JPS6254959B2 - - Google Patents

Info

Publication number
JPS6254959B2
JPS6254959B2 JP57112348A JP11234882A JPS6254959B2 JP S6254959 B2 JPS6254959 B2 JP S6254959B2 JP 57112348 A JP57112348 A JP 57112348A JP 11234882 A JP11234882 A JP 11234882A JP S6254959 B2 JPS6254959 B2 JP S6254959B2
Authority
JP
Japan
Prior art keywords
guide rail
bulkhead
unit
unit partition
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP57112348A
Other languages
Japanese (ja)
Other versions
JPS594800A (en
Inventor
Shunichi Iwata
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NIPPON PURESU KONKURIITO KK
NITSUSHIN SANGYO KK
Original Assignee
NIPPON PURESU KONKURIITO KK
NITSUSHIN SANGYO KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NIPPON PURESU KONKURIITO KK, NITSUSHIN SANGYO KK filed Critical NIPPON PURESU KONKURIITO KK
Priority to JP57112348A priority Critical patent/JPS594800A/en
Publication of JPS594800A publication Critical patent/JPS594800A/en
Publication of JPS6254959B2 publication Critical patent/JPS6254959B2/ja
Granted legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Description

【発明の詳細な説明】 この発明は共同溝、下水道暗渠等の地下道の隔
壁施工法に関するものである。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a method for constructing bulkheads for underground passages such as public ditches and sewer culverts.

従来共同溝においては、電話、電気、ガス、上
下水道等の収容空間を隔壁により仕切つて併用す
る場合が通常であり、また下水道暗渠においては
汚水と雨水とを隔壁によつて仕切り分流式下水道
として供用する場合がある。
Conventionally, in common sewers, the storage space for telephones, electricity, gas, water and sewage, etc. is usually separated by partition walls and used in combination.In addition, in sewer culverts, sewage and rainwater are separated by partition walls and used as a separate sewer system. It may be made available.

このような場合、既設の地下道を分割する場合
は当然としても、新設の地下道においても、特に
シールド工法、押管工法、沈埋工法等によつて、
本体を施工をする場合は、隔壁の施工は、本体施
工後に行われるのが通例である。
In such cases, it is natural to divide existing underground passages, but also for newly constructed underground passages, especially by using shield construction method, push pipe construction method, immersion construction method, etc.
When constructing the main body, the partition wall is usually constructed after the main body is constructed.

この隔壁の施工は、地下道内に型枠、鉄筋等を
セツトしコンクリートを打設して行うが、コンク
リートのまわり、コンクリートのブリージングの
問題等で良質の鉄筋コンクリート隔壁を施工する
ことは甚だ困難で、また狭小な施工現場での諸材
料の搬入及び型枠の組立解体が非常に煩雑なため
これをプレキヤストコンクリート化する考えが出
され実用化されている。例えば、特公昭54−
026829号のようにプレキヤストコンクリート板を
運搬台車によつて地下道内に搬入しヒユーム管頂
部に打ち込まれたホールインアンカーを介して、
躯体に取り付ける方法等が提案されている。そこ
では特殊な運搬台車が使用されるためコスト高に
なるケースが見られ、また運搬台車の往復で時間
を要し、現場作業においても相当に手間を要して
いた。
Construction of this bulkhead is carried out by setting formwork, reinforcing bars, etc. inside the underground passage and pouring concrete, but it is extremely difficult to construct high-quality reinforced concrete bulkheads due to problems such as breathing around the concrete. In addition, since transporting various materials and assembling and dismantling formwork at a narrow construction site is extremely complicated, the idea of using precast concrete for this purpose has been proposed and put into practical use. For example,
As shown in No. 026829, a precast concrete plate is carried into the underground passage using a transport trolley, and via a hole-in anchor driven into the top of the Huyum pipe,
Methods of attaching it to the building frame have been proposed. In these cases, special transport carts are used, which can result in high costs, and the time it takes to shuttle the transport carts back and forth also requires considerable time and effort on site.

この発明は前記事情に鑑み開発した工法で施工
の容易性、有力化をもたらした。以下、その詳細
を図示した実施例によつて説明する。
This invention is a construction method developed in view of the above circumstances, and has made construction easier and more effective. The details will be explained below with reference to illustrated embodiments.

Aは共同溝となる地下道を示し、その地下道躯
体の天井部にガイドレール1を地下道長さ方向に
固定する。このガイドレール1はI形断面の鉄筋
コンクリート、鋼材またはFRP材等からなりエ
ポキシ樹脂等によつて天井部は接着し、あるいは
アンカーボルト等の金具を使用して固定する。単
位隔壁板2は鉄筋コンクリート板、銅製板
FRP、GRC板等からなり、その上部に凹部3が
形成されキヤスター4を設けてガイドレール1に
懸垂させ、かつ、ガイドレール1に沿つて送行し
うるように構成してある。なおキヤスター4を使
用しないで単位隔壁板2からブラケツトを実設
し、テフロンシート等の減摩シートをガイドレー
ル1とブラケツトとの間に介在させて送行しうる
ようにしてもよい。
A indicates an underground passage serving as a common ditch, and a guide rail 1 is fixed to the ceiling of the underground passage frame in the length direction of the underground passage. This guide rail 1 is made of reinforced concrete, steel, FRP material, etc. with an I-shaped cross section, and the ceiling portion is adhered with epoxy resin or the like, or fixed using metal fittings such as anchor bolts. Unit bulkhead plate 2 is reinforced concrete plate, copper plate
It is made of FRP, GRC board, etc., has a recess 3 formed in its upper part, and is configured to have casters 4 so that it can be suspended from a guide rail 1 and can be moved along the guide rail 1. Note that a bracket may be provided from the unit partition plate 2 without using the caster 4, and an anti-friction sheet such as a Teflon sheet may be interposed between the guide rail 1 and the bracket so that it can be fed.

以上の単位隔壁板2を所要枚数立坑から地下道
内の所定の位置まで順次搬送し、次いで単位隔壁
板を持上げて、躯体頂部に接しさせる。躯体天井
部と単位隔壁板2との間はシーリング材5を介在
させ、またガイドレール1と単位隔壁板2の凹部
3との間隙にはセメントペーストまたはモルタル
等6を注入して両者を固定する。また単位隔壁板
2の下端部と地下道躯体との間隙には隔壁板の下
りを止める為の楔を打ちその後コンクリートを打
設し、あるいはモルタル7を充填して固定する。
また第5図、第6図のようにインバートコンクリ
ートを打設して固定することもできる。なおこの
単位隔壁板2は円形断面の地下道でしかも偏芯し
た位置にも配置できる。(第4図参照)またガイ
ドレール1の断面はI形断面に限らず第7図のよ
うにリツプ溝形断面、その他L形断面とすること
ができる。さらにキヤスター4は第8図のように
単位隔壁板2に対して着脱しうるようにして回収
できるようにすることもできる。
The required number of unit partition plates 2 are sequentially conveyed from the shaft to a predetermined position in the underground passage, and then the unit partition plates 2 are lifted and brought into contact with the top of the building structure. A sealing material 5 is interposed between the ceiling of the frame and the unit partition plate 2, and cement paste or mortar 6 is injected into the gap between the guide rail 1 and the recess 3 of the unit partition plate 2 to fix both. . Further, a wedge is formed in the gap between the lower end of the unit partition plate 2 and the underground passage frame to prevent the partition plate from descending, and then concrete is poured or mortar 7 is filled to fix it.
It is also possible to cast and fix invert concrete as shown in Figures 5 and 6. Note that this unit partition plate 2 can also be placed in an eccentric position in an underground passageway with a circular cross section. (See FIG. 4) Furthermore, the cross section of the guide rail 1 is not limited to an I-shaped cross section, but can also be a lip-shaped cross section as shown in FIG. 7, or an L-shaped cross section. Furthermore, the casters 4 can be made removable from the unit partition plate 2 as shown in FIG. 8 so that they can be recovered.

第9図は他の発明を示したもので、地下道Aの
床部にガイドレール1を固定し、単位隔壁板2の
下部にキヤスター4を設けて、このガイドレール
1上に単位隔壁板2を載置させて順次所定の位置
まで搬送し、次いで単位隔壁板2の上下端を地下
道躯体に固定するようにしてある。そして天井部
には必要により補助ガイドレール12を設けて単
位隔壁板2の倒れを防止することができる。
FIG. 9 shows another invention, in which a guide rail 1 is fixed to the floor of an underground passage A, casters 4 are provided at the bottom of a unit partition plate 2, and a unit partition plate 2 is mounted on the guide rail 1. The unit partition plates 2 are placed and transported one after another to a predetermined position, and then the upper and lower ends of the unit partition plates 2 are fixed to the underground structure. If necessary, an auxiliary guide rail 12 may be provided on the ceiling to prevent the unit partition plate 2 from falling.

ところで単位隔壁板2の頂部または天井部にパ
ツキング13を設けてキヤスター4を外して後の
単位隔壁板を移動調整を可能とするとともにシー
ルを確実とすることができる。
Incidentally, by providing packing 13 on the top or ceiling of the unit partition plate 2, the casters 4 can be removed to enable movement and adjustment of the subsequent unit partition plate and to ensure sealing.

この発明は以上の構成からなり、地下道天井部
あるいは床部の隔壁板の取付位置にガイドレール
を設置し、このガイドレールを利用して隔壁板を
懸垂し、あるいは載置して搬送するので地下道内
への搬入作業が容易であり、また所定位置に搬送
されると略その位置で間隙等にモルタルを充填す
ることにより隔壁板を固定でき、迅速な施工がで
き、特別な機具を必要とせず現場での手間も少な
くてよい。
This invention has the above-mentioned configuration, and a guide rail is installed at the installation position of the bulkhead plate on the ceiling or floor of the underground passage, and the bulkhead plate is suspended or placed on the guide rail using this guide rail to be transported. It is easy to transport the bulkhead into the interior, and once it is transported to the designated location, the bulkhead board can be fixed by filling the gap with mortar at approximately that location, allowing for quick construction and no special equipment required. It also requires less time and effort on site.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は施工過程の断面図、第2図、第3図は
要部の断面図、第4図、第5図、第6図は他の実
施例の断面図、第7図、第8図は他の実施例の要
部の断面図、第9図は他の発明の実施例の断面図
である。 A……地下道、1……ガイドレール、2……隔
壁板、3……凹部、4……キヤスター、5……シ
ール材、6……グラウト材、7……モルタルまた
はコンクリート、8……楔、9,10……インバ
ートコンクリート、11……ガイドレール、12
……補助ガイドレール、13……パツキング。
Figure 1 is a sectional view of the construction process, Figures 2 and 3 are sectional views of important parts, Figures 4, 5, and 6 are sectional views of other embodiments, and Figures 7 and 8. The figure is a sectional view of a main part of another embodiment, and FIG. 9 is a sectional view of another embodiment of the invention. A... Underpass, 1... Guide rail, 2... Bulkhead plate, 3... Recess, 4... Caster, 5... Sealing material, 6... Grout material, 7... Mortar or concrete, 8... Wedge , 9, 10... Invert concrete, 11... Guide rail, 12
...Auxiliary guide rail, 13...Patzking.

Claims (1)

【特許請求の範囲】 1 天井部にガイドレールを固定し、このガイド
レールに単位隔壁板を懸垂させて順次所定の位置
まで搬送し、次いで単位隔壁板の上端をガイドレ
ールと一体に躯体天井部に固定し、単位隔壁板の
下端は躯体間にコンクリートまたはモルタルを充
填し固定して隔壁を構成することを特徴とする地
下道の隔壁施工法。 2 床部にガイドレールを固定し、このガイドレ
ールに単位隔壁板を載置させて順次所定の位置ま
で搬送し、次いで単位隔壁板の下端をガイドレー
ルと一体に躯体に固定し単位隔壁板の上端は躯体
間にコンクリートまたはモルタルを充填し固定し
て隔壁を構成することを特徴とする地下道の隔壁
施工法。
[Scope of Claims] 1. A guide rail is fixed to the ceiling, unit partition plates are suspended from the guide rail and transported one by one to a predetermined position, and then the upper ends of the unit partition plates are attached to the ceiling of the frame integrally with the guide rail. A method of constructing partition walls for underground passages, characterized in that the lower ends of the unit partition plates are filled with concrete or mortar between the frames and fixed to form a partition wall. 2. Fix a guide rail to the floor, place the unit bulkhead plates on this guide rail, and transport them one by one to a predetermined position. Next, fix the lower ends of the unit bulkhead plates together with the guide rail to the building frame. An underground passage bulkhead construction method characterized by filling and fixing concrete or mortar between the frames at the upper end to form the bulkhead.
JP57112348A 1982-06-29 1982-06-29 Method of executing partition wall of subway Granted JPS594800A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP57112348A JPS594800A (en) 1982-06-29 1982-06-29 Method of executing partition wall of subway

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP57112348A JPS594800A (en) 1982-06-29 1982-06-29 Method of executing partition wall of subway

Publications (2)

Publication Number Publication Date
JPS594800A JPS594800A (en) 1984-01-11
JPS6254959B2 true JPS6254959B2 (en) 1987-11-17

Family

ID=14584435

Family Applications (1)

Application Number Title Priority Date Filing Date
JP57112348A Granted JPS594800A (en) 1982-06-29 1982-06-29 Method of executing partition wall of subway

Country Status (1)

Country Link
JP (1) JPS594800A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH02147229A (en) * 1988-03-16 1990-06-06 Nomix Mfg Co Ltd Manufacture of vessel

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60162155U (en) * 1984-04-03 1985-10-28 杉山 重昭 Column wiring piping facility culvert
JPS6154049U (en) * 1984-09-13 1986-04-11
JP2618684B2 (en) * 1988-04-28 1997-06-11 日本ゼニスパイプ株式会社 Method of manufacturing back split concrete pipe
DE19925932C2 (en) * 1999-06-08 2000-10-19 Ams Apparate Und Maschinenbau Road tunnel
JP2001220996A (en) * 2000-02-10 2001-08-17 Ishikawajima Constr Materials Co Ltd Method for constructing partition wall in tunnel
JP2007332656A (en) * 2006-06-15 2007-12-27 Geostr Corp Structure for installing back split wall
JP6321394B2 (en) * 2014-02-17 2018-05-09 株式会社Ihi建材工業 Wall panel installation method and wall panel transfer device

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5426829A (en) * 1977-08-01 1979-02-28 Tokuyama Soda Co Ltd Adhesive composition

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS52108791U (en) * 1976-02-13 1977-08-18

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5426829A (en) * 1977-08-01 1979-02-28 Tokuyama Soda Co Ltd Adhesive composition

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH02147229A (en) * 1988-03-16 1990-06-06 Nomix Mfg Co Ltd Manufacture of vessel

Also Published As

Publication number Publication date
JPS594800A (en) 1984-01-11

Similar Documents

Publication Publication Date Title
KR100743913B1 (en) Volumetric modular building system
CA1046297A (en) Precast element for the construction of trenched structures and the process related thereto
CN108360712A (en) A kind of assembled steel reinforced concrete shear force wall and its construction method
CN104060629A (en) Covered top-down excavation subway station overlapped wall construction method and movable side wall formwork jumbo
CN203924116U (en) Portable side wall formwork jumbo
JPS6254959B2 (en)
CN110924568A (en) Method for constructing stair partition wall by adopting precast concrete hollow wall board
JP2004027609A (en) Construction method for subterranean structure and subterranean structure
JPS6410837A (en) Box pulling basket retaining mold of iron pillar fixing part in s building
JPH08253947A (en) Installation method for form-support in reverse placing method of concrete
CN213417893U (en) Assembled utility tunnel
JPS6410838A (en) Box pulling basket retaining mold of iron pillar fixing part in src building
CN115030205B (en) Integrated rapid construction method for raft, water collecting well and elevator shaft of deep foundation pit
CN208996023U (en) Liner wall construction with cavity armored concrete
JP3528141B2 (en) Method for concrete filling reinforcement of pedestal and reinforced pedestal
CN214994069U (en) Prefabricated assembled concrete utility tunnel of segmentation
CN214883865U (en) Close on river course TRD combined type enclosure utility tunnel structure
CN208122450U (en) Cast-in-place pond top plate formwork system
JP2006152746A (en) Method of constructing inside of tunnel
JP3194615B2 (en) How to repair a cave
JP2000355901A (en) Aerated-mortar lightweight filling for track and its execution method
JPS5925971Y2 (en) Mobile concrete pouring hopper
JPS6010063A (en) Construction of underground stair beam material
Cuthbert et al. THE THAMES-LEE WATER MAIN.
JPH0689638B2 (en) Tunnel lining method