JPS5847872A - Apparatus for attaching reinforcing iron rod to large structure - Google Patents

Apparatus for attaching reinforcing iron rod to large structure

Info

Publication number
JPS5847872A
JPS5847872A JP14672381A JP14672381A JPS5847872A JP S5847872 A JPS5847872 A JP S5847872A JP 14672381 A JP14672381 A JP 14672381A JP 14672381 A JP14672381 A JP 14672381A JP S5847872 A JPS5847872 A JP S5847872A
Authority
JP
Japan
Prior art keywords
reinforcing bars
pedestal
center
rope
sized reinforcing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP14672381A
Other languages
Japanese (ja)
Other versions
JPS6114310B2 (en
Inventor
城田 逐馬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Construction Co Ltd
Original Assignee
Shimizu Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Construction Co Ltd filed Critical Shimizu Construction Co Ltd
Priority to JP14672381A priority Critical patent/JPS5847872A/en
Publication of JPS5847872A publication Critical patent/JPS5847872A/en
Publication of JPS6114310B2 publication Critical patent/JPS6114310B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Butt Welding And Welding Of Specific Article (AREA)
  • Reinforcement Elements For Buildings (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。
(57) [Summary] This bulletin contains application data before electronic filing, so abstract data is not recorded.

Description

【発明の詳細な説明】 本発明はL)IG等の低温地下タン、りの側壁を構鍋す
る@勢子め所定個所に*a付けられる大版組鉄筋の版付
は載置に関する。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to the placement of large-sized reinforcing bars that are attached to predetermined locations on the side walls of L) low-temperature underground tanks such as IGs.

地下タンクのamを構築する方法の一つとして、予め構
築された連続地中壁の内側に上側から下側へと順次コン
クリートを打役するいわゆる逆巻工法によって施工する
方法が知られている。
One known method for constructing an am for an underground tank is to use the so-called reverse winding method, in which concrete is poured sequentially from the top to the bottom inside a continuous underground wall that has been constructed in advance.

ところで、従来、このような施工方法にあっては、側壁
部分となる個所に鉄筋を配設する場合、人手によって鉄
筋を一本ずつ吊ル上げて鉄筋同士を接続させるいわゆる
パラ組工法によシ施工していた。しかしながら、このよ
うな方法にあっては、鉄筋を一本ずつ吊シ上けて組み付
けなけれにならず、従って作業能率が極めて悪く、ひい
ては工期が長くなるとともに多大な労力を必要とし、ま
た工費がアップするという間馳があった。
By the way, conventionally, in such construction methods, when installing reinforcing bars at the locations that will become the side walls, the so-called para-assembly method was used, in which the reinforcing bars were manually lifted one by one and connected to each other. It was under construction. However, with this method, the reinforcing bars must be hoisted up and assembled one by one, which is extremely inefficient, lengthens the construction period, requires a great deal of labor, and increases construction costs. There was a moment when I decided to upload it.

そこで、本発明者は、予め地上にて鉄筋同士を機銃させ
て大版組鉄筋をり(シ、この大版組鉄筋を吊シ上けて所
定個所に接続する施工方法を案出した。ところが、この
ような施工方法にあっては、クレーン勢を用いて大版組
鉄筋を吊シ込む際に既に構築された側壁が邪魔になるた
め、大版組鉄筋を既設@橡の下側に配置させることがで
きず、そのうえ特にLNG等の低温液化ガスの地下タン
ク用@壁を構築する場合にあっては、l1llIiの内
側部枠として表面に保竺材が取シ付けられたセグメント
が用いられているから、このセグメントを損傷しないよ
うにする必賛があるという問題を見い出した。
Therefore, the present inventor devised a construction method in which the reinforcing bars are machine-gunned together on the ground in advance, and the large-sized reinforcing bars are hoisted up and connected to predetermined locations. In this construction method, the already constructed side walls will get in the way when the large-sized reinforcing bars are lifted in using cranes, so the large-sized reinforcing bars are placed below the existing structure. In addition, especially when constructing walls for underground tanks for low-temperature liquefied gas such as LNG, segments with insulation material attached to the surface are used as the inner frame of l1llIi. Since I found this problem, I have to avoid damaging this segment.

本発明は上記事情に鑑みてなされたもので、既設側壁に
邪魔されることなく、シかもこの側壁の内側にセグメン
トが取シ付けられた場合であってもこのセグメントを損
傷することなく、大版組鉄筋を吊シ込むことができる大
版組鉄筋取付は装置を提供することを目的とする。
The present invention has been made in view of the above-mentioned circumstances, and even if the segment is installed inside the side wall without being obstructed by the existing side wall, it can be installed without damaging the segment. The purpose of the present invention is to provide a device for installing large-sized reinforcing bars that can hang up reinforcing bars.

以下、本発明の一実施例について第1図および第2図を
参照して説明する。図中1は架台で、その一端部には大
版組鉄筋2を垂直に載置させる大版組鉄筋載置部3が設
けられておシ、またその中間部には足場板4゛を載置さ
せる足場板載置部5が設けられている。足場板載置部5
の下部両側にはロープ接続用量シ金具6.7がそれぞれ
取シ付けられている。これら吊シ金Ate、 7にはp
−プ8ζ9の一端がそれぞれ接続されており、これらロ
ープ8.9の他端はクレーン(図示せず)の7ツク10
にそれぞれ接続されている。さらに、架台1の他側には
カウンターウェイト11が取シ付けられている。カウン
ターウェイト11の上部中央部にはホイスト12および
このホイスト12を駆動させるモータ18からなる重心
位置変化機構14がjk〕付けられている。また、カウ
ンターウェイト11の上部両側にはロープ接続用吊夛金
其15.16がそれぞれ堆シ付けられている。これら吊
シ金具15.10にはロープ17.18の一端がそれぞ
れ接続されておシ、これらロープ17.18の他端はそ
れぞれ滑車装置1gに後述するように接続されている。
An embodiment of the present invention will be described below with reference to FIGS. 1 and 2. In the figure, reference numeral 1 denotes a pedestal, and one end thereof is provided with a large-sized reinforcing bar 3 on which the large-sized reinforcing bars 2 are placed vertically, and a scaffold board 4 is placed in the middle. A scaffold board placement section 5 on which the scaffold board is placed is provided. Scaffold board placement part 5
Rope connection fittings 6.7 are attached to both sides of the lower part of the rope. These hanging metal Ate, 7 has p
- one end of each rope 8.9 is connected, and the other end of these ropes 8.9 is connected to a crane (not shown).
are connected to each. Furthermore, a counterweight 11 is attached to the other side of the pedestal 1. A gravity center position changing mechanism 14 consisting of a hoist 12 and a motor 18 for driving the hoist 12 is attached to the upper center of the counterweight 11. Furthermore, rope connection slings 15 and 16 are respectively mounted on both sides of the upper part of the counterweight 11. One end of a rope 17.18 is connected to each of these hanging fittings 15.10, and the other end of each of these ropes 17.18 is connected to a pulley device 1g as described later.

滑車装[19は定滑車2oと動滑車21とこれら両滑車
20,21間に巻回されるロープ22とからなっている
。定滑車18に連結されているフック23はロープ24
を介してクレーン(図示せず)の゛7ツク10に接続さ
れており、また動滑車21に連結されているフック25
は前記ロープ17.18の他端に接続されている。
The pulley system [19] consists of a fixed pulley 2o, a movable pulley 21, and a rope 22 wound between these pulleys 20, 21. The hook 23 connected to the fixed pulley 18 is connected to the rope 24
A hook 25 is connected to a hook 10 of a crane (not shown) via a hook 25 and a movable pulley 21.
is connected to the other end of said rope 17,18.

また、定滑車20から延びるロープ22は前記ホイスト
12に巻回されている。そして、ホイスト12を正転あ
るいは逆転させてロープ22を巻き取ったシあるいはそ
の巻回を解いたシすることによシ定渭車20と動滑車2
1との間隔を任意に変化させることができ、ひいてはフ
ック1oと吊シ金具15.16との間隔lを任意に変化
させることができるようになされている。
Further, a rope 22 extending from the fixed pulley 20 is wound around the hoist 12. Then, by rotating the hoist 12 in the forward or reverse direction to wind up or unwind the rope 22, the fixed wheel 20 and the movable pulley 2 are rotated.
The distance between the hook 1o and the hanging metal fittings 15 and 16 can be changed arbitrarily, and the distance l between the hook 1o and the hanging fittings 15 and 16 can also be changed arbitrarily.

次に、この装置を用いて大版組鉄筋2ft既設翻I&8
1の下−1に取シ付ける場合について説明する。
Next, we used this device to convert the existing 2ft large-sized reinforcing bars into I&8.
The case where it is attached to the bottom -1 of 1 will be explained.

なお、この説明の前に逆巻工iによる低温地下タンクの
@壁の構築方法について若干説明する。壕ず、タンクの
外周部分に相当する個所に連続地中1132を構築する
。次いで、側1181の内部部分に相当する個所に大版
組鉄筋2を配設するとともに@1131の内側部分にセ
グメント88を城シ付ける0次いで、連続地中1182
を外@型枠として用い−とともにセグメント3at−内
側型枠として用い、そして内部にコンクリートを打設す
ることによシ儒1i81を構築する。なお、34はセグ
メント保賎板である。
Before this explanation, we will briefly explain how to construct the @wall of a low-temperature underground tank using Sakamaki-i. Without a trench, a continuous underground 1132 is constructed at a location corresponding to the outer periphery of the tank. Next, large-sized reinforcing bars 2 are placed at locations corresponding to the internal portion of the side 1181, and segments 88 are attached to the internal portion of the side 1131.Next, the continuous underground 1182
1i81 is constructed by using segment 3at as the outside formwork and segment 3at as the inside formwork, and pouring concrete inside. In addition, 34 is a segment protection board.

ところで、大版組鉄筋2は現場あるいは工場にて鉄筋同
士を接続することにょシ所定形状に組まれる。そして、
このようにしてつくられた大版組鉄筋2tr−クレーン
(図示せず)によって吊シ上ばて移動させ架台1の大版
組鉄筋載置部8に載置させる。次いで、ホイスト12を
回転させてクレーンの7ツク10が架台1の重心G1の
鉛直上に至るように調整し、これにょシ架台1を水平状
態に保持した後、クレーンにょシロープ8,9.17.
18を介して架台1を吊)上けて移動させ、そして既設
側1131の下側に配置させる。そしてさらに、大版組
鉄筋2の上端部の鉄筋85が既設@壁31の下側に突出
する接続用鉄筋36と同軸的に合致するように配置させ
た状態で支持し、そして六角カプラ等の接続部材37を
介してそれら鉄筋を1本ずつ接続する。
By the way, the large-sized reinforcing bars 2 are assembled into a predetermined shape by connecting the reinforcing bars to each other on-site or in a factory. and,
The large-format reinforcing bars 2 produced in this manner are lifted up and moved by a crane (not shown) and placed on the large-format reinforcing bar mounting portion 8 of the pedestal 1. Next, the hoist 12 is rotated and adjusted so that the seven hoists 10 of the crane are vertically above the center of gravity G1 of the gantry 1, and after holding the gantry 1 horizontally, the crane ropes 8, 9, 17 are adjusted. ..
The pedestal 1 is lifted up and moved via 18, and placed below the existing side 1131. Further, the reinforcing bars 85 at the upper end of the large-sized reinforcing bars 2 are supported so as to be coaxially aligned with the connecting reinforcing bars 36 protruding from the bottom of the existing wall 31, and are supported using hexagonal couplers, etc. The reinforcing bars are connected one by one via the connecting members 37.

なお、大版組鉄筋2の上端部の鉄筋35の微妙な位置お
よび調整は、ホイスト12を回転させてフック10と吊
り金具15.16との間隔!を変化させることにより行
なわれる。また、フック10を吊シ上げるロープ38の
位置と大版組鉄筋2が載置されている個所とは大きく離
れており、従って大版組鉄筋2を吊シ込む際既設側壁3
1が邪魔になったり、あるいはセグメント33を損傷す
るおそれは全くない。
In addition, delicate positioning and adjustment of the reinforcing bar 35 at the upper end of the large-sized reinforcing bar 2 can be done by rotating the hoist 12 to adjust the distance between the hook 10 and the hanging fittings 15 and 16. This is done by changing the In addition, the position of the rope 38 for hoisting the hook 10 is far away from the location where the large-sized reinforcing bars 2 are placed, and therefore, when lifting the large-sized reinforcing bars 2, the existing side wall
1 may get in the way or damage the segment 33.

次に、架台1を下降させるのであるが、大版組鉄筋2は
既設側壁31に接続されており、架台1には載置されて
おらず、従って架台1の重心は嬉2図に示すようにへか
ら02へと移動する。この結果、架台1は重心へかフッ
ク10の鉛直下に至るように矢印入方向に回動して、取
シ付けた大版組鉄筋2を損傷したシあるいは足場板本が
落下する勢の不都合が生じる。しかしながら、本実施例
においては、第2図中2点鎖線で示すように重心の移動
量に応じてホイスト12を回転させてフック10と吊シ
金具15.16との間隔を11から12に短かくなるよ
うに変化させてフック13が新たな重心G1の鉛直上に
至るように一整するため、架台1は回動せず略水平状態
に保持されており、従って上記のような不都合は全く生
じない。
Next, the pedestal 1 is lowered, but the large-sized reinforcing bars 2 are connected to the existing side wall 31 and are not placed on the pedestal 1, so the center of gravity of the pedestal 1 is as shown in Figure 2. Move from Nihe to 02. As a result, the frame 1 rotates in the direction of the arrow so as to reach the center of gravity or vertically below the hook 10, causing damage to the attached large-sized reinforcing bars 2 or causing the scaffold board to fall. occurs. However, in this embodiment, the distance between the hook 10 and the hanging fittings 15 and 16 is shortened from 11 to 12 by rotating the hoist 12 according to the amount of movement of the center of gravity, as shown by the two-dot chain line in FIG. Since the hook 13 is aligned vertically above the new center of gravity G1 by changing it in this manner, the pedestal 1 is held in a substantially horizontal state without rotating, and therefore the above-mentioned inconvenience is completely avoided. Does not occur.

なお、上記実施例においては、吊シ下げロープの長さを
変化させることにより、重心位置を変化させているが、
これに限られることなく、例えばカウンターウェイト1
1を架台1の一端部から他端部側に移動調整させるよう
にしてもよい。なお、この場合、ローブ接続用吊り金具
15.16を架台1の他端部に固定的に取シ付打、これ
によυフック10の吊り位置を固定するようにしてもよ
い5以上説明したように、本発明による大版組鉄筋取付
は装置によれば、一端部に大版組鉄筋が載置されかつ他
端部にカウンターウェイトが設けられた架台の重心位置
を重心位11i1f化機構によって変化させる構成であ
るから、既設側壁に邪魔されることなく、シかもこの1
lllIIkの内側にセグメントが取り付けられた場合
であってもこのセグメントを損傷することなく大版組鉄
筋を吊り込′むごとができ、ひいては工期短縮、省力化
および工費低減を図ることができる等の効果を南する。
In addition, in the above embodiment, the center of gravity position is changed by changing the length of the hanging rope.
Without being limited to this, for example, counterweight 1
1 may be moved and adjusted from one end of the pedestal 1 to the other end. In this case, the hanging fittings 15 and 16 for connecting the lobes may be fixedly attached to the other end of the pedestal 1, thereby fixing the hanging position of the υ hook 10. As described above, according to the apparatus for attaching large-sized reinforcing bars according to the present invention, the center of gravity of a frame on which large-sized reinforcing bars are placed at one end and a counterweight is provided at the other end is adjusted to the center of gravity position 11i1f by a mechanism. Since it has a variable configuration, it can be easily installed without being obstructed by the existing side wall.
Even if a segment is installed inside the IllIIk, large-sized reinforcing bars can be hung without damaging the segment, which in turn shortens construction time, saves labor, and reduces construction costs. Southern effect.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は本発明による大版組鉄筋取付は装置の−爽施例
を示す斜視図、第2図はその作用を説明するために示す
図である。 1・・・・・・架台、2・・・・・・大版#1鉄勧、3
・・・・・・大版組鉄筋載置部、8.9.17.18・
・・・・・ロープ、10・・・・・・フック、11・・
・・・・カウンターウェイト、14・・・・・・重心位
置変化@栴、31・・・・・・側壁。 出願人清水建設株式会社 −3;
FIG. 1 is a perspective view showing an embodiment of a large-format reinforcing bar installation apparatus according to the present invention, and FIG. 2 is a diagram for explaining its operation. 1... Frame, 2... Large edition #1 Tetsukan, 3
・・・・・・Oban assembly reinforcing bar placement section, 8.9.17.18・
...Rope, 10...Hook, 11...
... Counterweight, 14 ... Center of gravity position change @Shiru, 31 ... Side wall. Applicant Shimizu Corporation-3;

Claims (1)

【特許請求の範囲】 (1)  一端部に大版組鉄筋■が載置される架台0)
と、該架台(1)の他端部に設けられたカウンターウェ
イ) [、i、 i’ )と、前記架台(1)を略水平
状態でクレーンのフック(101に吊〕下けるp−プ機
構(8,9,17,18)と、前l記架台(1)の重心
位置な変化させる重心位置変化機構(14)とからなる
ことを特徴とする大版組鉄筋取付は装置。 (2)  前記重心位置変化機構(14)は前記ロープ
機11(8,9,17,18)による前記架台0)に対
する吊シ下はロープ長さを変化させる構成であることを
特徴とする特許請求のI@囲第Allに記載の大版組鉄
筋取付は装置。 (8)前記、重心位11変化機構(14)は前記カウン
ターウェイト(11)の前記架台(1)に対する配置位
置を変化させる構成であることを特徴とする特許請求の
1aH第λ項に記載の大版耐鉄筋取付は装置。
[Claims] (1) Frame 0 on which the large-sized reinforcing bars ■ are placed at one end)
, a counterway) [, i, i') provided at the other end of the pedestal (1), and a p-plane for hanging the pedestal (1) in a substantially horizontal state from a crane hook (101). A device for attaching large-sized reinforcing bars characterized by comprising a mechanism (8, 9, 17, 18) and a center-of-gravity position changing mechanism (14) for changing the center of gravity position of the pedestal (1). (2 ) The center of gravity position changing mechanism (14) is configured to change the length of the rope when the rope machine 11 (8, 9, 17, 18) suspends it from the frame 0). The installation of large-sized reinforcing bars described in I@All Sections is a device. (8) The center of gravity position 11 changing mechanism (14) is configured to change the arrangement position of the counterweight (11) with respect to the pedestal (1), Large version reinforced steel installation equipment.
JP14672381A 1981-09-17 1981-09-17 Apparatus for attaching reinforcing iron rod to large structure Granted JPS5847872A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP14672381A JPS5847872A (en) 1981-09-17 1981-09-17 Apparatus for attaching reinforcing iron rod to large structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP14672381A JPS5847872A (en) 1981-09-17 1981-09-17 Apparatus for attaching reinforcing iron rod to large structure

Publications (2)

Publication Number Publication Date
JPS5847872A true JPS5847872A (en) 1983-03-19
JPS6114310B2 JPS6114310B2 (en) 1986-04-18

Family

ID=15414097

Family Applications (1)

Application Number Title Priority Date Filing Date
JP14672381A Granted JPS5847872A (en) 1981-09-17 1981-09-17 Apparatus for attaching reinforcing iron rod to large structure

Country Status (1)

Country Link
JP (1) JPS5847872A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62264264A (en) * 1986-05-09 1987-11-17 大成建設株式会社 Device of arrangement of bar of reinforcement

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0185621U (en) * 1987-11-28 1989-06-07

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62264264A (en) * 1986-05-09 1987-11-17 大成建設株式会社 Device of arrangement of bar of reinforcement
JPH0513222B2 (en) * 1986-05-09 1993-02-22 Taisei Kensetsu Kk

Also Published As

Publication number Publication date
JPS6114310B2 (en) 1986-04-18

Similar Documents

Publication Publication Date Title
JPH09302919A (en) Transfer platform for columnar body
JPS5847872A (en) Apparatus for attaching reinforcing iron rod to large structure
JP2002302382A (en) Vertically suspending method of long size material
JPH08218641A (en) Method of standing up pillar member in the air and device therefor
JP2725040B2 (en) Hanging method of construction plate and its device
JP2694098B2 (en) How to install heavy objects
JP2560703Y2 (en) Jig for sling
JP2944025B2 (en) Cast-in-place pile reinforced cage construction equipment
JP3326733B2 (en) Movable hanging jig for steel frame construction and steel frame construction method using the same
KR200290596Y1 (en) curtain-wall installation apparatus possible to move horizontally
CN210710492U (en) Hoisting device of anti-floating anchor rod
JP2001316074A (en) Lifting jig for lifted cargo and its use
CN210855068U (en) Suspension beam lifting device
KR20030096871A (en) curtain-wall installation apparatus possible to move horizontally and the installation method using the same
JP2007153555A (en) Suspending auxiliary device of heavy material
JP2566271Y2 (en) Piling equipment
JP2532195Y2 (en) Equipment for transporting earth and sand
KR20030096870A (en) curtain-wall installation apparatus possible to move horizontally and curtain-wall installation method using the same
JPH0728179Y2 (en) Lifting device for tower erection crane
JPH0769577A (en) Steel beam member erection method using crane
JPH0325161A (en) Hanging method for reverse winding mold
CN114016873A (en) Construction method for pouring civil air defense sill table and installing civil air defense door
JPH035567A (en) Temporary installation method for working suspension scaffold
JPS6128680A (en) Rising construction method of transmission iron tower
SU1511369A1 (en) Drilling rig equipment module