cooling pool line is provided next to the circulating mold making line, and an upper mold making line is provided at a predetermined interval between the line facing the secondary cooling pool line in the circulating mold making line and the line facing this. A mold transfer device is installed between the circulation mold molding line and the secondary cooling pool line between the upper mold and lower mold molding lines, and a mold transfer device is installed between the upper mold molding line and the lower mold molding line. A circulating mold making line with a secondary cooling pool line, characterized in that an upper frame separation device is provided at the intersection of the starting end and the circulating mold making line.
JP19963382A 1982-11-12 1982-11-12 Circulative mold forming line with secondary cooling pool line Granted JPS5987969A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP19963382A JPS5987969A (en) 1982-11-12 1982-11-12 Circulative mold forming line with secondary cooling pool line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP19963382A JPS5987969A (en) 1982-11-12 1982-11-12 Circulative mold forming line with secondary cooling pool line

Publications (2)

Publication Number Publication Date
JPS5987969A JPS5987969A (en) 1984-05-21
JPS6348622B2 true JPS6348622B2 (en) 1988-09-29

Family

ID=16411090

Family Applications (1)

Application Number Title Priority Date Filing Date
JP19963382A Granted JPS5987969A (en) 1982-11-12 1982-11-12 Circulative mold forming line with secondary cooling pool line

Country Status (1)

Country Link
JP (1) JPS5987969A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102343435A (en) * 2010-08-03 2012-02-08 新东工业株式会社 Decompression die-casting production line

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102343435A (en) * 2010-08-03 2012-02-08 新东工业株式会社 Decompression die-casting production line
CN102343435B (en) * 2010-08-03 2015-06-24 新东工业株式会社 Decompression die-casting production line

Also Published As

Publication number Publication date
JPS5987969A (en) 1984-05-21

Similar Documents

Publication Publication Date Title
EP1844882B1 (en) Mold disassembly method and installation therefor
KR920008673B1 (en) Molding process and apparatus
JPS6348623B2 (en)
JPS6348622B2 (en)
SU1007552A3 (en) Device for removal of casting from boxless moulds
JPH0130590B2 (en)
JP4370549B2 (en) Molding line and casting line
JPS591062A (en) Knock-out line for casting mold
JP4097220B2 (en) Casting method and casting apparatus
US3840316A (en) Two belt mold for shaping plural articles
JPS6342545B2 (en)
GB2047140A (en) Conveying system in die-casting plant
US671137A (en) Molding plant.
JPH0131985B2 (en)
JPH0242574B2 (en)
JPH10244360A (en) Shakeout machine
JPS6252661B2 (en)
SU1391803A1 (en) Arrangement for separating and shaking-out stack moulds
US1929538A (en) Foundry equipment
JPH0141430B2 (en)
SU822986A1 (en) Conveyer-type chill mould machine
JPS58128266A (en) Knocking out device of casting mold
JPS6317025B2 (en)
JPS5935338Y2 (en) automatic casting line
SU1447566A1 (en) Automatic moulding line