CN208996023U - Lining wall structure with cavity reinforced concrete - Google Patents

Lining wall structure with cavity reinforced concrete Download PDF

Info

Publication number
CN208996023U
CN208996023U CN201821666141.7U CN201821666141U CN208996023U CN 208996023 U CN208996023 U CN 208996023U CN 201821666141 U CN201821666141 U CN 201821666141U CN 208996023 U CN208996023 U CN 208996023U
Authority
CN
China
Prior art keywords
cavity
side template
steel
wall construction
liner wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821666141.7U
Other languages
Chinese (zh)
Inventor
周健芝
邱巍
张海旭
刘立良
宗海涛
刘廷会
王鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN201821666141.7U priority Critical patent/CN208996023U/en
Application granted granted Critical
Publication of CN208996023U publication Critical patent/CN208996023U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The utility model discloses a lining wall structure with cavity reinforced concrete, which is arranged between a floor slab ring beam and a bottom plate and comprises an inner side template and an outer side template, wherein a cement inner stay is arranged between the inner side template and the outer side template; the inner side template is an iron plate and is arranged on the steel reinforcement framework; the outer side template is a wood template which is supported by wood purlin and steel pipes; the steel bar framework is formed by welding transverse steel bars and longitudinal steel bars in a splicing way, the longitudinal steel bars are uniformly distributed, and the space between the adjacent transverse steel bars is sequentially reduced from top to bottom; the floor slab ring beam is provided with a fabrication hole, and the vertical projection of the fabrication hole is positioned between the inner side template and the outer side template. The utility model provides a take cavity reinforced concrete's inside lining wall structure, its is rational in infrastructure, and the cavity of setting is used for hydrophobic and holds the vapor in the cavity, has realized underground continuous wall as temporary support and permanent basement outer wall's two wall unification designs, effectively saves the work load of basement outer wall, reduces earthwork excavation and backfill volume, has practiced thrift construction cost.

Description

Liner wall construction with cavity armored concrete
Technical field
The utility model belongs to technical field of building construction, is related to the liner wall construction with cavity armored concrete.
Background technique
In design of deep foundation pit and construction, in order to control construction cost, following two form of construction work is generally used: first is that adopting The mode unified with two walls, i.e. diaphram wall also serves as basement structure outer wall, second is that using brick inwall.The above construction Mode has following deficiency: due to construction reason in construction of diaphragm wall, diaphram wall is frequently present of large area infiltration, later period It needs to put into a large amount of manpower and material resources and leak stopping is carried out to breakthrough, when secondary structure and sole plate waterproof being delayed to be inserted into advance Between;On the other hand, basement structure beam slab is directly anchored in diaphram wall, increases the load of diaphram wall.
Therefore, it needs to design the liner wall construction with cavity armored concrete, increases drain function, control construction cost, Solution.
Utility model content
The purpose of this utility model is the inwall knot with cavity armored concrete provided in view of the above technical problems Structure, structurally reasonable, the cavity of setting realizes diaphram wall as interim for the vapor in hydrophobic and accommodating cavity Two walls of supporting and permanent outer wall of basement unification design, effectively save outer wall of basement workload, reduce earth excavation with Backfill amount, has saved construction cost.
In order to solve the above technical problems, the liner wall construction provided by the utility model with cavity armored concrete, setting Between floor ring beam and bottom plate, a gap is provided between liner wall construction and diaphram wall;The liner wall construction packet Inner side template and outboard template are included, cement inner bracing strip is provided between inner side template and outboard template;The inner side template is iron Plate is arranged on framework of steel reinforcement;Outboard template is plank sheathing, is installed by the wooden a tree, used in making timber for boats and steel pipe;The framework of steel reinforcement is by transverse direction Reinforcing bar and the criss-cross welding of longitudinal reinforcement form, and longitudinal reinforcement is uniformly arranged, the spacing between adjacent transverse reinforcing bar on to Under successively become smaller;Fabrication hole is provided on the floor ring beam, at vertical projection between inner side template and outboard template.
In some embodiments, the crossover location of the transverse steel and longitudinal reinforcement is provided with reinforced bar support (9), supports It connects on diaphram wall (3).
In some embodiments, the inner side template (4) is 0.5mm iron plate, and fragment is fixed on framework of steel reinforcement (7), It is fixed between adjacent iron plate by riveting.
In some embodiments, the framework of steel reinforcement (7) is horizontally installed between adjacent buttress (10), transverse direction thereon Buttress (10) a distance is inserted at the reinforcing bar both ends (7-1);Thereon the longitudinal reinforcement both ends (7-2) insertion floor ring beam (1) and Bottom plate (2) a distance.
In some embodiments, the distance between the transverse steel (7-1) of the lowest part and bottom plate (2) are 300mm, phase The distance between adjacent transverse steel (7-1) successively increases 100mm upwards.
In some embodiments, the distance between described adjacent longitudinal reinforcement (7-2) is not more than 500mm.
In some embodiments, the gap between inner side template (4) surrounding and the structure constructed using iron sheet or Mortar blocks.
In some embodiments, pre-buried steel casing on the fabrication hole (8) is dumping pit or hole of vibrating.
In some embodiments, the quantity of the fabrication hole (8) is three, and fabrication hole (8) setting at middle part is helped adjacent The middle position of pilaster (10), the distance between the fabrication hole (8) of two sides and buttress (10) are not less than 600mm or adjacent counterfort The 1/6 of distance between column (10).
The utility model the utility model has the advantages that
Liner wall construction provided by the utility model with cavity armored concrete, it is structurally reasonable, there is following technology Effect:
(1) it is frequent to avoid diaphram wall for the vapor in hydrophobic and accommodating cavity for the cavity of the application setting The case where infiltration, avoids the later period from carrying out the construction of leak stopping to breakthrough, has saved construction cost;
(2) the application realizes diaphram wall and designs as the unification of two walls of gib and permanent outer wall of basement, The workload for effectively saving outer wall of basement, reduces earth excavation and backfill amount, has saved construction cost.
Detailed description of the invention
It will be apparent and more hold by made detailed description, the above-mentioned advantage of the utility model in conjunction with the following drawings Readily understood, these attached drawings are only schematical, are not intended to limit the utility model, in which:
Fig. 1 is the schematic diagram of the liner wall construction described in the utility model with cavity armored concrete;
Fig. 2 is the corresponding top view of Fig. 1;
Fig. 3 is the cross-sectional view in Fig. 2;
Fig. 4 is corresponding partial enlarged view in Fig. 3.
In attached drawing, component representated by each label is as follows:
1. floor ring beam;2. bottom plate;3. diaphram wall;4. inner side template;5. outboard template;6. cement inner bracing strip;7. Framework of steel reinforcement, 7-1. transverse steel, 7-2. longitudinal reinforcement;8. fabrication hole;9. reinforced bar support;10. buttress;11. in having constructed The anti-bank of chemise;12. mortar.
Specific embodiment
Fig. 1 to Fig. 4 is the accompanying drawings of the liner wall construction of herein described cavity armored concrete, below with reference to tool Body embodiment and attached drawing, are described in detail the utility model.
The embodiment recorded herein is the specific specific embodiment of the utility model, for illustrating the utility model Design, be it is explanatory and illustrative, should not be construed as the limit to the utility model embodiment and the scope of the utility model System.In addition to the embodiment recorded herein, those skilled in the art can also be public based on the claim of this application book and specification institute For the content opened using obvious other technical solutions, these technical solutions include using doing to the embodiment recorded herein The technical solution of any obvious substitutions and modifications out.
The attached drawing of this specification is schematic diagram, aids in illustrating the design of the utility model, it is schematically indicated each section Shape and its correlation.It note that for the ease of clearly showing the structure of each component of the utility model embodiment, respectively It is not drawn according to identical ratio between attached drawing.Identical reference marker is for indicating identical part.
The herein described liner wall construction with cavity armored concrete, as shown in Figure 1, its setting floor ring beam 1 with Between bottom plate 2, a gap is provided between liner wall construction and diaphram wall 3;Fig. 2 is the corresponding top view of Fig. 1, and Fig. 3 is Cross-sectional view in Fig. 2.The liner wall construction includes inner side template 4 and outboard template 5, between inner side template 4 and outboard template 5 It is provided with cement inner bracing strip 6;The inner side template 4 is iron plate, is arranged on framework of steel reinforcement 7;Outboard template 5 is plank sheathing, It is installed by the wooden a tree, used in making timber for boats and steel pipe, and specifically, the upright bar and oblique steel pipe held out against using about three returns back to top outboard template 5.
In some embodiments, the framework of steel reinforcement 7 by transverse steel 7-1 and the criss-cross welding of longitudinal reinforcement 7-2 and At longitudinal reinforcement 7-2 is uniformly arranged, and the spacing between adjacent transverse reinforcing bar 7-1 successively becomes smaller from top to bottom;The floor ring beam Fabrication hole 8 is provided on 1, at vertical projection between inner side template 4 and outboard template 5.
In the application, the crossover location of the transverse steel 7-1 and longitudinal reinforcement 7-2 are provided with reinforced bar support 9, such as Fig. 3 Shown, reinforced bar support 9 is connected on diaphram wall 3.In the embodiment shown in fig. 3, the diameter of reinforced bar support 9 is 12mm, The length is 100mm.
In the embodiment shown in fig. 1, the inner side template 4 is 0.5mm iron plate, and fragment is fixed on framework of steel reinforcement 7, It is fixed between adjacent iron plate by riveting, it is ensured that connection tightly avoids spillage.
The framework of steel reinforcement 7 is horizontally installed between adjacent buttress 10, and counterfort is inserted at the both ends transverse steel 7-1 thereon 10 a distance of column;The both ends longitudinal reinforcement 7-2 insertion floor ring beam 1 and 2 a distance of bottom plate thereon.Reality shown in Fig. 1 Apply in example, the both ends transverse steel 7-1 be inserted into buttress 10 distance be 50mm, the both ends longitudinal reinforcement 7-2 be inserted into floor ring beam 1 and The distance of bottom plate 2 is 100mm.
The distance between transverse steel 7-1 and bottom plate 2 of the lowest part are 300mm, between adjacent transverse steel 7-1 Distance successively increase 100mm upwards;The distance between described adjacent longitudinal reinforcement 7-2 is not more than 500mm.Shown in Fig. 1 In embodiment, the distance between adjacent longitudinal reinforcement 7-2 is 500mm, and the distance between adjacent transverse steel 7-1 is from the bottom up It is followed successively by 300mm, 400mm, 500mm, 600mm and 700mm.
Gap between 4 surrounding of inner side template and the structure constructed is blocked using iron sheet or mortar.Specifically, interior 4 surrounding of side template and structure being followed closely in structure using iron sheet there are gap constructed, and overlapped with iron sheet template, bottom office Mortar closure can be used in portion gap.Corresponding partial enlarged view in Fig. 4 Fig. 3,4 bottom partial aperture of inner side template use mortar 12 It is blocked, mortar 12 blocks on the top of the anti-bank 11 of inner lining construction wall.
In the application, pre-buried steel casing on the fabrication hole 8 is dumping pit or hole of vibrating.The quantity of the fabrication hole 8 It is three, the middle position of adjacent buttress 10 is arranged in the fabrication hole 8 at middle part, between the fabrication hole 8 and buttress 10 of two sides Distance not less than between 600mm or adjacent buttress 10 distance 1/6.
In the embodiment shown in fig. 1, fabrication hole 8 totally three, the diameter of fabrication hole 8 are 100mm, when two of them discharging Another is vibrated as the mouth that vibrates using interpolation type vibrating spear.In principle, when the general 400mm high of each discharge port discharging It is then changed to the mouth that vibrates, is successively replaced, until three holes overflow concrete and through vibrating, until concrete liquid level no longer sinks. In casting process, outboard template 5 uses wooden mallet to tap in newly-laid concrete range to assist vibration compacting.
At the construction field (site), inwall inner side template 4 caused by operating condition because that can not remove, and 3 days band moulds pour outboard template 5 in principle Outboard template 5 is removed in water curing after 3 days, concrete surface pours enough curing waters, and surface covers thin film moisturizing maintenance, conserved Supplement curing water in journey into overlay film in time, in principle moisture-keeping maintaining 14 days, it is ensured that the concrete formation quality of inwall.
Compared with the prior art the shortcomings that and deficiency, the inwall knot provided by the utility model with cavity armored concrete Structure, structurally reasonable, the cavity of setting realizes diaphram wall as interim for the vapor in hydrophobic and accommodating cavity Two walls of supporting and permanent outer wall of basement unification design, effectively save outer wall of basement workload, reduce earth excavation with Backfill amount, has saved construction cost, has preferable promotional value.
The utility model is not limited to above embodiment, anyone can obtain other under the enlightenment of the utility model Various forms of products, however, make any variation in its shape or structure, it is all with identical or similar to the present application Technical solution, all fall within the protection scope of the utility model.

Claims (9)

1. the liner wall construction with cavity armored concrete, which is characterized in that it is arranged between floor ring beam (1) and bottom plate (2), A gap is provided between liner wall construction and diaphram wall (3);The liner wall construction includes inner side template (4) and outside Template (5) is provided with cement inner bracing strip (6) between inner side template (4) and outboard template (5);The inner side template (4) is iron Plate is arranged on framework of steel reinforcement (7);Outboard template (5) is plank sheathing, is installed by the wooden a tree, used in making timber for boats and steel pipe;The framework of steel reinforcement (7) it is formed by transverse steel (7-1) and the criss-cross welding of longitudinal reinforcement (7-2), longitudinal reinforcement (7-2) is uniformly arranged, adjacent Spacing between transverse steel (7-1) successively becomes smaller from top to bottom;Fabrication hole (8) are provided on the floor ring beam (1), are erected At to projection between inner side template (4) and outboard template (5).
2. according to claim 1 with the liner wall construction of cavity armored concrete, which is characterized in that the transverse steel The crossover location of (7-1) and longitudinal reinforcement (7-2) is provided with reinforced bar support (9), is connected on diaphram wall (3).
3. according to claim 1 with the liner wall construction of cavity armored concrete, which is characterized in that the inner side template It (4) is 0.5mm iron plate, fragment is fixed on framework of steel reinforcement (7), is fixed between adjacent iron plate by riveting.
4. according to claim 1 with the liner wall construction of cavity armored concrete, which is characterized in that the framework of steel reinforcement (7) be horizontally installed between adjacent buttress (10), (10) one sections of transverse steel both ends (7-1) thereon insertion buttress away from From;Floor ring beam (1) and bottom plate (2) a distance is inserted at the longitudinal reinforcement both ends (7-2) thereon.
5. according to claim 4 with the liner wall construction of cavity armored concrete, which is characterized in that the cross of the lowest part It is 300mm to the distance between reinforcing bar (7-1) and bottom plate (2), the distance between adjacent transverse steel (7-1) successively increases upwards Add 100mm.
6. according to claim 4 with the liner wall construction of cavity armored concrete, which is characterized in that adjacent longitudinal steel The distance between muscle (7-2) is not more than 500mm.
7. according to claim 1 with the liner wall construction of cavity armored concrete, which is characterized in that the inner side template (4) gap between surrounding and the structure constructed is blocked using iron sheet or mortar.
8. according to claim 1 with the liner wall construction of cavity armored concrete, which is characterized in that the fabrication hole (8) Upper pre-buried steel casing is dumping pit or hole of vibrating.
9. according to claim 8 with the liner wall construction of cavity armored concrete, which is characterized in that the fabrication hole (8) Quantity be three, the setting of the fabrication hole (8) at middle part in the middle position of adjacent buttress (10), the fabrication hole (8) of two sides with 1/6 of the distance between buttress (10) not less than distance between 600mm or adjacent buttress (10).
CN201821666141.7U 2018-10-15 2018-10-15 Lining wall structure with cavity reinforced concrete Expired - Fee Related CN208996023U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821666141.7U CN208996023U (en) 2018-10-15 2018-10-15 Lining wall structure with cavity reinforced concrete

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821666141.7U CN208996023U (en) 2018-10-15 2018-10-15 Lining wall structure with cavity reinforced concrete

Publications (1)

Publication Number Publication Date
CN208996023U true CN208996023U (en) 2019-06-18

Family

ID=66802701

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821666141.7U Expired - Fee Related CN208996023U (en) 2018-10-15 2018-10-15 Lining wall structure with cavity reinforced concrete

Country Status (1)

Country Link
CN (1) CN208996023U (en)

Similar Documents

Publication Publication Date Title
CN105178357B (en) Prefabricated subsurface structure under foundation trench open cutting condition and construction method for prefabricated subsurface structure under foundation trench open cutting condition
CN108505805B (en) Large cast-in-situ water pool with expansion reinforcing belt for crack control and construction method thereof
CN201280725Y (en) Post-casting construction precast slab for basement of buildings
CN207616844U (en) Foundation platform precast concrete side form and molding machine
CN108360712A (en) A kind of assembled steel reinforced concrete shear force wall and its construction method
CN205242436U (en) Supplementary soleplate traded interim bearing structure who props during system was gone along with sb. to guard him to underground complex
CN205296388U (en) Apron is sealed to garage wall post -cast strip
CN104358275B (en) Darker elevator shaft or collecting well construction method
CN109555112A (en) A kind of structure superposition formula diaphram wall and construction method
CN102691301A (en) Synchronous construction method for envelope enclosure supporting breast beam and main structure wall
CN103590841A (en) Supporting method for primary support of underground excavated chamber
JP2004232328A (en) Structure of half precast type arch culvert and its construction method
CN103122642A (en) Construction method of vertical post support change
CN105756100A (en) Basement post-pouring belt system and making method thereof
JP2011017188A (en) Demolition method of existing building
CN210768793U (en) Two-lining construction system at intersection of main tunnel and double-layer construction transverse channel
CN208996023U (en) Lining wall structure with cavity reinforced concrete
CN210369043U (en) Vertical reinforced concrete cast-in-place structure without split bolts
JP2003097196A (en) Composite segment in pipe embedment method
CN109610516B (en) Basement exterior wall post-cast strip retaining wall construction method
CN209989847U (en) Shear force wall post-cast strip prefabricated plate closing device
CN107326924A (en) Outer wall of underground structure HCMW engineering methods overlap wall and its construction method
CN201520970U (en) Cast-in-situ open-web ground-connecting wall plate
CN207672609U (en) A kind of foundation pit supporting construction also serves as the pipe gallery of main body
CN216615981U (en) Basement outer wall post-cast strip precast slab reinforced structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190618

Termination date: 20211015

CF01 Termination of patent right due to non-payment of annual fee