JPS63123784A - Method of installation construction of elevator - Google Patents

Method of installation construction of elevator

Info

Publication number
JPS63123784A
JPS63123784A JP26850386A JP26850386A JPS63123784A JP S63123784 A JPS63123784 A JP S63123784A JP 26850386 A JP26850386 A JP 26850386A JP 26850386 A JP26850386 A JP 26850386A JP S63123784 A JPS63123784 A JP S63123784A
Authority
JP
Japan
Prior art keywords
permanent
hoistway
elevator
car frame
temporary work
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP26850386A
Other languages
Japanese (ja)
Other versions
JPH0512277B2 (en
Inventor
大迫 昭一
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Elevator Engineering and Service Co Ltd
Original Assignee
Hitachi Elevator Engineering and Service Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Elevator Engineering and Service Co Ltd filed Critical Hitachi Elevator Engineering and Service Co Ltd
Priority to JP26850386A priority Critical patent/JPS63123784A/en
Publication of JPS63123784A publication Critical patent/JPS63123784A/en
Publication of JPH0512277B2 publication Critical patent/JPH0512277B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。
(57) [Summary] This bulletin contains application data before electronic filing, so abstract data is not recorded.

Description

【発明の詳細な説明】 〔産業上の利用分野〕 本発明はエレベータの据付工事法に係り、特に巻胴式巻
上機により駆動させるエレベータに好適な据付工事法に
関する。
DETAILED DESCRIPTION OF THE INVENTION [Field of Industrial Application] The present invention relates to an installation method for an elevator, and particularly to an installation method suitable for an elevator driven by a drum hoist.

〔従来の技術〕[Conventional technology]

従来の巻胴式巻上機によって駆動するエレベータの据付
工事法は、特開昭60−52483号公報に記載のよう
に行なわれていた。すなわち、エレベータ昇降路に足場
を仮設し、これにより昇降路上部に本設プーリを取付け
、この本設プーリを介して昇降路下部付近の機械室に設
置した本設用巻胴式巻上機からのロープを配置し、この
ロープにエレベータの本設機器を連結し1巻胴式巻上磯
を操作することによって本設機器を所定位置に揚重する
ようにしていた。
A conventional method for installing an elevator driven by a winding drum type hoist is as described in Japanese Patent Application Laid-Open No. 60-52483. In other words, a scaffold is temporarily installed in the elevator hoistway, and a permanent pulley is attached to the upper part of the hoistway. A rope was placed, the main equipment of the elevator was connected to this rope, and the main equipment was hoisted to a predetermined position by operating a single-barrel hoisting rock.

〔発明が解決しようとする問題点〕[Problem that the invention seeks to solve]

ところで巻胴式巻上機を用いたエレベータの需要は、一
般に小型の建築物がほとんどである。このような小型の
建築物の建築に際しては、エレベータの据付工事を除い
て100v電源で間に合うため1元請けの建築業者は建
屋の完成間近までエレベータ用としてしか用いない20
0V電源を引かない場合が多い。このためエレベータ業
者は、エレベータ据付工事用として単独に仮設電源を引
かなければならなかったり、建築業者の作業日程に合わ
せなければならず経済性や効率の点で問題があった。
Incidentally, the demand for elevators using drum-type hoisting machines is generally for small-sized buildings. When constructing such a small building, a 100V power supply is sufficient except for the elevator installation work, so the main contractor uses the power supply only for the elevators until the building is near completion20.
In many cases, 0V power is not drawn. For this reason, elevator contractors have had to draw in a separate temporary power source for elevator installation work, or have had to match the work schedule of the builder, which has caused problems in terms of economy and efficiency.

従って、従来エレベータの据付工事法は、多くの場合、
エンジンによる別電源を手配するか、昇降路に涜って一
定のピッチで仮設足場を組立てなければならず、前者に
あっては騒音や経費高になる問題があり、また後者にあ
っては足場の仮設および撤去のために煩雑な手数を要す
るという問題があった。
Therefore, in many cases, the conventional elevator installation method is
It is necessary to arrange for a separate power source using an engine, or to assemble temporary scaffolding at a fixed pitch in front of the hoistway. There was a problem in that it required a lot of trouble to temporarily construct and dismantle.

本発明の目的は、N源の付設時期に拘ることなく据付工
事を行なうことができるエレベータの据付工事法を提供
することにある。
An object of the present invention is to provide an elevator installation method that allows installation work to be carried out regardless of the timing of installing an N source.

〔問題点を解決するための手段〕[Means for solving problems]

本発明は上記目的を達成するために、昇降路最上階にて
本設かご枠を組立て、この本設かご枠を。
In order to achieve the above object, the present invention assembles a main car frame on the top floor of a hoistway, and uses this main car frame.

昇降路下部付近に備えられた巻胴式巻上機からの本設ロ
ープによって昇降路最上部に設けたプーリを介して懸吊
し1太股用巻胴式巻上磯のブレーキを寸動的に開放操作
して本設かご枠を順次下方に移動させながら諸作業を行
なうようにしたことを特徴とする。
The brake of the 1-thigh spool-type hoist is momentarily released by suspending it via a pulley installed at the top of the hoistway using the main rope from the spool-type hoist installed near the bottom of the hoistway. The present invention is characterized in that various operations are performed while sequentially moving the main car frame downward by operation.

〔作用〕[Effect]

本発明は上述の如き据付工事法であるから1本設用巻胴
式巻上機のブレーキを手動で寸動的圧開放することによ
り、かご枠を自重で降下させることができるので、エレ
ベータ用電源が引き込まれない現場にあっても、自重で
降下させるかご枠を利用して、諸作業を行なうことが出
来る。
Since the present invention uses the above-mentioned installation method, the car frame can be lowered by its own weight by manually releasing the brake of the one-piece winding-truck hoisting machine in small steps. Even at sites where power is not available, various tasks can be carried out using the car frame, which is lowered by its own weight.

〔実施例〕〔Example〕

以下本発明の一実施例を図面によって説明する。 An embodiment of the present invention will be described below with reference to the drawings.

第1図は作業工程図で、先ず第1の工程として昇降路最
上階に仮設作業床を組み立てる。つまり6第2図に示す
ように昇降路最上階に持ち込んだ資材によって仮設作業
床3を組立てる。次に、第1図に示す第2の工程として
プーリ取付けを行なう。
Figure 1 is a work process diagram, in which the first step is to assemble a temporary work floor on the top floor of the hoistway. In other words, as shown in Fig. 6, a temporary work floor 3 is assembled using the materials brought to the top floor of the hoistway. Next, as a second step shown in FIG. 1, pulley attachment is performed.

これは第2図の仮設作業床3を足場にしてグーリブラケ
ット1を取付け、このプーリブラケット1へ本設プーリ
2を取付けている。その後、第1図の第3の工程として
、ガイドレール立設を行なう。
This is done by attaching a Gooley bracket 1 using the temporary work floor 3 shown in FIG. 2 as a foothold, and attaching the permanent pulley 2 to this pulley bracket 1. Thereafter, as the third step in FIG. 1, the guide rails are erected.

つまり第2図に示す昇降路6の下部近傍から昇降路6内
に搬入したガイドレール4を、仮設作業床3からロープ
で吊ったり、またはウィンチを利用して吊り上げ、ガイ
ドレール4のほぼ1本分の長さ忙相当する分だけ上方へ
引き上げる。次いで。
In other words, the guide rail 4 carried into the hoistway 6 from near the bottom of the hoistway 6 shown in FIG. Pull upwards by the amount equivalent to the length of the minute. Next.

この吊り上げたガイドレール4の下部忙次のガイドレー
ルを接続し、これを更にガイドレールの1本分に相当す
る高さまで吊り上げるという作業を繰り返し、結局、各
階床出入口13の両側に1対のガイドレールを立設する
The work of connecting the lower guide rail of this lifted guide rail 4 and lifting it up to a height equivalent to one guide rail is repeated, and in the end, a pair of guide rails are installed on both sides of each floor entrance/exit 13. Install the rail.

次の第4の工程はガイドレール芯出しおよび固定で、ガ
イドレールブラケット5を用いて各階床出入口13の各
床面に対して芯出しを行ないつつ固定する。次の第5の
工程はかご枠組立であり、昇降路最上階に組立てた仮設
作業床3を下方へ第3図の如く移動させ、移動後の仮設
作業床3を足場にして本設かご枠10を最上階で組立て
る。この工程と並行して、v、6エ程として昇降路6の
下部近傍に形成した機械室7に本設用巻胴式巻上機8と
制御盤9を据付けこの本設用巻胴式巻上機8から本設ロ
ープを送り出し、第7の工程として本設プーリ2を介し
て本設かご枠10を懸吊した状態にした後、第8の工程
として仮設作業床3を解体する。
The next fourth step is centering and fixing the guide rail, in which the guide rail bracket 5 is used to center and fix the guide rail to each floor surface of each floor entrance 13. The next fifth step is car frame assembly, in which the temporary work floor 3 assembled on the top floor of the hoistway is moved downward as shown in Figure 3, and the permanent car frame is constructed using the moved temporary work floor 3 as a foothold. Assemble 10 on the top floor. In parallel with this step, a winding drum type hoist 8 for permanent installation and a control panel 9 were installed in a machine room 7 formed near the bottom of the hoistway 6 as step v.6. After sending out the permanent rope from the upper machine 8 and suspending the permanent car frame 10 via the permanent pulley 2 in the seventh step, the temporary work floor 3 is dismantled in the eighth step.

このとき状態は第4図に示す通りである。The state at this time is as shown in FIG.

次に、第9の工程としてのかご枠移動は本設用巻胴式巻
上機8のブレーキを手動で操作し、これを寸動的に解放
することにより本設かご枠lOを所定の位置まで下降さ
せ、第10の工程として図示しない出入口部品や昇降路
内機器の取付け、昇降路内配線および結線作業等の諸作
業を行なう。このブレーキの寸動操作と諸作業を本設か
ご枠10が最下階に達するまで繰返すことにより昇降路
内の作業を全て完了する。
Next, in the ninth step of moving the car frame, the main car frame IO is moved to a predetermined position by manually operating the brake of the main installation winding drum type hoist 8 and releasing it inch by inch. As a tenth step, various works such as installation of entrance/exit parts and equipment in the hoistway (not shown), and wiring and connection work in the hoistway are performed. All the work in the hoistway is completed by repeating this brake inching operation and various works until the main car frame 10 reaches the lowest floor.

最後に、エレベータ用電源が引き込まれた時点で第11
の工程として試運転・調整を行う。
Finally, when the elevator power was turned on, the 11th
As part of the process, trial runs and adjustments will be made.

〔発明の効果〕〔Effect of the invention〕

以上説明したように本発明は、昇降路最上階に本設かご
枠を構成し、この本設かご枠を1巻胴式巻上磯から送り
出して本設プーリに掛けた本設。
As explained above, the present invention comprises a permanent car frame on the top floor of the hoistway, and this permanent car frame is sent out from a single-carrying type hoist and hung on a permanent pulley.

−プによって懸吊し1巻胴式巻上機のブレーキを寸動的
に解放操作することによって本設かご枠を自重で下降さ
せながら各階床での諸作業を行なうよ5にしたため、電
源が引込まれていない状態でも別電源を設けることなく
エレベータの据付工事を行なうことができる。
The main car frame was lowered by its own weight by suspending the car frame by its own weight by gradually releasing the brake of the single-carry hoisting machine. Elevator installation work can be carried out without installing a separate power source even when the elevator is not drawn in.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は本発明になるエレベータ据付工事法の作業工程
図、第2図、第3図および第4図は上記据付工事法にお
ける所定の工程中を示す昇降路縦断面図である。 2・・・・・・本設プーリ、3・・・・・・仮設作業床
、4・・・・・・ガイドレール、6・・・・・・昇降路
、8・・・・・・本設用巻胴式巻上機、10・・・・・
・本設かご枠、11・・・・・・本設ローブ。 第1図      第2図 第3図 第4図
FIG. 1 is a work process diagram of the elevator installation method according to the present invention, and FIGS. 2, 3, and 4 are vertical cross-sectional views of the hoistway showing predetermined steps in the above-mentioned installation method. 2... Permanent pulley, 3... Temporary work floor, 4... Guide rail, 6... Hoistway, 8... Pieces Installation winding drum type winding machine, 10...
・Permanent basket frame, 11...Permanent robe. Figure 1 Figure 2 Figure 3 Figure 4

Claims (1)

【特許請求の範囲】[Claims] 1、昇降路に立設したガイドレールに沿って本設かご枠
を移動させながら行なうエレベータの据付工事法におい
て、昇降路内最上階に仮設作業床を組立て、この仮設作
業床を用いて昇降路上部に本設プーリを取付け、上記ガ
イドレールを立設した後、上記仮設作業床を下方に移動
し、この仮設作業床を用いて上記本設かご枠を組立て、
昇降路下部付近に設けた本設用、胴式巻上機から上記本
設プーリを介して設けた本設ロープによって上記本設か
ご枠を懸吊した後、上記仮設作業床を解体し、上記本設
用巻胴式巻上機のブレーキを寸動的に開放することによ
り上記本設かご枠を順次下方に移動させながら諸作業を
行なうようにしたことを特徴とするエレベータの据付工
事法。
1. In the elevator installation method, which is carried out by moving the permanent car frame along the guide rail installed in the hoistway, a temporary work floor is assembled on the top floor of the hoistway, and this temporary work floor is used to install the elevator car on the hoistway. After attaching the permanent pulley to the section and erecting the guide rail, move the temporary work floor downward, and use this temporary work floor to assemble the permanent car frame,
After suspending the permanent car frame from the permanent trunk-type hoist installed near the bottom of the hoistway via the permanent rope provided through the permanent pulley, the temporary work floor was dismantled, and the above-mentioned A method for installing an elevator, characterized in that various works are carried out while sequentially moving the main car frame downward by gradually releasing the brake of a winding drum hoist for the main installation.
JP26850386A 1986-11-13 1986-11-13 Method of installation construction of elevator Granted JPS63123784A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP26850386A JPS63123784A (en) 1986-11-13 1986-11-13 Method of installation construction of elevator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP26850386A JPS63123784A (en) 1986-11-13 1986-11-13 Method of installation construction of elevator

Publications (2)

Publication Number Publication Date
JPS63123784A true JPS63123784A (en) 1988-05-27
JPH0512277B2 JPH0512277B2 (en) 1993-02-17

Family

ID=17459404

Family Applications (1)

Application Number Title Priority Date Filing Date
JP26850386A Granted JPS63123784A (en) 1986-11-13 1986-11-13 Method of installation construction of elevator

Country Status (1)

Country Link
JP (1) JPS63123784A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH02295877A (en) * 1989-05-08 1990-12-06 Hitachi Elevator Eng & Service Co Ltd Installation construction method for elevator

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH02295877A (en) * 1989-05-08 1990-12-06 Hitachi Elevator Eng & Service Co Ltd Installation construction method for elevator

Also Published As

Publication number Publication date
JPH0512277B2 (en) 1993-02-17

Similar Documents

Publication Publication Date Title
JPS63123784A (en) Method of installation construction of elevator
JP3844944B2 (en) Demolition method of construction elevator
JP3920527B2 (en) Elevator for construction
JP2000226169A (en) Elevator erection method
JP3348018B2 (en) Elevator installation method
JPS63134487A (en) Method of installation of elevator
JP2001335255A (en) Elevator installation construction method, and elevator installation unit
JPH021066B2 (en)
JPH02295877A (en) Installation construction method for elevator
JP2877593B2 (en) Elevator installation method
JP3301948B2 (en) Elevator installation method
JPH10218527A (en) Temporary elevator and installing method thereof
JPH072453A (en) Improving method for elevator
JP2000226168A (en) Elevator erection method and its device
JP3347968B2 (en) Hydraulic elevator installation method
JPH05201648A (en) Installation of elevator
JP3198428B2 (en) Elevator installation method
JPH0470231B2 (en)
JPH11292424A (en) Installation method for small size elevator
JP2812592B2 (en) How to modify the elevator
JPH0132153B2 (en)
JPS5912595B2 (en) Elevator installation construction method
JPH0388684A (en) Method of construction for setting elevator
JP2812590B2 (en) How to modify the elevator
JP2001316057A (en) Method and device for weight lifting in elevator