JPS6341323A - Unloading method and unloading device - Google Patents

Unloading method and unloading device

Info

Publication number
JPS6341323A
JPS6341323A JP18653886A JP18653886A JPS6341323A JP S6341323 A JPS6341323 A JP S6341323A JP 18653886 A JP18653886 A JP 18653886A JP 18653886 A JP18653886 A JP 18653886A JP S6341323 A JPS6341323 A JP S6341323A
Authority
JP
Japan
Prior art keywords
cargo
hopper
unloader
quay
belt conveyor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP18653886A
Other languages
Japanese (ja)
Other versions
JPH0818708B2 (en
Inventor
Akira Kawase
晃 川瀬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
IHI Corp
Original Assignee
IHI Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by IHI Corp filed Critical IHI Corp
Priority to JP61186538A priority Critical patent/JPH0818708B2/en
Publication of JPS6341323A publication Critical patent/JPS6341323A/en
Publication of JPH0818708B2 publication Critical patent/JPH0818708B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Ship Loading And Unloading (AREA)

Abstract

PURPOSE:To highly efficiently unload cargoes, by a method wherein a bulky cargo is unloaded from a ship bottom by means of an unloader on the quay side and is charged in a hopper installed on the deck of a bulky cargo ship, and the hopper is connected to the quay side through a belt conveyor. CONSTITUTION:A trolley 12 is moved over a boom 11 of an unloader 2, erected to a quay 1, to a position right above the hatch of a cargo ship 4. A grab bucket 3 is lowered from the trolley 12 to scrape up a bulky cargo 6 in a hatch, and the cargo is charged down in a hopper 18 of an unloading device 16. A belt conveyor 19 is installed between the unloading device 16 and a belt conveyor 13 on the quay 1 for unloading. This constitution efficiently and rapidly unloads cargo, and prevents a bulky cargo from being dropped between the quay and the cargo ship.

Description

【発明の詳細な説明】 「m楽土のfl用分野」 本発明は、貨物船に積載されているバラ物を揚貨するた
めに新規に開発された揚貨方法と、この方法を実施する
ための装置に関するものである。
[Detailed Description of the Invention] "Field for FL use in m-rakudo" The present invention relates to a newly developed cargo unloading method for unloading bulk materials loaded on a cargo ship, and a method for carrying out this method. The invention relates to a device.

「従来の技術」 これまで、貨物船に積載されているバラ物の揚貨方法と
して、第2図に示すらのが知られている。
``Prior Art'' Until now, the method shown in FIG. 2 has been known as a method for unloading bulk materials loaded on a cargo ship.

これは、岸壁1側に設立されたアンローダ2のグラフバ
ケット3を利用するようにしたしので、図中符号4はバ
ラ物用の貨物船、5は貨物船4の船倉で、6は鉱石ある
いは粉体等のバラ物である。
This uses the graph bucket 3 of the unloader 2 installed on the quay 1 side, so the reference numeral 4 in the figure is a cargo ship for bulk materials, 5 is the hold of the cargo ship 4, and 6 is a hold for ore or other cargo. It is loose material such as powder.

前記アンローダ2は、岸壁1上に布設されたレール7上
を走行可能な本体枠8と、この本体枠8の中間高さに取
り付けられたホッパー9と、本体枠8から海10側に張
り出すブーム11と、このブーム11上を走行するトロ
リー12と、このトロリー12に昇降可能に保持された
前記グラフバケット3とを装備したもので、まずグラフ
バケット3を貨物船4に積、滅されrこバラ物6の上に
移動させてバラ物6を掴ませ、次いでこのグラフバケッ
ト3を前記ホッパー9上に移動させて、ホッパー9内に
バラ物6を投下する。
The unloader 2 has a main body frame 8 that can run on rails 7 laid on the quay 1, a hopper 9 attached to the middle height of the main body frame 8, and a hopper 9 that extends from the main body frame 8 toward the sea 10. It is equipped with a boom 11, a trolley 12 that runs on the boom 11, and the graph bucket 3 held on the trolley 12 so that it can be raised and lowered. The graph bucket 3 is moved onto the loose material 6 to grab the loose material 6, and then the graph bucket 3 is moved onto the hopper 9, and the loose material 6 is dropped into the hopper 9.

前記ホッパー9の下には、倉庫等へバラ物6を搬送する
装置として、ベルトコンベヤ13が設けられており、ホ
ッパー9に投入されたバラ物6がこのベルトコンベヤ1
3によって順次倉庫等へ運ばれる。
A belt conveyor 13 is provided below the hopper 9 as a device for conveying bulk materials 6 to a warehouse or the like.
3, they are sequentially transported to a warehouse etc.

「発明が解決しようとする問題点」 ところで、前述のようにアンローダ2のグラフバケット
3を貨物船4上から地上側のホッパー9上まで走行させ
るというバラ物6の揚貨方法は、次のような問題点があ
る。
"Problems to be Solved by the Invention" By the way, as mentioned above, the method for unloading bulk goods 6 in which the graph bucket 3 of the unloader 2 is run from the top of the cargo ship 4 to the top of the hopper 9 on the ground side is as follows. There are some problems.

一つは、グラフバケット3で掴んだバラ物6の一部が、
グラフバケット3をホッパー9に向けて移動させる途中
で落下して、貨物船4の甲板や搬送経路周囲のiイ+j
や岸壁lが汚染されろということ。
One is that a part of the loose item 6 caught in the graph bucket 3 is
While the graph bucket 3 was being moved toward the hopper 9, it fell and landed on the deck of the cargo ship 4 and around the transport route.
and the quays should be contaminated.

さらに一つは、グラフバケット3による一回の荷役時間
を分析ずろと、その内の大半がグラフバケット3の往復
動に費やされており、作業時間の短縮を図るには、アン
ローダ2のトロリー12の移動速度を大幅に増太さ仕る
など、既設のアンローダ2の改造を大規模に行う必要が
あるということ。
Another problem is that most of the time for one load handling using the graph bucket 3 is spent on reciprocating the graph bucket 3, and in order to reduce the work time, it is necessary to This means that it is necessary to make extensive modifications to the existing unloader 2, such as by significantly increasing the movement speed of the unloader 12.

この発明は、前記事情に鑑みてなされたもので、岸壁側
に設置された既設のアンローダと組み合わせて使用する
ことによって、既設のアンローダの問題を解決すること
のできろ揚貨方法とこの方法の実施に使用する装置を提
供すること、すなわち、揚貨作業時に、バラ物の落下に
よって周囲が汚染されることを防止し、しから既設のア
ンローダに改造を施さなくとも、アンローダの一回の荷
役に要する往復動の時間を大幅に短縮して、荷役作業時
間を大幅に短縮させることのできる揚貨方法およびその
装置を提供することを目的とする。
This invention was made in view of the above-mentioned circumstances, and provides a cargo unloading method that can solve the problems of the existing unloader by using it in combination with the existing unloader installed on the quay side. To provide a device for carrying out unloading operations, that is, to prevent the surrounding area from being contaminated by falling bulk materials during cargo unloading operations, and to enable one-time cargo handling by unloaders without modification of existing unloaders. It is an object of the present invention to provide a cargo unloading method and its device which can significantly shorten the reciprocating time required for cargo handling operations.

「問題点を解決するための手段」 この発明に係る揚貨方法は、貨物船に積載されているバ
ラ物を、岸壁側に設立されたアンローダを活用して岸壁
側のコンベヤ等の搬送装置に揚貨する方法であって、貨
物船上に積載されているバラ物を前記アンローダのグラ
フバケットで掴んで貨物船上に設置したホッパーに投入
し、このホッパーに投入されたバラ物をベルトコンベヤ
で岸壁側の搬送装置に送る。
"Means for Solving the Problems" The unloading method according to the present invention utilizes an unloader installed on the quay side to transfer bulk goods loaded on a cargo ship to a conveyor such as a conveyor on the quay side. In this method, bulk materials loaded on a cargo ship are grabbed by the graph bucket of the unloader and thrown into a hopper installed on the cargo ship. to the transport device.

そして、この方法を実施するための装置は、貨物船上に
据え付けられる本体枠と、この本体枠に支持されて前記
アンローダのグラフバケットで掴んだバラ物を受けるホ
ッパーと、このホッパーの下に一端が位置するとともに
他端が岸壁側のベルトコンベヤ上に位置する如く配備さ
れて前記ホッパーに投入されたバラ物を岸壁側のベルト
コンベヤに送るベルトコンベヤとを具備した構成をなす
The apparatus for carrying out this method includes a main body frame installed on a cargo ship, a hopper supported by the main body frame for receiving bulk materials grabbed by the graph bucket of the unloader, and a hopper with one end located below the hopper. and a belt conveyor disposed such that the other end thereof is located above the belt conveyor on the quay side, and conveys the loose material thrown into the hopper to the belt conveyor on the quay side.

「作用」 この発明に係る揚貨方法は、貨物船上に積載されている
バラ物を岸壁側に設立したアンローダのグラフバケット
で掴んで貨物船上に設置したホッパーに投入し、このホ
ッパーに投入されたバラ物をベルトコンベヤで岸壁側の
搬送装置に送るfコめ、アンローダのグラフバケットに
よる荷役は貨物船の船倉から前記ホッパーまでの距離で
済み、アンローダだけで荷役を行っていた従来の場合と
比較すると、アンローダ上のグラフバケットの走行距離
が大幅に短縮され、これによって、既設のアンローダに
改造を施さなくとら、アンローダの一回の荷役に要する
往復動の時間が大幅に短縮されて、荷役作業時間が大幅
に短縮される。
"Operation" The cargo unloading method according to the present invention is such that bulk materials loaded on a cargo ship are grabbed by a graph bucket of an unloader installed on the quay side and thrown into a hopper installed on the cargo ship. Bulk materials are sent to the quayside transport device using a belt conveyor, and cargo handling using the unloader's graph bucket only takes the distance from the hold of the cargo ship to the hopper, compared to the conventional case where cargo handling was performed using the unloader alone. As a result, the travel distance of the graph bucket on the unloader is significantly shortened, and as a result, the time required for the reciprocating movement of the unloader for one cargo handling operation is significantly shortened, without making any modifications to the existing unloader. Time is significantly reduced.

また、この方法では、ホッパーから地上の搬送装置まで
のバラ物の輸送がベルトコンベヤで行われるため、貨物
船と岸壁との間にバラ物か落下するような不都合か極力
防止され、搬送経路途中の海や岸壁等の環境の汚染ら防
止される。
In addition, with this method, the transportation of bulk materials from the hopper to the conveyance device on the ground is carried out using a belt conveyor, which prevents as much as possible the inconvenience of loose materials falling between the cargo ship and the quay, and This will prevent pollution of the environment such as the sea and quays.

本発明に示した装置は、貨物船上に据え付けられる本体
枠と、この本体枠に支持されて首記アンローグのグラフ
バケットで掴んだバラ物を受けろホッパーと、このホッ
パーの下に一端か位置するとともに曲端が岸壁側のベル
トコンベヤ上ヒに位置ずろ如く配’Jiffされて前記
ホッパーに投入されたバラ物を岸壁側のベルトコンベヤ
に送るベルトコンベヤとを具備した構成で、岸壁側に設
゛けられているアンローダを利用して接岸された貨物船
の甲板上に設置すれば、貨物船の甲板から岸壁側の搬送
装置までの搬送路を提供することができ、上述の前記ア
ンローダとの連携により、前述の揚貨方法を良好に遂行
することができる。
The apparatus shown in the present invention includes a main body frame installed on a cargo ship, a hopper supported by the main body frame for receiving bulk materials caught by the graph bucket of the above-mentioned Anlog, and a hopper located at one end below the hopper. The belt conveyor is equipped with a belt conveyor whose curved ends are disposed on the belt conveyor on the quay side in a staggered manner and sends the loose materials thrown into the hopper to the belt conveyor on the quay side. If the unloader is installed on the deck of a berthed cargo ship, it is possible to provide a transport path from the deck of the cargo ship to the transport device on the quayside. , the above-mentioned cargo unloading method can be carried out successfully.

「実施例」 以下、この発明に係る揚貨装置およびその装置の一実施
例を図面に基づいて説明する。
"Embodiment" Hereinafter, an embodiment of a cargo lifting device and its device according to the present invention will be described based on the drawings.

第1図は、この発明に係る揚貨装置16と既設のアンロ
ーダ2とを示したものである。なお、第1図中のアンロ
ーダ2および貨物船4の構成は、第2図の従来品と同様
であり、第2図と同番号を付すことによって説明を省略
する。
FIG. 1 shows a cargo lifting device 16 and an existing unloader 2 according to the present invention. The configurations of the unloader 2 and the cargo ship 4 in FIG. 1 are the same as those of the conventional product shown in FIG. 2, and the same numbers as in FIG. 2 are used to omit the explanation.

この一実施例の揚貨装置16は、貨物船4上に据え付け
られる本体枠17と、この本体枠17に支持されて前記
アンローダ2のグラフバケット3で掴んだバラ物6を受
けるホッパー18と、このホッパー18の下に一端が位
置するとともに他端が岸壁1側のベルトコンベヤ13上
に(装置する如く配(liiiされて前記ホッパー18
に投入されたバラ物6を岸壁l側のベルトコンベヤ13
に送るベルトコンベヤ19とを具備してなる。
The cargo unloading device 16 of this embodiment includes a main body frame 17 installed on a cargo ship 4, a hopper 18 supported by the main body frame 17, and receiving bulk materials 6 grabbed by the graph bucket 3 of the unloader 2. One end is located below this hopper 18, and the other end is placed on the belt conveyor 13 on the quay wall 1 side.
The bulk goods 6 thrown into the
A belt conveyor 19 is provided.

nf工述の本体枠17は、貨物船4の甲板上あるいは船
倉5内に臨む適宜位置に固定しても良く、またレール等
を布設したり、揚貨装置16自体に走行用の車輪を設け
ておいて移動可能にしても良い。
The body frame 17 described in the nf construction may be fixed at an appropriate position facing the deck of the cargo ship 4 or inside the hold 5, or rails or the like may be laid, or wheels for running may be provided on the cargo lifting device 16 itself. It may also be made movable.

以上の如き揚貨装置16を使用しての揚貨方法を説明す
る。
A cargo lifting method using the cargo lifting device 16 as described above will be explained.

まず、岸壁1側に設けられているアンローダ2によって
接岸された貨物船4の甲板上に揚貨装置16設置する。
First, the unloading device 16 is installed on the deck of the cargo ship 4 which has been berthed by the unloader 2 provided on the quay 1 side.

そして、貨物船4上に積載されているバラ物6を岸壁1
側に設立したアンローダ2のグラフバケット3で掴んで
貨物船4上に設置したホッパー18に投入し、次いで、
グラフバケット3は次の荷役を開始し、以後、同様の動
作を繰り返す。一方、ホッパ−18に投入されたバラ物
6は、ベルトコンベヤ19で岸壁l側の搬送装置13に
送る。
Then, the bulk goods 6 loaded on the cargo ship 4 are transferred to the quay 1.
It is grabbed by the graph bucket 3 of the unloader 2 installed on the side and thrown into the hopper 18 installed on the cargo ship 4, and then
The graph bucket 3 starts the next cargo handling operation, and thereafter repeats the same operation. On the other hand, the bulk material 6 put into the hopper 18 is sent by a belt conveyor 19 to the conveying device 13 on the quay l side.

このように作業を進行させれば、アンローダ2のグラフ
バケット3による荷役は貨物船4の船倉5から前記ホッ
パー18までの距離で済み、アンローダ2だけで荷役を
行っていた従来の場合と比較すると、アンローダ2上の
グラフバケット3の走行距離が大幅に短縮され、これに
よって、既設のアンローダ2に改造を施さなくとも、ア
ンローダ2の一回の荷役に要する往復動の時間が大幅に
短縮されて、荷役作業時間が大幅に短縮される。
If the work is carried out in this way, cargo handling by the graph bucket 3 of the unloader 2 will only be carried out from the cargo hold 5 of the cargo ship 4 to the hopper 18, compared to the conventional case in which cargo handling is carried out only by the unloader 2. , the traveling distance of the graph bucket 3 on the unloader 2 is significantly shortened, and as a result, the reciprocating time required for one load handling of the unloader 2 can be significantly shortened without modifying the existing unloader 2. , cargo handling time is significantly reduced.

また、この方法では、ホッパー18から地上の搬送装置
13までのバラ物6の輸送がベルトコンベヤ19で行わ
れるため、貨物船4と岸壁lとの間にバラ物が落下する
ような不都合が極力防止され、搬送経路途中の海や岸壁
等の環境の汚染も防止される。
In addition, in this method, the transportation of bulk materials 6 from the hopper 18 to the conveyance device 13 on the ground is carried out by the belt conveyor 19, so that inconveniences such as bulk materials falling between the cargo ship 4 and the quay l are minimized. This also prevents pollution of the environment such as the sea and quays along the transport route.

「発明の効果」 以上の説明から明らかなように、本発明に係る揚貨方法
は、貨物船上に積載されているバラ物を岸壁側に設立し
たアンローダのグラフバケットで掴んで貨物船上に設置
したホッパーに投入し、このホッパーに投入されたバラ
物をベルトコンベヤで岸壁側の搬送装置に送るため、ア
ンローダのグラフバケットによる荷役は貨物船の船倉か
ら前記ホッパーまでの距離で済み、アンローダだけで荷
役を行っていた従来の場合と比較すると、アンローダ上
のグラフバケットの走行距離が大幅に短縮され、これに
よって、既設のアンローダに改造を施さなくとも、アン
ローダの一回の荷役に要する往復動の時間が大幅に短縮
されて、荷役作業時間が大幅に短縮される。
"Effects of the Invention" As is clear from the above explanation, the cargo unloading method according to the present invention is such that bulk goods loaded on a cargo ship are grabbed by a graph bucket of an unloader installed on the quayside and installed on the cargo ship. The bulk materials placed in the hopper are sent to the quay-side transport device using a belt conveyor, so cargo handling using the unloader's graph bucket can be carried out from the cargo ship's hold to the hopper, and the unloader alone can handle the cargo. Compared to the conventional method, the traveling distance of the graph bucket on the unloader has been significantly shortened. This results in a significant reduction in cargo handling time.

また、この方法では、ホッパーから地上の搬送装置まで
のバラ物の輸送がベルトコンベヤで行われるため、貨物
船と岸壁との間にバラ物が落下するような不都合が極力
防止され、搬送経路途中の海や岸壁等の環境の汚染ら防
止される。
In addition, with this method, the transportation of bulk materials from the hopper to the conveyance device on the ground is carried out by a belt conveyor, so inconveniences such as loose materials falling between the cargo ship and the quay are prevented as much as possible, and This will prevent pollution of the environment such as the sea and quays.

また、本発明に示した装置は、貨物船上に据え付けられ
る本体枠と、この本体枠に支持されて前記アンローダの
グラフバケットで掴んだバラ物を受けるホッパーと、こ
の十ツバ−の下に一端が位置するとと乙に他端が岸壁側
のベルトコンベヤ上に位置する如く配0;nされて前記
ホッパーに投入されたバラ物を岸壁側のベルトコンベヤ
に送るベルトコンベヤとを具備した構成で、岸壁側に設
けられているアンローダを利用して接岸された貨物船の
甲板上に設置すれば、貨物船の甲板から岸壁側の搬送装
置までの搬送路を提供することができ、上述の前記アン
ローダとの連携により、前述の揚貨方法を良好に遂行す
ることができる。
Furthermore, the apparatus shown in the present invention includes a main body frame installed on a cargo ship, a hopper supported by the main body frame for receiving bulk materials grabbed by the graph bucket of the unloader, and one end of the hopper under the ten brim. A belt conveyor is arranged such that the other end thereof is located on the belt conveyor on the quay side, and the belt conveyor is arranged such that the other end is located on the belt conveyor on the quay side and sends the loose materials thrown into the hopper to the belt conveyor on the quay side. If it is installed on the deck of a berthed cargo ship using an unloader provided on the side, it is possible to provide a transport path from the deck of the cargo ship to the transport device on the quay side, and the above-mentioned unloader and By working together, the above-mentioned cargo unloading method can be successfully carried out.

【図面の簡単な説明】[Brief explanation of drawings]

第1図は本発明に係る揚貨装置の一実施例の正面図、第
2図は従来のアンローダによる荷役方法の説明図である
。 1 ・・・岸壁、2・・・・・・アンローダ、3・・・
・・・グラフバケット、4・・・・・貨物船、5・・・
・・船倉、6・・・・・・バラ物、13・・・・・・ベ
ルトコンベヤ、16・・・・・・揚貨装置、17・・・
・・・本体枠、18・・・・・・ホッパー、19・・・
・・ベルトコンベヤ。 出願人  石川島播′磨重工業株式会社第1図
FIG. 1 is a front view of an embodiment of a cargo lifting device according to the present invention, and FIG. 2 is an explanatory diagram of a cargo handling method using a conventional unloader. 1... quay, 2... unloader, 3...
...Graph bucket, 4...Cargo ship, 5...
... Ship hold, 6 ... Bulk goods, 13 ... Belt conveyor, 16 ... Cargo lifting device, 17 ...
...Body frame, 18...Hopper, 19...
...belt conveyor. Applicant Ishikawajima Harima Heavy Industries Co., Ltd. Figure 1

Claims (2)

【特許請求の範囲】[Claims] (1)貨物船に積載されているバラ物を、岸壁側に設立
されたアンローダを活用して岸壁側のコンベヤ等の搬送
装置に揚貨する方法であって、貨物船上に積載されてい
るバラ物を前記アンローダのグラフバケットで掴んで貨
物船上に設置したホッパーに投入し、このホッパーに投
入されたバラ物をベルトコンベヤで岸壁側の搬送装置に
送ることを特長とした揚貨方法。
(1) A method of unloading bulk goods loaded on a cargo ship onto a conveyor or other conveyance device on the quay side by using an unloader installed on the quay side. This cargo unloading method is characterized in that the objects are grabbed by the graph bucket of the unloader and thrown into a hopper installed on the cargo ship, and the loose objects thrown into the hopper are sent to a conveyance device on the quay side by a belt conveyor.
(2)貨物船に積載されているバラ物を岸壁側のコンベ
ヤ等の搬送装置に揚貨する際に、岸壁側に設立されたア
ンローダと組み合わせて使用する揚貨装置であって、貨
物船上に据え付けられる本体枠と、この本体枠に支持さ
れて前記アンローダのグラフバケットで掴んだバラ物を
受けるホッパーと、このホッパーの下に一端が位置する
とともに他端が岸壁側のベルトコンベヤ上に位置する如
く配備されて前記ホッパーに投入されたバラ物を岸壁側
のベルトコンベヤに送るベルトコンベヤとを具備したこ
とを特徴とする揚貨装置。
(2) A cargo unloading device that is used in combination with an unloader installed on the quay side when unloading bulk goods loaded on a cargo ship to a conveyor or other transport device on the quay side, A main body frame to be installed, a hopper supported by the main body frame to receive bulk materials grabbed by the graph bucket of the unloader, one end of which is located below the hopper, and the other end of which is located on the belt conveyor on the quay side. and a belt conveyor which is arranged in a manner similar to the above and conveys the bulk materials thrown into the hopper to a belt conveyor on the quay side.
JP61186538A 1986-08-08 1986-08-08 Lifting method and lifting device Expired - Lifetime JPH0818708B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP61186538A JPH0818708B2 (en) 1986-08-08 1986-08-08 Lifting method and lifting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP61186538A JPH0818708B2 (en) 1986-08-08 1986-08-08 Lifting method and lifting device

Publications (2)

Publication Number Publication Date
JPS6341323A true JPS6341323A (en) 1988-02-22
JPH0818708B2 JPH0818708B2 (en) 1996-02-28

Family

ID=16190247

Family Applications (1)

Application Number Title Priority Date Filing Date
JP61186538A Expired - Lifetime JPH0818708B2 (en) 1986-08-08 1986-08-08 Lifting method and lifting device

Country Status (1)

Country Link
JP (1) JPH0818708B2 (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4891761A (en) * 1972-03-06 1973-11-29
JPS53160185U (en) * 1977-05-23 1978-12-15
JPS55101834U (en) * 1978-12-28 1980-07-16

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4891761A (en) * 1972-03-06 1973-11-29
JPS53160185U (en) * 1977-05-23 1978-12-15
JPS55101834U (en) * 1978-12-28 1980-07-16

Also Published As

Publication number Publication date
JPH0818708B2 (en) 1996-02-28

Similar Documents

Publication Publication Date Title
US3876059A (en) Vertically shiftable conveyor device
JP6216094B2 (en) Handling method
US3486641A (en) Bulk loader,unloader,and cargo container handling crane and method
JPWO2016139698A1 (en) Cargo container
GB1184700A (en) Bulk Loader, Unloader, and Cargo Container Handling Crane
GB1058935A (en) Load conveying apparatus for loading and unloading
JPS6341323A (en) Unloading method and unloading device
JPH02193891A (en) Crane
US11401118B2 (en) Cargo handling method
RU96108790A (en) DEVICE FOR CONTINUOUS UNLOADING OF BULK MATERIAL FROM VESSELS OR OTHER TANKS
US3536208A (en) Self-discharging bulk cargo vessel
US3326397A (en) Apparatus for handling a belt conveyor
JPS6175740A (en) Unloading installation
JP4502241B2 (en) Bulk carrier
JPH10250985A (en) Multi-purpose crane
JPS60242134A (en) Container transfer device
JP2560033Y2 (en) Continuous unloader
JPH026057Y2 (en)
JPS56165633A (en) Unloader with continuous unloading device for bulk cargo
US7004707B2 (en) Movable bulk charging/discharging equipment
NL8702398A (en) Marine vessel loading conveyor - has parallel conveyor tracks operated independently within casing
KR0162279B1 (en) Continuity type unloader comprising screw type dust catcher
CN117303034A (en) Bulk container unloading four-in-one quay crane and working method thereof
CN117303033A (en) Bulk container dumping and transporting integrated double-trolley shore bridge and working method thereof
SU1406081A1 (en) Overhead load-carrying conveyer