Suspension accessory for tube bundle

Info

Publication number
JPH11246164A
JPH11246164A JP7332998A JP7332998A JPH11246164A JP H11246164 A JPH11246164 A JP H11246164A JP 7332998 A JP7332998 A JP 7332998A JP 7332998 A JP7332998 A JP 7332998A JP H11246164 A JPH11246164 A JP H11246164A
Authority
JP
Japan
Prior art keywords
hanging
tube bundle
members
tube
suspension
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP7332998A
Other languages
Japanese (ja)
Inventor
Yusei Ueno
有世 上野
Kazuo Kimura
和夫 木村
Ryohei Hirano
良平 平野
Akira Takeda
章 武田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sankyu Inc
Original Assignee
Sankyu Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sankyu Inc filed Critical Sankyu Inc
Priority to JP7332998A priority Critical patent/JPH11246164A/en
Publication of JPH11246164A publication Critical patent/JPH11246164A/en
Pending legal-status Critical Current

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)
  • Hooks, Suction Cups, And Attachment By Adhesive Means (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a suspension accessory for a tube bundle having easy installation and removal and excellent safety. SOLUTION: This suspension accessory 10 carries a tube bundle 23 consisting of a plurality of tube aggregates. In this case, the suspending accessory 10 has a plurality of suspending members 11, 12 consisting of a string-like material or a belt-like material having flexibility and provided with latch parts 16-19 at both the sides, a plurality of abutting rods 15 for connecting the intermediate positions of the plurality of aligned suspending members 11, 12 at given pitches, and suspending beams 20, 21 for securing the latch parts 16-19 of the suspending members 11, 12, respectively.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、熱交換器等のチュ
ーブバンドルを搬送する場合に使用するチューブバンド
ル用吊り具に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a tube bundle suspending device used for transporting a tube bundle such as a heat exchanger.

【0002】[0002]

【従来の技術】図5に示すように、熱交換器等のチュー
ブバンドル50をクレーンを用いて吊り上げて搬送する
場合には、複数本のナイロンスリング51、52をチュ
ーブバンドル50に直接かけ、その両端をクレーンのフ
ック53、54に掛止した状態で搬送していた。ところ
が、チューブバンドル50は多数のチューブがバッフル
プレート55によって隙間を有して支持されているの
で、チューブバンドル50の荷重はナイロンスリング5
1、52に当接するチューブに直接かかり、吊り条件が
悪い場合には、チューブが曲がってしまうことがあっ
た。そこで、図6に示すように、ナイロンスリング5
1、52の内側に複数の枕木56を挿入し、隣り合うバ
ッフルプレート55に荷重を掛けることも行われてい
た。
2. Description of the Related Art As shown in FIG. 5, when a tube bundle 50 such as a heat exchanger is lifted and conveyed by using a crane, a plurality of nylon slings 51 and 52 are directly hung on the tube bundle 50 and the nylon slings 51 and 52 are placed on the tube bundle 50. The transport was carried out with both ends hooked on hooks 53 and 54 of a crane. However, since a large number of tubes are supported by the baffle plate 55 with a gap in the tube bundle 50, the load of the tube bundle 50 is
When the hanging condition is poor, the tube may bend if the tube directly touches the tube in contact with the tubes 1 and 52. Therefore, as shown in FIG.
In some cases, a plurality of sleepers 56 are inserted inside the first and second 52 to apply a load to adjacent baffle plates 55.

【0003】[0003]

【発明が解決しようとする課題】しかしながら、枕木5
6を所定間隔で挿入するのに手間が必要であり、更には
高所で枕木56を挿入する場合には、危険であるという
問題があった。また、使用中に枕木56が折れる場合が
あり、枕木56が折れると衝撃荷重がチューブバンドル
50にかかるので、チューブが曲がるという問題もあっ
た。本発明はかかる事情に鑑みてなされたもので、取付
け取り外しが容易で、しかも安全性にも優れるチューブ
バンドル用吊り具を提供することを目的とする。
However, the sleeper 5
It takes time and effort to insert 6 at predetermined intervals, and furthermore, there is a problem that it is dangerous to insert the sleeper 56 at a high place. Further, the sleeper 56 may be broken during use, and when the sleeper 56 is broken, an impact load is applied to the tube bundle 50, so that the tube is bent. The present invention has been made in view of such circumstances, and an object of the present invention is to provide a hanging device for a tube bundle that is easily attached and detached and is excellent in safety.

【0004】[0004]

【課題を解決するための手段】前記目的に沿う請求項1
記載の複数の管の集合体からなるチューブバンドルを搬
送するためのチューブバンドル用吊り具であって、柔軟
性を有する紐状材又は帯状材からなって、両側には掛止
部が設けられた複数本の吊り下げ部材と、並べられた前
記複数の吊り下げ部材の中間位置を所定ピッチで連結す
る複数本の当接ロッドと、前記吊り下げ部材の掛止部が
それぞれ固定される吊りビームとを有している。また、
請求項2記載のチューブバンドル用吊り具は、請求項1
記載のチューブバンドル用吊り具において、前記吊り下
げ部材の中間位置には、袋状物が被せられて、該袋状物
に前記複数本の当接ロッドが所定ピッチで取付けられて
いる。請求項3記載のチューブバンドル用吊り具は、請
求項1又は2記載のチューブバンドル用吊り具におい
て、前記当接ロッドは、両側に設けられた前記吊り下げ
部材の間隔より長くなって、その両端部が両側にある前
記吊り下げ部材から突出している。そして、請求項4記
載のチューブバンドル用吊り具は、請求項1〜3のいず
れか1項に記載のチューブバンドル用吊り具において、
前記吊り下げ部材はナイロンスリングからなって、前記
当接ロッドは鋼製のパイプ又は丸棒からなっている。
According to the present invention, there is provided a semiconductor device comprising:
A tube bundle suspending device for transporting a tube bundle consisting of an aggregate of a plurality of tubes according to the present invention, which is made of a flexible string-like material or a belt-like material, and provided with hooking portions on both sides. A plurality of hanging members, a plurality of contact rods connecting intermediate positions of the arranged plurality of hanging members at a predetermined pitch, and a hanging beam to which a hanging portion of the hanging member is respectively fixed. have. Also,
The hanging tool for a tube bundle according to the second aspect is the first aspect.
In the hanging device for a tube bundle described above, a bag-like material is covered at an intermediate position of the hanging member, and the plurality of contact rods are attached to the bag-like material at a predetermined pitch. The hanging device for a tube bundle according to claim 3 is the hanging device for a tube bundle according to claim 1, wherein the contact rod is longer than a space between the hanging members provided on both sides, and both ends thereof are provided. Parts protrude from the hanging members on both sides. The hanging device for a tube bundle according to claim 4 is the hanging device for a tube bundle according to any one of claims 1 to 3,
The hanging member is made of a nylon sling, and the contact rod is made of a steel pipe or a round bar.

【0005】[0005]

【発明の実施の形態】続いて、添付した図面を参照しつ
つ、本発明を具体化した実施の形態につき説明し、本発
明の理解に供する。ここに、図1は本発明の第1の実施
の形態に係るチューブバンドル用吊り具の使用状態の斜
視図、図2は同平面図、図3は本発明の第2の実施の形
態に係るチューブバンドル用吊り具の正面図、図4は同
側面図である。
DESCRIPTION OF THE PREFERRED EMBODIMENTS Next, embodiments of the present invention will be described with reference to the accompanying drawings to provide an understanding of the present invention. Here, FIG. 1 is a perspective view of a use state of the tube bundle hanging device according to the first embodiment of the present invention, FIG. 2 is a plan view of the same, and FIG. 3 is a second embodiment of the present invention. FIG. 4 is a front view of the hanging member for the tube bundle, and FIG.

【0006】図1、図2に示すように、本発明の第1の
実施の形態に係るチューブバンドル用吊り具10は、吊
り下げ部材11、12と、吊り下げ部材11、12の中
間位置に取付けられる袋状物13、14と、袋状物1
3、14にそれぞれ所定ピッチで固定された当接ロッド
15とを有している。以下、これらについて詳しく説明
する。
As shown in FIGS. 1 and 2, a tube bundle suspending device 10 according to a first embodiment of the present invention includes suspending members 11 and 12 and an intermediate position between suspending members 11 and 12. Bags 13 and 14 to be attached and bag 1
3 and 14, each having a contact rod 15 fixed at a predetermined pitch. Hereinafter, these will be described in detail.

【0007】前記吊り下げ部材11、12は、柔軟性を
有する帯状材(又は紐状材)であるナイロンスリングか
らなって、両側には、掛止部の一例である引っかけ孔1
6〜19が設けられている。この引っかけ孔16〜19
は、図1に示すように、上部の吊りビーム20、21に
取付けるシャックル22が遊嵌する大きさがあれば十分
であり、ナイロンスリングとして市販されている所定の
吊り強度を有するものであってもよい。なお、吊り下げ
部材11、12の長さは同一となって、複数の管の集合
からなるチューブバンドル23の直径の約7〜10倍程
度である。
The hanging members 11 and 12 are made of a nylon sling which is a flexible band-like material (or a string-like material).
6 to 19 are provided. These hook holes 16-19
As shown in FIG. 1, it is sufficient that the shackle 22 attached to the upper suspension beams 20, 21 has a size enough to loosely fit, and has a predetermined suspension strength commercially available as a nylon sling. Is also good. In addition, the length of the suspending members 11 and 12 is the same, and is about 7 to 10 times the diameter of the tube bundle 23 composed of a plurality of pipes.

【0008】前記袋状物13、14は両端が開放する管
状となって、十分強度を有する合成繊維素材の布材が使
用され、帯状の吊り下げ部材11、12がそれぞれ嵌入
する内幅を有している。そして、図2に示すように、吊
り下げ部材11、12の中間位置(即ち、両側部を除く
部分)に装着されている。袋状物13、14には所定ピ
ッチで対向する孔24、25がそれぞれ形成され、この
孔24、25を挿通して、当接ロッド15(この実施の
形態では6本)が取付けられている。
Each of the bag-like members 13 and 14 has a tubular shape whose both ends are open, is made of a synthetic fiber material having sufficient strength, and has an inner width into which the band-shaped hanging members 11 and 12 are fitted. doing. Then, as shown in FIG. 2, it is mounted at an intermediate position between the hanging members 11 and 12 (that is, a portion excluding both side portions). Opposite holes 24 and 25 are formed in the bag-like materials 13 and 14 at a predetermined pitch, and the contact rods 15 (six in this embodiment) are attached through the holes 24 and 25. .

【0009】当接ロッド15はこの実施の形態では、鋼
製のパイプ(丸棒でもよい)からなって、図1に示すよ
うに、平行に配置された吊り下げ部材11、12の距離
より長くなってその両端部が吊り下げ部材11、12か
ら突出し、チューブバンドル23の隣り合うバッフルプ
レート26に十分に余裕をもって当接するようになって
いる。また、当接ロッド15が一旦袋状物13、14に
挿通した後は、左右の移動を防止するように、所定のス
トッパーが設けられている。このストッパーは当接ロッ
ド15に突起やフランジを設けてもよいし、場合によっ
ては当接ロッド15を接着剤やファスナー等で、袋状物
13、14に固定するようにしてもよい。
In this embodiment, the contact rod 15 is made of a steel pipe (which may be a round bar) and is longer than the distance between the hanging members 11 and 12 arranged in parallel as shown in FIG. As a result, both end portions protrude from the suspension members 11 and 12 and come into contact with the baffle plate 26 adjacent to the tube bundle 23 with a sufficient margin. Further, after the contact rod 15 is once inserted into the bag-like materials 13 and 14, a predetermined stopper is provided so as to prevent left and right movement. The stopper may be provided with a projection or a flange on the contact rod 15, or in some cases, the contact rod 15 may be fixed to the bag-like material 13, 14 with an adhesive or a fastener.

【0010】前記吊り下げ部材11、12を吊り下げる
吊りビーム20、21は、H形鋼をビーム材28とし、
下方の吊り下げ部材11、12の幅に合わせて下吊り金
具29、30が設けられている。この下吊り金具29、
30にはボルト孔が設けられて、図1に示すシャックル
22とボルト32によって、吊り下げ部材11、12の
両側部が固定できるようになっている。ビーム材28の
中央上部には、更に長い補助吊りビーム33や、図示し
ないクレーンのフックに掛止する取付け孔を有する上吊
り金具34が設けられている。なお、補助吊りビーム3
3は前後の吊りビーム20、21を同時に一つのクレー
ンに吊り下げるもので、下部に図示しない下吊り金具
を、上部にクレーンのフックに掛止する上吊り金具34
aを備えている。
The suspension beams 20 and 21 for suspending the suspension members 11 and 12 are H-shaped steel beams 28,
Lower hanging brackets 29 and 30 are provided in accordance with the widths of the lower hanging members 11 and 12. This hanging metal fitting 29,
30 is provided with a bolt hole so that both sides of the suspension members 11 and 12 can be fixed by the shackle 22 and the bolt 32 shown in FIG. At the center upper portion of the beam member 28, a longer auxiliary suspension beam 33 and an upper suspension fitting 34 having a mounting hole to be hooked on a hook of a crane (not shown) are provided. The auxiliary suspension beam 3
Numeral 3 is for suspending the front and rear suspension beams 20 and 21 simultaneously on one crane. A lower suspension fitting (not shown) is provided at the lower part, and an upper suspension fitting 34 for hanging the hook of the crane at the upper part.
a.

【0011】続いて、このチューブバンドル用吊り具1
0の使用方法について説明する。図1に示す実施の形態
においては、チューブバンドル23の長さが長いので、
2個のチューブバンドル用吊り具10を用いているが、
チューブバンドルの長さが短い場合には、一つのチュー
ブバンドル用吊り具10であってもよい。まず、チュー
ブバンドル23の前後の管板34b、34cを支持した
状態で、チューブバンドル23の下部に隙間を設け、チ
ューブバンドル用吊り具10を挿通する。そして、前後
対となる吊り下げ部材11、12の両側を補助吊りビー
ム33を介してクレーンで吊り下げられた吊りビーム2
0、21に、シャックル22及びボルト32を用いてそ
れぞれ掛止する。この状態で、チューブバンドル用吊り
具10の各当接ロッド15の両側又は中間部がバッフル
プレート26に少なくとも2点で当接するように調整
し、クレーンによって引き上げる。チューブバンドル2
3の荷重は、各チューブの中間部分が固定されたバッフ
ルプレート26を介して当接ロッド15から吊り下げ部
材11、12に伝わるので、チューブの曲がり等が無く
なる。
Subsequently, the tube bundle suspending device 1
How to use 0 will be described. In the embodiment shown in FIG. 1, since the length of the tube bundle 23 is long,
Although two tube bundle suspenders 10 are used,
When the length of the tube bundle is short, one tube bundle hanging device 10 may be used. First, a gap is provided in the lower part of the tube bundle 23 in a state where the tube plates 34b and 34c before and after the tube bundle 23 are supported, and the tube bundle hanging device 10 is inserted. The suspension beams 2 suspended by a crane via the auxiliary suspension beams 33 on both sides of the suspension members 11 and 12 forming a front-rear pair.
The shackle 22 and the bolt 32 are engaged with the shackles 0 and 21, respectively. In this state, the both sides or the intermediate portion of each contact rod 15 of the tube bundle hanging device 10 are adjusted so as to contact the baffle plate 26 at at least two points, and are pulled up by the crane. Tube bundle 2
The load of No. 3 is transmitted from the contact rod 15 to the hanging members 11 and 12 via the baffle plate 26 to which the middle portion of each tube is fixed, so that the tube is not bent.

【0012】次に、図3、図4に示す本発明の第2の実
施の形態に係るチューブバンドル用吊り具35について
説明するが、第1の実施の形態に係るチューブバンドル
用吊り具10と同一の構成要素については、同一の符号
を付してその詳しい説明を省略する。この実施の形態に
係るチューブバンドル用吊り具35においては、各当接
ロッド36の横移動防止用のストッパー37、38が設
けられている。このストッパー37、38の取付け位置
は、対向する吊り下げ部材11、12の内側で、吊り下
げ部材11、12により近い位置に設けられている。ス
トッパー37、38はフランジ状となっているが、その
内外径の差はバッフルプレート26が外側のチューブか
ら突出する幅より小さくなって、確実に当接ロッド36
がバッフルプレート26に当接するようになっている。
Next, a description will be given of a tube bundle hanging device 35 according to a second embodiment of the present invention shown in FIGS. 3 and 4, and the tube bundle hanging device 10 according to the first embodiment will be described. The same components are denoted by the same reference numerals, and detailed description thereof will be omitted. In the tube bundle hanging device 35 according to this embodiment, stoppers 37 and 38 for preventing the lateral movement of each contact rod 36 are provided. The attachment positions of the stoppers 37 and 38 are provided inside the opposed hanging members 11 and 12 and closer to the hanging members 11 and 12. The stoppers 37 and 38 have a flange shape, but the difference between the inner and outer diameters is smaller than the width of the baffle plate 26 protruding from the outer tube, so that the contact rod 36
Are in contact with the baffle plate 26.

【0013】隣り合う各当接ロッド36の両端部はチェ
ーン39、40によって連結されて、個々の当接ロッド
36から袋状物13、14が外れないようになってい
る。そして、吊り下げ部材11、12の両側は、図4に
示すように、左右別々の吊りビーム41、42によって
支持され、この吊りビーム41、42が別の補助吊りビ
ームによって支持されて、クレーンによって搬送できる
構造となっている。なお、43はH形鋼(鋼製のパイプ
でもよい)からなるビーム材、44は下吊り金具、45
は上吊り金具を示す。このチューブバンドル用吊り具3
5によってチューブバンドル23の各チューブに無理な
荷重を与えることなく、搬送することができる。
Both ends of each adjacent contact rod 36 are connected by chains 39 and 40 so that the bag-like materials 13 and 14 do not come off from the individual contact rods 36. As shown in FIG. 4, both sides of the suspension members 11, 12 are supported by left and right separate suspension beams 41, 42, and the suspension beams 41, 42 are supported by another auxiliary suspension beam, and are supported by a crane. It can be transported. In addition, 43 is a beam member made of H-section steel (or a steel pipe), 44 is a lower hanging bracket, 45
Indicates an upper hanging bracket. Hanger 3 for this tube bundle
5 allows the tubes of the tube bundle 23 to be conveyed without imposing an excessive load.

【0014】前記実施の形態においては、2台の吊りビ
ームを用いてチューブバンドルを吊り上げたが、チュー
ブバンドルの長さによっては、吊りビームは一台又は3
台以上であってもよい。
In the above embodiment, the tube bundle is lifted by using two suspension beams. However, depending on the length of the tube bundle, one or three suspension beams may be used.
It may be more than one.

【0015】[0015]

【発明の効果】請求項1〜4記載のチューブバンドル用
吊り具においては、柔軟性を有する紐状材又は帯状材か
らなって、両側には掛止部が設けられた複数本の吊り下
げ部材と、並べられた複数の吊り下げ部材の中間位置を
所定ピッチで連結する複数本の当接ロッドと、吊り下げ
部材の掛止部がそれぞれ固定される吊りビームとを有す
るので、複数本の当接ロッドがチューブバンドルのバッ
フルプレートを支持し、チューブ自体に荷重が掛からな
いという利点がある。また、当接ロッドが吊り下げ部材
に所定ピッチで取付けられているので、その装着も容易
で作業性に優れる。特に、請求項2記載のチューブバン
ドル用吊り具は、吊り下げ部材の中間位置には、袋状物
が被せられて、該袋状物に複数本の当接ロッドが所定ピ
ッチで取付けられているので、荷重の掛かる吊り下げ部
材を加工する必要がなく、結果として安全性に優れる。
請求項3記載のチューブバンドル用吊り具は、当接ロッ
ドは、両側に設けられた吊り下げ部材の間隔より長くな
って、その両端部が両側にある吊り下げ部材から突出し
ているので、当接ロッドの両側又は中間部をバッフルプ
レートに当接でき、これによって、バッフルプレートに
直接袋状物や吊り下げ部材が不用意に当接して破断する
等の事故が減少する。そして、請求項4記載のチューブ
バンドル用吊り具は、吊り下げ部材はナイロンスリング
からなって、当接ロッドは鋼製のパイプ又は丸棒からな
っているので、安価に、しかも比較的軽量にこのチュー
ブバンドル用吊り具を製造することができる。
The hanging member for a tube bundle according to any one of claims 1 to 4, wherein the hanging member is made of a flexible string-like material or a band-like material, and has hanging portions on both sides. And a plurality of abutting rods that connect intermediate positions of the plurality of hanging members arranged at a predetermined pitch, and a hanging beam to which a hanging portion of the hanging member is fixed. There is an advantage that the connecting rod supports the baffle plate of the tube bundle, so that no load is applied to the tube itself. In addition, since the contact rods are attached to the suspension member at a predetermined pitch, the attachment is easy and the workability is excellent. In particular, in the tube bundle suspending device according to the second aspect, a bag-like material is covered at an intermediate position of the hanging member, and a plurality of contact rods are attached to the bag-like material at a predetermined pitch. Therefore, it is not necessary to process a hanging member that is subject to a load, resulting in excellent safety.
In the tube bundle suspending device according to the third aspect, the contact rod is longer than the interval between the suspending members provided on both sides, and both ends protrude from the suspending members on both sides. Both sides or the middle part of the rod can be abutted against the baffle plate, thereby reducing accidents such as the bag-like object or the hanging member directly abutting against the baffle plate and breaking. In the hanging device for a tube bundle according to claim 4, the hanging member is made of nylon sling, and the contact rod is made of a steel pipe or a round bar. A hanging device for a tube bundle can be manufactured.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の第1の実施の形態に係るチューブバン
ドル用吊り具の使用状態の斜視図である。
FIG. 1 is a perspective view of a use state of a tube bundle hanging device according to a first embodiment of the present invention.

【図2】同平面図である。FIG. 2 is a plan view of the same.

【図3】本発明の第2の実施の形態に係るチューブバン
ドル用吊り具の正面図である。
FIG. 3 is a front view of a tube bundle hanging device according to a second embodiment of the present invention.

【図4】同側面図である。FIG. 4 is a side view of the same.

【図5】従来例に掛かるチューブバンドル用吊り具の斜
視図である。
FIG. 5 is a perspective view of a hanging member for a tube bundle according to a conventional example.

【図6】従来例に掛かるチューブバンドル用吊り具の斜
視図である。
FIG. 6 is a perspective view of a tube bundle hanging device according to a conventional example.

【符号の説明】[Explanation of symbols]

10 チューブバンドル用吊り具 11 吊り下げ
部材 12 吊り下げ部材 13 袋状物 14 袋状物 15 当接ロッ
ド 16 引っかけ孔 17 引っかけ
孔 18 引っかけ孔 19 引っかけ
孔 20 吊りビーム 21 吊りビー
ム 22 シャックル 23 チューブ
バンドル 24 孔 25 孔 26 バッフルプレート 28 ビーム材 29 下吊り金具 30 下吊り金
具 32 ボルト 33 補助吊り
ビーム 34 上吊り金具 34a 上吊り
金具 34b 管板 34c 管板 35 チューブバンドル用吊り具 36 当接ロッ
ド 37 ストッパー 38 ストッパ
ー 39 チェーン 40 チェーン 41 吊りビーム 42 吊りビー
ム 43 ビーム材 44 下吊り金
具 45 上吊り金具
DESCRIPTION OF SYMBOLS 10 Hanging tool for tube bundle 11 Hanging member 12 Hanging member 13 Bag-shaped object 14 Bag-shaped object 15 Contact rod 16 Hook hole 17 Hook hole 18 Hook hole 19 Hook hole 20 Hanging beam 21 Hanging beam 22 Shackle 23 Tube bundle 24 Hole 25 Hole 26 Baffle plate 28 Beam material 29 Lower suspension fitting 30 Lower suspension fitting 32 Bolt 33 Auxiliary suspension beam 34 Upper suspension fitting 34a Upper suspension fitting 34b Tube plate 34c Tube plate 35 Hanging tool for tube bundle 36 Contact rod 37 Stopper 38 Stopper 39 Chain 40 Chain 41 Hanging beam 42 Hanging beam 43 Beam material 44 Lower hanging bracket 45 Upper hanging bracket

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】 複数の管の集合体からなるチューブバン
ドルを搬送するためのチューブバンドル用吊り具であっ
て、 柔軟性を有する紐状材又は帯状材からなって、両側には
掛止部が設けられた複数本の吊り下げ部材と、 並べられた前記複数の吊り下げ部材の中間位置を所定ピ
ッチで連結する複数本の当接ロッドと、 前記吊り下げ部材の掛止部がそれぞれ固定される吊りビ
ームとを有することを特徴とするチューブバンドル用吊
り具。
1. A tube bundle suspending device for transporting a tube bundle consisting of an aggregate of a plurality of tubes, comprising a flexible string-like material or a band-like material, and having hook portions on both sides. A plurality of provided hanging members, a plurality of abutting rods that connect intermediate positions of the arranged plurality of hanging members at a predetermined pitch, and hook portions of the hanging members are fixed, respectively. A hanging device for a tube bundle, comprising: a hanging beam.
【請求項2】 前記吊り下げ部材の中間位置には、袋状
物が被せられて、該袋状物に前記複数本の当接ロッドが
所定ピッチで取付けられている請求項1記載のチューブ
バンドル用吊り具。
2. The tube bundle according to claim 1, wherein a bag-like material is covered at an intermediate position of the hanging member, and the plurality of contact rods are attached to the bag-like material at a predetermined pitch. Hanging equipment.
【請求項3】 前記当接ロッドは、両側に設けられた前
記吊り下げ部材の間隔より長くなって、その両端部が両
側にある前記吊り下げ部材から突出している請求項1又
は2記載のチューブバンドル用吊り具。
3. The tube according to claim 1, wherein the contact rod is longer than an interval between the hanging members provided on both sides, and both ends protrude from the hanging members on both sides. Hanging equipment for bundles.
【請求項4】 前記吊り下げ部材はナイロンスリングか
らなって、前記当接ロッドは鋼製のパイプ又は丸棒から
なる請求項1〜3のいずれか1項に記載のチューブバン
ドル用吊り具。
4. The hanging device for a tube bundle according to claim 1, wherein the hanging member is made of a nylon sling, and the contact rod is made of a steel pipe or a round bar.
JP7332998A 1998-03-06 1998-03-06 Suspension accessory for tube bundle Pending JPH11246164A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP7332998A JPH11246164A (en) 1998-03-06 1998-03-06 Suspension accessory for tube bundle

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP7332998A JPH11246164A (en) 1998-03-06 1998-03-06 Suspension accessory for tube bundle

Publications (1)

Publication Number Publication Date
JPH11246164A true JPH11246164A (en) 1999-09-14

Family

ID=13515031

Family Applications (1)

Application Number Title Priority Date Filing Date
JP7332998A Pending JPH11246164A (en) 1998-03-06 1998-03-06 Suspension accessory for tube bundle

Country Status (1)

Country Link
JP (1) JPH11246164A (en)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010510942A (en) * 2006-11-23 2010-04-08 ペイネマン イクイップメント ビー.ブイ. Article gripper
KR200453103Y1 (en) 2010-05-27 2011-04-06 (주)플랙트우즈코리아 Air Conditioning Equipment
JP2012001299A (en) * 2010-06-15 2012-01-05 Nisshin Unyu Kk Attachment for forklift and freight handling method using the same
CN102674133A (en) * 2012-05-19 2012-09-19 曹先锋 Heavy hanging beam
CN103274288A (en) * 2013-06-05 2013-09-04 北京空间飞行器总体设计部 Suspending and releasing system used for impact test of lander
CN103335803A (en) * 2013-06-05 2013-10-02 北京空间飞行器总体设计部 A lander impact testing method
JP2014083838A (en) * 2012-10-27 2014-05-12 Tadahiro Umeda Jig and method for holding unvulcanized tire and method of producing tire
CN104098018A (en) * 2014-05-25 2014-10-15 中石化南京工程有限公司 Reusable multistage balance beam combination system
WO2015056338A1 (en) * 2013-10-18 2015-04-23 忠弘 梅田 Unvulcanized tire holding and storing tool
CN104652478A (en) * 2015-02-16 2015-05-27 中交第二航务工程局有限公司 Adjustable balance type component mounting device
CN109079666A (en) * 2018-08-14 2018-12-25 安徽新洲钢业有限公司 A kind of steel ramming hanging beam
CN109648513A (en) * 2019-01-15 2019-04-19 中盐安徽红四方股份有限公司 Horizontal U-shaped heat exchange of heat pipe restrains method for dismounting
CN112408177A (en) * 2020-11-20 2021-02-26 昌河飞机工业(集团)有限责任公司 Length-adjustable auxiliary lifting appliance for turnover of blades
CN113734950A (en) * 2021-08-25 2021-12-03 湖北三江航天红阳机电有限公司 Suspension device for horizontal modal test of large-scale solid carrier

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010510942A (en) * 2006-11-23 2010-04-08 ペイネマン イクイップメント ビー.ブイ. Article gripper
KR200453103Y1 (en) 2010-05-27 2011-04-06 (주)플랙트우즈코리아 Air Conditioning Equipment
JP2012001299A (en) * 2010-06-15 2012-01-05 Nisshin Unyu Kk Attachment for forklift and freight handling method using the same
CN102674133A (en) * 2012-05-19 2012-09-19 曹先锋 Heavy hanging beam
JP2014083838A (en) * 2012-10-27 2014-05-12 Tadahiro Umeda Jig and method for holding unvulcanized tire and method of producing tire
CN103274288A (en) * 2013-06-05 2013-09-04 北京空间飞行器总体设计部 Suspending and releasing system used for impact test of lander
CN103335803A (en) * 2013-06-05 2013-10-02 北京空间飞行器总体设计部 A lander impact testing method
CN103274288B (en) * 2013-06-05 2014-12-03 北京空间飞行器总体设计部 Suspending and releasing system used for impact test of lander
JP5816392B2 (en) * 2013-10-18 2015-11-18 忠弘 梅田 Unvulcanized tire storage and storage equipment
WO2015056338A1 (en) * 2013-10-18 2015-04-23 忠弘 梅田 Unvulcanized tire holding and storing tool
CN104098018A (en) * 2014-05-25 2014-10-15 中石化南京工程有限公司 Reusable multistage balance beam combination system
CN104652478A (en) * 2015-02-16 2015-05-27 中交第二航务工程局有限公司 Adjustable balance type component mounting device
CN104652478B (en) * 2015-02-16 2016-06-22 中交第二航务工程局有限公司 A kind of adjustable balanced type member mounting device
CN109079666A (en) * 2018-08-14 2018-12-25 安徽新洲钢业有限公司 A kind of steel ramming hanging beam
CN109079666B (en) * 2018-08-14 2020-05-15 安徽新洲钢业有限公司 Suspension beam for sand blasting of steel
CN109648513A (en) * 2019-01-15 2019-04-19 中盐安徽红四方股份有限公司 Horizontal U-shaped heat exchange of heat pipe restrains method for dismounting
CN112408177A (en) * 2020-11-20 2021-02-26 昌河飞机工业(集团)有限责任公司 Length-adjustable auxiliary lifting appliance for turnover of blades
CN112408177B (en) * 2020-11-20 2023-06-02 昌河飞机工业(集团)有限责任公司 Length-adjustable blade turnover auxiliary lifting appliance
CN113734950A (en) * 2021-08-25 2021-12-03 湖北三江航天红阳机电有限公司 Suspension device for horizontal modal test of large-scale solid carrier
CN113734950B (en) * 2021-08-25 2023-10-20 湖北三江航天红阳机电有限公司 Large-scale solid carrier horizontal modal test suspension device

Similar Documents

Publication Publication Date Title
JPH11246164A (en) Suspension accessory for tube bundle
JP2000327259A (en) Heating tube panel block hoisting method for exhaust heat recovery boiler
JP5597161B2 (en) Suspended scaffold assembly method, suspended scaffold structure, and scaffold connecting material
CN105152004B (en) Hoisting device for reinforcing beam of top surface inside box-shaped coal conveying gallery road
JP2893171B2 (en) Safety net hanging equipment for building construction and equipment with safety net for building construction
US11002026B1 (en) Adjustable suspension assembly
US3647254A (en) Beam-lifting apparatus
CN208039041U (en) Travelling cradle for bridge construction
JPH11107523A (en) Hanging scaffold, method for constructing the same, and mounting bracket for standard pipe, etc.
JP3024935B2 (en) Method of extending work safety net in steel structure and net mounting rod used in this method
JP4303494B2 (en) Container hanger
JP2020094397A (en) Hung scaffold
JP3815202B2 (en) Scaffolding method on Takahashi pier
JP3782988B2 (en) Belt sling
CN219333006U (en) Safety rope hanging device
CN210012550U (en) Be applied to hoist device of fork truck ash bag
KR200283392Y1 (en) I-Bolt mounting plate setting structure for carry the container by crane
JPH0740668U (en) Suspension equipment for mountain retaining materials
JPH08184178A (en) Connection space cover for suspended scaffold and connection space covering structure
JPH0986867A (en) Hanger for construction of brace block
JP2538491Y2 (en) Scaffolding hanger
JP3182392U (en) Hanging chain coupler
AU706396B2 (en) Support device
JPH08324968A (en) Drop preventing member mounting device for overhead conveyed article
JPH0435346Y2 (en)