JPS6056793A - Climbing crane for assembling steel tower - Google Patents

Climbing crane for assembling steel tower

Info

Publication number
JPS6056793A
JPS6056793A JP16434383A JP16434383A JPS6056793A JP S6056793 A JPS6056793 A JP S6056793A JP 16434383 A JP16434383 A JP 16434383A JP 16434383 A JP16434383 A JP 16434383A JP S6056793 A JPS6056793 A JP S6056793A
Authority
JP
Japan
Prior art keywords
horizontal support
mast
steel tower
crane
climbing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP16434383A
Other languages
Japanese (ja)
Other versions
JPH0253356B2 (en
Inventor
向畑 礼文
久保田 久雄
徳村 叶
登 五十畑
正岡 典夫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HIMENOGUMI KK
TOMOEGUMI GIKEN KK
Original Assignee
HIMENOGUMI KK
TOMOEGUMI GIKEN KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HIMENOGUMI KK, TOMOEGUMI GIKEN KK filed Critical HIMENOGUMI KK
Priority to JP16434383A priority Critical patent/JPS6056793A/en
Publication of JPS6056793A publication Critical patent/JPS6056793A/en
Publication of JPH0253356B2 publication Critical patent/JPH0253356B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Jib Cranes (AREA)

Abstract

(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。
(57) [Summary] This bulletin contains application data before electronic filing, so abstract data is not recorded.

Description

【発明の詳細な説明】 (産業上の利用分野) この発明は、鉄塔、特に中小規模鉄塔の組立に使用する
クライミングクレーンに関するものである0 (従来技術) 大型送電鉄塔の組立は、専用鉄塔組立用クライミングク
レーンの開発により、工期短縮、安全性の向上に多大な
メリットな出しているが、このクライミングクレーンを
中小規模の鉄塔組立に利用する場合には、機緘規模が大
型のため利用効率が低下する。第1図に示すような金棒
方式あるいは第2図に示すようなガイデリック方式の従
来工法により施工さnる事が多い。
Detailed Description of the Invention (Industrial Application Field) The present invention relates to a climbing crane used for assembling steel towers, particularly small and medium-sized steel towers. The development of climbing cranes for industrial use has brought great benefits in shortening construction times and improving safety, but when using these climbing cranes for assembling small and medium-sized steel towers, the large scale of the machine makes it difficult to use them efficiently. descend. It is often constructed using conventional construction methods such as the metal rod method as shown in Figure 1 or the Guidelic method as shown in Figure 2.

第1図に示すものは、鉄塔ポスト材Pの一部を流用し、
ジブ1と地上にあるウィンチ(図示省略)を利用した簡
易デリックであり、ジブ1の旋回は手動式となり、また
、地上よりパックテンションワイヤ2を取る必要がある
The one shown in Figure 1 uses a part of the steel tower post material P,
It is a simple derrick that uses a jib 1 and a winch (not shown) on the ground, and the jib 1 can be rotated manually, and it is necessary to take the pack tension wire 2 from the ground.

このようなりレーンの場合、装置が簡便で軽量のため、
装置費用が低減されるものの、次のような問題が考えら
れる。
In the case of such a lane, the equipment is simple and lightweight, so
Although the equipment cost is reduced, the following problems may occur.

■ 吊り上げ用ジブ1’J+’鉄塔のポスト材Pに取付
けるため作業範囲が限定され、使用が不便である。
■ Lifting jib 1'J+' Since it is attached to the post material P of the steel tower, the working range is limited and it is inconvenient to use.

■ 旋回等を人力で行なうため作業性が悪い。■ Workability is poor because turning etc. are done manually.

■ バラフチ/ジョンワイヤ2を必要とするが、鉄塔が
高い場合、取付けに手間がかかる。また、敷地の制限も
受ける場合がある。
■ Barafuchi/John wire 2 is required, but if the tower is high, installation is time consuming. There may also be site restrictions.

■ 迫り上げ(クライミング)時に、ジブlの段取りに
も手間がかかる。
■ It takes time to set up the jib when climbing.

■ 過負荷防止等の安全装置類を装備していない。■ It is not equipped with safety devices such as overload prevention.

嵯2図に示すものは、鉄塔中央にマス)3な立設し、水
平支持装置6により支持さrたマスト3の上部にガイデ
リッククレーン4な載置し、マスト迫り上げ装置5によ
り迫り上げつつ鉄塔?:g築し、作条性の向上を図った
ものであるが、装置が大がかりであり、中小規模の鉄塔
構築には効率的ではなかった。
The one shown in Figure 2 is a square 3 erected in the center of the steel tower, a guideric crane 4 is placed on top of the mast 3 supported by a horizontal support device 6, and the mast is raised by a mast lifting device 5. A steel tower? Although this method was designed to improve the construction efficiency of steel towers, the equipment was large-scale and was not efficient for constructing small- to medium-sized steel towers.

このため、中小規模の鉄塔組立専用のクレーンの開発が
望まnている。
Therefore, it is desired to develop a crane specifically for assembling small and medium-sized steel towers.

(発明の目的) この発明は、このような事情に鑑みて提案さnたもので
、その目的は、小型、軽量、安価で安全性、操作性の向
上を図れるクライミングクレーンを提供することにある
(Purpose of the Invention) This invention was proposed in view of the above circumstances, and its purpose is to provide a climbing crane that is small, lightweight, inexpensive, and has improved safety and operability. .

(発明の構成) この発明に係る鉄塔組立用クライミングクレーンは、鉄
塔の一側面における中央に立設された昇降レールを案内
として上昇しつつ鉄塔を構築するクライミングクレーン
であって、ジブクレーンと、このジブクレーンの基部に
垂設された所定長さのマストと、端部が鉄塔ポスト材に
着脱自在とされるとともに一方がマストに固定され他方
が昇降自在にマストに取付けられた上下に一対の水平支
持梁と、これら水平支持梁を上下方向に相対移動させる
昇降装置を備え、一対の水平支持梁を昇降装置によシ交
互に上昇させてジブクレーンを上昇させるようにしたも
のである。
(Structure of the Invention) A climbing crane for assembling a steel tower according to the present invention is a climbing crane that constructs a steel tower while climbing using a lifting rail installed at the center of one side of the tower as a guide, and includes a jib crane and a jib crane. A mast of a predetermined length hangs vertically from the base of the tower, and a pair of vertical support beams whose ends are detachable from the tower post material, one is fixed to the mast and the other is attached to the mast so that it can be raised and lowered. The jib crane is also provided with an elevating device that moves these horizontal support beams relative to each other in the vertical direction, and the pair of horizontal support beams are raised alternately by the elevating device to raise the jib crane.

(実 施 例) 以下、この発明を図示する実施例に基づいて説明する。(Example) The present invention will be described below based on illustrated embodiments.

第3図に示すように、クライミングクレーンは、構築さ
れた鉄塔の一側面における中央に立設された昇降レール
10を案内として昇降自在とされ、ジブクレーン11と
、このジブクレーン11の基部に垂設された所定長さの
マスト12と、このマスト12に上下一対で取付けられ
た水平支持梁13,14と、これら水平支持梁13.1
4を上下方向に相対的に移動させる昇降装置15と、安
全支持装置16を備えている。
As shown in FIG. 3, the climbing crane can be raised and lowered by being guided by a lifting rail 10 erected at the center of one side of the constructed steel tower. A mast 12 of a predetermined length, horizontal support beams 13 and 14 attached to the mast 12 in a pair above and below, and these horizontal support beams 13.1.
4 and a safety support device 16.

ジブクレーン11は、旋回装置17と、起伏、巻上げ用
の機械装置18と、ジブ19を有し、さらに、鉄塔側面
の傾斜に対して水平に旋回できるように角度調整装置2
0を備えている。
The jib crane 11 has a swing device 17, a mechanical device 18 for luffing and hoisting, and a jib 19, and further includes an angle adjustment device 2 so as to be able to swing horizontally with respect to the slope of the side of the tower.
0.

水平支持梁13,14は、梁基部21.22を介してマ
スト12に取付けられ、上部の水平支持梁13は、マス
ト12上部に固定され、下部の水平支持梁14は、マス
ト12を案内として昇降自在とされている。さらに、水
平支持梁13.14は、端部にバンド式支持金物23を
有し、これによシ鉄楢ボスト材Pに着脱自在に固定され
るとともに鉄塔の幅変化に対応できるように伸縮自在に
梁基部 21.22に取付けられている。そのため、水
平支持梁13.14は、それぞれ二つの部材から々す、
第3図、第4図に示すように、水平方向に互い違いに配
置してもよいし、第5図、第7図に示すように、上下方
向に互い違いに配置してもよい。また、昇降レール10
を転動するガイドローラ24は、梁基部21.22に取
付けられる。
The horizontal support beams 13, 14 are attached to the mast 12 via beam bases 21.22, the upper horizontal support beam 13 is fixed to the top of the mast 12, and the lower horizontal support beam 14 is attached to the mast 12 as a guide. It is said to be able to rise and fall freely. Furthermore, the horizontal support beams 13 and 14 have band-type support metal fittings 23 at their ends, which allow them to be removably fixed to the steel oak post material P and to be expandable and contractible to accommodate changes in the width of the steel tower. It is attached to the beam base 21.22. Therefore, the horizontal support beams 13, 14 each consist of two members:
As shown in FIGS. 3 and 4, they may be arranged alternately in the horizontal direction, or as shown in FIGS. 5 and 7, they may be arranged alternately in the vertical direction. In addition, the lifting rail 10
A guide roller 24 rolling on the beam base 21.22 is attached to the beam base 21.22.

昇降装置15は、水平支持梁13.14をいわゆる尺取
り式に移動させる装置で、下部の水平支持梁14を昇降
させる昇降装置15Aと、マスト12すなわち上部の水
平支持梁13を昇降させる昇降装置15Bとからなる。
The lifting device 15 is a device that moves the horizontal support beams 13 and 14 in a so-called scale-taking manner, and includes a lifting device 15A that lifts and lowers the lower horizontal support beam 14, and a lifting device that lifts and lowers the mast 12, that is, the upper horizontal support beam 13. It consists of 15B.

昇降装置15Aは、下部の梁基部22に固定されたウィ
ンチ25Aと、梁基部22に取付けられた一対の滑車2
6A、26Aと、鉄塔ポスト材Pに取付けられた一対の
滑車27A、28Aと、ウィンチ25Aのワイヤロープ
29Aからなる。このワイヤロープ29Aは、ウィンチ
25から滑車27A、26A、26A、28Aに順に巻
回されて先端が梁基部22に固定されており、ワイヤロ
ープ29Aをウィンチ25Aによシ巻上げ、巻下げする
ことにより、下部の水平支持梁14が昇降することにな
る。
The lifting device 15A includes a winch 25A fixed to a lower beam base 22 and a pair of pulleys 2 attached to the beam base 22.
6A, 26A, a pair of pulleys 27A, 28A attached to the steel tower post material P, and a wire rope 29A of the winch 25A. This wire rope 29A is wound around pulleys 27A, 26A, 26A, and 28A in order from the winch 25, and the tip is fixed to the beam base 22. By winding up and lowering the wire rope 29A by the winch 25A, , the lower horizontal support beam 14 will move up and down.

昇降装置15Bは、昇降装置15Aと同様であるが、滑
車27B、28Bは、マスト12の下端部に取付けられ
るとともに滑車26Bは一つでよく、これによシマスト
12すなわち上部の水平支持梁13およびジブクレーン
11が昇降する。
The lifting device 15B is similar to the lifting device 15A, but pulleys 27B and 28B are attached to the lower end of the mast 12, and only one pulley 26B is required, so that the mast 12, that is, the upper horizontal support beam 13 and The jib crane 11 moves up and down.

安全支持装置16は、第6図、第7図に示すように、下
部の梁基部22と上位の鉄塔ポスト材Pとを連結する安
全支持ワイヤロープ3oと、梁基部21.22とポスト
材Pを水平に連結する水平支持ワイヤロープ31.32
とからなる。安全支持ワイヤロープ30は、クレーンの
自重等を支持しポスト材Pへ伝達するようにされ、水平
支持ワイヤロープ31,32は、水平支持梁13.14
に加わる圧縮力を負担し、これらKよシジブクレーンか
らの作用力は、鉄塔へ効果的に伝達される。
As shown in FIGS. 6 and 7, the safety support device 16 includes a safety support wire rope 3o that connects the lower beam base 22 and the upper tower post material P, and a safety support wire rope 3o that connects the beam base 21.22 and the post material P. Horizontal support wire rope 31.32 horizontally connecting
It consists of The safety support wire rope 30 supports the crane's own weight and transmits it to the post material P, and the horizontal support wire ropes 31 and 32 are connected to the horizontal support beams 13 and 14.
The compressive force exerted on these cranes is effectively transmitted to the tower.

以上のような構成において、下部の水平支持梁14はマ
スト12に沿って昇降自在であるため、支持梁13.1
4の間隔を任意に選ぶことができ、第7図に示すように
、支持梁13.14を鉄塔のプレース材す取付点近傍に
位置せしめることができる。このような状態で、クレー
ンはワイヤロープ30,31.32等により強固に鉄塔
に支持されており、ジブクレーン1】にょシ上位のポス
ト材Pを組立てることになる。
In the above configuration, since the lower horizontal support beam 14 can move up and down along the mast 12, the support beam 13.1
4 can be arbitrarily selected, and as shown in FIG. 7, the support beams 13, 14 can be located near the attachment points of the steel tower's place material. In this state, the crane is firmly supported by the steel tower by wire ropes 30, 31, 32, etc., and the post material P above the jib crane 1 is assembled.

次いで、第8図に示すように、ジブクレーン11によ)
滑車27A、28Aを組立てられたポスト材Pの上部に
移動させてワイヤロープ29Aを盛シ替え、ジブ19を
直立させ、下部の水平支持梁14の端部の接続を外し、
昇降装置15Aにより水平支持梁14を昇降レール1o
に沿って上昇させる。
Then, as shown in FIG. 8, the jib crane 11)
Move the pulleys 27A and 28A to the top of the assembled post material P, reposition the wire rope 29A, stand the jib 19 upright, and disconnect the end of the lower horizontal support beam 14.
The horizontal support beam 14 is lifted and lowered by the lifting device 15A onto the rail 1o.
rise along.

続いて、第9図に示すように、下部の水平支持梁14を
ポスト材Pへ固定し、ワイヤロープ30゜32を張った
後、上部の水平支持梁13をポスト材Pから開放し、昇
降装置15Bにょシマスト12すなわち水平支持梁13
およびジブクレーン11を昇降レール10に沿って上昇
させる。
Subsequently, as shown in Fig. 9, after fixing the lower horizontal support beam 14 to the post material P and tensioning the wire rope 30°32, the upper horizontal support beam 13 is released from the post material P, and it is lifted and lowered. Device 15B mast 12 or horizontal support beam 13
And the jib crane 11 is raised along the lifting rail 10.

続いて、第10図に示すように、上部の水平支持梁13
をポスト材Pに固定し、ワイヤロープ31を張って上位
のポスト材Pの組立てを行なう。
Next, as shown in FIG. 10, the upper horizontal support beam 13
is fixed to the post material P, the wire rope 31 is stretched, and the upper post material P is assembled.

v上のような工程を順に繰返しながら鉄塔を構築するこ
とになる。下降に際しては、上昇の場合と逆の動作にな
る。
The steel tower will be constructed by repeating the steps above in order. When descending, the operation is opposite to that when ascending.

次に、第11図に示すのは、上下の水平支持梁を伸縮自
在とせずに、固定的な梁13’、 14’ とし、バン
ド式支持金物23が水平方向に移動するようにしたもの
である。バンド式支持金物23は、第12図、第13図
に示すように、水平支持梁13′ あるいは14′ に
係合して軸方向に摺動自在とされ九摺動支持金物33に
取付けられ、鉄塔幅に合わせてこの摺動支持金物33を
移動させ、固定金具34で固定するようにされている。
Next, Fig. 11 shows a system in which the upper and lower horizontal support beams are not telescopic, but are fixed beams 13' and 14', and the band-type support hardware 23 is movable in the horizontal direction. be. As shown in FIGS. 12 and 13, the band type support hardware 23 is engaged with the horizontal support beam 13' or 14' and is slidable in the axial direction, and is attached to nine sliding support hardware 33. This sliding support metal fitting 33 is moved according to the width of the steel tower and fixed with a fixing metal fitting 34.

また、鉄塔ポスト材Pには、予め所定位置にリング状の
落下防止金物35が取付けられている。この落下防止金
物35は、リング状に限らず、リプ、突起などでもよい
Further, a ring-shaped fall prevention hardware 35 is attached to the steel tower post material P in advance at a predetermined position. The fall prevention hardware 35 is not limited to a ring shape, but may be a lip, a protrusion, or the like.

なお、上部の水平支持梁13を固定し、下部の水平支持
梁14を昇降させるようにしたが、これとは逆に下部の
水平支持梁14を固定し、上部の水平支持梁13を昇降
させるようにしてもよい。
Note that the upper horizontal support beam 13 is fixed and the lower horizontal support beam 14 is raised and lowered, but in contrast, the lower horizontal support beam 14 is fixed and the upper horizontal support beam 13 is raised and lowered. You can do it like this.

また、上下の水平支持梁13.14を両方ともマスト1
2に固定し、昇降レール10に溢って昇降装置により昇
降させるようにしてもよい。
Also, both the upper and lower horizontal support beams 13 and 14 are attached to the mast 1.
2, overflowing the elevating rail 10 and raising and lowering it by a lifting device.

また、昇降装置は、ウィンチ、滑車、ワイヤ四−プによ
シ構成されているが、これに限らず、水平支持梁13.
14を上下方向に相対的に移動させ得る装置であればよ
く、例えばラック・ビニオン方式、流体圧シリンダ等が
考えられる。
Further, the elevating device is composed of a winch, a pulley, and a wire quad, but is not limited thereto.
Any device may be used as long as it can relatively move the device 14 in the vertical direction, such as a rack and pinion system, a fluid pressure cylinder, etc.

(発明の効果) この発明は、以上のような構成からなるので、次のよう
な効果を奏する。
(Effects of the Invention) Since the present invention has the above-described configuration, it has the following effects.

■ 鉄塔側面に設置して使用するため、作業半径が小さ
く在り、また、作業範囲の制限も受けないだめ、作業性
が良い。
■ Since it is installed on the side of the steel tower, the working radius is small and there are no restrictions on the working range, making it easy to work.

■ 上下の水平支持梁の間隔が調整できるため、構築す
る鉄塔の制限が々い。
■ Since the spacing between the upper and lower horizontal support beams can be adjusted, there are many restrictions on the number of steel towers that can be constructed.

(?) クレーンよ多発生する作用力が効果的に鉄塔へ
伝達される。
(?) The force generated by cranes is effectively transmitted to the steel tower.

■ 鉄塔の幅変化にも容易に対応できる。■ Easily adapts to changes in the width of the steel tower.

■ 昇降方式が単純でかつ安全であり、鉄塔に支持され
てクライミングしてゆくため、装置が軽量で安価となる
■ The climbing method is simple and safe, and since climbing is supported by a steel tower, the device is lightweight and inexpensive.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図、第2図は、従来の鉄塔の構築方法を示す概略図
、第3図は、この発明に係るクライミングクレーンを示
す斜視図、嬉4図は水平支持梁の基部を示す概略平面図
、第5図は、これと別の態様を示す概略平面図、第6図
は、昇降装置を示す概略図、第7図、第8図、第9図、
第10図は、上昇工程を順に示した正面図、第11図は
、水平支持梁の別の態様を示す斜視図、第12図、第1
3図は、その部分拡大断面図、部分拡大平面図である。 1・・ジブ、2・・バックテンションワイヤ。 3・・マスト、4・・ガイデリッククレーン、5・・マ
スト迫り上げ装置、 6・・水平支持装置、10・・昇降レール、11・・シ
フクレーン、12・・マスト、13.14・・水平支持
梁、15・・昇降装置、16・・安全支持装置、17・
・旋回装置、18・・機誠装置、19・・ジブ、 20・・角度調整装置、21,22°°梁基部123・
・バンド式支持金物、 24・・ガイドローラ、25・・ウィンチ、26.27
.28・Φ肩車、 29・・ワイヤロープ、 30・・安全支持ワイヤロープ、 31.32・・水平支持ワイヤロープ、33・・摺動支
持金物、34・・固定金具、35・・落下防止金物し 第1図 第 2 図 第 乙 1d 、1n 第 5 図 第7図 第8図 第9図 第10図 手続補正書 ■訓58年特願第164343号 2、発明の名称 鉄塔組立用クライミングクレーン 3、補正をする者 事件との関係 特許出願人 住 所 株式会社 姫 野 組 成 名 株式会社 巴組技研 4、代理人 5、 補正命令の日付 自発補正 (1)明細書第10頁第14〜16行目を次の通り訂正
する。 「■ クライミングクレーンが、鉄塔の側面に据付ける
ことができる為、鉄塔内の結構材(対角材、平面材等)
がすべて取付けることができる。 従来のクライミングクレーンは鉄塔の内面に取付けてあ
り結構材のすべてを取付けることができなかった。」
Figures 1 and 2 are schematic diagrams showing a conventional steel tower construction method, Figure 3 is a perspective view showing a climbing crane according to the present invention, and Figure 4 is a schematic plan view showing the base of a horizontal support beam. , FIG. 5 is a schematic plan view showing another aspect, FIG. 6 is a schematic diagram showing the lifting device, FIGS. 7, 8, 9,
Fig. 10 is a front view showing the raising process in order, Fig. 11 is a perspective view showing another aspect of the horizontal support beam, Fig. 12, Fig. 1
FIG. 3 is a partially enlarged sectional view and a partially enlarged plan view. 1. Jib, 2. Back tension wire. 3...Mast, 4...Guidelic crane, 5...Mast lifting device, 6...Horizontal support device, 10...Elevating rail, 11...Schiff crane, 12...Mast, 13.14...Horizontal support Beam, 15. Lifting device, 16. Safety support device, 17.
・Swivel device, 18・・Machine alignment device, 19・・Jib, 20・・Angle adjustment device, 21, 22°° beam base 123・
・Band type support hardware, 24...Guide roller, 25...Winch, 26.27
.. 28. Φ Shoulder wheel, 29.. Wire rope, 30.. Safety support wire rope, 31. 32.. Horizontal support wire rope, 33.. Sliding support hardware, 34.. Fixing hardware, 35.. Fall prevention hardware. Figure 1 Figure 2 Figure O 1d, 1n Figure 5 Figure 7 Figure 8 Figure 9 Figure 10 Procedure amendment ■Kun 1958 Japanese Patent Application No. 164343 2 Title of invention Climbing crane for steel tower assembly 3 Relationship with the case of the person making the amendment Patent applicant address Himeno Co., Ltd. Composition name Tomoe Gumi Giken Co., Ltd. 4, Agent 5 Date of amendment order Voluntary amendment (1) Specification, page 10, lines 14 to 16 is corrected as follows. ``■ Climbing cranes can be installed on the side of the steel tower, so the structural members inside the tower (diagonal members, flat members, etc.)
All can be installed. Conventional climbing cranes are attached to the inner surface of the steel tower and cannot attach all of the structural members. ”

Claims (1)

【特許請求の範囲】[Claims] (1)鉄塔の一側面における中央に立設された昇降レー
ルを案内として上昇しつつ鉄塔を構築するクライミング
クレーンであって、ジブクレーンと、このジブクレーン
の基部に垂設された所定長さのマストと、端部が鉄塔ポ
スト材に着脱自在とされるとともに一方がマストに固定
され他方が昇降自在にマストに取付けられた上下に一対
の水平支持梁と、これら水平支持梁を上下方向に相対移
動させる昇降装置を備えていることを特徴とする鉄塔組
立用クライミングクレーン。
(1) A climbing crane that builds a steel tower while climbing using a lifting rail erected at the center of one side of the tower as a guide, which includes a jib crane and a mast of a predetermined length hung vertically from the base of the jib crane. , a pair of vertical support beams whose ends are detachable from the steel tower post material, one of which is fixed to the mast and the other is attached to the mast so that it can be raised and lowered, and these horizontal support beams are moved relative to each other in the vertical direction. A climbing crane for assembling steel towers characterized by being equipped with a lifting device.
JP16434383A 1983-09-07 1983-09-07 Climbing crane for assembling steel tower Granted JPS6056793A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP16434383A JPS6056793A (en) 1983-09-07 1983-09-07 Climbing crane for assembling steel tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP16434383A JPS6056793A (en) 1983-09-07 1983-09-07 Climbing crane for assembling steel tower

Publications (2)

Publication Number Publication Date
JPS6056793A true JPS6056793A (en) 1985-04-02
JPH0253356B2 JPH0253356B2 (en) 1990-11-16

Family

ID=15791363

Family Applications (1)

Application Number Title Priority Date Filing Date
JP16434383A Granted JPS6056793A (en) 1983-09-07 1983-09-07 Climbing crane for assembling steel tower

Country Status (1)

Country Link
JP (1) JPS6056793A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005178940A (en) * 2003-12-17 2005-07-07 Ohbayashi Corp Tower crane stand and tower crane supporting method
US7290672B2 (en) * 2001-03-21 2007-11-06 Federated Equipment Co. Llc Tower crane device
JP2010208859A (en) * 2010-06-16 2010-09-24 Ohbayashi Corp Tower crane frame, tower crane supporting method, and tower crane frame mounting structure
CN108661402A (en) * 2018-05-24 2018-10-16 深圳市雷凌广通技术研发有限公司 A kind of communication steel tower that safety coefficient is high

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7290672B2 (en) * 2001-03-21 2007-11-06 Federated Equipment Co. Llc Tower crane device
JP2005178940A (en) * 2003-12-17 2005-07-07 Ohbayashi Corp Tower crane stand and tower crane supporting method
JP2010208859A (en) * 2010-06-16 2010-09-24 Ohbayashi Corp Tower crane frame, tower crane supporting method, and tower crane frame mounting structure
CN108661402A (en) * 2018-05-24 2018-10-16 深圳市雷凌广通技术研发有限公司 A kind of communication steel tower that safety coefficient is high

Also Published As

Publication number Publication date
JPH0253356B2 (en) 1990-11-16

Similar Documents

Publication Publication Date Title
CN106542444A (en) A kind of moment of flexure reduction structure set up in tower body revolution
JPH0245274Y2 (en)
JP2859163B2 (en) Rotary erection method for bridges with high piers
US4027441A (en) Arrangement for erecting and dismounting an elongate object having one end articulated to a foundation
CN216807824U (en) Pipeline mobile device for hydraulic engineering
CN211712453U (en) Gantry pay-off equipment
JPS6056793A (en) Climbing crane for assembling steel tower
US2858945A (en) Pivoting and hoisting arrangement for the distributing assembly of a tower crane
GB1409888A (en) Temporary mast structure
DE2648803A1 (en) METHOD AND DEVICE FOR DISASSEMBLING OR INSTALLING JIB PARTS ON A TOWER CRANE
CN221664249U (en) Slip form supporting system construction structure
JP7245098B2 (en) Relocation method of mast guide device for tower assembly work
CN219840355U (en) Hanging basket device suitable for arc-shaped structure
JP3532161B2 (en) Tower construction machine and tower construction method
JPH0240076Y2 (en)
CN216662301U (en) Assembled subway station top section of jurisdiction stretch-draw apparatus lifting device
CN218147821U (en) Telescopic general operating platform in cable-stayed bridge cable tower
CN214780584U (en) High-altitude operation lifting device
CN211419396U (en) Integral hoisting device for amplitude-variable derrick mast of large equipment
JPS6241191A (en) Simple crane for assembling steel tower
GB191415558A (en) Improvements in and relating to Tower Derricks.
JP7281936B2 (en) Elevating method of derrick device for assembly work of steel tower
JPH0835358A (en) Construction method for tower shaped structure and support structure used for the method
CN210622809U (en) Multifunctional rack for tunnel construction
CN210366709U (en) Suspension device and suspension equipment