CN112796528B - Construction method for high-altitude in-situ splicing of large-span steel truss - Google Patents

Construction method for high-altitude in-situ splicing of large-span steel truss Download PDF

Info

Publication number
CN112796528B
CN112796528B CN202110201402.8A CN202110201402A CN112796528B CN 112796528 B CN112796528 B CN 112796528B CN 202110201402 A CN202110201402 A CN 202110201402A CN 112796528 B CN112796528 B CN 112796528B
Authority
CN
China
Prior art keywords
steel truss
vertical
altitude
construction method
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202110201402.8A
Other languages
Chinese (zh)
Other versions
CN112796528A (en
Inventor
刘金芳
方源
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mcc Chongqing Construction Industry Co ltd
Original Assignee
Chongqing Steel Structure Co Ltd Of China Metallurgical Construction Engineering Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Steel Structure Co Ltd Of China Metallurgical Construction Engineering Group filed Critical Chongqing Steel Structure Co Ltd Of China Metallurgical Construction Engineering Group
Priority to CN202110201402.8A priority Critical patent/CN112796528B/en
Publication of CN112796528A publication Critical patent/CN112796528A/en
Application granted granted Critical
Publication of CN112796528B publication Critical patent/CN112796528B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/142Means in or on the elements for connecting same to handling apparatus
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/14Railings
    • E04G5/144Railings specific for the lateral, i.e. short side of a scaffold

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本发明公开了一种大跨度钢桁架高空原位拼装的施工方法,先在待拼装钢桁架下方搭设满堂支撑架;然后在满堂支撑架上搭设操作平台;再依次将钢桁架节段吊装至操作平台上,最后整体拼装各钢桁架节段即可;操作平台包括支撑单元,所述支撑单元由若干根横梁和铺设于横梁上的两条走道构成,每根横梁与钢桁架纵向垂直且所有横梁沿钢桁架纵向间隔设置,两条走道沿钢桁架纵向可拆卸设置在横梁上且两条走道之间间隔一定距离,从而在横梁上形成间隔槽,用于放置待拼装钢桁架;在搭设操作平台之前,先在每根横梁两端对应的两根满堂支撑架立杆的顶端设置可调U形顶托,横梁放置在U形顶托内。该施工方法采用的操作平台安装和拆卸方便,能有效提高工作效率。

Figure 202110201402

The invention discloses a construction method for high-altitude in-situ assembly of large-span steel trusses. First, a full-floor support frame is set up under the steel truss to be assembled; then an operation platform is set up on the full-floor support frame; On the platform, each steel truss segment can be assembled as a whole; the operation platform includes a support unit, which consists of several beams and two walkways laid on the beams, each beam is vertical to the steel truss longitudinally and all beams The two walkways are arranged at intervals along the longitudinal direction of the steel truss, and the two walkways are detachably arranged on the beam along the longitudinal direction of the steel truss, and there is a certain distance between the two walkways, so as to form a spacing groove on the cross beam for placing the steel truss to be assembled; Before, the adjustable U-shaped top brackets were set at the tops of the two full-house support frame poles corresponding to both ends of each beam, and the beams were placed in the U-shaped top brackets. The operation platform adopted by the construction method is convenient to install and disassemble, and can effectively improve the work efficiency.

Figure 202110201402

Description

Construction method for high-altitude in-situ splicing of large-span steel truss
Technical Field
The invention belongs to the technical field of building construction, and particularly relates to a construction method for high-altitude in-situ splicing of a large-span steel truss.
Background
At present, a atrium daylighting roof design is generally adopted in some large public buildings, namely, a large-span steel structure roof truss and a daylighting panel (glass) structure are arranged in the center of a building, and because the large-span steel structure roof truss is heavy in weight, large in hoisting radius and limited in site, large hoisting equipment cannot drive in, an integral hoisting method cannot be adopted, a full-hall support frame needs to be erected, a method for high-altitude in-situ bulk loading is carried out by using a tower crane, the hoisting capacity of the tower crane is small and is generally less than 5 tons, therefore, the large-span steel structure roof truss needs to be hoisted in sections firstly and then assembled at high altitude, an operation platform needs to be erected on the full-hall support frame for high-altitude assembly, a bamboo springboard is paved on the full-hall support frame as the existing method, the operation platform is troublesome to install and disassemble, and the working efficiency is low.
Disclosure of Invention
Aiming at the defects in the prior art, the invention aims to provide the construction method for the high-altitude in-situ splicing of the large-span steel truss, the operation platform adopted by the construction method is convenient to mount and dismount, and the working efficiency can be effectively improved.
The technical scheme of the invention is realized as follows:
a construction method for high-altitude in-situ assembly of a large-span steel truss comprises the steps of firstly, erecting a full-space support frame below a steel truss to be assembled, wherein the full-space support frame is composed of a plurality of vertical rods, cross rods and inclined rods; then, an operation platform is erected on the full-hall supporting frame; hoisting the steel truss sections to an operation platform in sequence, and finally integrally assembling all the steel truss sections; the operation platform comprises a supporting unit, the supporting unit is composed of a plurality of cross beams and two walkways paved on the cross beams, each cross beam is vertical to the longitudinal direction of the steel truss, all the cross beams are longitudinally arranged at intervals along the steel truss, the two walkways are longitudinally detachably arranged on the cross beams along the steel truss, and a certain distance is reserved between the two walkways, so that a spacing groove is formed on the cross beams and used for placing the steel truss to be assembled; before an operation platform is set up, an adjustable U-shaped jacking is arranged on the top ends of two full-hall support frame vertical rods corresponding to two ends of each cross beam, a notch of each U-shaped jacking is arranged upwards and transversely along a steel truss, then the cross beams are placed in the U-shaped jacking, two walkways are laid on the cross beams, and the U-shaped jacking is adjusted to enable the steel trusses to be assembled to be located at the installation height.
Furthermore, the cross beams are made of channel steel, and the notch of each cross beam is downwards placed in the corresponding two U-shaped jacking supports; each walkway is composed of a plurality of walkway plates, and each walkway plate is arranged between two adjacent cross beams and is detachably fixed on the corresponding two cross beams.
Further, every walk the guidance tape and fix on two crossbeams that correspond through setting up two first connecting pieces in the interval groove side, first connecting piece comprises the horizontal plate that the level set up and the vertical board of vertical setting in the horizontal plate top, thereby form T shape structure, first connecting piece horizontal plate passes through the bolt fastening on the crossbeam that corresponds, walk and be equipped with the lug that corresponds with the vertical board of two first connecting pieces on the guidance tape, the lug bolted connection on the guidance tape is walked to the vertical board of first connecting piece and two adjacent, thereby will walk the guidance tape and fix on the crossbeam.
Furthermore, a plurality of square pipe ribs are uniformly distributed between each walkway plate and the corresponding two cross beams, and each square pipe rib is longitudinally arranged along the steel truss and is flush with the two ends of the corresponding walkway plate.
Furthermore, including the protection unit, the protection unit has two and sets up in the support element both sides along steel truss is longitudinal respectively.
Furthermore, the protection unit comprises a plurality of vertical rods and two steel wire ropes, the vertical rods are vertically arranged on the cross beam, and the two steel wire ropes are horizontally arranged on the vertical rods at intervals.
Furthermore, a skirting board is arranged between two adjacent vertical rods, the skirting board is arranged in a side-standing mode, the lower end of the skirting board is located on the upper surface of the walkway, two connecting plates are arranged on the vertical rods, the planes where the two connecting plates are located are parallel to the skirting board, and two ends of the skirting board are respectively connected with the corresponding connecting plates through bolts.
Furthermore, the vertical rod is detachably arranged on the cross beam through the second connecting piece, the lower end of the vertical rod is fixed to the second connecting piece, and the second connecting piece is connected with the corresponding cross beam through bolts, so that the vertical rod is fixed to the cross beam.
Further, every montant is carried on the back by two angle steels and is set up, and the second connecting piece comprises the horizontal plate that the level set up and the vertical board of vertical setting in the horizontal plate top to form T shape structure, the horizontal plate and the crossbeam bolt fastening of second connecting piece, a straight flange of two angle steels is located the coplanar and vertically is parallel with the steel truss, another straight flange of two angle steels presss from both sides the vertical board of second connecting piece in the centre and fixed with vertical board respectively.
Further, be equipped with the shrouding on the top of montant, the shrouding comprises the horizontal plate that the level set up and the vertical board of vertical setting in the horizontal plate below to form T shape structure, the vertical board clamp of shrouding is established in the middle of a straight side of two angle steel, and the horizontal plate four sides edge of shrouding is respectively with the rectangle four sides parallel and level that two angle steel formed.
Compared with the prior art, the invention has the following beneficial effects:
1. compared with the mode of paving the bamboo gangplank on the full-hall supporting frame, all nodes of the operating platform are fixed by bolts and can be used as a standardized sizing tool, so that the operating platform can be repeatedly used, overhead welding and cutting operation can be reduced, and the operating platform conforms to the advocation concept of green construction.
2. The operation platform is convenient to mount and dismount, the working efficiency can be effectively improved, meanwhile, the safety of workers during high-altitude operation can be effectively guaranteed due to the arrangement of the protection unit, and the safety coefficient is effectively improved.
Drawings
Fig. 1-schematic structural view of the operation platform.
Fig. 2-structural schematic diagram of the operating platform in use.
Wherein: 1-a cross beam; 2-vertical rod; 3-a walkway plate; 4-a first connector; 5-skirting board; 6-steel wire rope; 7-a connecting plate; 8-a second connector; 9-square tube ribs; 10-closing the plate; 11-steel truss.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings and specific embodiments.
Referring to fig. 1 and 2, a construction method for high-altitude in-situ assembly of a large-span steel truss includes the steps that a full-space support frame is firstly erected below a steel truss 11 to be assembled, and the full-space support frame is composed of a plurality of vertical rods, cross rods and inclined rods; then, an operation platform is erected on the full-hall supporting frame; hoisting the steel truss sections to an operation platform in sequence, and finally integrally assembling all the steel truss sections; the operation platform comprises a supporting unit, wherein the supporting unit is composed of a plurality of cross beams 1 and two walkways paved on the cross beams 1, each cross beam 1 is vertical to the longitudinal direction of the steel truss, all the cross beams 1 are arranged at intervals along the longitudinal direction of the steel truss, the two walkways are detachably arranged on the cross beams along the longitudinal direction of the steel truss 11, and a certain distance is reserved between the two walkways, so that a spacing groove is formed on each cross beam and used for placing the steel truss 11 to be assembled; before an operation platform is set up, an adjustable U-shaped jacking is arranged at the top ends of two full-hall support frame vertical rods corresponding to two ends of each cross beam 1, a notch of the U-shaped jacking is upwards arranged and transversely arranged along a steel truss 11, then the cross beam 1 is placed in the U-shaped jacking, two walkways are laid on the cross beam, and the U-shaped jacking is adjusted to enable the steel truss to be assembled to be located at the installation height.
Through setting up the U-shaped top support on the top of full hall support frame pole setting, just can set up operating platform in full hall support frame top to through adjusting the U-shaped top support make the steel truss of hoist and mount assemble the back on operating platform and install promptly and target in place, realize the normal position and assemble.
When setting up full hall support frame, need consider steel truss mounted position to guarantee that the interval groove that is used for placing the steel truss is located the support unit in the middle of, in order to improve operation platform's structural stability.
In order to ensure the safety of the structure, the two ends of each cross beam extend out of the corresponding U-shaped jacking to be not less than 200 mm.
In order to improve the safety factor, the erected support frame is a disc buckle type support system. Meanwhile, in order to improve the structural stability, an adjustable U-shaped jacking support can be arranged on the vertical rod corresponding to the middle part of the cross beam so as to support the cross beam.
In specific implementation, the cross beams 1 are made of channel steel, and the notch of each cross beam 1 is downwards placed in the corresponding two U-shaped jacking supports; each walkway is composed of a plurality of walkway plates 3, and each walkway plate 3 is arranged between two adjacent cross beams 1 and is detachably fixed on the corresponding two cross beams 1.
In the present embodiment, the walkway plates are made of delta =5mm pattern steel plates, and each walkway plate has a size of 1.2m × 0.8 m.
During the concrete implementation, every walk guidance tape 3 and fix on two crossbeams 1 that correspond through setting up two first connecting pieces 4 in the interval groove side, first connecting piece 4 comprises the horizontal plate that the level set up and the vertical board that sets up in the horizontal plate top, thereby form T shape structure, first connecting piece 4 horizontal plate passes through the bolt fastening on the crossbeam 1 that corresponds, walk and be equipped with the lug that corresponds with two first connecting piece 4 vertical boards on the guidance tape 3, the lug bolted connection on first connecting piece 4 vertical board and the two adjacent guidance tapes 3, thereby will walk guidance tape 3 and fix on crossbeam 1.
Therefore, the two lifting lugs are arranged on the walkway plate and can be used for lifting the walkway plate and also serve as a connecting piece connected with the first connecting piece. A lug in the outer side of each walkway plate positioned at two ends in each walkway is connected with the first connecting piece through a bolt, and a lug in the inner side and a lug on the adjacent walkway plate are simultaneously connected with the same first connecting piece, so that the walkway plates are convenient to disassemble and assemble, and the first connecting pieces are also convenient to disassemble from the cross beam.
During specific implementation, a plurality of square pipe ribs 9 are uniformly distributed between each walkway plate 3 and the corresponding two cross beams, and each square pipe rib 9 is longitudinally arranged along the steel truss 11 and is flush with the two ends of the corresponding walkway plate 3.
In this embodiment, three square pipe ribs are arranged below each walkway plate to support the walkway plate and improve the structural strength of the walkway plate.
When the concrete implementation, including the protection unit, the protection unit has two and vertically sets up in the support element both sides along steel truss 11 respectively.
The safety of workers during high-altitude operation can be guaranteed by arranging the protection unit, and the safety coefficient is improved.
During specific implementation, the protection unit comprises a plurality of vertical rods 2 and two steel wire ropes 6, the vertical rods 2 are vertically arranged on the cross beam 1, and the two steel wire ropes 6 are horizontally arranged on the vertical rods 2 at intervals.
This is one of them implementation mode of protective unit, does not need all to set up the montant on every crossbeam, can set up a montant by a crossbeam of interval, as long as can play the guard action can. In fig. 1, each beam is provided with a vertical rod.
The steel wire rope has higher tensile strength and toughness, is stretched along the walking direction, is tensioned to be in a horizontal state, and the two ends of the steel wire rope are fixed on the vertical rods at the head end and the tail end through buckles, so that the effects of edge protection and life line attachment of the safety belt are achieved.
When the concrete implementation, be equipped with baseboard 5 between two adjacent montants 2, baseboard 5 sets up and baseboard 5 lower extreme is located the pavement upper surface on the side, is equipped with two connecting plates 7 on montant 2, and two connecting plates 7 place plane is parallel with baseboard 5, and baseboard 5 both ends respectively with corresponding connecting plate 7 bolted connection.
Set up behind the baseboard like this and can prevent to place splicing tool etc. on the pavement and drop to the baseboard is convenient to be dismantled and the installation, thereby can used repeatedly.
During specific implementation, montant 2 can be dismantled through second connecting piece 8 and set up on crossbeam 1, and the montant lower extreme is fixed with second connecting piece 8, second connecting piece 8 with correspond 1 bolted connection of crossbeam to fix montant 2 on crossbeam 1.
Therefore, the vertical rod can also be detachably and fixedly arranged on the cross beam, so that the mounting and the dismounting are convenient, and the repeated use can be realized.
During specific implementation, every montant 2 is set up by two angle steels side by side, and second connecting piece 8 comprises the horizontal plate that the level set up and the vertical board of vertical setting in the horizontal plate top to form T shape structure, the horizontal plate of second connecting piece 8 and 1 bolt fastening of crossbeam, a straight side of two angle steels is located the coplanar and vertically is parallel with steel truss 11, another straight side of two angle steels presss from both sides the vertical board of second connecting piece 8 in the middle of establishing and respectively with vertical board welded fastening.
During specific implementation, be equipped with shrouding 10 on montant 2's top, shrouding 10 comprises the horizontal plate that the level set up and the vertical board of vertical setting in the horizontal plate below to form T shape structure, shrouding 10's vertical board clamp is established in the middle of a straight side of two angle irons, shrouding 10's horizontal plate four sides edge respectively with the rectangle four sides parallel and level that two angle irons formed.
Finally, it should be noted that the above-mentioned examples of the present invention are only examples for illustrating the present invention, and are not intended to limit the embodiments of the present invention. Variations and modifications in other variations will occur to those skilled in the art upon reading the foregoing description. Not all embodiments are exhaustive. All obvious changes and modifications of the present invention are within the scope of the present invention.

Claims (10)

1.一种大跨度钢桁架高空原位拼装的施工方法,先在待拼装钢桁架下方搭设满堂支撑架,满堂支撑架由若干立杆、横杆和斜杆构成;然后在满堂支撑架上搭设操作平台;再依次将钢桁架节段吊装至操作平台上,最后整体拼装各钢桁架节段即可;其特征在于,所述操作平台包括支撑单元,所述支撑单元由若干根横梁和铺设于横梁上的两条走道构成,每根横梁与钢桁架纵向垂直且所有横梁沿钢桁架纵向间隔设置,两条走道沿钢桁架纵向可拆卸设置在横梁上且两条走道之间间隔一定距离,从而在横梁上形成间隔槽,用于放置待拼装钢桁架;在搭设操作平台之前,先在每根横梁两端对应的两根满堂支撑架立杆的顶端设置可调U形顶托,U形顶托的槽口向上且沿钢桁架横向设置,然后将横梁放置在U形顶托内,再将两条走道铺设在横梁上,并调节U形顶托使得待拼装钢桁架位于安装高度。1. A construction method for high-altitude in-situ assembly of large-span steel trusses. First, a full-floor support frame is erected below the steel truss to be assembled, and the full-floor support frame is composed of a number of vertical rods, cross bars and inclined rods; and then erected on the full-floor support frame operation platform; then hoist the steel truss segments to the operation platform in turn, and finally assemble the steel truss segments as a whole; it is characterized in that the operation platform includes a support unit, and the support unit consists of several beams and laid on Two walkways on the beam are formed, each beam is vertical to the longitudinal direction of the steel truss, and all the beams are arranged at intervals along the longitudinal direction of the steel truss. A spacing slot is formed on the beam to place the steel truss to be assembled; before the operation platform is erected, an adjustable U-shaped top bracket is set at the top of the two full-house support frame vertical rods corresponding to both ends of each beam. The notch of the bracket is set up and horizontally along the steel truss, then the beam is placed in the U-shaped top bracket, and then two walkways are laid on the beam, and the U-shaped bracket is adjusted so that the steel truss to be assembled is at the installation height. 2.根据权利要求1所述的一种大跨度钢桁架高空原位拼装的施工方法,其特征在于,横梁采用槽钢制成,且每根横梁的槽口向下放置在对应的两U形顶托内;每条走道由若干块走道板构成,每块走道板设于相邻两横梁之间并可拆卸固定在对应的两横梁上。2. The construction method of high-altitude in-situ assembly of a large-span steel truss according to claim 1, wherein the beam is made of channel steel, and the notch of each beam is placed downward on the corresponding two U-shaped In the top support; each walkway is composed of several walkway boards, and each walkway board is arranged between two adjacent beams and can be disassembled and fixed on the corresponding two beams. 3.根据权利要求2所述的一种大跨度钢桁架高空原位拼装的施工方法,其特征在于,每块走道板通过设置在间隔槽侧的两第一连接件固定在对应的两根横梁上,第一连接件由水平设置的水平板和竖直设置在水平板上方的竖直板构成,从而形成T形结构,第一连接件水平板通过螺栓固定在对应的横梁上,走道板上设有与两第一连接件竖直板对应的吊耳,第一连接件竖直板与相邻两走道板上的吊耳螺栓连接,从而将走道板固定在横梁上。3. The construction method for high-altitude in-situ assembly of a large-span steel truss according to claim 2, wherein each walkway board is fixed to the corresponding two beams by two first connectors arranged on the side of the interval groove The first connector is composed of a horizontal plate arranged horizontally and a vertical plate vertically arranged above the horizontal plate to form a T-shaped structure. The horizontal plate of the first connector is fixed on the corresponding beam by bolts, and the walkway plate There are lifting ears corresponding to the vertical plates of the two first connecting pieces, and the vertical plates of the first connecting pieces are connected with the lifting lugs on the two adjacent walkway boards with bolts, thereby fixing the walkway boards on the beams. 4.根据权利要求3所述的一种大跨度钢桁架高空原位拼装的施工方法,其特征在于,每块走道板和对应的两根横梁之间均匀分布有若干方管肋,每根方管肋沿钢桁架纵向设置且与对应的走道板两端平齐。4. The construction method for high-altitude in-situ assembly of a large-span steel truss according to claim 3, wherein several square tube ribs are evenly distributed between each walkway slab and the corresponding two beams, and each square The pipe ribs are arranged longitudinally along the steel truss and are flush with the two ends of the corresponding walkway slabs. 5.根据权利要求1所述的一种大跨度钢桁架高空原位拼装的施工方法,其特征在于,包括防护单元,所述防护单元有两个且分别沿钢桁架纵向设置于支撑单元两侧。5. A construction method for high-altitude in-situ assembling of large-span steel trusses according to claim 1, characterized in that, comprising protection units, two of which are respectively arranged on both sides of the support unit along the longitudinal direction of the steel truss . 6.根据权利要求5所述的一种大跨度钢桁架高空原位拼装的施工方法,其特征在于,所述防护单元包括若干竖杆和两根钢丝绳,竖杆竖直设置在横梁上,两根钢丝绳上下间隔水平设置在竖杆上。6. A construction method for high-altitude in-situ assembly of a large-span steel truss according to claim 5, wherein the protection unit comprises several vertical rods and two steel wire ropes, the vertical rods are vertically arranged on the beam, and the two A steel wire rope is horizontally arranged on the vertical rod at an upper and lower interval. 7.根据权利要求6所述的一种大跨度钢桁架高空原位拼装的施工方法,其特征在于,相邻两竖杆之间设有踢脚板,所述踢脚板侧立设置且踢脚板下端位于走道上表面,竖杆上设有两连接板,两连接板所在平面与踢脚板平行,踢脚板两端分别与对应的连接板螺栓连接。7. A construction method for high-altitude in-situ assembly of a large-span steel truss according to claim 6, wherein a skirting board is provided between two adjacent vertical rods, the skirting board is arranged sideways and the lower end of the skirting board is located on the aisle On the surface, the vertical rod is provided with two connecting plates, the planes where the two connecting plates are located are parallel to the skirting plate, and the two ends of the skirting plate are respectively connected with the corresponding connecting plate bolts. 8.根据权利要求7所述的一种大跨度钢桁架高空原位拼装的施工方法,其特征在于,竖杆通过第二连接件可拆卸设置在横梁上,竖杆下端与第二连接件固定,第二连接件与对应横梁螺栓连接,从而将竖杆固定在横梁上。8 . The construction method for high-altitude in-situ assembly of a large-span steel truss according to claim 7 , wherein the vertical rod is detachably arranged on the beam through the second connecting piece, and the lower end of the vertical rod is fixed with the second connecting piece. 9 . , the second connecting piece is bolted to the corresponding beam, so as to fix the vertical rod on the beam. 9.根据权利要求8所述的一种大跨度钢桁架高空原位拼装的施工方法,其特征在于,每根竖杆由两根角钢相背设置,第二连接件由水平设置的水平板和在水平板上方竖直设置的竖直板构成,从而形成T形结构,第二连接件的水平板与横梁螺栓固定,两根角钢的一直边位于同一平面且与钢桁架纵向平行,两根角钢的另一直边将第二连接件的竖直板夹设在中间并分别与竖直板固定。9 . The construction method for high-altitude in-situ assembly of a large-span steel truss according to claim 8 , wherein each vertical rod is arranged opposite to each other by two angle steels, and the second connecting piece is formed of a horizontal plate and a horizontally arranged horizontal plate. 10 . The vertical plate is formed vertically above the horizontal plate to form a T-shaped structure. The horizontal plate of the second connecting piece is bolted to the beam, and the straight sides of the two angle steels are on the same plane and parallel to the longitudinal direction of the steel truss. The other straight edge of the second connecting piece sandwiches the vertical plates of the second connecting piece and is respectively fixed with the vertical plates. 10.根据权利要求9所述的一种大跨度钢桁架高空原位拼装的施工方法,其特征在于,在竖杆的顶端设有封板,所述封板由水平设置的水平板和竖直设置在水平板下方的竖直板构成,从而形成T形结构,封板的竖直板夹设在两角钢的一直边中间,封板的水平板四边边缘分别与两角钢所形成的矩形四边平齐。10. A construction method for high-altitude in-situ assembly of a large-span steel truss according to claim 9, wherein a sealing plate is provided at the top of the vertical rod, and the sealing plate is composed of a horizontal plate and a vertical plate arranged horizontally. The vertical plate arranged under the horizontal plate is formed to form a T-shaped structure. The vertical plate of the sealing plate is sandwiched between the straight sides of the two angle steels. together.
CN202110201402.8A 2021-02-23 2021-02-23 Construction method for high-altitude in-situ splicing of large-span steel truss Active CN112796528B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110201402.8A CN112796528B (en) 2021-02-23 2021-02-23 Construction method for high-altitude in-situ splicing of large-span steel truss

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110201402.8A CN112796528B (en) 2021-02-23 2021-02-23 Construction method for high-altitude in-situ splicing of large-span steel truss

Publications (2)

Publication Number Publication Date
CN112796528A CN112796528A (en) 2021-05-14
CN112796528B true CN112796528B (en) 2022-06-10

Family

ID=75815403

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110201402.8A Active CN112796528B (en) 2021-02-23 2021-02-23 Construction method for high-altitude in-situ splicing of large-span steel truss

Country Status (1)

Country Link
CN (1) CN112796528B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113266157B (en) * 2021-05-21 2022-02-25 五冶集团上海有限公司 Installation method of steel structure corridor walkway plate
CN113309004B (en) * 2021-06-22 2022-12-13 中铁大桥局第七工程有限公司 Assembled high-altitude walkway for arched bridge
CN114033146B (en) * 2021-11-19 2022-12-20 中交第三航务工程局有限公司 Method for erecting high-altitude electromechanical engineering construction platform in large-scale studio

Family Cites Families (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000351562A (en) * 1999-06-08 2000-12-19 Toshiba Elevator Co Ltd Working scaffold for escalator
JP2002356988A (en) * 2001-06-01 2002-12-13 Toyo Chem Co Ltd Scaffold
JP4120515B2 (en) * 2003-07-16 2008-07-16 鹿島建設株式会社 Horizontal displacement restraint device for superstructure in seismic isolation structure
CA2523179A1 (en) * 2004-10-12 2006-04-12 Safway Services, Inc. Walk-through scaffold and hoist frame
CN201526151U (en) * 2009-08-18 2010-07-14 北京城建精工钢结构工程有限公司 Three-dimensional zigzag-shaped steel truss assembled support frame
CN102155096B (en) * 2011-03-02 2012-08-08 攀钢集团工程技术有限公司 Enormous-span steel tube house truss assembling construction method
CN103669815B (en) * 2013-12-02 2016-04-20 中国一冶集团有限公司 Unsettled rope pipe combined type full hall scaffold operation platform and guard system building method
US9404257B2 (en) * 2014-07-17 2016-08-02 Howard Reno Truss and wall stabilizer
CN105401691B (en) * 2015-11-23 2018-04-03 中建钢构有限公司 Temporary support device for shuttle-shaped space truss and assembling method thereof
JP6017083B1 (en) * 2016-07-06 2016-10-26 株式会社富士昭技研 Floor slab unit, floor slab construction method, and floor construction method
CN208473323U (en) * 2018-07-11 2019-02-05 江苏海勃膜科技有限公司 Spacial special-shaped members assembly moulding bed
CN108979152A (en) * 2018-08-31 2018-12-11 上海宝冶集团有限公司 Fetal membrane and its construction method for the high-altitude segmented assembly of large span steel truss
CN109505402A (en) * 2019-01-11 2019-03-22 中铁十六局集团第四工程有限公司 A kind of full hall support system and construction method based on multilayer truss piece
CN109779269B (en) * 2019-03-21 2024-02-09 中冶建工集团有限公司 Large-span truss sectional hoisting high-altitude folding measure device and construction method
CN110130627A (en) * 2019-05-23 2019-08-16 中国二十二冶集团有限公司 Large Span Structure of Arch surface mesh roofing construction platform and construction method
CN110965750A (en) * 2020-01-13 2020-04-07 珠海及力高空作业设备有限公司 Liftable full hall scaffold
CN111852041B (en) * 2020-08-24 2024-12-06 中冶建工集团重庆建筑工业有限公司 Installation structure of roof truss and curved multi-layered horseway and construction method of horseway

Also Published As

Publication number Publication date
CN112796528A (en) 2021-05-14

Similar Documents

Publication Publication Date Title
CN106760529B (en) Roof steel truss sliding assembly construction platform and installation method
CN112796528A (en) Construction method for high-altitude in-situ splicing of large-span steel truss
CN209780193U (en) Suspension type scaffold
CN101775896A (en) Method for installing pipeline scaffold of steel roof equipment and rigid suspended scaffold
KR20110014341A (en) Tower crane support with safety fence
CN112832368A (en) Quick construction process for cantilever beam at ultrahigh position
CN214462344U (en) A prefabricated operating platform for high-altitude in-situ assembly of large-span steel trusses
CN221590348U (en) Steel frame roof safety channel
CN113958074A (en) Method for mounting bottom tile of roof of tall and big factory building
CN204626915U (en) A kind of large span heavy in section truss is across interior assembling rack platform
CN111764308A (en) A light-weight assembled bridge bottom surface construction platform and its construction method
CN219060835U (en) Self-elevating lighting well operation platform device
CN211201112U (en) A prefabricated construction platform installed with segmented steel towers
CN212404902U (en) Light-duty pin-connected panel bridge bottom surface construction platform
CN212359164U (en) Trestle type assembling jig frame for steel beam subsection sliding
CN211712455U (en) Steel-concrete composite beam lifting station
CN205369948U (en) Lifting device for daylighting top is used for installing
CN112431398B (en) Protective frame and aerial work safety device
CN212224575U (en) Construction safety work platform
CN211201305U (en) Protection rack of submarine cable terminal preparation
CN223018133U (en) A kind of skylight working platform
CN211034805U (en) Device for combining rod piece and logistics channel of construction elevator
CN222120887U (en) Operation platform for construction of large-span daylighting roof
CN120649655B (en) Lightweight hoisting platform and construction method based on tensioned structure for roof curtain wall construction
CN223386539U (en) Large-size steel box arch bridge field installation construction platform

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: No.39-1 Jianshe Avenue, Banan District, Chongqing 400054

Patentee after: MCC Chongqing Construction Industry Co.,Ltd.

Address before: No.39-1 Jianshe Avenue, Banan District, Chongqing 400054

Patentee before: Chongqing Steel Structure Co., Ltd. of China Metallurgical Construction Engineering Group