JPH11255471A - Hoisting cargo device - Google Patents

Hoisting cargo device

Info

Publication number
JPH11255471A
JPH11255471A JP6098198A JP6098198A JPH11255471A JP H11255471 A JPH11255471 A JP H11255471A JP 6098198 A JP6098198 A JP 6098198A JP 6098198 A JP6098198 A JP 6098198A JP H11255471 A JPH11255471 A JP H11255471A
Authority
JP
Japan
Prior art keywords
rope
sheave
jig
sheaves
hanging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP6098198A
Other languages
Japanese (ja)
Inventor
Kenzo Hoashi
建三 帆足
Yasushi Chikaishi
康司 近石
Shoichiro Inatomi
祥一郎 稲富
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Komatsu Ltd
Komatsu Engineering Corp
Original Assignee
Komatsu Ltd
Komatsu Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Komatsu Ltd, Komatsu Engineering Corp filed Critical Komatsu Ltd
Priority to JP6098198A priority Critical patent/JPH11255471A/en
Publication of JPH11255471A publication Critical patent/JPH11255471A/en
Pending legal-status Critical Current

Links

Landscapes

  • Jib Cranes (AREA)

Abstract

PROBLEM TO BE SOLVED: To obtain a hoisting jig preventing shaking movement at moving time and rotating motion at lifting time. SOLUTION: In a hoisting jig, three sheaves 20 are movably mounted in three positions separated with the sheave 20 serving as each vertex of an almost regular triangle and in a single adjacent position in a main body 10, and a rope 4 is respectively wound to these three sheaves 20. In this way, when the rope 4 is placed in a position with three support parts serving as each vertex of almost a regular triangle, a rotating motion is prevented at lifting time, and when the three support parts of the rope 4 are placed in a single adjacent position, shaking movement is prevented at moving time.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、タワークレーン、
門型クレーン、クレーンブームなどにロープで吊り治具
を吊り上げ支持した吊り荷装置に関する。
TECHNICAL FIELD The present invention relates to a tower crane,
The present invention relates to a lifting device in which a hanging jig is lifted and supported by a rope on a portal crane, a crane boom, or the like.

【0002】[0002]

【従来の技術】タワークレーンのレールに沿って移動す
る移動体にウインチを取付け、このウインチで巻き取り
・繰り出しされるロープでフックを吊り上げ支持し、こ
のフックに荷物を吊り下げ、移動体を移動することで荷
物を移動すると共に、ロープを巻き取り・繰り出して荷
物を昇降する吊り荷装置が知られている。
2. Description of the Related Art A winch is mounted on a moving body that moves along a rail of a tower crane, a hook is lifted and supported by a rope that is wound and fed out by the winch, and a load is hung on the hook to move the moving body. 2. Description of the Related Art There is known a hanging load device that moves a load by taking up the rope, and also takes up and unwinds a rope to lift the load.

【0003】[0003]

【発明が解決しようとする課題】前述の吊り荷装置にお
いては、1本のロープでフックを吊り上げ支持している
ので、荷物を移動する時には荷物が移動方向に揺れ動く
し、荷物を昇降する時に荷物が回転運動する。また、フ
ックを3本のロープで吊り上げ支持すれば荷物を移動す
る時に荷物が移動方向に揺れ動くことを防止できるが、
荷物を昇降する時の荷物の回転運動を防止できない。ま
た、荷物の3点を3本のロープで吊り下げ支持すれば荷
物を昇降する時の荷物の回転運動を防止できるが、荷物
を移動する時に荷物の揺れ動きを防止できない。
In the above-mentioned hanging load device, the hook is lifted and supported by one rope, so that when the load is moved, the load swings in the moving direction, and when the load is moved up and down, the load is lifted. Rotates. Also, if the hook is lifted and supported by three ropes, the luggage can be prevented from swinging in the moving direction when the luggage is moved.
Rotational movement of luggage when lifting or lowering luggage cannot be prevented. In addition, if three points of the load are suspended and supported by three ropes, the load can be prevented from rotating when the load is raised or lowered, but the load cannot be shaken when the load is moved.

【0004】そこで、本発明は前述の課題を解決できる
ようにした吊り荷装置を提供することを目的とする。
[0004] Therefore, an object of the present invention is to provide a lifting device capable of solving the above-mentioned problems.

【0005】[0005]

【課題を解決するための手段及び作用・効果】第1の発
明は、ウインチで巻き取り・繰り出しされるロープを平
面方向に離隔した3つの以上の位置から垂れ下げて吊り
治具5の3点以上の位置に支持し、そのロープを巻き取
り・繰り出して吊り治具5を昇降し、ウインチ又はクレ
ーンブーム等を移動して吊り治具5を移動する吊り荷装
置において、前記吊り治具5に、複数のロープ支持部を
平面方向に離隔した複数の位置と平面方向に接近したほ
ぼ1つの位置との間に移動自在に設けたことを特徴とす
る吊り荷装置である。
A first aspect of the present invention is to provide a hanging jig 5 in which a rope to be wound and fed by a winch is hung from three or more positions separated in a plane direction. The lifting jig 5 is supported by the above-described position, the rope is taken up and unreeled, the lifting jig 5 is moved up and down, and the lifting jig 5 is moved by moving a winch or a crane boom. And a plurality of rope supporting portions movably provided between a plurality of positions spaced apart in a plane direction and substantially one position approached in a plane direction.

【0006】第1の発明によれば、複数のロープ支持部
を平面方向に離隔した複数の位置とすれば、吊り治具5
を昇降する時に吊り治具5が回転運動することを防止で
きる。また、複数のロープ支持部を平面方向に接近した
ほぼ1つの位置とすれば、吊り治具5を移動する時に吊
り治具5が揺れ動くことを防止できる。
According to the first invention, if the plurality of rope supporting portions are located at a plurality of positions separated in the plane direction, the hanging jig 5 can be provided.
The lifting jig 5 can be prevented from rotating when moving up and down. In addition, if the plurality of rope supporting portions are located at almost one position close to the plane direction, the hanging jig 5 can be prevented from swinging when the hanging jig 5 is moved.

【0007】第2の発明は、第1の発明において、吊り
治具5の本体10に、3つのシーブ20を平面方向にほ
ぼ120度間隔で離隔したほぼ正三角形の各頂点となる
3つの位置と接近したほぼ1つの位置とに移動自在に取
付け、この3つのシーブ20に、平面方向にほぼ120
度で離隔したほぼ正三角形の各頂点となる3つの位置か
ら垂れ下げたロープ4をそれぞれ巻掛けて支持した吊り
荷装置である。
According to a second aspect of the present invention, in the first aspect, the three sheaves 20 are provided on the main body 10 of the hanging jig 5 at three vertices of a substantially equilateral triangle having a spacing of approximately 120 degrees in the plane direction. And these three sheaves 20 are movably attached to almost one position close to the
This is a hoisting device in which ropes 4 hung from three positions that are each apex of a substantially equilateral triangle separated by degrees are wound around and supported respectively.

【0008】第2の発明によれば、3つのシーブ20を
離隔した3つの位置とすれば3本のロープ4で吊り治具
5が吊り上げ支持されるから、昇降時に回転運動するこ
とを防止できるし、3つのシーブ20を接近したほぼ1
つの位置とすれば平面方向にほぼ120度間隔で離隔し
た位置から垂れ下がった3つのロープ4で横荷重を支持
するから、移動時に揺れ動くことを防止できる。
According to the second aspect of the present invention, if the three sheaves 20 are set at three separate positions, the three jigs 4 support the lifting jig 5 so that the three jigs 20 can be prevented from rotating when ascending and descending. And nearly 1 approached three sheaves 20
With three positions, the lateral load is supported by the three ropes 4 hanging down from the positions separated by approximately 120 degrees in the plane direction, so that it is possible to prevent swinging during movement.

【0009】第3の発明は、第2の発明において、平面
方向にほぼ120度間隔で離隔したほぼ正三角形の各頂
点となるように配設した第1・第2・第3シーブ42,
46,47と、1つのウインチ49に巻掛けた1本のロ
ープ4と、請求項2の吊り治具5を備え、この1本のロ
ープ4を第1シーブ42から吊り治具5の1つのシーブ
20、他の1つのシーブ20、第2シーブ46、第3シ
ーブ47を経て吊り治具5の残りの1つのシーブ20に
巻掛け、前記吊り治具5の1つのシーブ20と他の1つ
のシーブ20にロープ4を固定するブレーキ装置50を
取付けた吊り荷装置である。
According to a third aspect, in the second aspect, the first, second, and third sheaves 42, which are disposed so as to be vertices of a substantially equilateral triangle that are separated from each other by approximately 120 degrees in the plane direction,
46, 47, one rope 4 wound around one winch 49, and the hanging jig 5 according to claim 2, and this one rope 4 is connected to one of the hanging jigs 5 from the first sheave 42. The sheave 20, the other one sheave 20, the second sheave 46, and the third sheave 47 are wound around the remaining one sheave 20 of the suspending jig 5, and one sheave 20 of the suspending jig 5 and the other sheave 20. This is a hanging device in which a brake device 50 for fixing the rope 4 to one sheave 20 is attached.

【0010】第3の発明によれば、ブレーキ装置50で
ロープ4とシーブ20を離隔すれば1本のロープ4で吊
り具5を昇降できるし、ブレーキ装置50でロープ4を
シーブ20に圧着して固定すれば吊り治具5を水平に保
持できる。
According to the third aspect of the present invention, if the rope 4 and the sheave 20 are separated by the brake device 50, the hanging member 5 can be moved up and down by one rope 4, and the rope 4 is crimped to the sheave 20 by the brake device 50. If fixed, the hanging jig 5 can be held horizontally.

【0011】[0011]

【発明の実施の形態】図1に示すように、タワークレー
ン1のレール2に沿って移動する移動体3における平面
方向にほぼ120度間隔で離隔した正三角形の各頂部と
なる3つの位置から3本のロープ4が垂れ下げてある。
この各ロープ4はそれぞれウインチで巻き取り・繰り出
しされる。なお、1つのウインチで巻き取り・繰り出し
ても良い。前記3本のロープ4は吊り治具5にそれぞれ
支持してあり、その吊り治具5にフック6が取付けてあ
る。これによって、吊り荷装置を形成している。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS As shown in FIG. 1, a moving body 3 moving along a rail 2 of a tower crane 1 is moved from three positions which are the tops of an equilateral triangle which is separated from each other by approximately 120 degrees in a plane direction. Three ropes 4 are hanging.
Each of the ropes 4 is wound and fed by a winch. In addition, you may wind and wind out with one winch. Each of the three ropes 4 is supported by a suspending jig 5, and a hook 6 is attached to the suspending jig 5. This forms a hanging load device.

【0012】前記吊り治具5は図2と図3に示すよう
に、板状の本体10の平面中央部にシリンダ11のシリ
ンダチューブ12を縦向きに取付け、このシリンダ11
のピストンロッド13にプレート14を固着し、このプ
レート14の平面方向に120度間隔でずれた3つの位
置に3本の第1リンク15を第1ピン16で上下揺動自
在に連結する。この各第1リンク15の他端部に第2リ
ンク17の一端部を第2ピン18で上下揺動自在に連結
し、その各第2リンク17を本体10のシリンダチュー
ブ12周囲における平面方向に120度間隔でずれた3
つの位置に第3ピン19で上下揺動自在に連結する。
As shown in FIGS. 2 and 3, the hanging jig 5 is provided with a cylinder tube 12 of a cylinder 11 mounted vertically at the center of the plate-shaped main body 10 in a plane.
The plate 14 is fixed to the piston rod 13 and three first links 15 are connected by a first pin 16 to three positions shifted by 120 degrees in the plane direction of the plate 14 so as to be vertically swingable. One end of a second link 17 is connected to the other end of each first link 15 by a second pin 18 so as to be swingable up and down, and each of the second links 17 is connected in a plane direction around the cylinder tube 12 of the main body 10. 3 shifted at 120 degree intervals
And a third pin 19 so as to be swingable up and down.

【0013】前記各第1リンク15と各第2リンク17
の連結部に3本のロープ4をそれぞれ連結する。例えば
各第2ピン18に取付けたシーブ20にロープ4を巻掛
ける。
Each of the first links 15 and each of the second links 17
Are connected to the three ropes 4 respectively. For example, the rope 4 is wound around the sheave 20 attached to each second pin 18.

【0014】次に作動を説明する。シリンダ11のピス
トンロッド13の縮み作動して図2の実線位置とすれば
3つの第2リンク17が放射状方向に向けてほぼ水平と
なり、3つのロープ4の支持部(シーブ20)は本体1
0の平面方向にほぼ120度間隔で離隔したほぼ正三角
形の各頂点である離隔した3つの位置となる。この状態
を模式的に示すと図4に示すようになる。
Next, the operation will be described. When the piston rod 13 of the cylinder 11 is contracted and brought to the position indicated by the solid line in FIG. 2, the three second links 17 become substantially horizontal in the radial direction, and the support portions (sheaves 20) of the three ropes 4 are connected to the main body 1.
The three vertices of the equilateral triangle which are separated by approximately 120 degrees in the plane direction of 0 are three separated positions. FIG. 4 schematically shows this state.

【0015】これにより、本体10が3本のロープ4で
水平に支持され、ロープ4を巻き取り・繰り出して昇降
する時に本体10が回転運転することがない。
As a result, the main body 10 is horizontally supported by the three ropes 4, so that the main body 10 does not rotate when the rope 4 is wound up and extended to ascend and descend.

【0016】シリンダ11のピストンロッド13を伸び
作動してプレート14を図2の仮想線で示すように上方
に移動すると各第1・第2リンク15,17がほぼ一直
線状となって3本のロープ4の支持部が本体10の中央
寄りに接近してほぼ1つの位置となる。この状態を模式
的に示すと図5に示すようになる。
When the piston rod 13 of the cylinder 11 is extended and the plate 14 is moved upward as shown by the phantom line in FIG. 2, the first and second links 15 and 17 become substantially straight, and the three The support portion of the rope 4 approaches the center of the main body 10 and is substantially in one position. This state is schematically shown in FIG.

【0017】これにより、本体10に作用する横向き力
がロープ4で支持されるから、走行体3をレール2に沿
って移動して本体10が移動する時に本体10が移動方
向に揺れ動くことがない。
As a result, since the lateral force acting on the main body 10 is supported by the rope 4, the main body 10 does not swing in the moving direction when the traveling body 3 moves along the rail 2 and the main body 10 moves. .

【0018】また、シリンダ11のピストンロッド13
を図2の実線位置と仮想線位置の中間位置とすれば各シ
ーブ20が実線位置と仮想線位置の中間位置となり、ロ
ープ4の3つの支持部は接近したほぼ1つの位置と離隔
した3つの位置の中間の位置となるから、回転運動、揺
れ動きをある程度規制できる状態となる。
The piston rod 13 of the cylinder 11
Is assumed to be an intermediate position between the solid line position and the imaginary line position in FIG. 2, each sheave 20 is at an intermediate position between the solid line position and the imaginary line position, and the three support portions of the rope 4 Since the position is an intermediate position, the rotational movement and the swinging movement can be restricted to some extent.

【0019】次に吊り治具5の第2の実施の形態を説明
する。図6に示すように、第2リンク17の一端部を第
1リンク15の中間部に第2ピン18で上下揺動自在に
連結し、第2リンク17の他端部をシリンダチューブ1
2に第3ピン19で上下揺動自在に連結する。第1リン
ク15の他端部にロープ4を支持する。例えば、第1リ
ンク15の他端部にシーブ20を取付け、そのシーブ2
0にロープ4を巻掛ける。
Next, a second embodiment of the hanging jig 5 will be described. As shown in FIG. 6, one end of the second link 17 is connected to the intermediate portion of the first link 15 so as to be vertically swingable by a second pin 18, and the other end of the second link 17 is connected to the cylinder tube 1.
2 is connected by a third pin 19 so as to be able to swing up and down. The other end of the first link 15 supports the rope 4. For example, the sheave 20 is attached to the other end of the first link 15 and the sheave 2
Wrap rope 4 around 0.

【0020】この吊り治具5の場合にも前述の吊り治具
5と同様に作動する。
The operation of the hanging jig 5 is the same as that of the hanging jig 5 described above.

【0021】次に吊り治具5の第3の実施の形態を説明
する。図7に示すように、本体10に3つのガイド部材
21を平面120度間隔で放射状に取付ける。各ガイド
部材21のガイド溝22に沿ってシーブ20をシリンダ
23で移動自在にそれぞれ設け、その各シーブ20にロ
ープ4を巻掛ける。
Next, a third embodiment of the hanging jig 5 will be described. As shown in FIG. 7, three guide members 21 are radially attached to the main body 10 at intervals of 120 degrees on a plane. The sheaves 20 are provided movably by the cylinders 23 along the guide grooves 22 of the respective guide members 21, and the ropes 4 are wound around the respective sheaves 20.

【0022】この吊り治具5の場合にはシリンダ23で
シーブ20を移動することで3つのロープ4の支持部が
本体10の中央部寄り位置と、本体10の平面ほぼ三角
形の各頂点となる位置に移動するので、前述の吊り治具
5と同様に機能する。
In the case of the hanging jig 5, the sheaves 20 are moved by the cylinders 23 so that the support portions of the three ropes 4 are located near the center of the main body 10 and the vertices of the main body 10 in a substantially triangular plane. Since it moves to the position, it functions similarly to the above-described hanging jig 5.

【0023】次に本発明の第4の実施の形態を説明す
る。図8に示すように、本体10に取付けた3つのガイ
ド部材21に沿ってラック24を移動自在にそれぞれ設
け、この各ラック24にシーブ20をそれぞれ取付け
る。本体10に取付けた3つのモータ25で駆動される
3つのピニオン26を各ラック24にそれぞれ噛合す
る。各シーブ20にロープ4をそれぞれ巻掛ける。
Next, a fourth embodiment of the present invention will be described. As shown in FIG. 8, racks 24 are movably provided along three guide members 21 attached to the main body 10, and sheaves 20 are attached to the respective racks 24. Three pinions 26 driven by three motors 25 attached to the main body 10 mesh with the respective racks 24. The rope 4 is wound around each sheave 20.

【0024】この吊り治具5の場合にはモータ25でピ
ニオン26を駆動することでラック24がガイド部材2
1に沿って移動し、シーブ20がガイド溝22に沿って
移動するので、前述の吊り治具5と同様に機能する。
In the case of the hanging jig 5, the pinion 26 is driven by the motor 25 so that the rack 24
1 and the sheave 20 moves along the guide groove 22, so that it functions in the same manner as the above-described hanging jig 5.

【0025】前記吊り治具5は図9に示すように門型ク
レーン30のレール31に沿って移動する移動体32に
設けた3本のロープ4に前述と同様に支持しても良い。
As shown in FIG. 9, the hanging jig 5 may be supported on three ropes 4 provided on a moving body 32 which moves along the rail 31 of the portal crane 30 in the same manner as described above.

【0026】前記吊り治具5は図10に示すようにクレ
ーンブーム40に吊り上げ支持しても良い。クレーンブ
ーム40は多段伸縮式で、最先端ブーム41に第1シー
ブ42が取付けてあり、二番目のブーム43に左右の補
助ブーム44,45が取付けてあり、その左右の補助ブ
ーム44,45に第2・第3シーブ46,47がそれぞ
れ取付けてある。これによって、第1・第2・第3シー
ブ42,46,47はほぼ正三角形の頂点となる3つの
位置に配設される。
The lifting jig 5 may be lifted and supported on a crane boom 40 as shown in FIG. The crane boom 40 is a multi-stage telescopic type. A first sheave 42 is attached to a leading end boom 41, left and right auxiliary booms 44 and 45 are attached to a second boom 43, and left and right auxiliary booms 44 and 45 are attached to the crane booms. Second and third sheaves 46 and 47 are respectively attached. As a result, the first, second, and third sheaves 42, 46, and 47 are disposed at three positions that are substantially the vertices of an equilateral triangle.

【0027】クレーンブーム40の固定ブーム48に取
付けたウインチ49にロープ4を巻掛け、このロープ4
を第1シーブ42から1つのシーブ20に巻掛け、その
シーブ20から他のシーブ20に巻掛けて第2シーブ4
6に経て第3シーブ47から残りのシーブ20に巻掛け
てある。なお、図10において3つのシーブ20は前述
の第1・第2・第3・第4の実施の形態に示したいずれ
か1つによって移動自在となっているが、その図示を省
略してある。
The rope 4 is wound around a winch 49 attached to a fixed boom 48 of the crane boom 40, and the rope 4
Is wound around one sheave 20 from the first sheave 42 and is wound around the other sheave 20 from the sheave 20 to form the second sheave 4.
After passing through No. 6, it is wound from the third sheave 47 to the remaining sheave 20. In FIG. 10, the three sheaves 20 are movable by any one of the first, second, third, and fourth embodiments, but are not shown. .

【0028】前記1つのシーブ20と他の1つのシーブ
20に巻掛けたロープ4をシーブ20に固定するブレー
キ装置が取付けてある。このブレーキ装置50は図11
に示すように、第1リンク15に固定したブラケット5
1にレバー52をピン53で揺動自在に支承し、このレ
バー52と前記ブラケット51に固着した杆体54に亘
ってブレーキ用シリンダ55を連結し、レバー52にブ
レーキパッド56をシーブ20と対向して取付けてあ
る。
A brake device for fixing the rope 4 wound around the one sheave 20 and the other one sheave 20 to the sheave 20 is provided. This brake device 50 is shown in FIG.
As shown in the figure, the bracket 5 fixed to the first link 15
1, a lever 52 is swingably supported by a pin 53, a brake cylinder 55 is connected to the lever 52 and a rod 54 fixed to the bracket 51, and a brake pad 56 is opposed to the sheave 20 by the lever 52. Installed.

【0029】次に作動を説明する。ブレーキ用シリンダ
55を縮み作動してブレーキパッド56を図11に仮想
線で示すようにロープ4と離隔した状態でウインチ49
によりロープ4を巻き取り・繰り出しすれば本体10が
上昇、下降するので、1本のロープ4で本体10を昇降
できる。
Next, the operation will be described. When the brake cylinder 55 is contracted and the brake pad 56 is separated from the rope 4 as shown by a virtual line in FIG.
When the rope 4 is wound up and fed out, the main body 10 moves up and down, so that the main body 10 can be moved up and down by one rope 4.

【0030】また、ブレーキ用シリンダ55を伸び作動
して図11に実線で示すようにブレーキパッド56をロ
ープ4に圧着すればロープ4がシーブ20に固定される
ので、本体10を水平に保持できる。
When the brake cylinder 55 is extended and the brake pad 56 is crimped to the rope 4 as shown by a solid line in FIG. 11, the rope 4 is fixed to the sheave 20, so that the main body 10 can be held horizontally. .

【0031】前記ブレーキ装置50は図12に示す形状
としても良い。シーブ20にブレーキディスク57を固
着し、第1リンク15にブラケット58は固着する。こ
のブラケット58に一対のブレーキパッド59とアクチ
ュエータ60を取付け、アクチュエータ60を作動して
一対のブレーキパッド59でブレーキディスク57を挾
持してシーブ20を制動する。
The brake device 50 may be shaped as shown in FIG. The brake disc 57 is fixed to the sheave 20, and the bracket 58 is fixed to the first link 15. A pair of brake pads 59 and an actuator 60 are attached to the bracket 58, and the actuator 60 is operated to hold the brake disk 57 between the pair of brake pads 59 and brake the sheave 20.

【0032】なお、図10における第1・第2・第3シ
ーブ42,46,47に3本のロープ4をそれぞれ巻掛
け、この各ロープ4をウインチ49に巻掛けて巻き取り
・繰り出しても良い。
It should be noted that three ropes 4 may be wound around the first, second, and third sheaves 42, 46, and 47 in FIG. 10, respectively, and these ropes 4 may be wound around a winch 49 and wound up and fed out. good.

【0033】前記吊り治具5の本体10にフック6を取
付けたが、このフック6に限らず他の作業機を取付けて
も良い。
Although the hook 6 is attached to the main body 10 of the hanging jig 5, the present invention is not limited to the hook 6, and another working machine may be attached.

【0034】なお、ロープ4は3本に限らず4本、5本
など3本以上としても良く、この場合には本体10のロ
ープ支持部を3つ以上とする。
The number of the ropes 4 is not limited to three, but may be three or more such as four or five. In this case, the number of the rope supporting portions of the main body 10 is three or more.

【図面の簡単な説明】[Brief description of the drawings]

【図1】タワークレーンに吊り治具を吊り上げ支持した
正面図である。
FIG. 1 is a front view in which a lifting jig is lifted and supported by a tower crane.

【図2】吊り治具の第1の実施の形態を示す正面図であ
る。
FIG. 2 is a front view showing the first embodiment of the hanging jig.

【図3】図2の平面図である。FIG. 3 is a plan view of FIG. 2;

【図4】ロープ支持部を3点とした状態の模式的説明図
である。
FIG. 4 is a schematic explanatory view showing a state where three rope support portions are provided.

【図5】ロープ支持部を1点とした状態の模式的説明図
である。
FIG. 5 is a schematic explanatory view showing a state where a rope support portion is set to one point.

【図6】吊り治具の第2の実施の形態を示す正面図であ
る。
FIG. 6 is a front view showing a second embodiment of the hanging jig.

【図7】吊り治具の第3の実施の形態を示す平面図であ
る。
FIG. 7 is a plan view showing a third embodiment of a hanging jig.

【図8】吊り治具の第4の実施の形態を示す平面図であ
る。
FIG. 8 is a plan view showing a hanging jig according to a fourth embodiment.

【図9】吊り治具を門型クレーンに吊り上げ支持した状
態の正面図である。
FIG. 9 is a front view of a state in which the lifting jig is lifted and supported by a portal crane.

【図10】吊り治具をクレーンブームに吊り上げ支持し
た状態の正面図である。
FIG. 10 is a front view of a state in which the lifting jig is lifted and supported on the crane boom.

【図11】ブレーキ装置の正面図である。FIG. 11 is a front view of the brake device.

【図12】ブレーキ装置の他の形態を示す側面図であ
る。
FIG. 12 is a side view showing another embodiment of the brake device.

【符号の説明】[Explanation of symbols]

1…タワークレーン 2…レール 3…移動体 4…ロープ 5…吊り治具 6…フック 10…本体 11…シリンダ 15…第1リンク 17…第2リンク 20…シーブ 21…ガイド部材 22…ガイド溝 23…シリンダ 24…ラック 25…モータ 26…ピニオン 30…門型クレーン 31…レール 32…移動体 40…クレーンブーム 42…第1シーブ 46…第2シーブ 47…第3シーブ 49…ウインチ 50…ブレーキ装置 52…レバー 55…ブレーキ用シリンダ 57…ブレーキディスク 59…ブレーキパッド 60…アクチュエータ DESCRIPTION OF SYMBOLS 1 ... Tower crane 2 ... Rail 3 ... Moving body 4 ... Rope 5 ... Hanging jig 6 ... Hook 10 ... Main body 11 ... Cylinder 15 ... 1st link 17 ... 2nd link 20 ... Sheave 21 ... Guide member 22 ... Guide groove 23 ... Cylinder 24. Rack 25. Motor 26. Pinion 30. ... Lever 55 ... Brake cylinder 57 ... Brake disc 59 ... Brake pad 60 ... Actuator

フロントページの続き (72)発明者 稲富 祥一郎 東京都港区赤坂二丁目3番6号 株式会社 小松製作所本社内Continuation of the front page (72) Inventor Shoichiro Inatomi 2-3-6 Akasaka, Minato-ku, Tokyo Komatsu Ltd. Head Office

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 ウインチで巻き取り・繰り出しされるロ
ープを平面方向に離隔した3つの以上の位置から垂れ下
げて吊り治具(5)の3点以上の位置に支持し、そのロ
ープを巻き取り・繰り出して吊り治具(5)を昇降し、
ウインチ又はクレーンブーム等を移動して吊り治具
(5)を移動する吊り荷装置において、 前記吊り治具(5)に、複数のロープ支持部を平面方向
に離隔した複数の位置と平面方向に接近したほぼ1つの
位置との間に移動自在に設けたことを特徴とする吊り荷
装置。
1. A rope to be wound and fed by a winch is suspended from three or more positions separated in a plane direction and supported at three or more positions of a hanging jig (5), and the rope is wound.・ Extend the lifting jig (5)
In a hanging load device that moves a winch or a crane boom to move a hanging jig (5), the hanging jig (5) is provided with a plurality of rope support portions at a plurality of positions separated in a plane direction and in a plane direction. A hoisting device characterized by being provided movably between substantially one position approached.
【請求項2】 吊り治具(5)の本体(10)に、3つ
のシーブ(20)を平面方向にほぼ120度間隔で離隔
したほぼ正三角形の各頂点となる3つの位置と接近した
ほぼ1つの位置とに移動自在に取付け、この3つのシー
ブ(20)に、平面方向にほぼ120度で離隔したほぼ
正三角形の各頂点となる3つの位置から垂れ下げたロー
プ(4)をそれぞれ巻掛けて支持した請求項1記載の吊
り荷装置。
2. A main body (10) of a suspending jig (5) having three sheaves (20) near three vertices of a substantially equilateral triangle which is separated from each other by approximately 120 degrees in a plane direction. The three sheaves (20) are movably attached to one position, and the three sheaves (20) are respectively wound with ropes (4) hanging down from three positions, each of which is a vertex of a substantially equilateral triangle separated by approximately 120 degrees in the plane direction. The hanging load device according to claim 1, which is supported by being hung.
【請求項3】 平面方向にほぼ120度間隔で離隔した
ほぼ正三角形の各頂点となるように配設した第1・第2
・第3シーブ(42),(46),(47)と、1つの
ウインチ(49)に巻掛けた1本のロープ(4)と、請
求項2の吊り治具(5)を備え、この1本のロープ4を
第1シーブ(42)から吊り治具(5)の1つのシーブ
(20)、他の1つのシーブ(20)、第2シーブ(4
6)、第3シーブ(47)を経て吊り治具(5)の残り
の1つのシーブ(20)に巻掛け、前記吊り治具(5)
の1つのシーブ(20)と他の1つのシーブ(20)に
ロープ(4)を固定するブレーキ装置(50)を取付け
た吊り荷装置。
3. A first and a second arrangement which are arranged so as to be each vertex of a substantially equilateral triangle which is separated from each other at an interval of about 120 degrees in a plane direction.
A third sheave (42), (46), (47), one rope (4) wound around one winch (49), and a hanging jig (5) according to claim 2; One rope 4 is suspended from the first sheave (42) to one sheave (20) of the jig (5), another sheave (20), and the second sheave (4).
6) passing through the third sheave (47) around the remaining one sheave (20) of the suspending jig (5), and suspending the suspending jig (5).
And a brake device (50) for fixing the rope (4) to one of the sheaves (20) and the other one of the sheaves (20).
JP6098198A 1998-03-12 1998-03-12 Hoisting cargo device Pending JPH11255471A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP6098198A JPH11255471A (en) 1998-03-12 1998-03-12 Hoisting cargo device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP6098198A JPH11255471A (en) 1998-03-12 1998-03-12 Hoisting cargo device

Publications (1)

Publication Number Publication Date
JPH11255471A true JPH11255471A (en) 1999-09-21

Family

ID=13158127

Family Applications (1)

Application Number Title Priority Date Filing Date
JP6098198A Pending JPH11255471A (en) 1998-03-12 1998-03-12 Hoisting cargo device

Country Status (1)

Country Link
JP (1) JPH11255471A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100620352B1 (en) 2004-07-27 2006-09-19 학교법인 동아대학교 Yard crane
KR101382379B1 (en) * 2012-09-07 2014-04-08 주식회사 포스코 Brake and method of sensing the same
CN108529446A (en) * 2018-07-05 2018-09-14 合肥市春华起重机械有限公司 A kind of crane that stability is strong
CN116281556A (en) * 2023-02-01 2023-06-23 浙江协成起重机械有限公司 Hoisting device for crane and hoisting method thereof

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100620352B1 (en) 2004-07-27 2006-09-19 학교법인 동아대학교 Yard crane
KR101382379B1 (en) * 2012-09-07 2014-04-08 주식회사 포스코 Brake and method of sensing the same
CN108529446A (en) * 2018-07-05 2018-09-14 合肥市春华起重机械有限公司 A kind of crane that stability is strong
CN116281556A (en) * 2023-02-01 2023-06-23 浙江协成起重机械有限公司 Hoisting device for crane and hoisting method thereof
CN116281556B (en) * 2023-02-01 2023-10-20 浙江协成起重机械有限公司 Hoisting device for crane and hoisting method thereof

Similar Documents

Publication Publication Date Title
KR20030012146A (en) Hoisting apparatus using counterweight
JP2004521045A (en) Crane mechanism placement device
JPH11255471A (en) Hoisting cargo device
JP2852951B2 (en) Lifting crane
KR20010021248A (en) Crane apparatus
JP2012121719A (en) Quay crane
RU2290362C1 (en) Tower boom crane
JPH04266397A (en) Crane with jib
JP7521424B2 (en) Method for raising a lifting member and crane
JP7447613B2 (en) working machine
JP4625163B2 (en) Mobile crane hoisting cylinder load reduction device
JP3477521B2 (en) Jib trolley type horizontal retraction crane
JP7230895B2 (en) crane hitch beam
CN116588822B (en) Hoisting device
RU2751926C1 (en) Crane mobile counterweight
KR200251266Y1 (en) Hoisting apparatus using counterweight
JP2001199685A (en) Suspension lifting device
JP3036563U (en) Jib crane
KR100263639B1 (en) Ballast weight device of crane
JP3572135B2 (en) Storage device for auxiliary hook in mobile crane
CN2378370Y (en) High building crane
JPS6030295Y2 (en) jib crane
KR20240123581A (en) Lifting device
JPS6158397B2 (en)
CN116443746A (en) Swing arm tower crane