JPS6334449U - - Google Patents

Info

Publication number
JPS6334449U
JPS6334449U JP10883887U JP10883887U JPS6334449U JP S6334449 U JPS6334449 U JP S6334449U JP 10883887 U JP10883887 U JP 10883887U JP 10883887 U JP10883887 U JP 10883887U JP S6334449 U JPS6334449 U JP S6334449U
Authority
JP
Japan
Prior art keywords
rope
attached
ropes
steel tower
main
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP10883887U
Other languages
Japanese (ja)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to JP10883887U priority Critical patent/JPS6334449U/ja
Publication of JPS6334449U publication Critical patent/JPS6334449U/ja
Pending legal-status Critical Current

Links

Landscapes

  • Emergency Lowering Means (AREA)

Description

【図面の簡単な説明】[Brief explanation of drawings]

第1図は垂直ロープ仮設状態図、第2図、第3
図は水平ロープ仮設状態図、第4図は移動用子綱
の取付状態図、第5図は移動ロープの取付状態図
、第6図は昇降安全器の取付状態図、第7図は本
装置の取付説明図、第8図は鉄塔ビーム部におけ
る本装置の取付説明図、第9図は本装置の取付状
態説明図、第10図はロープ類と安全帯とを結合
する手段の他の実施例を示す正面図である。 図中の符号、1は垂直ロープ、2,3,4は水
平ロープ、5は移動ロープ、6は移動用子綱、7
は昇降用安全器、11,23,26,54,62
はフツク、12は上部サポート、13は中間サポ
ート、14は引留器、15は巻取器、21は主ロ
ープ、22,25,52は台付ロープ、24は緊
張器、53は緩衝装置、55,74は小ロープ、
61は環、72は本体、73はロープ止爪、71
は結合部材、Pは主柱材、Bはビーム、Gは碍子
連。
Figure 1 is a vertical rope temporary installation state diagram, Figure 2, Figure 3
The figure is a diagram of the temporary installation of the horizontal rope, Figure 4 is a diagram of the installation of the mobile rope, Figure 5 is the installation of the moving rope, Figure 6 is the installation of the lifting safety device, and Figure 7 is the installation of the device. FIG. 8 is an explanatory diagram of the installation of this device on the steel tower beam part, FIG. 9 is an explanatory diagram of the installation state of this device, and FIG. 10 is another implementation of the means for connecting ropes and safety belts. It is a front view showing an example. Codes in the figure: 1 is a vertical rope, 2, 3, 4 are horizontal ropes, 5 is a moving rope, 6 is a child rope for moving, 7
is a safety device for lifting, 11, 23, 26, 54, 62
12 is a hook, 12 is an upper support, 13 is an intermediate support, 14 is a retainer, 15 is a winder, 21 is a main rope, 22, 25, 52 is a stand rope, 24 is a tensioner, 53 is a shock absorber, 55 ,74 is a small rope,
61 is a ring, 72 is a main body, 73 is a rope retaining claw, 71
is the connecting member, P is the main pillar material, B is the beam, and G is the insulator chain.

Claims (1)

【実用新案登録請求の範囲】 (1) 鉄塔の主柱材Pに沿つて垂直ロープ1を取
付け、所要高さの各主柱材P間に複数の水平ロー
プ2を取付け、各ビームBに沿つて複数の水平ロ
ープ3を取付け、各碍子連Gに沿つて水平ロープ
4を取付け、各主柱材Pと各ビームBの所定位置
に各々複数の移動ロープ5を取付け、前記各水平
ロープ2,3,4に複数の移動用子綱6を移動可
能状に取付け、前記垂直ロープ1に昇降用安全器
7を昇降自在に取付けたことを特徴とする鉄塔作
業用墜落防止装置。 (2) 垂直ロープ1は、先端にフツク11を取付
け、該フツク11を主柱材Pの上部に取付けた上
部サポート12に結合し、中間部を主柱材Pに取
付けた複数の中間サポート13に挿通し、下端部
を主柱材Pに取付けた引留器14によつて保持し
、遊端部を巻取器15に巻取収納したことを特徴
とする実用新案登録請求の範囲第1項に記載の鉄
塔作業用墜落防止装置。 (3) 水平ロープ2,3,4は、主ロープ21の
一端部に台付ロープ22又はフツク23を取付け
、他端部を緊張器24に挿通し、該緊張器24に
台付ロープ25又はフツク26を取付け、主ロー
プ21には複数の移動用子綱6を移動自在に取付
けたことを特徴とする実用新案登録請求の範囲第
1項に記載の鉄塔作業用墜落防止装置。 (4) 移動ロープ5は主ロープ51の上端部に台
付ロープ52を取付け、下端部に緩衝装置53を
結合し、該緩衝装置53の他端部に結合部材を直
接又は小ロープ55を介して取付けたことを特徴
とする実用新案登録請求の範囲第1項に記載の鉄
塔作業用墜落防止装置。 (5) 移動用子綱6は上端部に環61を取付け、
下端部に結合部材を設けたことを特徴とする実用
新案登録請求の範囲第1項又は第3項に記載の鉄
塔作業用墜落防止装置。 (6) 各水平ロープ2,3,4及び移動ロープ5
に取付けている台付ロープは先端にフツクを取付
け基端部に環を取付け、該環を介して各々の主ロ
ープに結合したことを特徴とする実用新案登録請
求の範囲第1項、第3項又は第4項に記載の鉄塔
作業用墜落防止装置。 (7) 昇降安全器7は垂直ロープ1を挿通する開
閉自在な本体72にロープ止爪73を取付け、先
端にフツク又は他の結合部材71を取付けた小ロ
ープ74を前記止爪73の環に結合したことを特
徴とする実用新案登録請求の範囲第1項又は第2
項に記載の鉄塔作業用墜落防止装置。
[Scope of claim for utility model registration] (1) A vertical rope 1 is installed along the main pillar P of the steel tower, a plurality of horizontal ropes 2 are installed between each main pillar P of the required height, and a plurality of horizontal ropes 2 are installed along each beam B. A plurality of horizontal ropes 3 are attached to each of the horizontal ropes 3, a horizontal rope 4 is attached along each insulator chain G, a plurality of movable ropes 5 are attached to predetermined positions of each main pillar P and each beam B, A fall prevention device for steel tower work, characterized in that a plurality of mobile child ropes 6 are movably attached to the vertical ropes 3 and 4, and a lifting safety device 7 is attached to the vertical rope 1 so as to be able to move up and down. (2) The vertical rope 1 has a hook 11 attached to its tip, the hook 11 is connected to an upper support 12 attached to the upper part of the main column P, and a plurality of intermediate supports 13 whose intermediate parts are attached to the main column P. Utility model registration claim 1, characterized in that the lower end is held by a retainer 14 attached to the main pillar material P, and the free end is wound and stored in a winder 15. Fall prevention device for steel tower work as described in . (3) For the horizontal ropes 2, 3, and 4, attach the pedestal rope 22 or hook 23 to one end of the main rope 21, insert the other end into the tensioner 24, and attach the pedestal rope 25 or hook 23 to the tensioner 24. A fall prevention device for steel tower work according to claim 1, characterized in that a hook 26 is attached and a plurality of movable child ropes 6 are movably attached to the main rope 21. (4) The movable rope 5 has a mounting rope 52 attached to the upper end of the main rope 51, a buffer device 53 coupled to the lower end, and a coupling member directly or via the small rope 55 to the other end of the buffer device 53. A fall prevention device for steel tower work as set forth in claim 1 of the utility model registration claim, characterized in that the device is attached to a steel tower. (5) A ring 61 is attached to the upper end of the mobile rope 6,
A fall prevention device for steel tower work according to claim 1 or 3, characterized in that a connecting member is provided at the lower end. (6) Each horizontal rope 2, 3, 4 and moving rope 5
Utility model registration claims 1 and 3, characterized in that the attached ropes have a hook at the tip and a ring at the base end, and are connected to each main rope via the ring. A fall prevention device for steel tower work as described in paragraph or paragraph 4. (7) The lifting safety device 7 has a rope stopper 73 attached to a main body 72 that can be opened and closed through which the vertical rope 1 is inserted, and a small rope 74 with a hook or other connecting member 71 attached to the tip is attached to the ring of the stopper 73. Paragraph 1 or 2 of the claims for utility model registration characterized by the combination of
Fall prevention device for steel tower work as described in .
JP10883887U 1987-07-14 1987-07-14 Pending JPS6334449U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP10883887U JPS6334449U (en) 1987-07-14 1987-07-14

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP10883887U JPS6334449U (en) 1987-07-14 1987-07-14

Publications (1)

Publication Number Publication Date
JPS6334449U true JPS6334449U (en) 1988-03-05

Family

ID=30986400

Family Applications (1)

Application Number Title Priority Date Filing Date
JP10883887U Pending JPS6334449U (en) 1987-07-14 1987-07-14

Country Status (1)

Country Link
JP (1) JPS6334449U (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4919677U (en) * 1972-05-20 1974-02-19
JPS5141297A (en) * 1974-10-03 1976-04-07 Sumitomo Electric Industries TSUIRAKUBOSHOANZENBERUTO
JPS5323200B2 (en) * 1972-10-09 1978-07-13
JPS54149232A (en) * 1978-05-13 1979-11-22 Tokyo Electric Power Co Fall preventive safety bolt installing device for height work

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4919677U (en) * 1972-05-20 1974-02-19
JPS5323200B2 (en) * 1972-10-09 1978-07-13
JPS5141297A (en) * 1974-10-03 1976-04-07 Sumitomo Electric Industries TSUIRAKUBOSHOANZENBERUTO
JPS54149232A (en) * 1978-05-13 1979-11-22 Tokyo Electric Power Co Fall preventive safety bolt installing device for height work

Similar Documents

Publication Publication Date Title
JPS6334449U (en)
US3471193A (en) Resilient support for lift magnet suspension
JPS637650Y2 (en)
JPH01190883A (en) Lift up or down method
FR2403968A1 (en) LOAD LIFT ARM WITH AUTOMATIC HOLDING OF THE LOAD IN A GIVEN POSITION IN RELATION TO THE HORIZONTAL
CN2339666Y (en) Fall-proof device for scaffold
CN213950412U (en) Pneumatic loop wheel machine convenient to remove
CN110485698B (en) Sliding system capable of horizontally moving hanging basket
JPS6443272A (en) Key lock type utility pole working method
CN212593589U (en) Movable loading falling protector
CN220725697U (en) Construction equipment encorbelments in building cornice position
CN211369475U (en) High-altitude operation hanging basket
JPH0298905U (en)
JPH0522543Y2 (en)
CN213141073U (en) Building construction elevator
CN208593970U (en) A kind of crane synchronizing device
JPS6056793A (en) Climbing crane for assembling steel tower
JPS58112564A (en) Apparatus for preventing falling
JPH0731688A (en) Device for preventing operator from dropping from electric-light pole
JPH02127698U (en)
JPH0746291Y2 (en) Net tensioning device with inclination
SU1344725A1 (en) Self-mounting tower crane
SU1076402A1 (en) Method of mounting an elongated structure on its foundation
JPH0451458Y2 (en)
CN118007979A (en) Safety belt hanging device for outer scaffold high building operation