JPS6322920A - Foundation pile construction - Google Patents

Foundation pile construction

Info

Publication number
JPS6322920A
JPS6322920A JP16646386A JP16646386A JPS6322920A JP S6322920 A JPS6322920 A JP S6322920A JP 16646386 A JP16646386 A JP 16646386A JP 16646386 A JP16646386 A JP 16646386A JP S6322920 A JPS6322920 A JP S6322920A
Authority
JP
Japan
Prior art keywords
steel pipe
drilling
tube
hole
motor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP16646386A
Other languages
Japanese (ja)
Inventor
Hiroshi Yamamoto
弘志 山本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP16646386A priority Critical patent/JPS6322920A/en
Publication of JPS6322920A publication Critical patent/JPS6322920A/en
Pending legal-status Critical Current

Links

Abstract

PURPOSE:To greatly shorten the period of construction by a method in which a steel tube having an excavating blade on its lower end is turned by a motor and lowered for penetration while drilling a pit, and cement mortar, etc., is poured into the wall space of the pit to construct a foundation pile. CONSTITUTION:A steel tube 8 held by the chuck 7 of a base block 4 lifted up by a crane 1 is turned by a motor 6 by giving rotation through the dhuck 7 to the tube 8 to turn an excavating blade 9 attached to the lower end of the tube 8 form given depth of pit 10. After the tube 8 is rotationally penetrated to a given depth, cement mortar or milk 13 is poured through jet nozzles 12 provided between the blades 9 into the space between the tube 8 and the pit wall and hardened. A strong foundation integrated with the ground by the tube 8 can thus be formed.

Description

【発明の詳細な説明】 〔産業上の利用分野〕 この発明は、ビル建築その他の建造物の基礎地盤fjt
a築する際の基礎杭の打設法に関するものである。
[Detailed Description of the Invention] [Field of Industrial Application] This invention is directed to the foundation ground fjt of building construction and other structures.
This relates to the method of driving foundation piles when building a.

〔従来の技術及び発明が解決しようとする問題点〕従来
は、基礎杭を打設する工法としてハンマー式或は圧縮式
1法がよく知られている。但しハンマー或は打撃音がは
げしいので、都市部又は住宅地に於ては殆ど採用さ幻て
いない。又、圧縮式は施工時間が長くかへり、コスト高
となる嫌がある。
[Prior art and problems to be solved by the invention] Conventionally, the hammer type or compression type 1 method is well known as a construction method for driving foundation piles. However, since the hammer or impact sound is loud, it is rarely used in urban areas or residential areas. In addition, the compression type requires a long construction time and is expensive.

そこで、施工時間を短縮し低廉なる基礎杭打設が可能で
あるかどうかの問題点が生じてくる。
Therefore, the question arises as to whether it is possible to shorten construction time and inexpensively drive foundation piles.

〔問題点を解決するための手段〕[Means for solving problems]

この発明は、上記問題点に鑑み之を解決せんとして提案
せられたものであり、クレーン柱体に昇降自在に設けら
れた荷台にモータを載置し、このモータの回転力を減速
機を介してチャックに伝達し、更に該チャックに打設せ
らるぺぎ鋼管等をチャックして該鋼管を地面土足立設し
、而も、前記鋼管の下端部には掘削刃を取付け、その後
、前記モータを駆動し、その回転力を鋼管を介して掘削
刃を回転せしめることにより掘削孔を穿設すると同時に
、この掘削孔内に該鋼管を下降埋入し、必要fより前記
掘削刃によって掘削孔を開穿し乍ら該掘削刃部よりセメ
ントミルク或はモルタル等を鋼管と掘削孔壁間に注入す
ることを特徴とする基礎杭打投法を提供せんとするもの
である。
This invention was proposed as a solution to the above problems, and involves mounting a motor on a loading platform that is movable up and down on a crane column, and transmitting the rotational force of the motor through a speed reducer. Furthermore, the steel pipe, etc. to be driven is chucked by the chuck, and the steel pipe is set upright on the ground, and a digging blade is attached to the lower end of the steel pipe, and then the motor is A drilling hole is drilled by rotating the drilling blade through the steel pipe, and at the same time, the steel pipe is lowered into the drilling hole, and as necessary, the drilling blade is used to drill the drilling hole. It is an object of the present invention to provide a foundation pile driving method characterized by injecting cement milk, mortar, etc. between the steel pipe and the wall of the excavation hole from the excavation blade part while excavating the excavation hole.

〔作用〕[Effect]

この発明は、モータの回転を鋼管の下端部に取付けられ
ている掘削刃に伝達し、この掘削刃によって地盤を開穿
する。そして、この掘削刃による掘削孔径は概して鋼管
の直径より犬であるため。
This invention transmits the rotation of the motor to the excavating blade attached to the lower end of the steel pipe, and the excavating blade excavates the ground. And because the diameter of the hole drilled by this drilling blade is generally smaller than the diameter of the steel pipe.

掘削孔の開穿動作に追随して鋼管は当該掘削孔内に埋入
されていく。而して、必要によっては前記回転挿入動作
の途中から、掘削刃間に設けられた噴出孔よりモルタル
を噴出せしめて該掘削孔壁と鋼管との間隙に注入せしめ
る。斯くして、所定の深さに到達したときは一チャック
を9A管頭部より取外せばよい。斯くして、当該鋼管は
基礎杭として地盤内に挿入され、且つ、その周囲はモル
タル等の硬化によって基礎が強固となるのである。又、
gA管の長さが不足するとぎは鋼管の通常の継足法によ
って結合し、前記操作を繰返せばよい。
Following the opening operation of the borehole, the steel pipe is buried in the borehole. If necessary, during the rotational insertion operation, mortar is ejected from the ejection hole provided between the drilling blades and injected into the gap between the wall of the drilling hole and the steel pipe. In this way, when a predetermined depth is reached, one chuck can be removed from the 9A pipe head. In this way, the steel pipe is inserted into the ground as a foundation pile, and the foundation is strengthened by hardening of mortar etc. around it. or,
If the length of the gA pipe is insufficient, it can be joined by the usual joining method for steel pipes, and the above operation can be repeated.

〔実施例〕〔Example〕

以下、この発明の一実施例を別紙添附図面に従って詳述
する。(出ヱクレーン柱体であり、クローラ(2)の−
側より上方に伸張して立設される。更に、クレーン柱体
(1)−側にはガイド(3)が上下に設けられ、このガ
イド(3)を上下動自在に荷台(4)が遊嵌されている
。そして、この荷台(4)にモータ(5)及び減速機(
6)が載#され、更にその下端部にチャック(力が回動
自在に嵌着されている。従って、チャック(7)はそ−
タ(5)に連動される。更に、該チャック(7)は鋼管
(8)をチャックすることができるものであり、且つ一
チャックすると同時に該鋼管(8)にモータ(5)の回
転を伝達するようになっている。又、鋼管(8)の下端
部には掘削刃(9)が取付けられる。この掘削刃(9)
は回転し乍ら地盤を掘削して掘削孔Qlを開穿するので
あるが、該掘削刃は通常回転と同時て回転方向に拡開し
、依って、掘削孔Q(Thの内径は鋼管(8)の直径よ
り大径になるのである。そこで、先づ前記荷台(4)は
クレーン柱体(1)の上方部にワイヤーロープαυによ
って吊上げられ、基奨杭打設個所に優W(8)の下端部
を当接する。そして、モータ(6)に回転を与支幻ば−
この回転力はチャック(7)を介して鋼管(8)が回転
する。然るときは、この鋼管(8)の下端部に取付けら
れている掘削刃(9)が回転し、地盤を穿孔し乍ら掘削
孔OIを形成し、所定の深さまで掘削穿孔するのである
。勿論、鋼管(8)の長さが掘削孔の深さに不足すると
ぎは通常の継足法によって鋼管を結合すればよい。又、
必要によっては掘削穿孔し、鋼管(8)を掘削孔α〔内
に回転挿入する途中から掘削刃(9)の方間に設けであ
る噴出孔a2α■・・・よりモルタル或はセメントミル
クa3を噴出せしめ、鋼管(8)と掘削孔ααの孔壁間
に注入せしめてもよい。又、肖初は前記噴出孔a203
・・・より水を射水し乍ら掘削してもよい。或は、鋼管
(8)を所定深さまで回転挿入した後、抛削孔a樟と孔
壁間にモルタルを注入して硬化せしめてもよい。斯くし
て、回転挿入された鋼管(8)は地盤に挿入された侭、
当蚊地盤内に打設されたことになり一更に、前記モルタ
ル或はセメントミルクαJ等によって硬化され。
Hereinafter, one embodiment of the present invention will be described in detail with reference to the accompanying drawings. (This is the crane column, and the − of the crawler (2)
It is erected and extends upward from the sides. Further, guides (3) are provided vertically on the crane column (1)-side, and a loading platform (4) is loosely fitted onto the guides (3) so as to be movable up and down. A motor (5) and a speed reducer (
6) is placed thereon, and the chuck (7) is rotatably fitted on the lower end of the chuck (7).
(5). Further, the chuck (7) is capable of chucking the steel pipe (8), and simultaneously transmits the rotation of the motor (5) to the steel pipe (8) once chucked. Further, a digging blade (9) is attached to the lower end of the steel pipe (8). This drilling blade (9)
While rotating, the drill bit excavates the ground to open the borehole Ql, but the drilling blade expands in the direction of rotation at the same time as normal rotation, and therefore the inner diameter of the borehole Q (Th) is equal to that of the steel pipe ( Therefore, the loading platform (4) is first hoisted to the upper part of the crane column (1) by a wire rope αυ, and a Y-W (8) is placed at the location where the basic pile will be driven. ) and then apply rotation to the motor (6).
This rotational force rotates the steel pipe (8) via the chuck (7). In such a case, the excavation blade (9) attached to the lower end of the steel pipe (8) rotates to form an excavation hole OI while drilling into the ground to a predetermined depth. Of course, if the length of the steel pipes (8) is insufficient for the depth of the excavated hole, the steel pipes may be joined by the usual joining method. or,
If necessary, drill a hole and pour mortar or cement milk A3 from the spout hole A2α, which is provided in the direction of the drilling blade (9), from the middle of rotationally inserting the steel pipe (8) into the drilling hole α. Alternatively, it may be injected between the steel pipe (8) and the hole wall of the borehole αα. Also, Xiaochu is the above-mentioned vent a203.
...You may excavate while spraying more water. Alternatively, after the steel pipe (8) is rotated and inserted to a predetermined depth, mortar may be injected between the drilled hole a and the hole wall and hardened. In this way, the steel pipe (8) that has been rotated and inserted is inserted into the ground,
After being poured into the ground, it is further hardened with the mortar or cement milk αJ.

該鋼管(8)は地盤と一体となって強固な基礎を形成す
るととくなるのである。
The steel pipe (8) is integrated with the ground to form a strong foundation.

尚、セメントミルク(13等の注入法は特別に限定され
るものではなく、通常の方式でよい。又、@管(8)の
回転挿入動作にワイヤーロープqυも同調させて該鋼管
(8)を下降せしめることは可熱であり。
Note that the method of pouring cement milk (13, etc.) is not particularly limited and may be any ordinary method. Also, the wire rope qυ is synchronized with the rotational insertion operation of the steel pipe (8). It is heatable to lower it.

更に鋼管(8)の回転を円滑にするためには、クレーン
柱体(1)の下端部に受部α4を設けて鋼管(8)を上
下方向摺動自在に支承せしめることを可とする。
Furthermore, in order to make the rotation of the steel pipe (8) smooth, it is possible to provide a receiving part α4 at the lower end of the crane column (1) to support the steel pipe (8) so as to be slidable in the vertical direction.

〔発明の効果〕〔Effect of the invention〕

この発明は、叙述せる一実施例に於て詳述せる如く、基
礎杭として打設せられる鋼管は掘削孔の開穿動作と同時
に回転挿入されて、一定の深さまで到達し、周囲のモル
タル等の硬化と相俟って強固な基礎地盤を構成できるの
であり、且つ、−旦オーガー等で掘削孔を開穿し、該オ
ーガーを引上げてその後、鋼管を挿入するもので9工な
いので工期が著しく短縮され、それだけコストダウンに
寄与することができろようになったのである。
As described in detail in one embodiment, the steel pipe driven as a foundation pile is rotated and inserted at the same time as the drilling operation of the excavation hole, and reaches a certain depth, and the surrounding mortar etc. Combined with the hardening of the steel, a strong foundation can be constructed.In addition, the construction period is shortened because it requires only 9 steps to first drill a hole with an auger, pull up the auger, and then insert a steel pipe. The time has been significantly shortened, which can contribute to cost reduction.

【図面の簡単な説明】[Brief explanation of the drawing]

図はこの発明の一実施例を示し、第1図は全体の解説正
面図、@2図(イ)(ロ)は夫々掘削状態を示す解説縦
断面図である。 符号説明
The figures show one embodiment of the present invention, with Fig. 1 being an explanatory front view of the whole, and Figs. Code explanation

Claims (1)

【特許請求の範囲】[Claims] クレーン柱体に昇降自在に設けられた荷台にモータを載
置し、このモータの回転力を減速機を介してチャックに
伝達し、更に該チャックに打設せらるべき鋼管等をチャ
ックして該鋼管を地面上に立設し、而も、前記鋼管の下
端部には掘削刃を取付け、その後、前記モータを駆動し
、その回転力を鋼管を介して掘削刃を回転せしめること
により掘削孔を穿設すると同時に、この掘削孔内に該鋼
管を下降埋入し、必要により前部掘削刃によつて掘削孔
を開穿し乍ら該掘削刃部よりセメントミルク或はモルタ
ル等を鋼管と掘削孔壁間に注入することを特徴とする基
礎杭打設法。
A motor is placed on a platform provided on the crane column so that it can be raised and lowered, and the rotational force of this motor is transmitted to a chuck via a reducer, and the chuck chucks the steel pipe, etc. to be driven. A steel pipe is erected on the ground, and a drilling blade is attached to the lower end of the steel pipe.Then, the motor is driven and the rotational force is transmitted through the steel pipe to rotate the drilling blade, thereby drilling a drilling hole. At the same time as drilling, lower the steel pipe into the excavation hole, open the excavation hole with the front excavation blade if necessary, and apply cement milk or mortar from the excavation blade to the steel pipe and excavate it. A foundation pile driving method characterized by pouring between the walls of the hole.
JP16646386A 1986-07-15 1986-07-15 Foundation pile construction Pending JPS6322920A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP16646386A JPS6322920A (en) 1986-07-15 1986-07-15 Foundation pile construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP16646386A JPS6322920A (en) 1986-07-15 1986-07-15 Foundation pile construction

Publications (1)

Publication Number Publication Date
JPS6322920A true JPS6322920A (en) 1988-01-30

Family

ID=15831864

Family Applications (1)

Application Number Title Priority Date Filing Date
JP16646386A Pending JPS6322920A (en) 1986-07-15 1986-07-15 Foundation pile construction

Country Status (1)

Country Link
JP (1) JPS6322920A (en)

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5517175A (en) * 1978-07-25 1980-02-06 Canon Inc Motor driving device of winding-speed-variable camera

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5517175A (en) * 1978-07-25 1980-02-06 Canon Inc Motor driving device of winding-speed-variable camera

Similar Documents

Publication Publication Date Title
CN105569560B (en) A full set of tubular type long auger stake machine and the method for utilizing the ram machine construction
CN108978644B (en) Energy-saving and environment-friendly construction method for cast-in-situ bored pile
JP5282541B2 (en) How to prevent lifting of the lining body
CN104727323A (en) Self-drilling steel pipe pile continuous wall construction method and steel pipe pile continuous wall used in self-drilling steel pipe pile continuous wall construction method
JP2002155530A (en) Embedding method and tip metal fitting of existing pile
JPS5985028A (en) Steel pipe pile and laying work thereof
JP4095461B2 (en) Pile sinking method and apparatus
GB2154630A (en) Construction method for foundation piling
JPS6322920A (en) Foundation pile construction
JP2002275892A (en) Method and device for placing steel pipe pile
JPS59126821A (en) Erection work of foundation pile
US4027490A (en) Self-sinking, axial passage foundation pile and method
JP5282542B2 (en) Ground deformation prevention method and ground deformation prevention structure
JPH03257215A (en) Pile constructing method
JP2000144727A (en) Construction method of footing pile
JPH09209361A (en) Pilingh method in pit structure
JPS6327618A (en) Setting work of concrete pile by preboring
JP2002054164A (en) Center of column and construction method therefor
JPS61151325A (en) Method of reinforcing pile head part against horizontal force
JP3170604B2 (en) Steel pipe construction method by medium digging method
JP3843045B2 (en) Rock construction method for jacket structure
JPS58204222A (en) Pile foundation work
JPS61250229A (en) Method and apparatus for penetration of steel sheet pile
JP2000226980A (en) Jacking shaft, its construction method and jacking method
JPS60164511A (en) Pile pit formation work