JPH11505646A - サイクルタイムコスティングのための方法及び装置 - Google Patents
サイクルタイムコスティングのための方法及び装置Info
- Publication number
- JPH11505646A JPH11505646A JP8533364A JP53336496A JPH11505646A JP H11505646 A JPH11505646 A JP H11505646A JP 8533364 A JP8533364 A JP 8533364A JP 53336496 A JP53336496 A JP 53336496A JP H11505646 A JPH11505646 A JP H11505646A
- Authority
- JP
- Japan
- Prior art keywords
- time
- cycle time
- information
- cost
- unit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0637—Strategic management or analysis, e.g. setting a goal or target of an organisation; Planning actions based on goals; Analysis or evaluation of effectiveness of goals
- G06Q10/06375—Prediction of business process outcome or impact based on a proposed change
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0639—Performance analysis of employees; Performance analysis of enterprise or organisation operations
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/30—Nc systems
- G05B2219/31—From computer integrated manufacturing till monitoring
- G05B2219/31415—Cost calculation in real time for a product manufactured
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Economics (AREA)
- Entrepreneurship & Innovation (AREA)
- Educational Administration (AREA)
- Development Economics (AREA)
- Operations Research (AREA)
- General Physics & Mathematics (AREA)
- Game Theory and Decision Science (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Marketing (AREA)
- Theoretical Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- General Factory Administration (AREA)
- Transition And Organic Metals Composition Catalysts For Addition Polymerization (AREA)
- Mobile Radio Communication Systems (AREA)
- Metal Rolling (AREA)
Abstract
Description
Claims (1)
- 【特許請求の範囲】 1.メモリ・ロケーションにワーク・セルからの時間と量とを記憶させ、 この時間と量の情報に応じて当該ワーク・セルに関するコスト情報を計算し 、そして そのコスト情報を出力する ことを特徴とした製造施設におけるコスト情報を得る方法。 2.ワーク・セルが製造プロセスの一つの段階を完了する請求項1に記載の方法 。 3.時間と量のデータがユニット許容時間とユニット許容量とを含む請求項1に 記載の方法。 4.時間と量のデータが製造プロセスの一つの段階のビギン・ラン タイムを含 む請求項2に記載の方法。 5.時間と量のデータが製造プロセスの全ラン・タイムを含む請求項2に記載の 方法。 6.時間と量のデータが製造プロセスの全量を含む請求項2に記載の方法。 7.コスト情報が全サイクル・タイムを含む請求項1に記載の方法。 8.コスト情報が正味のサイクル・タイムを含む請求項1に記載の方法。 9.コスト情報が製造プロセス段階のスクラップ量を含む請求項2に記載の方法 。 10.コスト情報の出力が表示装置へコスト情報を出力することを含んでいる請求 項1に記載の方法。 11.一つのプロセス段階を完了するためのワーク・セルを含んでいる製造プロセ スを改善する装置において、 ワーク・セルからユニット量と時間のデータを得る手段、 この手段に結合しており、前記のユニット量と時間に応答してサイクル・タ イムのコストデータを計算する手段、そして この計算手段に接続され、サイクル・タイムのコストデータを出力する手段 を備えたことを特徴とする装置。 12.ワーク・セルからユニット量と時間のデータを得る手段がコンピュータに結 合したバーコード・スキャナを含んでいる請求項11に記載の装置。 13.前記のユニット量と時間のデータがユニット許容量とユニット許容時間とを 含んでいる請求項11に記載の装置。 14.前記のユニット量と時間のデータがビギン・ランタイムを含んでいる請求項 11に記載の装置。 15.前記のユニット量と時間のデータが全ラン量と全ランタイムを含んでいる請 求項11に記載の装置。 16.前記の計算手段がコンピュータを含む請求項11に記載の装置。 17.前記のコンピュータが回路網へ結合しており、そして回路網は前記のワーク ・セルからユニット量と時間のデータを得る手段へ結合している請求項16に記 載の装置。 18.前記の出力する手段がプリンタを含んでいる請求項11に記載の装置。 19.前記の出力する手段が表示器を含んでいる請求項11に記載の装置。 20.前記の出力する手段がワークセルに近い投影器を含む請求項11に記載の装 置。 21.工場が製品製造の複数の生産ラインを含み、そして一つの生産ラインは複数 のワーク・セルを含んでいる、工場の収益性を改善する装置において、 時間と量の情報を含んでいるユニット情報を生産ラインのワーク・セルから 得る手段、 このユニット情報を得る手段に接続されている、ユニット情報を記憶するた めの局所処理手段、 この局所処理手段へ結合され、サイクル・タイムのコストデータを計算する 中央処理手段、そして この中央処理手段へ結合され、サイクル・タイムのコストデータを出力する 手段 を備えたことを特徴とする装置。 22.サイクル・タイムのコストデータが隘路情報を含んでいる請求項21に記載 の装置。 23.サイクル・タイムのコストデータが生産ラインの一つのワーク・セルの全サ イクル・タイムと正味のサイクル・タイムとを含んでいる請求項21に記載の装 置。 24.サイクル・タイムのコストデータが生産ラインで製造される製品に対する全 サイクル・タイムと正味のサイクル・タイムとを含んでいる請求項21に記載の 装置。 25.サイクル・タイムのコストデータがスクラップ・レートを含んでいる請求項 21に記載の装置。 26.前記の出力手段がプリンタを含んでいる請求項21に記載の装置。 27.前記の出力手段がワーク・セル近くに投影表示器を含んでいる請求項21に 記載の装置。 28.前記のユニット情報を得る手段がバーコード・スキャナを含んでいる請求項 21に記載の装置。 29.前記のユニット情報を得る手段がコンピュータに結合したキー・ボードを含 んでいる請求項21に記載の装置。 30.局所処理手段がコンピュータを含んでいる請求項21に記載の装置。 31.前記の中央処理手段がコンピュータへ結合されたサーバーを含んでいる請求 項21に記載の装置。 32.前記の中央処理手段がワーク・セル活動モジュールを含んでいる請求項31 に記載の装置。 33.前記の中央処理手段がワーク・セル価値創造モジュールを含んでいる請求項 31に記載の装置。 34.前記の中央処理手段が管理報告モジュールを含んでいる請求項31に記載の 装置。 35.前記の中央処理手段が隘路コストモジュールを含んでいる請求項31に記載 の装置。 36.前記の中央処理手段がスクラップ・チャージバックモジュールを含んでいる 請求項31に記載の装置。 37.複数の生産ラインを有する製造施設から情報を得る装置において、 第1の生産ラインの複数のワーク・セルの中の第1のワークセルから時間と 量の情報を入力する第1の局所装置、 この第1の局所装置に結合されていて、前記の第1のワークセルからの時間 と量の情報に応答して、全サイクルタイムと正味のサイクルタイムとを含むサイ クル・タイムのコストデータを計算する中央処理装置、そして この中央処理装置に結合され、前記の第1のワーク・セルの全サイクルタイ ムと正味のサイクルタイムとを出力する出力装置 を備えていることを特徴とする装置。 38.前記の中央処理装置へ結合され、第1の生産ラインの複数のワーク・セルの 中の第2のワーク・セルから時間と量の情報を入力する第2の局所装置を備えて いる請求項37に記載の装置。 39.第1の生産ラインで造られた製品の全サイクルタイムと正味のサイクルタイ ムとを含むサイクル・タイムのコストデータを、前記の第1と第2のワーク・セ ルからの時間と量の情報に応じて、前記の中央処理装置が計算する請求項37に 記載の装置。
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US43167995A | 1995-05-02 | 1995-05-02 | |
US08/431,679 | 1995-05-02 | ||
PCT/US1996/005692 WO1996035187A1 (en) | 1995-05-02 | 1996-04-24 | Method and apparatus for cycle time costing |
Publications (1)
Publication Number | Publication Date |
---|---|
JPH11505646A true JPH11505646A (ja) | 1999-05-21 |
Family
ID=23712970
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP8533364A Pending JPH11505646A (ja) | 1995-05-02 | 1996-04-24 | サイクルタイムコスティングのための方法及び装置 |
Country Status (6)
Country | Link |
---|---|
US (1) | US5966694A (ja) |
EP (1) | EP0839359A4 (ja) |
JP (1) | JPH11505646A (ja) |
AU (1) | AU5667196A (ja) |
BR (1) | BR9608460A (ja) |
WO (1) | WO1996035187A1 (ja) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2021022011A (ja) * | 2019-07-24 | 2021-02-18 | 株式会社日立製作所 | 製造工程設計方法及び製造工程設計システム |
Families Citing this family (43)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7039595B1 (en) * | 1998-10-21 | 2006-05-02 | Infor International Limited | System and method for throughput measurement |
US6144893A (en) * | 1998-02-20 | 2000-11-07 | Hagen Method (Pty) Ltd. | Method and computer system for controlling an industrial process by analysis of bottlenecks |
US6128540A (en) * | 1998-02-20 | 2000-10-03 | Hagen Method Pty. Ltd. | Method and computer system for controlling an industrial process using financial analysis |
US6690982B1 (en) * | 1998-08-24 | 2004-02-10 | Mori Seiki Co., Ltd. | Method and device for determining operation balance of machines |
US6963854B1 (en) | 1999-03-05 | 2005-11-08 | Manugistics, Inc. | Target pricing system |
US6336097B1 (en) | 1999-07-01 | 2002-01-01 | Manugistic Atlanta, Inc. | Apparatus, systems and methods for constructing large numbers of travel fares |
US6711798B2 (en) | 2000-01-18 | 2004-03-30 | Dell Products L.P. | Method for manufacturing products according to customer orders |
US6631606B2 (en) | 2000-01-18 | 2003-10-14 | Dell Products L.P. | System and method for accommodating atypical customer requirements in a mass customization manufacturing facility |
US6892104B2 (en) * | 2000-01-18 | 2005-05-10 | Dell Products L.P. | System and method for manufacturing products according to customer orders |
US20020059089A1 (en) * | 2000-08-31 | 2002-05-16 | Toyota Jidosha Kabushiki Kaisha | Supply plan drafting device, method of drafting supply plan, program for drafting supply plan, and method of drafting production plan |
JP2002123685A (ja) * | 2000-10-13 | 2002-04-26 | Mitsubishi Electric Corp | 情報端末装置 |
US20020069143A1 (en) * | 2000-12-06 | 2002-06-06 | Cepeda Jose Alberto | System and method for allocating operating expenses |
US7117060B2 (en) | 2001-01-26 | 2006-10-03 | International Business Machines Corporation | Method of improving production through cost of yield measurement |
US6615092B2 (en) | 2001-03-05 | 2003-09-02 | Dell Products L.P. | Method, system and facility for controlling resource allocation within a manufacturing environment |
US6816746B2 (en) * | 2001-03-05 | 2004-11-09 | Dell Products L.P. | Method and system for monitoring resources within a manufacturing environment |
US6978222B2 (en) * | 2001-03-29 | 2005-12-20 | Kabushiki Kaisha Toyota Chuo Kenkyusho | Method of determining level of effect of system entity on system performance, by use of active time of same entity |
US20030018503A1 (en) * | 2001-07-19 | 2003-01-23 | Shulman Ronald F. | Computer-based system and method for monitoring the profitability of a manufacturing plant |
US7218980B1 (en) * | 2001-07-23 | 2007-05-15 | Esilicon Corporation | Prediction based optimization of a semiconductor supply chain using an adaptive real time work-in-progress tracking system |
CN1402173A (zh) | 2001-08-07 | 2003-03-12 | 株式会社理光 | 成本估计方法及系统 |
US7865380B2 (en) * | 2001-11-08 | 2011-01-04 | International Business Machines Corporation | Automated information technology management system |
US6684118B2 (en) | 2002-01-14 | 2004-01-27 | Taiwan Semiconductor Manufacturing Co., Ltd | Fabrication facility cycle time approximation method employing historic work in process (WIP) cycle time correlation |
US7685029B2 (en) | 2002-01-25 | 2010-03-23 | Invensys Systems Inc. | System and method for real-time activity-based accounting |
US6662066B1 (en) | 2002-04-23 | 2003-12-09 | Taiwan Semiconductor Manufacturing Company | Dynamic adjustment and auto generation of water per hour (WPH) in capacity check system (CCS) by tool performance tracking platform (TP2) |
DE10250285A1 (de) * | 2002-10-29 | 2004-05-13 | Daimlerchrysler Ag | Vorhersage des Termintreuegrads in der Serienfertigung |
EP1676230A1 (en) * | 2003-10-20 | 2006-07-05 | Sap Ag | A computer implemented method and a computer system for managing and valuating inventory |
US7711589B2 (en) * | 2004-06-07 | 2010-05-04 | Marcus Veltman | Determination of a bottleneck |
US7424334B2 (en) | 2004-12-14 | 2008-09-09 | Delphi Technologies, Inc. | System, method, and article of manufacture for determining a process plan for forming features in a part |
US7505829B2 (en) * | 2004-12-14 | 2009-03-17 | Delphi Technologies, Inc. | System, method, and article of manufacture for determining a productivity rate of a manufacturing system |
US20070100645A1 (en) * | 2005-10-31 | 2007-05-03 | Caterpillar Inc. | Management of a process |
US7536233B1 (en) * | 2006-01-30 | 2009-05-19 | Advanced Micro Devices, Inc. | Method and apparatus for adjusting processing speeds based on work-in-process levels |
US20070219929A1 (en) * | 2006-03-14 | 2007-09-20 | Jochen Steinbach | Planning granularity in manufacturing computing systems |
US8027857B2 (en) | 2006-03-14 | 2011-09-27 | Sap Ag | Rough-cut manufacturing operations for use in planning |
US7551975B2 (en) * | 2006-12-21 | 2009-06-23 | Sap Ag | Consistency checking and repair of manufacturing operation groupings to be aggregated for use in planning |
US7894922B2 (en) * | 2006-12-21 | 2011-02-22 | Sap Ag | Structural transformation of execution-level manufacturing process routings into planning-level routings |
US7617015B2 (en) * | 2006-12-21 | 2009-11-10 | Sap Ag | Generating planning-level time and capacity requirement formulas for manufacturing processes |
US20090069919A1 (en) * | 2007-09-07 | 2009-03-12 | International Business Machines Corporation | Intelligent mass production planning and routing system |
US20090070167A1 (en) * | 2007-09-12 | 2009-03-12 | John Benad | Rule based product assessment method and apparatus |
US7844486B2 (en) * | 2007-11-05 | 2010-11-30 | Faction GmbH | System and method for determining and increasing an accuracy of costing |
US8412559B2 (en) | 2011-01-19 | 2013-04-02 | United Parcel Service Of America, Inc. | Systems and methods for improved calculation of coefficient for price sensitivity |
IN2013MU02766A (ja) * | 2013-08-23 | 2015-07-03 | Tata Consultancy Services Ltd | |
US10054936B2 (en) * | 2014-02-28 | 2018-08-21 | Schneider Electric Software, Llc | Manufacturing execution system and method of determining production metrics for a line |
CN105809307A (zh) * | 2014-12-30 | 2016-07-27 | 中国铁道科学研究院电子计算技术研究所 | 一种基于物联技术的离散生产线瓶颈检测方法 |
JP6837198B2 (ja) * | 2016-11-30 | 2021-03-03 | パナソニックIpマネジメント株式会社 | 設備構成作成支援システムおよび設備構成作成支援方法 |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5189624A (en) * | 1989-09-29 | 1993-02-23 | General Electric Company | Intelligent machining workstation operating logic |
-
1996
- 1996-04-24 BR BR9608460-0A patent/BR9608460A/pt unknown
- 1996-04-24 WO PCT/US1996/005692 patent/WO1996035187A1/en active Application Filing
- 1996-04-24 EP EP96913830A patent/EP0839359A4/en not_active Withdrawn
- 1996-04-24 AU AU56671/96A patent/AU5667196A/en not_active Abandoned
- 1996-04-24 JP JP8533364A patent/JPH11505646A/ja active Pending
-
1997
- 1997-06-23 US US08/880,320 patent/US5966694A/en not_active Expired - Lifetime
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2021022011A (ja) * | 2019-07-24 | 2021-02-18 | 株式会社日立製作所 | 製造工程設計方法及び製造工程設計システム |
Also Published As
Publication number | Publication date |
---|---|
BR9608460A (pt) | 1999-11-30 |
WO1996035187A1 (en) | 1996-11-07 |
AU5667196A (en) | 1996-11-21 |
US5966694A (en) | 1999-10-12 |
EP0839359A4 (en) | 1998-08-19 |
EP0839359A1 (en) | 1998-05-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JPH11505646A (ja) | サイクルタイムコスティングのための方法及び装置 | |
US5946661A (en) | Method and apparatus for identifying and obtaining bottleneck cost information | |
WO1997013211A9 (en) | Method and apparatus for identifying and obtaining bottleneck cost information | |
Beamon | Supply chain design and analysis:: Models and methods | |
EP1695282B1 (en) | Data processing system and method | |
US8290833B2 (en) | Multi-stage supply chain management system with dynamic order placement | |
US20090043625A1 (en) | Process Management System and Method | |
US6366824B1 (en) | Manufacturing reference database | |
Dong et al. | Performance modeling and analysis of integrated logistic chains: An analytic framework | |
US20030018503A1 (en) | Computer-based system and method for monitoring the profitability of a manufacturing plant | |
Huang et al. | Impact of product proliferation on the reverse supply chain | |
US20030233290A1 (en) | Buyer, multi-supplier, multi-stage supply chain management system with lot tracking | |
US20090292573A1 (en) | Method for optimal demanufacturing planning | |
JP2000176799A (ja) | 生産製造計画システム | |
JP2006503352A (ja) | プランニング、スケジューリングおよびサプライ・チェーン・マネジメントを改善するためのシステムおよび方法 | |
CN103679322A (zh) | 生产数据处理方法、装置及系统 | |
CN106127532A (zh) | 一种基于互联网的矿产品价格动态监测及查询服务系统 | |
CN101369919A (zh) | 基于企业的有相互关系的事件的消息次序管理 | |
CN116976948A (zh) | 一种制造型企业全价值链动态反馈流图生成方法及系统 | |
Makatsoris et al. | Design of a distributed order promising system and environment for a globally dispersed supply chain | |
US7461019B2 (en) | System and method for integration of material costs of a product | |
JP2001312542A (ja) | 在庫量決定装置及び在庫量決定方法 | |
RU18782U1 (ru) | Система осуществления планирования и контроля за деятельностью предприятия | |
WO2003098517A1 (en) | Decision support system for supply chain management | |
JP2004348403A (ja) | 企業活動評価方法及び評価装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20060328 |
|
A601 | Written request for extension of time |
Free format text: JAPANESE INTERMEDIATE CODE: A601 Effective date: 20060628 |
|
A602 | Written permission of extension of time |
Free format text: JAPANESE INTERMEDIATE CODE: A602 Effective date: 20060814 |
|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20060928 |
|
A02 | Decision of refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A02 Effective date: 20070130 |