JPS6282455A - Workshop management system - Google Patents

Workshop management system

Info

Publication number
JPS6282455A
JPS6282455A JP60223058A JP22305885A JPS6282455A JP S6282455 A JPS6282455 A JP S6282455A JP 60223058 A JP60223058 A JP 60223058A JP 22305885 A JP22305885 A JP 22305885A JP S6282455 A JPS6282455 A JP S6282455A
Authority
JP
Japan
Prior art keywords
information
processing
recording medium
recording
worker
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP60223058A
Other languages
Japanese (ja)
Other versions
JP2517223B2 (en
Inventor
Kazuyoshi Yasuda
和義 安田
Kiyoshi Yajima
矢島 清
Tomonori Inokoshi
猪腰 友典
Shigeki Yamashita
茂樹 山下
Toshiaki Kodama
児玉 利昭
Toshimitsu Hirose
広瀬 利光
Tomonori Ouchi
大内 智範
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Construction Co Ltd
Original Assignee
Shimizu Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Construction Co Ltd filed Critical Shimizu Construction Co Ltd
Priority to JP22305885A priority Critical patent/JP2517223B2/en
Publication of JPS6282455A publication Critical patent/JPS6282455A/en
Application granted granted Critical
Publication of JP2517223B2 publication Critical patent/JP2517223B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Abstract

PURPOSE:To grasp accurately conditions of a workshop by recording required management information on an information recording medium delivered to each worker and reading this information when the worker enters into and goes out of the workshop. CONSTITUTION:Each worker is allowed to carry a worker ID card 2 where information peculiar to the worker himself is recorded. When the worker enters into/goes out of the workshop, card information is read from the ID card 2 by a reader/writer 3 and is checked, and its contents are displayed on the screen of a display device 7 and are written in a present person file. In accordance with timer setting or arbitrary operator's instruction, a CPU 8 performs the data retrieval, totalization, and classifying of an entrance position list and the other various lists with respect to data registered in the present person file and outputs results as lists. Thus, the conditions of workers are grasped accurately on the basis of these lists.

Description

【発明の詳細な説明】 〔産業上の利用分野〕 本発明しJ、磁気カード、光カート、ICカー1等の個
人携帯用のデータ記録媒体を使って作業所における労務
・工程管理情報や健康管理情報、1)1害経歴情報等の
作業員各自の固有情報を入力し2て労務管理や工程管理
、健康管理、災害予知等のデータを作成し出力する作業
所管理システムに関するものである。
[Detailed Description of the Invention] [Industrial Application Field] The present invention provides labor and process management information and health information in workplaces using personal portable data recording media such as magnetic cards, optical carts, and IC cars. Management information relates to a workplace management system that 1) inputs unique information of each worker such as injury history information and 2) creates and outputs data on labor management, process management, health management, disaster prediction, etc.

〔従来の技術〕[Conventional technology]

作業所を管理する場合、−・般に複数の作業所がその対
象となるのが普通である。ところで、各作業所では、正
規作業員のほか、応援者、短!!J1就労者、新規入場
者、遅刻者等の様々な作業員がいてこれらの把握が必要
であり、場合によっては当[1の就労者氏名の確認、j
且鳴者の確認が随時必要である等、把握しなければなら
ない管理11口r口、t、 t+’常に多岐に渡ってい
る。このような作業所におい”ζは、就労者氏名の把握
、受入教育の徹底、連絡先や健康状態のナエソク、定時
Il後の残留者の確認、その他多岐にわたる労務管理が
必要であるが、その労務管理は、1゛事規模により種々
の手作業で実施されている。
When managing a workplace, it is common for multiple workplaces to be managed. By the way, at each work site, in addition to regular workers, there are also supporters and short staff members. ! There are various workers such as J1 workers, new entrants, late arrivals, etc., and it is necessary to understand them.
There are always a wide variety of management aspects that must be kept in mind, such as the need to confirm the person making the noise at any time. In such a workplace, it is necessary to know the names of workers, provide thorough training for on-boarding workers, confirm contact information and health conditions, confirm who remains after scheduled work hours, and perform a wide variety of other labor management tasks. Labor management is carried out manually in various ways depending on the scale of the project.

〔発明が解決しようとする問題点) −・般に、成る1目についてそのl」に就労する作業員
は、管理対象となる作業し1全員の・うちの約115程
度であるといわれており、作業員全員を対象とする作業
所毎の作業員の把握、労務管理、工程管理、安全管理は
重要であるが、現実には労務管理をそれぞれの]二車現
場の責任者が個別に行っており、総合的に管理する等の
有効な管理方式の採用63F非常に疎しかった。そのた
め、作業所の管理に一貫性がなく、作業所が変わるとそ
の都度そのイ1業所に合った管理方式に対応すべく配慮
が必要となり、各作業所を統括して工事を総合的に管理
−4る上では様々な支障を来していた。
[Problem to be solved by the invention] - Generally, it is said that there are approximately 115 workers working in the 1st part of the work that is subject to management. Although it is important to understand all workers at each work site, labor management, process management, and safety management, in reality, labor management is carried out individually by the person in charge of each motorcycle site. However, the adoption of effective management methods such as comprehensive management was extremely difficult. As a result, there is no consistency in the management of work sites, and when the work site changes, consideration must be given to adapting the management system to suit each work site. There were various problems in management.

本発明は、このような問題点を解決するものであり、作
業員各自の固有情報を正確に把握し、工程管理、労務管
理、安全管理も含めた総合的な作業所の管理が1+)能
な作業所管理システムの提供を目的とするものである。
The present invention solves these problems by accurately grasping the unique information of each worker and making comprehensive workplace management including process management, labor management, and safety management (1+) possible. The purpose is to provide a workplace management system.

〔問題点を解決するための手段〕[Means for solving problems]

そのために本発明の作業所管理シスケノ、tit、作業
員の個人情報を記録する情報記録媒体、データ処理指令
の情報を記録する処理記i、A媒体、記録媒体に対して
記録情報を読み取り/記録Aる読み取り/記録手段、情
報記録媒体から読み1収った作業員の個人情報を記1a
する記1a手段、データを出力する出力手段、及び記録
媒体に対して記録情報を読み取り/記録するデータの処
理を行う演算処理手段を備え、演算処理手段は、記1@
手段に記憶した個人情報をデータ処理指令に従って検索
、望計、分類、リスト化して出力することを特徴とする
ものであり、さらには、中央に情報処理センターを設け
、通信回線を通して各作業所の情報を情報処理センター
に収集して災害情報処理やT稈管理情報処理その他の統
訂処理を行うことを特徴とするものである。
For this purpose, the present invention reads/records recorded information on the workplace management system, tit, information recording medium that records personal information of workers, processing record i that records information on data processing commands, A medium, and recording medium. A reading/recording means records the personal information of the worker read from the information recording medium 1a
The arithmetic processing means includes a means for processing data for reading/recording recorded information on a recording medium, an output means for outputting data, and an arithmetic processing means for processing data for reading/recording recorded information on a recording medium.
This system is characterized by searching, visualizing, classifying, listing, and outputting personal information stored in the means according to data processing instructions.Furthermore, an information processing center is set up at the center, and each work site is accessed through communication lines. This system is characterized by collecting information in an information processing center and performing disaster information processing, T culm management information processing, and other revision processing.

〔作用〕[Effect]

4、:発明の作業所管理システノ、では、作業員個人に
月して情f13記録媒体を発給し、この情報記録媒体に
読め込み/記録手段を使って必要な管理情報を記録し7
、これを作業所の出入りに際して読み込ませるごとによ
って、所望の表やデータを生成して出力でき、これらの
表やデータから作業所の状況を正確に把握することがで
きる。また、その出力データは、処理記録媒体を使うこ
とによって簡華な操作により得ることができる。また、
各作業所の情報を中央の情報処理センターで収集するの
で、全体の作業所について総合的に管理することができ
る。
4.: In the workshop management system of the invention, an information recording medium is issued to each worker on a monthly basis, and necessary management information is recorded on this information recording medium using a reading/recording means.
By reading this data each time the user enters or exits the workplace, desired tables and data can be generated and output, and the situation in the workplace can be accurately grasped from these tables and data. Furthermore, the output data can be obtained through simple operations by using a processing recording medium. Also,
Since information on each worksite is collected at a central information processing center, the entire worksite can be comprehensively managed.

(実施例〕 以下、実施例を図面を参照しつつ説明する。(Example〕 Examples will be described below with reference to the drawings.

第1図は本発明に係る作業所管理システムの1実施例構
成を示す図、第2図はカードに記録するデータの例を示
す図、第3図は第1図に示す作業所管理システムの処理
の流れを説明するための図である。
FIG. 1 is a diagram showing the configuration of an embodiment of the workplace management system according to the present invention, FIG. 2 is a diagram showing an example of data to be recorded on a card, and FIG. 3 is a diagram showing an example of the construction of the workplace management system shown in FIG. FIG. 3 is a diagram for explaining the flow of processing.

第1図において、1は作業カード、2は作業具1F’)
カード、3はリーダー/ライター、4と5はリーダー、
6 Letプリンター、7はディスプレイ、8はCP 
IJ、9と10はフl′1ソピイディスク、11と12
はl?AM、13は通信回線を示す。
In Figure 1, 1 is a work card, 2 is a work tool 1F')
card, 3 is reader/writer, 4 and 5 are readers,
6 Let printer, 7 is display, 8 is CP
IJ, 9 and 10 are full l'1 sopy disks, 11 and 12
Is it? AM, 13 indicates a communication line.

作業カード1は、磁気カードや光カード、ICカード等
の携帯に適した記録媒体で、特定のデータ検索、集計、
分類、リスト化のデータ指令を入力するものであり、作
業員(Dカー1” 2 L;I、作業カード1と同様に
作業員各自が携帯するのに好適な磁気カードや光カード
、ICカー1等の記録媒体で、その作業員の固有情報を
記録しておくものである。リーダー/ライター3は、作
業員■Dカード2に作業員の固有情報を記録したり、そ
の記録した作業員の固有情報を訣み取ったりするもので
あり、リーダー4と5シl、例えば作業所の各ゲートに
設置して作業RIDカー1′2に記録した作業員の固有
情報を読み取るものである。作業員各自の固有情報とし
て番よ、例えば第2図に示すように、■その作業員の所
属や本籍、生年月日、氏名、職種、障害等の労務・工程
管理V4報、■血圧とその測定日、障害その他の健康管
理情報、■過去の災害発生内容や災害発生日等の災害予
知情報が記録される。フロンビイディスク9.10、R
AM1]、12は、各種の処理プログラムやデータを格
納するものであり、この処理プログラムに従って第3図
に示すような所定の処理を行うのがcp[18である。
The work card 1 is a recording medium suitable for carrying such as a magnetic card, optical card, or IC card, and is used for searching, aggregating, and
It is used to input data commands for classification and listing, and the worker (D car 1" 2 L; It is a first-class recording medium that records the worker's unique information.The reader/writer 3 records the worker's unique information on the worker's D card 2, and records the worker's unique information on the worker. Readers 4 and 5 are installed at each gate of a work site, for example, to read the unique information of workers recorded in the work RID car 1'2. For example, as shown in Figure 2, each worker's unique information includes: ■ Labor and process management V4 reports such as the worker's affiliation, domicile, date of birth, name, type of occupation, and disability; ■ Blood pressure and other information. Measurement date, disability and other health management information, ■Disaster prediction information such as past disaster occurrence contents and disaster occurrence date are recorded.Frombie Disc 9.10, R
AM1] and 12 are for storing various processing programs and data, and CP[18 is for performing predetermined processing as shown in FIG. 3 in accordance with this processing program.

CPU8は、キー人力手段や内蔵の記1a部を備え、作
業員IDカード2の読み携りデータの処理及び記録デー
タの処理を行うと共に、定期的に或いは随時キー人力指
令や作業カード1の入力により蓄積されたデータの検索
、集計、分類、リスト化のデータ処理を行うものであり
、その結果を出力するのがプリンター6やディスプレイ
7、電話回線などの通信回線13である。なお、リーダ
ー/ライター3やプリンター6、ディスプレイ7、CP
 1.J 8、フロッピィディスク9.10゜RAM1
1.12からなる作業所管理ユニットは、ケースに一体
化して収納して各作業所毎に設置される。また、従来の
個人携帯用のカードは、単に個人のTI’)(識別符号
)を記録するにすぎないため1トラツクのカードが使用
されているが、本発明のシステムでは、第2図に示すよ
うにカードに記録する情報が多くなることから2トラツ
クを使って記録することをも特徴とする。
The CPU 8 is equipped with a key manual means and a built-in recording unit 1a, and reads the worker ID card 2 and processes the carried data and recorded data, and periodically or at any time inputs the key manual commands and the work card 1. It performs data processing such as searching, aggregating, classifying, and listing data accumulated by the above, and outputs the results to a communication line 13 such as a printer 6, a display 7, and a telephone line. In addition, reader/writer 3, printer 6, display 7, CP
1. J 8, floppy disk 9.10° RAM 1
A worksite management unit consisting of 1.12 is housed integrally in a case and installed at each worksite. Furthermore, in the conventional personal portable card, a one-track card is used because it merely records the individual's TI' (identification code), but in the system of the present invention, the card shown in FIG. Since there is a large amount of information to be recorded on the card, it is also characterized by recording using two tracks.

次に、上記作業所管理システムを使った作業所の管理の
概要を第3図により説明する。まず、作業員が入場/退
場する際にカードの有無を調べ、カードを有している場
合にはカードの読み取り処理を行い、カードを有してい
ない場合にはキー人力手段を使って第2図に示すような
所定事項の入力処理を行う。カードの読み取り処理では
、カード情報読み取り及びチェックを行い、その内容を
画面に表示すると共に入場者ファイルに書き込む。
Next, an overview of workplace management using the above-mentioned workplace management system will be explained with reference to FIG. First, when a worker enters or exits, the worker checks whether or not he/she has a card. If the worker has the card, the card is read, and if the worker does not have the card, a second Input processing of predetermined items as shown in the figure is performed. In the card reading process, card information is read and checked, and the contents are displayed on the screen and written in the visitor file.

所定事項の入力処理では、第2図に示すようなデータシ
ートに各作業員の固有情帽を記入し、それに基づいてキ
ー人力する。そして、その入力情報を入場者ファイル及
び管理マスターファイルに登録し、要注意者チェックリ
ストを出力すると共に、磁気カードを発行し、管理マス
ター登録簿及び磁気カード発行簿を出力する。このよう
に入場者ファイルにば、その時々における作業所の入場
者に関する情報が格納され、管理マスターファイルには
、過去からの全入場考量する情報が格納される。
In the process of inputting predetermined items, the unique characteristics of each worker are entered in a data sheet as shown in FIG. 2, and key input is performed based on the information. Then, the input information is registered in the visitor file and the management master file, a caution list is output, a magnetic card is issued, and a management master register and a magnetic card issuance register are output. In this way, the visitor file stores information regarding the visitors to the workshop at any given time, and the management master file stores information regarding all past entries.

そして、タイマー設定により或いは随時オペレータの指
示により入場者一覧表その他各種の一覧表を入場者ファ
イルに登録されたデータについて所定のナータ検索、集
計、分類を行ってリスト化し出力する。
Then, by setting a timer or by instructions from an operator at any time, a visitor list and various other lists are outputted by performing predetermined search, aggregation, and classification on the data registered in the visitor file.

第4図はオンラインネットワークの構築例を示す図であ
り、21−1ないし21−nは作業所管理ユニット、2
2は中央通信装置、23は情報処理センターを示す。作
業所管理ユニ7)21−1ないし21−nは、第1図に
示す作業所管理ユニットであり、ここから中央通信装置
22により所定のデータが電話回線その他の通信回線を
通して収集され、情報処理センター23に送られる。情
報処理センター23では、例えば作業の基準工程情報を
登録しておく工程管理テーブルが用意され、災害情報処
理や工程管理情報処理、労務管理情報処理、健康管理情
報処理などを行う。以下にその処理内容を説明する。
FIG. 4 is a diagram showing an example of constructing an online network, in which 21-1 to 21-n are workshop management units, 2
2 is a central communication device, and 23 is an information processing center. Workplace management units 7) 21-1 to 21-n are the worksite management units shown in FIG. Sent to Center 23. In the information processing center 23, for example, a process management table is prepared in which standard process information of work is registered, and processes such as disaster information processing, process management information processing, labor management information processing, and health management information processing are performed. The details of the processing will be explained below.

災害情報処理は、災害予知をするための要因測定型「1
より経験に基づいた災害危険度を算出する処理である。
Disaster information processing is a factor measurement type “1” for predicting disasters.
This process calculates the degree of disaster risk based on experience.

災害危険度の測定項目としては、受注した工事の内容に
よって評価される固定イーと、]−事の進行に伴って評
価される変動値とがある。
The measurement items for disaster risk include a fixed value, which is evaluated based on the content of the construction contract, and a variable value, which is evaluated as the situation progresses.

固定値の特性要因としてtel:、 T事区分や構造、
延面積、階数(地下、地上)工期その他の要素により評
価される一L事の勤易度、工事責任者やその11業所の
過去の災害発41−データ等により評価される災害経歴
の有無、鉄骨建方工事や足場kll払し]−事等の危険
工事[稈の有無が考lεされ、変動値の特性要因として
は、事前計画の実施状況、安全施]。
As fixed value characteristic factors, tel:, T event classification and structure,
The level of workability of the 1L worker, which is evaluated based on the total area, number of floors (underground, above ground), construction period, and other factors, and whether or not there is a history of accidents, which is evaluated based on past accident occurrence data of the construction manager and his 11 workplaces. , steel frame erection work, scaffolding construction] - dangerous construction such as [the presence or absence of culms is taken into consideration, and the characteristic factors of the fluctuation values are the implementation status of advance planning, safety measures].

サイクルの実施状況、安全管理状況の評価、足止状況の
経歴評価が考t=される。そして、工事の進行に伴って
所定の期間毎に、過去の経験に帖づいて算定された数(
(ηを使ってこれらの評価を行い、危険度の配分計算を
行うことによって、墜落、飛来、落丁、クレーンその他
の災害予知が行われる。
The implementation status of the cycle, evaluation of safety management status, and history evaluation of stranded situations are considered. As the construction progresses, the number (
(By performing these evaluations using η and calculating the degree of danger, it is possible to predict accidents such as crashes, flying, falling off, cranes, etc.)

工程管理情報処理は、労務・工程管理情報から工程管理
に必要なデータを作成する処理である。
Process management information processing is a process that creates data necessary for process management from labor and process management information.

例えば、そのI]の各職種の人数を集計することにより
、工程管理テーブルに登録されたその日の各工程毎に必
要な職種の人数割合から工程/職種別作業員数予測デー
タが作成され、或いはその日迄の各職種毎の就業実績人
口数を集計し、その集計値と工程管理テーブルに登録さ
れたその日迄の人[1敗とを比較することにより、翌月
、2ケ月先、3ケ月先の職種別作業員の過不足予測デー
タが作成され、さらには、業者(所属)別に作業員を集
d1するごとにより業者別作業員の過不足予測データが
作成される。
For example, by aggregating the number of people in each job category in Part I], data for predicting the number of workers by process/job type can be created from the ratio of the number of people in each job category required for each process on that day registered in the process management table, or By tabulating the number of people employed in each occupation up to that point, and comparing the aggregated value with the number of people registered in the process management table up to that day (1 loss), we can calculate the occupations for the next month, 2 months ahead, and 3 months ahead. Excess/deficiency prediction data for different workers is created, and furthermore, surplus/deficiency prediction data for workers by vendor is created each time workers are collected d1 by vendor (belonging).

労務管理情報処理は、労務・工程管理情報から労化管理
に必要なデータを作成する処理である。
Labor management information processing is a process that creates data necessary for labor management from labor and process management information.

例えば、工程管理テーブル2に登録されたその日の各固
定毎に必要な職種と資格とをもとに、無資格者のチェッ
クを行うことにより、工程別の無資格者リストが作成さ
れ、また、作業員各自の入場時刻と退場時刻とを記録し
、退場時刻の未記録者を検索することによって残響音リ
ストが作成され健康管理情報処理は、()を康管理に必
要な+ht圧その他の値につき、比較M fit値と有
効期間を設定しておき、作業員各自の健康管理情報が比
較基準値を越えているか否かを調べ、比較基準値を越え
ている作業員、有効期間を過ぎている作業員のリストを
作成したり、障害者のサーチを行い、障害打リストを作
成したりするものである。
For example, a list of unqualified persons for each process is created by checking for unqualified persons based on the required occupations and qualifications for each fix of the day registered in the process management table 2, and A reverberation sound list is created by recording the entry and exit times of each worker and searching for those whose exit times have not been recorded.Health management information processing uses () to record +HT pressure and other values necessary for health management. Therefore, a comparison M fit value and a valid period are set, and the health management information of each worker is checked to see if it exceeds the comparison standard value. It creates a list of workers with disabilities, searches for people with disabilities, and creates a list of disabled workers.

このように情報処理センターおいて複数の作業所を総括
管理し、作業所間を頻繁に移動している作業員について
も常時とこの作業所に就労しζいるかを把握することに
より、各作業所への災害予知を行い、災害を未然に防I
トするための対策を講じるようにすることができる。
In this way, the information processing center can centrally manage multiple work sites, and by understanding whether workers who frequently move between work sites are working at that work site at all times, each work site can be Predict disasters and prevent them from occurring
It is possible to take measures to prevent this.

〔発明の効果〕〔Effect of the invention〕

以上の説明から明らかなように、本発明によれば、カー
ドによって作業所における各作業員の管理に必要な各種
のデータを人力し、所望の表やリストなどを出力できる
ので、各作業員の個人情報に基づいて作業所の管理を容
易に行うことができる。また、各作業所に関するデータ
を統括収集して処理することにより、複数の作業所にわ
たる総合的な管理が可能となる。
As is clear from the above description, according to the present invention, it is possible to manually input various data necessary for managing each worker at a work site using a card and output desired tables and lists. The workplace can be easily managed based on personal information. In addition, by centrally collecting and processing data regarding each work site, comprehensive management across multiple work sites becomes possible.

【図面の簡単な説明】[Brief explanation of drawings]

第1図は本発明に係る作業所管理システムの1実施例構
成を示す図、第2図はカードに記録するデータの例を示
す図、第3図は第1図に示す作業所管理システムの処理
の流れを説明するための図、第4図はオンラインネット
ワークの構築例を示す図である。 1・・・作業カード、2・・・作業員IDカード、3・
・・リーダー/ライター、4と5・・・リーダー、6・
・・プリンター、7・・・ディスプレイ、8・・・CP
 U、9と10・・・フロッピィディスク、11と12
・・・RAM、13・・・)m信回線。 出 願 人  清水建設株式会社 代理人弁理士 阿 部  龍 吉 図面の浄書(内容に変更なし) 第1図 図面の浄書(内容に変更なし) 第?図 LJ 手 h4E  J市 tE :b   <力式)%式% 1、事件の表示 昭和60年特許願第22305882
、発明の名称 作 業 所 管 理 シ ス テ J、
3、補正をする者 事件との関係  特許出願人 住  所 東京都中央区京橋−1月116番l壮名  
称 (229)清水建設株式会拐代表者吉野照藏 4、代理人
FIG. 1 is a diagram showing the configuration of an embodiment of the workplace management system according to the present invention, FIG. 2 is a diagram showing an example of data to be recorded on a card, and FIG. 3 is a diagram showing an example of the construction of the workplace management system shown in FIG. FIG. 4, which is a diagram for explaining the flow of processing, is a diagram showing an example of constructing an online network. 1...Work card, 2...Worker ID card, 3.
...Reader/Writer, 4 and 5...Reader, 6.
...Printer, 7...Display, 8...CP
U, 9 and 10...floppy disk, 11 and 12
...RAM, 13...)m communication line. Applicant: Shimizu Corporation Representative Patent Attorney Ryukichi Abe Engraving of the drawing (no changes to the content) Engraving of the drawing of Figure 1 (no changes to the content) No. 1? Figure LJ Hand h4E J city tE :b <Force formula)% formula% 1.Indication of incident 1985 Patent Application No. 22305882
, Title of the invention Workplace management system J.
3. Relationship with the case of the person making the amendment Patent applicant address: Kyobashi, Chuo-ku, Tokyo - January 116th, Soumei
Name (229) Shimizu Corporation Representative Teruzo Yoshino 4, Agent

Claims (5)

【特許請求の範囲】[Claims] (1)作業員の個人情報を記録する情報記録媒体、デー
タ処理指令の情報を記録する処理記録媒体、記録媒体に
対して記録情報を読み取り/記録する読み取り/記録手
段、情報記録媒体から読み取った作業員の個人情報を記
憶する記憶手段、データを出力する出力手段、及び記録
媒体に対して記録情報を読み取り/記録するデータの処
理を行う演算処理手段を備え、演算処理手段は、記憶手
段に記憶した個人情報をデータ処理指令に従って検索、
集計、分類、リスト化して出力することを特徴とする作
業所管理システム。
(1) Information recording medium that records personal information of workers, processing recording medium that records information on data processing instructions, reading/recording means that reads/records recorded information on the recording medium, and information that is read from the information recording medium. It is equipped with a storage means for storing personal information of a worker, an output means for outputting data, and an arithmetic processing means for processing data for reading/recording recorded information on a recording medium, and the arithmetic processing means is arranged in the storage means. Search stored personal information in accordance with the Data Processing Directive;
A workplace management system that is characterized by aggregation, classification, listing, and output.
(2)演算処理手段は、設定時刻毎に所定のデータ処理
を行うと共に、処理記録媒体を読み込んだときは該処理
記録媒体の情報によるデータ処理を行うことを特徴とす
る特許請求の範囲第1項記載の作業所管理システム。
(2) The arithmetic processing means performs predetermined data processing at each set time, and when reading a processing recording medium, performs data processing based on the information on the processing recording medium. Workplace management system as described in section.
(3)情報記録媒体は、2トラックに作業員の個人情報
を記録することを特徴とする特許請求の範囲第1項記載
の作業所管理システム。
(3) The workplace management system according to claim 1, wherein the information recording medium records the personal information of the worker on two tracks.
(4)読み取り/記録手段、記憶手段、出力手段、及び
演算処理手段をケースに一体収納したことを特徴とする
特許請求の範囲第1項記載の作業所管理システム。
(4) The workplace management system according to claim 1, wherein the reading/recording means, the storage means, the output means, and the arithmetic processing means are integrally housed in a case.
(5)作業員の個人情報を記録する情報記録媒体、デー
タ処理指令の情報を記録する処理記録媒体、記録媒体に
対して記録情報を読み取り/記録する読み取り/記録手
段、情報記録媒体から読み取った作業員の個人情報を記
憶する記憶手段、データを出力する出力手段、及び記録
媒体に対して記録情報を読み取り/記録するデータの処
理を行う演算処理手段からなる作業所管理ユニットを各
作業所単位に設けると共に、中央に情報処理センターを
設け、通信回線を通して作業所管理ユニットの情報を情
報処理センターに収集して災害情報処理や工程管理情報
処理その他の統計処理を行うことを特徴とする作業所管
理システム。
(5) Information recording medium for recording personal information of workers, processing recording medium for recording information on data processing instructions, reading/recording means for reading/recording recorded information on recording media, reading from information recording medium A workplace management unit consisting of a storage means for storing personal information of workers, an output means for outputting data, and an arithmetic processing means for reading/recording recorded information on a recording medium is set up for each workplace. A workshop characterized by having an information processing center in the center, collecting information from the workshop management unit to the information processing center through communication lines, and performing disaster information processing, process management information processing, and other statistical processing. management system.
JP22305885A 1985-10-07 1985-10-07 Work place management system Expired - Lifetime JP2517223B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP22305885A JP2517223B2 (en) 1985-10-07 1985-10-07 Work place management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP22305885A JP2517223B2 (en) 1985-10-07 1985-10-07 Work place management system

Publications (2)

Publication Number Publication Date
JPS6282455A true JPS6282455A (en) 1987-04-15
JP2517223B2 JP2517223B2 (en) 1996-07-24

Family

ID=16792171

Family Applications (1)

Application Number Title Priority Date Filing Date
JP22305885A Expired - Lifetime JP2517223B2 (en) 1985-10-07 1985-10-07 Work place management system

Country Status (1)

Country Link
JP (1) JP2517223B2 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6441064A (en) * 1987-08-06 1989-02-13 Shimizu Construction Co Ltd Individual control system using card
JPH0512294A (en) * 1991-07-02 1993-01-22 Shimizu Corp Large scale work area managing system
JPH0583857U (en) * 1991-02-19 1993-11-12 一夫 清水 Safety management system for workers wearing bar code demand air breathers and workers at closed construction sites
JPH0689284A (en) * 1990-12-18 1994-03-29 Shimizu Corp Entrance/exit managing device for workshop
CN103165014A (en) * 2013-04-15 2013-06-19 南京航空航天大学 Monitoring teaching demonstration method and system of internet-of-things-based discrete manufacturing workshop

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5916044A (en) * 1982-07-16 1984-01-27 Omron Tateisi Electronics Co Data collecting device
JPS59121458A (en) * 1982-12-27 1984-07-13 Meisei Electric Co Ltd Working hour managing system
JPS59170965A (en) * 1983-03-18 1984-09-27 Casio Comput Co Ltd Data processing system
JPS60159993A (en) * 1984-01-30 1985-08-21 富士通株式会社 Online time recorder
JPS60181895A (en) * 1984-02-29 1985-09-17 株式会社東芝 Time recorder

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5916044A (en) * 1982-07-16 1984-01-27 Omron Tateisi Electronics Co Data collecting device
JPS59121458A (en) * 1982-12-27 1984-07-13 Meisei Electric Co Ltd Working hour managing system
JPS59170965A (en) * 1983-03-18 1984-09-27 Casio Comput Co Ltd Data processing system
JPS60159993A (en) * 1984-01-30 1985-08-21 富士通株式会社 Online time recorder
JPS60181895A (en) * 1984-02-29 1985-09-17 株式会社東芝 Time recorder

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6441064A (en) * 1987-08-06 1989-02-13 Shimizu Construction Co Ltd Individual control system using card
JPH0689284A (en) * 1990-12-18 1994-03-29 Shimizu Corp Entrance/exit managing device for workshop
JPH0583857U (en) * 1991-02-19 1993-11-12 一夫 清水 Safety management system for workers wearing bar code demand air breathers and workers at closed construction sites
JPH0512294A (en) * 1991-07-02 1993-01-22 Shimizu Corp Large scale work area managing system
CN103165014A (en) * 2013-04-15 2013-06-19 南京航空航天大学 Monitoring teaching demonstration method and system of internet-of-things-based discrete manufacturing workshop

Also Published As

Publication number Publication date
JP2517223B2 (en) 1996-07-24

Similar Documents

Publication Publication Date Title
JP3259232B2 (en) Card entry / exit management system
Jacobs et al. Selecting bus drivers: Multiple predictors, multiple perspectives on validity, and multiple estimates of utility
JPS6282455A (en) Workshop management system
US20160098664A1 (en) Workforce Management System
JPH0724062B2 (en) Labor safety management device
JPH0724061B2 (en) Labor safety management system
Gottfredson An assessment of a mobility-based occupational classification for placement and counseling
JP3026119B2 (en) Large-scale workplace management system
Newar et al. ANALYSIS OF FACTORS THAT AFFECT EMPLOYEE WORK DISCIPLINE AT THE OFFICE OF THE PLANNING AND R&D AGENCY SIKKA REGENCY
JP2003242316A (en) System for adjusting and managing employed personnel allocation
Mitchell et al. Estimating training requirements from job and training models
Blake et al. Computer Streamlines Caseload at Philadelphia Common Pleas Court
JPH0461145B2 (en)
Baca et al. Automated court systems
JPH0724063B2 (en) Central management system
Freeman et al. An actuarial method for estimating the long-term, incidence-based costs of Navy civilian occupational injuries and illnesses
Bruns Jr et al. Management information for community action programs
Gold COURTRAN FROM THE USER'S POINT OF VIEW
Ritzel et al. Value Of Work-A Way Of Evaluating A Light Duty Program In
RU10900U1 (en) GUIDELINES OF THE ADMINISTRATOR OF PERSONNEL SERVICE, DEVICE FOR ACCOUNTING PERSONNEL IN THE COMPANY AND MODELS OF PERSONNEL DOCUMENTS
Rouse Applications of operations research techniques in Tufts University libraries
JPH0797861A (en) Work management system in construction execution
Mason Improving Productivity in the Courts: A Primer for Clerks of Court
Law Pofitv Proluctivi~
Jarosiewicz Rent control in Cambridge: who really benefits