JPS58181966A - Apparatus for constructing storage tank - Google Patents
Apparatus for constructing storage tankInfo
- Publication number
- JPS58181966A JPS58181966A JP57064598A JP6459882A JPS58181966A JP S58181966 A JPS58181966 A JP S58181966A JP 57064598 A JP57064598 A JP 57064598A JP 6459882 A JP6459882 A JP 6459882A JP S58181966 A JPS58181966 A JP S58181966A
- Authority
- JP
- Japan
- Prior art keywords
- tank
- storage tank
- rail
- cross beam
- pedestal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000003860 storage Methods 0.000 title claims description 4
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 claims description 5
- 239000000463 material Substances 0.000 claims description 4
- 238000010276 construction Methods 0.000 claims description 3
- 238000004519 manufacturing process Methods 0.000 description 5
- 230000001174 ascending effect Effects 0.000 description 4
- 229910000831 Steel Inorganic materials 0.000 description 3
- 239000010959 steel Substances 0.000 description 3
- 238000003466 welding Methods 0.000 description 2
- 229910001209 Low-carbon steel Inorganic materials 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 239000000295 fuel oil Substances 0.000 description 1
- 238000009421 internal insulation Methods 0.000 description 1
- 239000003949 liquefied natural gas Substances 0.000 description 1
- 239000003915 liquefied petroleum gas Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/24—Scaffolds essentially supported by building constructions, e.g. adjustable in height specially adapted for particular parts of buildings or for buildings of particular shape, e.g. chimney stacks or pylons
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/24—Scaffolds essentially supported by building constructions, e.g. adjustable in height specially adapted for particular parts of buildings or for buildings of particular shape, e.g. chimney stacks or pylons
- E04G3/243—Scaffolds essentially supported by building constructions, e.g. adjustable in height specially adapted for particular parts of buildings or for buildings of particular shape, e.g. chimney stacks or pylons following the outside contour of a building
Abstract
(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。(57) [Summary] This bulletin contains application data before electronic filing, so abstract data is not recorded.
Description
【発明の詳細な説明】
この発明は液体天然ガス、LPG、重油などの貯槽の建
設装置に関するものである。DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a construction device for storage tanks for liquid natural gas, LPG, heavy oil, etc.
上記のタンクは直径がωメートル、高さが(9)メート
ル内外あり、外槽を例えば32メ一トル×Lメートルで
厚さが36調のSUS 、 At SNi、鋼、軟鋼、
高張力鋼の板を溶接して製造する。The above-mentioned tank has a diameter of ω meters and a height of (9) meters.The outer tank is made of, for example, 32 meters x L meters and a thickness of 36 mm, such as SUS, At SNi, steel, mild steel, etc.
Manufactured by welding high-strength steel plates.
ぞの製造の際(資)メートル位の足場が必要となり一方
製造後、i−3図に示すようにタンク頂部へ昇降階段が
必要である。矛3図は地上式タンクでタンクの屋根の孔
から人間が中へ入り、内部の断熱材の修繕や、屋根の修
繕などを行う必要がある。又タンク製造の際には付近に
起重機を備え、材料の吊上げが必要となる。During the manufacturing process, scaffolding of about 1000 meters is required, and after manufacturing, stairs are required to go up and down to the top of the tank, as shown in Figure I-3. Figure 3 is an above-ground tank that requires people to enter through a hole in the roof of the tank to repair the internal insulation and repair the roof. Additionally, when manufacturing tanks, it is necessary to have a hoist nearby to lift the materials.
この発明は上記の状況に鑑み、製造時の足場。In view of the above-mentioned situation, this invention provides a scaffold for manufacturing.
起重機の役目を果し、タンク製造後の昇降階段の役目を
なす建設装置を提供することを目的とする。The purpose of the present invention is to provide a construction device that serves as a hoist and as a staircase for ascending and descending after manufacturing a tank.
この発明の実施例を添付図面により説明すると、才2図
において、地上の柱1の上にコンクリートの底板2を設
け、底板の周囲にレール3を敷設する。An embodiment of the present invention will be described with reference to the accompanying drawings. In Figure 2, a concrete bottom plate 2 is provided on a pillar 1 on the ground, and a rail 3 is laid around the bottom plate.
矛1図、112図においてタンクの側板の高さに応じて
いくつかに分割された架台4の車輪5をレール3の上に
乗せる。タンク6の中心に支柱7を設け、支柱7に横桁
8を回転自在に設置−rる。支柱7も側壁の高さに応じ
て積み上げ得るようブロック化しておく。横桁8の中間
を架台4により支承せしめる。In Figures 1 and 112, the wheels 5 of the frame 4, which is divided into several parts depending on the height of the side plate of the tank, are placed on the rail 3. A support 7 is provided at the center of the tank 6, and a cross beam 8 is rotatably installed on the support 7. The pillars 7 are also made into blocks so that they can be stacked according to the height of the side walls. The middle of the cross beam 8 is supported by the frame 4.
鋼板などの材料9を横桁8から四−ブ10で吊上げ、横
桁8に沿って中央に移動せしめ、適当なか所に降下せし
め、架台4の上に作業員が乗って溶接を行う。次に架台
4をレール3に治って移動せしめ、上記作業を繰返す。A material 9 such as a steel plate is hoisted up from the crossbeam 8 by a four-beam 10, moved along the crossbeam 8 to the center, and lowered to an appropriate location, and a worker stands on the frame 4 to perform welding. Next, the pedestal 4 is fixed to the rail 3 and moved, and the above operation is repeated.
−周の作業が終れば支柱7、架台4のブロックを積み重
ねて次の段の作業を行う。- Once the circumferential work is completed, stack the blocks of the pillar 7 and pedestal 4 and work on the next stage.
タンク6の側壁9の積重ねが終了したら架台4を牙3図
に示すように基礎底板11上に設置して昇降階段とする
。最後に横Vr8、支柱7を除去する。After the side walls 9 of the tank 6 are stacked, the pedestal 4 is installed on the base plate 11 as shown in Fig. 3 to form an ascending/descending staircase. Finally, remove the horizontal Vr8 and the pillar 7.
本発明により汎用のクレーンが不要となり1支柱7、横
桁8は繰り返し使用できる。The present invention eliminates the need for a general-purpose crane, and one support column 7 and crossbeam 8 can be used repeatedly.
従って60メートルのタンクに利用できるクレーンの賃
貸料が不要となる。Therefore, there is no need to rent a crane that can be used for a 60 meter tank.
積重ねた架台4をタンク6の全周に移動して使用できる
ので、大きな足場が不要となる。Since the stacked mounts 4 can be moved and used around the entire circumference of the tank 6, a large scaffolding is not required.
又架台4を使用するのでクレーンの如く折れることがな
く操業が安全、確実である。Furthermore, since the pedestal 4 is used, it does not break like a crane, and the operation is safe and reliable.
又積み重ねた架台4が昇降階段として利用でき、技術上
も経済上も多大の効果があるものである。Furthermore, the stacked pedestals 4 can be used as ascending/descending stairs, which has great effects both technically and economically.
牙1図は本発明の斜視図、牙2図は一部の正面図、牙3
図は貯槽に昇降階段を設けた状態を示す斜視図である。
3・・φレール
4・・・架台
5・・・車輪
6・・・タンク
7・・・支柱
8・・・横桁
9・・・材料
10・・・運搬装置Fang 1 is a perspective view of the present invention, Fang 2 is a partial front view, Fang 3
The figure is a perspective view showing a state in which the storage tank is provided with ascending and descending stairs. 3...φ rail 4...frame 5...wheel 6...tank 7...pillar 8...cross beam 9...material 10...transportation device
Claims (1)
上に、順次ブロックを積重ねる架台を走行できるよう載
置し、建設するタンクの中心に、ブロックを積重ねる支
柱を設け、その支柱に横桁を回転自在に設け、横桁の中
間を架台で支承せしめ、横桁に材料の運搬装置を設けて
なるI貯槽の建設装置。Lay a rail around the tank to be constructed, place a pedestal on which blocks can be stacked one by one on the rail so that it can run, set a column in the center of the tank to be constructed, and place a support horizontally on that column. A construction device for an I storage tank, in which a girder is rotatably provided, the middle of the cross beam is supported by a frame, and a material transport device is provided on the cross beam.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP57064598A JPS58181966A (en) | 1982-04-17 | 1982-04-17 | Apparatus for constructing storage tank |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP57064598A JPS58181966A (en) | 1982-04-17 | 1982-04-17 | Apparatus for constructing storage tank |
Publications (1)
Publication Number | Publication Date |
---|---|
JPS58181966A true JPS58181966A (en) | 1983-10-24 |
Family
ID=13262845
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP57064598A Pending JPS58181966A (en) | 1982-04-17 | 1982-04-17 | Apparatus for constructing storage tank |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPS58181966A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH03130284U (en) * | 1990-04-12 | 1991-12-27 | ||
CN102633198A (en) * | 2012-04-21 | 2012-08-15 | 陕西建工集团设备安装工程有限公司 | Storage tank lifting construction method applicable to heavy wind areas |
-
1982
- 1982-04-17 JP JP57064598A patent/JPS58181966A/en active Pending
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH03130284U (en) * | 1990-04-12 | 1991-12-27 | ||
CN102633198A (en) * | 2012-04-21 | 2012-08-15 | 陕西建工集团设备安装工程有限公司 | Storage tank lifting construction method applicable to heavy wind areas |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108560927B (en) | Steel rib column hoisting system and use method thereof | |
US20060045720A1 (en) | Method of fabricating a tall multi-stage work piece | |
JPS58181966A (en) | Apparatus for constructing storage tank | |
JP3242775B2 (en) | Installation method of vertical container | |
CN214329956U (en) | Ring rail hoisting device for curtain wall installation | |
CN213871393U (en) | Protection structure that portal bracing beam lifted | |
CN113463942A (en) | Dismantling method of large bulk cargo ship loader | |
CN107152182A (en) | Holding rod mounting structure and installation method are found outside the oblique tank bottom of stainless steel clad plate storage tank | |
JP3027920B2 (en) | Piping unit and its installation method | |
JP3046552B2 (en) | Blast furnace furnace construction method | |
US2216701A (en) | Device for supporting plates in tank construction | |
CN213055350U (en) | Movable tensioning and shielding platform for beam field | |
CN217841502U (en) | Movable platform ladder stand | |
CN218712232U (en) | Double-layer beam storage bracket for I-shaped steel-concrete combined beam | |
JP3532161B2 (en) | Tower construction machine and tower construction method | |
CN217419309U (en) | A construction platform for installation of bridge below drainage pipe | |
CN213710438U (en) | Regularization platform of unloading | |
CN115305906B (en) | Integrated device for manufacturing and hoisting reinforcement cage and construction method | |
CN218088680U (en) | Pre-buried nested combination formula tower crane festival device | |
CN109056741B (en) | Method for dismantling lower steel support in multi-layer steel support | |
JPS6393973A (en) | Method of assembly construction of cylindrical type structure | |
JPS6318426Y2 (en) | ||
GB1155491A (en) | Method of Building Structures | |
JP2513376B2 (en) | How to build a building | |
CN206448539U (en) | Assembled unloading platform |