JPS5850226A - Brace receiver - Google Patents

Brace receiver

Info

Publication number
JPS5850226A
JPS5850226A JP14777081A JP14777081A JPS5850226A JP S5850226 A JPS5850226 A JP S5850226A JP 14777081 A JP14777081 A JP 14777081A JP 14777081 A JP14777081 A JP 14777081A JP S5850226 A JPS5850226 A JP S5850226A
Authority
JP
Japan
Prior art keywords
brace
cut beam
force
flint
receiving
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP14777081A
Other languages
Japanese (ja)
Other versions
JPS5911014B2 (en
Inventor
Isamu Utsuki
宇津木 勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MARUBENI KENZAI LEASE KK
Original Assignee
MARUBENI KENZAI LEASE KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MARUBENI KENZAI LEASE KK filed Critical MARUBENI KENZAI LEASE KK
Priority to JP14777081A priority Critical patent/JPS5911014B2/en
Publication of JPS5850226A publication Critical patent/JPS5850226A/en
Publication of JPS5911014B2 publication Critical patent/JPS5911014B2/en
Expired legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

PURPOSE:To raise the durability and stability of supporting materials by integrally forming a receiving face in contact with the tips of a cut beam and a brace on the brace receiver of the supporting material to support earth pressures around an excavated pit at a construction site. CONSTITUTION:After excavating a pit underground, sheathing work is applied using a large number of plate materials 1 which are in turn supported by wales 8 and 2. Then, brace receivers 10 and 5 having receiving faces 15 and 22 are held at a fixed height by a jack, etc., and the receiving faces are welded with cut beams 9, 11 and 3 and braces 12 and 4. The tip of the cut beam 9 is in contact with the main cut beam receiving face 15 and transmits a force from the wale 8 to the other cut beam 11 as such. The tip of the brace 12 is in contact with the brace receiving face 22 slantly to the cut beam 9 at crossing angle of 30 deg. or 45 deg., but force component toward the direction of a basal shaft 14, among forces P which the brace 12 receives from the wale 8 through a connecting metal 13, is transmitted to the cut beam 11, and also component of force pH at right angle to the basal shaft 14 is neutralized with the force component of the paried braces 12.

Description

【発明の詳細な説明】 本発明は、 ima机−で用いられる火打受部材、籍に
、多数の@殖及び火打の先端を面接触で受けるようにし
九火打受部材に関する。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a fire support member used in an ima machine, and a fire support member that receives the tips of a large number of flints and flints in surface contact.

m拘に穴を−り下けた時、縞l幽及び第2図に示すよう
に、周囲の土圧によってその穴かつぶされないようにす
るため、穴0jiI囲に多数の板材1を打−ち込んで土
留を行なっている。そして、多数の立設されfctIL
材1に水平方向の支持材tかけ枚して、板材1が円lm
11に倒れ込まないようにしてiる。
When the hole is lowered into the hole, a large number of plates 1 are placed around the hole to prevent it from being crushed by the surrounding earth pressure, as shown in Figure 2. They are carrying out tsuchidome. And a large number of erected fctIL
Horizontal supporting material t is placed on material 1, and board material 1 becomes a circle lm.
I try not to fall into 11.

水平方向にかけ渡される支持材には、第3−に示すよう
に、立設畜れた板材1に1411rkJが幽接して、こ
れらの板材1を整列させる腹蔵2と、この腹蔵2に直交
し、水平方向に@架される切!!1i!Sと、腹蔵2に
斜交し、切5at−肯万から支える火打4とがある。
As shown in No. 3, on the support material extending in the horizontal direction, 1411 rkJ is in direct contact with the upright board materials 1, and there is a storage space 2 for aligning these board materials 1, and a storage space 2 that is orthogonal to this storage space 2. Cut horizontally! ! 1i! S and Hiuchi 4, which intersects obliquely with Harazo 2 and supports Kiri 5at-Konman.

これらの火打4Fi、切梁3を貴方から支えると共に、
腹蔵2が穴の内部方向に受ける力を可能な眠り広い範囲
にわたって引き受けようとするものであり、この火打4
は切梁3に斜交して顔合されるO 火打4と切癩3との結合に関し、従来においては、第3
図に示すように、各々の火打40先熾に火打受部材5を
設け、この火打受部材5の一1ii1″1゜H−鋼でめ
る切ASKボルト6で結合してい丸。
As well as supporting these Hiuchi 4Fi and Kiribashi 3 from you,
The purpose is to absorb the force that Uchizo 2 receives in the direction of the inside of the hole over a wide range of possible range, and this Hiuchi 4
is obliquely intersecting with the strut 3. Regarding the connection between the flint 4 and the strut 3, in the past, the third
As shown in the figure, a flint support member 5 is provided at the tip of each flint 40, and the flint support member 5 is connected with a cut ASK bolt 6 made of 11 1 1 1 1° H-steel.

しかしながら、仁のようなボルト結合を利用した火打受
部材は、耐力及び安定性か弱く、ま九、穴明中締細II
IPの施工に手間かかかり、東に、同一水平面で他の切
梁等と5Z葺することかできす、このため、板材を支持
する構造t−設計する際の自白簾か少ないという間mか
あった。
However, the strength and stability of fire-hammered members using bolted joints such as bolts are weak,
It takes time to construct IP, and it is only possible to 5Z roof with other struts etc. on the same horizontal plane on the east side.For this reason, it is difficult to construct the structure that supports the planks. there were.

本発−は、上記した間離KfIkみてなされたものであ
り、耐力及び安定性に優れ、lた、施工が容易で、七〇
上同−水平曲上で多数の切梁及び火打を交差畜ぜること
Oで龜る火打受部材を提供することを目的とし、この几
め、切梁及び火打の先端とmIIする多数の受rIiJ
を、その配置に工夫をこらして一体に曽えたものである
This project was made considering the above-mentioned spacing KfIk, has excellent strength and stability, and is easy to construct. The purpose of this is to provide a flint support member that is fixed with a thread and O, and a large number of support members that are connected to the tip of this sill, strut, and flint.
It is a replica of the original design, with some ingenuity in its arrangement.

以下% m1lIlll#照して本発明の央膳ガを説明
する。
The central dining room table of the present invention will be explained below with reference to %mlIllll#.

纂4−社、本発明に係る火打受部材の一実施例を示す平
向−1亀5−は、第4−の矢印1方向から見えni1面
一てあり、腹蔵1に直交する切梁9の先端には、i+i
i*に8面の受面を有する火打受部材10か連結されて
お9%また前記切梁9の反対−には他(D@采11が連
結されてiる。
The flat-1 turtle 5-, which shows an embodiment of the firework receiving member according to the present invention, is visible from the direction of the arrow 1 of the 4th-shape, and has a stub 9 that is perpendicular to the belly 1. At the tip of
A flint receiving member 10 having eight receiving surfaces is connected to i*, and 9% is connected to the opposite side of the strut 9.

12は火打で、この火打12の先4は、火打受部材10
の受面に画像し、一方Wt趨に、連結金具13t−介し
て腹蔵8に結合され、切梁9と共に腹蔵$に加えられる
力を受けている。
12 is a flint, and the tip 4 of this flint 12 is a flint receiving member 10
On the other hand, the Wt side is connected to the holder 8 through a connecting fitting 13t, and receives the force applied to the holder 8 together with the strut 9.

火打受11N10について詳述すると、その全体は、u
wi鋼◆O適宜の板鋼及び板鋼を**接合して成9、切
梁s、11と幽豪するため、基軸14に直交する1組の
主切梁欠肉15t−有する。また、11jlLfjmに
示す−ように、前記切梁9,11と直交する他O切梁1
1,17に同一水平面上で交差賂せる九め、前記基軸1
4に直交し九主軸1aを有する1組の貴方切梁受面18
か設けられている。
To explain in detail about Hiuchuke 11N10, its entirety is u
wi steel ◆O Appropriate plate steel and plate steel are joined to form a structure 9, struts S, and 11, so there is a set of main strut undercuts 15t orthogonal to the base axis 14. In addition, as shown in 11jlLfjm, there are other O struts 1 perpendicular to the struts 9 and 11.
1 and 17 on the same horizontal plane, the base axis 1
A set of cross beam bearing surfaces 18 having nine principal axes 1a perpendicular to 4.
Or is provided.

更に火打12の先端とm接して、切梁9と連係させる九
め、前記基軸14に対して、例えば30°。
Furthermore, the ninth point m in contact with the tip of the flint 12 and linked to the strut 9 is at an angle of, for example, 30° with respect to the base axis 14.

4sといった角度で斜交し、かつ該基軸14に胸して対
称に配置され丸主軸20.21を有する複数組の火打受
面22.28が設けられてiる。菖い換えると、本願火
打受部材10は、その外周に主切梁受面1s%側方切采
受面19及び火打受面22.2$、!、1/−=う8肉
の受11iヲ一体に備え”c$Pp、基軸14に胸して
対称である。
A plurality of sets of flint receiving surfaces 22.28 are provided which are diagonally intersecting at an angle of 4s and are arranged symmetrically with respect to the base axis 14 and have a round main axis 20.21. In other words, the present firework receiving member 10 has, on its outer periphery, a main strut receiving surface of 1 s%, a side cut-button receiving surface 19, and a firework receiving surface of 22.2 dollars! , 1/- = U8 meat receiver 11i is integrally provided, and is symmetrical about the base axis 14.

次に、上記実施例の作用を説明すると、まず施工O際K
W、火打受部材10はジヤツキ等によって一定為さく保
持され、その各々の受面に、切梁9.11及び火打12
等がsn接合畜れる。この場合、注意すべきことは、火
打受部材10がこれらの切nil 、 10及び火打1
2の先端と面接触するということである。すなわち、切
梁90先熾は、主切梁受面15に轟接して、腹蔵8から
受ける力【<の電筐他の切梁11に伝える。
Next, to explain the effect of the above embodiment, firstly, during construction
W, the flint receiving member 10 is held fixedly by jacks or the like, and a strut 9, 11 and a flint 12 are attached to each receiving surface.
etc. can be used as sn junction. In this case, it should be noted that the flint receiving member 10 is
This means that it makes surface contact with the tip of No.2. That is, the leading end of the strut 90 comes into contact with the main strut receiving surface 15 and transmits the force received from the support 8 to the other struts 11.

筐た、火打12の先端は、30 又は45 等の交角θ
で切梁9に斜交しながら火打受#a22に!1iIIj
kするが、この時、火打12が連結金具13を介して腹
WIASから受ける力Pのうち、基軸14方向の分力P
マは切*11に伝えられ、また基軸14に直角な分力P
Iは、対となりている火打12の分力と打ち消し合う。
The tip of the casing and flint 12 has an intersection angle θ of 30 or 45, etc.
Then, while diagonally crossing strut 9, it became Hiuchuke #a22! 1iIIj
However, at this time, of the force P that the flint 12 receives from the belly WIAS via the connecting fitting 13, the component force P in the direction of the base axis 14 is
The force P is transmitted to the cutting *11, and the component force P perpendicular to the base axis 14
I cancels out the force of the flint 12 that is paired with it.

なお、複数組存在する火打受面22,230主軸20.
21が基軸14に対して5ekする角度は、各々自由で
あC1′9.差角lILを異ならせることによ9% 1
個の火打受部材10を様々に利用することかで龜る。
Note that there are multiple sets of flint receiving surfaces 22, 230 and the main shaft 20.
The angles that 21 makes 5ek with respect to the base axis 14 are free, and C1'9. 9% by changing the difference angle lIL 1
This is accomplished by using the different flint support members 10 in various ways.

8面の受面tVする火打受部材10は、各々O切梁9#
11及び火打12eO先趨に正面から轟接して#!畿像
合されるが、このようにしたことによp1従米のボルト
産金を利用し、従って顔ボルトにせん断力か生じる火打
受部材に比較して2〜4倍以上も耐力及び構造上の安定
性が向上する。
The flint receiving member 10 having eight receiving surfaces tV each has an O stub 9#.
#! However, by doing this, the bolt gold produced in P1 is used, and the strength and structural strength are 2 to 4 times higher than that of the fire-strength member, which generates shear force on the face bolt. Improved stability.

この層内は、゛応力を鈎で受けるからである。ま次、ボ
ルト結合のためoycIjll及び大泣110合わせ、
良には、ボルト締結等0作l&か不用になるため、現場
での施工が非常に容易である。
This is because the inside of this layer receives stress from the hook. Next, for bolt connection, oycIjll and Oiyi 110 are combined,
Best of all, there is no need for bolt fastening, so construction on site is very easy.

吏に、菖6図に示し九九からも明らかなように、絢−水
平面上で多数の切梁8,11及び火打12を交差させる
ことができ、しかも前記したように、火打受面22.2
3の主軸20,21の父葺角度【異ならせるととによp
1設針上の自由直及び融通性が一層増して便利でめpl
その上、製品としてOS準化を図ることかできる。
In addition, as shown in Figure 6 and is clear from the multiplication table, a large number of struts 8, 11 and flints 12 can intersect on the horizontal plane, and as described above, the flint receiving surface 22. 2
3. The angle of the main shafts 20 and 21 is different.
Free straightness and flexibility on one set of needles are further increased for convenience and convenience.
Moreover, it is possible to standardize the OS as a product.

藤7図は、本願火打受部材10を2個並置iせて%側方
切梁受面11に釆僑材24を設けたもので、このように
切梁11.11に一層中させて腹蔵8からより一層大き
な力t−受けることもで龜る1、以上述べたように、本
発明に係る火打受部材によれば、切梁及び火打の先熾と
幽豪する受歯t−備部に一体に備えたことにより、耐力
及び安定性を向上させ、ま九、施工を容易にし、しかも
、設計上の融通性が^められるという効果かある。
In Fig. 7 of Fuji, two pieces of the original firework receiving members 10 are placed side by side, and a fillet material 24 is provided on the side strut receiving surface 11. As described above, according to the flint receiving member according to the present invention, the receiving tooth t-bench part, which is more powerful than the leading edge of the strut and flint. The integrated construction has the effect of improving strength and stability, making construction easier, and providing more flexibility in design.

【図面の簡単な説明】[Brief explanation of drawings]

M1図は、従来技術を示す期面凶、絽2図は、蕗1図の
平面図、紺3図は、第2図の細分拡大図、縞4図は、本
発明に係る火打受部材の一実施例を示す平面図、#I5
図は、第4−の矢印T方向から見九貴面図、J16図は
、本願発明に係る火打受部材の使用例を示す平面図、w
i7図は、他の使用例を示す部分平面−である。 8・・・腹蔵、1.11・・・切梁、1G・・・火打受
部材、12・・・火打、13・・・連結金具、14・・
・基軸、1s・・・土切9Ii受面、1@、1F・・・
切梁、18・・・主軸、19・・・側方切朱受面、20
,21・・・主軸、22゜23・・・火打受面、24・
・・架橋材。
Figure M1 shows the prior art, Figure 2 is a plan view of Figure 1, dark blue Figure 3 is a subdivided enlarged view of Figure 2, and Stripe 4 is a diagram of the fire support member according to the present invention. Plan view showing one embodiment, #I5
The figure is a nine-sided view seen from the direction of the arrow T of the 4-th figure.
Figure i7 is a partial plane showing another example of use. 8... Harakura, 1.11... Strut beam, 1G... Flint receiving member, 12... Flint, 13... Connecting metal fittings, 14...
・Base axis, 1s... Dokiri 9Ii receiving surface, 1@, 1F...
Structural beam, 18...Main shaft, 19...Side cutting vermilion receiving surface, 20
, 21... Main shaft, 22° 23... Flint receiving surface, 24.
...Bridging material.

Claims (1)

【特許請求の範囲】[Claims] 1、基軸に直交する1組の主切梁受内と、前記基軸に直
交し丸主軸を有する1組の側方切梁欠肉と、前記基軸に
斜変し、かつl[基軸に関して対称に配置され次主軸を
有する複数組の火打受−とを一体に備え九火打受部材。
1. A set of main strut bridges perpendicular to the base axis, a set of side beam undercuts perpendicular to the base axis and having a round main axis, oblique to the base axis, and l[symmetrical with respect to the base axis] 9. A fire support member, integrally comprising a plurality of sets of fire support, which are arranged and have a secondary spindle.
JP14777081A 1981-09-21 1981-09-21 firework parts Expired JPS5911014B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP14777081A JPS5911014B2 (en) 1981-09-21 1981-09-21 firework parts

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP14777081A JPS5911014B2 (en) 1981-09-21 1981-09-21 firework parts

Publications (2)

Publication Number Publication Date
JPS5850226A true JPS5850226A (en) 1983-03-24
JPS5911014B2 JPS5911014B2 (en) 1984-03-13

Family

ID=15437779

Family Applications (1)

Application Number Title Priority Date Filing Date
JP14777081A Expired JPS5911014B2 (en) 1981-09-21 1981-09-21 firework parts

Country Status (1)

Country Link
JP (1) JPS5911014B2 (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04280035A (en) * 1991-03-07 1992-10-06 Nec Corp Plasma display panel
JPH0547039U (en) * 1991-03-15 1993-06-22 ヒロセ株式会社 Yamatome shoring structure
KR100412162B1 (en) * 2001-09-25 2003-12-24 (주)신성엔지니어링 Method of construction for excavating the ground by using trusstype support structures
CN105297744A (en) * 2015-11-16 2016-02-03 中国建筑第八工程局有限公司 Large foundation pit assembling type structural steel supporting system
CN106592606A (en) * 2017-01-19 2017-04-26 中铁开发投资有限公司 Foundation pit support construction method suitable for three-free-face building envelope
CN106978813A (en) * 2016-01-13 2017-07-25 中国建筑第八工程局有限公司 The anti-failure power transmission component of the relay of large deep foundation pit bracing members system
JP2018112021A (en) * 2017-01-13 2018-07-19 ジェコス株式会社 Short strut brace connection structure and short strut brace connection piece
JP2018145618A (en) * 2017-03-02 2018-09-20 ジェコス株式会社 Strut beam and corner brace connection structure, and connection piece for strut beam and corner brace
CN112012223A (en) * 2020-08-27 2020-12-01 深圳市交通公用设施建设中心 Support stable strutting arrangement for foundation ditch construction
CN112095626A (en) * 2020-09-28 2020-12-18 中国电建集团华东勘测设计研究院有限公司 Foundation pit supporting structure serving as corridor underpinning pile foundation and construction method thereof

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6366309U (en) * 1986-10-21 1988-05-02
JPH0364806U (en) * 1989-10-31 1991-06-25

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04280035A (en) * 1991-03-07 1992-10-06 Nec Corp Plasma display panel
JPH0547039U (en) * 1991-03-15 1993-06-22 ヒロセ株式会社 Yamatome shoring structure
KR100412162B1 (en) * 2001-09-25 2003-12-24 (주)신성엔지니어링 Method of construction for excavating the ground by using trusstype support structures
CN105297744A (en) * 2015-11-16 2016-02-03 中国建筑第八工程局有限公司 Large foundation pit assembling type structural steel supporting system
CN106978813A (en) * 2016-01-13 2017-07-25 中国建筑第八工程局有限公司 The anti-failure power transmission component of the relay of large deep foundation pit bracing members system
JP2018112021A (en) * 2017-01-13 2018-07-19 ジェコス株式会社 Short strut brace connection structure and short strut brace connection piece
CN106592606A (en) * 2017-01-19 2017-04-26 中铁开发投资有限公司 Foundation pit support construction method suitable for three-free-face building envelope
JP2018145618A (en) * 2017-03-02 2018-09-20 ジェコス株式会社 Strut beam and corner brace connection structure, and connection piece for strut beam and corner brace
CN112012223A (en) * 2020-08-27 2020-12-01 深圳市交通公用设施建设中心 Support stable strutting arrangement for foundation ditch construction
CN112012223B (en) * 2020-08-27 2021-11-19 深圳市交通公用设施建设中心 Support stable strutting arrangement for foundation ditch construction
CN112095626A (en) * 2020-09-28 2020-12-18 中国电建集团华东勘测设计研究院有限公司 Foundation pit supporting structure serving as corridor underpinning pile foundation and construction method thereof

Also Published As

Publication number Publication date
JPS5911014B2 (en) 1984-03-13

Similar Documents

Publication Publication Date Title
JPS5850226A (en) Brace receiver
US2583368A (en) Coupling means for scaffolding bars
US4162866A (en) H-shaped steel sheet pile wall
JPH0516284Y2 (en)
GB2122711A (en) A joint arrangement
US3461635A (en) Building wall sections approximating a predetermined curvature and method of making the same
GB2136909A (en) Tower structure
JP3152849B2 (en) Joint structure between prong and cut beam
SU609829A1 (en) Butt joint of composite pile sections
KR970009270B1 (en) Prefabricated strut
JP3373663B2 (en) Column weld joint joint structure
GB840262A (en) Improvements in or relating to tunnel linings
GB559237A (en) Improvements in or relating to building structures
JP3152800B2 (en) H-section framing method, framing gantry used therefor, and fall prevention jig
JPS63308119A (en) Combination method of braced piling in pile foundation of construction
SU1652423A1 (en) Through-type mud stream protection structure
SU1184885A1 (en) Sheet pipe wall
JPH06322759A (en) Pedestal of anchor
SU898011A1 (en) Form for rendering monolithic corner joint of construction elements
GB1317653A (en) Scaffolding structures
JPH073795A (en) Universal joint for civil engineering and architecture land slide protection frame
SU90821A1 (en) Precast reinforced concrete column
JPH0813650A (en) Connecting structure of earthquake-resisting wall
JPH0367170B2 (en)
JP3024001U (en) Beam receiving free piece