JPS6327620A - Expanded foot protection work for surrounding of precast pile by expanding shoe - Google Patents
Expanded foot protection work for surrounding of precast pile by expanding shoeInfo
- Publication number
- JPS6327620A JPS6327620A JP16783686A JP16783686A JPS6327620A JP S6327620 A JPS6327620 A JP S6327620A JP 16783686 A JP16783686 A JP 16783686A JP 16783686 A JP16783686 A JP 16783686A JP S6327620 A JPS6327620 A JP S6327620A
- Authority
- JP
- Japan
- Prior art keywords
- pile
- ready
- surrounding
- foot protection
- expanding shoe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000004567 concrete Substances 0.000 claims abstract description 5
- 239000008267 milk Substances 0.000 claims abstract description 4
- 210000004080 milk Anatomy 0.000 claims abstract description 4
- 235000013336 milk Nutrition 0.000 claims abstract description 4
- 238000010276 construction Methods 0.000 claims description 16
- 239000004568 cement Substances 0.000 claims description 3
- 239000004570 mortar (masonry) Substances 0.000 claims description 3
- 239000000463 material Substances 0.000 claims description 2
- 239000011083 cement mortar Substances 0.000 abstract 1
- 238000000034 method Methods 0.000 description 4
- 230000000694 effects Effects 0.000 description 3
- 230000002093 peripheral effect Effects 0.000 description 3
- 238000009412 basement excavation Methods 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000005056 compaction Methods 0.000 description 1
- 238000007796 conventional method Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
Abstract
Description
【発明の詳細な説明】
3−1 、工法の説明:本工法の施工法、および施工順
序を、添付図に基つき説明致
しまず。[Detailed description of the invention] 3-1. Explanation of construction method: The construction method and construction order of this construction method will be explained based on the attached drawings.
(1)、既製杭の周辺拡大根固めの施ゴー順庄1、既製
杭に拡大シJ、−を装着したのち杭の建て込み
2、既製杭の沈設と同時に、拡大シューが杭周辺地盤を
締め固めつつ排除し、
化を形成
3、既製杭周辺地盤に形成された孔内にコ〉・クリート
、モルタル、セメントミルク等を打設
4.2.3の繰返しによる所定位置までの既製杭の周辺
拡大根因め完了(添付
[4−1参照)
(2) 既製杭相互の結合の施工法
1、既製杭−AのI、71辺拡大根固め完r2、既製杭
−Aと任意間隔を保ち、既製杭−Bの周辺拡大根固め完
了
既製杭−Aと既製杭−Bの周辺拡大根
固め部と二「なりを保ち、既製杭−C
(pc板等の結き材〉を沈設し、既製
杭−)\、−[ミ、−Cの結含完r〈添付IJ−、−2
参照)
3−2、本工法の効果と従来工法との比較木工法は主に
、既製杭の仝良を周辺拡
大根固め対象範囲としている点、また
周辺拡大根固めを行なう孔の形成を、
拡大シューにより杭周辺地盤を締め固
めつつ排除し行なつ点において、プレ
ボーリング(地盤の事ii(掘削)をiif提とし杭先
端部に対して拡大根固めを行
なう従来の各稚工法とは根本的な違い
を有していると考えます、以下に、本
工法を採用する事による効果と、従来
工法との比較についての詳細を述べま
す。(1) Expanding the surrounding area of the pre-fabricated pile and applying foot hardening. 1. After attaching the expansion shoe to the pre-fabricated pile, the pile is erected. 2. At the same time as the pre-fabricated pile is sunk, the expanding shoe expands the ground around the pile. 3. Cast concrete, mortar, cement milk, etc. into the hole formed in the ground around the ready-made pile. 4. Repeat steps 2.3 and 3. Peripheral expansion root cause completion (see attachment [4-1)] (2) Construction method 1 for joining prefabricated piles to each other, I of prefabricated pile A, 71 side expansion root hardening completed r2, arbitrary spacing with prefabricated pile A Maintaining the expanded foot hardening around the pre-fabricated pile-B, maintain the same shape as the expanded foot hardening around the pre-fabricated pile-A and pre-fabricated pile-B, and sink the pre-fabricated pile-C (tie material such as PC board). , Ready-made pile-)\,-[Mi, -C completion r
(Reference) 3-2. Comparison of the effects of this method and conventional methods The woodworking method mainly targets the area of peripheral expansion foot protection for the defects of prefabricated piles, and the formation of holes for peripheral expansion foot protection. In that the ground around the pile is compacted and removed using an expanding shoe, it is fundamentally different from the conventional construction methods in which pre-boring (excavation of the ground) is performed with expanded foot compaction at the tip of the pile. We believe that there are significant differences. Below, we will explain in detail the effects of adopting this construction method and a comparison with conventional construction methods.
(])0本工木工の沈設方式は、施工時の状況に応じて
、打ち込み、圧入(中堀)
回転等の各桟方式が選択可能でありま
ず、従来の工法は、たとえば、打ち込
みir能な状況においてもプレボーリングを行ない施工
しなければならず、状
況によっては、経済性、施工性におい
て柔軟性に欠ける場合が生じます。(]) For the installation method of 0-piece woodwork, each method such as driving, press-in (inside hole), and rotation can be selected depending on the situation at the time of construction. Depending on the situation, pre-boring must be performed before construction, and depending on the situation, there may be a lack of flexibility in terms of economy and construction.
(2)、 I!!を製杭全長に対し拡大根固めがOT能
であり、かつ、周辺地盤の締め固め効
果があり、従来の工法より支持力の発
現が期待できます。(2), I! ! It is possible to extend the foot reinforcement over the entire length of the pile, and it also has the effect of compacting the surrounding ground, so it can be expected to have more bearing capacity than conventional construction methods.
(3)、拡大シューがフリクションカット(杭周面摩擦
抵抗の低減)の役目を果
たす事により、既製杭の沈設が容易と
なりまず。(3) The expanding shoe serves as a friction cut (reducing frictional resistance on the pile circumference), making it easier to sink ready-made piles.
(4)、複数の既製杭を結合した柱列連壁抗等が、拡大
根固め部を重なり合わせ、
連続的に施工する事により築造されま
す。(4) A series of pillar columns, etc., is constructed by joining multiple pre-fabricated piles, overlapping the expanded foot protection sections, and constructing them continuously.
3−3.産業上の利用分野:建築および土木3-3. Industrial applications: architecture and civil engineering
(1)1図−1=既製杭の周辺拡大根固めの施工順序に
関する図面
(2)1図−2=既製杭相互の結合の施工法にi旬する
図面
記号表
■=既製杭
2:拡大シュー
3:拡大シューにより既製杭J4辺地盤に形成された孔
4:形成された孔内に打設された、コンクリート、モル
タル、セメントミルク等
5:完了した既製杭周辺拡大根固め部
IA:既製杭−A
1B:!!E賀杭−B
IC=既製杭−C(1) Figure 1-1 = Expansion of the surrounding area of pre-fabricated pilesDrawing regarding the construction order of foot protection (2) Figure-1-2 = Chart of drawing symbols for the construction method of connecting pre-fabricated piles to each other■ = Pre-fabricated pile 2: Enlargement Shoe 3: Hole formed in the ground on the J4 side of the ready-made pile by the expanding shoe 4: Concrete, mortar, cement milk, etc. placed in the formed hole 5: Enlarged foot hardening section around the completed ready-made pile IA: Ready-made Pile-A 1B:! ! Ega pile-B IC=ready-made pile-C
Claims (1)
のち、孔内に、コンクリート、モルタル、セメントミル
ク等を打設し、既製杭の周辺拡大根固めを図る工法 2−2、既製杭の周辺拡大根固め部同士又は周辺拡大根
固め部と既製杭、PC板等の結合材を重なり合わせる事
による既製杭相互の結合を図る工法[Claims] 2-1. A construction method in which a hole is made in the ground around the ready-made pile using an expanding shoe, and then concrete, mortar, cement milk, etc. is poured into the hole to expand and harden the area around the ready-made pile. 2-2. A construction method in which ready-made piles are connected to each other by overlapping the enlarged foot protection parts around the ready-made piles, or by overlapping the enlarged foot protection parts around the ready-made piles and binding materials such as PC boards.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP16783686A JPS6327620A (en) | 1986-07-18 | 1986-07-18 | Expanded foot protection work for surrounding of precast pile by expanding shoe |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP16783686A JPS6327620A (en) | 1986-07-18 | 1986-07-18 | Expanded foot protection work for surrounding of precast pile by expanding shoe |
Publications (1)
Publication Number | Publication Date |
---|---|
JPS6327620A true JPS6327620A (en) | 1988-02-05 |
Family
ID=15856982
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP16783686A Pending JPS6327620A (en) | 1986-07-18 | 1986-07-18 | Expanded foot protection work for surrounding of precast pile by expanding shoe |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPS6327620A (en) |
-
1986
- 1986-07-18 JP JP16783686A patent/JPS6327620A/en active Pending
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20020071725A1 (en) | Earth support and permanent structural foundation wall | |
JP2596798B2 (en) | Existing building seismic isolation method | |
JP3486602B2 (en) | Pier foundation method and pier foundation structure | |
EP0186337A3 (en) | Foundation arrangement | |
JPS6327620A (en) | Expanded foot protection work for surrounding of precast pile by expanding shoe | |
JPS63233120A (en) | Foundation work for wooden building | |
JPH0721196B2 (en) | Reverse construction method of underground structure | |
JPS6026724A (en) | Integration work of steel-framed building structure and composite underground beam | |
JPH051850B2 (en) | ||
JPS59134228A (en) | Integration work of pile or continuous wall and footing | |
JP2552860B2 (en) | Basement method | |
JPS6217233A (en) | Foundation base column | |
JPH1121914A (en) | Execution method of foundation made of precast concrete | |
JPH05112947A (en) | Execution method of foundation | |
JPH0137530B2 (en) | ||
JPH10299003A (en) | Foundation work using precast concrete member | |
JPS5849258Y2 (en) | Prefab footing | |
RU2081245C1 (en) | Method for enforcement of building foundation | |
JPH03260223A (en) | Positioning plate for base construction of housing | |
KR20060136234A (en) | Building Constuction Method using Precast Structure | |
JP3061934B2 (en) | Retaining wall construction method | |
JPS5812917Y2 (en) | Foundation formwork support structure | |
JPS5972319A (en) | Underground continuous wall work utilizing soil pillar-row wall | |
JPS6033937B2 (en) | Construction method of caisson work room part | |
JPH02274922A (en) | Foundation construction |