JPH1136294A - Reinforcing bar locating device and locating method for cast-in-place pile - Google Patents

Reinforcing bar locating device and locating method for cast-in-place pile

Info

Publication number
JPH1136294A
JPH1136294A JP20727697A JP20727697A JPH1136294A JP H1136294 A JPH1136294 A JP H1136294A JP 20727697 A JP20727697 A JP 20727697A JP 20727697 A JP20727697 A JP 20727697A JP H1136294 A JPH1136294 A JP H1136294A
Authority
JP
Japan
Prior art keywords
cast
place pile
flexible
lower frame
reinforcing bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP20727697A
Other languages
Japanese (ja)
Inventor
Tokiharu Furuya
時春 古谷
Tadayoshi Ishibashi
忠良 石橋
Hiroshi Hiraoka
寛 平岡
Masao Arai
政男 荒井
Motoshige Ariyama
元茂 有山
Toshimitsu Hirabe
俊光 平部
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
V S L JAPAN KK
Taisei Corp
East Japan Railway Co
Original Assignee
V S L JAPAN KK
Taisei Corp
East Japan Railway Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by V S L JAPAN KK, Taisei Corp, East Japan Railway Co filed Critical V S L JAPAN KK
Priority to JP20727697A priority Critical patent/JPH1136294A/en
Publication of JPH1136294A publication Critical patent/JPH1136294A/en
Pending legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To provide a method enabling the work execution of cast-in-place piles which is simple in structure, excellent in efficiency and high in quality. SOLUTION: This reinforcing bar locating device for a cast-in-place pile is constituted of a lower frame 2, a lower frame suspension device 3 provided with lower frame suspension cables 31, a lifting/lowering jack 32, and a cable winding drum 33, an erecting rack 4 provided with a guide pipe 41 and a guide ring, and a flexible reinforcing bar winding drum 5. In the locating method for flexible reinforcing bars 1 used for a cast-in-place pile, the locating rack 4 is arranged on the drilled hole 6 of the cast-in-place pile, the flexible reinforcing bars 1 are extracted to the ground surface G, the tips of the extracted flexible reinforcing bars 1 and the lower frame suspension cables 31 are fitted to the lower frame 2, tie hoops 7 are fitted to the outer peripheries of the flexible reinforcing bars 1, then the flexible reinforcing bars 1 are located.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、場所打杭の主鉄筋
に、可撓性のフレキシブル鉄筋を用いた鉄筋建込み装置
と建込み方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an apparatus and a method for installing a reinforcing bar using a flexible reinforcing bar as a main reinforcing bar of a cast-in-place pile.

【0002】[0002]

【従来の技術】地上において、予め組立てられた鉄筋籠
を、場所打杭を打設する場所で吊り下げ、その場所にお
いて帯鉄筋を一本ずつ鉄筋籠に定着させたり、又は、地
上において組立てられた鉄筋籠に予め帯鉄筋を定着させ
た後、場所打杭を打設する場所に吊り下げて施工する方
法が行われている。しかしこの方法では、以下の問題が
ある。 工事現場により、鉄筋籠を予め組立てるだけのスペー
スがない。 鉄筋籠をクレーンなどで吊り、帯鉄筋を一本ずつ定着
させるため、重機械の稼働率が低下する他、施工性も低
下する。 鉄筋籠の組立て作業はすべて人力によるものであり、
能率が低下する。 帯鉄筋の定着作業が人力であるため、一定のフープテ
ンションが得にくい。 高品質の場所打杭として期待できない。 以上の問題を解決する方法として、可撓性のフレキシブ
ル鉄筋を用いた鉄筋建込み方法がある。しかしこの方法
においても、以下の問題が発生している。 複数本のフレキシブル鉄筋を、同一長さで建込むため
には、フレキシブル鉄筋と同数の巻取ドラムを必要と
し、且つ、各ドラムの回転制御装置を必要とするため、
そのための費用が膨大となり、さらに、装置が大型化
し、狭隘な場所での施工ができない。 巻取ドラムから引き出されるフレキシブル鉄筋には、
フレキシブル鉄筋及びフレーム重量による張力がかかる
ため、巻取ドラムは施工場所の近くに置かなければなら
ず、狭隘な場所での施工ができない。 フレキシブル鉄筋の建込み架台を、作業場所の地表面
に置くため、建込み架台のための脚柱を必要とし、建込
み作業の効率が低下する。 フレキシブル鉄筋を送り出すガイドパイプが一定方向
に固定し、各ガイドパイプの設置高さを一定に取付けて
いたため、大きなスペースを必要とし、狭隘な場所での
施工が困難であった。
2. Description of the Related Art On the ground, a pre-assembled reinforced cage is suspended at a place where a cast-in-place pile is to be cast, and at that location, the band reinforcing bars are fixed to the reinforced cage one by one or assembled on the ground. A method has been carried out in which a belt reinforcing steel is fixed in advance to a reinforcing steel cage and then suspended at a place where a cast-in-place pile is to be driven. However, this method has the following problems. Depending on the construction site, there is not enough space to assemble the reinforced cage in advance. Since the rebar basket is suspended by a crane or the like and the belt rebars are fixed one by one, the operation rate of heavy machinery is reduced, and the workability is also reduced. All the work of assembling the reinforced cage is by hand,
Efficiency decreases. It is difficult to obtain a constant hoop tension because the fixing work of the belt reinforcing bar is manually performed. It cannot be expected as a high-quality cast-in-place pile. As a method for solving the above problem, there is a method of building a reinforcing bar using a flexible flexible reinforcing bar. However, this method also has the following problems. In order to build a plurality of flexible reinforcing bars with the same length, the same number of winding drums as the flexible reinforcing bars are required, and a rotation control device for each drum is required.
The cost for this is enormous, and the size of the apparatus is increased, so that it cannot be installed in a narrow place. Flexible rebar drawn from the take-up drum
Since tension is applied by the flexible rebar and the weight of the frame, the winding drum must be placed near a construction site, and construction in a narrow place cannot be performed. Since the mounting frame of the flexible reinforcing bars is placed on the ground surface of the work place, a pillar for the mounting frame is required, and the efficiency of the mounting operation is reduced. Since the guide pipes for sending out the flexible reinforcing bars were fixed in a certain direction and the installation height of each guide pipe was fixed, a large space was required, and construction in a narrow place was difficult.

【0003】[0003]

【発明が解決しようとする課題】本発明は、上記従来の
問題点を解決するためになされたもので、簡単な装置、
方法により、作業性のよい、高品質の場所打杭を構築で
きる場所打杭の鉄筋建込み装置と建込み方法を提供する
ことを目的とする。
SUMMARY OF THE INVENTION The present invention has been made to solve the above-mentioned conventional problems, and has a simple device,
It is an object of the present invention to provide an apparatus and a method for building a cast-in-place pile which can construct a cast-in-place pile with good workability and high quality.

【0004】[0004]

【課題を解決するための手段】本発明は、場所打杭で使
用するフレキシブル鉄筋の建込み装置であって、下部フ
レ−ムと、下部フレ−ム吊りケーブル、上昇・下降ジャ
ッキ、ケーブル巻取ドラムを備えた下部フレ−ム吊り装
置と、ガイドパイプ、ガイドリングを備えた建込み架台
と、フレキシブル鉄筋巻取ドラムとで構成されたことを
特徴とする、場所打杭の鉄筋建込み装置であり、また、
下部フレ−ム吊り装置は、建込み架台上に設置されたこ
とを特徴とする、場所打杭の鉄筋建込み装置であり、ま
た、建込み架台は、脚柱を備えたことを特徴とする、場
所打杭の鉄筋建込み装置であり、また、建込み架台は、
中間梁上に設置した架台走行装置を備えたことを特徴と
する、場所打杭の鉄筋建込み装置であり、また、建込み
架台は、側壁に設置したブラケット上の架台走行装置を
備えたことを特徴とする、場所打杭の鉄筋建込み装置で
あり、また、建込み架台に備えたガイドパイプは、回転
可能な構造とし、それぞれの高さを複数段階に変えたこ
とを特徴とする、場所打杭の鉄筋建込み装置であり、ま
た、場所打杭で使用するフレキシブル鉄筋の建込み方法
であって、場所打杭の削孔上に、建込み架台を配置し、
フレキシブル鉄筋を地表面まで引き出し、引き出したフ
レキシブル鉄筋の先端と、下部フレ−ム吊りケーブル
を、下部フレ−ムに取付けた後、フレキシブル鉄筋外周
に、帯鉄筋を取付け、フレキシブル鉄筋の建込みと、帯
鉄筋の取付けを繰り返した後、フレキシブル鉄筋に中間
フレームを取付け、再度、フレキシブル鉄筋の建込み
と、帯鉄筋の取付けを繰り返し、フレキシブル鉄筋に上
部フレームを取付け、フレキシブル鉄筋を場所打杭の削
孔内に建込んでいくことを特徴とする、場所打杭の鉄筋
建込み方法であり、さらにまた、フレキシブル鉄筋の建
込みは、上昇・下降ジャッキの操作により行われること
を特徴とする、場所打杭の鉄筋建込み方法である。
SUMMARY OF THE INVENTION The present invention relates to an apparatus for building a flexible reinforcing bar for use in a cast-in-place pile, comprising a lower frame, a lower frame suspension cable, an ascending / descending jack, and a cable winding. A cast-in-place pile rebar construction device, comprising: a lower frame suspension device having a drum, a gantry having a guide pipe and a guide ring, and a flexible rebar winding drum. Yes, and
The lower frame suspending device is a cast-in-place pile reinforcing bar installation device characterized by being installed on a mounting stand, and the mounting stand is provided with a pillar. , Is a cast-in-place pile reinforcing device, and the mounting base is:
A cast-in-place pile rebar construction device, characterized by having a gantry traveling device installed on an intermediate beam, and the gantry has a gantry traveling device on a bracket installed on a side wall. A cast-in-place pile reinforcing steel construction device, and the guide pipe provided in the construction stand has a rotatable structure, and the height of each is changed in a plurality of stages, A cast-in-place pile reinforcement device, and a method of building a flexible reinforcing bar used in cast-in-place piles, wherein a mounting stand is arranged on a drilled place-in-place pile,
After pulling out the flexible rebar to the ground surface and attaching the tip of the pulled out rebar and the lower frame suspension cable to the lower frame, attach a belt rebar around the outer periphery of the flexible rebar, build the flexible rebar, After repeating the installation of the belt reinforcement, attach the intermediate frame to the flexible reinforcement, repeat the installation of the flexible reinforcement, and repeat the installation of the belt reinforcement, attach the upper frame to the flexible reinforcement, drill holes in the flexible reinforcement in place It is a method of building a cast-in-place pile reinforcing bar, characterized by being built inside, and furthermore, the setting of a flexible reinforcing bar is performed by operation of an ascending / descending jack. It is a method of building a reinforcing bar for piles.

【0005】[0005]

【発明の実施の形態1】以下図面を参照しながら本発明
の実施形態の一例について説明する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described below with reference to the drawings.

【0006】<イ>全体構成 図1は、本発明による場所打杭の鉄筋建込み装置の配置
状況を示す側断面図、図2はその平面図である。場所打
杭の鉄筋建込み装置は、フレキシブル鉄筋1を固定する
下部フレ−ム2と、下部フレ−ム吊りケーブル31、上
昇・下降ジャッキ32、ケーブル巻取ドラム33を備え
た下部フレ−ム吊り装置3と、ガイドパイプ41、ガイ
ドリング42を備えた建込み架台4と、地表面G上に設
置されたフレキシブル鉄筋巻取ドラム5により構成され
ている。
<A> Overall Configuration FIG. 1 is a side sectional view showing an arrangement state of a reinforcing steel erection apparatus for a cast-in-place pile according to the present invention, and FIG. 2 is a plan view thereof. The reinforcing steel laying device of the cast-in-place pile includes a lower frame 2 for fixing the flexible reinforcing bar 1, a lower frame hanging cable 31, an ascending / descending jack 32, and a lower frame hanging provided with a cable winding drum 33. It comprises a device 3, a gantry 4 having a guide pipe 41 and a guide ring 42, and a flexible rebar winding drum 5 installed on the ground surface G.

【0007】<ロ>下部フレ−ム 図3は、下部フレ−ム2の斜視図である。下部フレ−ム
2は鉄板等を円形に加工し、内周面にフレキシブル鉄筋
1のピッチ間隔を確保するための凹部21を設け、ここ
にフレキシブル鉄筋1を固定する。 また、下部フレ−
ム2の外周にスペーサー22を取付け、削孔6とフレキ
シブル鉄筋1との間隙保持材とする。下部フレ−ム2の
円周上の所定箇所に、下部フレ−ム吊りケーブル31を
取付け、下部フレ−ム吊り装置3により懸垂される。そ
のため、フレキシブル鉄筋1は所定のピッチ間隔を確保
し、籠状となったフレキシブル鉄筋1をまとめて降下す
ることができるので、従来行っていた、複数個のストロ
ークジャッキは不要となり、コンパクトな装置とするこ
とができ、さらに、各フレキシブル鉄筋1の建込み長さ
の調整、ゆるみもなくすことができる。 図18は下部
フレ−ム2のその他の形態を示す斜視図であり、図19
はその平面図である。この形態によれば、下部フレ−ム
2の外周にフレキシブル鉄筋1を固定することができ
る。
<B> Lower Frame FIG. 3 is a perspective view of the lower frame 2. The lower frame 2 is formed by processing a steel plate or the like into a circular shape, and has a concave portion 21 for securing a pitch interval between the flexible reinforcing bars 1 on the inner peripheral surface, and the flexible reinforcing bar 1 is fixed thereto. Also, the lower frame
A spacer 22 is attached to the outer periphery of the space 2 to serve as a gap maintaining material between the hole 6 and the flexible reinforcing bar 1. A lower frame suspension cable 31 is attached to a predetermined position on the circumference of the lower frame 2 and is suspended by the lower frame suspension device 3. Therefore, the flexible rebar 1 secures a predetermined pitch interval, and the basket-shaped flexible rebar 1 can be lowered at a time, so that a plurality of stroke jacks, which has been conventionally performed, becomes unnecessary, and a compact device can be provided. In addition, it is possible to adjust the installation length of each flexible reinforcing bar 1 and to prevent the flexible reinforcing bar 1 from becoming loose. FIG. 18 is a perspective view showing another form of the lower frame 2, and FIG.
Is a plan view thereof. According to this embodiment, the flexible reinforcing bar 1 can be fixed to the outer periphery of the lower frame 2.

【0008】<ハ>上昇・下降ジャッキ 上昇・下降ジャッキ32は、従来使用されているジャッ
キで、建込み架台4の中央部に設置され、場所打杭の中
心部に位置するように設置されている。(図1)
<C> Ascending / Descending Jack The ascending / descending jack 32 is a conventionally used jack, which is installed at the center of the gantry 4 and located at the center of the cast-in-place pile. I have. (Fig. 1)

【0009】<ニ>ケーブル巻取ドラム ケーブル巻取ドラム33は、建込み架台4上に設置され
ている。ケーブル巻取ドラム33に巻き取られているケ
ーブルの先端は、前記下部フレ−ム2に連結され、上昇
・下降ジャッキ32内を経て、ケーブル巻取ドラム33
に収納されている。(図1)
<D> Cable Winding Drum The cable winding drum 33 is installed on the gantry 4. The distal end of the cable wound on the cable winding drum 33 is connected to the lower frame 2, passes through the ascending / descending jack 32, and passes through the cable winding drum 33.
It is stored in. (Fig. 1)

【0010】<ホ>建込み架台 建込み架台4は、鋼材等で枠組みされた架台で、前記の
上昇・下降ジャッキ32、ケーブル巻取ドラム33、ガ
イドパイプ41及びガイドリング42が搭載されてい
る。ガイドパイプ41は、図4に示すように、建込み架
台4上で回転可能な取付けとし、高さを数段階に変えて
取付けている。そのため、建込み架台4上のガイドパイ
プ41占有容積をコンパクトに収容することができる。
後述する場所打杭の施工現場条件等により、建込み架台
4下端部に、架台走行装置43を取付ける場合もある。
(図1)
<E> Built-in gantry The gantry 4 is a gantry framed with steel or the like, on which the above-mentioned up / down jack 32, cable winding drum 33, guide pipe 41 and guide ring 42 are mounted. . As shown in FIG. 4, the guide pipe 41 is rotatably mounted on the gantry 4 and is mounted at different heights. Therefore, the volume occupied by the guide pipe 41 on the gantry 4 can be compactly accommodated.
The gantry traveling device 43 may be attached to the lower end of the gantry 4 depending on the construction site conditions of the cast-in-place pile described later.
(Fig. 1)

【0011】<ヘ>フレキシブル鉄筋巻取ドラム 場所打杭のための各フレキシブル鉄筋1は、1本分をい
わばカセット状にして、引きだし枠51にそれぞれ収納
し、各引きだし枠51は、ドラム用枠52に積み上げら
れ、フレキシブル鉄筋巻取ドラム5に装着されている。
そのため、全てのフレキシブル鉄筋1を巻取っていた、
従来の巨大な巻取ドラムは不要となり、狭隘な場所での
施工が可能となる。
<F> Flexible Reinforcing Take-up Drum Each flexible reinforcing rod 1 for cast-in-place pile is stored in a drawer frame 51 in a so-called cassette shape, and each drawer frame 51 is a drum frame. 52, and is mounted on the flexible rebar winding drum 5.
Therefore, all the flexible rebars 1 were wound up,
The conventional large take-up drum becomes unnecessary, and construction in a narrow place becomes possible.

【0012】[0012]

【作用】以下に、場所打杭の鉄筋建込み方法を説明す
る。
[Effects] A method of laying a reinforcing bar for a cast-in-place pile will be described below.

【0013】<イ>建込み架台の配置 図5は、地表面G又は構築物の床版上に脚柱44を設
け、脚柱44上に建込み架台4を設置した場合の側断面
図を示し、図6は、その正面図を示す。建込み架台4の
中央部は、場所打杭の削孔6の位置と一致させて設置す
る。
<A> Arrangement of the gantry FIG. 5 is a side sectional view showing a case where the pillars 44 are provided on the ground surface G or the floor slab of the building, and the gantry 4 is installed on the pillars 44. , FIG. 6 shows a front view thereof. The central part of the erection stand 4 is installed so as to coincide with the position of the drill hole 6 of the cast-in-place pile.

【0014】<ロ>フレキシブル鉄筋の引き出し 建込み架台4に予め設置されたガイドパイプ41から、
フレキシブル鉄筋1を地表面G又は構築物の床版上まで
引き出す。(図7)
<B> Draw-out of Flexible Reinforcing Bar From the guide pipe 41 previously installed on the gantry 4,
The flexible reinforcing bar 1 is pulled out to the ground surface G or the floor of the building. (FIG. 7)

【0015】<ハ>下部フレ−ム、下部フレ−ム吊りケ
ーブルの取付け フレキシブル鉄筋1先端に、下部フレ−ム2を取付け
後、下部フレ−ム吊りケーブル31を下部フレ−ム2に
取付ける。フレキシブル鉄筋1及び下部フレ−ム2は、
下部フレ−ム吊りケーブル31により支持され、懸垂し
た状態となる。(図7)
<C> Mounting of lower frame and lower frame suspension cable After attaching the lower frame 2 to the tip of the flexible reinforcing bar 1, the lower frame suspension cable 31 is mounted to the lower frame 2. The flexible reinforcing bar 1 and the lower frame 2
It is supported by the lower frame suspension cable 31 and is suspended. (FIG. 7)

【0016】<ニ>帯鉄筋の取付け フレキシブル鉄筋1外周に、帯鉄筋7を取付ける。(図
8)
<D> Attaching the band reinforcing bar The band reinforcing bar 7 is attached to the outer periphery of the flexible reinforcing bar 1. (FIG. 8)

【0017】<ホ>フレキシブル鉄筋の建込み 上昇・下降ジャッキ32の操作により、下部フレ−ム吊
りケーブル31を降下させ、フレキシブル鉄筋1を削孔
6内へ建込む。(図9)
<E> Construction of Flexible Reinforcing Bar The lower frame suspension cable 31 is lowered by operating the lifting / lowering jack 32, and the flexible reinforcing bar 1 is built into the hole 6. (FIG. 9)

【0018】<ヘ>ジャッキ操作 図10は、上昇・下降ジャッキ32の側断面図を示す。
使用するジャッキは既存品であり、上部定着装置32a
と、下部定着装置32bの組み合わせて、建込み架台4
上に載置されている。下部フレ−ム2の上下は、下部フ
レ−ム吊りケーブル31を把持・解放することにより、
ピストンcを上下させることができる。
<F> Jack Operation FIG. 10 is a side sectional view of the ascending / descending jack 32. FIG.
The jack used is an existing product, and the upper fixing device 32a is used.
And the lower fixing device 32b,
Is placed on top. The upper and lower portions of the lower frame 2 are gripped and released by the lower frame suspending cable 31,
The piston c can be moved up and down.

【0019】<ト>中間フレ−ムの取付け 図11は、フレキシブル鉄筋1に、中間フレ−ム8を取
付けている状態を示す側断面図である。フレキシブル鉄
筋1を削孔6内へ建込み、中間フレ−ム8の取付け位置
が地表面G近くまで建込まらた時、フレキシブル鉄筋1
に中間フレ−ム8を取付ける。
<G> Mounting of Intermediate Frame FIG. 11 is a side sectional view showing a state where the intermediate frame 8 is mounted on the flexible reinforcing bar 1. When the flexible reinforcing bar 1 is built into the drilled hole 6 and the mounting position of the intermediate frame 8 is built near the ground surface G, the flexible reinforcing bar 1
Is attached to the intermediate frame 8.

【0020】<チ>上部フレ−ムの取付け b 図12は、フレキシブル鉄筋1に、上部フレ−ム9
を取付けている状態を示す側断面図である。前記と同様
に、上部フレ−ム9の取付け位置までフレキシブル鉄筋
1が降下した時、フレキシブル鉄筋1に上部フレ−ム9
の取付けを行う。
<H> Attaching the upper frame b FIG.
It is a sectional side view which shows the state which attached. As described above, when the flexible rebar 1 descends to the position where the upper frame 9 is attached, the upper frame 9 is attached to the flexible rebar 1.
Attach.

【0021】<リ>下部フレ−ムの着底 図13は、下部フレ−ム2が削孔6の底部に到達し、フ
レキシブル鉄筋1の建込みが終了した状態を示す側断面
図である。この時点で、余分なフレキシブル鉄筋1の切
断を行い、完了する。
<Re> Landing of Lower Frame FIG. 13 is a side sectional view showing a state where the lower frame 2 has reached the bottom of the drill hole 6 and the installation of the flexible reinforcing bar 1 has been completed. At this point, the extra flexible reinforcing bar 1 is cut and completed.

【0022】[0022]

【発明の実施の形態2】図14は、建込み架台4を、架
台走行装置41を介して、中間梁10上に設置した場合
の側断面図であり、図15はその正面図である。実施の
形態1においては、建込み架台4に脚部44を設け、地
面G上に設置していたが、現場が狭隘で、脚部44の設
置が困難な状況の場合に、本実施の形態を採用する。構
築物11内の中間梁10を利用し、中間梁10にレール
Rを載置し、建込み架台4を移動させることもできる。
[Embodiment 2] FIG. 14 is a side sectional view when the erection gantry 4 is installed on the intermediate beam 10 via a gantry traveling device 41, and FIG. 15 is a front view thereof. In the first embodiment, the legs 44 are provided on the gantry 4 and installed on the ground G. However, in a situation where the site is narrow and the installation of the legs 44 is difficult, this embodiment is used. Is adopted. Using the intermediate beam 10 in the building 11, the rail R can be placed on the intermediate beam 10 and the erection gantry 4 can be moved.

【0023】[0023]

【発明の実施の形態3】図16は、建込み架台4を、構
築物11の側壁にブラケット12を取り付け、ブラケッ
ト12上に建込み架台4を設置した場合の側断面図であ
り、図17はその正面図である。実施の形態2と同様
に、レールRを載置し、建込み架台4を移動させること
ができる。
[Embodiment 3] FIG. 16 is a side sectional view showing a case where the gantry 4 is mounted on a bracket 12 on the side wall of a building 11 and the gantry 4 is installed on the bracket 12. FIG. It is the front view. As in the second embodiment, the rail R can be placed and the gantry 4 can be moved.

【0024】[0024]

【発明の効果】本発明は以上説明したようになるから、
次のような効果を得ることができる。 <イ>場所打杭の上部空間が低く、狭隘な作業環境であ
っても施工できる。 <ロ>作業空間確保のための掘削土量が少なくなり、経
済性が向上する。 <ハ>鉄筋建込みの能率が向上し、工期の短縮が図れ
る。 <ニ>鉄筋のジョイント箇所がないので、高品質の場所
打杭とすることができる。<ホ>場所打杭の上部空間が
低い場合であっても、地下水位を下げて施工する必要が
なく、周辺環境の悪化を防ぐことができる。 <ヘ>鉄筋加工は工場で行うため、そのための用地確保
を必要としない。 <ト>狭隘な作業環境であっても施工できるので、場所
打杭の適用範囲を拡大することができる。
Since the present invention has been described above,
The following effects can be obtained. <B> The space above the cast-in-place pile is low, and construction is possible even in a narrow work environment. <B> The amount of excavated soil to secure the work space is reduced, and the economic efficiency is improved. <C> The efficiency of rebar construction is improved, and the construction period can be shortened. <D> Since there is no joint of the reinforcing bar, a high-quality cast-in-place pile can be obtained. <E> Even when the upper space of the cast-in-place pile is low, it is not necessary to lower the groundwater level and perform construction, thereby preventing deterioration of the surrounding environment. <F> Since the rebar processing is performed at the factory, it is not necessary to secure land for it. <G> Since the work can be performed even in a narrow work environment, the applicable range of the cast-in-place pile can be expanded.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明による場所打杭の鉄筋建込み装置の配置
状況を示す側断面図。
FIG. 1 is a side sectional view showing an arrangement state of a reinforcing steel building device for a cast-in-place pile according to the present invention.

【図2】同上平面図。FIG. 2 is a plan view of the same.

【図3】下部フレ−ムの斜視図。FIG. 3 is a perspective view of a lower frame.

【図4】ガイドパイプの斜視図。FIG. 4 is a perspective view of a guide pipe.

【図5】建込み架台を設置した場合の側断面図。FIG. 5 is a side cross-sectional view when a gantry is installed.

【図6】同上正面図。FIG. 6 is a front view of the same.

【図7】下部フレ−ム、下部フレ−ム吊りケーブルの取
付け状況図。
FIG. 7 is a view showing a state of attachment of a lower frame and a lower frame suspension cable.

【図8】帯鉄筋の取付け状況図。FIG. 8 is a view showing a state of attachment of a belt reinforcing bar.

【図9】フレキシブル鉄筋の削孔内への建込み状況図。FIG. 9 is a diagram showing the state of installation of a flexible reinforcing bar in a hole.

【図10】上昇・下降ジャッキの側断面図。FIG. 10 is a side sectional view of a lifting / lowering jack.

【図11】中間フレ−ムの取付け状態を示す側断面図。FIG. 11 is a side sectional view showing an attached state of the intermediate frame.

【図12】上部フレ−ムの取付け状態を示す側断面図。FIG. 12 is a side sectional view showing an attached state of an upper frame.

【図13】フレキシブル鉄筋の建込みが終了した状態を
示す側断面図。
FIG. 13 is a side sectional view showing a state in which the installation of the flexible reinforcing bars has been completed.

【図14】建込み架台を、中間梁上に設置した場合の側
断面図。
FIG. 14 is a side cross-sectional view when the erection stand is installed on an intermediate beam.

【図15】同上正面図。FIG. 15 is a front view of the same.

【図16】建込み架台を、ブラケット上に設置した場合
の側断面図。
FIG. 16 is a side cross-sectional view when the erection stand is installed on a bracket.

【図17】同上正面図。FIG. 17 is a front view of the same.

【図18】下部フレ−ムのその他の形態を示す斜視図。FIG. 18 is a perspective view showing another form of the lower frame.

【図19】同上平面図。FIG. 19 is a plan view of the same.

───────────────────────────────────────────────────── フロントページの続き (72)発明者 古谷 時春 東京都千代田区丸の内一丁目6番5号 東 日本旅客鉄道株式会社内 (72)発明者 石橋 忠良 東京都千代田区丸の内一丁目6番5号 東 日本旅客鉄道株式会社内 (72)発明者 平岡 寛 東京都新宿区西新宿一丁目25番1号 大成 建設株式会社内 (72)発明者 荒井 政男 東京都新宿区西新宿一丁目25番1号 大成 建設株式会社内 (72)発明者 有山 元茂 東京都新宿区西新宿一丁目25番1号 大成 建設株式会社内 (72)発明者 平部 俊光 東京都新宿区西新宿三丁目2番26号 ブ イ・エス・エル・ジャパン株式会社内 ──────────────────────────────────────────────────続 き Continuing on the front page (72) Inventor Tokiharu Furuya 1-6-5 Marunouchi, Chiyoda-ku, Tokyo East Japan Railway Company (72) Inventor Tadashi Ishibashi 1-6-5 Marunouchi, Chiyoda-ku, Tokyo No. East Japan Railway Company Co., Ltd. (72) Inventor Hiroshi Hiraoka 1-25-1, Nishi-Shinjuku, Shinjuku-ku, Tokyo Taisei Construction Co., Ltd. No. Taisei Construction Co., Ltd. (72) Inventor Motomo Ariyama 1-25-1, Nishi Shinjuku, Shinjuku-ku, Tokyo Taisei Construction Co., Ltd. No. 26 VSL Japan Co., Ltd.

Claims (8)

【特許請求の範囲】[Claims] 【請求項1】場所打杭で使用するフレキシブル鉄筋の建
込み装置であって、 下部フレ−ムと、 下部フレ−ム吊りケーブル、上昇・下降ジャッキ、ケー
ブル巻取ドラムを備えた下部フレ−ム吊り装置と、 ガイドパイプ、ガイドリングを備えた建込み架台と、 フレキシブル鉄筋巻取ドラムとで構成されたことを特徴
とする、 場所打杭の鉄筋建込み装置。
An apparatus for mounting a flexible reinforcing bar for use in a cast-in-place pile, comprising a lower frame, a lower frame suspension cable, a lifting / lowering jack, and a cable winding drum. A cast-in-place pile reinforcing bar device, comprising: a suspension unit, a mounting stand provided with guide pipes and guide rings, and a flexible reinforcing coil winding drum.
【請求項2】請求項1に記載の場所打杭の鉄筋建込み装
置において、 下部フレ−ム吊り装置は、建込み架台上に設置されたこ
とを特徴とする、 場所打杭の鉄筋建込み装置。
2. The reinforcing device for cast-in-place piles according to claim 1, wherein the lower frame suspension device is installed on a mounting stand. apparatus.
【請求項3】請求項1又は請求項2のいずれかに記載の
場所打杭の鉄筋建込み装置において、 建込み架台は、脚柱を備えたことを特徴とする、 場所打杭の鉄筋建込み装置。
3. The cast-in-place pile reinforcing steel building apparatus according to claim 1, wherein the mounting base is provided with a pillar. Device.
【請求項4】請求項1又は請求項2のいずれかに記載の
場所打杭の鉄筋建込み装置において、 建込み架台は、中間梁上に設置した架台走行装置を備え
たことを特徴とする、 場所打杭の鉄筋建込み装置。
4. The apparatus according to claim 1, wherein the gantry includes a gantry traveling device installed on an intermediate beam. , Cast-in-place pile reinforcement equipment.
【請求項5】請求項1又は請求項2のいずれかに記載の
場所打杭の鉄筋建込み装置において、 建込み架台は、側壁に設置したブラケット上の架台走行
装置を備えたことを特徴とする、 場所打杭の鉄筋建込み装置。
5. The reinforcing steel building device for a cast-in-place pile according to claim 1, wherein the mounting gantry includes a gantry traveling device on a bracket installed on a side wall. To make a cast-in-place pile rebar construction device.
【請求項6】請求項1乃至請求項5のいずれかに記載の
場所打杭の鉄筋建込み装置において、 建込み架台に備えたガイドパイプは、回転可能な構造と
し、それぞれの高さを複数段階に変えたことを特徴とす
る、 場所打杭の鉄筋建込み装置。
6. A reinforcing steel construction device for a cast-in-place pile according to any one of claims 1 to 5, wherein the guide pipe provided on the construction gantry has a rotatable structure and has a plurality of heights. A cast-in-place pile rebar construction device characterized by different stages.
【請求項7】場所打杭で使用するフレキシブル鉄筋の建
込み方法であって、 場所打杭の削孔上に、建込み架台を配置し、 フレキシブル鉄筋を地表面まで引き出し、 引き出したフレキシブル鉄筋の先端と、下部フレ−ム吊
りケーブルを、下部フレ−ムに取付けた後、 フレキシブル鉄筋外周に、帯鉄筋を取付け、 フレキシブル鉄筋の建込みと、帯鉄筋の取付けを繰り返
した後、 フレキシブル鉄筋に中間フレームを取付け、 再度、フレキシブル鉄筋の建込みと、帯鉄筋の取付けを
繰り返し、 フレキシブル鉄筋に上部フレームを取付け、フレキシブ
ル鉄筋を場所打杭の削孔内に建込んでいくことを特徴と
する、 場所打杭の鉄筋建込み方法。
7. A method for installing a flexible reinforcing bar used in a cast-in-place pile, comprising: placing a mounting stand on a drilled hole in the cast-in-place pile; extracting the flexible reinforcing bar to the ground surface; After attaching the tip and the lower frame suspension cable to the lower frame, attach the belt reinforcement to the outer periphery of the flexible reinforcement, repeat the installation of the flexible reinforcement and the installation of the belt reinforcement, and then intermediate to the flexible reinforcement. A place characterized by attaching a frame, repeating the installation of flexible reinforcing bars and attaching a reinforcing bar again, attaching an upper frame to the flexible reinforcing bars, and laying the flexible reinforcing bars in the drilling of the cast-in-place pile. How to build a reinforcing steel bar.
【請求項8】請求項7に記載の場所打杭の鉄筋建込み方
法において、 フレキシブル鉄筋の建込みは、上昇・下降ジャッキの操
作により行われることを特徴とする、 場所打杭の鉄筋建込み方法。
8. The method of building a cast-in-place pile according to claim 7, wherein the setting of the flexible reinforcing bar is performed by operating a lifting / lowering jack. Method.
JP20727697A 1997-07-16 1997-07-16 Reinforcing bar locating device and locating method for cast-in-place pile Pending JPH1136294A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP20727697A JPH1136294A (en) 1997-07-16 1997-07-16 Reinforcing bar locating device and locating method for cast-in-place pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP20727697A JPH1136294A (en) 1997-07-16 1997-07-16 Reinforcing bar locating device and locating method for cast-in-place pile

Publications (1)

Publication Number Publication Date
JPH1136294A true JPH1136294A (en) 1999-02-09

Family

ID=16537122

Family Applications (1)

Application Number Title Priority Date Filing Date
JP20727697A Pending JPH1136294A (en) 1997-07-16 1997-07-16 Reinforcing bar locating device and locating method for cast-in-place pile

Country Status (1)

Country Link
JP (1) JPH1136294A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003342952A (en) * 2002-05-30 2003-12-03 Okumura Corp Positioning jig for reinforcing bar
JP2006283286A (en) * 2005-03-31 2006-10-19 Kajima Corp Cage erection device and cage erecting method
JP2010077722A (en) * 2008-09-26 2010-04-08 Ntec:Kk Method of reinforcing hollow columnar member, and reinforced body of hollow columnar member

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003342952A (en) * 2002-05-30 2003-12-03 Okumura Corp Positioning jig for reinforcing bar
JP2006283286A (en) * 2005-03-31 2006-10-19 Kajima Corp Cage erection device and cage erecting method
JP4494272B2 (en) * 2005-03-31 2010-06-30 鹿島建設株式会社 Housing installation apparatus and housing installation method
JP2010077722A (en) * 2008-09-26 2010-04-08 Ntec:Kk Method of reinforcing hollow columnar member, and reinforced body of hollow columnar member

Similar Documents

Publication Publication Date Title
JP4181617B1 (en) Vibration compaction device and method for constructing cast-in-place concrete pile
JP2021514437A (en) Shaft slip foam device and method
KR101878832B1 (en) Tremie Plate Having a Crane Function of Reinforcing Bar and Verticality Maintaining Method for Reinforcing Bar of the Reinforced Concrete Pile Using the Same
US5359829A (en) Fabrication and installation of steel reinforcement cages for pier foundations
JPH1136294A (en) Reinforcing bar locating device and locating method for cast-in-place pile
JP3713678B2 (en) Cast-in-place pile, underground wall and its construction method
JP2001055733A (en) Construction method for underground wall and underground wall structure thereof
JP2780571B2 (en) Reinforcing cage construction equipment
JP6438931B2 (en) Temporary column, temporary column installation structure, and roof frame construction method
JP3069315B2 (en) Work method and device for leaderless auger
JP4352219B2 (en) Crane equipment
JPH1136292A (en) Spiral bar winding device and spiral bar winding method
JP6537778B2 (en) Environmental load reduction device and construction method
JP3684478B2 (en) Hoop muscle fixing method
KR200367259Y1 (en) Roller device for concrete girder form using RC downward construction
JP7007691B1 (en) Casting method for spring spacers, reinforcing bar cages and underground piles
SU977176A1 (en) Apparatus for installing underground reinforced concrete vessels
CN217174727U (en) Auxiliary vibrating device
CN215369043U (en) Ground separation equipment for electric pole construction
JP3265491B2 (en) Positioning method of vertical columns
JP3013353B2 (en) Method of placing concrete on SRC underground diaphragm wall
KR20070122024A (en) Non supporting form system for down ward construction and non supporting down ward construction method using the same
JP2005029364A6 (en) Crane equipment
JP3661166B2 (en) Reinforcing bar construction equipment for cast-in-place piles
CN113338269A (en) Auxiliary vibrating device

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20041019

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20041109

A521 Written amendment

Effective date: 20041228

Free format text: JAPANESE INTERMEDIATE CODE: A523

A02 Decision of refusal

Effective date: 20050301

Free format text: JAPANESE INTERMEDIATE CODE: A02