JP2517223B2 - Work place management system - Google Patents
Work place management systemInfo
- Publication number
- JP2517223B2 JP2517223B2 JP22305885A JP22305885A JP2517223B2 JP 2517223 B2 JP2517223 B2 JP 2517223B2 JP 22305885 A JP22305885 A JP 22305885A JP 22305885 A JP22305885 A JP 22305885A JP 2517223 B2 JP2517223 B2 JP 2517223B2
- Authority
- JP
- Japan
- Prior art keywords
- information
- processing
- recording
- recording medium
- data
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000012545 processing Methods 0.000 claims description 35
- 238000000034 method Methods 0.000 claims description 30
- 230000010365 information processing Effects 0.000 claims description 23
- 238000010276 construction Methods 0.000 claims description 19
- 238000004891 communication Methods 0.000 claims description 8
- 238000004886 process control Methods 0.000 claims description 6
- 238000011156 evaluation Methods 0.000 claims description 4
- 230000007812 deficiency Effects 0.000 claims description 3
- 238000007726 management method Methods 0.000 description 60
- 238000010586 diagram Methods 0.000 description 7
- 238000005259 measurement Methods 0.000 description 3
- 230000003287 optical effect Effects 0.000 description 3
- 230000036772 blood pressure Effects 0.000 description 2
- 238000012790 confirmation Methods 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000004931 aggregating effect Effects 0.000 description 1
- 239000013256 coordination polymer Substances 0.000 description 1
- 238000012937 correction Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000012797 qualification Methods 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/30—Computing systems specially adapted for manufacturing
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Description
【発明の詳細な説明】 〔産業上の利用分野〕 本発明は、磁気カード、光カード、ICカード等の個人
携帯用のデータ記録媒体を使って作業所における労務・
工程管理情報や健康管理情報、災害経歴情報等の作業員
各自の固有情報を入力して労務管理や工程管理、健康管
理、災害予知等のデータを作成し出力する作業所管理シ
ステムに関するものである。DETAILED DESCRIPTION OF THE INVENTION [Industrial field of application] The present invention employs a data recording medium such as a magnetic card, an optical card, and an IC card that is carried by an individual and is used for labor and work in a workplace.
The present invention relates to a work place management system that inputs unique information of each worker such as process management information, health management information, and disaster history information, and creates and outputs data such as labor management, process management, health management, and disaster prediction. .
作業所を管理する場合、一般に複数の作業所がその対
象となるのが普通である。ところで、各作業所では、正
規作業員のほか、応援者、短期就労者、新規入場者、遅
刻者等の様々な作業員がいてこれらの把握が必要であ
り、場合によっては当日の就労者氏名の確認、退場者の
確認が随時必要である等、把握しなければならない管理
事項は非常に多岐に渡っている。このような作業所にお
いては、就労者氏名の把握、受入教育の徹底、連絡先や
健康状態のチェック、定時以後の残留者の確認、その他
多岐にわたる労務管理が必要であるが、その労務管理
は、工事規模により種々の手作業で実施されている。When managing a work place, it is common to have multiple work places. By the way, at each work place, there are various workers such as supporters, short-term workers, new visitors, late workers, etc. in addition to regular workers, and it is necessary to keep track of these. There are a wide variety of management items that must be grasped, such as confirmation of information and confirmation of exits from time to time. In such a workplace, it is necessary to grasp the name of the worker, thorough receiving education, check the contact information and health condition, confirm the remaining person after the scheduled time, and other various labor management. , It is carried out by various manual work depending on the construction scale.
一般に、或る1日についてその日に就労する作業員
は、管理対象となる作業員全員のうちの約1/5程度であ
るといわれており、作業員全員を対象とする作業所毎の
作業員の把握、労務管理、工程管理、安全管理は重要で
あるが、現実には労務管理をそれぞれの工事現場の責任
者が個別に行っており、総合的に管理する等の有効な管
理方式の採用は非常に難しかった。そのため、作業所の
管理に一貫性がなく、作業所が変わるとその都度その作
業所に合った管理方式に対応すべく配慮が必要となり、
各作業所を統括して工事を総合的に管理する上では様々
な支障を来していた。Generally, it is said that about one-fifth of the workers to be managed on a certain day is about one-fifth of all workers to be managed. Understanding, labor management, process management, and safety management are important, but in reality labor management is carried out individually by the person in charge of each construction site, and an effective management method such as comprehensive management is adopted. Was very difficult. Therefore, there is inconsistency in the management of the work place, and every time the work place changes, consideration must be given to respond to the management method suitable for that work place.
There were various obstacles in the overall management of the work by controlling each work place.
本発明は、このような問題点を解決するものであり、
作業員各自の固有情報を正確に把握し、工程管理、労務
管理、安全管理も含めた総合的な作業所の管理が可能な
作業所管理システムの提供を目的とするものである。The present invention is to solve such problems,
The purpose is to provide a work place management system capable of accurately grasping the unique information of each worker and performing comprehensive work place management including process management, labor management, and safety management.
そのために本発明の作業所管理システムは、作業員の
個人情報を記録する情報記録媒体、データ処理指令の情
報を記録する処理記録媒体、記録媒体に対して記録情報
を読み取り/記録する読み取り/記録手段、情報記録媒
体から読み取った作業員の個人情報を記憶する記憶手
段、データの出力する出力手段、及び記録媒体に対して
記録情報を読み取り/記録するデータの処理を行う演算
処理手段を備え、演算処理手段は、設定時刻毎に所定の
データ処理を行い、処理記録媒体を読み込んだときは該
処理記録媒体の情報によるデータ処理を行うことによっ
て、記憶手段に記憶した個人情報をデータ処理指令に従
って検索、集計、分類、リスト化して出力することを特
徴とするものである。さらには、上記の作業所管理ユニ
ットを各作業所単位に設けると共に、中央に作業の基準
工程情報を登録した工程管理テーブルを備え通信回線を
通して作業所管理ユニットの情報を情報処理センターに
収集して災害情報処理や工程管理情報処理その他の統計
処理を行う情報処理センターを設け、該情報処理センタ
ーでは、工事の難易度や災害経歴、危険工事の有無の情
報を有する工事の内容や安全管理状況の評価情報を有す
る工事の進行に関する情報から危険度の計算を行って災
害予知情報を出力し、各職種の人数を集計して工程/職
種別作業員数予測データ、過不足予測データを含む工程
管理情報を出力することを特徴とするものである。Therefore, the work place management system of the present invention is an information recording medium for recording personal information of a worker, a processing recording medium for recording information of a data processing command, and a reading / recording for reading / recording recording information on the recording medium. Means, storage means for storing the personal information of the worker read from the information recording medium, output means for outputting the data, and arithmetic processing means for processing the data for reading / recording the recording information with respect to the recording medium, The arithmetic processing means performs predetermined data processing at each set time, and when the processing recording medium is read, performs data processing based on the information of the processing recording medium so that the personal information stored in the storage means is processed according to the data processing command. It is characterized in that it is searched, tabulated, classified, and converted into a list for output. Furthermore, the above-mentioned work place management unit is provided for each work place, and a process control table in which central reference work process information is registered is provided in the center to collect the work place management unit information to the information processing center through a communication line. An information processing center for performing disaster information processing, process management information processing, and other statistical processing is provided. The information processing center has information on the degree of difficulty of construction, history of disaster, and information on the presence or absence of dangerous construction and the status of safety management. Process control information including the process / job type forecast worker number forecast data and excess / deficiency forecast data by calculating the degree of risk from the information on the progress of construction that has the evaluation information, outputting disaster prediction information, and totaling the number of persons in each job category Is output.
本発明の作業所管理システムでは、作業員個人に対し
て情報記録媒体を発給し、この情報記録媒体に読み込み
/記録手段を使って必要な管理情報を記録し、これを作
業所の出入りに際して読み込ませることによって、所望
の表やデータを生成して出力でき、これらの表やデータ
から作業所の状況を正確に把握することができる。ま
た、その出力データは、処理記録媒体を使うことによっ
て簡単な操作により得ることができる。また、各作業所
の情報を中央の情報処理センターで収集するので、全体
の作業所について総合的に管理することができる。In the work place management system of the present invention, an information recording medium is issued to each worker, necessary management information is recorded on the information recording medium by using the reading / recording means, and this is read when the worker goes in and out of the work place. By doing so, desired tables and data can be generated and output, and the status of the work place can be accurately grasped from these tables and data. Further, the output data can be obtained by a simple operation by using the processing recording medium. Further, since information on each work place is collected at the central information processing center, it is possible to comprehensively manage all work places.
以下、実施例を図面を参照しつつ説明する。 Hereinafter, embodiments will be described with reference to the drawings.
第1図は本発明に係る作業所管理システムの1実施例
構成を示す図、第2図はカードに記録するデータの例を
示す図、第3図は第1図に示す作業所管理システムの処
理の流れを説明するための図である。FIG. 1 is a diagram showing a configuration of an embodiment of a work place management system according to the present invention, FIG. 2 is a diagram showing an example of data recorded on a card, and FIG. 3 is a view of the work place management system shown in FIG. It is a figure for demonstrating the flow of a process.
第1図において、1は作業カード、2は作業員IDカー
ド、3はリーダー/ライター、4と5はリーダー、6は
プリンター、7はディスプレイ、8はCPU、9と10はフ
ロッピィディスク、11と12はRAM、13は通信回線を示
す。In FIG. 1, 1 is a work card, 2 is a worker ID card, 3 is a reader / writer, 4 and 5 are readers, 6 is a printer, 7 is a display, 8 is a CPU, 9 and 10 are floppy disks, 11 and 12 is a RAM, and 13 is a communication line.
作業カード1は、磁気カードや光カード、ICカード等
の携帯に適した記録媒体で、特定のデータ検索、集計、
分類、リスト化のデータ指令を入力するものであり、作
業員IDカード2は、作業カード1と同様に作業員各自が
携帯するのに好適な磁気カードや光カード、ICカード等
の記録媒体で、その作業員の固有情報を記録しておくも
のである。リーダー/ライター3は、作業員IDカード2
に作業員の固有情報を記録したり、その記録した作業員
の固有情報を読み取ったりするものであり、リーダー4
と5は、例えば作業所の各ゲートに設置して作業員IDカ
ード2に記録した作業員の固有情報を読み取るものであ
る。作業員各自の固有情報としては、例えば第2図に示
すように、その作業員の所属や本籍、生年月日、氏
名、職種、障害等の労務・工程管理情報、血圧とその
測定日、障害その他の健康管理情報、過去の災害発生
内容や災害発生日等の災害予知情報が記録される。フロ
ッピィディスク9、10、RAM11、12は、各種の処理プロ
グラムやデータを格納するものであり、この処理プログ
ラムに従って第3図に示すような所定の処理を行うのが
CPU8である。CPU8は、キー入力手段や内蔵の記憶部を備
え、作業員IDカード2の読み取りデータの処理及び記録
データの処理を行うと共に、定期的に或いは随時キー入
力指令や作業カード1の入力により蓄積されたデータの
検索、集計、分類、リスト化のデータ処理を行うもので
あり、その結果を出力するのがプリンター6やディスプ
レイ7、電話回線などの通信回線13である。なお、リー
ダー/ライター3やプリンター6、ディスプレイ7、CP
U8、フロッピィディスク9、10、RAM11、12からなる作
業所管理ユニットは、ケースに一体化して収納して各作
業所毎に設置される。また、従来の個人携帯用のカード
は、単に個人のID(識別符号)を記録するにすぎないた
め1トラックのカードが使用されているが、本発明のシ
ステムでは、第2図に示すようにカードに記録する情報
が多くなることから2トラックを使って記録することを
も特徴とする。The work card 1 is a recording medium suitable for carrying, such as a magnetic card, an optical card, or an IC card.
The operator inputs the classification / listing data command, and the worker ID card 2 is a recording medium such as a magnetic card, an optical card, or an IC card, which is suitable for each worker to carry, like the work card 1. , The specific information of the worker is recorded. Reader / writer 3 is worker ID card 2
The reader 4 records the worker's unique information on the PC and reads the recorded worker's unique information.
And 5 are, for example, installed at each gate of a work place and read the worker's unique information recorded in the worker ID card 2. Specific information of each worker is, for example, as shown in FIG. 2, labor and process management information such as affiliation and permanent domicile of the worker, date of birth, name, job type, obstacle, blood pressure and its measurement date, obstacle, etc. Other health management information and disaster prediction information such as past disaster occurrence content and disaster occurrence date are recorded. The floppy disks 9 and 10 and the RAMs 11 and 12 store various processing programs and data, and perform predetermined processing as shown in FIG. 3 in accordance with these processing programs.
CPU8. The CPU 8 is provided with a key input means and a built-in storage unit, processes read data of the worker ID card 2 and records data, and stores the data periodically or at any time by a key input command or input of the work card 1. Data processing such as data retrieval, tabulation, classification, and listing is performed, and the output of the results is performed by the printer 6, the display 7, and the communication line 13 such as a telephone line. In addition, reader / writer 3, printer 6, display 7, CP
The work place management unit consisting of the U8, the floppy disks 9, 10, and the RAMs 11, 12 is housed integrally in a case and installed in each work place. Further, the conventional personal portable card uses a one-track card because it merely records the ID (identification code) of the individual, but in the system of the present invention, as shown in FIG. Since there is a large amount of information to be recorded on the card, it is also characterized by recording using two tracks.
次に、上記作業所管理システムを使った作業所の管理
の概要を第3図により説明する。まず、作業員が入場/
退場する際にカードの有無を調べ、カードを有している
場合にはカードの読み取り処理を行い、カードを有して
いない場合にはキー入力手段を使って第2図に示すよう
な所定事項の入力処理を行う。カードの読み取り処理で
は、カード情報読み取り及びチェックを行い、その内容
を画面に表示すると共に入場者ファイルに書き込む。所
定事項の入力処理では、第2図に示すようなデータシー
トに各作業員の固有情報を記入し、それに基づいてキー
入力する。そして、その入力情報を入場者ファイル及び
管理マスターファイルに登録し、要注意者チェックリス
トを出力すると共に、磁気カードを発行し、管理マスタ
ー登録簿及び磁気カード発行簿を出力する。このように
入場者ファイルには、その時々における作業所の入場者
に関する情報が格納され、管理マスターファイルには、
過去からの全入場者関する情報が格納される。そして、
タイマー設定により或いは随時オペレータの指示により
入場者一覧表その他各種の一覧表を入場者ファイルに登
録されたデータについて所定のデータ検索、集計、分類
を行ってリスト化し出力する。Next, an outline of work place management using the work place management system will be described with reference to FIG. First, the workers enter /
When exiting, check for the presence of a card, if you have a card, read the card, and if you do not have a card, use the key input means to perform the predetermined items as shown in FIG. Input processing of. In the card reading process, card information is read and checked, and the contents are displayed on the screen and written in the attendee file. In the input process of the predetermined items, the peculiar information of each worker is entered in the data sheet as shown in FIG. 2, and the key input is carried out based on it. Then, the input information is registered in the attendee file and the management master file, a checklist for those requiring attention is output, a magnetic card is issued, and a management master registration list and a magnetic card issue list are output. In this way, the attendee file stores information about the attendees of the workplace at any given time, and the management master file contains
Information about all visitors from the past is stored. And
By setting a timer or by an operator's instruction at any time, a list of visitors and other various lists are searched for data registered in the attendee file, tabulated, and classified, and a list is output.
第4図はオンラインネットワークの構築例を示す図で
あり、21−1ないし21−nは作業所管理ユニット、22は
中央通信装置、23は情報処理センターを示す。作業所管
理ユニット21−1ないし21−nは、第1図に示す作業所
管理ユニットであり、ここから中央通信装置22により所
定のデータが電話回線その他の通信回線を通して収集さ
れ、情報処理センター23に送られる。情報処理センター
23では、例えば作業の基準工程情報を登録しておく工程
管理テーブルが用意され、災害情報処理や工程管理情報
処理、労務管理情報処理、健康管理情報処理などを行
う。以下にその処理内容を説明する。FIG. 4 is a diagram showing an example of construction of an online network. 21-1 to 21-n are work place management units, 22 is a central communication device, and 23 is an information processing center. The work place management units 21-1 to 21-n are work place management units shown in FIG. 1, from which predetermined data are collected by the central communication device 22 through a telephone line or other communication lines, and the information processing center 23 Sent to. Information processing center
In 23, for example, a process management table for registering work standard process information is prepared, and disaster information processing, process management information processing, labor management information processing, health management information processing, and the like are performed. The processing content will be described below.
災害情報処理は、災害予知をするための要因測定項目
より経験に基づいた災害危険度を算出する処理である。
災害危険度の測定項目としては、受注した工事の内容に
よって評価される固定値と、工事の進行に伴って評価さ
れる変動値とがある。固定値の特性要因としては、工事
区分や構造、延面積、階数(地下、地上)工期その他の
要素により評価される工事の難易度、工事責任者やその
作業所の過去の災害発生データ等により評価される災害
経歴の有無、鉄骨建方工事や足場組払し工事等の危険工
事工程の有無が考慮され、変動値の特性要因としては、
事前計画の実施状況、安全施工サイクルの実施状況、安
全管理状況の評価、是正状況の経歴評価が考慮される。
そして、工事の進行に伴って所定の期間毎に、過去の経
験に基づいて算定された数値を使ってこれらの評価を行
い、危険度の配分計算を行うことによって、墜落、飛
来、落下、クレーンその他の災害予知が行われる。Disaster information processing is a process of calculating a disaster risk degree based on experience from factor measurement items for predicting a disaster.
The disaster risk measurement items include a fixed value evaluated according to the contents of the ordered construction and a variable value evaluated along with the progress of the construction. Characteristic factors of the fixed value depend on the construction category, structure, total area, number of floors (underground, above ground) construction level, the degree of difficulty of construction, the person in charge of construction, and past disaster occurrence data of the work place. The presence or absence of an evaluated disaster history and the presence or absence of dangerous construction processes such as steel erection work and scaffolding assembly work are taken into consideration.
The implementation status of the advance plan, the implementation status of the safety construction cycle, the evaluation of the safety management status, and the history evaluation of the correction status are considered.
Then, as the construction progresses, each time a predetermined period of time is evaluated using the values calculated based on past experience, and the risk level is calculated to calculate crashes, jumps, drops, and cranes. Other disaster predictions are made.
工程管理情報処理は、労務・工程管理情報から工程管
理に必要なデータを作成する処理である。例えば、その
日の各職種の人数を集計することにより、工程管理テー
ブルに登録されたその日の各工程毎に必要な職種の人数
割合から工程/職種別作業員数予測データが作成され、
或いはその日迄の各職種毎の就業実績人日数を集計し、
その集計値と工程管理テーブルに登録されたその日迄の
人日数とを比較することにより、翌月、2ケ月先、3ケ
月先の職種別作業員の過不足予測データが作成され、さ
らには、業者(所属)別に作業員を集計することにより
業者別作業員の過不足予測データが作成される。Process management information processing is a process of creating data necessary for process management from labor / process management information. For example, by summing up the number of people of each job type on that day, process / job type worker number prediction data is created from the ratio of the number of job types required for each process of the day registered in the process control table,
Or, total the number of working days for each job type up to that day,
By comparing the aggregated value with the number of man-hours up to that date registered in the process control table, the excess / deficiency prediction data of workers by job type for the next month, two months ahead, and three months ahead are created. Prediction data for workers by supplier is created by aggregating workers by (affiliation).
労務管理情報処理は、労務・工程管理情報から労務管
理に必要なデータを作成する処理である。例えば、工程
管理テーブル2に登録されたその日の各固定毎に必要な
職種と資格とをもとに、無資格者のチェックを行うこと
により、工程別の無資格者リストが作成され、また、作
業員各自の入場時刻と退場時刻とを記録し、退場時刻の
未記録者を検索することによって残留者リストが作成さ
れる。Labor management information processing is a process of creating data required for labor management from labor / process management information. For example, an unqualified person list for each process is created by checking unqualified persons based on the job title and qualification required for each fixed day registered in the process control table 2, and The remaining person list is created by recording the entry time and the exit time of each worker and searching for those who have not recorded the exit time.
健康管理情報処理は、健康管理に必要な血圧その他の
値につき、比較基準値と有効期間を設定しておき、作業
員各自の健康管理情報が比較基準値を越えているか否か
を調べ、比較基準値を越えている作業員、有効期間を過
ぎている作業員のリストを作成したり、障害者のサーチ
を行い、障害者リストを作成したりするものである。For health management information processing, a comparison reference value and validity period are set for blood pressure and other values necessary for health management, and it is checked whether each worker's health management information exceeds the comparison reference value, and comparison is made. This is to create a list of workers who have exceeded the reference value or workers whose validity period has expired, or to search for persons with disabilities to create a list of persons with disabilities.
このように情報処理センターにおいて複数の作業所を
総括管理し、作業所間を頻繁に移動している作業員につ
いても常時どこの作業所に就労しているかを把握するこ
とにより、各作業所への災害予知を行い、災害を未然に
防止するための対策を講じるようにすることができる。In this way, the information processing center manages multiple work sites collectively, and even for workers who frequently move between work sites, by grasping which work site they are always working, It is possible to predict disasters and take measures to prevent disasters.
以上の説明から明らかなように、本発明によれば、カ
ードによって作業所における各作業員の管理に必要な各
種のデータを入力し、所望の表やリストなどを出力でき
るので、各作業員の個人情報に基づいて作業所の管理を
容易に行うことができる。また、各作業所に関するデー
タを統括収集して処理することにより、複数の作業所に
わたる総合的な管理が可能となる。As is apparent from the above description, according to the present invention, various data necessary for management of each worker in the work place can be input by the card, and a desired table or list can be output. The work place can be easily managed based on the personal information. In addition, by comprehensively collecting and processing the data related to each work place, it is possible to perform comprehensive management over a plurality of work places.
第1図は本発明に係る作業所管理システムの1実施例構
成を示す図、第2図はカードに記録するデータの例を示
す図、第3図は第1図に示す作業所管理システムの処理
の流れを説明するための図、第4図はオンラインネット
ワークの構築例を示す図である。 1……作業カード、2……作業員IDカード、3……リー
ダー/ライター、4と5……リーダー、6……プリンタ
ー、7……ディスプレイ、8……CPU、9と10……フロ
ッピィディスク、11と12……RAM、13……通信回線。FIG. 1 is a diagram showing a configuration of an embodiment of a work place management system according to the present invention, FIG. 2 is a diagram showing an example of data recorded on a card, and FIG. 3 is a view of the work place management system shown in FIG. FIG. 4 is a diagram for explaining the flow of processing, and FIG. 4 is a diagram showing a construction example of an online network. 1 ... work card, 2 ... worker ID card, 3 ... reader / writer, 4 and 5 ... reader, 6 ... printer, 7 ... display, 8 ... CPU, 9 and 10 ... floppy disk , 11 and 12 …… RAM, 13 …… communication line.
───────────────────────────────────────────────────── フロントページの続き (72)発明者 猪腰 友典 東京都中央区京橋2丁目16番1号 清水 建設株式会社内 (72)発明者 山下 茂樹 東京都中央区京橋2丁目16番1号 清水 建設株式会社内 (72)発明者 児玉 利昭 東京都中央区京橋2丁目16番1号 清水 建設株式会社内 (72)発明者 広瀬 利光 東京都中央区京橋2丁目16番1号 清水 建設株式会社内 (72)発明者 大内 智範 東京都中央区京橋2丁目16番1号 清水 建設株式会社内 (56)参考文献 特開 昭60−181895(JP,A) 特開 昭60−159993(JP,A) 日経コンピュータ 1985年7月8日号 P.47〜P.58 新版情報処理ハンドブック 昭和55年 オーム社発行 P.501−P.508 ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Inventor Tomonori Inukoshi 2-16-1, Kyobashi, Chuo-ku, Tokyo Shimizu Construction Co., Ltd. (72) Inventor Shigeki Yamashita 2--16-1, Kyobashi, Chuo-ku, Tokyo Shimizu Construction Co., Ltd. (72) Inventor Toshiaki Kodama 2-16-1 Kyobashi, Chuo-ku, Tokyo Shimizu Construction Co., Ltd. (72) Toshimitsu Hirose 2-16-1 Kyobashi, Chuo-ku, Tokyo Shimizu Construction Co., Ltd. (72) Inventor Tomonori Ouchi 2-16-1, Kyobashi, Chuo-ku, Tokyo Shimizu Construction Co., Ltd. (56) Reference JP-A-60-181895 (JP, A) JP-A-60-159993 (JP, A) Nikkei Computer July 8, 1985 P. 47-P. 58 New Edition Information Processing Handbook 1980, published by Ohmsha P. 501-P. 508
Claims (2)
体、データ処理指令の情報を記録する処理記録媒体、記
録媒体に対して記録情報を読み取り/記録する読み取り
/記録手段、情報記録媒体から読み取った作業員の個人
情報を記憶する記憶手段、データを出力する出力手段、
及び記録媒体に対して記録情報を読み取り/記録するデ
ータの処理を行う演算処理手段を備え、演算処理手段
は、設定時刻毎に所定のデータ処理を行い、処理記録媒
体を読み込んだときは該処理記録媒体の情報によるデー
タ処理を行うことによって、記憶手段に記憶した個人情
報をデータ処理指令に従って検索、集計、分類、リスト
化して出力することを特徴とする作業所管理システム。1. An information recording medium for recording personal information of a worker, a processing recording medium for recording information of a data processing command, a reading / recording means for reading / recording recording information with respect to the recording medium, and an information recording medium. Storage means for storing the read personal information of the worker, output means for outputting data,
And an arithmetic processing means for performing processing of data for reading / recording recording information with respect to the recording medium, the arithmetic processing means performing predetermined data processing at each set time, and when the processing recording medium is read, the processing is performed. A work place management system characterized in that personal information stored in a storage means is searched, tabulated, classified, and listed according to a data processing command and output by performing data processing based on information on a recording medium.
体、データ処理指令の情報を記録する処理記録媒体、記
録媒体に対して記録情報を読み取り/記録する読み取り
/記録手段、情報記録媒体から読み取った作業員の個人
情報を記憶する記憶手段、データの出力する出力手段、
及び記録媒体に対して記録情報を読み取り/記録するデ
ータの処理を行う演算処理手段からなる作業所管理ユニ
ットを各作業所単位に設けると共に、中央に作業の基準
工程情報を登録した工程管理テーブルを備え通信回線を
通して作業所管理ユニットの情報を情報処理センターに
収集して災害情報処理や工程管理情報処理その他の統計
処理を行う情報処理センターを設け、該情報処理センタ
ーでは、工事の難易度や災害経歴、危険工事の有無の情
報を有する工事の内容や安全管理状況の評価情報を有す
る工事の進行に関する情報から危険度の計算を行って災
害予知情報を出力し、各職種の人数を集計して工程/職
種別作業員数予測データ、過不足予測データを含む工程
管理情報を出力することを特徴とする作業所管理システ
ム。2. An information recording medium for recording personal information of a worker, a processing recording medium for recording information of a data processing command, a reading / recording means for reading / recording recording information with respect to the recording medium, and an information recording medium. Storage means for storing the read personal information of the worker, output means for outputting the data,
Further, a work place management unit including an arithmetic processing unit for performing processing of data for reading / recording record information with respect to a recording medium is provided for each work place unit, and a process control table in which reference work process information of work is registered is provided in the center. An information processing center that collects information on the work place management unit to the information processing center through a communication line and performs disaster information processing, process management information processing, and other statistical processing is provided. History, information on the presence or absence of dangerous construction, and information on the progress of construction, which has evaluation information on the status of safety management, and information on the progress of construction, calculate the degree of risk, output disaster prediction information, and aggregate the number of people in each job category. A work place management system, which outputs process management information including prediction data of number of workers by process / job type and prediction data of excess and deficiency.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP22305885A JP2517223B2 (en) | 1985-10-07 | 1985-10-07 | Work place management system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP22305885A JP2517223B2 (en) | 1985-10-07 | 1985-10-07 | Work place management system |
Publications (2)
Publication Number | Publication Date |
---|---|
JPS6282455A JPS6282455A (en) | 1987-04-15 |
JP2517223B2 true JP2517223B2 (en) | 1996-07-24 |
Family
ID=16792171
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP22305885A Expired - Lifetime JP2517223B2 (en) | 1985-10-07 | 1985-10-07 | Work place management system |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2517223B2 (en) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS6441064A (en) * | 1987-08-06 | 1989-02-13 | Shimizu Construction Co Ltd | Individual control system using card |
JPH0689284A (en) * | 1990-12-18 | 1994-03-29 | Shimizu Corp | Entrance/exit managing device for workshop |
JPH0583857U (en) * | 1991-02-19 | 1993-11-12 | 一夫 清水 | Safety management system for workers wearing bar code demand air breathers and workers at closed construction sites |
JP3026119B2 (en) * | 1991-07-02 | 2000-03-27 | 清水建設株式会社 | Large-scale workplace management system |
CN103165014B (en) * | 2013-04-15 | 2014-09-17 | 南京航空航天大学 | Monitoring teaching demonstration method and system of internet-of-things-based discrete manufacturing workshop |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5916044A (en) * | 1982-07-16 | 1984-01-27 | Omron Tateisi Electronics Co | Data collecting device |
JPS59121458A (en) * | 1982-12-27 | 1984-07-13 | Meisei Electric Co Ltd | Working hour managing system |
JPS59170965A (en) * | 1983-03-18 | 1984-09-27 | Casio Comput Co Ltd | Data processing system |
JPS60159993A (en) * | 1984-01-30 | 1985-08-21 | 富士通株式会社 | Online time recorder |
JPS60181895A (en) * | 1984-02-29 | 1985-09-17 | 株式会社東芝 | Time recorder |
-
1985
- 1985-10-07 JP JP22305885A patent/JP2517223B2/en not_active Expired - Lifetime
Non-Patent Citations (2)
Title |
---|
新版情報処理ハンドブック昭和55年オーム社発行P.501−P.508 |
日経コンピュータ1985年7月8日号P.47〜P.58 |
Also Published As
Publication number | Publication date |
---|---|
JPS6282455A (en) | 1987-04-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Bellinger | The economic analysis of public policy | |
Kopczynski et al. | Comparative performance measurement: Insights and lessons learned from a consortium effort | |
US20040054563A1 (en) | Method for managing enterprise risk | |
CN106716458A (en) | Improved client entry and maintenance system for timekeeping and billing for professional services system and method. | |
CN107077647A (en) | Improved system and method for the distribution value that worked to timekeeper | |
JP2517223B2 (en) | Work place management system | |
Redleir et al. | Impact of Emerging Technologies on Facility Services-A Mixed-Methodic Approach on Smart Building Technologies | |
JPH0724062B2 (en) | Labor safety management device | |
JPH0724061B2 (en) | Labor safety management system | |
JP2004185158A (en) | Working management system | |
JP2003242316A (en) | System for adjusting and managing employed personnel allocation | |
JP2000311176A (en) | Data retrieval managing device and program recording medium therefor | |
JP3026119B2 (en) | Large-scale workplace management system | |
JPH0797861A (en) | Work management system in construction execution | |
Mendes | Maturity model development to evaluate hospital services’ readiness in disaster and emergency situations | |
Guess | Government Budgeting: A Practical Guidebook | |
JPH0461145B2 (en) | ||
JPH0724063B2 (en) | Central management system | |
Hale et al. | Evaluating the success of safety culture interventions | |
Gold | COURTRAN FROM THE USER'S POINT OF VIEW | |
CN117371869A (en) | Performance assessment method for administrative public institutions | |
JPH10266583A (en) | Manday totalizing system | |
Santisarn | Inventory information system of Stationery Mall Co., Ltd | |
Law | Pofitv Proluctivi~ | |
JPH0689284A (en) | Entrance/exit managing device for workshop |