CN104652478B - A kind of adjustable balanced type member mounting device - Google Patents

A kind of adjustable balanced type member mounting device Download PDF

Info

Publication number
CN104652478B
CN104652478B CN201510086093.9A CN201510086093A CN104652478B CN 104652478 B CN104652478 B CN 104652478B CN 201510086093 A CN201510086093 A CN 201510086093A CN 104652478 B CN104652478 B CN 104652478B
Authority
CN
China
Prior art keywords
rack beams
girder steel
balanced type
steel bracket
mounting device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510086093.9A
Other languages
Chinese (zh)
Other versions
CN104652478A (en
Inventor
刘经国
冯伟
范充
范卓凡
李凯凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Second Harbor Engineering Co
CCCC Fourth Harbor Engineering Co Ltd
China Communications 2nd Navigational Bureau 2nd Engineering Co Ltd
No 2 Engineering Co of CCCC Fourth Harbor Engineering Co Ltd
Original Assignee
CCCC Second Harbor Engineering Co
CCCC Fourth Harbor Engineering Co Ltd
China Communications 2nd Navigational Bureau 2nd Engineering Co Ltd
No 2 Engineering Co of CCCC Fourth Harbor Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Second Harbor Engineering Co, CCCC Fourth Harbor Engineering Co Ltd, China Communications 2nd Navigational Bureau 2nd Engineering Co Ltd, No 2 Engineering Co of CCCC Fourth Harbor Engineering Co Ltd filed Critical CCCC Second Harbor Engineering Co
Priority to CN201510086093.9A priority Critical patent/CN104652478B/en
Publication of CN104652478A publication Critical patent/CN104652478A/en
Application granted granted Critical
Publication of CN104652478B publication Critical patent/CN104652478B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The present invention relates to immersed tube tunnel mounting technique field, it is provided that a kind of adjustable balanced type member mounting device。This device includes rack beams platform;First end of described rack beams platform is connected above girder steel bracket installation unit;Second end of described rack beams platform is connected to simulation girder steel bracket;Described first end and the second end are the two ends of opposition;Being distributed with multiple hanger at the two ends of described rack beams platform, the described hanger of part is connected with steel wire rope;Described rack beams platform connects balance sling。The adjustable balanced type component mounting hanger of the present invention, after installing girder steel bracket, it is possible to by chain block adjustment, and is directly lifted into position to be installed by girder steel bracket, has therefore saved the set-up time, decrease artificial and mechanical input。Additionally, due to staff has only to carry out tightening or installing of screw or associated connecting structure in installation process, without manually moving girder steel bracket, therefore reduce the risk of installation。

Description

A kind of adjustable balanced type member mounting device
Technical field
The present invention relates to immersed tube tunnel mounting technique field, particularly relate to a kind of adjustable balanced type member mounting device。
Background technology
A Zhuhai and Macao bridge immersed tube prefabricated fitting-out end in port is sealed up a door in installation process, intracavity top board place girder steel bracket is installed as intracavity and installs, because cannot directly lift installation, the mode of forklift lifting stand can only be adopted to install, and be stood on by operating personnel and stand carries out hole is regulated and bolt is executed stubborn。Therefore, current intracavity top board place girder steel bracket there is problems in that and first hole regulates in installation process inconvenience, and because stand affects, bolt is executed and twisted also inconvenience;Secondly, it is 54 pieces that every tube coupling girder steel bracket installs number, and the prefabricated quantity of whole tube coupling is 33 tube couplings, and the mode according to forklift lifting stand installs girder steel bracket, and every tube coupling needs people's number and mechanical one-shift more, but manually puts into bigger inefficient with machinery;Finally, because immersed tube intracavity height is higher, commonly reaching 11.4m height, safety devices installation difficulty, operating personnel cannot be guaranteed safely, and security risk is bigger。
Summary of the invention
(1) to solve the technical problem that
The technical problem to be solved in the present invention is just to provide a kind of adjustable balanced type member mounting device, thus being greatly improved the installation effectiveness of girder steel bracket, reducing artificial and mechanical one-shift input, and reducing installation risk。
(2) technical scheme
In order to solve above-mentioned technical problem, the invention provides a kind of adjustable balanced type member mounting device, including rack beams platform;First end of described rack beams platform is connected above girder steel bracket installation unit;Second end of described rack beams platform is connected to simulation girder steel bracket;Described first end and the second end are the two ends of opposition;Being distributed with multiple hanger at the two ends of described rack beams platform, the described hanger of part is connected with steel wire rope;Described rack beams platform connects balance sling。
Preferably, described rack beams platform includes two parallel girders, and connects the crossbeam of two described girders。
Preferably, described crossbeam is in the same plane with described girder。
Preferably, parallel to each other between all described crossbeams。
Preferably, described girder steel bracket installation unit includes laying column and fixing beam;Described upright post vertical of laying stands on above the first end of described rack beams platform, and is connected with described rack beams platform;Described fixing beam lies across in the described side laying column, and is connected with described rack beams platform。
Preferably, the quantity laying column described in is four。
Preferably, described fixing beam offers screwed hole, be used for and realize threaded between girder steel bracket。
Preferably, described balance sling is chain block。
Preferably, the quantity of described chain block is four, and is respectively between two above the first end and second end of rack beams platform。
Preferably, described chain block connects balance sling by snap ring。
(3) beneficial effect
Technical scheme has the advantage that the adjustable balanced type component mounting hanger of the present invention, after installing girder steel bracket, it is possible to by chain block adjustment, and girder steel bracket is directly lifted into position to be installed, therefore saved the set-up time, decreased artificial and mechanical input。Additionally, due to staff has only to carry out tightening or installing of screw or associated connecting structure in installation process, without manually moving girder steel bracket, therefore reduce the risk of installation。
Accompanying drawing explanation
In order to be illustrated more clearly that the embodiment of the present invention or technical scheme of the prior art, the accompanying drawing used required in embodiment or description of the prior art will be briefly described below, apparently, accompanying drawing in the following describes is only some embodiments of the present invention, for those of ordinary skill in the art, under the premise not paying creative work, it is also possible to obtain other accompanying drawing according to these accompanying drawings。
Fig. 1 is the structural representation of the adjustable balanced type member mounting device of the present invention;
In figure: 1, girder;2, crossbeam;3, simulation girder steel bracket;4, fixing beam;5, column is laid;6, hanger;7, chain block;8, steel wire rope;9, snap ring。
Detailed description of the invention
Below in conjunction with drawings and Examples, embodiments of the present invention are described in further detail。Following example are used for illustrating the present invention, but can not be used for limiting the scope of the present invention。
In describing the invention, it should be noted that, term " on ", D score, "left", "right", " top ", " end ", " interior ", the orientation of the instruction such as " outward " or position relationship be based on orientation shown in the drawings or position relationship, it is for only for ease of the description present invention and simplifies description, rather than instruction or hint indication device or element must have specific orientation, with specific azimuth configuration and operation, be therefore not considered as limiting the invention。Additionally, term " first ", " second " are only for descriptive purposes, and it is not intended that indicate or hint relative importance。
Without loss of generality, the present embodiment illustrates with the installation of girder steel bracket, should be understood that and see, except the installation for girder steel bracket, the adjustable balanced type member mounting device of the application can also be applied to the installation at certain altitude of other weight bigger component, the especially installation of various components below immersed tube top board。
Referring to Fig. 1, the adjustable balanced type member mounting device of the present embodiment, including rack beams platform, the first end of described rack beams platform is connected above girder steel bracket installation unit。In order to realize the balance of whole device at girder steel bracket after fixing, the second end of rack beams platform is connected to simulation girder steel bracket 3, it is preferable that the simulation size of girder steel bracket 3, shape are basic identical with girder steel bracket with weight。Wherein the first end and the second end are the opposition two ends of a structure, if the first end refers to left end, then the second end refers to right-hand member;First end refers to front end, then the second end refers to rear end。Additionally, be distributed with multiple hanger 6 at the two ends of described rack beams platform, the described hanger 6 of part is connected with steel wire rope 8, for mounting with handling apparatus。Can be obtained by general knowledge, the lifting in later stage will be realized, and make adjustable balanced type member mounting device steady as far as possible, it is clear that steel wire rope 8 should not only connect with the hanger 6 of wherein one end。Additionally, due to girder steel bracket installation unit needs to enter into specific installation site in installation process, in order to avoid now installation environment interferes with steel wire rope 8, it is preferable that the steel wire rope 8 of the first end connects the hanger 6 inside girder steel bracket installation unit。Wherein, definition is outside near end, and away from end is inner side。In order to realize regulating the balance of whole device, it is preferable that connecting multiple balance sling on the diverse location of described rack beams platform, each balance sling can work alone thus realizing the balance adjustment of difference, is finally reached the balance adjustment of whole device。
The present embodiment provides the specific constructive form of a kind of rack beams platform bag, specifically, rack beams platform includes two parallel girders 1, and connect the crossbeam 2 of two described girders 1, its middle cross beam 2 primarily serves booster action, therefore crossbeam 2 quantity and along girder 1 layout need can carry out appropriate design in conjunction with concrete stressing conditions。Between preferred all described crossbeams 2 parallel to each other, and described crossbeam 2 and girder 1 in the same plane。Additionally, the hanger 6 in the present embodiment may be located on girder 1, it is also possible to be positioned on crossbeam 2。It should be appreciated that this form of the present embodiment is not the unique version of rack beams platform。
Additionally, the girder steel bracket installation unit of the present embodiment includes laying column 5 and fixing beam 4;Described column 5 of laying is erected in above the first end of described rack beams platform, and is connected with described rack beams platform;Described fixing beam 4 lies across in the described side laying column 5, and is connected with described rack beams platform。The quantity laying column 5 described in preferably is four, thus realizing the steady installation of girder steel bracket。Certainly, the quantity laying column 5 may also be two, three, five ..., as long as steadily installing of girder steel bracket can be realized。In the present embodiment, it is preferable that described fixing beam 4 is parallel with above-mentioned crossbeam 2, and fixing beam 4 is positioned at the top of girder 1, and connects two girders 1。Described fixing beam 4 being threaded hole, laying after on column 5 thus being fixed at girder steel bracket, by the machinery such as bolt or screw is first, girder steel bracket is fixed。
In the present embodiment, it is preferable that described suspender is chain block 7, and the quantity of chain block 7 is four, and is respectively between two above the first end and second end of rack beams platform。Each chain block 7 is connected with rack beams platform preferably by snap ring 9, thus realizing the balance adjustment of this hanger 6 position, is realized the adjustment of multiple spot by multiple bottle gouards moved by hands, is finally reached the purpose regulating device balance。It should be noted that this kind of suspender the not exclusive structure that can realize device balance adjustment。
The adjustable balanced type member mounting device using the present embodiment carries out, in the installation process of girder steel bracket, girder steel bracket being placed in girder steel bracket and laying on column 5, it is preferable that fixed by the fixing beam 4 of connecting bolt and girder steel bracket。By chain block 7 adjustment after fixing, by tower crane or crane, girder steel bracket delivered to appointment position after adjustment, carry out hole adjustment, bolt are executed the operations such as stubborn, by tower crane or crane, adjustable balanced type member mounting device is fallen to refer to allocation after installation and carry out next girder steel bracket installation。
The adjustable balanced type member mounting device of the present embodiment has simple in construction, light advantage, and can realize the quick location of girder steel bracket in installation process。By using contrast to find, originally the installation of girder steel bracket needs 2.0h/ block, only needs 0.5h/ block after improvement, therefore can improve the installation effectiveness of 3 times;Additionally, every piece of girder steel bracket needed 4 people to install originally, after improvement, only need 3 people, it is necessary to workmen decrease 25%, and the input of mechanical one-shift also greatly reduces;The more important thing is, reduce security risk, it is not necessary to too many safety devices are installed。
Embodiment of above is merely to illustrate the present invention, but not limitation of the present invention。Although the present invention being described in detail with reference to embodiment, it will be understood by those within the art that, technical scheme is carried out various combination, amendment or equivalent replacement, without departure from the spirit and scope of technical solution of the present invention, all should be encompassed in the middle of scope of the presently claimed invention。

Claims (9)

1. an adjustable balanced type member mounting device, it is characterised in that include rack beams platform;First end of described rack beams platform is connected above girder steel bracket installation unit;Second end of described rack beams platform is connected to simulation girder steel bracket;Described first end and the second end are the two ends of opposition;Being distributed with multiple hanger at the two ends of described rack beams platform, the described hanger of part is connected with steel wire rope;Described rack beams platform connects balance sling, and described girder steel bracket installation unit includes laying column and fixing beam;Described upright post vertical of laying stands on above the first end of described rack beams platform, and is connected with described rack beams platform;Described fixing beam lies across in the described side laying column, and is connected with described rack beams platform。
2. adjustable balanced type member mounting device according to claim 1, it is characterised in that described rack beams platform includes two parallel girders, and connects the crossbeam of two described girders。
3. adjustable balanced type member mounting device according to claim 2, it is characterised in that described crossbeam is in the same plane with described girder。
4. adjustable balanced type member mounting device according to claim 2, it is characterised in that parallel to each other between all described crossbeams。
5. the adjustable balanced type member mounting device according to Claims 1-4 any one, it is characterised in that described in lay the quantity of column be four。
6. the adjustable balanced type member mounting device according to Claims 1-4 any one, it is characterised in that offer screwed hole on described fixing beam, is used for and realizes threaded between girder steel bracket。
7. the adjustable balanced type member mounting device according to Claims 1-4 any one, it is characterised in that described balance sling is chain block。
8. adjustable balanced type member mounting device according to claim 7, it is characterised in that the quantity of described chain block is four, and be respectively between two above the first end and second end of rack beams platform。
9. adjustable balanced type member mounting device according to claim 1, it is characterised in that described rack beams platform connects balance sling by snap ring。
CN201510086093.9A 2015-02-16 2015-02-16 A kind of adjustable balanced type member mounting device Active CN104652478B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510086093.9A CN104652478B (en) 2015-02-16 2015-02-16 A kind of adjustable balanced type member mounting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510086093.9A CN104652478B (en) 2015-02-16 2015-02-16 A kind of adjustable balanced type member mounting device

Publications (2)

Publication Number Publication Date
CN104652478A CN104652478A (en) 2015-05-27
CN104652478B true CN104652478B (en) 2016-06-22

Family

ID=53244072

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510086093.9A Active CN104652478B (en) 2015-02-16 2015-02-16 A kind of adjustable balanced type member mounting device

Country Status (1)

Country Link
CN (1) CN104652478B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11246164A (en) * 1998-03-06 1999-09-14 Sankyu Inc Suspension accessory for tube bundle
CN101723237A (en) * 2010-01-22 2010-06-09 中交四航局第二工程有限公司 Novel soft rope strut type hanger for box girder
CN202090580U (en) * 2011-05-30 2011-12-28 中国葛洲坝集团股份有限公司 Telescopic operating platform
CN202116184U (en) * 2011-05-11 2012-01-18 中交第二航务工程局有限公司 Multipoint self-balancing lifting appliance of cable crane
CN202379592U (en) * 2011-12-23 2012-08-15 上海市机械施工有限公司 Device for lifting inclined steel columns
CN204530760U (en) * 2015-02-16 2015-08-05 中交第二航务工程局有限公司 A kind of adjustable balanced type member mounting device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11246164A (en) * 1998-03-06 1999-09-14 Sankyu Inc Suspension accessory for tube bundle
CN101723237A (en) * 2010-01-22 2010-06-09 中交四航局第二工程有限公司 Novel soft rope strut type hanger for box girder
CN202116184U (en) * 2011-05-11 2012-01-18 中交第二航务工程局有限公司 Multipoint self-balancing lifting appliance of cable crane
CN202090580U (en) * 2011-05-30 2011-12-28 中国葛洲坝集团股份有限公司 Telescopic operating platform
CN202379592U (en) * 2011-12-23 2012-08-15 上海市机械施工有限公司 Device for lifting inclined steel columns
CN204530760U (en) * 2015-02-16 2015-08-05 中交第二航务工程局有限公司 A kind of adjustable balanced type member mounting device

Also Published As

Publication number Publication date
CN104652478A (en) 2015-05-27

Similar Documents

Publication Publication Date Title
CN107298371A (en) A kind of steel structure modularization house universal hanger and on-site hoisting installation method
CN103882811A (en) Bridge floor crane for cable-stayed bridge
CN104032967B (en) Prefabricated assembled frame structure component construction method for hanging
CN103883129B (en) A kind of steel structural roof beam installation method
CN103510541B (en) In a kind of mast-up hole, the device of steel pipe column is installed in lifting
CN107956923A (en) A kind of pipe well standpipe construction method of installation
CN108217456A (en) A kind of framing type steel box-girder middle cross beam lifts self-level(l)ing device
CN210103312U (en) Adjustable balance hanger
CN107419665B (en) Large-span steel beam hoisting sling and steel beam hoisting method thereof
CN104652478B (en) A kind of adjustable balanced type member mounting device
CN204530760U (en) A kind of adjustable balanced type member mounting device
JP6473922B2 (en) Lifting balance
CN109160434A (en) Hanging apparatus
CN104627849B (en) Hoisting equipment and hoisting method for hoisting inner courtyard pipeline
CN103743581B (en) Internal-climbing tower crane test platform device and test method
CN207021590U (en) ADSS optical cable inspection platforms
CN105152001A (en) Special lifting device and lifting method for lifting reflector unit of radiotelescope
CN104264781A (en) Grid-shaped, cylindrical-surface and steel structured latticed shell and construction method thereof
CN103849709A (en) Installation method for tilting system of steelmaking converter
CN205653104U (en) Walking crane of cell board curtain installation
CN202201650U (en) Four-supporting-column combined hoisting device for ultra-high voltage serial compensation platform
CN109972845B (en) Method for mounting steel roof truss
CN106544957A (en) Length adjustment device, stiffening girder of suspension bridge mounting system and method
CN205873760U (en) Embrace roof beam hoisting apparatus
JP5761595B2 (en) Module structure, module construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant