JPH1157861A - Pipe body reforming facility - Google Patents
Pipe body reforming facilityInfo
- Publication number
- JPH1157861A JPH1157861A JP23010897A JP23010897A JPH1157861A JP H1157861 A JPH1157861 A JP H1157861A JP 23010897 A JP23010897 A JP 23010897A JP 23010897 A JP23010897 A JP 23010897A JP H1157861 A JPH1157861 A JP H1157861A
- Authority
- JP
- Japan
- Prior art keywords
- pipe
- tube
- correction
- straightening
- bending
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Length Measuring Devices By Optical Means (AREA)
Abstract
Description
【0001】[0001]
【発明の属する技術分野】本発明は、矯正不能の不良管
を選別すると共に、その選別した不良管が良品管及び矯
正管に合流しないようにした管体矯正設備に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a pipe straightening apparatus for selecting uncorrectable defective pipes and preventing the selected defective pipes from joining non-defective pipes and straightening pipes.
【0002】[0002]
【従来の技術】従来、この種の管体矯正設備として図1
9に示すものがある。これは、鉄管などの管体Pを搬送
する搬送経路1の途中に検査装置2が設けられ、該検査
装置2の下流側に搬送経路1を跨ぐようにして2階建て
の建屋3が設けられ、該建屋3の2階部分3a上に曲が
り矯正装置4、楕円矯正装置5及びマーキング装置6を
備えた矯正区域7が設けられると共に、該建屋3の上流
側と下流側とに昇降装置8,9が設けられている。2. Description of the Related Art Conventionally, this kind of pipe straightening equipment is shown in FIG.
9 is shown. The inspection apparatus 2 is provided in the middle of a transport path 1 for transporting a pipe P such as an iron pipe, and a two-story building 3 is provided downstream of the inspection apparatus 2 so as to straddle the transport path 1. On the second floor portion 3a of the building 3, a straightening section 7 provided with a bending straightening device 4, an elliptic straightening device 5, and a marking device 6 is provided, and an elevating device 8, 9 are provided.
【0003】上記構成において、搬送経路1に沿って矢
印a方向に搬送された管体Pは検査装置2により検査さ
れ、その検査に合格した良品管Paはそのまま搬送経路
1に沿って搬送され、不合格の管体Pは、矢印b方向で
示すように、上流側昇降装置8により矯正区域7に送り
出されて曲がり矯正装置4及び楕円矯正装置5により矯
正されると共に、矯正不能のものにはマーキング装置6
により不良品マークがマーキングされ、その矯正管Pb
と不良管Pcとは、矢印cで示すように、下流側昇降装
置9により搬送経路1に戻される。In the above configuration, the pipe P transported in the direction of the arrow a along the transport path 1 is inspected by the inspection device 2, and the non-defective pipe Pa that passes the inspection is transported along the transport path 1 as it is. As shown in the direction of arrow b, the failed pipe P is sent out to the straightening area 7 by the upstream lifting device 8 and is straightened by the bending straightening device 4 and the elliptical straightening device 5. Marking device 6
Defective mark is marked by the correction pipe Pb
The defective pipe Pc is returned to the transport path 1 by the downstream lifting device 9 as shown by the arrow c.
【0004】上記構成では、不良管Pcも搬送経路1に
戻されて、その不良管Pcが良品管Pa及び矯正管Pb
と混在した状態で搬送されるため、その不良管Pcを良
品管Pa及び矯正管Pbから識別する不良品マークをマ
ーキングするためのマーキング装置6と、搬送経路1の
下流端で不良管Pcと良品管Pa及び矯正管Pbとを振
り分けるための振り分け装置とが必要であって、構成が
複雑で、製作費が高くつく。In the above configuration, the defective pipe Pc is also returned to the transport path 1, and the defective pipe Pc is returned to the non-defective pipe Pa and the correction pipe Pb.
And a marking device 6 for marking a defective mark for identifying the defective pipe Pc from the non-defective pipe Pa and the correction pipe Pb, and the defective pipe Pc and the non-defective product at the downstream end of the transport path 1. A sorting device for sorting the pipe Pa and the correction pipe Pb is required, and the configuration is complicated and the manufacturing cost is high.
【0005】そこで、前記矯正区域7の上方に回収区域
を設け、該回収区域に不良管Pcを送り出し装置により
送り出して選別すると共に、回収区域の出入口にストッ
パー装置を設けて、回収区域内の不良管Pcが出入口か
ら不測に排出されないようにすることが考えられる。[0005] Therefore, a collection area is provided above the correction area 7, and a defective pipe Pc is sent out from the collection area by a sending-out device to select the defective pipe Pc. It is conceivable to prevent the pipe Pc from being accidentally discharged from the entrance.
【0006】[0006]
【発明が解決しようとする課題】上記構成では、矯正不
能の不良管Pcを回収区域内の送り出して選別するため
の送り出し装置と、その選別した不良管Pcが回収区域
の出入口から不測に排出されて良品管Pa及び矯正管P
bと合流しないようにするためのストッパー装置との2
台の装置を用いており、構成が複雑で、製作費が高くつ
く。In the above construction, a delivery device for delivering and selecting uncorrectable defective pipes Pc in the collection area, and the selected defective pipes Pc are unexpectedly discharged from the entrance of the recovery area. Good quality pipe Pa and straightening pipe P
b with a stopper device to prevent it from joining
It uses a single device, has a complicated structure, and is expensive to manufacture.
【0007】本発明は、上記問題点に鑑み、簡単な構成
で、矯正不能の不良管を選別すると共に、その選別した
不良管が不測に排出されないようにした管体矯正設備を
提供することを目的としている。The present invention has been made in view of the above problems, and has an object to provide a pipe straightening apparatus which has a simple configuration and selects uncorrectable defective pipes and prevents the selected defective pipes from being unexpectedly discharged. The purpose is.
【0008】[0008]
【課題を解決するための手段】上記目的を達成するた
め、本発明は、管体搬送経路の途中に管体の曲がり量及
び該管体の挿口の真円度を検査する検査装置が設けら
れ、該検査装置の下流側で前記搬送経路より上方に曲が
り矯正装置及び楕円矯正装置を備えた矯正区域が設けら
れると共に、該矯正区域より上方に回収区域が設けら
れ、該回収区域の出入口に送り出し装置が設けられてお
り、前記検査装置の検査により不合格となった管体を矯
正区域に送り出して前記各矯正装置により矯正し、その
矯正管を前記搬送経路に戻すと共に、矯正不能の不良管
を前記送り出し装置により回収区域に送り出すようにし
た管体矯正設備であって、前記送り出し装置が、枢支軸
を中心に揺動駆動される揺動枠を有し、該揺動枠の先端
に管体受取部が設けられると共に、その後端にストッパ
ー部が設けられ、前記揺動枠を下動させて前記管体受取
部を不良管受取状態にしたときに、前記ストッパー部に
より回収区域の出入口が閉鎖されるようにしたことを特
徴としている。In order to achieve the above object, the present invention provides an inspection apparatus for inspecting the amount of bending of a tube and the roundness of an insertion opening of the tube in the middle of a tube conveying path. A straightening section provided with a bending straightening device and an elliptical straightening device is provided on the downstream side of the inspection device above the transport path, and a collecting area is provided above the straightening section. A delivery device is provided, and the pipes rejected by the inspection of the inspection device are sent out to a correction area, corrected by the respective correction devices, and the correction tubes are returned to the transport path, and uncorrectable defects are returned. What is claimed is: 1. A pipe straightening device for feeding a pipe to a collection area by the delivery device, wherein the delivery device has a swing frame that is swingably driven about a pivot shaft, and a tip of the swing frame. Is provided with a tube receiving section At the same time, a stopper portion is provided at the rear end, so that when the swing frame is moved down to bring the tube receiving portion into a defective tube receiving state, the entrance and exit of the collection area are closed by the stopper portion. It is characterized by:
【0009】上記構成において、搬送経路に沿って搬送
された管体は検査装置により検査され、その検査に合格
した良品管はそのまま搬送経路に沿って搬送され、不合
格の管体のうち、矯正可能なものは、矯正区域に送り出
されて曲がり矯正装置及び楕円矯正装置により矯正され
た後、前記搬送経路に戻され、不合格の管体のうち、矯
正不能の不良管は、送り出し装置の揺動枠を下動させる
ことにより、該揺動枠の先端部に設けた管体受取部によ
り受け取られ、また、それと同時に、前記揺動枠の後端
部に設けたストッパー部により回収区域の出入口を閉鎖
して、該回収区域内の不良管が出入口から排出されない
ようにし、続いて、前記揺動枠を上動させることによ
り、管体受取部に受け取られた不良管を回収区域内に送
り出すようになっている。In the above configuration, the pipe transported along the transport path is inspected by the inspection device, and the non-defective pipe that has passed the inspection is transported along the transport path as it is. Possible pipes are sent out to the correction area, corrected by the bending correction device and the elliptical correction device, and then returned to the transport path. Among the rejected pipes, uncorrectable defective pipes are shaken by the feeding device. When the moving frame is moved down, the moving frame is received by the tube receiving portion provided at the tip end of the swing frame, and at the same time, the entrance and exit of the collection area is stopped by the stopper portion provided at the rear end of the swing frame. Is closed to prevent the defective pipe in the collection area from being discharged from the entrance and exit, and then, by moving the swing frame upward, the defective pipe received by the pipe body receiving section is sent out to the collection area. Like That.
【0010】この場合、不良管を受け取って回収区域内
に送り出すための管体受取部と、回収区域の出入口を開
閉するためのストッパー部とが送り出し装置の揺動枠に
一体的に設けられているから、構成が簡単で、製作費を
安くすることができる。In this case, a tube receiving portion for receiving the defective pipe and sending it into the collection area, and a stopper for opening and closing the entrance of the collection area are provided integrally with the swing frame of the feeding device. Therefore, the configuration is simple and the production cost can be reduced.
【0011】[0011]
【発明の実施の形態】以下、本発明の実施の形態を図面
に基づいて説明する。図1及び図2は本発明の実施の一
形態である管体矯正設備を示すものであって、管体Pを
搬送する搬送経路1の途中に設けた検査装置2の下流側
に搬送経路1を跨ぐようにして3階建ての建屋3が設け
られ、該建屋3の2階部分3aに、曲がり矯正装置4及
び楕円矯正装置5を備えた矯正区域7が設けられると共
に、該矯正区域7内のストックスペース10に、第1搬
送手段11、軸心方向移動装置12、第2搬送手段1
3、第3搬送手段14及び芯出し装置15が設けられ、
前記両矯正装置4,5の下方に第4搬送手段16が設け
られている。Embodiments of the present invention will be described below with reference to the drawings. FIGS. 1 and 2 show a pipe straightening apparatus according to an embodiment of the present invention. The pipe straightening equipment is provided downstream of an inspection device 2 provided in the middle of a transfer path 1 for transferring a pipe P. A three-story building 3 is provided so as to straddle, and a straightening area 7 including a bending straightening device 4 and an elliptic straightening device 5 is provided in the second floor portion 3a of the building 3, and inside the straightening zone 7. The first transport means 11, the axial movement device 12, the second transport means 1
3, a third conveying means 14 and a centering device 15 are provided,
A fourth transport means 16 is provided below the straightening devices 4 and 5.
【0012】前記建屋3の3階部分3bに、矯正不能の
不良管Pcを回収するための回収区域17が設けられ、
該回収区域17の前後両出入口17aに送り出し装置1
8が設けられ、建屋3の上流側と下流側とに昇降装置
8,9が設けられている。A collection area 17 for collecting uncorrectable defective pipes Pc is provided in the third floor portion 3b of the building 3,
Delivery device 1 to front and rear entrances 17a of collection area 17
8 are provided, and lifting devices 8 and 9 are provided on the upstream side and the downstream side of the building 3.
【0013】前記検査装置2は、図3〜図5に示すよう
に、管体Pを回転可能に水平に支持する左右一対の回転
装置2aと、該回転装置2aの上方において搬送経路1
の横断方向に沿って所定間隔をおいて複数(この実施の
形態では3)配置された曲がり量検査部2bと、回転装
置2aの側方に配置された真円度検査部2cとを有して
いる。As shown in FIGS. 3 to 5, the inspection device 2 includes a pair of left and right rotation devices 2a that rotatably support the pipe P horizontally and a transport path 1 above the rotation devices 2a.
A plurality of (in this embodiment, three) bending amount inspection units 2b arranged at predetermined intervals along the transverse direction, and a roundness inspection unit 2c arranged on the side of the rotating device 2a. ing.
【0014】前記各回転装置2aは、図3及び図4に示
すように、搬送経路1の横断方向に沿って設けたガイド
レール20上に配置されてシリンダ装置21により水平
移動される台車22と、該台車22上に回転可能に設け
た前後一対の支持ローラ23とを有し、一方の回転装置
2aに支持ローラ23を回転駆動するための駆動モータ
24が設けられている。As shown in FIGS. 3 and 4, each of the rotating devices 2a is disposed on a guide rail 20 provided along the transverse direction of the transport path 1 and is horizontally moved by a cylinder device 21. And a pair of front and rear support rollers 23 rotatably provided on the carriage 22. A drive motor 24 for rotating the support rollers 23 is provided on one of the rotating devices 2a.
【0015】図3及び図4に示すように、前記各曲がり
量検査部2bのうち、その中央の曲がり量検査部2b
は、基枠25上の基台26に設けた昇降駆動装置27に
より昇降される昇降枠28を有し、その左右両側の曲が
り量検査部2bは、基枠25上の搬送経路1の横断方向
に沿って設けたガイドレール29上に配置されてシリン
ダ装置30により水平移動される台車31に設けた昇降
駆動装置27により昇降される昇降枠28を有し、各昇
降枠28の下端部に投光部33aと受光部33bとから
なる遮光式レーザーセンサー33が設けられ、各昇降枠
28の中央部に近接スイッチからなる管体検知器34が
設けられると共に、該管体検知器34に対応して各昇降
枠28に昇降可能に設けたローラフォロア35a付き昇
降杆35に被検知部材36が設けられ、これらを制御す
るマイクロコンピュータからなる制御部37(図6参
照)が設けられている。As shown in FIG. 3 and FIG. 4, of the respective bending amount inspection units 2b, the center bending amount inspection unit 2b is provided.
Has an elevating frame 28 that is raised and lowered by an elevating drive device 27 provided on a base 26 on the base frame 25, and a bending amount inspection unit 2 b on both the left and right sides thereof moves in the transverse direction of the transport path 1 on the A lift frame 28 which is arranged on a guide rail 29 provided along and is horizontally moved by a cylinder device 30 and which is lifted and lowered by a lift drive device 27 provided on a carriage 31 is projected onto the lower end of each lift frame 28. A light-shielding laser sensor 33 composed of a light part 33a and a light receiving part 33b is provided. A tube detector 34 composed of a proximity switch is provided at the center of each lifting frame 28, and corresponds to the tube detector 34. A detection member 36 is provided on an elevating rod 35 with a roller follower 35a which is provided on each elevating frame 28 so as to be able to ascend and descend, and a control unit 37 (see FIG. 6) including a microcomputer for controlling these members is provided. .
【0016】上記構成において、管体Pの曲がり量を検
査する場合の制御部37の作用を説明すると、管体Pの
全長に合わせて各回転装置2a及び左右両側の曲がり量
検査部2bの位置を調整した後(図3仮想線参照)、搬
送経路1から両回転装置2a上に管体Pを移し換えた状
態で、各曲がり量検査部2bの昇降駆動装置27を駆動
して昇降枠28を下降させる。これにより、図6に示す
ように、ローラフォロア35aが管体Pに当接して昇降
杆35が引き上げられて被検知部材36が管体検知器3
4に接近され、該管体検知器36の検知信号に基づいて
昇降駆動装置27の駆動を停止させ、続いて、駆動モー
タ24により支持ローラ23を回転駆動して管体Pを回
転させると共に、遮光式レーザーセンサー33の投光部
33aから受光部33bに向けて複数の光線Rを所定間
隔をおいて平行に投射し、その複数の投射光線Rの管体
Pの外周面により遮光される本数から管体Pの曲がり量
を検出する。The operation of the control unit 37 for inspecting the amount of bending of the tube P in the above configuration will be described. The position of each rotating device 2a and the amount of bending inspection unit 2b on both the left and right sides according to the entire length of the tube P will be described. Is adjusted (see the phantom line in FIG. 3), in a state in which the pipe P is transferred from the transport path 1 onto both the rotation devices 2a, the lifting drive device 27 of each bending amount inspection unit 2b is driven to drive the lifting frame 28 Is lowered. As a result, as shown in FIG. 6, the roller follower 35a comes into contact with the pipe P, the elevating rod 35 is pulled up, and the detected member 36 is connected to the pipe detector 3
4, the drive of the elevation drive device 27 is stopped based on the detection signal of the tube detector 36, and then the support roller 23 is driven to rotate by the drive motor 24 to rotate the tube P, A plurality of light beams R are projected in parallel at predetermined intervals from the light projecting portion 33a of the light shielding type laser sensor 33 to the light receiving portion 33b, and the number of the plurality of projected light beams R blocked by the outer peripheral surface of the tube P , The amount of bending of the pipe P is detected.
【0017】図3及び図5に示すように、前記真円度検
査部2cは上下一対の遮光式レーザーセンサー33を有
し、その下側の遮光式レーザーセンサー33は、シリン
ダ装置39により管体Pの軸心方向に移動される移動枠
40の下端部に固定され、その上側の遮光式レーザーセ
ンサー33は、移動枠40に設けたシリンダ装置41に
より昇降されるようになっており、これらを制御するマ
イクロコンピュータからなる制御部37(図7参照)が
設けられている。As shown in FIGS. 3 and 5, the roundness inspection section 2 c has a pair of upper and lower light-shielding laser sensors 33, and the lower light-shielding laser sensor 33 is connected to a tubular body by a cylinder device 39. The light-shielding laser sensor 33 on the upper side is fixed to the lower end of the moving frame 40 moved in the axial direction of P, and is moved up and down by a cylinder device 41 provided on the moving frame 40. A control unit 37 (see FIG. 7) including a microcomputer for controlling is provided.
【0018】上記構成において、管体Pの真円度を検査
する場合の制御部37の作用を説明すると、シリンダ装
置39を駆動して移動枠40を回転装置2a上の管体P
に接近させて、下側遮光式レーザーセンサー33を管体
Pの挿口の下面に対向させると共に、シリンダ装置41
を駆動して上側遮光式レーザーセンサー33を管体Pの
挿口の上面に対向させ(図7参照)、続いて、駆動モー
タ24により支持ローラ23を回転駆動して管体Pを回
転させると共に、両遮光式レーザーセンサー33の投光
部33aから受光部33bに向けて複数の光線Rを所定
間隔をおいて平行に投射し、その複数の投射光線Rの管
体Pの挿口外周面により遮光される本数から管体Pの真
円度を検出する。In the above configuration, the operation of the control unit 37 when inspecting the roundness of the tube P will be described. The cylinder unit 39 is driven to move the moving frame 40 to the tube P on the rotating device 2a.
, The lower light-shielding laser sensor 33 is opposed to the lower surface of the insertion opening of the tube P, and the cylinder device 41
To make the upper light-shielding laser sensor 33 face the upper surface of the insertion opening of the tube P (see FIG. 7). Then, the support roller 23 is driven to rotate by the drive motor 24 to rotate the tube P. A plurality of light rays R are projected in parallel from the light projecting part 33a of the light-shielding laser sensor 33 toward the light receiving part 33b at a predetermined interval, and the plurality of projected light rays R are projected by the outer peripheral surface of the opening of the tube P. The roundness of the tube P is detected from the number of light-shielded tubes.
【0019】上記検査の結果、合格した良品管Paはそ
のまま搬送経路1に沿って搬送される。この場合、検査
装置2として遮光式レーザーセンサー33を用いている
ので、管体Pの外周面の性状及び色などに関係なく、管
体Pの曲がり量及び該管体Pの挿口の真円度を正確に検
査することができる。As a result of the inspection, the non-defective pipe Pa that has passed is transported along the transport path 1 as it is. In this case, since the light-shielding laser sensor 33 is used as the inspection device 2, the amount of bending of the tube P and the true circle of the opening of the tube P are independent of the properties and color of the outer peripheral surface of the tube P. The degree can be inspected accurately.
【0020】前記昇降装置8,9は、図1及び図2に示
すように、搬送経路1を間に挟んで立設した左右一対の
機枠43にチェン駆動機構44を介して昇降される左右
一対のリフター45からなり、その両リフター45上に
管体Pの両端を載置するようになっている。As shown in FIGS. 1 and 2, the lifting devices 8 and 9 are vertically moved via a chain drive mechanism 44 on a pair of left and right machine frames 43 erected with the conveyance path 1 interposed therebetween. It consists of a pair of lifters 45, and both ends of the tube P are placed on both lifters 45.
【0021】上記構成において、上流側昇降装置8によ
り、前記検査により不合格となった管体Pのうち、矯正
可能なものを矯正区域7まで持ち上げると共に、矯正不
能の不良管Pcを回収区域17まで持ち上げ、下流側昇
降装置9により、矯正区域7で矯正された矯正管Pbを
搬送経路1まで降ろすと共に、矯正区域7で矯正できな
かった不良管Pcを回収区域17まで持ち上げるように
なっている。In the above configuration, among the pipes P rejected by the inspection, those that can be corrected are lifted up to the correction area 7 by the upstream lifting device 8, and the uncorrectable defective pipes Pc are collected in the collection area 17. The correction pipe Pb corrected in the correction area 7 is lowered to the transport path 1 by the downstream lifting device 9, and the defective pipe Pc that could not be corrected in the correction area 7 is lifted to the collection area 17. .
【0022】前記第1搬送手段11は、図2に示すよう
に、ガイドレール47上に載置されてシリンダ装置48
により前後方向に移動される移動枠49を有し、該移動
枠49の両側面に一対の支持台50が設けられており、
図2に仮想線で示すように、移動枠49を前進させて、
上流側昇降装置8により持ち上げた管体Pを両支持台5
0で受け取った後、移動枠49を後退させて(図2実線
参照)、両支持台50上の管体Pを矯正区域7のストッ
クスペース10内に引き込むようになっている。As shown in FIG. 2, the first transport means 11 is mounted on a guide rail 47 and is provided with a cylinder device 48.
Has a moving frame 49 that is moved in the front-rear direction, and a pair of support tables 50 are provided on both side surfaces of the moving frame 49;
As shown by a virtual line in FIG. 2, the moving frame 49 is moved forward,
The pipe P lifted by the upstream lifting device 8 is moved to
After receiving at 0, the moving frame 49 is retracted (see the solid line in FIG. 2), and the pipes P on both support tables 50 are drawn into the stock space 10 of the correction area 7.
【0023】前記軸心方向移動装置12は、図2に示す
ように、前記第1搬送手段11の両側方に配置した昇降
駆動可能な左右一対の支持ローラ52を有し、その一方
の支持ローラ52を正逆回転させる駆動装置53が設け
られており、第1搬送手段11によりストックスペース
10内に引き込んだ管体Pを両支持ローラ52により受
け取った後、一方の支持ローラ52を正逆回転させるこ
とにより、図8に示すように、両支持ローラ52上の管
体Pを軸心方向に沿って移動させる。これにより、図2
に示すように、ストックスペース10内にストックされ
た複数の管体Pの受口側フランジP1が互いに位置ずれ
されて、管体P間の間隔hが狭められ、ストックスペー
ス10内にストックされる管体Pの本数が従来より増さ
れ、そのストックスペース10を有効利用することがで
きる。As shown in FIG. 2, the axial moving device 12 has a pair of left and right support rollers 52 disposed on both sides of the first transport means 11 and capable of driving up and down. A drive device 53 for rotating the roller 52 forward and reverse is provided. After the pipe P drawn into the stock space 10 by the first transport means 11 is received by the two support rollers 52, one of the support rollers 52 is rotated forward and reverse. As a result, as shown in FIG. 8, the pipes P on both support rollers 52 are moved along the axial direction. As a result, FIG.
As shown in (1), the receiving side flanges P1 of the plurality of pipes P stocked in the stock space 10 are displaced from each other, the interval h between the pipes P is narrowed, and the pipes P are stocked in the stock space 10. The number of pipes P is increased as compared with the conventional case, and the stock space 10 can be effectively used.
【0024】前記第2搬送手段13は、図2に示すよう
に、軸心方向移動装置12の両側方に前後方向に沿って
配置された左右一対の支持レール55と、該各支持レー
ル55の前後両端に設けたスプロケットホイール56間
に巻回されたチェン57と、一方のスプロケットホイー
ル56を回転駆動させるための駆動装置58とを有して
おり、軸心方向移動装置12の両支持ローラ52から両
支持レール55上に管体Pを移し換えた後、両チェン5
7を走行させて、その管体Pを曲がり矯正装置4及び楕
円矯正装置5に向けて搬送するようになっている。As shown in FIG. 2, the second transport means 13 includes a pair of left and right support rails 55 arranged on both sides of the axial movement device 12 along the front-rear direction. It has a chain 57 wound between sprocket wheels 56 provided at both front and rear ends, and a driving device 58 for rotating and driving one sprocket wheel 56. Both support rollers 52 of the axial movement device 12 are provided. After transferring the pipe body P onto both support rails 55 from the
7, the pipe P is transported to the bending correction device 4 and the elliptic correction device 5.
【0025】前記第3搬送手段14は、図2に示すよう
に、前期各支持レール55の内側面に設けたガイドレー
ル60に支持されてシリンダ装置61により前後方向に
移動される左右一対の移動枠62を有し、該各移動枠6
2に昇降駆動可能な一対の支持台63が設けられてお
り、各移動枠62の支持台63を上昇させて両支持レー
ル55の後端に位置する管体Pを持ち上げた後、各移動
枠62を前進させ(図2仮想線参照)、その各移動枠6
2の支持台63を下降させることにより、第4搬送手段
16(後述する)の昇降駆動可能な左右一対の支持ロー
ラ64上に載置するようになっている。As shown in FIG. 2, the third transport means 14 is supported by guide rails 60 provided on the inner surface of each of the support rails 55, and is moved in the front-rear direction by a cylinder device 61. Frame 62, and each moving frame 6
2 is provided with a pair of support bases 63 which can be moved up and down. After raising the support bases 63 of the respective moving frames 62 to lift the pipes P located at the rear ends of both the support rails 55, the respective moving frames 62 (see the imaginary line in FIG. 2),
By lowering the second support 63, it is mounted on a pair of left and right support rollers 64 that can be driven up and down by a fourth transport unit 16 (described later).
【0026】前期芯出し装置15は、図2及び図9に示
すように、前記支持ローラ64の側方の基台66に設け
たガイドレール67上に移動可能に載置された前段シリ
ンダ装置68と、該前段シリンダ装置68をガイドレー
ル67に沿って移動させるための後段シリンダ装置69
とを有し、前段シリンダ装置68のピストンロッド先端
に芯出し基準板70が設けられている。The centering device 15 is, as shown in FIGS. 2 and 9, a front cylinder device 68 movably mounted on a guide rail 67 provided on a base 66 beside the support roller 64. And a rear cylinder device 69 for moving the front cylinder device 68 along the guide rail 67.
And a centering reference plate 70 is provided at the tip of the piston rod of the pre-stage cylinder device 68.
【0027】上記構成において、前記左右一対の支持ロ
ーラ64上に管体Pを載置し、その一方の支持ローラ6
4を駆動装置71により駆動して、管体Pを左右方向に
移動させることにより、その管体Pの挿口端面をシリン
ダ装置68,69の伸縮駆動により位置決めされた芯出
し基準板70に当接させるだけで、その管体Pの芯出し
を行うことができる。In the above configuration, the pipe P is placed on the pair of left and right support rollers 64, and one of the support rollers 6
4 is driven by the driving device 71 to move the pipe P in the left-right direction so that the insertion end face of the pipe P is brought into contact with the centering reference plate 70 positioned by the expansion and contraction drive of the cylinder devices 68 and 69. The tube P can be centered simply by contacting the tube.
【0028】前記第4搬送手段16は、図2及び図9に
示すように、ガイドレール73上に載置されてシリンダ
装置74により前後方向に移動される移動枠75を有
し、該移動枠75の両側面の後端に前記左右一対の支持
ローラ64が設けられると共に、その両側面の前端に昇
降駆動可能な左右一対の支持台76が設けられており、
図2に仮想線で示すように、移動枠75を後退させるこ
とにより、芯出し装置15により芯出した管体Pを両支
持ローラ64により曲がり矯正装置4及び楕円矯正装置
5まで搬送すると共に、曲がり矯正装置4及び楕円矯正
装置5により矯正した矯正管Pb及び矯正不能の不良管
Pcを下流側昇降装置9まで搬送する。As shown in FIGS. 2 and 9, the fourth transport means 16 has a moving frame 75 mounted on a guide rail 73 and moved in the front-rear direction by a cylinder device 74. A pair of left and right support rollers 64 are provided at the rear ends of both side surfaces of the pair 75, and a pair of left and right support bases 76 that can be driven up and down are provided at the front ends of the both side surfaces.
As shown by the imaginary line in FIG. 2, by moving back the moving frame 75, the pipe P centered by the centering device 15 is transported to the bending correction device 4 and the elliptic correction device 5 by both support rollers 64, The correction pipe Pb and the uncorrectable defective pipe Pc corrected by the bending correction device 4 and the elliptical correction device 5 are transported to the downstream lifting device 9.
【0029】前記曲がり矯正装置4は、図10〜図12
に示すように、左右一対の回転装置78のにより回転可
能に支持された管体Pをその長手方向に所定間隔をおい
て複数箇所で挟持して加圧変形させる上側2つの曲がり
矯正部材79aと下側3つの曲がり矯正部材79bとを
有し、その下側3つの曲がり矯正部材79bに管体Pの
曲がり量を測定する曲がり量測定装置80が設けられて
いる。The bending straightening device 4 is shown in FIGS.
As shown in the figure, the upper two bending correcting members 79a which press and deform the tube P supported rotatably by the pair of left and right rotating devices 78 at a plurality of locations at predetermined intervals in the longitudinal direction thereof and It has three lower bending correction members 79b, and the lower three bending correction members 79b are provided with a bending amount measuring device 80 for measuring the bending amount of the pipe P.
【0030】前記各回転装置78は、図10及び図12
に示すように、建屋3の2階部分3aに固定した支持台
78a上に回転可能に設けた前後一対の支持ローラ78
bを有し、一方の回転装置78に支持ローラ78bを回
転駆動するための駆動モータ81が設けられている。Each of the rotating devices 78 is shown in FIGS.
, A pair of front and rear support rollers 78 rotatably provided on a support base 78a fixed to the second floor portion 3a of the building 3 as shown in FIG.
b, and one of the rotating devices 78 is provided with a drive motor 81 for rotationally driving the support roller 78b.
【0031】前記上側2つの曲がり矯正部材79aは、
建屋3の3階部分3bに固定した軸受82に枢支軸83
を介して枢支されており、シリンダ装置84により揺動
される。また、前記下側3つの曲がり矯正部材79b
は、建屋3の2階部分3aに固定したラムシリンダ85
のピストンロッドに固定されている。前記曲がり量測定
装置80は、図14に示すように、前記曲がり量検査部
2bと同様に、ブラケット86を介してラムシリンダ8
5のピストンロッドに固定された投光部33aと受光部
33bとからなる遮光式レーザーセンサー33により構
成され、制御部37により制御されている。The two upper straightening members 79a are:
A pivot shaft 83 is attached to a bearing 82 fixed to the third floor portion 3 b of the building 3.
And is oscillated by a cylinder device 84. Also, the lower three bending correction members 79b
Is a ram cylinder 85 fixed to the second floor portion 3a of the building 3.
Is fixed to the piston rod. As shown in FIG. 14, the bending amount measuring device 80 includes a ram cylinder 8 via a bracket 86, similarly to the bending amount inspection unit 2b.
The light-shielding type laser sensor 33 includes a light projecting part 33a and a light receiving part 33b fixed to the piston rod 5 and is controlled by the control part 37.
【0032】上記構成において、管体Pの曲がりを矯正
する場合の作用を説明すると、駆動モータ81により支
持ローラ78bを回転駆動して管体Pを回転させると共
に、遮光式レーザーセンサー33の投光部33aから受
光部33bに向けて複数の光線Rを所定間隔をおいて平
行に投射し(図14参照)、その複数の投射光線Rの管
体Pの外周面により遮光される本数から管体Pの曲がり
量を測定し、その測定に基づいて管体Pを所定角度回転
させて位置決めすると共に、シリンダ装置84により上
側2つの曲がり矯正部材79aを垂下させると共に、ラ
ムシリンダ85により下側3つの曲がり矯正部材79b
を上昇させることにより、図15に示すように、その上
下各曲がり矯正部材79a,79bにより管体Pを挟持
して管体Pの曲がりを矯正する。次に、ラムシリンダ8
5により下側3つの曲がり矯正部材79bを下降させる
ことにより、管体Pを両回転装置78の支持ローラ78
b上に載置し、前記と同様の手順で管体Pの曲がり量を
測定し、その測定の結果、矯正が不足している場合に
は、更に前記動作を繰り返して管体Pを矯正する。The operation for correcting the bending of the tube P in the above configuration will be described. The driving motor 81 rotates the support roller 78b to rotate the tube P, and the light-shielding laser sensor 33 emits light. A plurality of light beams R are projected from the portion 33a toward the light receiving portion 33b in parallel at a predetermined interval (see FIG. 14), and the number of the projected light beams R is reduced by the number of light beams blocked by the outer peripheral surface of the tube P. The amount of bending of P is measured, and based on the measurement, the pipe body P is rotated and positioned by a predetermined angle, the upper two bending correcting members 79a are suspended by the cylinder device 84, and the lower three Bending straightening member 79b
15, the pipe P is clamped by the upper and lower bend correcting members 79a and 79b to correct the bend of the pipe P as shown in FIG. Next, the ram cylinder 8
By lowering the three lower straightening members 79b by means of 5, the pipe P is supported by the support rollers 78 of the two rotation devices 78.
b, and measures the amount of bending of the tube P in the same procedure as described above. If the result of the measurement indicates that the correction is insufficient, the above operation is repeated to correct the tube P. .
【0033】前記楕円矯正装置5は、図10、図11及
び図13に示すように、前記回転装置78により回転可
能に支持された管体Pの挿口を挟持して加圧変形させる
上下一対の楕円矯正部材88a,88bを有し、その一
対の楕円矯正部材88a,88bを支持する建屋3に管
体Pの挿口の真円度を測定する真円度測定装置89が設
けられている。As shown in FIGS. 10, 11 and 13, the elliptical correction device 5 includes a pair of upper and lower members for holding the insertion opening of the tubular body P rotatably supported by the rotation device 78 and deforming under pressure. A roundness measuring device 89 for measuring the roundness of the opening of the pipe P is provided in the building 3 supporting the pair of elliptical correction members 88a and 88b. .
【0034】前記上下一対の楕円矯正部材88a,88
bは建屋3の2階部分3aと3階部分3bとに設けたラ
ムシリンダ90により昇降されるようになっている。ま
た、前記真円度測定装置89は、前記真円度検査部2c
と同様に、上下一対の遮光式レーザーセンサー33を有
しており、制御部37により制御されている。The pair of upper and lower elliptical correction members 88a, 88
b is raised and lowered by ram cylinders 90 provided on the second floor portion 3a and the third floor portion 3b of the building 3. Further, the roundness measuring device 89 includes the roundness inspection unit 2c.
Similarly to the above, a pair of upper and lower light-shielding laser sensors 33 are provided, and are controlled by the control unit 37.
【0035】上記構成において、管体Pの挿口の楕円状
変形を矯正する場合の作用を説明すると、シリンダ装置
39を駆動して移動枠40を回転装置78上の管体Pに
接近させて、下側遮光式レーザーセンサー33を管体P
の挿口の下面に対向させると共に、シリンダ装置41を
駆動して上側遮光式レーザーセンサー33を管体Pの挿
口の上面に対向させ(図13参照)、駆動モータ81に
より支持ローラ78bを回転駆動して管体Pを回転させ
ると共に、両遮光式レーザーセンサー33の投光部33
aから受光部33bに向けて複数の光線Rを所定間隔を
おいて平行に投射し、その複数の投射光線Rの管体Pの
挿口外周面により遮光される本数から管体Pの真円度を
測定し(図16参照)、その測定に基づいて管体Pを所
定角度回転させて位置決めすると共に、ラムシリンダ9
0により両楕円矯正部材88a,88bを互いに接近さ
せて管体Pの挿口を挟持し(図16仮想線参照)、その
挿口の楕円状変形を矯正する。次に、ラムシリンダ90
により両楕円矯正部材88a,88bを互いに離間させ
た後、駆動モータ81により支持ローラ78bを回転駆
動して管体Pを回転させて、前記と同様の手順で管体P
の真円度を測定し、その測定の結果、矯正が不足してい
る場合には、更に前記動作を繰り返して管体Pを矯正す
る。なお、矯正と同時に真円度を測定してもよい。これ
によって、矯正を短時間で能率良く行うことができる。The operation for correcting the elliptical deformation of the opening of the tube P in the above configuration will be described. The cylinder device 39 is driven to move the moving frame 40 to the tube P on the rotating device 78. , The lower light shielding type laser sensor 33 to the pipe P
, And the cylinder device 41 is driven to make the upper light-shielding laser sensor 33 face the upper surface of the insertion opening of the tube P (see FIG. 13), and the driving motor 81 rotates the support roller 78b. When driven, the tube P is rotated, and the light projecting portion 33 of
a, a plurality of light rays R are projected in parallel at a predetermined interval from the light receiving section 33b to the light receiving section 33b. The degree is measured (see FIG. 16), and based on the measurement, the pipe P is rotated by a predetermined angle to determine the position.
With 0, the two elliptical correction members 88a and 88b approach each other to pinch the opening of the tube P (see the phantom line in FIG. 16), and correct the elliptical deformation of the insertion. Next, the ram cylinder 90
After the two elliptical correction members 88a and 88b are separated from each other, the supporting roller 78b is driven to rotate by the drive motor 81 to rotate the tube P, and the tube P is rotated in the same procedure as described above.
Is measured, and as a result of the measurement, if the correction is insufficient, the above operation is further repeated to correct the tubular body P. The roundness may be measured simultaneously with the correction. Thereby, the correction can be efficiently performed in a short time.
【0036】この場合、曲がり矯正装置4と楕円矯正装
置5とが一箇所に集められているので、専有スペースを
小さくすることができると共に、回転装置78を兼用し
ているので、構成が簡単で、製作費を安くすることがで
きる。また、曲がり量測定装置80が下側3つの曲がり
矯正部材79bに設けられると共に、真円度測定装置8
9が一対の楕円矯正部材88a,88bを支持する建屋
3に設けられているので、構成が簡単で、製作費を安く
することができると共に、矯正から測定までのサイクル
タイムが短くなり、能率的に矯正作業を行うことができ
る。In this case, since the bending straightening device 4 and the elliptic straightening device 5 are gathered at one place, the space occupied by the device can be reduced, and the structure is simple because the rotating device 78 is also used. , The production cost can be reduced. Further, the bending amount measuring device 80 is provided on the lower three bending correcting members 79b, and the roundness measuring device 8 is provided.
9 is provided in the building 3 supporting the pair of elliptical correction members 88a and 88b, the configuration is simple, the manufacturing cost can be reduced, the cycle time from correction to measurement is shortened, and the efficiency is improved. Straightening work can be performed.
【0037】前記送り出し装置18は、図1、図17及
び図18に示すように、建屋3の3階部分3bに枢支軸
92を中心にシリンダ装置93により揺動レバー94を
介して揺動駆動される略三角形の揺動枠95を有し、該
揺動枠95の先端を上方に延ばして管体受取部95aが
設けられると共に、その後端面にストッパー部95bが
設けられている。As shown in FIGS. 1, 17, and 18, the delivery device 18 swings about a pivot shaft 92 through a swing lever 94 around a pivot shaft 92 at the third floor portion 3b of the building 3. It has a substantially triangular swing frame 95 to be driven, a tip end of the swing frame 95 is extended upward to provide a tube receiving portion 95a, and a stopper portion 95b is provided at a rear end surface thereof.
【0038】上記構成において、矯正不能の不良管Pc
が各昇降装置8,9のリフター45により回収区域17
の出入口17aまで持ち上げられると、シリンダ装置9
3により揺動枠95を下動させることにより(図17仮
想線参照)、リフター45から不良管Pcを管体受取部
95aにより受け取り、また、それと同時に、ストッパ
ー部95bにより出入口17aを閉鎖して、回収区域1
7内の不良管Pcが出入口17aから排出されないよう
にし、続いて、シリンダ装置93により、揺動枠95を
上動させることにより(図17実線参照)、管体受取部
95aに受け取られた不良管Pcを回収区域17内に送
り出すようになっている。In the above configuration, the uncorrectable defective pipe Pc
Is collected by the lifters 45 of the lifting devices 8 and 9 in the collection area 17.
Is lifted to the entrance 17a of the cylinder device 9
By moving the swing frame 95 downward by 3 (see the phantom line in FIG. 17), the defective tube Pc is received from the lifter 45 by the tube receiving portion 95a, and at the same time, the entrance 17a is closed by the stopper portion 95b. , Collection area 1
The defective pipe Pc in the pipe 7 is prevented from being discharged from the entrance 17a, and subsequently, the swing frame 95 is moved upward by the cylinder device 93 (see the solid line in FIG. 17), so that the defective pipe Pc is received by the pipe receiving section 95a. The pipe Pc is sent out into the collection area 17.
【0039】この場合、不良管Pcを受け取って回収区
域17内に送り出すための管体受取部95aと回収区域
17の出入口17aを開閉するためのストッパー部95
bとが揺動枠95に一体的に設けられているから、構成
が簡単で、製作費を安くすることができる。In this case, a tube receiving portion 95a for receiving the defective pipe Pc and sending it into the collection area 17 and a stopper section 95 for opening and closing the entrance 17a of the collection area 17 are provided.
Since b is provided integrally with the swing frame 95, the configuration is simple and the manufacturing cost can be reduced.
【0040】上記構成に基づいて管体Pの矯正手順を説
明すると、図1及び図2に示すように、搬送経路1に沿
って矢印a方向に搬送された管体Pは検査装置2により
検査され、その検査に合格した良品管Paはそのまま搬
送経路1に沿って搬送される。The procedure for correcting the pipe P based on the above configuration will be described. As shown in FIGS. 1 and 2, the pipe P transported in the direction of the arrow a along the transport path 1 is inspected by the inspection device 2. The non-defective pipe Pa that has passed the inspection is transported along the transport path 1 as it is.
【0041】不合格の管体Pのうち、矯正可能なもの
は、矢印bに示すように、上流側昇降装置8及び第1搬
送手段11により矯正区域7のストックスペース10に
送り出され、軸心方向移動装置12、第2搬送手段1
3、第3搬送手段14、芯出し装置15及び第4搬送手
段16を介して回転装置78上に載置され、曲がり矯正
装置4及び楕円矯正装置5により矯正されると共に、そ
の矯正状態が曲がり量測定装置80及び真円度測定装置
89により測定された後、矢印cに示すように、下流側
昇降装置9を介して搬送経路1に戻される。Among the failed pipes P, those which can be corrected are sent out to the stock space 10 of the correction area 7 by the upstream lifting / lowering device 8 and the first conveying means 11 as shown by the arrow b, and Direction moving device 12, second transport means 1
3, placed on the rotating device 78 via the third transport means 14, the centering device 15 and the fourth transport means 16 and corrected by the bending correction device 4 and the elliptical correction device 5, and the corrected state is bent. After being measured by the quantity measuring device 80 and the roundness measuring device 89, it is returned to the transport path 1 via the downstream elevating device 9 as shown by the arrow c.
【0042】検査装置2の検査により矯正不能と判断さ
れた不良管Pcは、矢印dで示すように、上流側昇降装
置8及び上流側送り出し装置18により回収区域17に
送り出され、曲がり矯正装置4及び楕円矯正装置5によ
り矯正できなかった不良管Pcは、矢印eに示すよう
に、下流側昇降装置9及び下流側送り出し装置18によ
り回収区域17に送り出され、その回収区域17上の不
良管Pcはクレーンなどにより廃棄場所まで搬出され
る。The defective pipe Pc determined to be uncorrectable by the inspection of the inspection device 2 is sent out to the collection area 17 by the upstream lifting / lowering device 8 and the upstream delivery device 18 as shown by an arrow d, and the bending straightening device 4 The defective pipe Pc that could not be corrected by the elliptical correction device 5 is sent out to the collection area 17 by the downstream lifting device 9 and the downstream delivery device 18 as shown by the arrow e, and the defective pipe Pc on the collection area 17 is removed. Is transported to a disposal site by a crane or the like.
【0043】[0043]
【発明の効果】本発明によれば、不良管を受け取って回
収区域内に送り出すための管体受取部と、回収区域の出
入口を開閉するためのストッパー部とが送り出し装置の
揺動枠に一体的に設けられているから、構成が簡単で、
製作費を安くすることができる。According to the present invention, a pipe receiving portion for receiving a defective pipe and sending it into the collection area, and a stopper for opening and closing the entrance of the collection area are integrated with the swing frame of the feeding device. The configuration is simple,
Production costs can be reduced.
【図1】 本発明の実施の一形態である管体矯正設備の
側面図である。FIG. 1 is a side view of a tube straightening facility according to an embodiment of the present invention.
【図2】 同水平断面図である。FIG. 2 is a horizontal sectional view of the same.
【図3】 同検査装置の正面図である。FIG. 3 is a front view of the inspection device.
【図4】 同検査装置の中央横断面図である。FIG. 4 is a central cross-sectional view of the inspection device.
【図5】 同検査装置の真円度検査部の側面図である。FIG. 5 is a side view of a roundness inspection unit of the inspection device.
【図6】 同検査装置による曲がり検査状態を示す要部
の側面図である。FIG. 6 is a side view of a main part showing a bending inspection state by the inspection device.
【図7】 同検査装置による真円度検査状態を示す要部
の側面図である。FIG. 7 is a side view of a main part showing a roundness inspection state by the inspection apparatus.
【図8】 同軸心方向移動装置の平面図である。FIG. 8 is a plan view of the coaxial direction moving device.
【図9】 同芯出し装置の正面図である。FIG. 9 is a front view of the centering device.
【図10】 同曲がり矯正装置及び楕円矯正装置の正面
図である。FIG. 10 is a front view of the bending correction device and the elliptical correction device.
【図11】 同曲がり矯正装置及び楕円矯正装置の平面
図である。FIG. 11 is a plan view of the bending correction device and the elliptical correction device.
【図12】 同曲がり矯正装置の横断面図である。FIG. 12 is a cross-sectional view of the bending correction device.
【図13】 同真円度測定装置の側面図である。FIG. 13 is a side view of the roundness measuring device.
【図14】 同曲がり矯正装置の要部の拡大横断面図で
ある。FIG. 14 is an enlarged cross-sectional view of a main part of the bending correction device.
【図15】 同曲がり矯正装置による矯正状態を示す正
面図である。FIG. 15 is a front view showing a correction state by the bending correction device.
【図16】 同楕円矯正装置の要部の拡大横断面図であ
る。FIG. 16 is an enlarged cross-sectional view of a main part of the elliptical correction device.
【図17】 同送り出し装置の側面図である。FIG. 17 is a side view of the delivery device.
【図18】 同送り出し装置の平面図である。FIG. 18 is a plan view of the delivery device.
【図19】 従来例を示す概略側面図である。FIG. 19 is a schematic side view showing a conventional example.
1 搬送経路 2 検査装置 2a 回転装置 2b 曲がり量検査部 2c 真円度検査部 3 建屋 4 曲がり矯正装置 5 楕円矯正装置 7 矯正区域 10 ストックスペース 12 軸心方向移動装置 17 回収区域 17a 回収区域の出入口 18 送り出し装置 33 遮光式レーザーセンサー 33a 遮光式レーザーセンサーの投光部 33b 遮光式レーザーセンサーの受光部 78 回転装置 79a 曲がり矯正部材 79b 曲がり矯正部材 80 曲がり量測定装置 88a 楕円矯正部材 88b 楕円矯正部材 89 真円度測定装置 95 揺動枠 95a 揺動枠の管体受取部 95b 揺動枠のストッパー部 P 管体 Pa 良品管 Pb 矯正管 Pc 不良管 DESCRIPTION OF SYMBOLS 1 Conveyance path 2 Inspection device 2a Rotating device 2b Bending amount inspection unit 2c Roundness inspection unit 3 Building 4 Bending correction device 5 Elliptical correction device 7 Correction area 10 Stock space 12 Axial direction moving device 17 Recovery area 17a Entrance of recovery area Reference Signs List 18 Sending-out device 33 Light-shielding laser sensor 33a Light-shielding laser sensor light-emitting portion 33b Light-shielding laser sensor light-receiving portion 78 Rotating device 79a Curve correcting member 79b Curve correcting member 80 Curve amount measuring device 88a Elliptical correcting member 88b Elliptic correcting member 89 Roundness measuring device 95 Rocking frame 95a Pipe receiving portion of rocking frame 95b Stopper portion of rocking frame P Pipe Pa Good pipe Pb Correction pipe Pc Defective pipe
Claims (1)
び該管体の挿口の真円度を検査する検査装置が設けら
れ、該検査装置の下流側で前記搬送経路より上方に曲が
り矯正装置及び楕円矯正装置を備えた矯正区域が設けら
れると共に、該矯正区域より上方に回収区域が設けら
れ、該回収区域の出入口に送り出し装置が設けられてお
り、前記検査装置の検査により不合格となった管体を矯
正区域に送り出して前記各矯正装置により矯正し、その
矯正管を前記搬送経路に戻すと共に、矯正不能の不良管
を前記送り出し装置により回収区域に送り出すようにし
た管体矯正設備であって、前記送り出し装置が、枢支軸
を中心に揺動駆動される揺動枠を有し、該揺動枠の先端
に管体受取部が設けられると共に、その後端にストッパ
ー部が設けられ、前記揺動枠を下動させて前記管体受取
部を不良管受取状態にしたときに、前記ストッパー部に
より回収区域の出入口が閉鎖されるようにしたことを特
徴とする管体矯正設備。An inspection device for inspecting the amount of bending of a tube and the roundness of an insertion opening of the tube is provided in the middle of the tube transportation route, and is provided at a position downstream of the inspection device above the transportation route. A straightening section provided with a bending straightening device and an elliptical straightening device is provided, a collecting section is provided above the straightening section, and a delivery device is provided at an entrance and exit of the collecting section. A pipe body in which a passed pipe is sent out to the correction area and corrected by each of the correction devices, and the correction pipe is returned to the transport path, and an uncorrectable defective pipe is sent out to the collection area by the delivery device. A straightening device, wherein the delivery device has a swing frame that is swingably driven about a pivot shaft, a tip end of the swing frame is provided with a tube receiving portion, and a stopper portion is provided at a rear end of the swing frame. Is provided, When the moving frame is moved down to bring the pipe receiving section into a defective pipe receiving state, the entrance and exit of the collection area are closed by the stopper section.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP23010897A JPH1157861A (en) | 1997-08-27 | 1997-08-27 | Pipe body reforming facility |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP23010897A JPH1157861A (en) | 1997-08-27 | 1997-08-27 | Pipe body reforming facility |
Publications (1)
Publication Number | Publication Date |
---|---|
JPH1157861A true JPH1157861A (en) | 1999-03-02 |
Family
ID=16902693
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP23010897A Pending JPH1157861A (en) | 1997-08-27 | 1997-08-27 | Pipe body reforming facility |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPH1157861A (en) |
-
1997
- 1997-08-27 JP JP23010897A patent/JPH1157861A/en active Pending
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100956797B1 (en) | X-ray inspection apparatus for board shaped pad | |
KR101767868B1 (en) | Automatic feeder for metal bar | |
JP5975232B2 (en) | Steel pipe conveying method and conveying device | |
KR100579082B1 (en) | Bearing ball supply distribution and ball quantity check device | |
JP2000288664A (en) | Sheet transfer device of press forming machine | |
JPH1163955A (en) | Pipe body correction facility | |
JPH1157862A (en) | Pipe body reforming facility | |
JPH1157859A (en) | Pipe body reforming facility | |
JPH1157861A (en) | Pipe body reforming facility | |
JPH1157860A (en) | Pipe body reforming facility | |
KR101287933B1 (en) | Mechanical device for manufacturing metal pole used for stand-alone structure | |
JPH1157858A (en) | Pipe body reforming facility | |
JP3668118B2 (en) | Defective pipe sorting device | |
JP2858410B2 (en) | Tube bending straightening device | |
JPH0348024B2 (en) | ||
CN211060868U (en) | Curtain wall glass size on-line measuring device | |
JPH07270151A (en) | Measuring method of outline of work | |
CN219162054U (en) | Small-diameter pipe rod eddy current flaw detection equipment | |
JPH0725574A (en) | Man conveyor | |
KR100232399B1 (en) | Visual inspection equipment of front glass surface in a cathod ray tube | |
CN114441562B (en) | DR detection device | |
CN211945123U (en) | Sleeper truss extraction and inspection line | |
KR100397158B1 (en) | Apparatus for measuring the weight of crt glass | |
KR102456700B1 (en) | Weld bead inspection device | |
JP2685398B2 (en) | Mixed production type circular fluorescent lamp processing device |