JPS624692A - Method for selecting connection of combination mooring line - Google Patents

Method for selecting connection of combination mooring line

Info

Publication number
JPS624692A
JPS624692A JP14183185A JP14183185A JPS624692A JP S624692 A JPS624692 A JP S624692A JP 14183185 A JP14183185 A JP 14183185A JP 14183185 A JP14183185 A JP 14183185A JP S624692 A JPS624692 A JP S624692A
Authority
JP
Japan
Prior art keywords
chain
line
connection
wire
link
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP14183185A
Other languages
Japanese (ja)
Other versions
JPH0577559B2 (en
Inventor
Tsuneo Kubo
久保 恒夫
Kazuyoshi Matsukawa
松川 和義
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Heavy Industries Ltd
Original Assignee
Mitsubishi Heavy Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Heavy Industries Ltd filed Critical Mitsubishi Heavy Industries Ltd
Priority to JP14183185A priority Critical patent/JPS624692A/en
Publication of JPS624692A publication Critical patent/JPS624692A/en
Publication of JPH0577559B2 publication Critical patent/JPH0577559B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

PURPOSE:To select connection of a line without using a special shape link, by providing a temporary retaining device consisting of a change link and a temporary chain load retainer, and connecting or disconnecting each kenter shackle at an end of a chain connected to a wire rope and an end of a chain line. CONSTITUTION:A temporary retaining device 12 consisting of change link 19 and a temporary chain load retainer 21 is connected through kenter shackles 14 and 16 to either end of a wire rope 11 wound by a winch 3 or a chain line 10 wound by a windlass 2. After supporting the load by the temporary chain load retainer 21, one of the kenter shackles 14 and 16 is opened to select a mooring line through the change link 19. Thus, it is not necessary to use a conventional open link or the like, and consider a direction of the open link in a winding operation of the winch and the windlass.

Description

【発明の詳細な説明】 〔産業上の利用分野〕 本発明は石油掘削リグなどの海洋構造物及び船舶の深海
係留に用いるコンビネーションムアリングラインの接続
替え方法に関する。
DETAILED DESCRIPTION OF THE INVENTION [Field of Industrial Application] The present invention relates to a method for reconnecting combination mooring lines used for deep-sea mooring of offshore structures such as oil drilling rigs and ships.

〔従来の技術〕[Conventional technology]

第14図〜第18図は、従来のコンビネーシッンムアリ
ングラインの接続替え方法を示す例(特開昭52−14
0189号)であり、第14図は全体正面図、第15図
〜第17図は接続替え説明図。
Figures 14 to 18 show an example of a conventional combination mooring line connection change method (Japanese Unexamined Patent Publication No. 52-14
0189), FIG. 14 is an overall front view, and FIGS. 15 to 17 are connection change explanatory views.

及び第18図は、8開ロリングが、フェアリードシーブ
に係合する部分断面図を示す。
and FIG. 18 show a partial cross-sectional view of the eight-opening roll engaging the fairlead sheave.

従来のコンビネーションムアリングラインの接続替え方
法はワイヤーロープとチェンラインの接続替えに使用す
る特殊形状のリンクがムアリングライン中に挿入されラ
インの一部として使用される方法であり、その構成を第
14図により示すと。
The conventional combination mooring line reconnection method is a method in which a specially shaped link used to reconnect the wire rope and chain line is inserted into the mooring line and used as part of the line. As shown in Figure 14.

に) ドラム88にて巻取シ巻戻しされるワイヤーロー
プ40及びアンカに接続するチェンライン72゜ (イ) リーダーチェン(ワイヤー/チェノコネクター
)50〜64は・・・・・・・・・コネクター50.シ
イベ/I/構体60.チェーン54.56.58.62
.64 から構成され、上記ワイヤーロープ40.  
リーダチェン、チェンライン72の組合体にてコンビネ
ーシヲンムアリングラインを形成スル。
(b) The wire rope 40 is wound up and unwound on the drum 88, and the chain line 72° connected to the anchor (a) The leader chain (wire/cheno connector) 50 to 64 is... Connector 50. Shiibe/I/Structure 60. Chain 54.56.58.62
.. 64, and the wire rope 40.
The combination of leader chain and chain line 72 forms a combination mooring line.

(ロ) 3開ロリンクロ8は、8つの開口を有し8方向
にムアリングラインを接続可能とした特殊形状リンクで
ある。
(b) The 3-open roller link 8 is a specially shaped link that has eight openings and can connect mooring lines in eight directions.

に) リードチェン46は、チェンロッカーよりウイン
ドブスのチェンドラム上を通り作業台まで導いたチェー
ンである。
) The lead chain 46 is a chain that is led from the chain locker to the workbench, passing over the windbus chain drum.

(4)第1及び第2取付取はずし用リンク66、80は
、ワイヤー/チェノラインの接続替えに用いる着脱自在
のリンクである。
(4) The first and second attachment/detachment links 66, 80 are detachable links used for changing the connection of the wire/cheno line.

等よりなり、3開ロリンクロ8は、第1又は第2取付取
はずし用リンク66.80を介してリードチェン46又
はリーダーチェン50〜64に接続しムアリングライン
の1部分としてライン内に含まれる。
The three-opening roller chain 8 is connected to the lead chain 46 or leader chains 50 to 64 via the first or second attachment/detachment link 66.80 and is included in the line as a part of the mooring line. .

この3開ロリンクロ8は3つの接続用開口を有しワイヤ
ー/チェーンラインの接続替えに供される。8開口に取
付数はずし用リンク66.68を用いてリーダーチェノ
50〜64.リードチエン46及びチェンライン72が
同時に接続されることが出来、ワイヤー/チェノライン
の接続替え時に丁字形のラインが成形される特長を有す
る。このY字形ラインのため取りはずし側ラインをたる
ませ使用側ラインに張力を移動させるのはウインドラヌ
又はウィンチのどちらか一方を操作することにより容易
、かつ安全に行なえる。8開ロリンクロ8を使用してワ
イヤー/チェーンフィンの接続替えは簡単に行なえるが
接続替えを完了したチェンライン又はコンビネーシ冒ン
ムアリングライン中にラインの1部として8開ロリンク
ロ8が装入され、ウインドラヌのチェンドラム上及びフ
ェアリードシープを通過しなければならない。
This three-open Rolin Kuro 8 has three connection openings and is used for changing wire/chain line connections. 8 openings using the link 66.68 for removing the number of attachments to the leader chenno 50-64. The lead chain 46 and the chain line 72 can be connected at the same time, and a T-shaped line is formed when changing the wire/cheno line connection. Because of this Y-shaped line, it is possible to slacken the removal side line and transfer tension to the use side line easily and safely by operating either the wind lane or the winch. Wire/chain fin connections can be easily changed using the 8-open Rollin Cro 8, but the 8-open Rollin Cro 8 must be inserted as part of the line into the chain line or combination mooring line after the connection has been changed. , must pass over Windranu's Chendrum and Fairlead Sheep.

さらに、8開ロリンクロ8を使用したワイヤー/チェノ
の接続替えの手順を第14〜第18図にて説明する。
Furthermore, the procedure for changing the wire/cheno connection using the 8-open Rolin Kuro 8 will be explained with reference to FIGS. 14 to 18.

(1)  第14図よ#)3開ロリンクロ8はチェンド
ラム44の溝に竪方向で通過出来る状態で接続する。
(1) Figure 14 #) The three-open roller roller 8 is connected to the groove of the chain drum 44 so that it can pass vertically.

(2)第15図よりチェンロッカー内に収納されている
チェンライン72をリードチェンの一部を残し、のこシ
の全量ウィンドラスのチェンドラム44にて操出し、接
続替え位置で停止する。
(2) From FIG. 15, the entire chain line 72 stored in the chain locker is moved out by the chain drum 44 of the windlass, leaving a part of the lead chain, and stopped at the connection change position.

(3)第16図よりリーダチェン50〜64の先端と3
開ロリンクロ8のリーダーチェノ接続用開口を第一取付
は用リンク66にて接続する。これでワイヤーロープ4
0−リードチェノ46−チエンライン72のY字形ライ
ンが形成される。
(3) From Figure 16, the tips of leader chains 50 to 64 and 3
The opening for connecting the leader chino of the opening roller 8 is connected with the first attachment link 66. Now wire rope 4
A Y-shaped line of 0-lead chain 46-chain line 72 is formed.

(4)第17図よりウィンドラス42又はウィンチ86
のどちらかの一方を操作してリードチェン46に作用し
ている張力をワイヤーロープ40に完全に移動させ、リ
ードチェン46をたるませる。
(4) From Figure 17, the windlass 42 or winch 86
The tension acting on the reed chain 46 is completely transferred to the wire rope 40 by operating either one of the reed chains 46 and the reed chain 46 becomes slack.

リードチェン46と8開ロリンクロ8を接続している第
二取付は用リンク80を取シはずしてリードチェーン4
6と3開・ロリンクロ8の接続を断ちワイヤーロープ4
0−リードチェノ開口−3開ロリンクロ8−チェンライ
ン72のコンビネーションムアリングラインが構成され
る。
For the second installation connecting the lead chain 46 and the 8-open roller chain 8, remove the link 80 and attach the lead chain 4.
Cut the connection between 6 and 3 open/Rorincro 8 and wire rope 4
A combination mooring line of 0-lead chino opening-3 open roller chain 8-chain line 72 is constructed.

(5)  ウィンチ36を操作しワイヤーラインを繰出
し8開ロリンクロ8.リーダーチエン50〜64゜ワイ
ヤーロープ40がフェアリードシープ74を通過してコ
ンビネーションムアリングラインが成立する。
(5) Operate the winch 36 and feed out the wire line to open the 8-open roller 8. The leader chain 50-64° wire rope 40 passes through the fairlead sheep 74 to form a combination mooring line.

(6)  コンビネーションムアリングラインよりチェ
ン単独のチェンラインに接続替えは前述の逆手順にて行
う。
(6) To change the connection from a combination mooring line to a chain line with a single chain, follow the above procedure in reverse.

(7)  第18図にフェアリードシープ74にワイヤ
ーo −7” 40 、 チェ772及び8開ロリンク
ロ8が通過する状態を示す。
(7) FIG. 18 shows the state in which the wire O-7" 40, the check 772, and the 8-open roller 8 pass through the fairlead sheep 74.

〔発明が解決しようとする問題点〕[Problem that the invention seeks to solve]

しかしながら、従来の方法では、下記の如く(1)  
従来のワイヤー/チェノの接続替えは3開ロリンクを用
いて行うが、この方法では接続替え後も3開ロリンクが
ムアリングライン中に残シラインの一部となる。
However, in the conventional method, (1)
Conventional wire/cheno connections are changed using a 3-way link, but with this method, the 3-way link remains part of the mooring line even after the connection is changed.

(2) この3開ロリンクは接続用のため使用チェーン
に対しもう一つの開口を余分に有す突起部があり、ムア
リングラインに使用しているコモンリンク、ケンターシ
ャック〃、エンドリンク等の標準リンクと同一形状でな
いためチェンドラム及び・フェアリードシープを通過す
るのに竪側且つ開口部がシープの外側にしないと通過し
ないという方向性を有し、8開ロリンクを竪側に来る様
リードチェンの端末を横チェンに調整することが必要で
ある。
(2) This 3-open link has a protrusion that has an extra opening for the chain used for connection, and is used for common links, Kenter shacks, end links, etc. used in mooring lines. Because it is not the same shape as the standard link, it has a directionality that it will not pass through the chain drum and fairlead sheep unless it is on the vertical side and the opening is on the outside of the sheep, so lead the 8-open link so that it is on the vertical side. It is necessary to adjust the end of the chain to a horizontal chain.

(3)  ワイヤー/チェノのコンビネーシ冒ンムアリ
ングラインを回収する時、ワイヤーロープのねじれが3
開ロリンクに作用し3開ロリンクの方向が定まらずフェ
アリードシープに入る前に竪方向となる様調整作業が必
要となる。
(3) Wire/cheno combination damage When retrieving the mooring line, the wire rope is twisted 3 times.
The direction of the 3-way open link is not determined due to the effect on the open link, and adjustment work is required to make it vertical before entering the fairlead sheep.

(4)  フェアリードシープが海水中に没した場合の
、3開ロリンクの方向確認及び調整作業は。
(4) If the Fairlead Sheep is submerged in seawater, what should be done to check the direction and adjust the 3-way link?

海中で行なうので大変な作業で長時間作業となりかつ危
険を伴う。
Since it is carried out underwater, the work is difficult, requires long hours, and is dangerous.

等の欠点があった。There were drawbacks such as.

本発明は特殊形状リンク(3開ロリンク等)を単なるワ
イヤー/チェノの接続替えに用いる道具とし、ムアリン
グライン中に挿入せずに済む接続替えの手段を供するも
ので、これにより接続替え部がチェンドラム及びフェア
リードシープを通過するのに方向調整及び同調作業を必
要とせずにスムーズに通過し係留作業を円滑かつ安全に
行なえることを目的とする。
The present invention uses a special-shaped link (such as a 3-open link) as a tool for simply changing the wire/cheno connection, and provides a means for changing the connection without having to insert it into the mooring line. The purpose of the present invention is to smoothly pass through a chain drum and fairlead sheep without requiring direction adjustment or synchronization work, and to perform mooring work smoothly and safely.

〔問題点を解決するための手段〕[Means for solving problems]

しかるに本発明のコンビネーションムアリングラインの
接続替え方法は。
However, the method for changing the connection of a combination mooring line according to the present invention is as follows.

(1ン  ウィンチを介してのワイヤラインとウィンド
ラスを介してのチェンラインの接続替えに使用されるコ
ンビネーションムアリングラインの接続替え方法におい
て、上記ワイヤラインの先端部に設けた第1接続替え部
とチェンジリンクよりなる接合用チェン荷重一次保持装
置の保持具先端を上記チェンラインの保持部に貫入し、
上記両ラインにてチェン荷重を保持し、前記チェノライ
ンの保持部より数リンク上方の第2接続替え部にて、上
記チェノラインを分離し、さらに該チェノの第2接続替
え部を前記チェンジリンクに連結し、上記チェノライン
にてチェノ荷重を保持し、前記ワイヤライン上の第1接
続替え部とチェンジリンクとを分離し、該第1接続替え
部を前記分離下方チェノラインの上端に連結し、上記ワ
イヤラインにてチェノ荷重を保持し、さらに前記チェノ
ラインの保持部に貫入している前記保持具先端を取りは
ずすことにより、上記両ラインを一組にする一連の手順
よりなることを特徴とする。さらに (2)  ウィンチを介してのワイヤラインとウィンド
ラスを介してのチェン°ラインの接続替えに使用される
コンビネーションムアリングラインの接続替え方法にお
いて、アンカー、チェンライン、ワイヤライン及びウィ
ンチよりなる一連のコンビネーションムアリングライン
における前記ウィンチを介してワイヤラインを巻取り、
該ワイヤラインと前記チェノラインとのコネクター下方
近傍の保持部に、チェノラインの一部分を形成するリー
ドチェンの先端部に設けた第1接続替え部とチェンジリ
ンクよりなる接合用チエン荷重一次保持装置の保持具先
端を貫入し1.上記両ラインにてチェノ荷重を保持し、
前記保持部より数リンク上方の第2接続替え部を前記チ
ェンジリンクに連結し、ワイヤラインにてチェノ荷重を
保持し、前記第1接続替え部とチェンジリンクを分離し
、該第−1接続替え部を前記分離下方チェノラインの上
端に連結し、チェノラインにてチェノ荷重を保持し、さ
らに前記保持部に貫入している前記保持具先端を取シは
ずすことによりチェノラインのみにする一連の手順より
なることを特徴とする。
(In a method for changing the connection of a combination mooring line used to change the connection between a wire line via a winch and a chain line via a windlass, the first connection change section is provided at the tip of the wire line. Insert the tip of the holder of the joining chain load primary holding device consisting of a change link and a change link into the holding part of the chain line,
The chain load is held in both lines, the chain is separated at a second connection change section several links above the holding section of the chain, and the second connection change section of the chain is connected to the change link. holding a chain load in the chain line, separating a first connection change part and a change link on the wire line, connecting the first connection change part to the upper end of the separated lower chain line, and connecting the first connection change part to the upper end of the separated lower chain line; The present invention is characterized by a series of steps in which the two lines are combined into a set by holding the cheno load at the cheno line and then removing the tip of the holder penetrating the holding portion of the cheno line. Furthermore, (2) a method for reconnecting a combination mooring line used for reconnecting a wire line via a winch and a chain line via a windlass, including a series consisting of an anchor, a chain line, a wire line, and a winch. winding the wire line through the winch in the combination mooring line;
A holder for a joining chain load primary holding device comprising a first connection change part and a change link provided at the tip of a lead chain forming a part of the Cheno line, in a holding part near the lower part of the connector between the wire line and the Cheno line. Penetrate the tip 1. Hold the cheno load on both lines above,
A second connection change part several links above the holding part is connected to the change link, the chain load is held by a wire line, the first connection change part and the change link are separated, and the -1st connection change is performed. connecting a part to the upper end of the separation lower cheno line, holding the cheno load with the cheno line, and further removing the tip of the holder penetrating the holding part to leave only the cheno line alone. It is characterized by

〔作用〕[Effect]

上記手順によりコンビネーションムアリングラインから
特殊形状のリンクを除くことによりムアリングライン接
続部がチェンドラム及びフェアリードシープを通過する
のに調整を要せず通常のチェノラインの通過と変らない
状態を作る。
By removing the specially shaped link from the combination mooring line through the above procedure, no adjustment is required for the mooring line connection part to pass through the chain drum and fairlead sheep, creating a condition that is no different from the passage of a normal chain line.

〔実施例〕〔Example〕

第1図〜第18図は1本発明であるコンビネーションム
アリングラインの接続替え方法に係る一実施例であり、
第1図は全体正面図、第2図〜第11図は本発明の詳細
な説明図、第12図(−) 。
Figures 1 to 18 show an embodiment of the method of changing the connection of a combination mooring line according to the present invention.
FIG. 1 is an overall front view, FIGS. 2 to 11 are detailed explanatory views of the present invention, and FIG. 12 (-).

(b)、 (e)はモエンホルダーの詳細図、及び第1
8図(a)、 (b)はワイヤ/チェノコネクター詳細
図を示す。
(b), (e) are detailed views of Moenholder and the first
Figures 8(a) and 8(b) show detailed views of the wire/cheno connector.

第1図、第2図、第12図(a)、 (b)、 (C)
及び第8図(a)、 (b)より1本発明のコンビネー
ションムアリングラインの接続替え方法の一実施例は。
Figure 1, Figure 2, Figure 12 (a), (b), (C)
From FIGS. 8(a) and 8(b), one embodiment of the method for changing the connection of a combination mooring line according to the present invention is shown.

(7) ドラム3により巻取シ9巻戻しされるワイヤー
ロープ11及び一端にてアンカーに接続するチェノライ
ン10゜ (イ) ロープソケット108.ボールアダプター10
9B、 109b 、特殊スイベル110.チ! ン1
07から構成され、ロープソケット108は、ワイヤー
ロープ11に接続し一体となっている前記ワイヤロープ
11端に接続するワイヤー/チェノコネクター13゜ (ロ) チェノ荷重保持具(チェノハンガー)21と8
系列のムアリングラインを接続可能なチェンジリンク1
9を1体化したワイヤー/チェノ接続替え用具である接
合用チェン荷重一次保持装置12゜ に) チェノロッカー6よりラインドラス1のチェンド
ラム2を通り作業台8まで導くリードチェン7゜ (4) ムアリングラインの一部となり着脱可能な接続
替え部(A、B)をもつケンターシャック ル 14,
16  。
(7) Wire rope 11 that is wound up and 9 unwound by the drum 3 and the Chenoline 10° connected to the anchor at one end (A) Rope socket 108. Ball adapter 10
9B, 109b, special swivel 110. blood! N1
07, the rope socket 108 is connected to the wire rope 11 and is integrated with a wire/cheno connector 13° (b) connected to the end of the wire rope 11, a chino load holder (cheno hanger) 21, and 8
Change link 1 that can connect series mooring lines
The lead chain 7° (4) leads from the chain rocker 6 through the chain drum 2 of the line lath 1 to the workbench 8. ) Kenter shackle 14, which is part of the mooring line and has removable connection parts (A, B).
16.

等の構成であり、上記購成に基ずき、海洋構造物及び石
油掘削リグ等のコンビネーションムアリングラインの接
続替え方法の手順を第2図〜第18図にて説明する。
Based on the above-mentioned purchase, the procedure for changing the connection of combination mooring lines for offshore structures, oil drilling rigs, etc. will be explained with reference to FIGS. 2 to 18.

(1ン  第2図よクチエンロッカー6内に収納すして
いるチェンライン10を全てウィンドラス1のチェンド
ラム2.にて操出し、接続替え位置で停止する。
(1) As shown in Fig. 2, all the chain lines 10 stored in the chain locker 6 are pulled out by the chain drum 2 of the windlass 1 and stopped at the connection change position.

(2)第3図、12図(a)、 (b)、 (e) !
 D接合層チェン荷重一次保持装置12のチェンハンガ
ー21を第1ケンターシヤツク#14より数すンク下の
チェンライン保持部(c)にセットする。これでワイヤ
ーロープ11−リードチェン7−チェンライン10のY
字形ラインを形成する。
(2) Figures 3 and 12 (a), (b), (e)!
Set the chain hanger 21 of the D joint layer chain load primary holding device 12 to the chain line holding part (c) a few inches below the first Kenter shaft #14. Now wire rope 11 - lead chain 7 - chain line 10 Y
Form glyph lines.

(3)第4図よりラインドラス1又はウィンチ4のどち
らかの一方に操作してリードチェン7に作用している張
力をワイヤーライン11に完全に移動させリードチェン
7をたるませる。
(3) From FIG. 4, operate either the line lath 1 or the winch 4 to completely transfer the tension acting on the lead chain 7 to the wire line 11 and slacken the lead chain 7.

(4)第5図よりリ−トチエン7とチェンライン10を
結合している第1ケンターシヤツクル14の接続替え部
(A)にてリードチェン7とチェンライン10の接続を
断つ。
(4) As shown in FIG. 5, the connection between the lead chain 7 and chain line 10 is cut off at the reconnection section (A) of the first Kenter shaft 14, which connects the lead chain 7 and chain line 10.

(5)  第6図より分断されたリードチェン7を接合
用チェンー次保持装置12のチェンジリンク19に第1
ケンターシヤツク/L’14の接続替え部囚にて連結す
る。
(5) As shown in FIG.
Connect at Kenter Shock/L'14 connection switching section.

(6)第7図よりラインドラス1又はウィンチ4のどち
らかの一方を操作してワイヤーロープ11に移動した張
力を再びリードチェン7に完全に移動させワイヤーロー
111をたるませる。
(6) From FIG. 7, operate either the line lath 1 or the winch 4 to completely transfer the tension that has been transferred to the wire rope 11 to the lead chain 7 again, causing the wire row 111 to slacken.

(7)第8図よりワイヤーロープ11トチエンジリンク
19を結合している第2ケンターシヤツク/I/16の
接続替゛え部(B)にて取シはすし、ワイヤーロープ1
1と接合用チェン荷1重一次保持装置12を介してチェ
ンライン10の接続を断つ。
(7) From Fig. 8, the wire rope 1 is removed at the connection change part (B) of the second Kenter shaft/I/16 that connects the wire rope 11 and the change link 19.
1 and the chain line 10 are disconnected via the joining chain load single-layer primary holding device 12.

(8)  第9図より再び分断したワイヤーロープ11
とチェンライン10を第2ケンターシヤツクル16の接
続替え部CB)にて連結してワイヤーロープ11−接合
用チエン荷重一次保持装置12を含めたリードチェン7
−チェンラインlOのY字形ラインを形成する。
(8) Wire rope 11 separated again from Figure 9
and the chain line 10 are connected at the connection change part CB of the second Kenter shaft 16 to form the lead chain 7 including the wire rope 11 and the joining chain load primary holding device 12.
- Forming a Y-shaped line of chain line lO.

(9)  第10図よりウィンドラス1又はウィンチ4
のどちらかの一方を操作してリードチェン7に作用して
いる張力をワイヤーロープ11に完全に移動させ、す、
−トチエン7をたるませる。
(9) From Figure 10, windlass 1 or winch 4
completely transfer the tension acting on the lead chain 7 to the wire rope 11 by operating either one of the
- Sag the tothiene 7.

叫 第11図より接合用チェン荷重一次保持装置12の
チェンハンガー21をチェンライン10の保持部(C)
より取りはずす。
From Figure 11, the chain hanger 21 of the joining chain load primary holding device 12 is moved to the holding part (C) of the chain line 10.
Remove it.

以上よりワイヤーロープ11とチェンライン10が完全
に1体化しコンビネーションムアリングラインが完成す
る。
As described above, the wire rope 11 and the chain line 10 are completely integrated, and a combination mooring line is completed.

尚この時のライン構成はワイヤーロープ11゜ワイヤー
/チェノコネクター18.第2ケンターシャック/L/
 16 、  チェンライン10及びアンカーとなる。
The line configuration at this time is 11° wire rope and 18° wire/cheno connector. 2nd Kentershack/L/
16, chain line 10 and anchor.

(11)  接合用チェン荷重一次保持装置12はリー
ドチェン7に連結された状態で次のワイヤー/fエン接
続替え作業に供されるまで保持される。
(11) The welding chain load primary holding device 12 is held connected to the lead chain 7 until it is used for the next wire/f engine connection change operation.

さらに @ コンビネーションムアリングラインよりチェン単独
のムアリングラインへの接続替え手順はアンカー、チエ
ンライン、ワイヤライン及びウィンチよりなる一連のコ
ンビネーションムアリングラインにおける前記ウィンチ
を介してワイヤラインを巻取り、該ワイヤラインと前記
チェンラインとのコネクター下方近傍の保持部に、チェ
ンラインの一部分を形成するリードチェンの先端部に設
けた第1接続替工部とチェンジリンクよりなる接合用チ
ェン荷重一次保持装置の保持具先端を貫入し。
Furthermore, the procedure for changing the connection from a combination mooring line to a chain-only mooring line involves winding up the wire line through the winch in a combination mooring line consisting of an anchor, a chain line, a wire line, and a winch. A connecting chain load primary holding device consisting of a first connection change section and a change link provided at the tip of the lead chain that forms part of the chain line is held in a holding section near the bottom of the connector between the line and the chain line. Penetrate the tip of the tool.

上記両ラインにてチェン荷重を保持し、前記保持部より
数リンク上方の第2接続替え部を前記チェンジリンクに
連結し、ワイヤラインにてチェン荷重を保持し、前記第
1接続替え部とチェンジリンクを分離し、該第1接続替
え部を前記分離下方チェンラインの上端に連結し、チェ
ンラインにてチェン荷重を保持し。
The chain load is held in both of the above lines, a second connection change part several links above the holding part is connected to the change link, the chain load is held in the wire line, and the second connection change part is connected to the first connection change part. The link is separated, and the first connection change part is connected to the upper end of the separated lower chain line, and the chain load is held by the chain line.

さらに前記保持部に貫入している前記保持具先端を取り
はずすことによりチェンラインのみにする手順で実施す
る。
Furthermore, by removing the tip of the holder that has penetrated into the holder, only the chain line is left.

尚、接合用チエン荷重一次保持装置12のチェノ荷重保
持具21は1例としてチェノハンガー形式のものを示し
たものでチェノ荷重を保持可能なもので有れば特に制限
されるものではない。
The chain load holder 21 of the joining chain load primary holding device 12 is shown in the form of a chain hanger as an example, and is not particularly limited as long as it can hold the chain load.

〔発明の効果〕〔Effect of the invention〕

詳述の如く、コンビネーションムアリングラインのワイ
ヤーンチェン接続替え方法を提供することにより接続替
え用具である特殊形状リンク(チェンジリンク)をムア
リングラインに含めないラインの構成が可能となり、コ
ンビネーシヲンムアリングラインの操作が容易かつ安全
なものとなる。
As described in detail, by providing a wire chain connection change method for a combination mooring line, it is possible to configure a line that does not include a specially shaped link (change link), which is a connection change tool, in the mooring line. The operation of the ring line becomes easy and safe.

【図面の簡単な説明】[Brief explanation of drawings]

第1図〜第18図は1本発明であるコンビネーションム
アリングラインの接続替え方法に係る一実強例であり、
第1図は本発明の全体正面図。 第2図〜第11図は1本発明の詳細な説明図。 第12図体)、 (b)、 (C)は各々、チェンホル
ダーの詳細図、第12図(−)の■b−■b線断面図、
第12図(b)の■C−■C線断面図、第13図(−)
、 (b)は各々。 ワイヤ/チェノコネクター詳細平面図及び%号榊今側面
図を示す。第14図〜第18図は、従来のコンビネーシ
ョンムアリングラインの接続替え方法であり、第14図
は全体正面図、第15〜第17図は、接続替え説明図及
び第18図は、3開ロリングが、フェアリードシープに
係合する部分断面図を示す。 l・・・ウィンド”ラス、2・・・チェンドラム、8・
・・ドラム、4・・・ウィンチ、5・・・ト、ラス、6
・・・チェノロッカー、7・・・リードチェン、8・・
・作業台。 9・・・フェアリードシープ、10・・・チェノライン
。 11・・・ワイヤーロープ、12・・・接合用チエン荷
重一次保持装置、18・・・ワイヤ/チェノコネクター
。 14・・・第1ケンターシヤツクル、16・・・第2ケ
ンターシヤツクル、18・・・チェノ、19・・・チェ
ンジリンク、20・・・チェノ、21・・・チェン荷重
一次保持具。 第1圓 (ト) 第72111 第13圓
Figures 1 to 18 show a practical example of the method of changing the connection of a combination mooring line according to the present invention.
FIG. 1 is an overall front view of the present invention. 2 to 11 are detailed explanatory diagrams of the present invention. Figure 12 (body), (b), and (C) are detailed views of the chain holder, and a sectional view taken along the line ■b-■b in Figure 12 (-).
Figure 12 (b) ■C-■C cross-sectional view, Figure 13 (-)
, (b) respectively. A detailed plan view of the wire/cheno connector and a side view of the % No. Sakakima are shown. 14 to 18 show a conventional method for changing the connection of a combination mooring line. FIG. 14 is an overall front view, FIG. FIG. 6 shows a partial cross-sectional view of the rolling engaging the fairlead sheep. l...Wind" Rath, 2...Cendrum, 8.
... Drum, 4... Winch, 5... To, Last, 6
...cheno rocker, 7...lead chain, 8...
·Workbench. 9... Fairlead Sheep, 10... Chenoline. DESCRIPTION OF SYMBOLS 11...Wire rope, 12...Join chain load primary holding device, 18...Wire/cheno connector. 14... First Kenter shaft, 16... Second Kenter shaft, 18... Cheno, 19... Change link, 20... Cheno, 21... Chain load primary holder. 1st circle (g) 72111 13th circle

Claims (2)

【特許請求の範囲】[Claims] (1)ウインチを介してのワイヤラインとウインドラス
を介してのチェンラインの接続替えに使用されるコンビ
ネーションムアリングラインの接続替え方法において、
上記ワイヤラインの先端部に設けた第1接続替え部とチ
ェンジリンクよりなる接合用チェン荷重一次保持装置の
保持具先端を上記チェンラインの保持部に貫入し、上記
両ラインにてチェン荷重を保持し、前記チェンラインの
保持部より数リンク上方の第2接続替え部にて、上記チ
ェンラインを分離し、さらに該チェンの第2接続替え部
を前記チェンジリンクに接続し、上記チェンラインにて
チェン荷重を保持し、前記ワイヤライン上の第1接続替
え部とチェンジリンクを分離し、該第1接続替え部を前
記分離下方チェンラインの上端に連結し、上記ワイヤラ
インにてチェン荷重を保持し、さらに前記チェンライン
の保持部に貫入している前記保持具先端を取りはずすこ
とにより上記両ラインを一組にする一連の手順よりなる
ことを特徴とするコンビネーションムアリングラインの
接続替え方法。
(1) In a method for reconnecting a combination mooring line used for reconnecting a wire line via a winch and a chain line via a windlass,
The tip of the holder of the joining chain load primary holding device, which consists of the first connection change section and change link provided at the tip of the wire line, penetrates into the holding section of the chain line, and the chain load is held on both lines. Then, the chain line is separated at a second connection change part several links above the holding part of the chain line, and the second connection change part of the chain is connected to the change link, and the chain line is connected to the second connection change part several links above the holding part of the chain line. Holding a chain load, separating a first connection change part and a change link on the wire line, connecting the first connection change part to the upper end of the separated lower chain line, and holding the chain load on the wire line. A method for changing the connection of a combination mooring line, further comprising a series of steps of combining the two lines into a set by removing the tip of the holder penetrating the holding part of the chain line.
(2)ウインチを介してのワイヤラインとウインドラス
を介してのチェンラインの接続替えに使用されるコンビ
ネーションムアリングラインの接続替え方法において、
アンカー、チェンライン、ワイヤライン及びウインチよ
りなる一連のコンビネーションムアリングラインにおけ
る前記ウインチを介してワイヤラインを巻取り、該ワイ
ヤラインと前記チェンラインとのコネクター下方近傍の
保持部に、チェンラインの一部分を形成するリードチェ
ンの先端部に設けた第1接続替え部とチェンジリンクよ
りなる接合用チェン荷重一次保持装置の保持具先端を貫
入し、上記両ラインにてチェン荷重を保持し、前記保持
部より数リンク上方の第2接続替え部を前記チェンジリ
ンクに連結し、ワイヤラインにてチェン荷重を保持し、
前記第1接続替え部とチェンジリンクを分離し、該第1
接続替え部を前記分離下方チェンラインの上端に連結し
、チェンラインにてチェン荷重を保持し、さらに前記保
持部に貫入している前記保持具先端を取りはずすことに
よりチェンラインのみにする一連の手順よりなることを
特徴とするコンビネーションムアリングラインの接続替
え方法。
(2) In a method for reconnecting a combination mooring line used for reconnecting a wire line via a winch and a chain line via a windlass,
In a series of combination mooring lines consisting of an anchor, a chain line, a wire line, and a winch, the wire line is wound up through the winch, and a portion of the chain line is attached to a holding part near the lower part of the connector between the wire line and the chain line. The tip of the holder of the joining chain load primary holding device consisting of the first connection change part and the change link provided at the tip of the lead chain forming the lead chain is penetrated, and the chain load is held in both lines, and the holding part A second connection change part several links above is connected to the change link, and the chain load is held by a wire line,
Separate the first connection change section and change link, and
A series of steps in which a connection change part is connected to the upper end of the separated lower chain line, the chain load is held by the chain line, and the tip of the holder penetrating into the holding part is removed to leave only the chain line. A method for changing the connection of a combination mooring line, which is characterized by:
JP14183185A 1985-06-28 1985-06-28 Method for selecting connection of combination mooring line Granted JPS624692A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP14183185A JPS624692A (en) 1985-06-28 1985-06-28 Method for selecting connection of combination mooring line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP14183185A JPS624692A (en) 1985-06-28 1985-06-28 Method for selecting connection of combination mooring line

Publications (2)

Publication Number Publication Date
JPS624692A true JPS624692A (en) 1987-01-10
JPH0577559B2 JPH0577559B2 (en) 1993-10-26

Family

ID=15301145

Family Applications (1)

Application Number Title Priority Date Filing Date
JP14183185A Granted JPS624692A (en) 1985-06-28 1985-06-28 Method for selecting connection of combination mooring line

Country Status (1)

Country Link
JP (1) JPS624692A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0234498A (en) * 1988-07-25 1990-02-05 Mitsui Eng & Shipbuild Co Ltd Multi-point mooring method for floating type ocean structure
CN1044497C (en) * 1997-04-07 1999-08-04 中国科学院上海技术物理研究所 Method for solid regional melting growth of 1-3 micron Te-Cd-Hg crystal material

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS52140189A (en) * 1976-05-19 1977-11-22 Skagit Corp Mooring device
JPS5445678U (en) * 1977-09-02 1979-03-29

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS52140189A (en) * 1976-05-19 1977-11-22 Skagit Corp Mooring device
JPS5445678U (en) * 1977-09-02 1979-03-29

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0234498A (en) * 1988-07-25 1990-02-05 Mitsui Eng & Shipbuild Co Ltd Multi-point mooring method for floating type ocean structure
CN1044497C (en) * 1997-04-07 1999-08-04 中国科学院上海技术物理研究所 Method for solid regional melting growth of 1-3 micron Te-Cd-Hg crystal material

Also Published As

Publication number Publication date
JPH0577559B2 (en) 1993-10-26

Similar Documents

Publication Publication Date Title
AU777356B2 (en) Subsea anchor line connection method and connector for use therein
US4067282A (en) Releasable and retrievable mooring system
US4020779A (en) Chain/wire rope connector assembly for anchor
US8757077B2 (en) Spar mooring line sharing method and system
US20160185427A1 (en) Anchor line tensioning method
US8291848B2 (en) Traction method for operating lines, in particular mooring and/or production lines, of a floating production unit
EP2841330B1 (en) In-line mechanical disconnect device
WO2006123934A2 (en) Crane for handling of chains, wires, etc., and tools for same
US4458631A (en) Stop assembly for securing a buoy line connecting a mooring anchor to the associated buoy
US9469960B2 (en) Method of and apparatus for installation of plate anchors
US5522336A (en) Method and system for the casting of anchors and mooring of platforms and anchor casting unit for same
EP1305206B1 (en) Method and structure for connecting a floating structure with rope anchor lines to the seabed
JPS624692A (en) Method for selecting connection of combination mooring line
JPH01190597A (en) Connection tool for anchor heaving
EP1861309B1 (en) Mooring pull-in system
GB2343667A (en) Arrangements for recovering an anchor mooring line with or without its associated anchor
JPH0249119Y2 (en)
JPS5851231Y2 (en) Oil fence adapter
JPH019405Y2 (en)
KR200218457Y1 (en) Hawser mooring grapple
JPH0331675Y2 (en)
JPS5914309Y2 (en) cable retention device
JP3055777U (en) Belt sling for small boat suspension
JPH0235598Y2 (en)
CA1174122A (en) Stop assembly for securing a buoy line connecting a mooring anchor to the associated buoy