KR20090019591A - Block for revetment construction and method using the same - Google Patents
Block for revetment construction and method using the same Download PDFInfo
- Publication number
- KR20090019591A KR20090019591A KR1020070084141A KR20070084141A KR20090019591A KR 20090019591 A KR20090019591 A KR 20090019591A KR 1020070084141 A KR1020070084141 A KR 1020070084141A KR 20070084141 A KR20070084141 A KR 20070084141A KR 20090019591 A KR20090019591 A KR 20090019591A
- Authority
- KR
- South Korea
- Prior art keywords
- block
- retaining wall
- foundation
- constructed
- construction
- Prior art date
Links
Images
Classifications
-
- A—HUMAN NECESSITIES
- A01—AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
- A01G—HORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
- A01G9/00—Cultivation in receptacles, forcing-frames or greenhouses; Edging for beds, lawn or the like
- A01G9/02—Receptacles, e.g. flower-pots or boxes; Glasses for cultivating flowers
- A01G9/022—Pots for vertical horticulture
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/02—Retaining or protecting walls
- E02D29/0225—Retaining or protecting walls comprising retention means in the backfill
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/02—Retaining or protecting walls
- E02D29/0258—Retaining or protecting walls characterised by constructional features
- E02D29/0266—Retaining or protecting walls characterised by constructional features made up of preformed elements
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2600/00—Miscellaneous
- E02D2600/30—Miscellaneous comprising anchoring details
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Environmental Sciences (AREA)
- Revetment (AREA)
Abstract
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a retaining wall building block and a construction method thereof, and more particularly, to a retaining wall building block and a method for constructing the retaining wall.
An inner space of the retaining wall building block according to the present invention is formed with an empty space penetrating up and down, and a plurality of drainage holes communicating with the space portion are formed on the rear surface, and a fixing bar protrudes from the upper surface, and the bottom surface is constructed in a lower row. Insertion grooves are formed to be inserted into the fixing bar of the block to be formed, and the plate-shaped bracket fixedly attached to the coupling portion of the two bodies to prevent the flow between the body and the body is reinforced with each side and firmly fixed Characterized in that it comprises a.
Description
The present invention relates to a retaining wall construction block and a construction method thereof, and more particularly, to a block in which rebar is disposed on each side of the block and a construction method thereof.
In general, when the slopes of the mountain slopes or hills are partially damaged by natural disasters such as heavy rains or floods, some of the damaged slopes are scraped off to make slopes, and the soil is filled to form new slopes. In addition, when a road or a railroad is newly established on a hillside or a hillside, a portion of the hillside or a hillside is scraped off to form a slope, and the opened surface is flattened, and then the remaining portion is formed as a new slope. In addition, slopes are formed due to embankments, embankments, or earth and sand in the vicinity of rivers and lakes to prevent flooding of rivers and use of water resources.
In case of leaving the inclined surface formed as described above, soils of the inclined surface are easily lost due to various causes such as heavy rain or flood, so that the work of repairing the inclined surface is frequently performed, as well as damage to life and property by the collapsed soil. Was induced. In addition, the cost of restoring the collapsed slope was wasted.
Therefore, the inclined surface in front of the inclined risk as described above usually used to build the retaining wall construction block or panel retaining wall to prevent the risk of collapse in advance.
Such a reinforced concrete block made of concrete has a problem in that cracks due to shear and torsion due to earth pressure are not generated because reinforcing bars are not disposed, and conventional panel retaining walls are reinforced with reinforcing bars. There is a problem of structural stability that the reinforcement is separated from the panel by the natural environment such as earthquake occurrence or the loss of the sediment of sediment, which does not perform its original function.
In addition, in the panel retaining wall, the panel itself is not able to stand on its own, so when the reinforcement is connected, the panel must be fixed using heavy machinery such as a crane, so there is a high risk of work.
The present invention has been made in order to solve the above problems, it is to provide a reinforcement to each side of the reinforcement soil block to resist cracking by earth pressure, easy to install the retaining wall block for construction and its construction method.
In order to achieve the above technical problem, the retaining wall building block according to the present invention has an empty space portion penetrated up and down, and a plurality of drainage holes communicating with the space portion are formed on the rear surface thereof, and a fixing bar protrudes from the upper surface thereof. Is provided, the bottom is formed with an insertion groove is inserted into the fixed bar of the block that is built in the lower row, each side of the body is reinforced with reinforcement bar and the combination of the two bodies to prevent the flow between the body and firmly fixed The groove is formed in the portion is formed with a bolt hole, characterized in that it comprises a plate-like bracket coupled to the groove portion. The vegetation hole is preferably formed on the front surface.
It is preferable that a cultivation means is further provided in the empty space part of the body so that the plant can be cultivated more efficiently.
The cultivation means, the support is fixed to the left and right on the inner wall of the space; And
It is preferably configured to include a vegetation box that is located on the support and the culture soil is filled therein to grow plants.
The support is preferably made of a N-shaped support plate that is bolted symmetrically in front and rear of the inner space and the turnbuckle provided between the support plate.
The inner and outer surfaces of the vegetation box is preferably provided with a nonwoven fabric to prevent the flow of the vegetation box and to absorb moisture to grow the plant well.
It is preferable to have a horizontal connecting bar coupled to the drainage hole formed in the rear of the body and connected to the reinforcement of the rear.
The horizontal connecting bar is connected to the vertical connecting bar, the cross-shaped cross-section of the center plate of the plate is inserted into the holes of the connecting member formed in each of the holes in which the horizontal, vertical connecting bar can be fitted is fastened with U bolts desirable.
The bottom surface of the body is blocked to form a through hole through which the head of the foundation penetrates, and a drainage hole is formed on the side to be used as a foundation block installed on the bottom surface to build the retaining wall. It is preferable that grooves formed with bolt holes are formed to connect the basic blocks to the brackets.
It is preferable that the groove is formed on the upper surface of the body is formed with a bolt hole is coupled to the bracket is used as a corner block.
It is preferable that the nonwoven fabric is additionally provided so that the drainage hole formed in the rear surface of the body is not blocked.
In addition, the construction method of the retaining wall construction block according to the present invention, in the construction method of the retaining wall construction block using the reinforcement of the foundation block, block, finishing block, a) the foundation ground in front of the various inclined surface damaged or filled Basic block installation process for fixing the coupling part by arranging the base block having a drainage hole on the side and the rear side in the longitudinal direction after smoothly and evenly placing the micro pile or the like; b) a block installation step of forming a plurality of drainage holes on the rear surface and fixing the coupling part by fixing the upper and lower sides of each block with a bracket, and a block coupled with the insertion groove and the bracket on the upper part of the base block; c) spaced apart from the back of the constructed retaining wall; Leave After digging and installing non-woven fabric therein, insert the foundation block, connect the foundation block and the retaining wall of the front side with horizontal connection bar, and then sand or gravel compaction inside the trench and the foundation block, Reinforcement process to fill; And d) a finishing block installation step of constructing and fixing a finishing block at the top end of the block constructed at a predetermined height by repeating the steps b) to c).
In the block installation process, when the block is formed in the vegetation hole, it is preferable to include a step of installing the vegetation box in the space of the block.
In the block installation step, it is preferable to construct the retaining wall stepwise by repeatedly constructing the block at least one step above the foundation block, and again installing the foundation block and then installing the block.
In addition, in the construction method of retaining wall construction block using reinforcement foundation blocks, blocks, and finishing blocks, a) smoothly and evenly lay foundation grounds in front of various inclined surfaces to be damaged or filled, and then construct direct piles or micro piles. Then, the base block installation process for fixing the coupling portion by arranging the foundation block formed in the drainage hole on the side and the rear in the longitudinal direction; b) a block installation process in which a plurality of drainage holes are formed on the rear surface, and a fixed bar and an insertion groove and a bracket coupled to the upper and lower sides of each block are constructed on the upper part of the base block to fix the coupling part; c) reinforcing process of filling the gravel and crushed stone directly on the back of the block, backfilling the reinforcement soil to the rear, and installing a geogrid to connect the constructed block; And d) a finishing block installation step of constructing and fixing a finishing block at the top end of the block constructed at a predetermined height by repeating the steps b) to c).
In addition, in the construction method of the retaining wall construction block using the foundation block, the block, the finishing block in which the reinforcing bar is reinforced, a) the process of installing a packer nail on the inclined surface, b) the foundation ground in front of various inclined surface damaged or filled After the semi-evenly and evenly placed directly or construct a micro pile, the base block installation process for fixing the coupling portion by arranging the base block formed in the longitudinal direction with the drainage holes formed on the side and rear;
c) a block installation process in which a plurality of drainage holes are formed on the rear surface, and a fixed bar and an insertion groove and a bracket coupled to the upper and lower sides of each block by the bracket are constructed on the upper part of the base block to fix the coupling portion; D) filling gravel and crushed stone directly on the rear of the block, backfilling the reinforcement soil to the rear thereof, and connecting the packer nail;
e) is constructed including a finishing block installation process for constructing and fixing a finishing block at the top end of the block constructed at a predetermined height.
According to the retaining wall construction block and the construction method thereof of the present invention, by reinforcing the reinforcing bar on each side of the reinforcement earth block body to withstand the tensile cracks efficiently, by connecting each block up, down, left, right to integrate By suppressing the flow of the liver reduces the displacement and there is an effect that the construction is easy.
"A" of Figure 1 is a perspective view showing a retaining wall construction block according to an embodiment of the present invention from the front, "I" is a perspective view shown from the back, "A" of Figure 2 is AA of Figure 1 "B" is a BB cross-sectional view, "C" is a CC cross-sectional view, and "D" is a cross-sectional view of D-D '.
Referring to Figures 1 and 2, the retaining
First, the
In addition, the
Of course, the same
Forming a
Next, the
On the other hand, in attaching the
In addition, a
In particular, the bolt hole formed on the inner surface of the front and the bolt hole formed on the upper surface of the body to fix the left and right of the
Subsequently, the
1 and 2, the block is formed to be large, but the
That is, it is natural that it is difficult to flexibly cope with the curved angle when the relatively
And Figure 3 is a
In addition, the front of the block can be put in a pattern of intaglio, embossing, etc. of the pattern to eliminate the boredom of the retaining wall, the low block may differentiate the color by the artificial granite change treatment on the surface. As such, the
Figure 4 is a perspective view showing a cultivation means according to an embodiment of the present invention.
Referring to the drawings, the cultivation means 130 is largely comprised of a
First, the
Next, the
The
Plants cultivated in the block is possible to cultivate different plants for each stage, and plants with different flowering times can be cultivated for each block so that different plants can be seen to install eco-friendly reinforced soil retaining walls.
"A" of Figure 5 is a perspective view showing a retaining wall for building blocks according to another embodiment of the present invention from the front, "I" is a perspective view shown from the back, "C" is "A" A-A 'As a cross-sectional view, it is used as the foundation block of the retaining wall.
The other configuration is the same as that of the
The
In addition, in order to fix the left and right of the
6 is a perspective view schematically illustrating a process of constructing a retaining wall constructing block according to an embodiment of the present invention.
Referring to the drawings, the
In addition, another
At this time, since the
Figure 7 is a cross-sectional view showing the stepped construction of the retaining wall construction block according to an embodiment of the present invention, the stepped construction is to build the base block after the floor surface arrangement, and at least one step to build the block to the upper portion, the upper portion As a result, building the basic block and building the block are repeated.
8 is a schematic side cross-sectional view showing a state of use of the retaining wall construction block according to an embodiment of the present invention, Figure 9 is a plan view showing a construction state of the retaining wall construction block according to a preferred embodiment of the present invention. , "A" in Figure 10 is a perspective view showing a state connecting the horizontal connecting bar and the vertical connecting bar according to an embodiment of the present invention, "I" is a separate perspective view of "A", "D" is "A" Side view.
Referring to the drawings, the
In addition, plants are planted in the culture soil filled in the
This makes it possible to provide a beautiful, nature-friendly retaining wall beyond the concept of a retaining wall for safety.
After constructing a certain height with only the blocks without vegetation holes, the blocks having vegetation holes are installed, and the blocks are alternately constructed as if the blocks without vegetation holes are formed again. As described above, it is possible to construct only the blocks in which the vegetation holes are formed. In addition, it is a matter of course that only the blocks without vegetation holes are formed.
In addition, the
The horizontal connecting
The horizontal connecting
The connecting
In addition, the horizontal and vertical connecting
FIG. 11 is a schematic side cross-sectional view illustrating a construction process of a retaining wall building block according to an embodiment of the present invention. Referring to the drawings, a method of constructing the retaining wall building block of the present invention using a geogrid will be described. It will be constructed including a) foundation block installation process, b) block construction process, c) reinforcement process, and d) finishing block construction process.
First, a) the base block installation step is a step of installing the
In addition, the internal space of the
Next, the b) block building step is a step of building the
Thus formed
In the block installation step, the block may be constructed stepwise by repeatedly constructing at least one step of the block above the foundation block, installing the foundation block, and then repeatedly installing the block.
Next, the c) reinforcement process, filling the gravel and crushed stone on the back of the
First, the horizontal connecting
Here, after filling the reinforcement soil of the rear may be connected to the horizontal connecting
Next, the d) finishing block installation process is an installation process for constructing and fixing the finishing block 168 at the top end of the
Therefore, according to the retaining wall construction vegetation block and the construction method thereof of the present invention, the cultivation means 130 including a
In addition, Figure 12 is a schematic side cross-sectional view showing a state of use of the retaining wall construction block according to another embodiment of the present invention, which is a packer nail construction with a reinforcing
Figure 13 is a schematic side cross-sectional view showing a state of use of the retaining wall building blocks according to another embodiment of the present invention, and relates to the use of the foundation block as the reinforcing
First, where the foundation block 160 is located is to dig to a certain depth to prevent the flow of the foundation block 160 and that the sand and gravel filled in the trench and the installed foundation block is lost between the dark bulge In order to prevent the installation of a nonwoven fabric, the base block is installed on the nonwoven fabric. Thereafter, the horizontal connecting bar connected to each block of the reinforcement earth retaining wall is connected to the foundation block. The method of connecting the horizontal connecting bar to the foundation block is inserted into the drainage hole in the same way as the block connection method. Connect by closing. Next, sand or gravel is filled in the inner space and the trench of the foundation block, and the rock blocks are filled.
On the other hand, although not shown, if all the layers stacked in the above-mentioned building process are constructed with blocks having vegetation holes, the aesthetic view may be deteriorated. Therefore, blocks not forming vegetation holes may be crossed by one layer. In addition, after a predetermined height of the blocks in which the vegetation holes are not formed, the blocks in which the vegetation holes are formed may be stacked. In the case of stacking the blocks in which the vegetation holes are formed, the vegetation box is installed in the space of the block after the stacking of the blocks so that the plants can be grown.
What has been described above is only one embodiment for carrying out the retaining wall construction block and the construction method according to the present invention, the present invention is not limited to the above embodiment, as claimed in the following claims Without departing from the gist of the invention, anyone of ordinary skill in the art to which the present invention will have the technical spirit of the present invention to the extent that various modifications can be made.
"A" of Figure 1 is a perspective view showing a retaining wall for building blocks according to an embodiment of the present invention from the front, "I" is a perspective view shown from the back.
"A" in Fig. 2 is a cross-sectional view taken along the line A-A 'of Fig. 1, "I" is a cross-sectional view taken along the line B-B', "D" is a cross-sectional view taken on the line C-C ', and "D" is a D-D'. Line section.
Figure 3 is a plan view showing a retaining wall of the curved corner in accordance with a preferred embodiment of the present invention.
Figure 4 is a perspective view showing a cultivation means according to an embodiment of the present invention.
"A" of Figure 5 is a perspective view showing a retaining wall for building blocks according to another embodiment of the present invention from the front, "I" is a perspective view shown from the back, "C" is "A" A-A 'Line section.
Figure 6 is a perspective view schematically showing the construction process of the retaining wall construction block according to an embodiment of the present invention.
7 is a cross-sectional view showing a stepped construction of the retaining wall construction block according to an embodiment of the present invention.
Figure 8 is a schematic side cross-sectional view showing a state of use of the retaining wall construction block according to an embodiment of the present invention.
9 is a plan view showing a construction state of the retaining wall construction block according to an embodiment of the present invention.
"A" of Figure 10 is a perspective view showing a state connecting the horizontal connecting bar and the vertical connecting bar according to an embodiment of the present invention, "I" is an exploded perspective view of "A", "D" is the "A" Side view.
Figure 11 is a schematic side cross-sectional view showing the construction process of the retaining wall construction block according to an embodiment of the present invention.
12 is a schematic side cross-sectional view showing a state of use of the retaining wall building block according to another embodiment of the present invention.
Figure 13 is a schematic side cross-sectional view showing a state of use of the retaining wall construction block according to another embodiment of the present invention.
Explanation of symbols for the main parts of the drawings
100: block 110: body
110a: front 110b: rear
110c:
110e: bottom 112: space part
114: vegetation hole 116: drainage hole
118: fixing
119:
120: bracket 122: U bolt
130: cultivation means 132: support
133: support plate 134: turnbuckle
136: vegetation box 137: drain hole
138: nonwoven fabric 141: bolt sleeve tube
141a: bolt portion 142: groove portion
144: horizontal connecting bar 146: vertical connecting bar
148: connecting member 150: tightening nut
152: closing cap 154: connecting member
160: basic block 162: through hole
164: drainage hole 166: nonwoven fabric
168: finishing block 170: reinforcement
180: corner block B: bolt
Claims (16)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020070084141A KR20090019591A (en) | 2007-08-21 | 2007-08-21 | Block for revetment construction and method using the same |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020070084141A KR20090019591A (en) | 2007-08-21 | 2007-08-21 | Block for revetment construction and method using the same |
Publications (1)
Publication Number | Publication Date |
---|---|
KR20090019591A true KR20090019591A (en) | 2009-02-25 |
Family
ID=40687374
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020070084141A KR20090019591A (en) | 2007-08-21 | 2007-08-21 | Block for revetment construction and method using the same |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR20090019591A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100980859B1 (en) * | 2010-02-24 | 2010-09-10 | (주)보원 | Retaining wall using wasterocks and method for thereof |
KR101429481B1 (en) * | 2013-12-18 | 2014-08-18 | 벽화수주식회사 | Block for engineering works |
CN108867554A (en) * | 2018-09-20 | 2018-11-23 | 连云港东浦建筑工业化发展有限公司 | Revetment brick and protective slope structure |
KR20210094334A (en) * | 2020-01-21 | 2021-07-29 | 임태승 | Retaining wall block with easy slope deformation |
KR20210149949A (en) * | 2020-06-02 | 2021-12-10 | 한국철도기술연구원 | Traveling way of automatic guided transit |
KR102696345B1 (en) * | 2024-02-26 | 2024-08-19 | 성운산업개발(주) | Step-type retaining wall structure using prefabricated retaining wall block and its construction method |
-
2007
- 2007-08-21 KR KR1020070084141A patent/KR20090019591A/en not_active Application Discontinuation
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100980859B1 (en) * | 2010-02-24 | 2010-09-10 | (주)보원 | Retaining wall using wasterocks and method for thereof |
KR101429481B1 (en) * | 2013-12-18 | 2014-08-18 | 벽화수주식회사 | Block for engineering works |
CN108867554A (en) * | 2018-09-20 | 2018-11-23 | 连云港东浦建筑工业化发展有限公司 | Revetment brick and protective slope structure |
KR20210094334A (en) * | 2020-01-21 | 2021-07-29 | 임태승 | Retaining wall block with easy slope deformation |
KR20210149949A (en) * | 2020-06-02 | 2021-12-10 | 한국철도기술연구원 | Traveling way of automatic guided transit |
KR102696345B1 (en) * | 2024-02-26 | 2024-08-19 | 성운산업개발(주) | Step-type retaining wall structure using prefabricated retaining wall block and its construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105887898B (en) | A kind of method and structure of protection swell-shrink characteristic ground cut slope | |
KR100924933B1 (en) | Construction method of retaining wall using soil sack block for vegetation and fixed device and Structure for installation thereof | |
KR100660379B1 (en) | Plantable reinforced earth wall and its block and construction method of reinforced earth wall | |
KR20090019591A (en) | Block for revetment construction and method using the same | |
KR20160009002A (en) | Vegetation block | |
KR101025260B1 (en) | Slope stabilization method which uses prefabricated shore protection block and coir mat | |
KR100872836B1 (en) | Block for revetment construction and method using the same | |
US20010008267A1 (en) | Sheet piling-supported modular wall system | |
KR101334749B1 (en) | Vegetation block in tiers for retaining wall and method for construction of retaining wall using the same | |
KR200345937Y1 (en) | Precast concrete block for retaining wall | |
KR100995097B1 (en) | Method for constructing wall block | |
KR100884017B1 (en) | Method of Constructing Bank Walls with Recovering Natural Environment | |
KR100794221B1 (en) | Retaining wall for planting | |
CN213038303U (en) | Ecological concrete vegetation slope protection structure | |
KR100526753B1 (en) | Slope surface construction structure of river for ecosystem restoration | |
KR100487838B1 (en) | Prefabricated retaining wall and it's construction method | |
KR200376814Y1 (en) | Revetment Block Unit for Plants in Ground | |
CN114086505A (en) | River course slope protection structure for hydraulic engineering and laying construction method | |
KR200300440Y1 (en) | Revetment block | |
KR200361729Y1 (en) | Multi function block for environment protection | |
CN205804371U (en) | A kind of structure protecting swell-shrink characteristic ground cut slope | |
KR100995094B1 (en) | Method for constructing retaining wall block | |
KR200235107Y1 (en) | Afforestation Retaining-Wall laying Concrete-block | |
KR20050118070A (en) | Plantable reinforced earth wall and its block and construction method of reinforced earth wall | |
CN217998118U (en) | Ecological slope protection |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E601 | Decision to refuse application |