CN213710438U - Regularization platform of unloading - Google Patents
Regularization platform of unloading Download PDFInfo
- Publication number
- CN213710438U CN213710438U CN202022068260.6U CN202022068260U CN213710438U CN 213710438 U CN213710438 U CN 213710438U CN 202022068260 U CN202022068260 U CN 202022068260U CN 213710438 U CN213710438 U CN 213710438U
- Authority
- CN
- China
- Prior art keywords
- platform
- protection
- fixedly connected
- unloading
- material receiving
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000000463 material Substances 0.000 claims abstract description 49
- 230000001681 protective effect Effects 0.000 claims description 14
- 239000010410 layer Substances 0.000 claims description 9
- 239000011241 protective layer Substances 0.000 claims description 5
- 238000005728 strengthening Methods 0.000 claims description 4
- 230000000712 assembly Effects 0.000 claims description 2
- 238000000429 assembly Methods 0.000 claims description 2
- 230000000694 effects Effects 0.000 abstract description 5
- 238000007599 discharging Methods 0.000 description 12
- 230000002349 favourable effect Effects 0.000 description 12
- 229910000831 Steel Inorganic materials 0.000 description 6
- 239000010959 steel Substances 0.000 description 6
- 238000003466 welding Methods 0.000 description 6
- 238000010276 construction Methods 0.000 description 5
- 238000009434 installation Methods 0.000 description 5
- 230000009286 beneficial effect Effects 0.000 description 4
- 238000010586 diagram Methods 0.000 description 4
- 230000003014 reinforcing effect Effects 0.000 description 4
- 238000000034 method Methods 0.000 description 3
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 230000007797 corrosion Effects 0.000 description 2
- 238000005260 corrosion Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 230000003647 oxidation Effects 0.000 description 2
- 238000007254 oxidation reaction Methods 0.000 description 2
- 230000010354 integration Effects 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 229910052751 metal Inorganic materials 0.000 description 1
- 230000007306 turnover Effects 0.000 description 1
Images
Landscapes
- Building Environments (AREA)
Abstract
The utility model relates to a regularization platform of unloading, it is including connecing material platform, fixed connection connect the protection subassembly of connecing material platform one side at the support column and the fixed connection that connect the material platform both sides, and the protection subassembly is located between the adjacent support column, and the protection subassembly includes protection post and the protection network of fixed connection on the protection post, and the tip fixedly connected with fixed plate of support column is provided with the fixed orifices on the fixed plate, is provided with the mounting in the fixed orifices. This application has the effect that improves the platform stability of unloading.
Description
Technical Field
The application relates to the field of buildings, in particular to a regularization platform of unloading.
Background
The unloading platform is a temporary operation platform and an operation frame which are usually erected on a construction site and are generally used for material turnover. The discharging platform is divided into a movable discharging platform, a floor type discharging platform and an overhanging type discharging platform.
In the related technology, a real estate development project of project construction comprises 18 floors and 4 layers, the difference between the positive and negative zero elevation and the elevation of a garage top plate is about 1.8 meters, a material lifting machine is not installed in the project of considering the cost problem because a main building is a four-layer project, a floor unloading platform is installed in the project of solving the problem of vertical transportation, and the floor unloading platform is formed by overlapping a plurality of steel pipes which are staggered from the transverse cross.
Aiming at the related technologies, the inventor thinks that the unloading platform built by the steel pipes has poor stability, small safety factor, poor quality of steel pipe materials, poor aesthetic property, high danger coefficient in the installation and dismantling process, safety accidents are easy to happen in the use process, and the installation and dismantling process needs a plurality of workers to operate simultaneously, so that the construction cost is increased.
SUMMERY OF THE UTILITY MODEL
In order to improve the platform stability of unloading to increase the security, this application provides a regularization platform of unloading.
The application provides a regularization platform of unloading adopts following technical scheme:
a regularization unloading platform comprises a material receiving platform, support columns fixedly connected to two sides of the material receiving platform and a protection assembly fixedly connected to one side of the material receiving platform, wherein the protection assembly is positioned between the adjacent support columns and comprises protection columns and protection nets fixedly connected to the protection columns; the end part of the support column is fixedly connected with a fixing plate, a fixing hole is formed in the fixing plate, and a fixing part is arranged in the fixing hole.
Through adopting above-mentioned technical scheme, the platform of unloading of integration makes the platform of unloading not need installation and dismantlement, has saved the time of construction, and the protection component makes the material of arranging in on the platform of unloading difficult to drop, and utilizes the fixed plate and the mounting at support column both ends to and the fixed orifices on the fixed plate, can realize piling up of the platform of unloading and place, and the platform of unloading that is located the lowest floor can be fixed on the surface of building, in order to increase the stability that the platform of unloading was placed.
Preferably, a connecting rod is fixedly connected between the adjacent supporting columns.
Through adopting above-mentioned technical scheme, the connecting rod is favorable to increasing the stability of support column for the support column is difficult to because receive great heavy object and slope in order to influence its stability.
Preferably, the supporting column is fixedly connected with a connecting piece for fixedly connecting with a building.
Through adopting above-mentioned technical scheme, make further fixed connection between platform of unloading and the building through the connecting piece to be favorable to increasing the stability of platform of unloading.
Preferably, one side of the material receiving platform, which is far away from the protection assembly, is fixedly connected with a reinforcing rib.
Through adopting above-mentioned technical scheme, the strengthening rib is favorable to increasing the support intensity of platform of unloading.
Preferably, one side of each protection column, which is far away from the building, is fixedly connected with a limiting part, and the limiting parts form limiting grooves among the protection columns.
Through adopting above-mentioned technical scheme, the spacing groove is favorable to the hoist and mount of overlength material, plays the effect of support and direction.
Preferably, the material receiving platform further comprises a protective belt arranged at a gap between the material receiving platform and the protective assembly, and the protective belt is provided with a fluorescent layer.
Through adopting above-mentioned technical scheme, the protecting band is favorable to reducing the bits thing and drops from the gap to be favorable to reducing the harm of the thing that drops, safer, and the fluorescent layer has the effect of warning, and the suggestion is paid attention to danger through personnel.
Preferably, protective layers are arranged on the surfaces of the material receiving platform, the supporting columns and the protection assemblies.
By adopting the technical scheme, the protective layer is favorable for reducing the oxidation or corrosion of the surface of the material, protecting the material and prolonging the service life of the discharging platform.
Preferably, the material receiving platform, the supporting column and the protection component are arranged in a hollow mode.
Through adopting above-mentioned technical scheme, the material that cavity set up is favorable to reducing the weight of the platform of unloading to be favorable to reducing the bearing weight of the platform of unloading that is located the below, thereby the protection is located the platform of unloading of below, and when the multilayer platform of unloading of equipment, easy to assemble.
The application comprises at least one of the following beneficial technical effects:
1. the shaped unloading platform reduces the construction time of installation and disassembly, the protection assembly protects materials arranged on the unloading platform, the upper unloading platform and the lower unloading platform can be stacked and fixedly arranged, and the unloading platform positioned at the lowest layer can be fixed on the surface of a building, so that the stability of the unloading platform is improved;
2. the connecting rod further increases the stability of the discharging platform;
3. the connecting piece has increased the stability between platform of unloading and the building.
Drawings
FIG. 1 is a schematic overall structure diagram of an embodiment of a shaped unloading platform according to the present application;
FIG. 2 is a schematic overall structure diagram of an embodiment of a shaped discharging platform according to the present application, which is mainly used for showing a schematic structural diagram of a reinforcing rib;
fig. 3 is a schematic overall structure diagram of an embodiment of a finalized unloading platform according to the present application, which is mainly used for showing an unloading platform in a stacked state.
Reference numerals: 1. a material receiving platform; 2. a support pillar; 3. a guard assembly; 4. a fixing plate; 5. a fixing hole; 6. a fixing member; 7. a connecting rod; 8. a connecting member; 9. reinforcing ribs; 10. a limiting member; 11. a limiting groove; 12. a protective band.
Detailed Description
The present application is described in further detail below with reference to figures 1-3.
Referring to fig. 1, the embodiment of the application discloses a regularization platform of unloading, including square material platform 1 that connects, the welding connect the support column 2 of material platform 1 four corners and the welding connect the protection component 3 of material platform 1 one side. The welding of the both ends of support column 2 has square fixed plate 4, has seted up fixed orifices 5 on fixed plate 4, is provided with mounting 6 in the fixed orifices 5. The fixing member 6 includes a fixing screw and a fixing nut.
Referring to fig. 2 and 3, connect one side fixedly connected with strengthening rib 9 that material platform 1 kept away from protection component 3, strengthening rib 9 includes welded transverse rod and vertical pole, and the transverse rod distributes along connecing the length direction of material platform 1 equidistant, and the vertical pole setting is connecing material platform 1 all around, and with support column 2 welding. Reinforcing ribs 9 are utilized to increase the supporting strength of the discharge platform.
The welding of the one end of connecing material platform 1 is kept away from to adjacent support column 2 has the cavity connecting rod 7 of square column shape to increase the stability of support column 2, make support column 2 be difficult to the slope in order to influence platform stability of unloading. And a connecting piece 8 for fixing an embedded part in the building is welded on one side of the support column 2 close to the building, and the connecting piece 8 is a hollow cylindrical pipeline. The embedded parts and the connecting pieces 8 are connected through ropes or other tools, so that the stability of connection between the discharging platform and the building is improved.
The surfaces of the material receiving platform 1, the supporting column 2 and the protection component 3 are provided with protective layers. The protective layer is beneficial to reducing the oxidation or corrosion of the surface of the material, protecting the material and prolonging the service life of the discharging platform. Connect material platform 1, support column 2 and protection component 3 to be cavity setting. The material that cavity set up is favorable to reducing the weight of the platform of unloading to be favorable to reducing the bearing weight of the platform of unloading that is located the below, thereby the protection is located the platform of unloading of below, and when the multilayer platform of unloading of equipment, easy to assemble.
Wherein, the fixed plate 4 is a square steel plate; the material receiving platform 1 is arranged as a steel plate; and the support column 2 is a square steel tube; the protective belt 12 is made of metal sheet, such as iron sheet.
The application of a regularization platform of unloading's implementation principle does: the regularization platform of unloading makes the platform of unloading reduce loaded down with trivial details installation and the time of dismantling, and protection component 3 and protective zone 12 are favorable to protecting the material of arranging on the platform of unloading in. In addition, the stacking of the discharging platforms can be realized, and the fixing plates 4 on the upper supporting column 2 and the lower supporting column 2 are connected by the fixing part 6. The discharging platform at the lowest layer can be fixed on the surface of a building by using the fixing piece 6, so that the placing stability of the discharging platform is further improved.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.
Claims (8)
1. The utility model provides a regularization platform of unloading which characterized in that: the material receiving platform comprises a material receiving platform (1), supporting columns (2) fixedly connected to two sides of the material receiving platform (1) and a protection assembly (3) fixedly connected to one side of the material receiving platform (1), wherein the protection assembly (3) is positioned between the adjacent supporting columns (2), and the protection assembly (3) comprises protection columns and protection nets fixedly connected to the protection columns; the end part of the support column (2) is fixedly connected with a fixing plate (4), a fixing hole (5) is formed in the fixing plate (4), and a fixing part (6) is arranged in the fixing hole (5).
2. A shaped discharge platform according to claim 1, wherein: and a connecting rod (7) is fixedly connected between the adjacent supporting columns (2).
3. A shaped discharge platform according to claim 1, wherein: the supporting column (2) is fixedly connected with a connecting piece (8) which is fixedly connected with a building.
4. A shaped discharge platform according to claim 1, wherein: connect material platform (1) to keep away from one side fixedly connected with strengthening rib (9) of protection component (3).
5. A shaped discharge platform according to claim 1, wherein: one side of each protection column far away from the building is fixedly connected with a limiting part (10), and the limiting parts (10) form limiting grooves (11) between the protection columns.
6. A shaped discharge platform according to claim 1, wherein: the material receiving platform is characterized by further comprising a protective belt (12) arranged at a gap between the material receiving platform (1) and the protective assembly (3), wherein a fluorescent layer is arranged on the protective belt (12).
7. A shaped discharge platform according to claim 1, wherein: the protective layers are arranged on the surfaces of the material receiving platform (1), the supporting columns (2) and the protective assemblies (3).
8. A shaped discharge platform according to claim 1, wherein: connect material platform (1), support column (2) and protection component (3) are the cavity setting.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202022068260.6U CN213710438U (en) | 2020-09-18 | 2020-09-18 | Regularization platform of unloading |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202022068260.6U CN213710438U (en) | 2020-09-18 | 2020-09-18 | Regularization platform of unloading |
Publications (1)
Publication Number | Publication Date |
---|---|
CN213710438U true CN213710438U (en) | 2021-07-16 |
Family
ID=76794718
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202022068260.6U Active CN213710438U (en) | 2020-09-18 | 2020-09-18 | Regularization platform of unloading |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN213710438U (en) |
-
2020
- 2020-09-18 CN CN202022068260.6U patent/CN213710438U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN113931313B (en) | Construction method of super high-rise core tube horizontal structure | |
CN112796528B (en) | Construction method for high-altitude in-situ splicing of large-span steel truss | |
CN112343064A (en) | Construction method for dismantling large-section annular concrete support beam of deep foundation pit | |
CN114197325A (en) | Pier shaft construction safety protection platform | |
CN213710438U (en) | Regularization platform of unloading | |
US20080250579A1 (en) | Modular Support Catch System | |
CN212224575U (en) | Construction safety work platform | |
CN115095118A (en) | Method for constructing coke quenching tower by suspended integrally-installed support | |
CN214462401U (en) | Double-layer protection frame with novel structure | |
CN212895943U (en) | Operation platform device for binding small-section pier column reinforcing steel bars | |
CN112983031A (en) | Movable elevator shaft protection horizontal protection device | |
CN212129859U (en) | Detachable steel structure aerial work operating platform | |
CN211644382U (en) | Tower crane attached stay bar walkway platform system | |
CN209742334U (en) | Steel construction vestibule bottom curtain construction platform | |
CN113309008A (en) | Steel case roof beam temporary support construction safety work platform | |
CN206220547U (en) | A kind of operating platform for steel structure column installation | |
CN215594839U (en) | Station auxiliary device applied to super high-rise steel-concrete structure | |
CN217453745U (en) | Shore bridge girder installation frock | |
CN215595036U (en) | Movable elevator shaft protection horizontal protection device | |
CN221277359U (en) | Large-scale unsettled steel vestibule bed-jig structure | |
CN221342045U (en) | Assembled stair stacking rack | |
CN220580489U (en) | Sliding hanging basket for construction in umbrella column | |
CN214989751U (en) | Combined small-sized portal frame | |
CN217106217U (en) | Climb a support type and change material platform | |
CN219787175U (en) | Auxiliary device for high-altitude welding of steel structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |