JPS554470A - Method of correcting uneven settling of building - Google Patents

Method of correcting uneven settling of building

Info

Publication number
JPS554470A
JPS554470A JP7813978A JP7813978A JPS554470A JP S554470 A JPS554470 A JP S554470A JP 7813978 A JP7813978 A JP 7813978A JP 7813978 A JP7813978 A JP 7813978A JP S554470 A JPS554470 A JP S554470A
Authority
JP
Japan
Prior art keywords
building
water
box
uneven settling
caused
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP7813978A
Other languages
Japanese (ja)
Other versions
JPS5545141B2 (en
Inventor
Tsutomu Kubota
Morio Sugano
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP7813978A priority Critical patent/JPS554470A/en
Publication of JPS554470A publication Critical patent/JPS554470A/en
Publication of JPS5545141B2 publication Critical patent/JPS5545141B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)

Abstract

PURPOSE: To provide a method of correcting uneven settling of building, according to which the portion of building where uneven settling has been caused is raised upward by expanding calcium lime packed in water-permeable bags, whereby ground can be reinforced at the same time.
CONSTITUTION: Material consisting principally of calcium lime, added with other coagulating agents as the case demands, is filled in water-permeable bags 4, 4' and so on. Then, these bags 4, 4' are put into a box 2 opened only at its upper portion, and the box 2 with cover 3 being fitted in the opening is placed under the portion of building where uneven settling has been caused, whereafter water is forced into the box 2 via water supplying hose. Resultantly, the portion of the building where uneven settling has been caused is raised upward together with its cover 3 to the level where the cover is shown as 3'. Here, it is to be noted that, although volume of calcium lime is increased about two times with addition of water, volume of the box 2 as a whole is increased only about 1.5 times because of sand or the like filled in the hollow space. According to the above method, it is enabled to raise building upward through a fairly wide area, so that the ground can be strengthened at the same time.
COPYRIGHT: (C)1980,JPO&Japio
JP7813978A 1978-06-28 1978-06-28 Method of correcting uneven settling of building Granted JPS554470A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP7813978A JPS554470A (en) 1978-06-28 1978-06-28 Method of correcting uneven settling of building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP7813978A JPS554470A (en) 1978-06-28 1978-06-28 Method of correcting uneven settling of building

Publications (2)

Publication Number Publication Date
JPS554470A true JPS554470A (en) 1980-01-12
JPS5545141B2 JPS5545141B2 (en) 1980-11-15

Family

ID=13653540

Family Applications (1)

Application Number Title Priority Date Filing Date
JP7813978A Granted JPS554470A (en) 1978-06-28 1978-06-28 Method of correcting uneven settling of building

Country Status (1)

Country Link
JP (1) JPS554470A (en)

Also Published As

Publication number Publication date
JPS5545141B2 (en) 1980-11-15

Similar Documents

Publication Publication Date Title
JPS55142815A (en) Liquefaction preventing method for sandy ground
JPS554470A (en) Method of correcting uneven settling of building
JPS5330143A (en) Construction method of underground tanks
JPS57226A (en) Construction and structure of net pile
JPS56119013A (en) Hollow fill-type dam
JPS5751331A (en) Construction of continuous underground wall
JPS5721617A (en) Construction of sand bag pile in soft ground under water by vibro-hammer
JPS5771938A (en) Outer water-proofing work
JPS57155423A (en) Method of construction of solidification of muddy water
JPS5552420A (en) Method of improving ground
JPS554446A (en) Method of preventing water-tight sheet embedded in reclaimed land from being exposed by slide of sand
JPS5575025A (en) Protection method of slope
JPS5231556A (en) Manhole foot
JPS5565632A (en) Method of bulding non-tiltable tank on soft ground
JPS5719406A (en) Lattice structure for wave dissipating construction and wave dissipating body thereof
JPS5523243A (en) Draining process for springing water and stagnant water in road ground
JPS56159413A (en) Construction of iceproof breakwater
JPS55148826A (en) Method for tree-planting on base rock at mine
JPS579923A (en) Reinforcing method for concrete sprayed to slope
JPS56159412A (en) Construction of iceproof breakwater and construction thereof
JPS557369A (en) Soil nature stabilizing method and its device for soft ground at bottom of water
JPS6443616A (en) Soil cement underground wall having water-permeable wall at upper part and its construction
JPS5736209A (en) Treatment of soft ground under water
JPS5595013A (en) Construction of incinerator
JPS5572663A (en) Adjusting flow level