JPS5448612A - Air blasting in shaft furnace - Google Patents
Air blasting in shaft furnaceInfo
- Publication number
- JPS5448612A JPS5448612A JP11528677A JP11528677A JPS5448612A JP S5448612 A JPS5448612 A JP S5448612A JP 11528677 A JP11528677 A JP 11528677A JP 11528677 A JP11528677 A JP 11528677A JP S5448612 A JPS5448612 A JP S5448612A
- Authority
- JP
- Japan
- Prior art keywords
- furnace
- gas
- reducing gas
- shaft furnace
- gas flow
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21B—MANUFACTURE OF IRON OR STEEL
- C21B5/00—Making pig-iron in the blast furnace
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Manufacturing & Machinery (AREA)
- Materials Engineering (AREA)
- Metallurgy (AREA)
- Organic Chemistry (AREA)
- Manufacture Of Iron (AREA)
Abstract
PURPOSE:To stabilize the flow of gas inside the furnace and to enhance the utility efficiency of reducing gas by providing obliquely the tuyere of shaft furnace, e.g., blast furnace, etc., blast furnace, etc., at a fixed angle against the furnace wall in order to make the gas flow line inside the furnace a spiral form. CONSTITUTION:Hot air is blown into the furnace from the tuyeres 1'a,1'b,...1'h set up at fixed oblique angle against the radial direction of the shaft furnace, e.g., blast furnace, etc., preferably in the range of theta of 0 to 60 deg. in order to make the gas flow line inside the furnace a spiral form. Thus, it is possible to lengthen the actual contact time between reducing gas and mineral ore to be reduced, and also to keep the uniform flow rate distribution in the radial direction of the furnace while maintaining stabilized gas flow. Thus, the utility efficiency of reducing gas can be raised.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP11528677A JPS5448612A (en) | 1977-09-26 | 1977-09-26 | Air blasting in shaft furnace |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP11528677A JPS5448612A (en) | 1977-09-26 | 1977-09-26 | Air blasting in shaft furnace |
Publications (1)
Publication Number | Publication Date |
---|---|
JPS5448612A true JPS5448612A (en) | 1979-04-17 |
Family
ID=14658891
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP11528677A Pending JPS5448612A (en) | 1977-09-26 | 1977-09-26 | Air blasting in shaft furnace |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPS5448612A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2681418A1 (en) * | 1991-09-17 | 1993-03-19 | Air Liquide | Method of injecting oxidant gas and additives into a metal-smelting furnace, and smelting furnace |
-
1977
- 1977-09-26 JP JP11528677A patent/JPS5448612A/en active Pending
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2681418A1 (en) * | 1991-09-17 | 1993-03-19 | Air Liquide | Method of injecting oxidant gas and additives into a metal-smelting furnace, and smelting furnace |
BE1006250A3 (en) * | 1991-09-17 | 1994-07-05 | Air Liquide | Process gas injection and fuel additives in four metal fusion and melting furnace. |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JPS5687617A (en) | Steel making method using arc furnace | |
JPS5448612A (en) | Air blasting in shaft furnace | |
JPS5222509A (en) | Apparatus for detecting charge distribution shape in reducing blast fu rnaces | |
JPS552740A (en) | Continuous preheating or reducing method for raw material to be refined | |
JPS6428312A (en) | Blowing method for powdered material into blast furnace | |
JPS5655508A (en) | Blast furnace operation method | |
JPS57123909A (en) | Blasting device for blast furnace | |
JPS5438208A (en) | Blast furnace operating method | |
SU1502623A1 (en) | Air tuyere for blast-furnace | |
JPS5739143A (en) | Smelting process | |
ES461386A1 (en) | Process for upgrading iron ore pellets | |
JPS57140803A (en) | Blast furnace operation method | |
Li et al. | Study on the Gas-Flow Pattern in Blast Furnace by Use of Hydroelectric Model | |
JPS5288203A (en) | Operation of hot stove | |
JPS54148116A (en) | Operation of blast furnace | |
Gajewski | Fluidized-Bed Heating of Blast Furnace Wind | |
JPS57181309A (en) | Operating method for hot stove | |
Wang et al. | Design and Operation of Pebble Stoves for 185 m exp 3 Blast Furnace at Weiyuan Steel Works | |
Donskov et al. | Controlling the Distribution of Gas Flow at the Periphery of a Blast Furnace | |
JPS5282607A (en) | Regulation of race way in blast furnace | |
Pilly | The Determination of the Number of Blast Furnace Tuyeres and Their Diameter Size | |
Riposan | Improvements on Cupola Furnace After 125 Years of Its Existence | |
Pochekailo et al. | Effect of Air Tuyere Diameter on the Operation of a 5000 m exp 2 Blast Furnace | |
JPS57181305A (en) | Controlling method for heat of hearth of blast furnace | |
Carmichael et al. | Optimization of Burden Distribution in the Large Blast Furnace Using a Paul Wurth Bell-Less Top |