JPS6122950Y2 - - Google Patents

Info

Publication number
JPS6122950Y2
JPS6122950Y2 JP1981188126U JP18812681U JPS6122950Y2 JP S6122950 Y2 JPS6122950 Y2 JP S6122950Y2 JP 1981188126 U JP1981188126 U JP 1981188126U JP 18812681 U JP18812681 U JP 18812681U JP S6122950 Y2 JPS6122950 Y2 JP S6122950Y2
Authority
JP
Japan
Prior art keywords
boom
jib
tip
auxiliary jib
stage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP1981188126U
Other languages
Japanese (ja)
Other versions
JPS5892289U (en
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to JP18812681U priority Critical patent/JPS5892289U/en
Publication of JPS5892289U publication Critical patent/JPS5892289U/en
Application granted granted Critical
Publication of JPS6122950Y2 publication Critical patent/JPS6122950Y2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Jib Cranes (AREA)

Description

【考案の詳細な説明】 本考案は補助ジブ付き伸縮ブーム式クレーンに
関し、さらに詳しくは、このような補助ジブ付き
伸縮ブーム式クレーンの補助ジブの取付け構造に
関するものである。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a telescopic boom type crane with an auxiliary jib, and more particularly, to a mounting structure for the auxiliary jib of such a telescopic boom type crane with an auxiliary jib.

従来この種の伸縮ブーム式クレーンとしては、
補助ジブを伸縮ブームの側方に横抱き状態で格納
するようにしたジブ横抱き方式のものが一般的で
あつたが、このようなジブ横抱き方式の伸縮ブー
ム式クレーンにおいては、補助ジブの着脱時には
該補助ジブを伸縮ブームの先端部において旋回さ
せなければならず、そのためにかなり広い作業空
間を要し、路地奥での建屋作業において補助ジブ
を使用したような場合には作業が終つて補助ジブ
を格納しようとした時、補助ジブの格納作業上必
要な作業空間を確保することができず、その格納
作業が困難を極めるという問題があつた。このジ
ブ横抱き方式のクレーンにおける問題を解決する
ために補助ジブを伸縮ブーム内に伸縮自在に内挿
し、ジブ作業時には該補助ジブを伸縮ブーム内か
らそのままブーム伸長方向に抜き出して使用する
ことができるようにしたジブ内挿方式の伸縮ブー
ム式クレーンが既に開発されているが、この従来
のジブ内挿方式の伸縮ブーム式クレーンにおいて
は、通常のクレーン作業時(非ジブ作業時)には
補助ジブを伸縮ブームの先端ブームに固定した状
態で該伸縮ブーム内に格納し該補助ジブを先端ブ
ームと一体的に伸縮させながら吊荷作業を行うよ
うにしていたため、補助ジブの自重によるクレー
ン全体としての転倒モーメントが大きく、それだ
け吊上げ荷重が制限されることになり、その結
果、クレーンの吊上げ能力が悪化するという問題
があつた。
Conventionally, this type of telescopic boom crane
It was common to use a horizontal jib type crane in which the auxiliary jib was stored sideways on the side of the telescopic boom. The auxiliary jib must be rotated at the tip of the telescopic boom, which requires a fairly large working space, and when the auxiliary jib is used for building work in the back of an alley, it is difficult to turn the auxiliary jib after the work is finished. When attempting to store the auxiliary jib, there was a problem in that the necessary work space for storing the auxiliary jib could not be secured, making the work extremely difficult. In order to solve this problem with the jib side-carrying type crane, the auxiliary jib is telescopically inserted into the telescopic boom, and during jib work, the auxiliary jib can be pulled out from within the telescopic boom in the boom extension direction and used. A telescopic boom crane with an internal jib system has already been developed, but in this conventional telescopic boom crane with an internal jib system, the auxiliary jib cannot be used during normal crane operations (during non-jib operations). Because the auxiliary jib was stored inside the telescopic boom while being fixed to the end boom, and the lifting work was carried out while extending and contracting the auxiliary jib integrally with the end boom, the crane as a whole fell over due to the weight of the auxiliary jib. There was a problem in that the moment was large, and the lifting load was limited accordingly, resulting in a deterioration in the lifting ability of the crane.

本考案は、上記の如き従来の補助ジブ付き伸縮
ブーム式クレーンの問題点に鑑み、補助ジブをブ
ーム内挿式としてその着脱作業の簡易化を図ると
ともにジブ不使用時におけるクレーンの転倒モー
メントを可及的に減小せしめて、その吊上げ能力
の向上を図り得るようにした補助ジブ付き伸縮ブ
ーム式クレーンを提供することを目的としてなさ
れたものであり、基端ブームに対して伸縮する先
端ブームと第2段ブームとを有し且つ前記基端ブ
ームと前記第2段ブームの間に油圧シリンダを倒
立状に内装配置して該油圧シリンダのシリンダヘ
ツド部と前記第2段ブームの基端部を枢着連結し
前記第2段ブームを前記油圧シリンダによつて伸
縮せしめ得る如くするとともに、前記先端ブーム
を該先端ブームと前記第2段ブームと前記基端ブ
ームの間に張設した適宜のブーム伸縮用ワイヤロ
ープ装置を介して前記第2段ブームの伸縮動に連
動して同時伸縮せしめ得る如くした伸縮ブーム
と、該伸縮ブームに装着される補助ジブとを有す
る伸縮ブーム式クレーンにおいて、前記補助ジブ
を前記伸縮ブームの第2段ブーム内に格納可能
で、しかも該第2段ブーム内への格納状態におい
ては該補助ジブでもつて前記油圧シリンダを囲繞
する如き形状とする一方、該補助ジブはその使用
時においては前記先端ブームの先端部に装着さ
れ、その格納時においては前記第2段ブーム内に
おいて、しかも該第2段ブームの基端部側に止着
されて固定されるようにしたことを特徴とするも
のである。
In view of the above-mentioned problems with conventional telescopic boom type cranes with auxiliary jibs, the present invention aims to simplify the work of attaching and removing the auxiliary jib by inserting the auxiliary jib into the boom, and also reduces the overturning moment of the crane when the jib is not in use. The purpose of this crane is to provide a telescoping boom type crane with an auxiliary jib that can improve the lifting capacity by reducing the overall size of the crane. a second stage boom, and a hydraulic cylinder is arranged internally in an inverted manner between the base end boom and the second stage boom, and a cylinder head of the hydraulic cylinder and a base end of the second stage boom are connected to each other. an appropriate boom which is pivotally connected so that the second stage boom can be extended and contracted by the hydraulic cylinder, and the tip boom is stretched between the tip boom, the second step boom and the proximal boom; A telescoping boom type crane comprising a telescoping boom capable of simultaneously telescoping in conjunction with the telescoping movement of the second stage boom via a telescoping wire rope device, and an auxiliary jib attached to the telescoping boom. The jib can be stored in the second stage boom of the telescopic boom, and the auxiliary jib is shaped so as to surround the hydraulic cylinder in the state of being stored in the second stage boom, and the auxiliary jib is When in use, it is attached to the tip of the tip boom, and when it is stored, it is fixed within the second stage boom and to the base end side of the second stage boom. It is characterized by this.

以下、本考案の補助ジブ付き伸縮ブーム式クレ
ーンを添付図面に示す実施例に基づいて説明する
と、第1図には車両Yにクレーン装置Xを塔載し
た本考案実施例に係る補助ジブ付き伸縮ブーム式
トラツククレーンZが示されている。このクレー
ン装置Xは、伸縮ブーム1と、該伸縮ブーム1に
装着される補助ジブ5と、伸縮ブーム1及び補助
ジブ5を起伏且つ旋回自在に支持する旋回台7,
起伏用油圧シリンダ8及び吊荷作業用の巻上げ装
置9,10を有している。
The telescopic boom type crane with auxiliary jib of the present invention will be explained below based on the embodiment shown in the attached drawings. A boom truck crane Z is shown. This crane device
It has a hydraulic cylinder 8 for luffing and hoisting devices 9 and 10 for lifting a load.

以下、本考案の要旨である伸縮ブーム1と補助
ジブ5の構成並びにその作用を第2図ないし第1
8図を参照して詳述する。
Below, the configuration and operation of the telescopic boom 1 and the auxiliary jib 5, which are the gist of the present invention, will be explained in Figures 2 to 1.
This will be explained in detail with reference to FIG.

伸縮ブーム1は、第2図に示す如く旋回台7側
に取り付けられる基端ブーム2と該基端ブーム2
に対して伸縮せしめられる第2段ブーム3と先端
ブーム4とを有する3段伸縮式ブームであつて、
該伸縮ブーム1内に内挿せしめた状態で基端ブー
ム2の基端部2aと第2段ブーム3の基端部3a
の間に配置した油圧シリンダ6を伸縮させて第2
段ブーム3を基端ブーム2に対して伸縮させるこ
とにより、該基端ブーム2と先端ブーム4の間に
張設したブーム伸縮用ワイヤロープ装置Uを介し
て先端ブーム4を第2段ブーム3と同時に伸縮せ
しめることができるようになつている(第5図、
第7図参照)。即ち、ブーム伸縮用ワイヤロープ
装置Uは、第2図に示す如く第2段ブーム3の先
端部3bに取付けた前側シーブ65を介して基端
ブーム2先端部2bに設けた索端ピン63と先端
ブーム4の基端部4aに設けたイコライザー64
の間に張設したブーム伸縮用ワイヤロープ61
と、第2段ブーム3の基端部3aに設けた後側シ
ーブ68を介して先端ブーム4の基端部4aに設
けた索端ピン67と基端ブーム2の先端部2bに
設けたイコライザー66の間に張設したブーム縮
小用ワイヤロープ62とを有しており、油圧シリ
ンダ6を伸長させて第2段ブーム3を伸長させた
時には前側シーブ65が一種の動滑車として作用
しブーム伸長用ワイヤロープ61をして先端ブー
ム4を第2段ブーム3に連動して同時に伸長せし
め、逆に、油圧シリンダ6を縮小させて第2段ブ
ーム3を縮小せしめた時には後側シーブ68が一
種の動滑車として作用しブーム縮小用ワイヤロー
プ62をして先端ブーム4を第2段ブーム3に連
動して同時に縮小せしめる如く作用する。
The telescopic boom 1 includes a base end boom 2 attached to the swivel base 7 side as shown in FIG.
A three-stage telescopic boom having a second stage boom 3 and a tip boom 4 that can be extended and contracted against the
The base end portion 2a of the base end boom 2 and the base end portion 3a of the second stage boom 3 are inserted into the telescopic boom 1.
The hydraulic cylinder 6 placed between the
By extending and retracting the step boom 3 relative to the base boom 2, the tip boom 4 is connected to the second step boom 3 via a boom extension/contraction wire rope device U stretched between the base boom 2 and the tip boom 4. At the same time, it can be expanded and contracted (Fig. 5,
(See Figure 7). That is, as shown in FIG. 2, the boom extension/retraction wire rope device U connects the cable end pin 63 provided at the tip 2b of the proximal boom 2 via the front sheave 65 attached to the tip 3b of the second stage boom 3. Equalizer 64 provided at the base end 4a of the tip boom 4
Boom extension wire rope 61 stretched between
and a cable end pin 67 provided at the proximal end 4a of the tip boom 4 via a rear sheave 68 provided at the proximal end 3a of the second stage boom 3, and an equalizer provided at the tip 2b of the proximal boom 2. When the hydraulic cylinder 6 is extended to extend the second stage boom 3, the front sheave 65 acts as a kind of movable pulley to extend the boom. When the front end boom 4 is linked to the second stage boom 3 and the second stage boom 3 is extended simultaneously using the wire rope 61, and conversely, when the second stage boom 3 is contracted by contracting the hydraulic cylinder 6, the rear sheave 68 is extended at the same time. The boom retracting wire rope 62 acts as a movable pulley to move the tip boom 4 to the second stage boom 3 and simultaneously retract it.

又、この伸縮ブーム1は、その格納状態におい
て先端ブーム4の基端側端面4cが第2段ブーム
3の基端側端面3cより適宜寸法だけブーム先端
側に位置するように先端ブーム4と第2段ブーム
3の長さを適宜に設定している。この先端ブーム
4の端面4cよりブーム基端側に位置する第2段
ブーム3の基端部3aには前記ブーム伸縮用ワイ
ヤロープ装置Uの後側シーブ68が取付けられて
いる。又、この先端ブーム4の端面4cよりブー
ム基端側に位置する第2段ブーム3の基端部3a
の下側フランジ板94上には、先端ブーム4の下
側フランジ板97の上面とほぼ同一高さを有する
パツト板27が取付けられている。このパツト板
27は、後述する補助ジブ5に取付けた下側ガイ
ドローラ71,71の走行用ガイド板として作用
する。又、このパツト板27のブーム基端側端部
27aには後述する如く補助ジブ5を所定の格納
位置で正確に停止せしめる如く作用するストツパ
ー26が取付けられている。又、油圧シリンダ6
は、第2段ブーム3の基端部3aに設けたトラニ
オンピン40によつてそのシリンダヘツド部6a
を支持されたいわゆる先端トラニオン型油圧シリ
ンダであつて、そのシリンダテール部6bを伸縮
ブーム1の先端側に向けた状態で伸縮ブーム1内
に内挿せしめられている。尚、この油圧シリンダ
6のシリンダテール部6bには後述するシリンダ
調芯装置Wが装着される。
In addition, the lengths of the tip boom 4 and the second boom stage 3 of this telescopic boom 1 are appropriately set so that, in the stored state, the base end face 4c of the tip boom 4 is located an appropriate distance toward the boom tip side from the base end face 3c of the second boom stage 3. The rear sheave 68 of the boom telescopic wire rope device U is attached to the base end 3a of the second boom stage 3 located toward the boom base end side from the end face 4c of the tip boom 4.
A pad plate 27 having approximately the same height as the upper surface of the lower flange plate 97 of the tip boom 4 is attached to the lower flange plate 94 of the boom 6. This pad plate 27 acts as a guide plate for the travel of the lower guide rollers 71, 71 attached to the auxiliary jib 5, which will be described later. A stopper 26 is attached to the boom base end side end 27a of this pad plate 27, which acts to stop the auxiliary jib 5 accurately at a specified storage position, as will be described later.
The second boom 3 has a base end 3a and a trunnion pin 40 at its cylinder head 6a.
The hydraulic cylinder 6 is a so-called tip trunnion type hydraulic cylinder supported by a trunnion rod and inserted into the telescopic boom 1 with its cylinder tail portion 6b facing the tip of the telescopic boom 1. A cylinder centering device W, which will be described later, is attached to the cylinder tail portion 6b of the hydraulic cylinder 6.

補助ジブ5は、第2図及び第12図ないし第1
5図に示す如く断面矩形状に形成されたプレート
構造ジブであり、その長さは全縮状態における伸
縮ブーム1の第2段ブーム3の基端部3aから先
端ブーム4の先端部4bに至るブーム伸長方向長
さとほぼ同じ長さを有し、またその断面寸法は先
端ブーム4内に内挿せしめ得る程度の寸法とされ
ている。この補助ジブ5は、その基端部5aの
上、下面に設けた上側ガイドローラ70,70と
下側ガイドローラ71,71と前記先端ブーム4
の先端部4bの下面に設けた先端側ガイドローラ
72,72によつてブーム伸長方向に走行自在に
支持されており、該補助ジブ5の先端部5bに設
けた把手部材75,75を手でもつて押引するこ
とにより該補助ジブ5を容易に伸縮ブーム1内か
ら引き出したり(第9図)、また該伸縮ブーム1
内に押し込んだりすることができる(第2図)。
尚、この補助ジブ5の押し込み作業は、吊荷作業
用の巻上げ装置9,10を使用して行うこともで
きる。又、この上側ガイドローラ70,70と下
側ガイドローラ71,71の内、下側ガイドロー
ラ71,71は補助ジブ5の基端部5aの下側端
面5cに近接して配置され、これに対して上側ガ
イドローラ70,70は下側ガイドローラ71,
71より適宜寸法だけジブ先端側に離隔して配置
されており、伸縮ブーム1の全縮時における先端
ブーム4の基端部4aとジブ軸方向において重合
せしめられている。
The auxiliary jib 5 is shown in FIGS. 2 and 12 to 1.
As shown in Figure 5, it is a plate structure jib formed with a rectangular cross section, and its length extends from the base end 3a of the second stage boom 3 of the telescopic boom 1 in the fully retracted state to the front end 4b of the tip boom 4. It has approximately the same length as the length in the boom extension direction, and its cross-sectional dimension is such that it can be inserted into the tip boom 4. This auxiliary jib 5 includes upper guide rollers 70, 70 and lower guide rollers 71, 71 provided on the upper and lower surfaces of the base end 5a, and the tip boom 4.
The tip side guide rollers 72, 72 provided on the lower surface of the tip portion 4b of the auxiliary jib 5 allow the boom to run freely in the extension direction, and the handle members 75, 75 provided on the tip portion 5b of the auxiliary jib 5 can be held by hand. By pushing and pulling the auxiliary jib 5, the auxiliary jib 5 can be easily pulled out from inside the telescopic boom 1 (Fig. 9).
(Figure 2).
Note that this pushing operation of the auxiliary jib 5 can also be performed using hoisting devices 9 and 10 for lifting a load. Also, of the upper guide rollers 70, 70 and the lower guide rollers 71, 71, the lower guide rollers 71, 71 are arranged close to the lower end surface 5c of the base end 5a of the auxiliary jib 5, and On the other hand, the upper guide rollers 70, 70 are the lower guide rollers 71,
71 by an appropriate distance toward the tip end of the jib, and is overlapped with the base end 4a of the tip boom 4 in the jib axial direction when the telescopic boom 1 is fully retracted.

又、補助ジブ5の基端部5aは、前記油圧シリ
ンダ6のトラニオンピン40との干渉をさけるた
めに上下方向に2つの端面5c,5dを有する如
くU字形にカツトされており、その上側端面5d
は下側端面5cよりも適宜寸法だけブーム基端側
に延出せしめられている。尚、下側ガイドローラ
71,71のブラケツト73,73は、その基端
側端面73a,73aが補助ジブ5の下側端面5
cとジブ軸方向において面一となるようにされて
おり、該下側端面5cとともに後述する如く補助
ジブ5の位置決め用ストツパー部材として作用す
る。又、上側端面5dは、後述する如くシリンダ
調芯装置Wの姿勢制御用部材として作用する。
In addition, the base end 5a of the auxiliary jib 5 is cut into a U-shape to have two end faces 5c and 5d in the vertical direction in order to avoid interference with the trunnion pin 40 of the hydraulic cylinder 6. 5d
is extended toward the base end of the boom by an appropriate dimension from the lower end surface 5c. The brackets 73, 73 of the lower guide rollers 71, 71 have their proximal end surfaces 73a, 73a aligned with the lower end surface 5 of the auxiliary jib 5.
c in the jib axial direction, and together with the lower end surface 5c, acts as a stopper member for positioning the auxiliary jib 5 as described later. Further, the upper end surface 5d functions as a posture control member of the cylinder alignment device W as described later.

この補助ジブ5の軸方向への移動は、第2段ブ
ーム3の基端部3aに設けた前記ストツパー26
と、先端ブーム4の先端部4bに設けた後述する
ジブ抜け止め装置Vとによつて規制される。即
ち、補助ジブ5は、伸縮ブーム1内に押し込まれ
た時にはその基端部5aの下側端面5cがストツ
パー26に衝突した位置で停止せしめられる(第
3図図示位置)。この時、補助ジブ5の下側ガイ
ドローラ71,71は前記パツト板27上にあ
り、また上側ガイドローラ70,70は先端ブー
ム4の基端側端面4cに近接した位置に位置せし
められている。また、この時、補助ジブ5の先端
部5bは先端ブーム4の先端部4bより若干前方
に突出せしめられている。この補助ジブ5の位置
は、該補助ジブ5の伸縮ブーム1に対する格納位
置であり、この状態においては第14図に示す如
く該補助ジブ5に設けたジブ側ピン受穴15,1
5と第2段ブーム3の基端部3aに設けたブーム
基端側ピン受穴16,16とが合致しており、こ
の相互に合致せしめられた両ピン受穴15,1
5,16,16に伸縮ブーム1の側方からジブ固
定ピン42を嵌挿せしめることにより補助ジブ5
は第2段ブーム3側に固定されることになる。
This movement of the auxiliary jib 5 in the axial direction is controlled by the stopper 26 provided at the base end 3a of the second stage boom 3.
and a jib retaining device V, which will be described later, provided at the tip end 4b of the tip boom 4. That is, when the auxiliary jib 5 is pushed into the telescopic boom 1, it is stopped at the position where the lower end surface 5c of the base end 5a collides with the stopper 26 (the position shown in the third figure). At this time, the lower guide rollers 71, 71 of the auxiliary jib 5 are on the part plate 27, and the upper guide rollers 70, 70 are positioned close to the proximal end surface 4c of the tip boom 4. . Further, at this time, the tip end 5b of the auxiliary jib 5 is made to protrude slightly forward than the tip end 4b of the tip boom 4. This position of the auxiliary jib 5 is the retracted position of the auxiliary jib 5 with respect to the telescopic boom 1, and in this state, as shown in FIG.
5 and the boom proximal side pin receiving holes 16, 16 provided in the proximal end 3a of the second stage boom 3 are aligned, and both pin receiving holes 15, 1 are aligned with each other.
By inserting the jib fixing pin 42 into the telescopic boom 1 from the side of the telescopic boom 1, the auxiliary jib 5
will be fixed to the second stage boom 3 side.

一方、補助ジブ5のジブ引出し方向への移動は
ジブ抜け止め装置Vによつて規制される。即ち、
該ジブ抜け止め装置Vは、第11図に示す如く常
時、先端ブーム4内に突出する如くスプリング2
1によつて付勢せしめられたストツパーピン22
と該ストツパーピン22を強制的に没入せしめる
如く作用する操作レバー23よりなり、第2図に
示す如く補助ジブ5を格納した状態においてはこ
のストツパーピン22が補助ジブ5の先端部5b
の下面適所に設けた先端側ストツパープレート3
1とジブ引出し方向において係合し、前記ジブ固
定ピン42を抜き取つたとき、該補助ジブ5がそ
の格納位置から不用意に先端側に向けて移動する
のを防止する如く作用する。又、このジブ抜け止
め装置Vの操作レバー23を押し下げてストツパ
ーピン22と先端側ストツパープレート31との
係合を離脱させることにより第9図に示す如く補
助ジブ5を伸縮ブーム1から前方に引き出すこと
ができる。一方、ストツパーピン22は、操作レ
バー23から手をはなすことによりそのスプリン
グ21のバネ力によつて所定位置(その先端が先
端ブーム4内に突出した位置)に復帰せしめられ
るようになつており、該ストツパーピン22は補
助ジブ5を適宜位置まで引き出した時点で今度は
該補助ジブ5の基端部5aの下面にその一端30
aを下側フランジ板86の基端側端面86aから
ブーム基端側に延出させた状態で取付けた基端側
ストツパープレート30のピン受部30bとジブ
引き出し方向において係合し、該補助ジブ5の最
大引き出し量を一定量に規制する如く作用する。
このストツパーピン22と基端側ストツパープレ
ート30とが係合した状態における補助ジブ5の
引き出し位置が該補助ジブ5を使用してジブ作業
を行う場合の補助ジブ5の装着位置となる。この
状態においては第13図に示す如く補助ジブ5に
設けた前記ジブ側ピン受穴15,15が先端ブー
ム4の先端部に設けたブーム先端側ピン受穴1
7,17と合致しており、前記ジブ抜け止めピン
42をこの相互に重合した両ピン受穴15,1
5,17,17に嵌挿することにより補助ジブ5
は先端ブーム4の先端部4bに固定される。ま
た、この時、補助ジブ5は、先端ブーム4の先端
部4bの下面に配置した前記先端側ガイドローラ
72,72と該補助ジブ5の基端部5aの上側フ
ランジ板85と接触した先端ブーム4の上側フラ
ンジ板96とによつて若干下方に傾斜した状態で
支持されて適宜のチルト角度を形成している。
On the other hand, the movement of the auxiliary jib 5 in the jib pull-out direction is regulated by the jib slip-off prevention device V. That is,
The jib retaining device V is connected to a spring 2 so as to always protrude into the tip boom 4 as shown in FIG.
Stopper pin 22 biased by 1
and an operating lever 23 that acts to forcibly retract the stopper pin 22. When the auxiliary jib 5 is retracted as shown in FIG.
Tip end stopper plate 3 installed at the appropriate location on the bottom of the
1 in the jib pull-out direction, and acts to prevent the auxiliary jib 5 from inadvertently moving toward the tip side from its storage position when the jib fixing pin 42 is removed. Also, by pushing down the operating lever 23 of this jib retaining device V to disengage the stopper pin 22 and the front end stopper plate 31, the auxiliary jib 5 is pulled forward from the telescopic boom 1 as shown in FIG. be able to. On the other hand, when the stopper pin 22 is released from the operating lever 23, the spring force of the spring 21 causes the stopper pin 22 to return to a predetermined position (the position where its tip protrudes into the tip boom 4). When the auxiliary jib 5 is pulled out to an appropriate position, the stopper pin 22 attaches one end 30 to the lower surface of the base end 5a of the auxiliary jib 5.
a extends from the proximal end surface 86a of the lower flange plate 86 toward the boom proximal end and engages with the pin receiving portion 30b of the proximal stopper plate 30 attached in the jib pull-out direction. It acts to regulate the maximum amount of pullout of the jib 5 to a certain amount.
The pulled-out position of the auxiliary jib 5 when the stopper pin 22 and the proximal stopper plate 30 are engaged becomes the mounting position of the auxiliary jib 5 when performing jib work using the auxiliary jib 5. In this state, as shown in FIG.
7 and 17, and the jib retaining pin 42 is inserted into both pin receiving holes 15 and 1 which are overlapped with each other.
5, 17, 17 by inserting it into the auxiliary jib 5.
is fixed to the tip end portion 4b of the tip boom 4. Also, at this time, the auxiliary jib 5 is in contact with the tip side guide rollers 72, 72 arranged on the lower surface of the tip portion 4b of the tip boom 4 and the upper flange plate 85 of the base end portion 5a of the auxiliary jib 5. It is supported in a slightly downwardly inclined state by the upper flange plate 96 of No. 4 to form an appropriate tilt angle.

又、この伸縮ブーム1は、補助ジブ5を該伸縮
ブーム1内に格納した状態で自由に該伸縮ブーム
1を伸縮させて該伸縮ブーム1だけを使用して通
常のクレーン作業を行うことができるようになつ
ているが、(第7図参照)、この場合、先端ブーム
4は第2段ブーム3側に固定された補助ジブ5か
ら見掛上前方に引き出され先端ブーム4側の先端
側ガイドローラ72,72が補助ジブ5の下面か
ら外れることになるが、該先端側ガイドローラ7
2,72が補助ジブ5から外れた後は前記先端側
ストツパープレート31が該先端側ガイドローラ
72,72にかわつて先端ブーム4の下フランジ
97と直接接触してスライドブツシユとして作用
する。
Further, this telescopic boom 1 can freely extend and contract the telescopic boom 1 with the auxiliary jib 5 stored inside the telescopic boom 1, and normal crane work can be performed using only the telescopic boom 1. However, in this case, the tip boom 4 is apparently pulled forward from the auxiliary jib 5 fixed to the second stage boom 3 side, and the tip side guide on the tip boom 4 side The rollers 72, 72 will come off the lower surface of the auxiliary jib 5, but the tip side guide roller 7
2 and 72 are removed from the auxiliary jib 5, the tip side stopper plate 31 directly contacts the lower flange 97 of the tip boom 4 instead of the tip side guide rollers 72 and 72, and acts as a slide bush.

さらに、この伸縮ブーム1は、第9図に示す如
くジブ装着時における補助ジブ5の上側ガイドロ
ーラ70,70と対向する位置の先端ブーム4の
先端部4bの上側フランジ板96に、シーム調整
により該上側ガイドローラ70,70との間隔を
適宜に調整し得る如くした板状のジブ跳上り防止
用ストツパー28を設け、このジブ跳上り防止用
ストツパー28によつてジブ装着時における補助
ジブ5の跳上り量を可及的に減少せしめるように
している。
Further, as shown in FIG. 9, this telescopic boom 1 is attached to the upper flange plate 96 of the tip end 4b of the tip boom 4 at a position facing the upper guide rollers 70, 70 of the auxiliary jib 5 when the jib is attached, by adjusting the seam. A plate-shaped stopper 28 for preventing jib jumping is provided so that the distance between the upper guide rollers 70 and 70 can be adjusted as appropriate. An attempt is made to reduce the amount of jump as much as possible.

ジブ固定ピン42は、第18図に示す如くその
一端42aに適宜長さの平板44を一方側に延出
させた状態で取付けて構成されており、補助ジブ
5側には下記の如くして嵌挿せしめられる。即
ち、ジブ格納時においては、第14図及び第16
図に示す如く基端ブーム2の側板92に形成した
円形穴50と該円形穴50から上方に延びる長穴
53よりなる基端ブーム側ピン挿通穴47と、第
2段ブーム3の側板95に形成した円形穴51と
該円形穴51から上方に延びる長穴54よりなる
第2段ブーム側ピン挿通穴48とが基端ブーム2
に形成した前記ブーム基端側ピン受穴16,16
に合致するようにされている。従つて、ストツパ
ープレート44を各ピン挿通穴47,48の長穴
53,54に合致させることにより、ジブ固定ピ
ン42を伸縮ブーム1の外側から該各ピン挿通穴
47,48を通して相互に合致せしめられている
ジブ側ピン受穴15,15とブーム基端側ピン受
穴16,16内に嵌挿して補助ジブ5を第2段ブ
ーム側に連結することができる。尚、このジブ固
定ピン42は、そのストツパープレート44が第
2段ブーム3の側板95より内側に入つた時点で
手を放すと該ストツパープレート44の偏心重量
のために回転して第14図に示す如く該ストツパ
ープレート44が下方に垂下した状態で停止す
る。この時、このストツパープレート44は、第
2段ブーム3の側板95とピン抜け出し方向にお
いて係合し、該ジブ固定ピン42の抜け止め部材
として作用する。尚、ブーム基端側ピン受穴1
6,16は、第2段ブーム3に設けたピン支持用
部材99,99側に形成されている。また、ジブ
装着時においては、前記ジブ格納時とと同様に第
13図及び第17図に示す如く先端ブーム4のブ
ームヘツド側板82に、先端ブーム4の側板8
8,88に形成したブーム先端側ピン受穴17,
17と同軸状に円形穴52と該円形穴52から上
方に延びる長穴55よりなる先端ブーム側ピン挿
通穴49を形成し、このピン挿通穴49を通して
ジブ固定ピン42を伸縮ブーム1の外側から相互
に合致せしめられたブーム先端側ピン受穴17,
17とジブ側ピン受穴15,1に嵌挿して補助ジ
ブ5を先端ブーム4側に連結する。この場合に
も、ジブ固定ピン42のストツパープレート44
が該ジブ固定ピン42の抜け止め部材として作用
する。尚、ジブ固定ピン42は、第18図に示す
如くジブ固定ピン42を内嵌せしめ得る内径を有
する直筒体46の一側にストツパープレート44
をその軸方向において収容し得る適宜大きさの角
穴57と該角穴57と直筒体46の一端46aと
を連通せしめる連通溝58を形成したピン抜き出
し工具45によつて容易に取り出すことができ
る。
As shown in FIG. 18, the jib fixing pin 42 has a flat plate 44 of an appropriate length attached to one end 42a of the pin 42, with the plate 44 extending to one side. I am forced to insert it. In other words, when the jib is stored, Figs. 14 and 16
As shown in the figure, a proximal boom side pin insertion hole 47 consisting of a circular hole 50 formed in the side plate 92 of the proximal boom 2 and an elongated hole 53 extending upward from the circular hole 50, and a side plate 95 of the second stage boom 3. The second stage boom side pin insertion hole 48, which is made up of the formed circular hole 51 and an elongated hole 54 extending upward from the circular hole 51, is connected to the base end boom 2.
The boom base end side pin receiving holes 16, 16 formed in
It is made to match. Therefore, by aligning the stopper plate 44 with the elongated holes 53, 54 of each pin insertion hole 47, 48, the jib fixing pin 42 can be inserted from the outside of the telescopic boom 1 into each pin insertion hole 47, 48 and aligned with each other. The auxiliary jib 5 can be connected to the second stage boom side by fitting into the jib side pin receiving holes 15, 15 and the boom base end side pin receiving holes 16, 16. If the jib fixing pin 42 is released when the stopper plate 44 is inside the side plate 95 of the second stage boom 3, the jib fixing pin 42 will rotate due to the eccentric weight of the stopper plate 44 and move to the 14th stage boom 3. As shown in the figure, the stopper plate 44 stops in a downwardly hanging state. At this time, the stopper plate 44 engages with the side plate 95 of the second stage boom 3 in the direction in which the pin comes out, and acts as a member to prevent the jib fixing pin 42 from coming off. In addition, boom base end pin receiving hole 1
6 and 16 are formed on the side of pin support members 99 and 99 provided on the second stage boom 3. In addition, when the jib is installed, the side plate 8 of the tip boom 4 is attached to the boom head side plate 82 of the tip boom 4, as shown in FIGS.
Boom tip side pin receiving hole 17 formed in 8, 88,
A tip boom side pin insertion hole 49 is formed coaxially with the circular hole 52 and a long hole 55 extending upward from the circular hole 52, and the jib fixing pin 42 is inserted from the outside of the telescopic boom 1 through this pin insertion hole 49. boom tip side pin receiving holes 17 that are aligned with each other;
17 and jib side pin receiving holes 15, 1 to connect the auxiliary jib 5 to the tip boom 4 side. Also in this case, the stopper plate 44 of the jib fixing pin 42
acts as a retaining member for the jib fixing pin 42. The jib fixing pin 42 has a stopper plate 44 on one side of a straight cylindrical body 46 having an inner diameter into which the jib fixing pin 42 can be fitted, as shown in FIG.
The pin can be easily removed using the pin extracting tool 45, which has a square hole 57 of an appropriate size that can accommodate the pin in its axial direction, and a communication groove 58 that communicates the square hole 57 with one end 46a of the straight cylindrical body 46. .

油圧シリンダ6は、前述の如く先端トラニオン
型シリンダであり且つジブ格納時には第2図に示
す如く口径寸法の小さい補助ジブ5内に内挿され
るが、ジブ装着時には第6図に示す如く口径寸法
の大きい先端ブーム4内に内挿されるため、その
シリンダテール部6bをジブ格納時あるいはジブ
装着時に拘わらず常に同一高さに支持するととも
に、クレーン作業に伴う振動によるシリンダテー
ル部6bのはね上がりを可及的に減少せしめてロ
ツド部に過大な曲げ荷重が作用するのを防止する
必要があり、このため図示実施例においては該シ
リンダテール部6bにシリンダ調芯装置Wを装着
している。
As mentioned above, the hydraulic cylinder 6 is a trunnion-type cylinder at the tip, and when the jib is stored, it is inserted into the auxiliary jib 5, which has a small diameter as shown in FIG. 2, but when the jib is installed, it has a small diameter as shown in FIG. Since it is inserted into the large tip boom 4, the cylinder tail part 6b is always supported at the same height regardless of whether the jib is stored or installed, and the cylinder tail part 6b can be prevented from flying up due to vibrations caused by crane work. It is necessary to prevent an excessive bending load from acting on the rod portion by reducing the bending force. For this reason, in the illustrated embodiment, a cylinder alignment device W is attached to the cylinder tail portion 6b.

シリンダ調芯装置Wは、第5図ないし第7図及
び第10図に示す如くシリンダテール部6bから
後方に延出する如く該シリンダテール部6bに突
設した適宜長さのシリンダ支持フレーム33と、
該シリンダ支持フレーム33の軸方向中間部の油
圧シリンダ6の軸芯l1上に設けた支点ピン34に
よつて枢動自在に枢支されたレバー部材35と、
該レバー部材35の両方の揺動端35a,35b
にそれぞれ取付けられたシリンダ自重を支持する
ための支支持ローラ36と油圧シリンダ6のはね
上がりを規制するための規制ローラ37と、該レ
バー部材35を一方側に付勢せしめる如く作用す
るスプリング38とを有している。レバー部材3
5は、該レバー部材35とシリンダ支持フレーム
33の間に張設したスプリング38によつて常時
矢印A方向に回転する如く付勢せしめられている
とともに、その両側面35c,35dをそれぞれ
シリンダ支持フレーム33に設けたストツパー部
33a,33bに当接せしめることによつて矢印
A−B方向への最大傾斜角度が規制される。この
レバー部材35が矢印A方向に最大角度傾斜した
状態(第10図において二点鎖線図示35″の位
置)は、ジブ装着時におけるレバー部材35の回
動位置であり、これを第1回動位置という。また
レバー部材35が矢印B方向に最大角度傾斜した
状態(第10図において実線図示35)は、ジブ
格納時におけるレバー部材35の回動位置であ
り、これを第2回動位置という。又、支点ピン3
4に対する支持ローラ36と規制ローラ37の相
対位置関係は、レバー部材35の回動位置(即
ち、補助ジブ5の状態)に応じて次の如く設定さ
れている。即ち、レバー部材35が第1の回動位
置にあるとき(即ち、ジブ装着時)には、支持ロ
ーラ36が鎖線図示36″で示す如く支点ピン3
4からシリンダ軸芯l1に直交する方向に垂下する
直線l2上において先端ブーム4の下側フランジ板
97と接触するとともに規制ローラ37が鎖線図
示37″で示す如く上側フランジ板96から適宜
微少間隔S1だけ離隔した状態において支点ピン3
4を所定高さに位置せしめ、またレバー部材35
が第2回動位置にあるとき(即ち、ジブ格納時)
には、支持ローラ36が補助ジブ5の下側フラン
ジ板86に接触するとともに規制ローラ37が上
側フランジ板85から適宜微少間隔S2だけ離隔し
た状態において支点ピン34を所定高さに位置せ
しめることができるようにされている。尚、この
レバー部材35は、補助ジブ5が先端ブーム4か
ら引き出される時には、第2回動位置から第1回
動位置へスプリング38のバネ力によつて復帰せ
しめられ、また逆に補助ジブ5が先端ブーム4内
に押し込まれる場合には、第10図において符号
5d′で示す如くレバー部材35は、基端側に延出
せしめられた前記補助ジブ5の上側端面5dによ
つて先ずその肩部35eが押圧され強制的に矢印
B方向に回動せしめられて第10図において符号
35′で図示する位置まで復帰せしめられ、続い
て第10図において鎖線図示36′にある支持ロ
ーラ36が補助ジブ5の上側端面5dに後続する
下側端面5c部に設けた前記基端側ストツパープ
レート30によつてすくい上げられて補助ジブ5
の下側フランジ板86上に載置されることにより
実線図示する第2回動位置まで復帰せしめられ
る。
The cylinder alignment device W includes a cylinder support frame 33 of an appropriate length, which is protruded from the cylinder tail portion 6b and extends rearward from the cylinder tail portion 6b, as shown in FIGS. 5 to 7 and 10. ,
a lever member 35 pivotably supported by a fulcrum pin 34 provided on the axis l1 of the hydraulic cylinder 6 at an axially intermediate portion of the cylinder support frame 33;
Both swinging ends 35a, 35b of the lever member 35
A supporting roller 36 for supporting the cylinder's own weight, a regulating roller 37 for regulating the lifting of the hydraulic cylinder 6, and a spring 38 that acts to bias the lever member 35 to one side are attached to each of the cylinders. have. Lever member 3
5 is always urged to rotate in the direction of arrow A by a spring 38 stretched between the lever member 35 and the cylinder support frame 33, and both sides 35c and 35d of the cylinder support frame 5 are connected to the cylinder support frame 33, respectively. The maximum inclination angle in the direction of arrow A-B is regulated by contacting stopper portions 33a and 33b provided at 33. The state in which the lever member 35 is tilted at the maximum angle in the direction of arrow A (the position indicated by the two-dot chain line 35'' in FIG. 10) is the rotational position of the lever member 35 when the jib is installed, and this is the first rotational position. Also, the state in which the lever member 35 is tilted at the maximum angle in the direction of arrow B (indicated by the solid line 35 in FIG. 10) is the rotational position of the lever member 35 when the jib is retracted, and this is referred to as the second rotational position. .Also, fulcrum pin 3
The relative positional relationship between the support roller 36 and the regulation roller 37 with respect to the roller 4 is set as follows depending on the rotational position of the lever member 35 (that is, the state of the auxiliary jib 5). That is, when the lever member 35 is in the first rotational position (i.e., when the jib is installed), the support roller 36 moves toward the fulcrum pin 3 as indicated by the chain line 36''.
The regulating roller 37 contacts the lower flange plate 97 of the tip boom 4 on a straight line L2 hanging from the cylinder axis L1 in a direction perpendicular to the cylinder axis L1, and the regulating roller 37 is moved slightly away from the upper flange plate 96 as shown by the chain line 37''. The fulcrum pin 3 is separated by the distance S 1 .
4 at a predetermined height, and the lever member 35
is in the second rotation position (i.e., when the jib is retracted)
To do this, the fulcrum pin 34 is positioned at a predetermined height with the support roller 36 in contact with the lower flange plate 86 of the auxiliary jib 5 and the regulating roller 37 separated from the upper flange plate 85 by an appropriate minute distance S2. is made possible. Note that when the auxiliary jib 5 is pulled out from the tip boom 4, this lever member 35 is returned from the second rotation position to the first rotation position by the spring force of the spring 38, and vice versa. When the lever member 35 is pushed into the tip boom 4, the lever member 35 is first pushed over its shoulder by the upper end surface 5d of the auxiliary jib 5 extending toward the proximal end, as shown by the reference numeral 5d' in FIG. The portion 35e is pressed and forcibly rotated in the direction of arrow B and returned to the position indicated by the reference numeral 35' in FIG. 10, and then the support roller 36 indicated by the chain line 36' in FIG. The auxiliary jib 5 is scooped up by the base end stopper plate 30 provided on the lower end surface 5c following the upper end surface 5d of the jib 5.
By being placed on the lower flange plate 86, it is returned to the second rotational position shown by the solid line.

続いて、図示実施例の伸縮ブーム1及び補助ジ
ブ5の操作法並びにその作用を説明すると、この
補助ジブ5は、伸縮ブーム1を全縮させた状態に
おいて先端ブーム4に着脱される。即ち、伸縮ブ
ーム1内に格納された補助ジブ5を先端ブーム4
の先端部4bに装着する場合には、先ず、第2図
及び第5図に示す状態(ジブ格納状態)において
該補助ジブ5と第2段ブーム3とを連結している
ジブ固定ピン42を抜き取るとともに、第11図
に示す如くジブ抜け止め装置Vのレバー23を実
線図示位置から鎖線図示23′の位置まで引き下
げてそのストツパーピン22と補助ジブ5の先端
側ストツパープレート31との係合を離脱させ、
しかるのちに伸縮ブーム1の先端側から補助ジブ
5の先端部5bに設けた把手75を手でもつて該
補助ジブ5を軸方向に引き出す。尚、補助ジブ5
が先端側に引き出され、その先端側ストツパープ
レート31がジブ抜け止め装置Vを通過した時点
でレバー23の操作力を解除してストツパーピン
22を先端ブーム4内に突出させておく。
Next, the operation method and function of the telescopic boom 1 and the auxiliary jib 5 of the illustrated embodiment will be explained.The auxiliary jib 5 is attached to and detached from the tip boom 4 when the telescopic boom 1 is fully retracted. That is, the auxiliary jib 5 stored in the telescopic boom 1 is moved to the tip boom 4.
When installing the auxiliary jib 5 and the second stage boom 3 in the state shown in FIGS. 2 and 5 (jib retracted state), At the same time, as shown in FIG. 11, the lever 23 of the jib retaining device V is pulled down from the position shown by the solid line to the position 23' shown by the chain line to engage the stopper pin 22 with the stopper plate 31 on the distal end side of the auxiliary jib 5. let go,
Thereafter, from the distal end side of the telescopic boom 1, the handle 75 provided on the distal end portion 5b of the auxiliary jib 5 is held by hand and the auxiliary jib 5 is pulled out in the axial direction. In addition, auxiliary jib 5
is pulled out to the tip side, and when the tip side stopper plate 31 passes the jib retaining device V, the operating force of the lever 23 is released to cause the stopper pin 22 to protrude into the tip boom 4.

補助ジブ5は、該補助ジブ5側に設けた上側ロ
ーラ70,70と下側ローラ71,71及び先端
ブーム4側に設けたブーム側ローラ72,72に
よつて支持され且つ第2段ブーム3の基端部3a
バツト27を設けているため、先端ブーム4の下
側フランジ板97と第2段ブーム3の下側フラン
ジ板94とに段差があるにも拘わらずその下側ロ
ーラ71,71を第2段ブーム3側から先端ブー
ム4側に容易に移動させることができ、その引き
出しあるいは押し込み操作を衝撃音(段差部への
下側ローラ71,71の乗上げ、落下による)を
生ずることなく、しかも小操作力で行うことがで
きる。又、この補助ジブ5は、ジブ引き出し操作
の初期においては下側ローラ71,71とブーム
側ローラ72,72によつて滑動せしめられる
が、該補助ジブ5の引き出しが長くなり、その重
心位置がブーム側ローラ72,72の位置より前
方に移動した時点からは該補助ジブ5の基端部5
aが浮き上がり今度はブーム側ローラ72,72
と上側ローラ70,70によつて滑動せしめられ
る。又、該補助ジブ5がさらに引き出されてジブ
装着位置付近までくると今度はジブ抜け止め装置
Vのストツパーピン22が第9図に示す如く補助
ジブ5の基端部5aに設けた基端側ストツパープ
レート30のピン受部30bとジブ引き出し方向
において係合し該補助ジブ5はその位置で停止せ
しめられる。この状態においては、補助ジブ5の
ピン受け穴15,15と先端ブーム4のブーム先
端側ピン受穴17,17とが合致しており、この
相互に合致せしめられた両ピン受穴15,15,
17,17にジブ固定ピン42を嵌挿して補助ジ
ブ5と先端ブーム4とを連結する。これで補助ジ
ブ5の先端ブーム4側への装着作業が完了する
(第6図参照)。補助ジブ5の装着作業が完了する
と第8図に示す如く伸縮ブーム1を適宜に伸長さ
せて所定のジブ作業を行う。
The auxiliary jib 5 is supported by upper rollers 70, 70 and lower rollers 71, 71 provided on the auxiliary jib 5 side, and boom side rollers 72, 72 provided on the tip boom 4 side, and is supported by the second stage boom 3. base end 3a of
Because the butt 27 is provided, even though there is a step between the lower flange plate 97 of the tip boom 4 and the lower flange plate 94 of the second stage boom 3, the lower rollers 71, 71 can be moved to the second stage boom. It can be easily moved from side 3 to tip boom 4, and its pull-out or push-in operations do not generate impact noises (due to the lower rollers 71, 71 running up and down on steps), and can be performed with a small amount of operation. It can be done by force. In addition, at the initial stage of the jib pull-out operation, the auxiliary jib 5 is slid by the lower rollers 71, 71 and the boom-side rollers 72, 72, but as the auxiliary jib 5 is pulled out for a longer time, its center of gravity changes. From the time when the boom side rollers 72, 72 are moved forward, the base end 5 of the auxiliary jib 5
a is lifted up and now the boom side rollers 72, 72
and upper rollers 70, 70. When the auxiliary jib 5 is further pulled out and near the jib attachment position, the stopper pin 22 of the jib slip-off prevention device V engages the proximal stop provided at the base end 5a of the auxiliary jib 5, as shown in FIG. It engages with the pin receiving portion 30b of the par plate 30 in the jib pull-out direction, and the auxiliary jib 5 is stopped at that position. In this state, the pin receiving holes 15, 15 of the auxiliary jib 5 and the boom tip side pin receiving holes 17, 17 of the tip boom 4 are aligned, and both pin receiving holes 15, 15 are aligned with each other. ,
A jib fixing pin 42 is inserted into 17, 17 to connect the auxiliary jib 5 and the tip boom 4. This completes the work of attaching the auxiliary jib 5 to the tip boom 4 side (see Fig. 6). When the installation work of the auxiliary jib 5 is completed, the telescopic boom 1 is appropriately extended as shown in FIG. 8, and a predetermined jib work is performed.

一方、ジブ作業が終了して補助ジブ5を伸縮ブ
ーム1内に格納する場合には、先ず、伸縮ブーム
1を全縮させた状態で先端ブーム4と補助ジブ5
とを連結したジブ固定ピン42を抜き取り、しか
るのちに補助ジブ5をその基端部5aの下側端面
5cが基端ブーム2の基端部2aに設けたストツ
パー26に衝突する位置まで押し込む。この時、
補助ジブ5は、その下側端面5cがストツパー2
6に衝突する直前において該補助ジブ5の先端側
ストツパープレート31がジブ抜け止め装置Vの
ストツパーピン22を強制的に押し下げて先端側
から基端側に乗り越えストツパープピン22とジ
ブ引き出し方向において係合するため、該ジブ抜
け止め装置Vとストツパー26によつて確実に格
納位置に位置決めされる。さらに、この状態にお
いては、補助ジブ5のピン受穴15,15と第2
段ブーム3のピン受穴16,16とが合致してい
るため、この相互に合致せしめられた両ピン受穴
15,15,16,16にジブ固定ピン42を嵌
挿することにより、該補助ジブ5を第2段ブーム
3側に固定した状態で伸縮ブーム1内に格納する
ことができる。
On the other hand, when storing the auxiliary jib 5 inside the telescopic boom 1 after completing the jib work, first, the telescopic boom 1 is fully retracted, and then the tip boom 4 and the auxiliary jib 5 are
Then, the auxiliary jib 5 is pushed to a position where the lower end surface 5c of the base end 5a collides with the stopper 26 provided on the base end 2a of the base boom 2. At this time,
The lower end surface 5c of the auxiliary jib 5 is connected to the stopper 2.
6, the distal end stopper plate 31 of the auxiliary jib 5 forcibly pushes down the stopper pin 22 of the jib retaining device V, climbs over from the distal end to the proximal end, and engages with the stopper pin 22 in the jib withdrawal direction. Therefore, the jib retaining device V and the stopper 26 ensure that the jib is positioned at the retracted position. Furthermore, in this state, the pin receiving holes 15, 15 of the auxiliary jib 5 and the second
Since the pin receiving holes 16, 16 of the stage boom 3 match, the jib fixing pin 42 is inserted into the mutually matching pin receiving holes 15, 15, 16, 16, so that the auxiliary The jib 5 can be stored in the telescopic boom 1 while being fixed to the second stage boom 3 side.

さらに、この補助ジブ5は、ジブ格納時におい
ては伸縮ブーム1の第2段ブーム3に対して固定
されるが、先端ブーム4に対しては相対摺動自在
とされているため、格納状態のまま伸縮ブーム1
を伸縮させると補助ジブ5は第2段ブーム3と一
体的に変位せしめられる。従つて、該補助ジブ5
を第2段ブーム3側に固定した状態のまま伸縮ブ
ーム1を自由に伸縮させて該伸縮ブーム1のみに
よる通常のクレーン作業を行うことができる(第
7図参照)。
Furthermore, this auxiliary jib 5 is fixed to the second stage boom 3 of the telescopic boom 1 when the jib is stored, but it is slidable relative to the tip boom 4, so that it can be kept in the stored state. Mama telescopic boom 1
When the auxiliary jib 5 is extended or contracted, the auxiliary jib 5 is displaced integrally with the second stage boom 3. Therefore, the auxiliary jib 5
The telescopic boom 1 can be freely extended and contracted with the telescopic boom 1 fixed to the second stage boom 3 side, and normal crane work can be performed using only the telescopic boom 1 (see Fig. 7).

次に、本考案の補助ジブ付き伸縮ブーム式クレ
ーンの効果を説明すると、本考案の補助ジブ付き
伸縮ブーム式クレーンは、補助ジブを伸縮ブーム
内に内挿した状態で格納し、補助ジブ使用時には
該補助ジブを伸縮ブームからその軸方向に引き出
すことにより該伸縮ブームの先端部に装着し得る
ようにしているため、従来の補助ジブ横抱き方式
のクレーン如く大きな補助ジブ着脱用の作業空間
を必要とせず、しかも補助ジブを旋回させる必要
がないため安全であるなど補助ジブの着脱作業が
大幅に簡略化され、その作業性及び操作性が向上
するという効果がある。
Next, to explain the effects of the telescopic boom crane with auxiliary jib of the present invention, the telescopic boom crane with auxiliary jib of the present invention stores the auxiliary jib inside the telescopic boom, and when using the auxiliary jib, Since the auxiliary jib can be attached to the tip of the telescopic boom by pulling it out in the axial direction from the telescopic boom, it does not require a large work space for attaching and removing the auxiliary jib, unlike conventional cranes that carry the auxiliary jib sideways. Moreover, since there is no need to rotate the auxiliary jib, it is safe, and the work of attaching and detaching the auxiliary jib is greatly simplified, and the workability and operability are improved.

又、補助ジブの不使用時には該補助ジブを、伸
縮ブームの先端より2段目に位置する第2段ブー
ムに固定した状態で該伸縮ブーム内に格納して伸
縮ブームの伸縮に伴つて第2段ブームとともに一
体的に伸縮変位し得るようにしているため、補助
ジブを先端ブーム側に固定するようにしたクレー
ンに比してその補助ジブの自重による転倒モーメ
ントの減少分だけ吊荷荷重を増加させることがで
き、クレーンの吊上げ能力の向上を図ることがで
きるという効果もある。
In addition, when the auxiliary jib is not in use, the auxiliary jib is fixed to the second stage boom located at the second stage from the tip of the telescopic boom, and is stored inside the telescopic boom, so that the second stage boom is moved as the telescopic boom expands and contracts. Since it is designed to be able to extend and contract together with the stage boom, the lifting load is increased by the reduction in the overturning moment due to the weight of the auxiliary jib compared to a crane in which the auxiliary jib is fixed to the tip boom side. This also has the effect of improving the lifting ability of the crane.

更に、補助ジブを、ジブ不使用時には油圧シリ
ンダを囲繞する如く伸縮ブーム内に格納すること
ができるようにしているため、補助ジブを油圧シ
リンダと並列配置した状態で伸縮ブーム内に格納
するようにした場合に比して該補助ジブの断面形
状を大きくしてその断面性能を向上せしめること
ができ、その吊上げ能力の向上を図り得るという
実用的効果がある。
Furthermore, the auxiliary jib can be stored in the telescopic boom so as to surround the hydraulic cylinder when the jib is not in use. This has the practical effect that the cross-sectional shape of the auxiliary jib can be made larger than in the case where the auxiliary jib is made larger, and its cross-sectional performance can be improved, and its lifting ability can be improved.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は本考案実施例に係る補助ジブ付き伸縮
ブーム式トラツククレーンの全体図、第2図は第
1図のトラツククレーンの伸縮ブーム及び補助ジ
ブの縦断面図、第3図は第2図の部拡大図、第
4図は第2図の部拡大図、第5図ないし第8図
は第2図の伸縮ブーム及び補助ジブの伸縮状態
図、第9図は第8図の部拡大詳細図、第10図
は第5図の部拡大詳細図、第11図は第4図の
XI−XI縦断面図、第12図は第4図のXII−XII矢視
図、第13図は第9図の−縦断面図、第
14図は第3図の−縦断面図、第15図
は第3図の−縦断面図、第16図は第1
4図の矢視図、第17図は第13図の矢
視図、第18図は第13図に示すジブ固定ピン及
びその取出し工具の斜視図である。 1…伸縮ブーム、2…基端ブーム、3…第2段
ブーム、3a…第2段ブームの基端部、4…先端
ブーム、5…補助ジブ、6…油圧シリンダ、6a
…油圧シリンダのシリンダヘツド部、U…ブーム
伸縮用ワイヤロープ装置。
Fig. 1 is an overall view of a telescopic boom type truck crane with an auxiliary jib according to an embodiment of the present invention, Fig. 2 is a vertical sectional view of the telescopic boom and auxiliary jib of the truck crane of Fig. Figure 4 is an enlarged view of the part shown in Figure 2, Figures 5 to 8 are views of the telescopic boom and auxiliary jib in the telescopic state shown in Figure 2, and Figure 9 is an enlarged detail of the part shown in Figure 8. Figure 10 is an enlarged detailed view of Figure 5, Figure 11 is a detailed view of Figure 4.
12 is a view taken along arrows XII-XII of FIG. 4, FIG. 13 is a vertical sectional view of FIG. 9, FIG. The figure is a -longitudinal sectional view of Figure 3, and Figure 16 is the -longitudinal cross-sectional view of Figure 1.
4, FIG. 17 is a view taken along the arrow in FIG. 13, and FIG. 18 is a perspective view of the jib fixing pin and its removal tool shown in FIG. 13. 1... Telescopic boom, 2... Base end boom, 3... Second stage boom, 3a... Base end of second stage boom, 4... Tip boom, 5... Auxiliary jib, 6... Hydraulic cylinder, 6a
...Cylinder head of hydraulic cylinder, U...Wire rope device for boom extension and contraction.

Claims (1)

【実用新案登録請求の範囲】[Scope of utility model registration request] 基端ブーム2に対して伸縮する先端ブーム4と
第2段ブーム3とを有し且つ前記基端ブーム2と
前記第2段ブーム3の間に油圧シリンダ6を倒立
状に内装配置して該油圧シリンダ6のシリンダヘ
ツド部6aと前記第2段ブーム3の基端部3aを
枢着連結し前記第2段ブーム3を前記油圧シリン
ダ6によつて伸縮せしめ得る如くするとともに、
前記先端ブーム4を該先端ブーム4と前記第2段
ブーム3と前記基端ブーム2の間に張設した適宜
のブーム伸縮用ワイヤロープ装置Uを介して前記
第2段ブーム3の伸縮動に連動して同時伸縮せし
め得る如くした伸縮ブーム1と、該伸縮ブーム1
に装着される補助ジブ5とを有する補助ジブ付き
伸縮ブーム式クレーンであつて、前記補助ジブ5
を前記伸縮ブーム1の第2段ブーム3内に格納可
能で、しかも該第2段ブーム3内への格納状態に
おいては該補助ジブ5でもつて前記油圧シリンダ
6を囲繞する如き形状とする一方、該補助ジブ5
はその使用時においては前記先端ブーム4の先端
部に装着され、その格納時においては前記第2段
ブーム3内において、しかも該第2段ブーム3の
基端部3a側に止着されて固定されるようにした
ことを特徴とする補助ジブ付き伸縮ブーム式クレ
ーン。
It has a tip boom 4 and a second stage boom 3 that extend and contract with respect to the base end boom 2, and a hydraulic cylinder 6 is internally disposed in an inverted manner between the base end boom 2 and the second stage boom 3. The cylinder head portion 6a of the hydraulic cylinder 6 and the base end portion 3a of the second stage boom 3 are pivotally connected so that the second stage boom 3 can be extended and contracted by the hydraulic cylinder 6,
The distal end boom 4 is connected to the telescopic movement of the second stage boom 3 via an appropriate boom telescoping wire rope device U stretched between the distal end boom 4, the second stage boom 3, and the base end boom 2. A telescoping boom 1 that can be simultaneously extended and contracted in conjunction with each other, and the telescoping boom 1
A telescopic boom type crane with an auxiliary jib, the crane having an auxiliary jib 5 attached to the auxiliary jib 5.
can be stored in the second-stage boom 3 of the telescopic boom 1, and has a shape such that the auxiliary jib 5 also surrounds the hydraulic cylinder 6 when stored in the second-stage boom 3, The auxiliary jib 5
is attached to the tip of the tip boom 4 when in use, and fixed within the second stage boom 3 and on the base end 3a side of the second stage boom 3 when stored. A telescopic boom type crane with an auxiliary jib, characterized in that it is designed to be
JP18812681U 1981-12-15 1981-12-15 Telescopic boom crane with auxiliary jib Granted JPS5892289U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP18812681U JPS5892289U (en) 1981-12-15 1981-12-15 Telescopic boom crane with auxiliary jib

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP18812681U JPS5892289U (en) 1981-12-15 1981-12-15 Telescopic boom crane with auxiliary jib

Publications (2)

Publication Number Publication Date
JPS5892289U JPS5892289U (en) 1983-06-22
JPS6122950Y2 true JPS6122950Y2 (en) 1986-07-09

Family

ID=29991429

Family Applications (1)

Application Number Title Priority Date Filing Date
JP18812681U Granted JPS5892289U (en) 1981-12-15 1981-12-15 Telescopic boom crane with auxiliary jib

Country Status (1)

Country Link
JP (1) JPS5892289U (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0791025B2 (en) * 1985-08-24 1995-10-04 株式会社加藤製作所 Telescopic boom with built-in jib

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4828545U (en) * 1971-08-09 1973-04-07

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5553596Y2 (en) * 1976-03-10 1980-12-11
JPS6016632Y2 (en) * 1980-02-25 1985-05-23 愛知車輛株式会社 Telescopic boom with built-in sub-boom

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4828545U (en) * 1971-08-09 1973-04-07

Also Published As

Publication number Publication date
JPS5892289U (en) 1983-06-22

Similar Documents

Publication Publication Date Title
JPS6122950Y2 (en)
JP7246934B2 (en) Jib hoisting mechanism and crane vehicle equipped with jib hoisting mechanism
JP3101026B2 (en) Jib overhanging device for crane with auxiliary jib
JP3566418B2 (en) Mobile crane with luffing jib
JP5547618B2 (en) crane
JP6388089B2 (en) crane
JP2000143162A (en) Wheel crane
JP3361772B2 (en) Traveling work vehicle
JP5352164B2 (en) Jib overhang storage device for crane equipment
JP4191955B2 (en) Jib storage mechanism of crane equipment
JPH078548Y2 (en) Jib storage device for vehicle-mounted crane
JPH0118450Y2 (en)
JPH0221334Y2 (en)
JP2567978Y2 (en) Multi-stage telescopic boom
JP4098875B2 (en) Self-propelled crane
JP3451862B2 (en) Wheel crane jib containment device
JPH0328071Y2 (en)
JPS6346464Y2 (en)
JPH0340866Y2 (en)
JPH01281295A (en) Jib projection and storing device for crane
JPS6214070Y2 (en)
JPS6032072Y2 (en) vehicle type crane
JPS6231319Y2 (en)
JPH0686279B2 (en) Jib collapse prevention device in crane
JP5352165B2 (en) Jib overhang storage device for crane equipment