JPS5814087A - Nuclear reactor facility - Google Patents

Nuclear reactor facility

Info

Publication number
JPS5814087A
JPS5814087A JP56113128A JP11312881A JPS5814087A JP S5814087 A JPS5814087 A JP S5814087A JP 56113128 A JP56113128 A JP 56113128A JP 11312881 A JP11312881 A JP 11312881A JP S5814087 A JPS5814087 A JP S5814087A
Authority
JP
Japan
Prior art keywords
reactor
equipment
containment vessel
unloading
nuclear reactor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP56113128A
Other languages
Japanese (ja)
Other versions
JPS6328271B2 (en
Inventor
菊地 志郎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Original Assignee
Tokyo Shibaura Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tokyo Shibaura Electric Co Ltd filed Critical Tokyo Shibaura Electric Co Ltd
Priority to JP56113128A priority Critical patent/JPS5814087A/en
Publication of JPS5814087A publication Critical patent/JPS5814087A/en
Publication of JPS6328271B2 publication Critical patent/JPS6328271B2/ja
Granted legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E30/00Energy generation of nuclear origin
    • Y02E30/30Nuclear fission reactors

Landscapes

  • Monitoring And Testing Of Nuclear Reactors (AREA)
  • Radiation-Therapy Devices (AREA)

Abstract

(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。
(57) [Summary] This bulletin contains application data before electronic filing, so abstract data is not recorded.

Description

【発明の詳細な説明】 この発明は高速増殖炉等用原子力発電所における原子炉
施設に係り、特に原子炉格納容器を収容した原子炉施設
に関する。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a nuclear reactor facility in a nuclear power plant such as a fast breeder reactor, and more particularly to a nuclear reactor facility housing a reactor containment vessel.

従来、高速増殖炉等用原子力発電所においては。Conventionally, in nuclear power plants such as fast breeder reactors.

原子炉補助建物内に原子炉格納容器か設けられ。A reactor containment vessel is installed in the reactor auxiliary building.

この原子炉格納容器に原子炉圧力容器を備えた原子炉建
物が組み込まれている。原子炉格納容器の側壁に7つの
機器搬出入口が形成され、この機器搬出入口を通じて、
原子炉の定期点検時や燃料交換時等に各種原子炉機器を
搬出入している。各種機器の搬出入時には原子炉の運転
を停止して搬出入作業が進められる。
A reactor building equipped with a reactor pressure vessel is incorporated into this reactor containment vessel. Seven equipment entrances and exits are formed on the side walls of the reactor containment vessel, and through these equipment entrances,
Various nuclear reactor equipment is transported in and out during periodic reactor inspections and fuel changes. When carrying in and out various equipment, the reactor operation is stopped and the work is carried out.

しかしながら、従来の原子炉格納容器は機器搬出入口が
1つしか形成されていないため、原子炉機器の搬出入時
に、搬出機器と搬入機器とが互いに衝突し、搬出入作業
がスムーズに行なわれなかったりするため、原子炉停止
期間か長びく等の問題があった。
However, since conventional reactor containment vessels have only one equipment loading/unloading entrance, when carrying in and out nuclear reactor equipment, the loading and unloading equipment collides with each other, making it difficult to carry out the loading and unloading work smoothly. This caused problems such as the reactor shutdown period becoming longer.

一方、原子炉プラント建設時には、掠子炉格納容器内に
収容される原子炉機器の搬入作業が多いため1機器搬出
入口以外に仮設の搬入口を臨時に設け、各種原子炉機器
の搬入作業をスムーズに行ない得るようにして、プラン
ト建設期間の短縮化を図っている。
On the other hand, during the construction of a nuclear reactor plant, there is a lot of work to bring in reactor equipment to be housed in the containment vessel, so a temporary entrance was set up in addition to the single equipment entrance to carry in various reactor equipment. We are working to shorten the plant construction period by making the process smoother.

しかし、仮設の搬入口は原子炉機器搬入後には復旧して
閉塞し力けrlばならず、かつこの閉塞作業は複雑で長
時間を要し5原子炉プラント建設期間遅延の原因と寿っ
ていた。
However, the temporary entrance had to be restored and blocked after the reactor equipment was brought in, and this blocking work was complex and took a long time, causing delays in the construction period of the five reactor plants. Ta.

この発明は上述した点を考慮し、原子炉格納容器の側壁
に検数の機器搬出入口を形成することにより、各種原子
炉機器の搬出入に要する作業時間を短縮し、原子炉プラ
ントの運転稼動率を高めるとともにプラン)N設時に仮
設の機器搬入口を不要にした原子炉施設を提供すること
を目的とする。
In consideration of the above-mentioned points, this invention reduces the work time required for carrying in and out of various nuclear reactor equipment by forming a number of equipment carrying-in/out entrances on the side walls of the reactor containment vessel, thereby improving the operation and operation of the nuclear reactor plant. The purpose of this project is to provide a nuclear reactor facility that eliminates the need for a temporary equipment entrance during the installation of a nuclear power plant (Plan)N.

以下、この発、明の実施例について添付図面を参照して
説明する。
Embodiments of the present invention will be described below with reference to the accompanying drawings.

第7図および第2し1は高速増殖炉等の原子力発電所に
おけろ原子炉施設を示し1図中符号IOは基礎マット/
/上に建設された原子炉補助建物である。
Figure 7 and Figure 2-1 show nuclear reactor facilities in a nuclear power plant such as a fast breeder reactor.
/ This is the reactor auxiliary building constructed above.

この原子炉補助建物IOの中央部に原子炉格納容器12
が組み込寸れろ。原子炉格納容器/、2内に原子炉建物
/3か収容され、原子炉ダ1【物73内の中央部に図示
しない原子炉圧力容器が設けられる。
The reactor containment vessel 12 is located in the center of this reactor auxiliary building IO.
Is it possible to incorporate it? A reactor building/3 is housed in the reactor containment vessel/2, and a reactor pressure vessel (not shown) is provided in the center of the reactor building/3.

原子炉格納容器/2の側壁には2つの機器搬出人口/A
 、 /Aがそれぞれ周方向にN1を間して形成される
There are two equipment removal ports/A on the side wall of the reactor containment vessel/2.
, /A are formed with N1 in between in the circumferential direction.

機器搬出入口/4 、 /Aは原子炉什物/3の運転1
ヅ(作床面Aに相当するレベルに位置されて原子炉格納
容器/コの内外を連通し、絆子炉補助建物lO内に形成
された機器搬出入路/g 、 1gに通じている。この
搬出入路/g 、 1gも機器搬出入口/A 、 /A
と同じ旨さ位置に設けられる。
Equipment loading/unloading entrance /4, /A is the operation 1 of reactor fixtures /3
ㅅ(It is located at a level corresponding to the planting surface A, and communicates the inside and outside of the reactor containment vessel/K, and leads to the equipment loading/unloading path/g and 1g formed in the Kizuna Reactor Auxiliary Building IO. This loading/unloading entrance /g, 1g is also the equipment loading/unloading entrance /A, /A
It is located in the same position as .

原子炉格納容器/コの機器搬出人口/Aは、第3図1に
示すように、原子炉格納容器1.2のll1l壁に溶接
等で固着された筒状体3内に形成される。筒状体、10
は望ましくは円筒状ななし、その軸線は原子炉格納容器
/2のfill 13面に直交している。筒状体λθの
開口は原子炉格納容器/2の内側で螺体2/により密封
可能に覆われる。蓋体、2/は、蓋フランジ22を有し
As shown in FIG. 3, the equipment removal capacity/A of the reactor containment vessel 1.2 is formed in a cylindrical body 3 fixed to the ll1l wall of the reactor containment vessel 1.2 by welding or the like. Cylindrical body, 10
is preferably cylindrical, and its axis is perpendicular to the fill 13 surface of reactor containment vessel/2. The opening of the cylindrical body λθ is hermetically covered by the screw 2/ inside the reactor containment vessel /2. The lid body 2/ has a lid flange 22.

このフランジ22が筒状体〃の端部に一体成形された筒
状体フランジλ、[増刊ボルト2q等の取付手段で取外
し可能に取付けられ、両フランジ面は0リング等のシー
リング部材2Sにより密着される。しかして、筒状体、
20および両フランジ23 、21Iは機器搬出入ロア
ロ部を補強しており、筒状体〃の内部空間が原子炉用各
種検器搬出人のための有効空間を形成している。
This flange 22 is removably attached to the cylindrical body flange λ integrally molded on the end of the cylindrical body with attachment means such as extra bolts 2q, and both flange surfaces are tightly attached by a sealing member 2S such as an O-ring. be done. However, the cylindrical body,
20 and both flanges 23 and 21I reinforce the equipment loading and unloading lower part, and the internal space of the cylindrical body forms an effective space for people to carry out various test instruments for the nuclear reactor.

々お、第1し!ぼおいて、符号27は作業員用エアーロ
ックでtりす、このエアーロックも原子炉格納容器/コ
の(111壁に勿密に取付けられる。
Oh, first! Also, reference numeral 27 denotes an airlock for workers, and this airlock is also securely attached to the wall of the reactor containment vessel (111).

次に、この発明の作用について説明する。Next, the operation of this invention will be explained.

原子炉プラントの通常運転時には、原子炉格納容器7.
2に形成される機器搬出人口/Aは蓋体コ/により気密
状態に覆わ第1、原子炉格納容器バウンダリを形成する
During normal operation of a nuclear reactor plant, the reactor containment vessel 7.
The equipment removal port /A formed in 2 is covered in an airtight state by a lid body / to form a first reactor containment vessel boundary.

原子炉の定期点検作業や燃料交接作業の際には、原子炉
プラントの運1を停止させ、この運転停止後に、取付ボ
ルト2q等の取付手段を操作して蓋体コ/を筒状体20
から取外し、原子炉格納容器/コの機器搬出入口/A 
、 /Aを開口させる。この場合、原子炉格納容器/2
には2つの機器搬出入口/A 、 /Aが周方向に独立
して配置されているから、互いに独立した機器搬出入ル
ートを得ることができ、一方の機器搬出入ルートを例え
ば搬入用に、他方を搬出用にそれぞれ独立して形成すれ
ば、原子炉格納容器lコからの搬出入作業をスムーズに
かつ能率的に行かうことができる。これにより、燃料交
換作業や定期点検作業をスムーズに短時間で行75こと
ができる。
During periodic reactor inspection work or fuel exchange work, the operation of the reactor plant 1 is stopped, and after this operation is stopped, the lid body is attached to the cylindrical body 20 by operating the attachment means such as the attachment bolts 2q.
Removal from the reactor containment vessel/Equipment entrance/A
, /A is opened. In this case, reactor containment vessel/2
Since the two equipment loading/unloading entrances /A and /A are arranged independently in the circumferential direction, mutually independent equipment loading/unloading routes can be obtained, and one equipment loading/unloading route can be used, for example, for loading. If the other is formed independently for carrying out, the work of carrying in and out of the reactor containment vessel can be carried out smoothly and efficiently. Thereby, fuel exchange work and periodic inspection work can be carried out smoothly and in a short time 75.

各種原子炉機器の搬出入作業が終了すると、yA子炉格
納容器/コの機器搬出入口/Aは蓋体、2/で再び閉塞
されて原子炉格納容器バウンダリが形成され。
When the loading/unloading work of various reactor equipment is completed, the equipment loading/unloading entrance /A of the yA sub-reactor containment vessel /A is closed again with the cover body, 2/ to form the reactor containment vessel boundary.

原子炉プラントの運転町開に備えらねる。Preparing for the opening of nuclear reactor plant operations.

以上に述べたようにこの発明に保る原子炉施設において
は、原子炉格納容器の側壁にかつ原子炉建物の運転操作
床面に相当する位fQit数の機器搬出入口を形成し、
各機器搬出入口を密封可能な蓋体で取外し可能に閉塞し
たから、原子炉運転中は原子炉格納容器バウンダリを形
hVする一方、原子炉運転停止時に実施する燃料交換作
業、坤子炉機器の定期検査作業の機器搬出入取扱作業を
、蓋体を堆列すことfより、各機器搬出入口を通じてス
ムーズにかつ有効的に短時間で行なうことができ、原子
炉プラントの運転稼動率を向上させることができる。
As described above, in the nuclear reactor facility according to the present invention, equipment loading/unloading ports are formed in the side wall of the reactor containment vessel and have a number of fQit equivalent to the operation floor surface of the reactor building,
Since each equipment entrance/exit is removably closed with a sealable lid, the boundary of the reactor containment vessel is closed during reactor operation, while the fuel exchange work carried out when the reactor is shut down, the reactor equipment is By stacking the lids in a row, equipment loading/unloading work for periodic inspection work can be carried out smoothly and effectively in a short time through each equipment loading/unloading entrance, improving the operating efficiency of the nuclear reactor plant. be able to.

また、原子炉プラントの建設時には、原子炉格納容器の
各機器搬出入口なは設資材や原子炉機器の搬出入ルート
として利用できるので、仮設の搬入口を形成する必要が
なく、原子炉プラント建設期間の短縮化を図ることがで
き、建設コストの低減を図ることができる。
In addition, during the construction of a nuclear reactor plant, the equipment entrances and exits of the reactor containment vessel can be used as transport routes for construction materials and reactor equipment, so there is no need to create temporary entrances, and the reactor plant construction It is possible to shorten the period and reduce construction costs.

【図面の簡単な説明】[Brief explanation of drawings]

第1図はこの究明に併ろ原子炉施設を示す半面図、第一
図は第1図のIt−1線に沿う断面図、IJ3図は第2
図に示された原子炉施設のB部の拡大図である。 IO・・・原子炉施設、//・・・基礎マツ) 、 /
、2・・・原子炉格納容器、/3・・・原子炉建物、/
6・・・機器搬出入口、1g・・・機器搬出入路1.2
θ・・・筒状体、2/・・・蓋体、22゜n・・・フラ
ンジ、:l!r・・・シーリング部材。 出願人代理人  猪  股     清第3目
Figure 1 is a half-view of the nuclear reactor facility used in this investigation, Figure 1 is a sectional view taken along the It-1 line in Figure 1, and Figure IJ3 is the
It is an enlarged view of part B of the nuclear reactor facility shown in the figure. IO...Nuclear reactor facility, //...Basic pine), /
, 2... Reactor containment vessel, /3... Reactor building, /
6...Equipment carry-in/out entrance, 1g...Equipment carry-in/out entrance 1.2
θ...Cylindrical body, 2/...Lid body, 22゜n...Flange, :l! r... Sealing member. Applicant's agent Kiyoshi Inomata 3rd

Claims (1)

【特許請求の範囲】 1、原子炉格納容器内に原子炉圧力容器を有する原子炉
建物を収容した原子炉施設において、上記原子炉格納容
器の側壁にかつ原子炉建物の運転操作床面に相当する位
置に複数の機器搬出入口を形成し、各機器搬出入口を密
封可能な蓋体で取外し可能に閉塞したことを特徴とする
原子炉施設。 コ、各機器搬出入口は1原子炉格納容器の側壁に。 周方向圧互いに離間するように独立して形成された特許
請求の範囲第7項に記載の原子炉施設。 3、各機器搬出入口は原子炉格納容器の側壁に溶接等に
より固着さねた筒状体により形成され。 この筒状体の一端に蓋体が取外し可能に取付けられた特
許請求の範囲第1項に記載の原子炉施設・
[Scope of Claims] 1. In a nuclear reactor facility housing a reactor building having a reactor pressure vessel inside the reactor containment vessel, a nuclear reactor on the side wall of the reactor containment vessel and corresponding to the operation floor of the reactor building. A nuclear reactor facility characterized in that a plurality of equipment loading/unloading entrances are formed at positions where equipment loading/unloading is carried out, and each equipment loading/unloading entrance is removably closed with a sealable lid. All equipment loading and unloading entrances are located on the side wall of the reactor containment vessel. The nuclear reactor facility according to claim 7, which is formed independently so as to be spaced apart from each other in the circumferential direction. 3. Each equipment entrance/exit is formed by a cylindrical body fixed to the side wall of the reactor containment vessel by welding or the like. A nuclear reactor facility according to claim 1, wherein a lid body is removably attached to one end of the cylindrical body.
JP56113128A 1981-07-20 1981-07-20 Nuclear reactor facility Granted JPS5814087A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP56113128A JPS5814087A (en) 1981-07-20 1981-07-20 Nuclear reactor facility

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP56113128A JPS5814087A (en) 1981-07-20 1981-07-20 Nuclear reactor facility

Publications (2)

Publication Number Publication Date
JPS5814087A true JPS5814087A (en) 1983-01-26
JPS6328271B2 JPS6328271B2 (en) 1988-06-07

Family

ID=14604243

Family Applications (1)

Application Number Title Priority Date Filing Date
JP56113128A Granted JPS5814087A (en) 1981-07-20 1981-07-20 Nuclear reactor facility

Country Status (1)

Country Link
JP (1) JPS5814087A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS59206795A (en) * 1983-05-11 1984-11-22 株式会社日立製作所 Reactor building
FR2786439A1 (en) 1998-12-01 2000-06-02 Sanden Corp AIR CONDITIONER INTAKE UNIT FOR VEHICLES
JP2016114546A (en) * 2014-12-17 2016-06-23 株式会社Ihi Recovery method and recovery system of fuel debris

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5587092A (en) * 1978-12-26 1980-07-01 Tokyo Shibaura Electric Co Reactor containment vessel

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5587092A (en) * 1978-12-26 1980-07-01 Tokyo Shibaura Electric Co Reactor containment vessel

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS59206795A (en) * 1983-05-11 1984-11-22 株式会社日立製作所 Reactor building
FR2786439A1 (en) 1998-12-01 2000-06-02 Sanden Corp AIR CONDITIONER INTAKE UNIT FOR VEHICLES
JP2016114546A (en) * 2014-12-17 2016-06-23 株式会社Ihi Recovery method and recovery system of fuel debris

Also Published As

Publication number Publication date
JPS6328271B2 (en) 1988-06-07

Similar Documents

Publication Publication Date Title
CN110246600A (en) A kind of full underground type compact reactor refuling device
JPS5814087A (en) Nuclear reactor facility
US3929568A (en) Nuclear power plant containment construction
US4021297A (en) Nuclear reactor installation containment construction
JP2519896B2 (en) Reactor dismantling method
US3948724A (en) Device traveling in nuclear reactor rotary cover for handling rod-shaped members in the reactor
JPS63274897A (en) Cask cleaning pit in common use as depot for head of nuclear reactor pressure vessel
JPS59176700A (en) Radiation leakage protecting device
JPH09243790A (en) Nuclear power plant
JPS62185198A (en) Air- and water-tight partition device in carry-out-in facility of casks for exchanging fuel for marine nuclear reactor
JP3481306B2 (en) Reactor building
JPS6158795B2 (en)
JP2000028798A (en) Facility for storing radioactive substances
JPS6337298A (en) Method of inspecting reactor container pressure suppressing chamber and structure thereof
JPH037277B2 (en)
JPS63284493A (en) Frame for supporting reactor pressure vessel
JPH09166684A (en) Structure of pool in reactor building
JPS6158793B2 (en)
JPH11248888A (en) Construction method for closing cut nozzle part of reactor pressure vessel
JPS62266493A (en) Reactor containing facility
JPS6357587B2 (en)
JPH0968588A (en) Nuclear reactor building
JPH10132979A (en) Building for reactor
JPS5933869B2 (en) How to store the connecting waterway gate of a radioactive waste storage pool
JPH04252997A (en) Constructing method for containment vessel of nuclear reactor in nuclear power station