JPS62264183A - Method of main cable exchange construction of elevator - Google Patents

Method of main cable exchange construction of elevator

Info

Publication number
JPS62264183A
JPS62264183A JP10556086A JP10556086A JPS62264183A JP S62264183 A JPS62264183 A JP S62264183A JP 10556086 A JP10556086 A JP 10556086A JP 10556086 A JP10556086 A JP 10556086A JP S62264183 A JPS62264183 A JP S62264183A
Authority
JP
Japan
Prior art keywords
car
main rope
counterweight
rope
elevator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP10556086A
Other languages
Japanese (ja)
Other versions
JPH0530752B2 (en
Inventor
博士 加藤
靖 松田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Corp
Original Assignee
Mitsubishi Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Corp filed Critical Mitsubishi Electric Corp
Priority to JP10556086A priority Critical patent/JPS62264183A/en
Publication of JPS62264183A publication Critical patent/JPS62264183A/en
Publication of JPH0530752B2 publication Critical patent/JPH0530752B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。
(57) [Summary] This bulletin contains application data before electronic filing, so abstract data is not recorded.

Description

【発明の詳細な説明】 〔産業上の利用分野〕 この発明は既設エレベータ−の主索を新しい主索に交換
する工法に関するものである。
DETAILED DESCRIPTION OF THE INVENTION [Field of Industrial Application] This invention relates to a method of replacing the main ropes of an existing elevator with new main ropes.

〔従来の技術〕[Conventional technology]

第8図は例えは特願昭59−206580号公報に示さ
れた従来のエレベータの主索交換工法を示す昇降路縦断
面図である。
FIG. 8 is a longitudinal cross-sectional view of a hoistway showing a conventional method for replacing the main rope of an elevator, as disclosed in Japanese Patent Application No. 59-206580.

図中、(1)は機械室、+2)は機械室(1)の床に支
持された機械台、(3)は機械台(21上に設置された
G上根。
In the figure, (1) is the machine room, +2) is the machine stand supported on the floor of the machine room (1), and (3) is the G upper base installed on the machine stand (21).

(4)は巻上機(3)の駆動綱車、(5)は機械室(1
)内の作業者、(6)は機械室(1)の直下に形成され
た昇降路、(7)は昇降路(6)から機械室(1)に通
じるロープ穴、(8)は昇降路(6)の底部を構成する
ビット、(9目工昇降路(6)内に配置されガイトレー
Iしく図示しない)に案内されて昇降するかご、 ul
lはかと(9)を支持するかごわくで、  (10a)
はその上はり、alは上端が機械台(2)に結合されロ
ープ穴(7)を通って下垂され下端にチェーンブロック
Q3が装着されたつり上げ用ロープで、チェーンブロッ
クσりは上はり(1Oa)に結合されている。0はかと
(91の上に乗った作業者、 、14は一端が上はり(
1Oa)に結合され(図では点Eで切断された状態を示
す)中間部が駆動鋼車(4)に巻き掛みられた既設の主
索、a9は既設主索Iの他端に結合され(図では点Fで
切断されることを示す)ガイドレール(図示しない)に
案内されて昇降するつり合おもり、α1は脚立aηを使
用して作業する作業者、鰻はビット(8)に設置された
かご用緩衝器。
(4) is the driving sheave of the hoist (3), (5) is the machine room (1)
), (6) is the hoistway formed directly below the machine room (1), (7) is the rope hole leading from the hoistway (6) to the machine room (1), (8) is the hoistway The bit forming the bottom of (6), the cage that moves up and down while being guided by the guide tray (located in the ninth hoistway (6) and not shown), ul
l is the basket frame supporting the heel (9), (10a)
is the upper beam, al is the lifting rope whose upper end is connected to the machine stand (2), is hung down through the rope hole (7), and the chain block Q3 is attached to the lower end, and the chain block σ is the upper beam (1Oa ) is combined with 0 has one end raised (worker on top of 91, 14 has one end raised)
1Oa) (the figure shows the state cut at point E) is the existing main rope whose middle part is wrapped around the driving steel wheel (4), and a9 is connected to the other end of the existing main rope I. (The figure shows that it is cut at point F) A counterweight that moves up and down guided by a guide rail (not shown), α1 is a worker working using a stepladder aη, and the eel is installed on the bit (8) Buffer for baskets.

α旧ま同じくつり合おもり用緩衝器、儀はつり合おもり
a!9と緩衝器α9の間に挿入された間隔片、3υは最
上階の乗場、のは最上階の乗場r2pに設置され新設の
主索のの巻取り及び巻戻しをするウィンチ。
α Same as the old one, a buffer for the counterweight, and a counterweight a! The spacing piece inserted between 9 and buffer α9, 3υ is a landing on the top floor, and 3υ is a winch installed at landing r2p on the top floor for winding and rewinding the newly installed main rope.

C14はウィンチのを操作する作業者、田はウィンチ@
操作用のスイッチである。
C14 is the worker who operates the winch, and Ta is the winch@
This is a switch for operation.

従来のエレベータ−の主索交換工法は上記のように構成
され1次のような手順で既設の主索Iが新設の主索のに
交換される。
The conventional elevator main rope replacement method is constructed as described above, and the existing main rope I is replaced with a new main rope in the following steps.

まず9作業者a3がかご19)の上に乗り込み、かご(
9)を運転し、かご(9)の上部とつり合おもりα9の
上部が同一位置に米るようにかご(9)を停止させる。
First, 9th worker a3 gets on top of the basket (19) and
9) and stop the car (9) so that the top of the car (9) and the top of the counterweight α9 are in the same position.

既設の主索tI41の両端にはそれぞれロープ保持棒(
図示しなもすが固着され、この保持棒を介してかご(9
)及びつり合おもりα9に結合されているが。
Rope holding rods (
A cage (not shown) is fixed to the cage (9) through this holding rod.
) and is connected to the counterweight α9.

ここで、上記保持棒の調整代を最大に設定する(これで
、かご(9)及びつり合おもりa9の位置は少し下がる
ことになる)0次に、かご(9)を運転して最上階の乗
場aυに停止させる。この状態でつり合おもりαSと緩
衝器醤との間隙Aを測定する。また・既iの主索!14
1の現状長さx測定する。これで、新設の主索Ωの長さ
しが9次式から決定される。
Here, set the adjustment allowance for the holding rod to the maximum (this will lower the position of the car (9) and counterweight a9 a little).Next, drive the car (9) to the top floor. Stop at landing aυ. In this state, the gap A between the counterweight αS and the buffer sauce is measured. Also, I already have the main line! 14
Measure the current length x of 1. Now, the length of the newly installed main rope Ω is determined from the 9th equation.

L子(X+2D) −(B−A) ここに、B:既設の主索I交換後に設定されるつり合お
もりαSと緩衝器四との間 隙 P:新設の主索Gの端末処理に要する 長さ 新設の主索@は上式の長さに切断される。また。
L child (X+2D) - (B-A) where, B: Gap between counterweight αS and buffer 4 set after replacing existing main rope I: Length required for terminal treatment of newly installed main rope G The newly installed main rope @ will be cut to the length shown above. Also.

つり合おもりa9と緩衝器0の間に1間隙Aと同じ長さ
の間隔片■を挿入する。
Insert a spacing piece (2) with the same length as one gap A between the counterweight a9 and the shock absorber 0.

次に、つり上げ用ロープ1υの上端を機械台(2)に結
合し、ロープ穴(7)から下垂させ、下端にチェーンブ
ロックαaを連結し、チェーンブロックaりを上はりQ
tiに結合して、かご(91を機械台(21に懸吊する
Next, connect the upper end of the lifting rope 1υ to the machine base (2), let it hang down from the rope hole (7), connect the chain block αa to the lower end, and lift the chain block a to the upper end Q.
The car (91) is connected to the machine stand (21).

そして、運転再開後つり合おもりa99部に間隙Bが保
たれるようにするため、チェーンブロックfiaを操作
してかご(91をCB−A)だけつり上げる。
Then, in order to maintain the gap B at the counterweight a99 after restarting the operation, the chain block fia is operated to lift only the car (91 to CB-A).

このようにした後、上記ロープ保持棒の上部の点E、F
で既設の主索1)4を1本切断する。そして。
After doing this, the points E and F on the top of the rope holding rod are
Cut one of the existing main ropes 1) 4. and.

既設のロープ保持棒を新設の主索@の端末に固着し、か
ご19)側の既設の主索α尋の端末に、ロープ保持棒が
固着された新設の主索(2)の端末(つり台おもりQ5
側用)を固定する。一方、新設の主索(2)の他端末(
かご19+側用)を上はり(1oa)に結合する。
Attach the existing rope holding rod to the terminal of the newly installed main rope @, and then attach the rope holding rod to the terminal of the new main rope (2) with the rope holding rod fixed to the α fathom terminal of the existing main rope on the car 19) side. Platform weight Q5
(for side use). Meanwhile, the other terminal of the newly installed main rope (2) (
(for car 19+ side) to the upper beam (1oa).

ウィンチ2aの操作により、新設の主索@を繰り出しな
がら、既設の主索Iの下端をビット183に引き降ろす
。これで、新設の主索のは駆動綱車(41に巻き掛けら
れ、その下端がつり合おもりa3の上部に達する。この
ようにして引き降ろされた新設の主索(2)の端末をつ
り合おもり霞に結合する。上述の動作を新設の主索Ωの
本数分繰り返えす。これで。
By operating the winch 2a, the lower end of the existing main rope I is lowered to the bit 183 while letting out the newly installed main rope @. The newly installed main rope is now wrapped around the driving sheave (41), and its lower end reaches the top of the counterweight a3. Connect to the weight Kasumi. Repeat the above operation for the number of newly installed main ropes Ω. Now.

既設の1索Iは新設の主索のに交換される。The existing 1 rope I will be replaced with the new main rope.

上述の作業終了後、チェーンブロックUS、つり上げ用
ロープαυ及び間隔片■を除去する。そして。
After completing the above-mentioned work, remove the chain block US, the lifting rope αυ, and the spacing piece ■. and.

かご(9)を運転して、かご(9:とつり合おもりQs
の1部がほぼ同一位置に米るようにかと(9)を停止さ
せ。
Drive the basket (9) and load the counterweight Qs with the basket (9).
Stop (9) so that one part of the two is in almost the same position.

新設Φ生葉−の張力を調整した後正規運転に移行する。After adjusting the tension of the newly installed Φ raw leaves, we will move on to regular operation.

なお、6停止程度の小容鼠エレベータ−では。In addition, it is a small mouse elevator with about 6 stops.

主索の重量も軽いので0乗場C1g+のウィンチのは不
要になり0作業者(51,(13,allは3名でよい
が、主索の1皿が大になるとウィンチのが必要となる。
Since the weight of the main rope is light, there is no need for a winch for the 0 platform C1g+, and 0 workers (51, (13, all can be done by 3 people, but if one plate of the main rope becomes large, a winch is required.

特に、主索は麻心に油が浸み込ませであるため。In particular, the main rope has a hemp core soaked in oil.

滑りやすく、また古い主索では素線切れを起こしている
場合もあり、この素線によって手に負傷することもあり
、安全上からはウィンチ@で作業゛するのが好ましい。
It is slippery, and old main ropes may have broken wires, which can injure your hands, so for safety reasons, it is preferable to work with a winch.

〔発明が解決しようとする問題点〕[Problem that the invention seeks to solve]

上記のような従来のエレベータの主索交換工法では、か
ご(9)を最上階の乗場Qυに固定して既設の主索α尋
の交換作業を行うため2作業者(5)・、(13,Qυ
In the conventional elevator main rope replacement method as described above, two workers (5), (13 ,Qυ
.

c!4は機械室(1]、かご(9)上、ビット(8)及
び最上階の乗場C1υと4名必要になるという問題点が
ある。また、ピット(8)では脚立CLIを使用しなけ
れILfAらず。
c! 4 has the problem that four people are required for the machine room (1), the top of the car (9), the bit (8), and the landing C1υ on the top floor.In addition, the stepladder CLI must be used in the pit (8).ILfA No.

危険作業になるという問題点もある。There is also the problem that the work is dangerous.

この発明は上記問題点を解決するためになされたもので
、少数の作業者で作業ができ、かつ広い作業床を確保し
て安全に作業ができるようにしたエレベータ−の主索交
換工法を提供することを目的とする。
This invention was made in order to solve the above-mentioned problems, and provides a method for replacing the main rope of an elevator, which allows the work to be carried out by a small number of workers, secures a wide working floor, and allows the work to be carried out safely. The purpose is to

〔問題点を解決するための手段〕[Means for solving problems]

この発明に係るエレベータ−の主索交換工法は。 The main rope replacement method for an elevator according to the present invention is as follows.

かごをその上部つり合おもりの上部とほぼ一致した位置
で停止させ、このかごの上でかご及びつり合おもりをそ
れぞれガイドレールに懸吊し、かご及びつり合おもりと
既設の主索との結合点をそれぞれ切断し、既設の主索の
かご側端末に新設の主索の端末を固定し、つり合おもり
側端末をかご上又は近傍の乗場へ引き出し、既設の主索
と新設の主索を入れ換えた後、新設の主索の端末をそれ
ぞれかと及びつり合おもりに結合するようにしたもので
ある。
The car is stopped at a position that is almost in line with the top of its upper counterweight, and the car and counterweight are each suspended from guide rails above the car, and the car and counterweight are connected to the existing main rope. Cut each point, fix the terminal of the new main rope to the car-side terminal of the existing main rope, pull out the counterweight-side terminal onto the car or to a nearby landing, and connect the existing main rope and the new main rope. After the replacement, the terminals of the newly installed main rope are connected to the respective hems and counterweights.

〔作 用〕[For production]

この発明においては、かごとつり合おもりをほぼ同位置
に停止させ、このかご上で主索の交換作業をするため、
ピット及び乗場の作業者は不要となる。したがって、ピ
ット内の脚立作業も不要となる。
In this invention, the car and the counterweight are stopped at approximately the same position, and the main rope is replaced on the car.
There will be no need for pit and landing workers. Therefore, there is no need for stepladder work inside the pit.

〔実施例〕〔Example〕

第1図〜第7図はこの発明の一実施例を示す図で、第1
図は昇降路縦断面図、第2図は昇降路縦断つり合おもり
正面図、第3図は同じくかご正面図、第4図は固定金具
の斜視図、第5図は同じく平面図、第6図及び第7図は
主索交換作業説明用の昇降路縦断面図であり、+1)〜
顛、  (10a) 、α2〜(IL III、 Il
l、 @、 CI!3. C5は上記従来装置と同様の
ものである。  − 図中、@はブラケット(至)で昇降路(6)の壁に固定
して立設され目板■で互いに接続されてかと(9)を案
内するかご用ガイドレール、G[lは同じ(ブラケツt
JI)で固定され目板(至)で接続されてつり合おもり
四を案内するおもり用ガイドレール、(至)はガイドレ
ール0.3)の背面に係着された固定金具で。
Figures 1 to 7 are diagrams showing one embodiment of the present invention.
Figure 2 is a vertical cross-sectional view of the hoistway, Figure 2 is a front view of the counterbalance weight, Figure 3 is a front view of the car, Figure 4 is a perspective view of the fixing fittings, Figure 5 is a plan view, and Figure 6 is a front view of the hoistway. Figure 7 and Figure 7 are vertical cross-sectional views of the hoistway for explaining the main rope replacement work.
顛、(10a)、α2〜(ILIII、Il
l, @, CI! 3. C5 is similar to the conventional device described above. - In the figure, @ is a car guide rail that is fixed to the wall of the hoistway (6) with a bracket (to) and is connected to each other with a batten ■ to guide the car (9), and G [l is the same (bracket t
A guide rail for weights that guides the counterweight 4, which is fixed with JI) and connected with a batten (to), and (to) is a fixing bracket attached to the back of the guide rail 0.3).

固定板(至)にガイドレール面、(7)把持用の把持具
(至)が複数列配置されそれぞれボルト(至)で締結さ
れている。また、固定板(至)の下端にはU字状の懸吊
具■が装着されている。(至)は懸吊異国と上はり(1
0a)をチェーンブロックaaを介して結合するロープ
A plurality of rows of guide rail surfaces and (7) gripping tools are arranged on the fixed plate (to), and each is fastened with a bolt (to). Furthermore, a U-shaped hanging device (■) is attached to the lower end of the fixed plate (to). (To) is Hanging Ikoku and Uwabari (1)
Rope connecting 0a) via chain block aa.

(至)は懸吊具■とつり合おもりa9(かご枠(1)1
)7)′上はり(10a)と同様のおもり枠の上はりに
結合されるが図示省略)を結合するロープである。
(to) is the suspension tool ■ and the counterweight a9 (car frame (1) 1
) 7)' It is a rope that connects to the upper beam of the weight frame similar to the upper beam (10a) (not shown).

上記のように構成されたエレベータ−の主索交換工法に
おいては、かご+91上と機械室(1■と作業者15+
、+13が各1名配置され9次のような手順で既設の主
索Iが新設の主索のに交換される。
In the main rope replacement method for an elevator configured as described above, the main cables are replaced on the car +91 and in the machine room (1
, +13 are placed, and the existing main rope I is replaced with the newly installed main rope in the following procedure.

既述のように1作業者1)3がかご(9)の上に乗り込
み、かご(91とつり合おもりatを同一位置にしてロ
ープ保持棒の調整代を最大に設定する。次に、第6図に
゛示すように、かご+91を最上階の乗場(Jlに停止
させ、つり合おもり+15と緩衝器alとの間隙Aを測
定し、既設の主索■の現状長さXを測定する。
As mentioned above, one worker 1)3 gets on top of the car (9), sets the car (91) and the counterweight at the same position, and sets the adjustment allowance of the rope holding rod to the maximum. As shown in Figure 6, stop the car +91 at the top floor landing (Jl), measure the gap A between the counterweight +15 and the shock absorber al, and measure the current length X of the existing main rope ■. .

そして、新間隙Bを決定して新設の主索四の長さLを算
出する。次に第1図に示すように、再びかご(9)を運
転してかご(91とつり合おもり(ハ)が同一位置に来
るようにかご+9)を停止させろ。これで、かご(91
の上′を作業床として作業が開始される。
Then, the new gap B is determined and the length L of the newly installed main rope 4 is calculated. Next, as shown in Fig. 1, drive the car (9) again and stop the car (car +9) so that 91 and the counterweight (c) are in the same position. Now the basket (91
The work begins with the top of the floor as the work floor.

まず、第2図に示すように、おもり用ガイドレール■に
固定金i(至)を、つり合おもりa9の上方3〜5mの
位置に把持具(至)により係着させ、ロープ(至)によ
りつり合おもりa9を懸吊する。この際、ロープ(至)
が水平面となす角度θは、できるだけ大きいことが望ま
しい。これは、ガイドレールωに極力曲げ力が作用しな
いようにするためである。固定金具■には多数の把持具
(至)が設けられているから、適宜選択することにより
、目板6′!J及びブラケットCtt+を避けてガイド
レール■に係看させることができ、角度゛θを大きく選
ぶことが可能になる。
First, as shown in Fig. 2, fix the fixed metal i (to) on the weight guide rail ■ with a gripping tool (to) at a position 3 to 5 m above the counterweight a9, and then attach the rope (to) to the weight guide rail Suspend the counterweight a9. At this time, the rope (to)
It is desirable that the angle θ between the plane and the horizontal plane is as large as possible. This is to prevent bending force from acting on the guide rail ω as much as possible. The fixing metal fitting ■ is provided with a large number of gripping tools (to), so by selecting the appropriate gripping tools, the batten 6'! J and the bracket Ctt+ can be avoided and the guide rail (2) can be attached to the guide rail (2), and the angle ゛θ can be selected to be large.

また1把持具(至)は複数列設けられているため、レー
ル寸法に合わせて使用することができる。
Furthermore, since multiple rows of one gripper are provided, they can be used in accordance with the rail dimensions.

次に、第3図に示すように、かご用ガイドレールΩに固
定金具aを、上はり(10a)の上方3〜5mの位置に
係着させ、ロープ′(至)によりチェーンプロックαり
を介してかご(9)を懸吊する。詳細はつり合おもりa
Sの場合と同様である。そして、既述のように、チェー
ンブロックaりによりかと(91を(B−A)だけつり
上げる。これで、°主索交換の主作業に入る。
Next, as shown in Fig. 3, attach the fixing fitting a to the car guide rail Ω at a position of 3 to 5 m above the upper beam (10a), and secure the chain block α with the rope ′. The cage (9) is suspended through the cage. For details, see counterweight a.
The same is true for S. Then, as mentioned above, the chain block a is used to raise the heel (91) by (B-A). Now, the main work of replacing the main rope begins.

まず、かご(9)及びつり合おもり(15のロープ保持
棒の上部の点E、Fで既設の主索α瘤を1本切断する(
2本ずつ切断してもよい)、。主索α4は通常3本以上
で構成され、しかも安全率は10以上に設定されている
ため十分な強度を有している。したがって、1本(又は
2本)ずつ切断交換しても十分安全である。次に、既設
のロープ保持棒を新設の主索のの端末に1看し、かご(
9)側の既設の主索Iの端末に、ロープ保持棒が1看さ
れた新設の主索@の端末を固定する。一方、つり合おも
りaS側の既設の主索Hの端末を近傍の乗場へ引き出す
First, cut one of the existing main ropes at points E and F on the top of the rope holding rod of the basket (9) and the counterweight (15).
(You can cut it in two pieces at a time). The main rope α4 is usually composed of three or more ropes, and the safety factor is set to 10 or more, so it has sufficient strength. Therefore, it is safe enough to cut and replace one piece (or two pieces) at a time. Next, place the existing rope holding rod at the end of the newly installed main rope, and place it in the basket (
9) Attach the end of the newly installed main rope with one rope holding rod attached to the end of the existing main rope I on the side. On the other hand, the end of the existing main rope H on the side of the counterweight aS is pulled out to a nearby landing.

これで0乗場へ引き出された既設の主索Iを作業者α3
のスイッチ四の操作によりウィンチ四で巻き取ると共に
、新設の主索@をウィンチQから巻き戻すことにより、
新設の主索@を駆動綱車(4)に巻き掛ける。そして、
新設の主索ツの両端末を、それぞれ上はり(1Oa)及
びつり合おもり(ISに結合する。上述の動作を新設の
主索(2)の本数分繰り返えす。これで、既設の主索I
は新設の主索のに交換される。
Operator α3 now moves the existing main rope I, which has been pulled out to landing area 0.
By operating switch 4, the newly installed main rope @ is reeled in by winch 4 and reeled in from winch Q.
Wrap the newly installed main rope around the driving sheave (4). and,
Connect both ends of the newly installed main rope to the uphill (1Oa) and counterweight (IS) respectively.Repeat the above operation for the number of newly installed main ropes (2). Cable I
will be replaced with a new main rope.

上述の作業終了後、チェーンブロック+13を除去する
。これで、かご(91は少し下がり、つり合おもり(l
!1は少し上がるので、つり合おもり四側の固定金具(
至)を除去し、新設の主索■の張力を調整した後、正規
運転に移行する。
After completing the above work, remove chain block +13. With this, the basket (91) will be lowered slightly and the counterweight (l
! 1 will rise a little, so fix the fixing metal fittings on the four sides of the counterweight (
After removing the rope (to) and adjusting the tension of the newly installed main rope (■), normal operation will begin.

このようにして2作業者(5;、αJは2名で作業でき
、省力化に寄与するところ大である。作業者0はかと(
9)の上という大きな作業床が確保できるため、安全性
も向上する。また、かご(9)の上で、かご(9)側及
びつり合おもりα9側共に、一度に主索交換作業が実権
できるので能率的である。史に主索交換後、かご(9!
を動かすことrl < 、主索張力の調整ができ、安全
である。固定金具Ωにより、かご覧9)を任惹の位置各
ζ固定することが可能であるから。
In this way, 2 workers (5;, αJ can be worked by 2 people, which greatly contributes to labor saving.
Safety is also improved because a large work floor above 9) can be secured. Furthermore, it is efficient because the main rope replacement work can be carried out on the car (9) at the same time on both the car (9) side and the counterweight α9 side. After replacing the main rope, the basket (9!
By moving rl <, the tension of the main rope can be adjusted and it is safe. This is because the fixing metal fittings Ω allow the holder 9) to be fixed at any desired position.

高揚程のエレベータ−にも適用し得る。また9巻上機(
3)の種類等には無関係である。固定金具aは複数種の
ガイドレールの、(ISにも対応できる。例えは、13
h/mのかご用ガイドレール(2)、8麺/mのおもり
用ガイドレール(至)の場合、Bh/mのかご用及びお
もり用ガイドレール@、31の場合にも、共に同一品が
使用でき、かご用及びおもり用というように限定される
ことはないので、誤取付が生じることはす<、能率的で
ある。
It can also be applied to high-lift elevators. In addition, 9 hoisting machines (
It has nothing to do with the type of item 3). The fixing bracket a can also be used for multiple types of guide rails (IS).For example, 13
In the case of h/m car guide rail (2), 8 noodle/m weight guide rail (to), Bh/m car and weight guide rail @, 31, the same product is used. Since it can be used and is not limited to being used for a car or for weights, it is highly efficient that there is no possibility of incorrect installation.

なお、実施例では、既設の主索aSの端末を乗場へ引き
出すものとしたが、これをかご(91の上に巻き置くよ
うにしてもよい。
In the embodiment, the terminal of the existing main rope aS is pulled out to the landing, but it may be wound onto the car (91).

また、実1ifiF!/1)では、固定金具(至)によ
りかご(9)及びつり合おもりaSを固定して、主索交
換作業をするものを示したが、これに限るものではない
。例えは、かご(9)の重jt測定をする場合等にも適
用できる。この場合は、かご(91を適当な位置に停止
させて固定金具−で固定し、固定金具Ωとかご(9)を
重量計(図示しない)を介して結合する。そして。
Also, real 1ifiF! In /1), the car (9) and the counterweight aS are fixed using the fixing metal fittings (to) to replace the main rope, but this is not the only option. For example, it can be applied to the case of measuring the weight jt of the car (9). In this case, the car (91) is stopped at an appropriate position and fixed with a fixing fitting, and the fixing fitting Ω and the car (9) are connected via a weight scale (not shown).And.

ロープ保持棒を外し、チェーンブロックαりを緩めれば
、上記Mlk計によりかご191の重量が測定できる。
By removing the rope holding rod and loosening the chain block α, the weight of the car 191 can be measured using the Mlk meter.

〔発明の効果〕〔Effect of the invention〕

以上説明したとおりこの発明では、かごとつり合おもり
をほぼ同位置に停止させ、このかごの上で主索の交換作
業をするようにしたので、少数の作業者で作業ができ、
かつ広い作業床を確保して安全作業をすることができる
効果がある。
As explained above, in this invention, the car and the counterweight are stopped at approximately the same position, and the main rope is replaced on top of the car, so that the work can be done by fewer workers.
It also has the effect of ensuring a wide work floor and allowing safe work.

【図面の簡単な説明】[Brief explanation of drawings]

第1図〜第1図はこの発明によるエレベータ−の主索交
換工法の一実施例を示す図で、第1図は昇降路縦断面図
、第2図は昇降路縦断つり合おもり正面図、第3図は同
じくかご正面図、第4図は固定金具の斜視図、第5図は
同じく平面図、第6図及び第7図は主索交換作業説明用
の昇降路縦断面図、第8図は従来のエレベータ−の主索
交換工法を示す昇降路縦断面図である。 図中、(1)は機械室、(4)は駆動綱車、(9)は昇
降体(かごン、α尋は既設の主索、αりは昇降体(つり
合おもり)、嘘は新設の主索、鰭はかご用ガイドレール
、(1)mはおもり用ガイドレール、コは固定金具。 (至)、39はロープである。 なお0図中同一符号は同一部分を示す。
1 to 1 are diagrams showing an embodiment of the elevator main cable replacement method according to the present invention, in which FIG. 1 is a vertical cross-sectional view of the hoistway, FIG. 2 is a front view of the vertical cross-section of the hoistway, and Figure 3 is a front view of the car, Figure 4 is a perspective view of the fixing fittings, Figure 5 is a plan view, Figures 6 and 7 are vertical sectional views of the hoistway for explaining the main rope replacement work, Figure 8 The figure is a vertical cross-sectional view of a hoistway showing a conventional method for replacing the main rope of an elevator. In the diagram, (1) is the machine room, (4) is the driving sheave, (9) is the elevator (basket), α-hiro is the existing main rope, α-hiro is the elevator (balance weight), and the lie is the new installation. The main rope, the fin is the guide rail for the car, (1) m is the guide rail for the weight, and ko is the fixing metal fitting.

Claims (2)

【特許請求の範囲】[Claims] (1)かご上で運転してこのかごをその上面とつり合お
もりの上面がほぼ一致した位置で停止させ、上記かご及
びつり合おもりをそれぞれガイドレールに懸吊し、機械
室の駆動綱車に巻き掛けられた既設の主索と上記かご及
びつり合おもりの結合点をそれぞれ切断し、上記既設の
主索のかご側端末に新設の主索の端末を固定し、上記既
設の主索のつり台おもり側端末を上記かご上又はこのか
ご近傍の乗場へ引き出して上記既設の主索と上記新設の
主索を入れ換えた後上記新設の主索の端末をそれぞれ上
記かご及びつり合おもりに結合する手順からなるエレベ
ーターの主索交換工法。
(1) Operate the car on the car, stop the car at a position where the top surface of the car and the top surface of the counterweight almost match, suspend the car and the counterweight on the guide rails, and drive the driving sheave in the machine room. Cut the connection points of the existing main rope wrapped around the car and the counterweight, fix the terminal of the new main rope to the car-side terminal of the existing main rope, and then After pulling out the terminal on the lifting platform weight side to the landing area on the car or near the car and replacing the existing main rope with the newly installed main rope, connect the terminals of the newly installed main rope to the car and the counterweight respectively. An elevator main rope replacement method that consists of the following steps:
(2)主索は1本ずつ又は2本ずつ交換するものとした
特許請求の範囲第1項記載のエレベーターの主索交換工
法。
(2) The elevator main rope replacement method according to claim 1, wherein the main ropes are replaced one at a time or two at a time.
JP10556086A 1986-05-08 1986-05-08 Method of main cable exchange construction of elevator Granted JPS62264183A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP10556086A JPS62264183A (en) 1986-05-08 1986-05-08 Method of main cable exchange construction of elevator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP10556086A JPS62264183A (en) 1986-05-08 1986-05-08 Method of main cable exchange construction of elevator

Publications (2)

Publication Number Publication Date
JPS62264183A true JPS62264183A (en) 1987-11-17
JPH0530752B2 JPH0530752B2 (en) 1993-05-10

Family

ID=14410927

Family Applications (1)

Application Number Title Priority Date Filing Date
JP10556086A Granted JPS62264183A (en) 1986-05-08 1986-05-08 Method of main cable exchange construction of elevator

Country Status (1)

Country Link
JP (1) JPS62264183A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0266092A (en) * 1988-09-01 1990-03-06 Hitachi Elevator Eng & Service Co Ltd Method for driving main rope of elevator

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0266092A (en) * 1988-09-01 1990-03-06 Hitachi Elevator Eng & Service Co Ltd Method for driving main rope of elevator

Also Published As

Publication number Publication date
JPH0530752B2 (en) 1993-05-10

Similar Documents

Publication Publication Date Title
JP6969686B2 (en) How to extend the lift of a construction elevator
JP3281168B2 (en) Lifting equipment for elevator cars
JP4929045B2 (en) Guide rail installation method for machine room-less elevator
JPS62264183A (en) Method of main cable exchange construction of elevator
JP2839970B2 (en) Elevator main cable replacement method
JP3807775B2 (en) How to lift the construction elevator
JPH08245116A (en) Installation engineering of elevator
JP5841929B2 (en) How to change the main rope of the elevator
JP4790941B2 (en) Elevator main rope hanging method
JP3020325B2 (en) Elevator main cable replacement method
JP2815251B2 (en) Elevator main cable replacement method
JPH0772067B2 (en) Lifting body fixing device for elevator
JP2654409B2 (en) Elevator main cable replacement method
JPH04101982A (en) Hoist cable replacing method for elevator
JP3020337B2 (en) Elevator main cable replacement method
JPH10203751A (en) Main rope replacing method of 2:1 roping elevator and device thereof
JPH0494388A (en) Main cable replacing in elevator
JP2849281B2 (en) Elevator main cable replacement method
JPH01181689A (en) Lift rope replacing method
JPH04140291A (en) Main rope replacing method for elevator
JPS5918309B2 (en) Installation method of mobile mechanical room elevator
JP2003073052A (en) Rope installing method of elevator and rope guide device
JP2000351555A (en) Method for replacing elevator main rope
JPH08169662A (en) Elevator suspending device
JPH0751432B2 (en) Main rope replacement method for elevators

Legal Events

Date Code Title Description
EXPY Cancellation because of completion of term