JPS6187813A - Ladle refining installation - Google Patents

Ladle refining installation

Info

Publication number
JPS6187813A
JPS6187813A JP59209285A JP20928584A JPS6187813A JP S6187813 A JPS6187813 A JP S6187813A JP 59209285 A JP59209285 A JP 59209285A JP 20928584 A JP20928584 A JP 20928584A JP S6187813 A JPS6187813 A JP S6187813A
Authority
JP
Japan
Prior art keywords
ladle
closed loop
molten steel
central support
equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP59209285A
Other languages
Japanese (ja)
Other versions
JPH029085B2 (en
Inventor
Kiyoshi Ebina
蝦名 清
Masaaki Kitai
北井 正明
Yukio Katagiri
片桐 行雄
Takanori Kominami
小南 孝教
Hiroshi Morii
森井 宏
Satoshi Ikenaga
池永 智
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kobe Steel Ltd
Original Assignee
Kobe Steel Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kobe Steel Ltd filed Critical Kobe Steel Ltd
Priority to JP59209285A priority Critical patent/JPS6187813A/en
Publication of JPS6187813A publication Critical patent/JPS6187813A/en
Publication of JPH029085B2 publication Critical patent/JPH029085B2/ja
Granted legal-status Critical Current

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21CPROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
    • C21C7/00Treating molten ferrous alloys, e.g. steel, not covered by groups C21C1/00 - C21C5/00
    • C21C7/0075Treating in a ladle furnace, e.g. up-/reheating of molten steel within the ladle
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21CPROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
    • C21C5/00Manufacture of carbon-steel, e.g. plain mild steel, medium carbon steel or cast steel or stainless steel
    • C21C5/52Manufacture of steel in electric furnaces
    • C21C5/5294General arrangement or layout of the electric melt shop
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P10/00Technologies related to metal processing
    • Y02P10/20Recycling

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Treatment Of Steel In Its Molten State (AREA)
  • Waste-Gas Treatment And Other Accessory Devices For Furnaces (AREA)

Abstract

PURPOSE:To treat continuously a molten steel with good productivity by providing a ladle loading and unloading station, molten steel heater, degassing device, etc. in the circumferential direction of a toric closed loop and providing a central support which receives the load of each installation and apparatus to the center of the closed loop. CONSTITUTION:The ladle loading and unloading station 1, a slag discharging station 2, the molten steel heater 3, a KAT device 4 and a vacuum degassing device 5 are disposed apart from each other in the circumferential direction on the toric closed loop 8. The central support 15 made into a hollow columnar construction is erected and fixed to the center of the closed loop 8. Upper, middle and lower decks 13, 14, 12 which receive the load of each installation and apparatus are provided to the support 15 and are connected to a passage 20. Stirrers 9 which can freely advance and retreat to the inside and outside of the diametral direction are respectively provided to the lower deck 12 facing the heater 3 and the degassing device 5 in the inside direction of the diameter so that the molten steel in the ladle 7 imposed on the carriage 6 in the station 1 is stirred.

Description

【発明の詳細な説明】 〔産業上の利用分野〕 本発明は、転炉から収り出し九m鋼を取鍋に収容し、該
取鍋を移行さぜながら連続的に精錬を行なう取鍋精錬設
備に係り、エフ具体的にμ前記取鍋を円環状の閉ループ
上で移行させる取鍋精錬設備における支持架構体に関す
る。、 〔従来の技術〕 f!r株の転炉から収り出さnる浴鋼隠、いりtん取鍋
に収容されるが、必鮫に応じ鋳造に先立って各機の炉外
精錬が行なわルる。ま九こルらの精錬vc置としてμ′
i!r種のものがあるが、最近、取鍋に収容さnytf
m鋼中に精錬用粉末添加剤(列えばCaC1、Ca −
Siなど)を−?ヤリャーガス(通常Ar)と共に吹キ
込むことによって、介在物のコントロール、脱硫、脱酸
等を行なう精錬読直(通称カルシウムインジェクション
装置以下KAT[直という)が利用嘔nている。更に瓜
、s*’i保熱乃至加熱する為の710熱fc@或に溶
鋼中の溶存〃スを除(為の脱ガス装置等も利用さルる。
[Detailed Description of the Invention] [Industrial Application Field] The present invention provides a ladle for continuously refining a 9-meter steel taken out of a converter and placed in a ladle while moving the ladle. The present invention relates to refining equipment, and specifically relates to a support frame structure in a ladle refining equipment that moves the ladle mentioned above in a circular closed loop. , [Conventional technology] f! The steel bath extracted from the r-share converter is stored in a ladle, but as required, each machine is refined outside the furnace prior to casting. μ′ as a refining vc station
i! There are R types, but recently they have been stored in a ladle.
Powder additives for refining (for example, CaC1, Ca -
Si, etc.) -? Calcium injection equipment (commonly referred to as KAT) is used, which controls inclusions, desulfurizes, deoxidizes, etc. by injecting it with Arya gas (usually Ar). Furthermore, a 710 heat fc@ for heat retention or heating, or a degassing device for removing dissolved gas from the molten steel is also used.

こルらの装置に従来独立的に設けられ、必要にエフ夫々
独立的に合金取分等の添加も行なって17?、が、例え
ば前記KATli置に使用さnるCa合金粉末は吸湿性
がある丸めに事後の溶鋼の脱水素に特に重要であるとさ
n、’rrnらの関連性が注目を集めている。
Conventionally, these devices were provided independently, and if necessary, alloy fractions, etc. were added to each F independently. However, for example, the Ca alloy powder used in the KATli process is particularly important for the dehydrogenation of molten steel after rounding due to its hygroscopic properties, and the relevance of 'rrn et al. has attracted attention.

即ち前記しtにAT民は、加熱装置及び脱ガス製置等は
、そルぞル独立設備として設置名nsしかも離rt72
場所に設置さnているのが尖状である。
In other words, as mentioned above, AT people install the heating equipment, degassing equipment, etc. as independent equipment, and furthermore, they are separated from RT72.
It is pointed that is placed in place.

従ってこnらの装置に@鍋を搬送する丸めの特別のクレ
ーンが必於てあり、また!装置の間にもクレーン若しく
は取鍋載置移動台風が必要である。
Therefore, these devices require a special round crane to transport the pots, and also! A crane or a moving ladle is also required between the equipment.

更に、鋼種やその用途等に工っては1こnらの処理工程
も異なり、加熱装置と脱ガス製置を通すだけでよいもの
、加熱装置とKAT民隨を通すだけで脱ガス装置を省略
するもの、或は加熱装置を通さずに直接KAT[直に搬
入し、次いで脱ガス装置に搬入する等種々の工程が利用
さnる。七の為こ几らt結ぶ取鍋搬送ラインはこれらに
対応できる様に構成さnる必まがある。まtこnらの諸
脱mは離几て設直嘔ルているため、そ几ぞnに独立し九
合金粉末民入装置及び/若しく隠排ガス臣置t−設ける
必焚かあって設備費?高騰させ、しかも操作管理及び操
業面でも不都合な場合が多い。−万、近年生産性、歩留
りの同上、省エネルギ、省人等の観点から晋通造塊法に
代って連続鋳造法が全面的に採用さnつつあるが、この
連続鋳造法の利点を最大限に発揮させるためにμ、連続
鋳造工程に対して常に目的とする品質の溶鋼を連続的に
準備、供給する必要がある。ところが、こn2共給する
立場にある転炉側ではチャージ毎に吹錬時間、各鋼品質
の交切がかな9あり、ま7を以後の処理工程もこの影響
を受けると共に鋼種に工っでまちまちであるtめ、特に
前記しt従来の様な設備m成では連続鋳造工程において
管理される品質の1?[t一連α的に効率良く供給する
ことが困難になる場合がしばしば生じている。従って連
続語a法の利点?十分に活しさっていないのが現状であ
る。
Furthermore, the processing steps differ depending on the type of steel and its purpose, and some require only passing through a heating device and a degassing device, while others require only passing through a heating device and a KAT civil equipment to complete a degassing device. Various steps are used, such as omitting the KAT, or directly transporting the KAT without passing it through a heating device, and then transporting it to a degassing device. The ladle conveyance line that connects the seven vessels must be constructed to accommodate these requirements. Since these various types of demolition equipment are directly installed separately, it is necessary to install an independent nine-alloy powder private equipment and/or concealed exhaust gas equipment. Expenses? Moreover, it is often inconvenient in terms of operation management and operation. -In recent years, the continuous casting method has been widely adopted in place of the Jintong ingot making method from the viewpoints of productivity, yield, energy saving, labor saving, etc. In order to achieve maximum performance, it is necessary to continuously prepare and supply molten steel of the desired quality to the continuous casting process. However, on the converter side, which is in the position of co-supplying n2, there is a difference between the blowing time and the quality of each steel for each charge, and the subsequent processing steps are also affected by this, and there are also changes in the steel type. There are many variations in quality, especially in the conventional equipment configuration mentioned above, which is controlled in the continuous casting process. [It often happens that it becomes difficult to efficiently supply the series α. Therefore, is it an advantage of continuous word a method? The current situation is that it is not fully utilized.

斯る観点に立脚して不出願人は特開昭56−164(7
20号公報において、円環状の閉ループ上で取鍋を走行
させる連続爵鋼処理装置?提案し注目されているところ
である。
Based on this viewpoint, the applicant who refused the application
In Publication No. 20, a continuous steel processing device in which a ladle runs on a circular closed loop? This is something that has been proposed and is attracting attention.

〔発明が解決しょうとする問題点〕[Problem that the invention seeks to solve]

ところで、取鍋精錬設備において、閉ループ上で取鍋の
?!!処理ラインに移行させ、加熱装置及び脱ガス装置
において溶鋼を攪拌する必まがあるが、七のtめの″電
磁攪拌1i:IiC以下、スターテ5いう)を設置する
場合、これらの荷重を閉ループ外周エフ支持することに
、設備が高くなり構造的に困難である。特に閉ループ内
面についてに支持体がなければ不可能である。
By the way, in ladle refining equipment, what happens when the ladle is closed on a closed loop? ! ! It is necessary to move the molten steel to the processing line and stir it in the heating device and degassing device, but when installing the 7th "electromagnetic stirring 1i: IiC hereafter referred to as Starte 5), these loads can be stirred in a closed loop. Supporting the outer circumference increases the height of the equipment and is structurally difficult.In particular, it is impossible to support the inner surface of the closed loop without a support.

そこで本発明では、閉ループで走行格納するレードルカ
ー又はし−ドル台に対し、障害を与えずループ中央部で
各設備荷重を受けかつ上記谷設備機器の設はを容易とじ
7を取鍋精錬設備の提供を目的とするものである。
Therefore, in the present invention, the ladle car or ladle stand that runs and stores in a closed loop receives the load of each equipment at the center of the loop without causing any obstruction, and the installation of the valley equipment can be easily closed. The purpose is to provide the following.

〔問題点を解決するtめの手段〕[The tth way to solve the problem]

本発明が萌述の目的を達成する丸めに講じた技術的手段
は鍋−戦場、取鍋中の溶鋼を加熱する7111熱湊置及
び脱ガス製置が円環状とさrLm閉ループ上に周方向の
間隔をおいて配置1几ており、前記鍋降戦場に搬入さr
L九啓鋼収容敗取鍋、前記加熱装置及び脱ガス装置に閉
ループ上で格納させる台惠又ぼ鍋積載台が設けらn、7
を取鍋精錬設備であって、前記閉ループの中央vc?!
r設備機器の荷重を受ける中央支持体が基礎上に立設固
定され、該中央支持体の上段、中段及び下段のセルそれ
に水平力量に延設さrL7tデツキが収付けらルてお9
1史に前記各デツ″#を連絡する通路がmJ記中央支交
付に設けらn1曲配下段デツキ上には匝万nap’q外
に進退移切自在なスターラーが設けられているところに
ある。
The technical measures taken by the present invention to achieve the stated purpose are that the ladle-battlefield, the 7111 heat sink and degassing station for heating the molten steel in the ladle are circular and circumferential on the rLm closed loop. The pots were placed at intervals of
A ladle for storing the L-9 steel, and a ladle loading platform for storing the heating device and the degassing device in a closed loop are provided.
In the ladle refining equipment, the central vc of the closed loop is !
r A central support that receives the load of the equipment is erected and fixed on the foundation, and a L7t deck is housed in the upper, middle and lower cells of the central support and extended horizontally.
A passageway connecting each of the above-mentioned decks is provided in the mJ central branch, and a stirrer that can move forward and backward is installed on the lower deck of the n1 song. .

〔作 用〕 閉ループ上0鍋降載場において転炉から収り出しt浴鋼
を収容しt取鍋が七の積載台又は金玉上に降ろさ几ると
、該@鍋は閉ループ上において排滓場、加熱VC置、脱
ガス装置、KAT読直等の円周方向に間隔を有して配置
さt″L7′c′?!r処理ラインに七nぞル独立して
移行され、谷処理ライン乃至処理部において所安の処理
工程が施こさnる。
[Operation] When the ladle is unloaded from the converter at the ladle unloading station in the closed loop, and the ladle is unloaded onto the loading platform or the metal ball, the ladle is discharged from the slag on the closed loop. A heating VC station, a degassing device, a KAT reading device, etc. are arranged at intervals in the circumferential direction. In the line or in the processing section, some processing steps are carried out.

この場合、各設備機器の荷重は、閉ループ中央部に立設
固定さnL中央支持体にぶって担拉され、該中央支持体
の上段デツキが各処理vc置の支持架台、又、を甑置場
、インジェクション用粉体置場、ランス置場等の置場及
び操業用として使用されることになる。
In this case, the load of each piece of equipment is carried by the NL central support that is erected and fixed at the center of the closed loop, and the upper deck of the central support serves as a support frame for each processing VC, and also for the storage area. It will be used for storage and operation such as powder storage for injection, lance storage, etc.

更に、中央支持体の中段デツキにあって隠各処理電ノ敗
沓、シール状況、レンガ状況等のf/1.業用デツキと
さ几、又、中央支持体の下段デツキにはスターラーが設
けられて、 71+]熱又に脱ガス時において取鍋中V
)石調を攪拌する。
Furthermore, f/1. A stirrer is installed on the industrial deck and box, and on the lower deck of the central support, to prevent V in the ladle during heating or degassing.
) Stir the stone tone.

まm%谷デツキ間μ中央支持体に設けらnた通路’!l
−f′F、東員が通ることに1つて′?!r作業の連絡
、連携がなされる。
A passage provided in the central support between the valley decks! l
-f'F, is there one thing about Toin passing through?' ! r Work will be communicated and coordinated.

〔実施列〕[Implementation row]

回向を参照して不発明の実施例を詳述する。 Embodiments of the invention will be described in detail with reference to the following.

第1図から第3図を参照すると、(1)μ鍋降戦場、+
21μプロテクタ行脱及び排滓場、13J i Arc
加熱民置装置41μKAT民置、(6)は真空脱ガス装
置でろり、円環状の閉ループ(8)上に周方向の所定間
隔tおいて配置さルている。
Referring to Figures 1 to 3, (1) μ pot surrender field, +
21μ protector evacuation and slag disposal site, 13J i Arc
The heating device 41 μKAT private device (6) is heated by a vacuum degassing device and placed on the annular closed loop (8) at a predetermined interval t in the circumferential direction.

(6)に台本又は鍋積載台(以下台車という)であり、
閉ループ181上の円環状に宿ってそn−(” n独立
して移動不能とされ、本例で框2つ設けであるがこnの
個数に任意である0 (7)ば取鍋であり、転炉から喉り出さr′L九浴鋼溶
鋼容してX: flJでa鍋頌鈎臼Jη全介して台I(
6)上に交付されている。
(6) is a script or pot loading platform (hereinafter referred to as a trolley),
It resides in an annular shape on the closed loop 181 and cannot be moved independently.In this example, there are two frames, but the number of frames can be set arbitrarily. , take out the molten steel r′L from the converter and put it into
6) Issued above.

116)μ中央支持体であり、閉ループ(8)の中央に
おいて基礎a目上に座台acat介して立設固定さnて
いる。
116) μ central support, which is erected and fixed on the base a at the center of the closed loop (8) via a pedestal acat.

α4に上段デツキ、α41μ甲段デツキ、lI4に下段
デツキであり、各デツキに中央支持体σ旬に水平方向に
延設爆nている。
There is an upper deck on α4, an upper deck on α41μ, and a lower deck on lI4, and each deck has a bomb extending horizontally from the central support σ.

中央支持坏咳μ中受柱構造であり、七の内部に階段、ハ
シゴ等で示す通路渕が設けられ、該通路2[IKは5デ
ツキに通じる出入ローに連絡されている。
It has a centrally supported pillar structure, with a passageway indicated by stairs, ladders, etc. inside the 7th floor, and the passageway 2 [IK] is connected to the entrance/exit row leading to the 5th deck.

なお、通路2I]に中央支持体用の内周に設けらnた第
6図で示すラセン階段であってもLい0(91にスター
ラーであり、加熱装置(31,脱ガス民政16+と匝内
方同において対応する下段デツキ口上に、甑方向内外に
進退移初自在に設けらルている0(lO)にスターラー
移切廿であり、レール1ll)に涜って転動する惠輪囚
r有し、該−Q tlolとデツキαりとを伸縮シリン
ダ圏で連結することにエフ、前述のスターラー(9)が
匝方向内外に進退格納自在とされている。
It should be noted that even if the helical staircase shown in FIG. On the inside, a stirrer is installed on the corresponding lower deck opening so that it can move forward and backward in and out of the direction of the kettle. The stirrer (9) mentioned above can be freely moved forward and backward in and out of the direction of the container.

九μ位置決めシリンダで、前述スターラー格納台(lO
)の背部に縦向で取付けらnており、スターラー(9)
の前進位置と後進位置との;F:t′Lぞt′Lを位置
決め可能である。
With the 9μ positioning cylinder, the above-mentioned stirrer storage stand (lO
) is installed vertically on the back of the stirrer (9).
F: t'L to t'L can be positioned between the forward position and the reverse position.

即ち、シリンダ刺のピストンにストッパを@付ケ、コの
ストッパ全デツキ112+に穿設し7t 受孔e2s 
’:Aに係脱することに工ってスターラー(9)の泣置
央メを可能としている。
That is, a stopper is attached to the piston of the cylinder, and a stopper is drilled in all decks 112+ of the cylinder, and a 7t receiving hole e2s is inserted.
': It is possible for Starrer (9) to leave the house by contriving to disengage from A.

なお、スターラーt91への給電ケーブル何隠前述の進
退1に許谷丁べく可撓部(27A) k有し、格納台(
lO)を介し℃スターラー(9)に蕾睨自在とさルてい
る。
In addition, the power supply cable to the stirrer T91 has a flexible part (27A) in the above-mentioned advance and retreat 1, and a storage platform (
The buds can be freely heated through the °C stirrer (9).

281μ鍋頑初民直であり、下段デツキリフ上に排滓場
、2)と対応する径内方向に伸縮形として設けであるO 即ち、m6図で示す如く、下段デツキIlz上のブラケ
ット怨にシリンダチューブ鍋tビンβ11で取付け、チ
ューブ1301に漱挿さ1几ロツドのエンドにフック敬
を設けて構成されており、こnが伸長さnるとフック鏝
が鍋傾鰐台Jηの被保合部(17A)を下方ぶり突上げ
る工うにされている。
It is a 281μ pot with a rigid and civil construction, and is installed as a telescopic type in the radial inward direction corresponding to the slag removal area and 2) on the lower deck lift. It is attached to the pot T-bin β11 and is inserted into the tube 1301, and a hook is provided at the end of the rod. 17A) is pushed downwards and upwards.

なお、鍋傾IFl廿甥に外周下部がピン(至)で萱凰(
6)に枢支され、従って、鍋#41Fl 製置銘が伸長
されると、ピ/@を支点に取鍋(71が第6図で示す如
く頌切不能である〇 一μ滓鍋、鍾隠滓掻機を七nぞn示しており、排滓場1
2)の外周域に対応して設けらnている。
In addition, the lower part of the outer periphery of the pot is tilted with a pin (to).
6), and therefore, when the ladle #41Fl is extended, the ladle (71 is an uncuttable 〇1μ slag ladle, a ladle, which cannot be cut as shown in Fig. Seven hidden slag scrapers are shown, and slag removal site 1
2) are provided corresponding to the outer peripheral area.

臼箪(6)に旋回アーム案を介して座台α9に装置さn
ており、モーター、ギヤ伝副体案等を介して閉ループ+
81上t1e初不能である。
The device is attached to the pedestal α9 via the rotating arm plan on the mortar (6).
Closed loop + via motor, gear transmission system, etc.
81 upper t1e first incapacity.

なお、台車(9)は旋回アーム冥で支持させる以外vc
、閉ループ121)上で自走する型式のものであっても
よい。
In addition, the trolley (9) is not supported by the rotating arm (vc).
, closed loop 121).

μs)に蓋であり、加熱装置(3)及び脱ガス装置16
)等において、暇鍋(7)に養親自在に施蓋され、昇降
動作さルるものである。
μs), a heating device (3) and a degassing device 16
), etc., the pot (7) is covered at the discretion of the adoptive parent and can be raised and lowered.

史に、上段デツキα3、中段デツキα4及び下段デッキ
1J21u図外の柱?介して互いに連結されて所謂ユニ
ット構造体とさnており、このユニット構造体の一側に
第1図で示す如く操作室!4CA、)ランス富圓が設け
られている。
Historically, upper deck α3, middle deck α4, and lower deck 1J21u pillars not shown in the diagram? They are connected to each other through a so-called unit structure, and on one side of this unit structure is an operation room as shown in FIG. 4CA,) Reims Tomien is provided.

そして、上段デツキα四は第1図で示す電極置場(6)
、インジェクション用粉体置場−四等の谷檎付属物の置
場とされている他、加熱装置131%KAT民[114
1%脱ガスfc@ telの谷a処理機器の交付架台及
び電柱の補充、インジェクションランスの取替、測温サ
ンプリング作業等の操業デツキとされているのである。
The upper deck α4 is the electrode storage area (6) shown in Figure 1.
, Powder storage area for injection - In addition to being used as a storage area for 4th-grade tanicho attachments, a heating device of 131% KATmin [114
It is used as an operational deck for 1% degassing fc @ tel's Valley A processing equipment, replenishment of mounts and utility poles, replacement of injection lances, temperature measurement sampling work, etc.

ま几、中段デッキ04rc各処理蓋θ敗替作業、レンガ
状況の罐認等のメンテナンス作業用とさn。
For maintenance work such as replacement work, confirmation of brick condition, etc.

下段デツキ恨りがスターラー(9)等の取付は用とさル
、中央支柱体用に工ってこルら荷重を担持するものとさ
nている。その他、第1図において、!441μ保温費
脱装置、囮は排滓場の中段デツキα滲に形成し九切入で
ある。
It is assumed that the stirrer (9) etc. will not be attached to the lower deck, and that the load will be carried by the central column. In addition, in Figure 1, ! A 441μ heat retention cost removal device and a decoy are formed in the middle deck α of the slag dumping area and have nine incisions.

〔発明の効果〕〔Effect of the invention〕

不発明は、鍋降@場、暇鍋中の石鍋を加熱する加熱装置
及び脱ガス装置が円環状とさt″L九閉ループ上に周方
向の間隔をおいて配置されており、i]記鍋降載戦場搬
入さfl、之石鍋収容取鍋を、前記加熱装置及び脱ガス
装置に閉ループ上で移動させる台車又に@積載せが設け
らnt収取鍋錬設備であることから、次のような基本的
作用効果?奏する。
The non-invention is that a heating device for heating a stone pot in a hotpot, a heating device for heating a stone pot in a hotpot, and a degassing device are arranged at intervals in the circumferential direction on a circular ring-shaped closed loop. When the ladle was delivered to the battlefield, a trolley or loading device was installed to move the ladle containing the stone ladle to the heating device and the degassing device in a closed loop. Basic action and effect?

■ 処理工程を連続的に行なうことができ、生産性を向
上させる。
■ The processing process can be performed continuously, improving productivity.

■ 谷処理段置間を短くでき走行うレーンが不快となり
処理時間を短縮して生産を増大させる。
■ The interval between valley processing stages can be shortened, making the running lane uncomfortable, reducing processing time and increasing production.

■ ′?!r処理装置が近接して配役さnるので、操作
管理を集中的に行なうことが容易である。
■ ′? ! Since the processing devices are located close to each other, it is easy to centrally manage operations.

■ 付帯設備を集中的に設置できると共に共用すること
もでき設備費を安画にでさる。
■ Auxiliary equipment can be centrally installed and shared, reducing equipment costs.

■ 設置床面が少なくてすみ隈らrL7’F−敷地に設
置できる。
■ The installation floor space is small and it can be installed on Sumikuma rL7'F-site.

■ 目標品質に応じt処理の組み合せが自由にできる。■ You can freely combine t processes according to the target quality.

ま九、本発明では前記閉ループの中央に各設備機器の荷
重?受ける中央支持体が基礎上に立設固定され、該中央
支持体の上段、中段及び下段のそnぞnに水平方向に延
設さn友デツキが取付けらルで$Pり、更に、前記各デ
ツキを連絡する通路が前記中央支持体に設けられ、前記
下段デツキ上には径方向内外に進退移動自任なスターラ
ーが設けられているので、次の特有の作用効果を奏する
Nine, in the present invention, is the load of each equipment at the center of the closed loop? A receiving central support is erected and fixed on the foundation, and horizontally extending decks are attached to each of the upper, middle and lower tiers of the central support; A passage connecting the decks is provided in the central support, and a stirrer that can freely move forward and backward in the radial direction is provided on the lower deck, so that the following unique effects are achieved.

■ 加熱処理、脱ガス処理のとき、スターラーにLつて
取鍋円の浴鋼を確実に攪拌できる。
- During heat treatment and degassing treatment, the bath steel in the ladle can be reliably stirred using a stirrer.

■ 閉ループで走行移初するレードルカー又はレードル
せに対し、障害を与えずループ中央部で各設置S荷重を
受けかつ上記各設備機器0設@を容易とする0
■ For a ladle car or ladle set that starts traveling in a closed loop, it is possible to receive each installation S load at the center of the loop without causing any obstruction, and to facilitate the installation of each of the above equipment equipment.

【図面の簡単な説明】[Brief explanation of drawings]

図面に本発明の実施例と示し、第1図に設備の概装平面
図、第2図μ下段デツキ部の概略平面図、第3図に設備
の立面側面図、第4図μ同じく方向をη1えてみ九11
111面図、第5図μ鍋頑卿部を示す側面図、@6図に
階段の他の例を示しt鍋#IvJ部の側面図である。 (1)・・・M降戦場、(31・・・加熱装置、(6ン
・・・悦ガス装置、(6)・・・臼鳳、())・・・@
鍋、(8)・・・閉ループ、α四α3α4・・・デツキ
、11す・・・中央支持体、渕・・・通路。 特 許 出 願 人  株式会社神戸製鋼所二i、−仙
、・ 第7 図 4U          47 第4 図
The drawings show an embodiment of the present invention, and Fig. 1 is a schematic plan view of the equipment, Fig. 2 is a schematic plan view of the lower deck section, Fig. 3 is an elevational side view of the equipment, and Fig. 4 is the same direction. η1 911
Figure 111 is a side view, Figure 5 is a side view showing the μ pan stubborn part, and Figure @6 is a side view of the t pan #IvJ part showing another example of stairs. (1)...M surrender field, (31...heating device, (6n...Yue gas device, (6)...Usuho, ())...@
Pot, (8)...closed loop, α4α3α4...deck, 11su...center support, edge...passage. Patent Applicant: Kobe Steel, Ltd. 2i,-Sen,・7 Figure 4U 47 Figure 4

Claims (1)

【特許請求の範囲】 1、鍋降載場、取鍋中の溶鋼を加熱する加熱装置および
脱ガス装置が円環状とされた閉ループ上に周方向の間隔
をおいて配置されており、前記鍋降載場に搬入された溶
鋼収容取鍋を、前記加熱装置および脱ガス装置に閉ルー
プ上で移動させる台車又は鍋積載台が設けられた取鍋精
錬設備であって、 前記閉ループの中央に各設備機器の荷重を受ける中央支
持体が基礎上に立設固定され、該中央支持体の上段、中
段及び下段のそれぞれに水平方向に延設されたデッキが
取付けられており、更に、前記各デッキを連絡する通路
が前記中央支持体に設けられ、前記下段デッキ上には径
方向内外に進退移動自在なスターラーが設けられている
ことを特徴とする取鍋精錬設備。
[Claims] 1. A ladle unloading station, a heating device for heating molten steel in a ladle, and a degassing device are arranged at intervals in the circumferential direction on an annular closed loop; A ladle refining facility equipped with a truck or a ladle loading platform for moving the molten steel storage ladle carried into the unloading area to the heating device and the degassing device in a closed loop, the ladle refining facility being equipped with a truck or a ladle loading platform that moves the molten steel storage ladle carried into the unloading area to the heating device and the degassing device in a closed loop, wherein each device is installed in the center of the closed loop. A central support that receives the load of the equipment is erected and fixed on the foundation, and horizontally extending decks are attached to each of the upper, middle, and lower tiers of the central support; A ladle refining equipment characterized in that a communicating passage is provided in the central support, and a stirrer that is movable radially inwardly and outwardly is provided on the lower deck.
JP59209285A 1984-10-04 1984-10-04 Ladle refining installation Granted JPS6187813A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP59209285A JPS6187813A (en) 1984-10-04 1984-10-04 Ladle refining installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP59209285A JPS6187813A (en) 1984-10-04 1984-10-04 Ladle refining installation

Publications (2)

Publication Number Publication Date
JPS6187813A true JPS6187813A (en) 1986-05-06
JPH029085B2 JPH029085B2 (en) 1990-02-28

Family

ID=16570411

Family Applications (1)

Application Number Title Priority Date Filing Date
JP59209285A Granted JPS6187813A (en) 1984-10-04 1984-10-04 Ladle refining installation

Country Status (1)

Country Link
JP (1) JPS6187813A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010121172A (en) * 2008-11-19 2010-06-03 Nippon Steel Corp Facility and method for secondary-refining molten steel

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010121172A (en) * 2008-11-19 2010-06-03 Nippon Steel Corp Facility and method for secondary-refining molten steel

Also Published As

Publication number Publication date
JPH029085B2 (en) 1990-02-28

Similar Documents

Publication Publication Date Title
US3866382A (en) Apparatus for supporting workmen within an open-ended vessel and carrying materials into and out of the vessel, and method of installing such apparatus in a vessel
US3013789A (en) Mobile apparatus for oxygen refining of metal
JPS6187813A (en) Ladle refining installation
US3271020A (en) Steel plant
US3285390A (en) Apparatus for lining metallurgical vessels, such as converters
US2933918A (en) Method of lining furnaces
CN217876598U (en) Cooling device for brown corundum
US1312474A (en) Gkustaf l
US3679071A (en) Apparatus for use in lining vessels
JP3503938B2 (en) Hot metal transfer equipment between converters and hot metal setting equipment used for the equipment
US20120193062A1 (en) Metallurgical complex
JP3685781B2 (en) Melting equipment for molten cast iron for ductile castings
JP4520659B2 (en) Converter operation method
CA2521705A1 (en) Direct smelting plant
CN101194029A (en) Hot metal supply apparatus
JP3930661B2 (en) Steelmaking equipment
SU478869A1 (en) A device for steel production in mobile converters
KR101528254B1 (en) Melting furnace capable of lifting body of furnace
US240714A (en) holley
CN211771491U (en) Smelting slag slow cooling processing system
US3357691A (en) Releasable bearing for crucibles or converters
JP2560093Y2 (en) Waste casting equipment for continuous casting equipment
US4241902A (en) System for vessel exchange
JPH0211714A (en) Method for operating converter
JPH0344124B2 (en)