KR200218457Y1 - Hawser mooring grapple - Google Patents

Hawser mooring grapple Download PDF

Info

Publication number
KR200218457Y1
KR200218457Y1 KR2020000028288U KR20000028288U KR200218457Y1 KR 200218457 Y1 KR200218457 Y1 KR 200218457Y1 KR 2020000028288 U KR2020000028288 U KR 2020000028288U KR 20000028288 U KR20000028288 U KR 20000028288U KR 200218457 Y1 KR200218457 Y1 KR 200218457Y1
Authority
KR
South Korea
Prior art keywords
grapple
tongs
excavator
rope
present
Prior art date
Application number
KR2020000028288U
Other languages
Korean (ko)
Inventor
임동호
Original Assignee
현대중공업주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 현대중공업주식회사 filed Critical 현대중공업주식회사
Priority to KR2020000028288U priority Critical patent/KR200218457Y1/en
Application granted granted Critical
Publication of KR200218457Y1 publication Critical patent/KR200218457Y1/en

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

본 고안은 조선소에서 대형로프로 계류시키는 모든 배에 적용이 가능한 그라플에 관한 것으로서, 더욱 상세하게는 상ㆍ하부집게를 서로 연결 설치한 그라플을 굴삭기의 암에 고정 설치한 상태에서 그라플의 상ㆍ하부집게를 벌려 로프를 끼우고 그라플의 집게를 닫은 후 굴삭기를 후진시켜서 로프를 끌어올림으로써 작업인원을 최소화할 수 있으며 작업능률을 향상시킬 수 있는 굴삭기를 이용한 호사무어링 그라플에 관한 것이다.The present invention relates to a grapple that can be applied to all ships mooring with a large rope in a shipyard, and more specifically, to a grapple in which a grapple having upper and lower grapples connected to each other is fixed to an excavator's arm. Open the upper and lower tongs, insert the rope, close the grapple to the grapple, and then retract the excavator to pull up the rope to minimize the number of workers and improve the work efficiency. will be.

본 고안의 그라플(10)은 상ㆍ하에 각각 상부집게(12)와 하부집게(14)를 형성하여 상부집게(12)와 하부집게(14)를 고정핀(16)으로 고정하고 고정핀(16) 외측부에 더스트 실(18)을 체결하되 고정핀(16)과 더스트 실(18) 사이에 부시(20)를 형성하며 고정핀(16) 내부에 그리스 니플(22)을 삽입한다.The grapple 10 of the present invention forms the upper and lower tweezers 12 and the lower tweezers 14, respectively, to fix the upper and lower tweezers 12 and the lower tongs 14 with fixing pins 16, and fixing pins ( 16) The dust seal 18 is fastened to the outer side, but the bush 20 is formed between the fixing pin 16 and the dust seal 18 and the grease nipple 22 is inserted into the fixing pin 16.

상기, 상부집게(12) 내측 하부에 복수개의 걸림돌기(26,26')를 형성하고 하부집게(14) 내측 하부에 걸림돌기(28)를 형성하며 상ㆍ하부집게(12,14) 측부에 스토퍼(30)를 형성하고 상부집게(12) 일측에 굴삭기 암(36)이 연결힌지(24)로 고정되게 복수개의 체결구(32,32')를 천공하며 하부집게(14) 일측에 링크(40)와 힌지(24')로 연결되게 체결구(34)를 천공한 것이다.The plurality of locking protrusions 26 and 26 'are formed on the lower side of the upper tongs 12, and the locking protrusions 28 are formed on the lower side of the lower tongs 14, and the upper and lower tweezers 12 and 14 are formed on the side. A stopper 30 is formed and a plurality of fasteners 32 and 32 'are drilled to fix the excavator arm 36 to one side of the upper tongs 12 and the hinge 24, and a link to one side of the lower tongs 14 40 and the hinge (24 ') is to be punched in the fastener 34.

Description

호사무어링 그라플{Hawser mooring grapple}Hawser mooring grapple}

본 고안은 조선소에서 대형로프로 계류시키는 모든 배에 적용이 가능한 그라플에 관한 것으로서, 더욱 상세하게는 상ㆍ하부집게를 서로 연결 설치한 그라플을 굴삭기의 암에 고정 설치한 상태에서 그라플의 상ㆍ하부집게를 벌려 로프를 끼우고 그라플의 집게를 닫은 후 굴삭기를 후진시켜서 로프를 끌어올림으로써 작업인원을 최소화할 수 있으며 작업능률을 향상시킬 수 있는 굴삭기를 이용한 호사무어링 그라플에 관한 것이다.The present invention relates to a grapple that can be applied to all ships mooring with a large rope in a shipyard, and more specifically, to a grapple in which a grapple having upper and lower grapples connected to each other is fixed to an excavator's arm. Open the upper and lower tongs, insert the rope, close the grapple to the grapple, and then retract the excavator to pull up the rope to minimize the number of workers and improve the work efficiency. will be.

일반적으로, 종래의 기술은 4 ∼ 5 명의 선거작업자 인력으로 로프를 안벽에 올리고 지게차로 고쳐 잡아 후진력을 이용하여 로프를 당겨서 16파이 로프를 비트 주위에 인력이 정리하는 방식으로서 작업자가 일일이 로프를 잡아올려야 하므로 불필요한 작업인원이 과다하게 필요하며 그로 인해 생산능률이 저하됨과 동시에 안전사고의 위험이 많은 문제점이 있었다.In general, the conventional technique is a method in which a worker pulls a rope around a bit by pulling a rope using a reverse force by pulling the rope on a quay wall by using 4 to 5 electoral workers and fixing it with a forklift. Since it is necessary to pull up, excessive workforce is necessary, and as a result, there is a problem that the production efficiency is degraded and the risk of safety accidents is high.

본 고안은 상기한 문제점을 해결하기 위하여 안출한 것으로서, 그 목적은 지게차에 작업인원이 들어가는 동작을 그라플을 굴삭기의 암에 장착한 상태에서 로프를 들어올림으로 인해 수면에서 잡을 수 있게끔 하고 힘을 주었을 때도 로프에 손상(damage)이 발생하지 않을 뿐만 아니라 기계 장비를 사용함으로 작업인원을 줄일 수 있으며 생산능률을 극대화할 수 있음과 또한 안전사고를 미연에 방지할 수 있는 굴삭기를 사용한 호사무어링 그라플을 제공하는 것이다.The present invention has been made in order to solve the above problems, the purpose is to allow the operation of the personnel entering the forklift to grab on the water surface by lifting the rope while mounting the grapple on the arm of the excavator Not only does it cause damage to the ropes, but it also reduces the number of workers by using mechanical equipment, maximizes production efficiency, and also uses a hoaring excavator with an excavator that can prevent safety accidents. To provide a raffle.

본 고안은 상기한 목적을 달성하기 위하여 상부집게와 하부집게를 고정핀으로 연결하고 상ㆍ하부집게 내측 하부에 걸림돌기를 형성하며 각각의 상ㆍ하부집게 내측에 스토퍼를 형성한 그라플을 형성하여 굴삭기의 암에 그라플의 상부집게를 연결 고정하여 로프를 끌어올리는 호사무어링 그라플을 제공함에 의해 달성된다.In order to achieve the above object, the present invention connects the upper and lower tongs with fixing pins, forms a locking protrusion on the lower part of the upper and lower tongs, and forms a grapple having a stopper formed inside each of the upper and lower tongs. This is achieved by providing a hoaring grapple that pulls up the rope by fixing the upper tongs of the grapple to the arm.

도 1 은 본 고안의 그라플을 나타낸 측면예시도1 is a side view showing a grapple of the present invention

도 2 는 본 고안의 그라플 상부집게를 나타낸 정면예시도Figure 2 is a front view showing the grapple upper tong of the present invention

도 3 은 본 고안의 그라플을 나타낸 배면예시도3 is a rear view showing a grapple of the present invention

도 4 는 도 3 의 'A-A'선 단면예시도4 is a cross-sectional view taken along the line 'A-A' of FIG.

도 5 는 도 3 의 'B-B'선 단면예시도5 is a cross-sectional view taken along the line 'B-B' of FIG.

도 6 은 굴삭기의 암에 본 고안의 그라플이 닫혀있는 상태를 나타낸 측면예시도6 is a side view illustrating a state in which the grapple of the present invention is closed to an arm of an excavator;

도 7 은 굴삭기의 암에 본 고안의 그라플이 최대로 열린 상태를 나타낸 측면예시도7 is a side view illustrating a state in which the grapple of the present invention is opened to the arm of an excavator at the maximum;

도 8 은 본 고안의 그라플을 굴삭기에 장착한 상태를 나타낸 예시도8 is an exemplary view showing a state equipped with a grapple of the present invention to the excavator

〈도면의 주요부분에 대한 부호의 설명><Explanation of symbols for main parts of the drawings>

(10) : 그라플(10): Grapple

(12) : 상부집게(12): upper clamp

(14) : 하부집게(14): lower tongs

(16) : 고정핀(16): fixed pin

(18) : 더스트 실18.dust seal

(20) : 부시20: bush

(22) : 그리스 니플(22): Grease Nipple

(24,24') : 연결힌지(24,24 '): Connecting hinge

(26,26',28) : 걸림돌기(26,26 ', 28): Obstruction

(30) : 스토퍼30: stopper

(32,32',34) : 체결구(32,32 ', 34): Fastener

(36) : 굴삭기 암36: excavator arm

(38) : 운반고리(38): carrying ring

(40) : 링크40: link

(42) : 굴삭기42: excavator

이하, 첨부된 도면을 참조하여 본 고안의 구성 및 작용을 설명하면 다음과 같다.Hereinafter, the configuration and operation of the present invention with reference to the accompanying drawings.

도 1 은 본 고안의 그라플을 나타낸 측면예시도를,1 is a side view showing a grapple of the present invention,

도 2 는 본 고안의 그라플 상부집게를 나타낸 정면예시도를,Figure 2 is a front view showing a grapple upper tong of the present invention,

도 3 은 본 고안의 그라플을 나타낸 배면예시도를,3 is a rear view showing a grapple of the present invention,

도 4 는 도 3 의 'A-A'선 단면예시도를,4 is a cross-sectional view taken along the line 'A-A' of FIG.

도 5 는 도 3 의 'B-B'선 단면예시도를,5 is a cross-sectional view of the line 'B-B' of FIG. 3;

도 6 은 굴삭기의 암에 본 고안의 그라플이 닫혀있는 상태를 나타낸 측면예시도를,Figure 6 is a side view showing a state in which the grapple of the present invention is closed to the arm of the excavator,

도 7 은 굴삭기의 암에 본 고안의 그라플이 최대로 열린 상태를 나타낸 측면예시도를 도시한 것으로서, 그라플(10)을 형성함에 있어, 상기 그라플(10)은 상ㆍ하에 각각 상부집게(12)와 하부집게(14)를 형성하여 상부집게(12)와 하부집게(14)를 고정핀(16)으로 고정하고 고정핀(16) 외측부에 더스트 실(18)을 체결하되 고정핀(16)과 더스트 실(18) 사이에 부시(20)를 형성하며 고정핀(16) 내부에 그리스 니플(22)을 삽입한다.FIG. 7 is a side view illustrating a state in which the grapple of the present invention is opened to the arm of an excavator to the maximum, and in forming the grapple 10, the grapple 10 is upper and lower upper tongs, respectively. (12) and the lower tongs (14) to form the upper tongs (12) and the lower tongs (14) to fix the pin 16, and to fasten the dust seal 18 to the outer side of the pin 16 fixed pin ( A bush 20 is formed between the 16 and the dust seal 18, and the grease nipple 22 is inserted into the fixing pin 16.

상기, 상부집게(12) 내측 하부에 복수개의 걸림돌기(26,26')를 형성하고 하부집게(14) 내측 하부에 걸림돌기(28)를 형성하며 상ㆍ하부집게(12,14) 측부에 스토퍼(30)를 형성하고 상부집게(12) 일측에 굴삭기 암(36)이 연결힌지(24)로 고정되게 복수개의 체결구(32,32')를 천공하며 하부집게(14) 일측에 링크(40)와 힌지(24')로 연결되게 체결구(34)를 천공한 구성으로 되어진 것이다.The plurality of locking protrusions 26 and 26 'are formed on the lower side of the upper tongs 12, and the locking protrusions 28 are formed on the lower side of the lower tongs 14, and the upper and lower tweezers 12 and 14 are formed on the side. A stopper 30 is formed and a plurality of fasteners 32 and 32 'are drilled to fix the excavator arm 36 to one side of the upper tongs 12 and the hinge 24, and a link to one side of the lower tongs 14 40 and the hinge 24 'is to be configured to be perforated fastener 34.

첨부된 도면중 미설명 부호 (38)은 운반고리이고, (42)는 굴삭기이다.Reference numeral 38 in the accompanying drawings is a transport ring, 42 is an excavator.

상기와 같은 구성을 참조하여 본 고안의 작용을 설명하겠다.The operation of the present invention will be described with reference to the configuration as described above.

도 6 과 도 7 및 도 8 에 도시한 바와 같이 상기, 그라플(10)의 상부집게(12)와 굴삭기 암(36)을 연결힌지(24)로 고정하고 그라플(10)의 하부집게(14)와 굴삭기 암(36)의 링크(40)를 힌지(24')로 고정하여 도 7 에서와 같이 굴삭기 암(36)에 체결된 그라플(10)의 상부집게(12)와 하부집게(14)를 벌린 상태에서 상ㆍ하부집게(12,14)가 해면으로 내려가서 로프(도시하지 않음)를 상ㆍ하부집게(12,14) 사이에 끼운 후 도 6 에서와 같이 상부집게(12)와 하부집게(14)를 닫고 버켓실린더(도시하지 않음)가 강하게 밀면 로프를 강하게 문 채 피이장으로 들어올려 굴삭기(42)가 후진하여 굴삭기 암(36)의 힘으로 로프를 강하게 고정하고 그라플(10)이 로프를 비트 주위로 가져가게 된다.As shown in FIGS. 6, 7, and 8, the upper clamp 12 and the excavator arm 36 of the grapple 10 are fixed with the connecting hinge 24 and the lower clamp of the grapple 10 ( 14) and the link 40 of the excavator arm 36 by the hinge 24 ', the upper tong 12 and the lower tong (12) of the grapple 10 fastened to the excavator arm 36 as shown in FIG. 14) With the upper and lower tongs 12 and 14 lowered to the sea level with the rope open (not shown) between the upper and lower tongs 12 and 14, the upper tongs 12 as shown in FIG. And the lower tongs 14 are closed and the bucket cylinder (not shown) pushes strongly, lifts the rope strongly and lifts it into the pedestal so that the excavator 42 retreats to strongly fix the rope by the force of the excavator arm 36 and grapples. (10) take the rope around the bit.

본 고안은 상술한 특정의 바람직한 실시예에 한정되지 아니하며, 청구범위에서 청구하는 본 고안의 요지를 벗어남이 없이 당해 고안이 속하는 기술분야에서 통상의 지식을 가진 자라면 누구든지 다양한 변형실시가 가능한 것은 물론이고, 그와 같은 변경은 청구범위 기재의 범위 내에 있게 된다.The present invention is not limited to the above-described specific preferred embodiments, and any person having ordinary skill in the art to which the present invention pertains may make various modifications without departing from the gist of the present invention claimed in the claims. Of course, such changes will fall within the scope of the claims.

본 고안은 상ㆍ하부집게를 서로 연결한 그라플을 굴삭기의 암에 연결 설치함으로써 수면에서 직접 로프를 집을 수가 있고 굴삭기가 후진하여 장력을 생기게 한 다음 굴삭기 암을 굽힐 때의 강한 힘을 이용하여 로프에 장력을 주어 16파이 로프로 고정시킨 다음에 직접 집어서 비트 주위까지 가져가서 로프를 정리함으로 안벽에서 직접 들어올리는 인력의 노고를 줄이고 로프를 고쳐매는 중간과정을 기계화함으로 인해 신속하고 원활하게 로프를 매게 되어 작업인력을 최소화할 수 있으며 이에 따라 생산능률을 향상시킴과 작업비를 극소화할 수 있고 또한 안전사고를 미연에 방지할 수 있도록 한 매우 유용한 고안인 것이다.The present invention connects the grapples connecting the upper and lower clamps to the arm of the excavator, so that the rope can be picked up directly from the surface of the water, and the excavator retracts to create tension and then uses the strong force when bending the excavator arm. Tighten the rope with a 16-pile rope, and then pick it up and take it around the bit to clear the rope, thereby reducing the labor of manpower lifting directly from the inner wall and mechanizing the intermediate process of fixing the rope. It is a very useful design that can minimize the work force, thereby improving production efficiency, minimizing the work cost, and preventing safety accidents.

Claims (1)

그라플(10)을 형성함에 있어서, 그라플(10)은 상ㆍ하에 각각 상부집게(12)와 하부집게(14)를 형성하여 상부집게(12)와 하부집게(14)를 고정핀(16)으로 고정하고 고정핀(16) 외측부에 더스트 실(18)을 체결하되 고정핀(16)과 더스트 실(18) 사이에 부시(20)를 형성하며 고정핀(16) 내부에 그리스 니플(22)을 삽입하고 상기, 상부집게(12) 내측 하부에 복수개의 걸림돌기(26,26')를 형성하며 하부집게(14) 내측 하부에 걸림돌기(28)를 형성하고 상ㆍ하부집게(12,14) 측부에 스토퍼(30)를 형성하며 상부집게(12) 일측에 굴삭기 암(36)이 연결힌지(24)로 고정되게 복수개의 체결구(32,32')를 천공하고 하부집게(14) 일측에 링크(40)와 힌지(24')로 연결되게 체결구(34)를 천공한 것을 특징으로 하는 호사무어링 그라플.In forming the grapple (10), the grapple (10) forms the upper and lower tongs (12) and the lower tongs (14), respectively, to fix the upper and lower tongs (12) and the lower tongs (14). ) And fasten the dust seal 18 to the outer side of the fixing pin 16 to form a bush 20 between the fixing pin 16 and the dust seal 18 and grease nipple 22 inside the fixing pin 16. ) And a plurality of locking projections 26 and 26 'are formed in the lower part of the upper tongs 12, and a locking projection 28 is formed in the lower part of the lower tongs 14 and the upper and lower tongs 12, 14) forming a stopper 30 on the side and drilling a plurality of fasteners (32, 32 ') to the excavator arm 36 to one side of the upper tongs (12) connected to the hinge 24 and the lower tongs (14) Hosaming grapple, characterized in that the perforated fastener 34 to be connected to the link 40 and the hinge 24 'on one side.
KR2020000028288U 2000-10-11 2000-10-11 Hawser mooring grapple KR200218457Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2020000028288U KR200218457Y1 (en) 2000-10-11 2000-10-11 Hawser mooring grapple

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2020000028288U KR200218457Y1 (en) 2000-10-11 2000-10-11 Hawser mooring grapple

Publications (1)

Publication Number Publication Date
KR200218457Y1 true KR200218457Y1 (en) 2001-04-02

Family

ID=73058772

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2020000028288U KR200218457Y1 (en) 2000-10-11 2000-10-11 Hawser mooring grapple

Country Status (1)

Country Link
KR (1) KR200218457Y1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101208774B1 (en) 2011-10-21 2012-12-05 박대홍 Apparatus for forefinger of an excavator

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101208774B1 (en) 2011-10-21 2012-12-05 박대홍 Apparatus for forefinger of an excavator

Similar Documents

Publication Publication Date Title
AU777356B2 (en) Subsea anchor line connection method and connector for use therein
US7543799B2 (en) Method and apparatus for deploying articles in deep waters
US7677532B2 (en) System to guide a wire, chain or cable onboard a vessel
US20090301983A1 (en) Crane for handling of chains,wires,etc., and tools for same
CA2322917A1 (en) Trolley and traveling block system
EP2513494B1 (en) A clamping device
KR200218457Y1 (en) Hawser mooring grapple
CN103287967B (en) Releasing device provided with long-distance releasing function
CN209815506U (en) Hoisting part of prefabricated part
CN213834230U (en) Box girder reinforcing steel bar integral hoisting device
JP6820697B2 (en) Mooring method of floating structure and construction method of floating offshore wind power generation facility
CN211417529U (en) Ocean platform hatch board formula of sinking promotes handle
CN111764856A (en) Jaw type fisher
KR101749950B1 (en) Purse ring with a Multi-lock by second round
SE515145C2 (en) Door latch
KR200181538Y1 (en) Automatic latch to pulling up
US7044522B2 (en) Passive capture slip-proof chain handling hook
JPS5851231Y2 (en) Oil fence adapter
CN108033354A (en) A kind of Novel breakwater armour removes device
EP0102464B1 (en) A device for an easy quick refloating of anchors, fouled in the sea-bottom
CN210914980U (en) Special lifting hook for laminated slab
CN215292443U (en) Deep water riser limiting anchor chain device suitable for underwater ROV connection
CN209740496U (en) Anti-winding sling
CN210698552U (en) Falling protector for high-altitude construction of electric power engineering
US2013621A (en) Elevator

Legal Events

Date Code Title Description
REGI Registration of establishment
T201 Request for technology evaluation of utility model
EXTG Extinguishment
T601 Decision on revocation of utility model registration