JPS5664015A - Continuous construction of steel pipe piles - Google Patents

Continuous construction of steel pipe piles

Info

Publication number
JPS5664015A
JPS5664015A JP13905879A JP13905879A JPS5664015A JP S5664015 A JPS5664015 A JP S5664015A JP 13905879 A JP13905879 A JP 13905879A JP 13905879 A JP13905879 A JP 13905879A JP S5664015 A JPS5664015 A JP S5664015A
Authority
JP
Japan
Prior art keywords
pile
pit
steel pipe
junction
fitted
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP13905879A
Other languages
Japanese (ja)
Inventor
Hisayuki Kimura
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TOKYO TOKUSHIYU KOUJI KK
TOKYO TOKUSHU KOJI KK
Original Assignee
TOKYO TOKUSHIYU KOUJI KK
TOKYO TOKUSHU KOJI KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TOKYO TOKUSHIYU KOUJI KK, TOKYO TOKUSHU KOJI KK filed Critical TOKYO TOKUSHIYU KOUJI KK
Priority to JP13905879A priority Critical patent/JPS5664015A/en
Publication of JPS5664015A publication Critical patent/JPS5664015A/en
Pending legal-status Critical Current

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

PURPOSE: To permit the simple construction of steel pipe piles even in narrow places as well as prevent the occurrence of noise pollution by excavating pits in parallel with adjacent vertical piles and at almost equal intervals.
CONSTITUTION: In the neighboring site of a pile serving as a base pile, a foot 9 provided with a guide rod 10 is fitted into the aperture of a junction 3, and a pit 2 is excavated by turning a bit 11. And, a given length of a pit is excavated at nearly equal interval in proportion to the vertical direction of the first pile a to which a guide plate 7, etc., is already fixed. Then, in the pit 2 being dug by said method, a connection part constituting the T-shaped coupler 4 of a steel pipe pile is fitted into the aperture 5 of the junction 3, and at the same time the skirt of the T-shaped coupler 4 is fitted into the junction 3. Thus, the whole of the pile can be smoothly driven into the pit 2.
COPYRIGHT: (C)1981,JPO&Japio
JP13905879A 1979-10-27 1979-10-27 Continuous construction of steel pipe piles Pending JPS5664015A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP13905879A JPS5664015A (en) 1979-10-27 1979-10-27 Continuous construction of steel pipe piles

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP13905879A JPS5664015A (en) 1979-10-27 1979-10-27 Continuous construction of steel pipe piles

Publications (1)

Publication Number Publication Date
JPS5664015A true JPS5664015A (en) 1981-06-01

Family

ID=15236497

Family Applications (1)

Application Number Title Priority Date Filing Date
JP13905879A Pending JPS5664015A (en) 1979-10-27 1979-10-27 Continuous construction of steel pipe piles

Country Status (1)

Country Link
JP (1) JPS5664015A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106638561A (en) * 2017-02-04 2017-05-10 张继红 Elastic guide device of continuous pile wall

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106638561A (en) * 2017-02-04 2017-05-10 张继红 Elastic guide device of continuous pile wall

Similar Documents

Publication Publication Date Title
JPS5664015A (en) Continuous construction of steel pipe piles
JPS57130622A (en) Construction of continuous underground wall
JPS5721623A (en) Treatment work for top of pile
JPS5513338A (en) Caison sinking method
JPS5646031A (en) Constructing method for pile foundation footing with erected trunk
JPS5568919A (en) Construction of underground continuous wall
JPS5781525A (en) Construction of underground continuous wall
JPS5748018A (en) Constructing method for pile foundation with underground wall
JPS57226A (en) Construction and structure of net pile
JPS5670322A (en) Construction of underground wall by column strip
JPS5519304A (en) Ground barrier work in noncontinuous steel plate pile location
JPS5766221A (en) Construction work of underground continuous wall
JPS55159025A (en) Construction method for disk type foundation
JPS56156304A (en) Construction of revetment with composite structure consisting of steel sheet pile and concrete
JPS55114715A (en) Method for construction of steel pipe sheet pile well foundation
JPS56139305A (en) Temporary coffering work for liver, etc.
JPS5736212A (en) Construction of in-situ foundation pile
JPS5792220A (en) Sheathing work for excavated trench
JPS5761111A (en) Reduction of extra-banking concrete for head of pile driven in situ
JPS55136330A (en) Shoring method for trench excavation
JPS57146812A (en) Gravity type dam
JPS5724728A (en) Sheathing method and waling structure for use in said method
JPS55152224A (en) Construction of underground foundation using reverse pile
JPS56163323A (en) Exection of foundation of bridge such as abutment, bridge pier or the like
JPS57140424A (en) Construction work of reinforced soil