JPS6015774B2 - like wall - Google Patents

like wall

Info

Publication number
JPS6015774B2
JPS6015774B2 JP21453581A JP21453581A JPS6015774B2 JP S6015774 B2 JPS6015774 B2 JP S6015774B2 JP 21453581 A JP21453581 A JP 21453581A JP 21453581 A JP21453581 A JP 21453581A JP S6015774 B2 JPS6015774 B2 JP S6015774B2
Authority
JP
Japan
Prior art keywords
block
bottom plate
plate
wall
main wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP21453581A
Other languages
Japanese (ja)
Other versions
JPS58117137A (en
Inventor
茂 田中
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP21453581A priority Critical patent/JPS6015774B2/en
Publication of JPS58117137A publication Critical patent/JPS58117137A/en
Publication of JPS6015774B2 publication Critical patent/JPS6015774B2/en
Expired legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/025Retaining or protecting walls made up of similar modular elements stacked without mortar

Landscapes

  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Retaining Walls (AREA)

Description

【発明の詳細な説明】 この発明は、土蟹のために大型のコンクリートブロック
を積重ねて築造したよう壁に関する。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a wall constructed by stacking large concrete blocks to protect against mud crabs.

従来、土蟹には、石垣や小型のコンクリートブロックを
積んだり、無筋及び鉄筋コンクリート壁を築造すること
などが行われていた。しかし、石垣やコンクリートブロ
ック積みは箸るしく人手を要することに加えて強度が十
分でなく、無筋コンクリートよう壁は大きな断面を必要
とするし、また鉄筋コンクリート壁は大きな寸法の鉄筋
を用いた大掛りな現場作業を要することに加え、極めて
無味乾燥である。この発明は、特殊な大型の鉄筋コンク
リートブロックを用いることにより、能率よく築造でき
、必要に応じ植樹壇をも設けることができるよう壁を実
現することを目的とする。次に、この発明を図示の実施
例に塞いて説明する。
Traditionally, earth crabs have been built with stone walls, small concrete blocks, and unreinforced or reinforced concrete walls. However, stone walls and concrete block masonry require a lot of manpower and are not strong enough, unreinforced concrete walls require large cross sections, and reinforced concrete walls require large sections using large-sized reinforcing bars. In addition to requiring extensive on-site work, it is extremely bland. The purpose of this invention is to realize a wall that can be constructed efficiently by using special large-sized reinforced concrete blocks, and can also be equipped with a planting bed if necessary. Next, the present invention will be explained by referring to the illustrated embodiments.

第1図乃至第3図において、最下段ブロック1は、第1
図に示すように、板状主壁2と、これにほぼ直角をなし
てその上下に位置する頂板3及び底板4と、底板4の前
緑から下方へ突出するキー部5と、底板4の後緑から王
墜2にほぼ平行に起立する受圧板6とよりなり、これら
は鉄筋コンクリートをもって一体に形成されている。
In FIGS. 1 to 3, the lowest block 1 is the first
As shown in the figure, a plate-shaped main wall 2, a top plate 3 and a bottom plate 4 located above and below the plate-shaped main wall 2 at almost right angles thereto, a key portion 5 projecting downward from the front green of the bottom plate 4, and a key portion 5 of the bottom plate 4. It consists of a pressure-receiving plate 6 that stands up almost parallel to the crown 2 from the rear green, and these are integrally formed of reinforced concrete.

そして、主壁2には適所に水抜孔7,7及び滋水孔8,
8が穿設され、頂部3には王壁2の上方位置に突起9が
突設され、突起9の前方には水抜孔10,10が、後方
にはそれぞれ適所に水抜孔11,11と潅水孔12,1
2と、作業窓13,13,13とボルト孔14,14と
が穿設されている。中段或いは最上段ブロック21は、
第2図に示すように、板状主壁22と、これにほぼ直角
をなしてその上下に位置する煩板23及び底板24と、
底板24の後緑から主壁22にほぼ平行に起立する受圧
板26とよりなり、最下段ブロック1と同様にこれらは
鉄筋コンクリートをもって一体に形成されている。そし
て、主壁22には適所に水抜孔27,27及び潅水孔2
8,28が穿設され、頂板23には主壁22の上方に突
起29が突設され、突起29の前方には水抜孔30,3
0が穿設され、突起23の後方にはそれぞれ適所に水抜
孔31,31と潅水孔32,32と作業窓33,33,
33とボルト孔34,34とが穿設されている。また底
板24の主壁22の直下には凹所35が形成され、凹所
35の前方には水抜孔36,36が穿設され、凹所36
の後方には適所に水抜孔37,37と潅水孔38,38
と作業窓39,39,39とボルト孔40,40とが穿
設されている。施工には、先づのり面直下の地面41に
十分な幅の溝42を掘削し、捨石43及び栗石44を敷
設して、その上にクレーンを用いて最下段ブロック1を
戦層する。
The main wall 2 has drainage holes 7, 7 and water supply holes 8,
8 is bored, and a protrusion 9 is protruded from the top part 3 at a position above the royal wall 2. In front of the protrusion 9, there are drain holes 10, 10, and at the rear, drain holes 11, 11 and irrigation holes are provided at appropriate positions, respectively. hole 12,1
2, working windows 13, 13, 13, and bolt holes 14, 14 are bored. The middle or top block 21 is
As shown in FIG. 2, a plate-shaped main wall 22, a side plate 23 and a bottom plate 24 that are located above and below the plate-shaped main wall 22, and are substantially perpendicular to the plate-shaped main wall 22.
It consists of a pressure receiving plate 26 that stands up from the rear green of the bottom plate 24 almost parallel to the main wall 22, and like the lowermost block 1, these are integrally formed with reinforced concrete. The main wall 22 has drain holes 27, 27 and irrigation holes 2 at appropriate locations.
8 and 28 are bored, a projection 29 is provided on the top plate 23 to protrude above the main wall 22, and drain holes 30 and 3 are provided in front of the projection 29.
0 are drilled, and drain holes 31, 31, irrigation holes 32, 32, and working windows 33, 33 are provided at appropriate locations behind the protrusion 23, respectively.
33 and bolt holes 34, 34 are bored. Further, a recess 35 is formed directly under the main wall 22 of the bottom plate 24, and drain holes 36, 36 are bored in front of the recess 35.
There are drain holes 37, 37 and irrigation holes 38, 38 in the appropriate places behind the
, working windows 39, 39, 39 and bolt holes 40, 40 are bored. For construction, a groove 42 of sufficient width is excavated in the ground 41 directly below the slope surface, rubble 43 and chestnut stone 44 are laid down, and the lowest block 1 is laid on top of it using a crane.

このとき、底板4の後端とキー部5の下端とがほぼ同じ
高さに漬かれる結果、主壁2は適度に後頭する。底板4
の下面とキー部5とで作られる凹所内、キー部5の前方
空間及び受圧板6の後方空間には、栗石または砕石(以
下桑石等と略称する。)45,46を込める。また、受
圧板6の前方で底板4の上方にあるポケット状空間には
、コンクリートまたはソイルセメント47を充填する。
次いで、主壁2及び頂板3の背面に沿って栗石等48を
込め、更にその背後に±砂を充填する。作業窓13は、
粟石等48を込め易くするためのものである。下段ブロ
ックーの裾付が終ったら、クレーンを用いてその上に中
段または最上段用のブロック21を積重ねる。
At this time, the rear end of the bottom plate 4 and the lower end of the key part 5 are placed at approximately the same height, so that the main wall 2 is appropriately tilted back. Bottom plate 4
Chestnut stone or crushed stone (hereinafter abbreviated as mulberry stone etc.) 45, 46 is filled in the recess formed by the lower surface of the key part 5 and the space in front of the key part 5 and the space behind the pressure receiving plate 6. Further, a pocket-shaped space in front of the pressure receiving plate 6 and above the bottom plate 4 is filled with concrete or soil cement 47.
Next, chestnut stone or the like 48 is filled along the back side of the main wall 2 and the top plate 3, and furthermore, ± sand is filled behind it. The work window 13 is
This is to make it easier to load millet etc. 48. When the hemming of the lower block is completed, the block 21 for the middle or top level is stacked on top of it using a crane.

このとき、ブロック21の凹所35は最下段ブロック1
の突起9にかみ合い、底板24に穿談した水抜孔36及
び37、溝水孔38、作業窓39、ボルト孔40等は、
それぞれ最下段ブロックーの頂板3に穿設されている水
抜孔10及び11、潅水孔12、作業窓13、ボルト孔
14に合致する。そこで、ボルト孔14及び40を貫通
するボルトにより両ブロック1,21を結合し、作業窓
13,39をコンクリート49で閉塞し、受圧板26の
前方で底板24の上方のポケット状空間にコンクリート
またはソイルセメント50を充填する。次に、受圧板2
6及び王壁22の背面に沿って栗石等51を込めると共
に、その背後の土砂を充填する。必要に応じ、ブロック
21の上方には同形のブロックを更に積重ね、同様な作
業を行う。
At this time, the recess 35 of the block 21 is located in the lowermost block 1.
The drain holes 36 and 37, the groove water hole 38, the working window 39, the bolt hole 40, etc., which are engaged with the protrusion 9 and bored in the bottom plate 24, are as follows.
These correspond to drain holes 10 and 11, irrigation holes 12, working windows 13, and bolt holes 14, which are drilled in the top plate 3 of the bottom block, respectively. Therefore, both blocks 1 and 21 are connected by bolts passing through bolt holes 14 and 40, and working windows 13 and 39 are closed with concrete 49, and a pocket-like space above the bottom plate 24 is filled with concrete or Fill with soil cement 50. Next, pressure receiving plate 2
6 and the back side of the king wall 22, chestnut stone, etc. 51 is filled, and the back of it is filled with earth and sand. If necessary, blocks of the same shape are further stacked above the block 21 and the same operation is performed.

最後に、最上段ブロックの頂板23の不要な水抜孔30
及び31、作業窓33、ボルト孔34等をモルタル或い
はコンクリート52によって閉塞し、頂板23の上面及
び地表面にそれぞれコンクリート53,54を打って上
部排水路55を形成し、のり面下方の地面41に排水溝
55を設置して、一応作業が完了する。緑化を行いたい
場合には、各ブロックの底板4,24の前部上面に予め
設けられている孔56,56・・・に鋼柱57,57・
・・を槽立し、これに横桟58,58・・・を渡して柵
を作り、その内方に合成樹脂板等を支持させて土砂59
,59を充填して植樹壇60,60′を作り、ここに樹
木61,61′を植える。
Finally, the unnecessary drain hole 30 in the top plate 23 of the top block
31, the work window 33, bolt hole 34, etc. are closed with mortar or concrete 52, and concrete 53, 54 is poured on the top surface of the top plate 23 and the ground surface, respectively, to form an upper drainage channel 55, and the ground 41 below the slope surface is poured. A drainage ditch 55 is installed in the area, and the work is tentatively completed. If you want to carry out greening, insert steel columns 57, 57, etc. into holes 56, 56, etc., which are previously provided on the front upper surface of the bottom plates 4, 24 of each block.
... is stood in the tank, horizontal bars 58, 58... are passed over it to create a fence, and synthetic resin boards, etc. are supported on the inside of the fence to remove soil 59.
, 59 are filled to form tree beds 60, 60', and trees 61, 61' are planted there.

そして、上部排水路55から溝水管62をブロック21
及び1の鍵水孔32,38,12等を貫通させ各主壁2
2及び2の背面に沿い伸延させ、先端を溝水孔8を通し
て植樹壇60中に開口させ、また潅水管62′をブロッ
ク21の導水孔32を貫通させて主壁22の背面に沿い
伸延させ、先端を濯水孔28を通して植樹壇60′中に
開□させる。これにより、上部排水路55に注水すると
きは、滋水管62及び62′を経てすべての植樹壇に潅
水を行うことができる。なお、各主壁2,22の下部水
抜孔7,27は、これから流出する水が±壌59,59
を洗掘しないように、排水管63,63を取付けて土壌
69,59の外方へ排水できるようにする。上述のよう
壁において、ブロック1には上方からの重量の他に、前
方へ押出そうとする土庄が加わる。
Then, the drain pipe 62 is connected to the block 21 from the upper drainage channel 55.
and each main wall 2 by passing through the key water holes 32, 38, 12, etc. of 1.
2 and 2, and its tip is opened into the planting bed 60 through the groove water hole 8, and the irrigation pipe 62' is passed through the water guide hole 32 of the block 21 and extends along the back surface of the main wall 22. , the tip is opened into the planting bed 60' through the irrigation hole 28. Thereby, when water is poured into the upper drainage channel 55, all the tree beds can be irrigated through the water supply pipes 62 and 62'. In addition, the lower water drain holes 7, 27 of each main wall 2, 22 allow water flowing out from the drain holes 59, 59
Drainage pipes 63, 63 are installed to allow drainage to the outside of the soil 69, 59 so as not to scour the soil. As described above, on the wall, in addition to the weight from above, the block 1 is subjected to a force that tries to push it forward.

これに対してブロック1は、底板4の下面が前上りにな
っていることと、キー部5が土中に食込んで滑り抵抗を
高めていることとにより、ブロツクーが土庄により前方
へ押出されるのを防いでいる。また、受圧板6の前方に
はコンクリート等47が充填され、かつその上に粟石等
48が乗っているので、主壁2が後便していることと相
まって重心が後方に位置し、そのためにブロック1の上
部に作用した土庄によりブロック1が前方へ転倒するの
を防ぐことができる。なお、キー部5を包含する前部底
板には±圧とよう肇の自重の合力による反力によって上
向きの曲げモーメントを生ずるが、植樹壇60を設ける
ときは、その重量が上言己曲げモーメントを減殺し、ブ
ロック1の前部底板の負担を減ずる。フロック21の底
板24は、ブロック1の頂板3上に前上り姿勢で支持さ
れ、かつその凹所がブロック1の突起9にかみ合ってい
るので、背後の±圧によって前方へ滑落するのを防ぐこ
とができる。
On the other hand, in block 1, the lower surface of the bottom plate 4 is upwardly inclined, and the key part 5 digs into the soil to increase slip resistance, so that the block is pushed forward by the tonosho. It prevents the In addition, since the front of the pressure receiving plate 6 is filled with concrete 47 and on top of it the agate stone 48, the center of gravity is located at the rear due to the fact that the main wall 2 is located at the rear. The tonosho acting on the upper part of the block 1 can prevent the block 1 from falling forward. Note that an upward bending moment is generated on the front bottom plate that includes the key part 5 due to the reaction force due to the resultant force of the pressure and the own weight of the feet. This reduces the load on the front bottom plate of block 1. The bottom plate 24 of the flock 21 is supported on the top plate 3 of the block 1 in a forward upward position, and its recess is engaged with the protrusion 9 of the block 1, so that it is prevented from sliding forward due to pressure from behind. I can do it.

そして、ブロック1と同様にブロック21も重心が後方
に位置することと、頂板3と底板24との間がボルト結
合されていることが相まって、ブロック21が前方へ滑
動及び転倒するのを防いでいる。ブロック1の頂板3の
後端には、ブロック21及びその背後の葵石等51の重
量と、更にその背後の士圧とが斜前方へ向う合力となっ
て加わる。
Similarly to the block 1, the center of gravity of the block 21 is located at the rear, and the bolt connection between the top plate 3 and the bottom plate 24 prevents the block 21 from sliding forward and overturning. There is. At the rear end of the top plate 3 of the block 1, the weight of the block 21 and the hollyhock stone 51 behind it, and the mechanical pressure behind it are applied as a resultant force diagonally forward.

このうち、頂板3に垂直な分力は王壁2に対して後方へ
の曲げモーメントとして作用し、頂板3に平行な分力は
主壁2に対して前方への曲げモーメントとして作用する
。従って、主壁2に対する2つの曲げモ−メントは互に
相殺されて、小さな値になる。第4図は、ブロック1及
び21に加わる力を説明する図である。
Of these, the component force perpendicular to the top plate 3 acts on the king wall 2 as a backward bending moment, and the component force parallel to the top plate 3 acts on the main wall 2 as a forward bending moment. Therefore, the two bending moments on the main wall 2 cancel each other out and become small values. FIG. 4 is a diagram illustrating the forces applied to the blocks 1 and 21.

仮想背面64及び65には、それぞれ66及び67で示
すような大きさの土庄が現われる。そのうち、矢印で示
しているものは、ブロックーの底板4と受圧板6とセメ
ント47とが一体化された頑強な塊状部分と、ブロック
1の頂部3とブロック21の底板24及び受圧板26と
セメント50とが一体化された頑強な塊状部分とに直接
作用する。そして残余の力は、ブロックー及び21の主
壁2,22にそれぞれ曲線68及び69で示すような大
きさで加わる。この説明によって明らかなように、ブロ
ック1及び21の受圧板6,26は、強大な土庄を直に
受止め、これがそのま)王壁2,21の下部に曲げモー
メントとなって加わるのを防ぎ、かつ主壁2,21の中
間部分に加わる力を大幅に減少させている。
Tonosho of sizes as shown by 66 and 67 appear on the virtual back surfaces 64 and 65, respectively. Among them, the ones indicated by arrows are a strong blocky part in which the bottom plate 4 of the block, the pressure receiving plate 6, and the cement 47 are integrated, and the top part 3 of the block 1, the bottom plate 24 of the block 21, the pressure receiving plate 26, and the cement. 50 acts directly on the integrated strong blocky part. The remaining forces are then applied to the main walls 2, 22 of the blocks and 21 in magnitudes as shown by curves 68 and 69, respectively. As is clear from this explanation, the pressure receiving plates 6, 26 of the blocks 1 and 21 directly receive the powerful tonosho, and prevent this from being applied as a bending moment to the lower part of the king wall 2, 21. , and the force applied to the intermediate portion of the main walls 2, 21 is significantly reduced.

従って各ブロックに加わる曲げモーメントは全体的に小
さくなって、主壁2,22の肉厚を薄く、かつ補強鉄筋
量を少なくすることができる。第5図は、第1図示のよ
うな最下段ブロック1において、頂板3の後縁から受圧
板70を垂下させたもので、これを設けることにより王
壁2の上部に直接作用する土圧を除くことができる。
Therefore, the bending moment applied to each block is reduced overall, allowing the main walls 2, 22 to be thinner and the amount of reinforcing reinforcing bars to be reduced. In FIG. 5, a pressure receiving plate 70 is suspended from the rear edge of the top plate 3 in the lowermost block 1 as shown in the first figure.By providing this, the earth pressure acting directly on the upper part of the royal wall 2 is reduced. Can be removed.

その結果、主壁2の中央附近に作用する曲げモーメント
は勿論のこと、主壁2と底板4との接合部分に作用する
曲げモーメントをも更に軽減することができる。なお、
71は栗石充填等を容易にする作業窓で、作業後にコン
クリート等で閉塞する必要はない。第6図は第2図示の
ような上、中段用ブロック21において、主壁22を途
中から前方へ折曲する代りに、底板24から前方へ頃斜
して起立させたものである。
As a result, not only the bending moment acting on the vicinity of the center of the main wall 2 but also the bending moment acting on the joint portion between the main wall 2 and the bottom plate 4 can be further reduced. In addition,
Reference numeral 71 is a work window that facilitates filling of chestnut stone, etc., and there is no need to block it with concrete or the like after work. In FIG. 6, the main wall 22 of the upper and middle blocks 21 shown in FIG. 2 is made to stand obliquely forward from the bottom plate 24 instead of being bent forward from the middle.

その作用は、第2図示のものと大差がない。以上のよう
に、この発明によるときは、各ブロックの頂板後緑と底
板とを結ぶ面64,65を仮想背面と見ることができ、
それよりも前方が部厚くて重いよう壁構造物として作用
する。
Its action is not much different from that shown in the second figure. As described above, according to the present invention, the surfaces 64 and 65 connecting the back green of the top plate and the bottom plate of each block can be seen as the virtual back surface,
The front part is thicker and heavier so it acts as a wall structure.

そして、この構造物の後優に塞く重量の分力は、極めて
効果的に仮想背面に現われる土圧と相殺する。また、各
ブロックの重量は、王壁にほぼ直角な腰板によって下段
ブロックへ伝えられ、下段ブロックにおいては頂板で受
けた上段ブロック重量を、頂板にほぼ直角な王壁へも伝
達する。このようにして上方に位置するブロックの底板
と下方に位置するブロックの頂板とが一体となり、これ
が背後からの土庄の軽減に大きく貢献し、且つこの上に
のる粟石等及び土砂の重量がよう壁全体の重量を増大さ
せ、さらに粟石等が排水作用を確実にし、これらの結果
このよう壁の安定性が高くなっている。従って、かなり
大きな寸法のブロックを作っても、鉄筋量及びコンクリ
ート量が少いために軽量かつ安価であり、運搬やクレー
ンを用いての現場作業が容易であり、安定したよう壁を
少し、経費で容易に実現することができ、必要に応じ植
樹壇を設けて外観を改善することもできる。
The component force of the weight of this structure, which blocks the back of the structure, very effectively cancels out the earth pressure that appears on the virtual rear surface. Furthermore, the weight of each block is transmitted to the lower block by a waist board that is approximately perpendicular to the crown wall, and in the lower block, the weight of the upper block received by the top board is also transmitted to the king wall that is approximately perpendicular to the top board. In this way, the bottom plate of the block located above and the top plate of the block located below are integrated, which greatly contributes to reducing the impact from behind, and also reduces the weight of millet, etc. and earth and sand placed on top of it. In addition to increasing the overall weight of the wall, millet stones and the like ensure drainage, and as a result, the stability of such a wall is increased. Therefore, even if you make a block of fairly large size, it is lightweight and inexpensive because the amount of reinforcing bars and concrete is small, and it is easy to transport and work on site using a crane. This can be easily realized, and if necessary, a planting bed can be installed to improve the appearance.

【図面の簡単な説明】[Brief explanation of drawings]

第1図はこの発明の実施例に用いる最下段ブロックの正
面図と中央縦断面図と平面図、第2図は同実施例に用い
る中段或いは最上段ブロックの正面図と中央縦断面図と
平面図、第3図は上記実施例の縦断面図、第4図は同実
施例における応力の説明図、第5図は最下段ブロックの
異る例を示す中央縦断面図、第6図は中段或いは最上段
ブロックの異る例を示す中央縦断面図である。 1…・・・最下段ブロック、2・・・・・・主壁、3・
・・・・・頂板、4・・・・・・底板、5・・・・・・
キー部、6・・・・・・受圧板、9・・・・・・突部、
21・…・・上段ブロック、22・・・…主壁、23・
・・・・・頂板、24・・・・・・底板、26・・・・
・・受圧板、35・・・・・・凹所。 第1図 第2図 第5図 第6図 第3図 第4図
FIG. 1 is a front view, central vertical sectional view, and plan view of the lowest block used in the embodiment of the present invention, and FIG. 2 is a front view, central vertical sectional view, and plan view of the middle or top block used in the embodiment. Figure 3 is a vertical cross-sectional view of the above embodiment, Figure 4 is an explanatory diagram of stress in the same example, Figure 5 is a central vertical cross-sectional view showing a different example of the bottom block, and Figure 6 is the middle block. Alternatively, it is a central longitudinal sectional view showing a different example of the uppermost block. 1... Bottom block, 2... Main wall, 3.
...Top plate, 4...Bottom plate, 5...
key part, 6...pressure plate, 9...protrusion,
21... Upper block, 22... Main wall, 23...
...Top plate, 24...Bottom plate, 26...
...Pressure plate, 35... recess. Figure 1 Figure 2 Figure 5 Figure 6 Figure 3 Figure 4

Claims (1)

【特許請求の範囲】[Claims] 1 適所に水抜孔を穿設した板状の主壁と、その上下に
断面がI字形をなすように連設した頂板及び底板とを、
鉄筋コンクリートをもつて一体に形成したブロツクを複
数段積重ねると共に、その背後に栗石または砕石の層を
形成してなるよう壁において、各ブロツクにおける上記
頂板及び上記底板は上記主壁にほぼ直角に連接され、上
記底板の後縁からは上記主壁にほぼ平行に受圧板が起立
し、最下段ブロツクの上記底板の前縁からは下方へキー
部が突出し、上下に隣接するブロツク間においては下段
ブロツクの上記頂板と上段ブロツクの上記底板とに互に
噛合う突部及び凹所がそれぞれ形成されていることを特
徴とするよう壁。
1. A plate-shaped main wall with drainage holes drilled in appropriate places, and a top plate and a bottom plate connected above and below it so that the cross section forms an I-shape,
The wall is made up of a plurality of blocks integrally made of reinforced concrete stacked together and a layer of chestnut stone or crushed stone is formed behind the blocks, and the top plate and bottom plate of each block are connected to the main wall at approximately right angles. A pressure receiving plate stands up from the rear edge of the bottom plate approximately parallel to the main wall, a key portion protrudes downward from the front edge of the bottom plate of the bottom block, and a pressure receiving plate stands up from the rear edge of the bottom plate, and a key portion projects downward from the front edge of the bottom plate of the bottom block. The wall is characterized in that the top plate of the upper block and the bottom plate of the upper block are respectively formed with protrusions and recesses that engage with each other.
JP21453581A 1981-12-29 1981-12-29 like wall Expired JPS6015774B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP21453581A JPS6015774B2 (en) 1981-12-29 1981-12-29 like wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP21453581A JPS6015774B2 (en) 1981-12-29 1981-12-29 like wall

Publications (2)

Publication Number Publication Date
JPS58117137A JPS58117137A (en) 1983-07-12
JPS6015774B2 true JPS6015774B2 (en) 1985-04-22

Family

ID=16657335

Family Applications (1)

Application Number Title Priority Date Filing Date
JP21453581A Expired JPS6015774B2 (en) 1981-12-29 1981-12-29 like wall

Country Status (1)

Country Link
JP (1) JPS6015774B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS63196574U (en) * 1987-06-08 1988-12-19
JPH01111487U (en) * 1988-01-21 1989-07-27

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108301413A (en) * 2018-01-10 2018-07-20 郑磊 A kind of reservoir builds construction machine
CN108301437A (en) * 2018-01-10 2018-07-20 韦毓宝 A kind of bank protection side wall, which smooths, pours device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS63196574U (en) * 1987-06-08 1988-12-19
JPH01111487U (en) * 1988-01-21 1989-07-27

Also Published As

Publication number Publication date
JPS58117137A (en) 1983-07-12

Similar Documents

Publication Publication Date Title
KR100660379B1 (en) Plantable reinforced earth wall and its block and construction method of reinforced earth wall
JP3979466B2 (en) Temporary closing method
KR100842076B1 (en) The composite retaining wall of trapezoid environmental timber-stone block supported by the backfill subgrade reaction ? displacement, and the construction method of this
CN212561606U (en) Row pile retaining wall with permanent retaining structure
JPS6015774B2 (en) like wall
KR20090019591A (en) Block for revetment construction and method using the same
CN216586395U (en) Ecological retaining wall revetment
JPS6311710A (en) Earthquake-proofing and reinforcing work for existing structure
KR101334749B1 (en) Vegetation block in tiers for retaining wall and method for construction of retaining wall using the same
JP4573964B2 (en) Retaining wall construction method using blocks
JPH1129927A (en) Ground subsidence preventive foundation pile using old tire block
KR20100100294A (en) Installation structure of block type breast wall and its construction method
CN205557573U (en) Underground structure
KR20090035951A (en) Retaining wall for easy drainage and it's construction work method thereof
JP2957995B1 (en) Retaining wall backfill frame
KR102420947B1 (en) Retaining wall construction method using gravity block
JPS60192030A (en) Terraced block for reinforced concrete retaining wall
JPH11350505A (en) Stone retaining wall
JPH0310200Y2 (en)
CN212052807U (en) Stepped inter-pile baffle structure of soil slope top slide-resistant pile
KR100708895B1 (en) Stack-type block, multistage stack-type civil work structure and construction method thereof
KR100341856B1 (en) Method of embanking in shore
JP2555838B2 (en) Independent panel mountain retaining method
JPH03156026A (en) Steep-sloped banking equipped with downspout drain outlet, and wall body and wall surface unit therefor
JPH1088592A (en) Concrete retaining wall