JPH11321727A - Extracting device and method for connection pin in construction machine - Google Patents

Extracting device and method for connection pin in construction machine

Info

Publication number
JPH11321727A
JPH11321727A JP12989598A JP12989598A JPH11321727A JP H11321727 A JPH11321727 A JP H11321727A JP 12989598 A JP12989598 A JP 12989598A JP 12989598 A JP12989598 A JP 12989598A JP H11321727 A JPH11321727 A JP H11321727A
Authority
JP
Japan
Prior art keywords
pin
connecting pin
construction machine
connection
wedge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP12989598A
Other languages
Japanese (ja)
Inventor
Sakae Fukai
栄 深井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Construction Machinery Co Ltd
Original Assignee
Hitachi Construction Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Construction Machinery Co Ltd filed Critical Hitachi Construction Machinery Co Ltd
Priority to JP12989598A priority Critical patent/JPH11321727A/en
Publication of JPH11321727A publication Critical patent/JPH11321727A/en
Pending legal-status Critical Current

Links

Landscapes

  • Jib Cranes (AREA)
  • Snaps, Bayonet Connections, Set Pins, And Snap Rings (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide an extracting device and method for a connection pin in a construction machine capable of quickly and easily extracting the connection pin. SOLUTION: A connection pin 4 inserted from pin holes 21, 28 of a first member 1, which is a constitutional member of a construction machine, is inserted into a pin hole 29 of a second member 3, so as to connect the first and second members 1, 3. A slit 4a or a constriction part buried partially in the pin holes 27, 28 of the first member 1 in a connection condition is provided in the connection pin 4. A wedge, which is press-fitted to a part exposed to the outside from the pin hole 28 of the first member 1 in the slit 4a or the constriction part to extract the connection pin 4, is provided.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、クレーンや油圧シ
ョベル等の建設機械において、構成部材間を連結する連
結ピンの抜出装置と抜出方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an extracting device and an extracting method of a connecting pin for connecting components in a construction machine such as a crane and a hydraulic shovel.

【0002】[0002]

【従来の技術】クレーンを輸送する場合、比較的大型の
場合には、図10(A)、(B)に示すように、トラッ
クフレーム1に取り付けてあるジャッキ21を伸長させ
てトラックフレーム1をクローラ2から浮かせ、クロー
2を別のクレーンにより吊ってトラックフレーム1から
両側のクローラ2を外し、トラックフレーム1に取付け
たジャッキ21をさらに伸長することにより、トラック
フレーム1以上の旋回装置22や上部旋回体23の部分
をより高くし、その下にトレーラトラックの荷台24を
潜らせ、再度ジャッキ21を収縮させてクレーンのトラ
ックフレーム1以上の部分を荷台24に載せる。
2. Description of the Related Art When a crane is transported, if it is relatively large, as shown in FIGS. 10A and 10B, a jack 21 attached to the truck frame 1 is extended and the truck frame 1 is extended. The crawler 2 is lifted from the crawler 2, the craws 2 are suspended by another crane, the crawlers 2 on both sides are detached from the track frame 1, and the jack 21 attached to the track frame 1 is further extended, so that the turning device 22 and the upper part of the The portion of the revolving structure 23 is made higher, and the bed 24 of the trailer truck is sunk under it. The jack 21 is contracted again, and the portion of the truck frame 1 or more of the crane is placed on the bed 24.

【0003】このような輸送において、クローラ2をト
ラックフレーム1に対して着脱するため、図11(A)
に示すように、トラックフレーム1の両端は、クローラ
2の骨組みであるサイドフレーム3に設けた孔部3aに
挿入され、連結ピン4により着脱自在に連結する構造を
有する。トラックフレーム1は上板1aと下板1bと両
側板1cとによりボックス型をなし、両端部には中板1
dと補強板1eとを有する。連結ピン4は、トラックフ
レーム1の両端の中板1dと下板1bにそれぞれ設けた
ピン孔27、28と、サイドフレーム3に設けたピン孔
29に挿入して取付けられる。
In such transportation, the crawler 2 is attached to and detached from the track frame 1, so that the crawler 2 shown in FIG.
As shown in (1), both ends of the track frame 1 are inserted into holes 3a provided in a side frame 3 which is a framework of the crawler 2, and have a structure of being detachably connected by connecting pins 4. The track frame 1 is formed in a box shape by an upper plate 1a, a lower plate 1b, and both side plates 1c.
d and a reinforcing plate 1e. The connecting pins 4 are attached by inserting them into pin holes 27 and 28 provided in the middle plate 1 d and the lower plate 1 b of both ends of the track frame 1 and pin holes 29 provided in the side frame 3.

【0004】輸送時には、図11(A)、(B)に示す
ように、連結ピン4をサイドフレーム3のピン孔29か
ら抜き出し、バー30を、前記中板1dに取付けた支持
板31の上方の孔aと、トラックフレーム1の補強板1
eに設けた上方の孔bと、連結ピン4の上端に取付けた
アイボルト32に通して連結ピン4を支持させ、この状
態で、トラックフレーム1の前記サイドフレーム3の孔
3aに対する挿脱を行う。また、連結ピン4をピン孔2
9に挿入して連結を行った状態では、図11(B)に示
すように、連結ピン4の抜け出しを防ぐため、前記バー
30を支持板31および補強板1eの下方の孔c、dと
前記アイボルト32に挿通する。
At the time of transportation, as shown in FIGS. 11A and 11B, the connecting pin 4 is pulled out from the pin hole 29 of the side frame 3, and the bar 30 is placed above the support plate 31 attached to the intermediate plate 1d. Hole a and the reinforcing plate 1 of the track frame 1
e, and the connecting pin 4 is supported by passing it through an upper hole b provided in an upper end of the connecting pin 4 and an eyebolt 32 attached to the upper end of the connecting pin 4. In this state, the track frame 1 is inserted into and removed from the hole 3 a of the side frame 3. . In addition, the connecting pin 4 is
In the state where the connecting pins 4 are inserted into the holes 9 and 9, as shown in FIG. 11B, in order to prevent the connecting pins 4 from coming out, the bar 30 is connected to the holes c and d below the supporting plate 31 and the reinforcing plate 1e. The eye bolt 32 is inserted.

【0005】前記連結ピン4の抜き出しを行う場合は、
前記支持板31の孔の下方の孔eにバー30の途中の部
分を入れ、バー30の一端をアイボルト32に入れ、バ
ー30の他端を押し下げて梃子の原理により連結ピン4
を所定の長さだけ抜き出し、次にバー30を引き抜いて
上段の孔fに入れて前記同様に梃子の原理によりバー3
0により連結ピン4を所定の長さだけ抜き出している。
When pulling out the connecting pin 4,
The middle part of the bar 30 is inserted into the hole e below the hole of the support plate 31, one end of the bar 30 is inserted into the eyebolt 32, and the other end of the bar 30 is pushed down, so that the connecting pin 4
Is pulled out by a predetermined length, and then the bar 30 is pulled out and put into the upper hole f, and the bar 3
By 0, the connecting pin 4 is pulled out by a predetermined length.

【0006】[0006]

【発明が解決しようとする課題】上述のように、従来の
連結ピン4の抜出作業は、バー30を挿入する支持板3
1の孔e、fの位置を変えて梃子の原理を利用して抜き
出しているので、連結ピン4を最終位置まで抜き出すの
に時間がかかるという問題点があった。
As described above, the conventional operation of extracting the connecting pin 4 is performed by the support plate 3 into which the bar 30 is inserted.
Since the positions of the holes e and f are changed and the holes are extracted using the principle of leverage, there is a problem that it takes time to extract the connecting pin 4 to the final position.

【0007】本発明は、上記問題点に鑑み、連結ピンの
抜出が迅速かつ容易に行える建設機械における連結ピン
の抜出装置と抜出方法を提供することを目的とする。
SUMMARY OF THE INVENTION In view of the above problems, an object of the present invention is to provide an apparatus and a method for extracting a connecting pin in a construction machine in which the connecting pin can be quickly and easily extracted.

【0008】[0008]

【課題を解決するための手段】この目的を達成するた
め、請求項1の発明は、建設機械の構成部材である第一
部材のピン孔から挿入した連結ピンを第二部材のピン孔
に挿入することにより第一、第二部材を連結する建設機
械における連結ピンの抜出装置において、前記連結ピン
に、連結状態において一部が前記第一部材のピン孔内に
埋没するスリットまたはくびれ部を設けると共に、前記
スリットまたはくびれ部の前記第一部材のピン孔より外
部に露出した部分に圧入して前記連結ピンを抜き出す楔
を備えたことを特徴とする。
In order to achieve this object, according to the first aspect of the present invention, a connecting pin inserted from a pin hole of a first member which is a component of a construction machine is inserted into a pin hole of a second member. By doing so, in the connecting pin extraction device in the construction machine that connects the first and second members, the connecting pin has a slit or a constricted part that is partially buried in the pin hole of the first member in the connected state. And a wedge for press-fitting a portion of the slit or the constricted portion exposed to the outside from a pin hole of the first member to extract the connection pin.

【0009】請求項1においては、スリットあるいはく
びれ部に楔を金槌等の工具によって圧入することによ
り、迅速に連結ピンが抜き出すことができる。
According to the first aspect of the present invention, the connecting pin can be quickly pulled out by pressing a wedge into the slit or the constricted portion with a tool such as a hammer.

【0010】請求項2の発明は、建設機械の構成部材で
ある第一部材のピン孔から挿入した連結ピンを第二部材
のピン孔に挿入することにより第一、第二部材を連結す
る建設機械における連結ピンの抜出装置において、連結
状態において、連結ピンの頭部と第一部材との間に隙間
が形成される構造を有すると共に、前記隙間に圧入して
前記連結ピンを抜き出す楔を備えたことを特徴とする。
According to a second aspect of the present invention, there is provided a construction for connecting a first member and a second member by inserting a connecting pin inserted from a pin hole of a first member, which is a constituent member of a construction machine, into a pin hole of a second member. In a connecting pin extracting device of a machine, in a connected state, the connecting pin has a structure in which a gap is formed between a head of the connecting pin and a first member, and a wedge for press-fitting the gap and extracting the connecting pin. It is characterized by having.

【0011】請求項2においては、連結ピンの頭部と第
一部材との間に形成した隙間に楔を金槌等の工具によっ
て圧入することにより、迅速に連結ピンが抜き出すこと
ができる。
According to the second aspect, the connection pin can be quickly pulled out by press-fitting a wedge with a tool such as a hammer into a gap formed between the head of the connection pin and the first member.

【0012】請求項3の発明は、建設機械の構成部材で
ある第一部材のピン孔から挿入した連結ピンを第二部材
のピン孔に挿入することにより第一、第二部材を連結す
る建設機械における連結ピンの抜出方法において、前記
連結ピンに、連結状態において一部が前記第一部材のピ
ン孔内に埋没するスリットまたはくびれ部を設けてお
き、前記スリットまたはくびれ部の前記第一部材のピン
孔より外部に露出した部分に楔を圧入して前記連結ピン
を抜き出すことを特徴とする。
According to a third aspect of the present invention, there is provided a construction for connecting a first member and a second member by inserting a connecting pin inserted from a pin hole of a first member, which is a constituent member of a construction machine, into a pin hole of a second member. In the method of extracting a connecting pin in a machine, a slit or a constricted portion that is partially buried in a pin hole of the first member in a connected state is provided on the connecting pin, and the first of the slit or the constricted portion is provided. A wedge is press-fitted into a portion of the member exposed to the outside from the pin hole, and the connection pin is extracted.

【0013】請求項3においては、前記スリットまたは
くびれ部の前記第一部材のピン孔より外部に露出した部
分に楔を圧入して前記連結ピンを抜き出すことにより、
連結ピンを迅速に抜き出すことができる。
According to a third aspect of the present invention, a wedge is pressed into a portion of the slit or the constricted portion exposed to the outside from a pin hole of the first member, and the connecting pin is pulled out.
The connecting pin can be quickly pulled out.

【0014】請求項4の発明は、建設機械の構成部材で
ある第一部材のピン孔から挿入した連結ピンを第二部材
のピン孔に挿入することにより第一、第二部材を連結す
る建設機械における連結ピンの抜出方法において、連結
状態において、連結ピンの頭部と第一部材との間に隙間
を形成しておき、前記隙間に楔を圧入して前記連結ピン
を抜き出すことを特徴とする。
According to a fourth aspect of the present invention, there is provided a construction for connecting a first member and a second member by inserting a connecting pin inserted through a pin hole of a first member, which is a constituent member of a construction machine, into a pin hole of a second member. In a method of extracting a connecting pin in a machine, a gap is formed between a head of the connecting pin and a first member in a connected state, and a wedge is pressed into the gap to extract the connecting pin. And

【0015】請求項4においては、連結ピンの頭部と第
一部材との間に設けた隙間に楔を圧入することにより、
連結ピンを迅速に抜き出すことができる。
According to a fourth aspect of the present invention, the wedge is press-fitted into a gap provided between the head of the connecting pin and the first member.
The connecting pin can be quickly pulled out.

【0016】[0016]

【発明の実施の形態】図1は本発明による連結ピンの抜
出方法を実施する装置を、前記クレーンのトラックフレ
ーム(第一部材)1とサイドフレーム(第二部材)3と
を連結ピン4により連結する部分について示す側面図、
図2は図1のE−E断面図、図3は連結ピン4を抜き出
した状態を示す断面図である。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS FIG. 1 shows an apparatus for carrying out a method for extracting a connecting pin according to the present invention, which comprises connecting a track frame (first member) 1 and a side frame (second member) 3 of the crane to a connecting pin 4. Side view showing the part connected by
FIG. 2 is a cross-sectional view taken along the line EE of FIG. 1, and FIG. 3 is a cross-sectional view showing a state where the connecting pin 4 is extracted.

【0017】図1ないし図3において、サイドフレーム
3のトラックフレーム1挿入のための開口部3aは、上
板3bと、下板3cと、両側板3dとにより形成され
る。連結ピン4には、長手方向にスリット4aが設けら
れ、該スリット4aは、連結ピン4によるトラックフレ
ーム1とサイドフレーム3との連結状態において、トラ
ックフレーム1の下板1bに設けたピン孔28にスリッ
ト4aの一部が埋没する位置に設けられる。また、連結
ピン4による連結状態において、中板1dの下面近傍と
なる箇所には孔4bが設けられ、該孔4bに抜止ピン5
が挿着される。
1 to 3, an opening 3a for inserting the track frame 1 in the side frame 3 is formed by an upper plate 3b, a lower plate 3c, and both side plates 3d. The connecting pin 4 is provided with a slit 4a in the longitudinal direction. The slit 4a is provided in a pin hole 28 provided in the lower plate 1b of the track frame 1 when the connecting pin 4 connects the track frame 1 and the side frame 3. Is provided at a position where a part of the slit 4a is buried. In the connection state by the connection pin 4, a hole 4b is provided at a position near the lower surface of the intermediate plate 1d, and the retaining pin 5 is provided in the hole 4b.
Is inserted.

【0018】連結ピン4をサイドフレーム3の下板3b
のピン孔29から抜き出してサイドフレーム3からトラ
ックフレーム1を外す場合は、図3に示すように、抜止
ピン5を抜き、前記スリット4aに挿入できる横幅と、
先端がスリット4aの露出部の上下幅よりやや狭い幅を
有するテーパー形の楔6を金槌等の工具を利用してスリ
ット4aの下板1bから上部に露出した部分内に圧入
し、これにより連結ピン4をピン孔29から抜き出す。
これによりトラックフレーム1をサイドフレーム3の開
口部3aから抜き出すことができる。楔6はスリット4
aに圧入したままにしておくことにより、連結ピン4が
トラックフレーム1の下板1bのピン孔28から下面に
突出しない状態を保つことができる。
Connect the connecting pin 4 to the lower plate 3b of the side frame 3.
When the track frame 1 is to be removed from the side frame 3 by extracting the track frame 1 from the pin hole 29, as shown in FIG.
Using a tool such as a hammer, a tapered wedge 6 having a tip whose width is slightly smaller than the vertical width of the exposed portion of the slit 4a is press-fitted into a portion exposed upward from the lower plate 1b of the slit 4a, thereby connecting. The pin 4 is pulled out from the pin hole 29.
Thereby, the track frame 1 can be extracted from the opening 3a of the side frame 3. Wedge 6 is slit 4
By keeping the connection pin 4 press-fitted into the pin a, it is possible to keep a state in which the connecting pin 4 does not project from the pin hole 28 of the lower plate 1b of the track frame 1 to the lower surface.

【0019】このように、楔6を圧入することで連結ピ
ン4を抜き出すことにより、連結ピン4の抜き出しが容
易にかつ迅速に行える。
As described above, by pulling out the connection pin 4 by press-fitting the wedge 6, the connection pin 4 can be easily and quickly pulled out.

【0020】なお、スリット4aは1方向についてのみ
設けるのではなく、連結ピン4の周方向に複数個配設す
ることにより、連結ピン4の向きが変わっても、いずれ
の方向からでもスリット4aに楔6を圧入できるように
することもできる。また、スリット4aの向き外向きに
固定するため、連結ピン4とトラックフレーム1との間
に連結ピン4の向きを一定にする手段を設けてもよい。
The slits 4a are provided not only in one direction, but by arranging a plurality of the slits 4a in the circumferential direction of the connecting pin 4 so that the slit 4a is formed from any direction even if the direction of the connecting pin 4 changes. The wedge 6 can be press-fitted. In order to fix the slit 4a in the outward direction, a means for fixing the direction of the connecting pin 4 between the connecting pin 4 and the track frame 1 may be provided.

【0021】図4(A)は本発明の他の実施の形態を示
す側面図、図4(B)はこの実施の形態における連結ピ
ンと楔を示す斜視図、図5は楔による連結ピン4の抜き
出し状態を示す断面図である。
FIG. 4A is a side view showing another embodiment of the present invention, FIG. 4B is a perspective view showing a connecting pin and a wedge in this embodiment, and FIG. It is sectional drawing which shows the extraction state.

【0022】本実施の形態においては、図4(B)に示
すように、連結ピン4に前記スリット4aの代わりに外
周にくびれ部4cを設け、楔6Aはこのくびれ部4cに
嵌まるように2又状に形成したものである。この場合
も、図4(A)に示すように、連結ピン4による連結状
態において、トラックフレーム1の下板1bに設けたピ
ン孔28にくびれ部4cの一部が埋没する位置にくびれ
部4cが設けられる。
In this embodiment, as shown in FIG. 4B, a constricted portion 4c is provided on the outer periphery of the connecting pin 4 instead of the slit 4a so that the wedge 6A fits in the constricted portion 4c. It is a bifurcated shape. Also in this case, as shown in FIG. 4A, in the connection state by the connection pin 4, the constricted portion 4c is located at a position where a part of the constricted portion 4c is buried in the pin hole 28 provided in the lower plate 1b of the track frame 1. Is provided.

【0023】図5に示すように、連結ピン4を抜き出す
場合は、楔6Aをくびれ部4cに嵌めて金槌等の工具で
圧入する(図3に示したように板状の楔6を片方の隙間
Gに圧入してもよい)ことにより、前記実施の形態と同
様に連結ピン4をピン孔29より迅速かつ容易に抜き出
すことができる。
As shown in FIG. 5, when pulling out the connecting pin 4, the wedge 6A is fitted into the constricted portion 4c and press-fitted with a tool such as a hammer (as shown in FIG. 3, the plate-shaped wedge 6 is inserted into one side). By press-fitting into the gap G), the connecting pin 4 can be quickly and easily extracted from the pin hole 29 as in the above-described embodiment.

【0024】図6(A)は本発明の他の実施の形態を示
す側面図、図6(B)はこの実施の形態における連結ピ
ンと楔を示す斜視図、図7は楔による連結ピン4の抜き
出し状態を示す断面図である。
FIG. 6A is a side view showing another embodiment of the present invention, FIG. 6B is a perspective view showing a connecting pin and a wedge in this embodiment, and FIG. It is sectional drawing which shows the extraction state.

【0025】本実施の形態においては、図6(B)に示
すように、連結ピン4の頭部4dの両側に(片側でもよ
い)下方に突出する突片4eを設けることにより、図6
(A)に示すように、連結ピン4による連結状態におい
ては、トラックフレーム1の中板1dに突片4eの先端
が当接し、これにより、連結ピン4の頭部4dと中板1
dとの間に隙間Gが形成されるようにし、図6(B)に
示すように、楔6Bは連結ピン4の軸部を挟むように2
又状に形成したものである。
In the present embodiment, as shown in FIG. 6B, projecting pieces 4e projecting downward (one side may be provided) are provided on both sides of the head 4d of the connecting pin 4 so as to provide a structure as shown in FIG.
As shown in (A), in the connection state by the connecting pin 4, the tip of the projecting piece 4 e abuts on the middle plate 1 d of the track frame 1, whereby the head 4 d of the connecting pin 4 and the middle plate 1
6D, a gap G is formed between the connecting pin 4 and the shaft G of the connecting pin 4 as shown in FIG.
It is also formed in a shape.

【0026】図7に示すように、連結ピン4を抜き出す
場合は、楔6Bを前記隙間G、すなわち連結ピン4の頭
部4dと中板1dとの間に挿入して金槌等の工具で圧入
することにより、前記実施の形態と同様に連結ピン4を
ピン孔29より迅速かつ容易に抜き出すことができる。
As shown in FIG. 7, when pulling out the connecting pin 4, a wedge 6B is inserted into the gap G, that is, between the head 4d of the connecting pin 4 and the middle plate 1d, and pressed with a tool such as a hammer. By doing so, the connecting pin 4 can be quickly and easily extracted from the pin hole 29 as in the above-described embodiment.

【0027】図8は図6の実施の形態における隙間Gの
形成手段として、前記中板1dの上面に、連結ピン4の
両側(片側でもよい)に、連結ピン4の頭部4fを支持
する台7を設けたものであり、本実施の形態において
も、図9に示すように、連結ピン4の頭部4fの下の隙
間Gに図6(B)に示した楔6Bを金槌等で圧入する
(図3に示したように板状の楔6を片方の隙間Gに圧入
してもよい)ことにより、連結ピン4を迅速かつ容易に
抜き出すことができる。
FIG. 8 shows, as means for forming the gap G in the embodiment of FIG. 6, a head 4f of the connecting pin 4 is supported on both sides (or one side) of the connecting pin 4 on the upper surface of the intermediate plate 1d. In this embodiment, as shown in FIG. 9, the wedge 6B shown in FIG. 6B is inserted into the gap G below the head 4f of the connecting pin 4 with a hammer or the like. By press-fitting (the plate-shaped wedge 6 may be press-fitted into one of the gaps G as shown in FIG. 3), the connecting pin 4 can be quickly and easily extracted.

【0028】なお、頭部4fの下部に隙間Gを設ける構
造は、図8に二点鎖線で示すように、連結ピン4の先端
を受ける受け部材8をサイドフレーム3に設けることに
よっても実現できる。
The structure in which the gap G is provided below the head 4f can also be realized by providing the receiving member 8 for receiving the tip of the connecting pin 4 on the side frame 3, as shown by the two-dot chain line in FIG. .

【0029】本発明は、クレーンあるいは油圧ショベル
におけるサイドフレーム3とトラックフレーム1との連
結ピン4についてのみならず、連結ピンにかじり等が発
生したり重量物であるために連結ピンの抜き出しが困難
になるような掘削機等他の建設機械の種々の箇所に用い
ることができる。
The present invention is not limited to the connection pin 4 between the side frame 3 and the track frame 1 in a crane or a hydraulic excavator, and it is difficult to pull out the connection pin because the connection pin is galling or is heavy. It can be used in various places of other construction machines such as an excavator.

【0030】[0030]

【発明の効果】本発明によれば、楔を連結ピンのスリッ
トまたはくびれ部あるいは頭部と第1部材との間に設け
た隙間に圧入することにより、連結ピンを迅速かつ容易
に抜き出すことができる。また、本発明は、比較的簡単
な構造により実施できる。
According to the present invention, the connecting pin can be quickly and easily extracted by press-fitting the wedge into the slit or the constricted portion of the connecting pin or the gap provided between the head and the first member. it can. Further, the present invention can be implemented with a relatively simple structure.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明による連結ピンの抜出方法を実施する装
置の一形態を、クレーンのトラックフレーム(第一部
材)とサイドフレーム(第二部材)とを連結ピンにより
連結する部分について示す側面図である。
FIG. 1 is a side view showing an embodiment of an apparatus for carrying out a method for extracting a connecting pin according to the present invention, with respect to a portion connecting a track frame (first member) and a side frame (second member) of a crane with a connecting pin. FIG.

【図2】図1のE−E断面図である。FIG. 2 is a sectional view taken along line EE of FIG.

【図3】図1、図2の実施の形態において、連結ピンを
抜き出した状態を示す断面図である。
FIG. 3 is a cross-sectional view showing a state where a connecting pin is extracted in the embodiment of FIGS. 1 and 2;

【図4】(A)は本発明の他の実施の形態を示す側面
図、(B)はこの実施の形態における連結ピンと楔を示
す斜視図である。
FIG. 4A is a side view showing another embodiment of the present invention, and FIG. 4B is a perspective view showing a connecting pin and a wedge according to this embodiment.

【図5】図4の実施の形態において連結ピンの抜き出し
状態を示す断面図である。
FIG. 5 is a sectional view showing a state in which a connecting pin is extracted in the embodiment of FIG. 4;

【図6】(A)は本発明の他の実施の形態を示す側面
図、(B)はこの実施の形態における連結ピンと楔を示
す斜視図である。
FIG. 6A is a side view showing another embodiment of the present invention, and FIG. 6B is a perspective view showing a connecting pin and a wedge according to this embodiment.

【図7】図6の実施の形態において連結ピンの抜き出し
状態を示す断面図である。
FIG. 7 is a sectional view showing a state in which a connecting pin is extracted in the embodiment of FIG. 6;

【図8】本発明の他の実施の形態を示す側面図である。FIG. 8 is a side view showing another embodiment of the present invention.

【図9】図8の実施の形態において連結ピンの抜き出し
状態を示す断面図である。
FIG. 9 is a sectional view showing a state in which a connecting pin is extracted in the embodiment of FIG. 8;

【図10】(A)は従来のクレーンの輸送を説明する側
面図、(B)は従来のクレーンの輸送の際の分解組立を
示す正面図である。
FIG. 10A is a side view for explaining transport of a conventional crane, and FIG. 10B is a front view showing disassembly and assembly during transport of the conventional crane.

【図11】(A)は従来のクレーンのトラックフレーム
とサイドフレームとの連結ピンによる連結構造を示す一
部断面正面図、(B)、(C)はその連結構造を、ピン
抜き出し状態、ピンによる連結状態について示す斜視図
である。
11 (A) is a partial cross-sectional front view showing a connecting structure of a conventional crane using a connecting pin for connecting a track frame and a side frame, and FIGS. 11 (B) and 11 (C) show the connecting structure in a pin pulled-out state; It is a perspective view shown about the connection state by.

【符号の説明】[Explanation of symbols]

1:トラックフレーム、2:クローラ、3:サイドフレ
ーム、4:連結ピン、4a:スリット、4c:くびれ
部、4d、4f:頭部、4e:突片、5:抜止ピン、
6、6A、6B:楔、7:台、8:受け部材、27〜2
9:ピン孔、G:隙間
1: track frame, 2: crawler, 3: side frame, 4: connecting pin, 4a: slit, 4c: constricted portion, 4d, 4f: head, 4e: projecting piece, 5: retaining pin,
6, 6A, 6B: wedge, 7: table, 8: receiving member, 27-2
9: Pin hole, G: Clearance

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】建設機械の構成部材である第一部材のピン
孔から挿入した連結ピンを第二部材のピン孔に挿入する
ことにより第一、第二部材を連結する建設機械における
連結ピンの抜出装置において、 前記連結ピンに、連結状態において一部が前記第一部材
のピン孔内に埋没するスリットまたはくびれ部を設ける
と共に、 前記スリットまたはくびれ部の前記第一部材のピン孔よ
り外部に露出した部分に圧入して前記連結ピンを抜き出
す楔を備えたことを特徴とする建設機械の連結ピンの抜
出装置。
1. A connecting pin of a construction machine for connecting a first member and a second member by inserting a connecting pin inserted from a pin hole of a first member, which is a component member of the construction machine, into a pin hole of a second member. In the extraction device, the connection pin is provided with a slit or a constricted portion that is partially embedded in the pin hole of the first member in a connected state, and is provided outside the pin hole of the first member in the slit or the constricted portion. A connection pin extracting device for a construction machine, comprising a wedge for press-fitting the connecting pin and extracting the connecting pin.
【請求項2】建設機械の構成部材である第一部材のピン
孔から挿入した連結ピンを第二部材のピン孔に挿入する
ことにより第一、第二部材を連結する建設機械における
連結ピンの抜出装置において、 連結状態において、連結ピンの頭部と第一部材との間に
隙間が形成される構造を有すると共に、 前記隙間に圧入して前記連結ピンを抜き出す楔を備えた
ことを特徴とする建設機械の連結ピンの抜出装置。
2. A connecting pin of a construction machine for connecting a first member and a second member by inserting a connecting pin inserted from a pin hole of a first member, which is a constituent member of the construction machine, into a pin hole of a second member. In the removal device, in a connected state, a gap is formed between a head of the connection pin and the first member, and a wedge is provided to press-fit the connection pin and pull out the connection pin. Extraction device for connecting pins of construction machinery.
【請求項3】建設機械の構成部材である第一部材のピン
孔から挿入した連結ピンを第二部材のピン孔に挿入する
ことにより第一、第二部材を連結する建設機械における
連結ピンの抜出方法において、 前記連結ピンに、連結状態において一部が前記第一部材
のピン孔内に埋没するスリットまたはくびれ部を設けて
おき、 前記スリットまたはくびれ部の前記第一部材のピン孔よ
り外部に露出した部分に楔を圧入して前記連結ピンを抜
き出すことを特徴とする建設機械の連結ピンの抜出方
法。
3. A connection pin of a construction machine for connecting a first member and a second member by inserting a connection pin inserted from a pin hole of a first member, which is a component member of the construction machine, into a pin hole of a second member. In the extracting method, a slit or a constricted portion that is partially buried in the pin hole of the first member in a connected state is provided on the connecting pin, and the slit or the constricted portion is provided with a slit or a constricted portion. A method for extracting a connecting pin of a construction machine, comprising inserting a wedge into a portion exposed to the outside and extracting the connecting pin.
【請求項4】建設機械の構成部材である第一部材のピン
孔から挿入した連結ピンを第二部材のピン孔に挿入する
ことにより第一、第二部材を連結する建設機械における
連結ピンの抜出方法において、 連結状態において、連結ピンの頭部と第一部材との間に
隙間を形成しておき、 前記隙間に楔を圧入して前記連結ピンを抜き出すことを
特徴とする建設機械の連結ピンの抜出方法。
4. A connecting pin of a construction machine for connecting a first member and a second member by inserting a connecting pin inserted from a pin hole of a first member, which is a component member of the construction machine, into a pin hole of a second member. In the extraction method, in the connection state, a gap is formed between the head of the connection pin and the first member, and a wedge is pressed into the gap to extract the connection pin. How to pull out the connecting pin.
JP12989598A 1998-05-13 1998-05-13 Extracting device and method for connection pin in construction machine Pending JPH11321727A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP12989598A JPH11321727A (en) 1998-05-13 1998-05-13 Extracting device and method for connection pin in construction machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP12989598A JPH11321727A (en) 1998-05-13 1998-05-13 Extracting device and method for connection pin in construction machine

Publications (1)

Publication Number Publication Date
JPH11321727A true JPH11321727A (en) 1999-11-24

Family

ID=15021029

Family Applications (1)

Application Number Title Priority Date Filing Date
JP12989598A Pending JPH11321727A (en) 1998-05-13 1998-05-13 Extracting device and method for connection pin in construction machine

Country Status (1)

Country Link
JP (1) JPH11321727A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006016208A (en) * 2004-06-01 2006-01-19 Hitachi Sumitomo Heavy Industries Construction Crane Co Ltd Jack up device of construction machinery
JP2012206712A (en) * 2011-03-29 2012-10-25 Tadano Ltd Self-storing retainer cap assembly
JP2015155231A (en) * 2014-02-20 2015-08-27 コベルコ建機株式会社 Connection pin device
CN112389555A (en) * 2020-11-25 2021-02-23 三一重机有限公司 Guide wheel mechanism, drive device, and excavator

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006016208A (en) * 2004-06-01 2006-01-19 Hitachi Sumitomo Heavy Industries Construction Crane Co Ltd Jack up device of construction machinery
JP2012206712A (en) * 2011-03-29 2012-10-25 Tadano Ltd Self-storing retainer cap assembly
JP2015155231A (en) * 2014-02-20 2015-08-27 コベルコ建機株式会社 Connection pin device
CN112389555A (en) * 2020-11-25 2021-02-23 三一重机有限公司 Guide wheel mechanism, drive device, and excavator

Similar Documents

Publication Publication Date Title
JP4791788B2 (en) Counterweight attachment / detachment unit and method of attaching / detaching counterweight
JPH11321727A (en) Extracting device and method for connection pin in construction machine
CN102996141A (en) Star wheel device, insertion board comprising star wheel device and heading machine comprising insertion board
US2628403A (en) Collapsible form for concrete crypts
DE102004043709A1 (en) Electric connection box of a vehicle and method of assembling an electrical connection box
JP4494157B2 (en) Earth retaining method using stake pile sheet pile and Messel steel plate
JP2005105521A (en) Working machine
US7552609B2 (en) Piercing device of hydroforming mold
JP3070312B2 (en) Jig for press-fitting crank pin
JP2006016208A (en) Jack up device of construction machinery
JP3381163B2 (en) Rock Lifting and Removal Methods
JPH08416U (en) Yatco connecting device for building H-shaped steel piles
JP4268268B2 (en) Suspension jig and suspension method for building panel
JP2005263016A (en) Crawler coupling device of crawler crane
JP2678350B2 (en) Formwork
CN217552277U (en) Gateway controller's dismantlement tool
CN214989224U (en) Pay-off that construction of power transmission and distribution power consumption electrical engineering was used
JPH0976223A (en) Core unit of form for manufacturing retaining wall and side ditch block
JP6949532B2 (en) How to join precast concrete members
JP2019210703A (en) Loading method and loading jig for outrigger device
JP3209054U (en) Lower railing
KR20110137688A (en) A drilling machine
JP2002275939A (en) Track frame for construction machine
JPS5821509Y2 (en) Power interlock device for printed circuit board module
KR101128159B1 (en) Connect pin for construction equipment