JPH1121894A - Mobile type sheathing device, and construction of method avoiding underground obstacle by sheathing device - Google Patents

Mobile type sheathing device, and construction of method avoiding underground obstacle by sheathing device

Info

Publication number
JPH1121894A
JPH1121894A JP18781997A JP18781997A JPH1121894A JP H1121894 A JPH1121894 A JP H1121894A JP 18781997 A JP18781997 A JP 18781997A JP 18781997 A JP18781997 A JP 18781997A JP H1121894 A JPH1121894 A JP H1121894A
Authority
JP
Japan
Prior art keywords
retaining device
sheet pile
earth retaining
work area
underground obstacle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP18781997A
Other languages
Japanese (ja)
Other versions
JP3075397B2 (en
Inventor
Kenji Shoda
賢志 正田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
K SUTATSUFU KK
Sutatsufu Kk K
Original Assignee
K SUTATSUFU KK
Sutatsufu Kk K
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by K SUTATSUFU KK, Sutatsufu Kk K filed Critical K SUTATSUFU KK
Priority to JP09187819A priority Critical patent/JP3075397B2/en
Publication of JPH1121894A publication Critical patent/JPH1121894A/en
Application granted granted Critical
Publication of JP3075397B2 publication Critical patent/JP3075397B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a low-cost sheathing device and a construction method of avoiding underground obstacle by the sheathing device, which enable the safe and quick avoidance of obstacles and which are available even though the obstacles lie in deep positions. SOLUTION: A left and a right sheet pile unit 2 are coupled together by a coupling member 4, and a normal operation region W1 for connecting an embedded object W such as pipe is formed under the part behind between the sheet pile units 2, and it is made practicable to move within a groove V using an external driving means, etc. With this mobile type sheathing device 1, a removably mounted or a mobile aux. coupling member 5 is installed in a position under the part ahead between the units 2 and on the horizontal extension line of the region W1, and the normal operation region W1 and an avoid work region W2 leading to outside the forefront of the units 2 are formed in the part under ahead of the units 2 in between by moving the aux. coupling member 5 or any other similar means.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、管などの埋設物を
埋設する工事に際し、掘削した溝の側壁を保護する移動
式土留装置(以下単に土留装置という。)及びその土留
装置による地中障害物の回避工法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a mobile retaining device (hereinafter simply referred to as "retaining device") for protecting the side wall of an excavated trench when burying a buried object such as a pipe, and an underground obstacle caused by the retaining device. It relates to the method of avoiding objects.

【0002】[0002]

【従来の技術】左右一対の矢板ユニットを連結部材で連
結し、パワーシャベルなどで掘削した溝内を移動する土
留装置及びその土留装置による地中障害物の回避工法が
例えば特開平2−274918号公報に記載されてい
る。この従来型の土留装置は、図7(a)〜(c)に示
したように、固定矢板100の上に可動矢板101を連
結して矢板ユニット102を形成し、さらに可動矢板1
01を昇降手段103で上下動させることにより矢板ユ
ニット102の高さを変更可能にしたものである。
2. Description of the Related Art Japanese Unexamined Patent Publication (Kokai) No. 2-274918 discloses a soil retaining device in which a pair of left and right sheet pile units are connected by a connecting member and moves in a trench excavated by a power shovel or the like and an underground obstacle is prevented by the soil retaining device. It is described in the gazette. As shown in FIGS. 7A to 7C, this conventional earth retaining device forms a sheet pile unit 102 by connecting a movable sheet pile 101 on a fixed sheet pile 100, and furthermore, the movable sheet pile 1
The height of the sheet pile unit 102 can be changed by vertically moving 01 with the lifting means 103.

【0003】しかして、上記土留装置を使って地中障害
物P(既設の管など)を回避する方法は、先ず図7
(a)のように地中障害物Pの手前で可動矢板101を
下げ、その状態で地中障害物Pを損傷させないようにし
て溝Vを掘り進め、その溝Vの中で土留装置を前進させ
て図7(b)のように地中障害物Pの下をくぐり抜けさ
せ、図7(c)のように地中障害物Pの下を土留装置が
完全に通過してから可動矢板101を上げる、というも
のである。
[0003] A method of avoiding an underground obstacle P (existing pipe or the like) using the earth retaining device is firstly described with reference to FIG.
As shown in (a), the movable sheet pile 101 is lowered in front of the underground obstacle P, and the trench V is dug in such a state without damaging the underground obstacle P, and the retaining device is advanced in the groove V. As shown in FIG. 7B, the movable sheet pile 101 is passed under the underground obstacle P, and the movable sheet pile 101 is passed after the soil retaining device completely passes under the underground obstacle P as shown in FIG. 7C. Raise it.

【0004】[0004]

【発明が解決しようとする課題】しかし、上記従来の土
留装置を使った地中障害物の回避工法では、可動矢板1
01を下げた図7(a)の位置から可動矢板101を上
げた図7(c)までの区間Lが、溝Vの上半部に土留の
ない危険な工事になる。従って、この回避工法は、崩落
しやすい地盤では危なくて使えない。また、従来の回避
工法は、矢板ユニット102の高さを最大限に低くして
も、それより低所に地中障害物Pがある場合にも使えな
い。
However, in the above-described method of avoiding an underground obstacle using the conventional earth retaining device, the movable sheet pile 1 is required.
The section L from the position of FIG. 7 (a) where 01 is lowered to the position of FIG. 7 (c) where the movable sheet pile 101 is raised is a dangerous construction in which there is no soil in the upper half of the groove V. Therefore, this avoidance method is dangerous and cannot be used on the easily collapsed ground. Further, even if the height of the sheet pile unit 102 is reduced to the maximum, the conventional avoidance method cannot be used even when the underground obstacle P is lower than that.

【0005】一方、上記のような地中障害物の回避手段
を持たない土留装置(例えば特公昭62−27234号
など)にあっては、地中障害物の手前で土留装置を引き
上げることになるが、その際、埋設物の先端が土留装置
の中央にあってそれ以上つなげない状態になっているた
め、引き上げる前に土留装置の回りを矢板で囲っておく
必要がある。そうしなければ、土留装置を引き上げる際
に溝Vが崩れて接続途中の埋設物が埋まるおそれがある
からである。従って、従来は、地中埋設物の手前に多数
の矢板を立てて土留装置がすっぽり入る大きさの到達坑
を作るようにしていた。もちろん、地中障害物を回避す
る度に到達坑を作っていたのでは、土留装置を使用する
メリットが激減することはもちろん、地中障害物の多い
都市部の工事では地中障害物を回避するためのタイムロ
スが顕著になるから折角の土留装置が使えない。
On the other hand, in an earth retaining device having no means for avoiding an underground obstacle as described above (for example, Japanese Patent Publication No. 62-27234), the earth retaining device is to be raised just before the underground obstacle. However, at this time, since the tip of the buried object is in the center of the soil retaining device and cannot be connected any more, it is necessary to surround the soil retaining device with a sheet pile before lifting. Otherwise, when the earth retaining device is pulled up, the groove V may collapse and the buried object in the middle of connection may be buried. Therefore, conventionally, a large number of sheet piles have been erected in front of an underground object to make a reaching pit large enough for the earth retaining device. Of course, creating a pit every time avoiding underground obstacles would not only drastically reduce the benefits of using earth retaining equipment, but also avoiding underground obstacles in construction work in urban areas with many underground obstacles The time loss required to perform the operation becomes prominent, so that the conventional earth retaining device cannot be used.

【0006】本発明は、上記に鑑みなされたもので、そ
の目的は、第一に地中障害物を安全且つ短時間で回避す
ることができ、第二に地中障害物が深い位置にあっても
使用可能であり、第三に低コストな土留装置及びその土
留装置による地中障害物の回避工法を提供することにあ
る。
SUMMARY OF THE INVENTION The present invention has been made in view of the above, and its object is to firstly avoid an underground obstacle safely and in a short time, and secondly, to make it possible to avoid an underground obstacle at a deep position. Thirdly, it is an object of the present invention to provide a low-cost soil retaining device and a method for avoiding underground obstacles by the soil retaining device.

【0007】[0007]

【課題を解決するための手段】上記の目的を達成するた
め本発明は、左右の矢板ユニットを連結部材で連結する
とともにその矢板ユニット間の後方下部に管などの埋設
物を接続するための通常作業領域を形成し、さらに外部
の駆動手段又は自己の推進手段で溝内を移動するように
した土留装置において、矢板ユニット間の前方下部であ
って前記通常作業領域の水平延長線上に着脱又は移動自
在な補助連結部材を配設し、その補助連結部材を外すか
又は移動させることにより矢板ユニット間の前方下部に
前記通常作業領域と矢板ユニットの先端外部に通じる回
避作業領域を形成するようにした土留装置を提供する。
SUMMARY OF THE INVENTION In order to achieve the above object, the present invention relates to a conventional method for connecting left and right sheet pile units with a connecting member and connecting an embedded object such as a pipe to a lower rear portion between the sheet pile units. In a retaining device which forms a work area and is further moved in a groove by an external driving means or a self-propelled means, the detachable or movable part is mounted on a horizontal extension of the normal work area at a lower front portion between sheet pile units. A free auxiliary connecting member is provided, and by removing or moving the auxiliary connecting member, the normal work area and the avoidance work area communicating with the outside of the tip of the sheet pile unit are formed in the lower front part between the sheet pile units. Provide earth retaining equipment.

【0008】この土留装置を使用することにより、次の
ような地中障害物の回避工法が可能になる。 地中障害物と交差するようにしてパワーシャベルなど
を使って埋設物用の溝を掘削する。 矢板ユニット間に補助連結部材を取り付け、通常作業
領域で埋設物をつなぐ作業を行いながら土留装置を前記
溝の中で移動させ、地中障害物の直前で止める。矢板ユ
ニットに作用する土圧は、移動時のしかも前側が最も大
きいが、矢板ユニット間の前方下部に補助連結部材を取
り付けておけば、大きな土圧にも十分に耐えることがで
きる。 停止状態で矢板ユニット間から補助連結部材を外すか
又は移動させて土留装置の回避作業領域を開放する。矢
板ユニットに作用する土圧は、多くの場合停止状態にお
いて極小さいため、補助連結部材を外しても強度上問題
がない。 通常作業領域にある埋設物に次の埋設物をつなぎ合わ
せ、最終的に埋設物が回避作業領域を貫くようにする。 地中障害物の後ろに土留装置が入る長さの溝を掘り進
める。 土留装置を溝から引き抜いて地中障害物の上を越えさ
せ、先に掘り進めた溝の中に降ろす。 土留装置の前方下部に補助連結部材を戻して回避作業
領域を閉じる。 通常作業領域を使って埋設物をつなぎ合わせ、さらに
溝を掘り進めながら土留装置を前進させる。
By using the earth retaining device, the following method of avoiding an underground obstacle can be realized. Excavate a trench for a buried object using a power shovel or the like so as to cross an underground obstacle. An auxiliary connecting member is attached between the sheet pile units, and the earth retaining device is moved in the groove while the work of connecting the buried object in the normal work area is stopped just before the underground obstacle. The earth pressure acting on the sheet pile unit is greatest at the time of movement and on the front side. However, if an auxiliary connecting member is attached to the lower front part between the sheet pile units, it can sufficiently withstand a large earth pressure. In the stopped state, the auxiliary connecting member is removed or moved from between the sheet pile units to open the avoidance work area of the earth retaining device. Since the earth pressure acting on the sheet pile unit is extremely small in the stopped state in many cases, there is no problem in strength even if the auxiliary connecting member is removed. The next buried object is joined to the buried object in the normal work area so that the buried object finally passes through the avoidance work area. Dig a ditch long enough to hold the retaining device behind an underground obstacle. The retaining device is pulled out of the trench, over the underground obstacle, and lowered into the previously dug trench. The avoidance work area is closed by returning the auxiliary connecting member to the lower front part of the earth retaining device. The buried objects are connected using the normal work area, and the retaining device is advanced while digging a trench.

【0009】[0009]

【発明の実施の形態】以下に本発明の実施の形態を図面
を参照しつつ説明する。なお、図1は土留装置の断面
図、図2(a)〜(c)は土留装置の側面図、図3〜図
8は地中障害物の回避工法1,2を説明する断面図であ
る。
Embodiments of the present invention will be described below with reference to the drawings. 1 is a cross-sectional view of the soil retaining device, FIGS. 2A to 2C are side views of the soil retaining device, and FIGS. 3 to 8 are cross-sectional views illustrating methods 1 and 2 for avoiding an underground obstacle. .

【0010】土留装置1は、左右の矢板ユニット2と、
後面上半部を塞ぐ土留板3と、二枚の矢板ユニット2同
士を連結する連結部材4及び補助連結部材5とから概略
構成される。実施形態の土留装置1は、パワーシャベル
に代表される外部の駆動手段で牽引する移動方式であ
り、そのための牽引部6が両矢板ユニット2の先端ほぼ
中央又は連結部材4に設けられている。
The earth retaining device 1 comprises left and right sheet pile units 2,
It is roughly composed of an earth retaining plate 3 for closing the upper half of the rear surface, a connecting member 4 for connecting the two sheet pile units 2 and an auxiliary connecting member 5. The earth retaining device 1 of the embodiment is of a moving type of towing by an external driving means represented by a power shovel, and a towing part 6 for that purpose is provided substantially at the center of the both sheet pile units 2 or at the connecting member 4.

【0011】各矢板ユニット2は、鋼材の骨組みを二枚
の鋼板でサンドイッチにしたフラッシュパネル構造であ
り、先端が斜めのいわゆる船首形状になっている。矢板
ユニット2同士を止める連結部材4は鋼製の角材であっ
て、矢板ユニット2の上部と中央の前後の計四箇所に固
着されている。土留装置1は、矢板ユニット2間の後方
下部が通常作業領域W1になっており、この通常作業領
域W1で管などの埋設物Xを接続する作業を行う。
Each sheet pile unit 2 has a flash panel structure in which a steel frame is sandwiched between two steel plates, and has a so-called bow shape with an oblique tip. The connecting members 4 for stopping the sheet pile units 2 are steel square members, and are fixed to the upper part of the sheet pile unit 2 and four places in front and behind the center. The earth retaining device 1 has a normal work area W1 at a lower rear portion between the sheet pile units 2, and performs an operation of connecting an embedded object X such as a pipe in the normal work area W1.

【0012】しかして、本発明の土留装置1は、矢板ユ
ニット2間の前方下部であって前記通常作業領域W1の
水平延長線上に着脱又は移動自在な補助連結部材5を配
設し、その補助連結部材5を外すか又は移動させること
により矢板ユニット2間の前方下部に前記通常作業領域
W1と矢板ユニット2の先端外部に通じる回避作業領域
W2を形成するようにしたものである。
In the earth retaining device 1 of the present invention, the detachable or movable auxiliary connecting member 5 is disposed at the lower front part between the sheet pile units 2 and on the horizontal extension of the normal work area W1. By removing or moving the connecting member 5, the normal work area W1 and the avoidance work area W2 communicating with the outside of the tip of the sheet pile unit 2 are formed in the lower front part between the sheet pile units 2.

【0013】補助連結部材5は、例えば、第一に図2
(a)に示したように一端を矢板ユニット2の内側面に
ピン7で軸着し、他端を他方の矢板ユニット2に係止さ
せ、同図一点鎖線のようにピン7を中心に回動させて回
避作業領域W2を開放するようにしたもの、第二に図2
(b)に示したように矢板ユニット2に設けた縦レール
8に沿って上下動自在に装着し、同図一点鎖線のように
上昇させて回避作業領域W2を開放するようにしたも
の、第三に図2(c)に示したように矢板ユニット2に
ボルト9で取り付け、同図一点鎖線のようにボルト9を
外して矢板ユニット2から完全に外すことによって回避
作業領域W2を開放するようにしたもの、第四に図示し
ないが、補助連結部材5をブランコ式にスイングさせて
跳ね上げるようにしたもの、の何れか(もちろんそれ以
外の形態でもよい。)の形態を選択することができる。
The auxiliary connecting member 5 is, for example, first shown in FIG.
As shown in (a), one end is pivotally attached to the inner side surface of the sheet pile unit 2 with the pin 7 and the other end is locked to the other sheet pile unit 2, and the pin 7 is turned around the pin 7 as shown by the dashed line in FIG. 2 to open the avoidance work area W2.
(B) as shown in (b), mounted vertically movably along the vertical rails 8 provided on the sheet pile unit 2, and lifted up as shown by a dashed line in FIG. Third, as shown in FIG. 2 (c), the work 9 is attached to the sheet pile unit 2 with bolts 9, and the bolt 9 is removed and completely removed from the sheet pile unit 2 as indicated by a dashed line in FIG. Although not shown in the figure, a configuration in which the auxiliary connecting member 5 swings in a swing manner and jumps up can be selected (of course, other configurations are also possible). .

【0014】また、補助連結部材5は、一本の鋼材で形
成した固定長構造と、二本以上の鋼材をつなぎ合わせて
伸縮自在にした可変長構造がある。固定長構造の補助連
結部材5は構造が簡単で低コストにできる利点があり、
また、可変長構造の補助連結部材5は、土圧が作用して
取り外しや移動が困難である場合に長さを縮めて土圧を
軽減又は解除し、もって取り外しや移動を簡単にするこ
とができる利点がある。なお、可変長構造の補助連結部
材5において長さを変更する手段は、例えば、ねじ式の
ジャッキ構造や、液圧や気圧式の伸縮シリンダーを使う
構造がある。
The auxiliary connecting member 5 has a fixed length structure formed of a single steel material and a variable length structure formed by connecting two or more steel materials so as to be expandable and contractible. The auxiliary connecting member 5 having a fixed length structure has an advantage that the structure is simple and the cost can be reduced.
In addition, the auxiliary connecting member 5 having a variable length structure can reduce the length to reduce or cancel the earth pressure when the earth pressure acts and it is difficult to remove and move, thereby simplifying the removal and movement. There are advantages that can be done. The means for changing the length of the auxiliary connecting member 5 having a variable length structure includes, for example, a screw jack structure and a structure using a hydraulic or pneumatic telescopic cylinder.

【0015】[0015]

【回避工法1】次ぎに、上記土留装置1を使った地中障
害物Pの回避工法1について図3〜図5により説明す
る。先ず、管などの地中障害物Pがない場所では、パワ
ーシャベルなどを使って掘削した埋設物用の溝Vに土留
装置1を設置し、通常作業領域W1に埋設物Xを入れ、
先に埋設した埋設物Xの端部にその埋設物Xをつなぎ、
同時に土留装置1の前方の溝Vを掘り進み、パワーシャ
ベルで土留装置1を牽引して前進させ、土留装置1の後
ろを埋め戻す、という作業を繰り返す。
[Avoidance Method 1] Next, an avoidance method 1 of the underground obstacle P using the earth retaining device 1 will be described with reference to FIGS. First, in a place where there is no underground obstacle P such as a pipe, the earth retaining device 1 is installed in a groove V for a buried object that is excavated using a power shovel or the like, and the buried object X is put in the normal work area W1.
Connect the buried object X to the end of the previously buried object X,
At the same time, the operation of digging the groove V in front of the retaining device 1, pulling the retaining device 1 forward with a power shovel, and backfilling the retaining device 1 is repeated.

【0016】次ぎに、進路の前方に管などの地中障害物
Pがある場合は、図3のように地中障害物Pの直前で土
留装置1を止める。このとき溝Vは地中障害物Pを越え
た所まで掘り進んでおり、地中障害物Pが溝Vを横断す
る状態で露出している。次ぎに止めた土留装置1の矢板
ユニット2間から補助連結部材5を外すか又は移動させ
て前記回避作業領域W2を開放する。停止状態では矢板
ユニット2に加わる土圧が小さいため、前記のように補
助連結部材5による支えを外しても安全性に問題はな
い。なお、現場の状況に応じて万全を期する意味で図1
二点鎖線のように矢板ユニット2の内面に杭用のガイド
部材10を設けておいてもよい。そして、必要に応じて
そのガイド部材10に杭11を通し、その杭11を溝V
の底に打ち込んで土圧対策を講じてから補助連結部材5
を外すようにすれば、より高度な安全性が確保できる。
Next, when there is an underground obstacle P such as a pipe in front of the course, the earth retaining device 1 is stopped immediately before the underground obstacle P as shown in FIG. At this time, the trench V has been dug up to a position beyond the underground obstacle P, and the underground obstacle P is exposed while crossing the trench V. Next, the auxiliary connecting member 5 is removed or moved from between the sheet pile units 2 of the earth retaining device 1 that has been stopped to open the avoidance work area W2. In the stopped state, since the earth pressure applied to the sheet pile unit 2 is small, there is no problem in safety even if the support by the auxiliary connecting member 5 is removed as described above. In addition, in the sense of being thorough according to the situation of the site,
A guide member 10 for a pile may be provided on the inner surface of the sheet pile unit 2 as indicated by a two-dot chain line. Then, the stake 11 is passed through the guide member 10 as necessary, and the stake 11 is
After taking measures against earth pressure by driving into the bottom of
If you remove, higher security can be secured.

【0017】次ぎに、通常作業領域W1にある埋設物X
に次の埋設物Xをつなぎ、最終的に図4のように埋設物
Xの先端が回避作業領域W2を貫くようにする。一方、
これらの作業と並行して地中障害物Pの後ろに土留装置
1が入る長さの溝Vを掘る。このとき溝Vが深すぎて崩
落のおそれがある場合には、土留装置1が半分位埋まる
程度の深さか又はそれより浅くする。
Next, the embedded object X in the normal work area W1
Then, the next buried object X is connected so that the tip of the buried object X finally penetrates the avoidance work area W2 as shown in FIG. on the other hand,
In parallel with these operations, a groove V long enough to receive the earth retaining device 1 is dug behind the underground obstacle P. At this time, if the groove V is too deep and there is a risk of collapse, the depth is set to a depth such that the earth retaining device 1 is half-buried or shallower than that.

【0018】次ぎに、クレーンなどを使って土留装置1
を吊り上げ、図4一点鎖線のように地中障害物Pの上を
越えさせて先に掘り進めた溝Vの中に降ろす。前記のよ
うに溝Vの深さを浅くした場合には、土留装置1の中を
パワーシャベルなどで掘って底を崩しながら目的の深さ
まで土留装置1を降ろす。そうすると、土留装置1の後
端に先に埋めた埋設物Xの先端が臨むため、図5のよう
にその埋設物Xに次の埋設物Xをつなぐ。以後、上記の
要領で埋設物Xをつないで埋めながら土留装置1を前進
させる。
Next, the earth retaining device 1 using a crane or the like.
Is lifted up and lowered into the previously dug groove V over the underground obstacle P as shown by the dashed line in FIG. When the depth of the groove V is reduced as described above, the soil retaining device 1 is lowered to a target depth while digging the inside of the soil retaining device 1 with a power shovel or the like and breaking the bottom. Then, since the front end of the embedded object X buried first faces the rear end of the earth retaining device 1, the next embedded object X is connected to the embedded object X as shown in FIG. Thereafter, the retaining device 1 is advanced while connecting and burying the buried object X in the above-described manner.

【0019】なお、地中障害物Pが埋設物Xの進路を妨
げる位置にある場合は、溝Vをなだらかに深くして地中
障害物Pの下に埋設物Xを通すが、それには、矢板ユニ
ット2の上端に別途形成した土留用の補助パネル(図示
せず)を継ぎ足し、矢板ユニット2の高さを高くするよ
うにすればよい。
When the underground obstacle P is located at a position where it obstructs the path of the buried object X, the groove V is gently deepened to allow the buried object X to pass under the underground obstacle P. An auxiliary panel (not shown) for retaining formed separately at the upper end of the sheet pile unit 2 may be added to increase the height of the sheet pile unit 2.

【0020】[0020]

【回避工法2】次ぎに、上記土留装置1を使った地中障
害物Pの回避方法2について図6〜図8により説明す
る。この回避工法2は、地盤の状態や工事の安全基準な
どの制約から土留装置1の前方に浅く短い溝Vしか掘れ
ない場合に適用する。先ず、進路の前方に管などの地中
障害物Pがある場合は、図6のように地中障害物Pの直
前で土留装置1を止める。このとき溝Vは地中障害物P
を越えていない。この状態で図7のように地中障害物P
の前後に鋼製の矢板12を打ち込む。もちろん、この矢
板12は土留装置1が到達する前に事前に打ち込んでお
いてもよい。次ぎに矢板12で囲われた部分の土をパワ
ーシャベルなどで掘り出し地中障害物Pを露出させる。
この作業と並行して土留装置1の矢板ユニット2間から
補助連結部材5を外すか又は移動させて回避作業領域W
2を開放する。そして、埋設物Xをつないで回避作業領
域W2を通し、埋設物Xの先端が矢板12で挟まれた領
域に達するようにする。一方、矢板12の後方に土留装
置1が半分位埋まる程度の深さか又はそれより浅い溝V
を掘る。
[Avoidance Method 2] Next, a method 2 for avoiding an underground obstacle P using the earth retaining device 1 will be described with reference to FIGS. This avoidance method 2 is applied when only a shallow short groove V can be dug in front of the earth retaining device 1 due to restrictions such as the condition of the ground and safety standards for construction. First, when there is an underground obstacle P such as a pipe in the front of the course, the retaining device 1 is stopped immediately before the underground obstacle P as shown in FIG. At this time, the groove V is underground obstacle P
Not exceeded. In this state, the underground obstacle P as shown in FIG.
The steel sheet pile 12 is driven before and after. Of course, the sheet pile 12 may be driven in before the soil retaining device 1 reaches. Next, the soil surrounded by the sheet pile 12 is dug by a power shovel or the like to expose the underground obstacle P.
In parallel with this work, the auxiliary connecting member 5 is detached or moved from between the sheet pile units 2 of the earth retaining device 1 so as to avoid the work area W
Release 2 Then, the embedded object X is connected to pass through the avoidance work area W2 so that the tip of the embedded object X reaches the area sandwiched by the sheet piles 12. On the other hand, a groove V which is deep enough to half the earth retaining device 1 is buried behind the sheet pile 12 or shallower than that.
Dig.

【0021】次ぎに、クレーンなどを使って土留装置1
を吊り上げる。このとき、土留装置1の中に砂を入れな
がら少しづつ上昇させる。そして、吊り上げた土留装置
1を先に掘り進めた溝Vの中に降ろし、土留装置1の中
を掘って底を崩しながら目的の深さまで降ろす。そうす
ると、土留装置1の後端が矢板12で囲った溝Vに連通
するため、次の埋設物Xをつなぎ、矢板12部分の溝V
を埋め戻して矢板12を抜く。以後は回避工法1と同じ
である。なお、この回避工法2は矢板12を使用するこ
とになるが、その本数は従来工法に較べて極僅かであ
る。
Next, the earth retaining device 1 using a crane or the like.
Hoist. At this time, the sand is gradually raised while the sand is put into the earth retaining device 1. Then, the lifted soil retaining device 1 is lowered into the previously dug groove V, and is lowered to a target depth while digging into the soil retaining device 1 and breaking down the bottom. Then, since the rear end of the earth retaining device 1 communicates with the groove V surrounded by the sheet pile 12, the next buried object X is connected, and the groove V of the sheet pile 12 portion is connected.
Is backfilled and the sheet pile 12 is pulled out. Subsequent steps are the same as in the first avoidance method. In this avoidance method 2, the sheet pile 12 is used, but the number thereof is extremely small as compared with the conventional method.

【0022】以上、本発明を実施の形態について説明し
たが、もちろん本発明は上記実施形態に限定されるもの
ではない。例えば実施形態は、補助連結部材5が一本に
なっているが複数本であってもよい。また、実施形態
は、パワーシャベルなどで牽引する移動方式の土留装置
1への適用例を示したが、本発明は、推進手段を備えた
自走方式の土留装置にも同様に適用できる。このような
自走方式の土留装置は、例えば、前記した特開平2−2
74918号や特公昭62−27234号などに記載さ
れており、それらは矢板ユニットを前後方向に分割し、
自己の推進手段(例えば推進ジャッキ)で矢板ユニット
を伸縮させ、蠕動(ぜんどう)運動の要領で前後を交互
に前進させる。なお、前記特公昭62−27234号
は、幅員増減ジャッキで左右の矢板ユニット同士を連結
し、矢板ユニット間の幅員を増減させて土圧を調節する
構造であるが、本発明の補助連結部材にはこのような幅
員増減ジャッキをも含む。
Although the present invention has been described with reference to the embodiment, it is needless to say that the present invention is not limited to the above embodiment. For example, in the embodiment, the number of the auxiliary connection member 5 is one, but a plurality of the auxiliary connection members 5 may be used. Although the embodiment has been described with reference to the application example to the moving type retaining device 1 towed by a power shovel or the like, the present invention can be similarly applied to a self-propelled retaining device provided with propulsion means. Such a self-propelled earth retaining device is disclosed in, for example, the above-mentioned Japanese Patent Laid-Open No. 2-2.
No. 74918 and Japanese Patent Publication No. 62-27234, which divide the sheet pile unit in the front-rear direction.
The sheet pile unit is expanded and contracted by its own propulsion means (for example, a propulsion jack), and is moved forward and backward alternately in the manner of peristaltic movement. The Japanese Patent Publication No. 62-27234 discloses a structure in which left and right sheet pile units are connected to each other with a width increasing / decreasing jack and the earth pressure is adjusted by increasing or decreasing the width between sheet pile units. Also includes such a width increasing / decreasing jack.

【0023】また、実施形態の矢板ユニット2は左右の
それぞれが一枚構造になっているが、図6のように左右
の各矢板ユニット2をほぼ中央付近で前後に分断して二
枚構造となし、土留装置1を前後に分割するようにして
もよい。そうすることにより、図6の状態で通常作業領
域W1のある後半部1Rだけを先に移動させ、前半部1
Fの回避作業領域W2で行う作業と並行して後半部1R
を地中障害物Pの後ろに設置することができ、続いて後
半部1Rで行う作業と並行して前半部1Fを移動させる
ことができるから、地中障害物Pを回避するためのロス
タイムを最小限に短縮することができる。また、土留装
置1を前半部1Fと後半部1Rに分割して別々に移動さ
せるようにすれば、小型のクレーンなどでも吊り上げる
ことが可能になるから、大掛な設備が不要で実施の容易
性が高まることはもちろん、工事に要するコストも大幅
に抑制することができる。なお、土留装置1を上下に分
割可能な構造にしてバラバラに移動させるようにして
も、同様な効果が得られる。
The left and right sheet pile units 2 of the embodiment have a single-piece structure. However, as shown in FIG. None, the earth retaining device 1 may be divided into front and rear. By doing so, only the rear half 1R having the normal work area W1 is moved first in the state of FIG.
The latter half 1R in parallel with the work performed in the avoidance work area W2 of F
Can be installed behind the underground obstacle P, and subsequently, the first half 1F can be moved in parallel with the work performed in the second half 1R, so that the loss time for avoiding the underground obstacle P is reduced. Can be reduced to a minimum. Further, if the earth retaining device 1 is divided into the first half 1F and the second half 1R and moved separately, it is possible to lift even with a small crane or the like. Not only increase but also the cost required for the construction can be greatly reduced. Note that the same effect can be obtained even when the earth retaining device 1 is configured to be vertically split and moved separately.

【0024】[0024]

【発明の効果】以上のように本発明の土留装置は、矢板
ユニット間の前方下部であって通常作業領域の水平延長
線上に着脱又は移動自在な補助連結部材を配設し、その
補助連結部材を外すか又は移動させて回避作業領域を形
成する手段を講じたことにより、移動時の土圧に耐え得
る強度を備えながら、矢板ユニット間の前方下部に必要
に応じて回避作業領域を形成することができる。そし
て、この土留装置を使用して本発明の地中障害物の回避
工法を実施すれば、地中障害物を回避する際にも土留の
ない危険な場所で作業する必要がなく、また、地中障害
物の下をくぐらないから地中障害物が深い位置にあって
も使用可能であり、さらに土留装置の構造が簡単で新た
なコストが殆ど掛からない、などの優れた効果を発揮す
る。
As described above, the earth retaining device according to the present invention has the auxiliary connecting member which is detachable or movable on the lower front portion between the sheet pile units and on the horizontal extension of the normal working area. By taking measures to remove or move the work to form the avoidance work area, the avoidance work area is formed as needed in the lower front part between the sheet pile units while having strength enough to withstand the earth pressure during movement. be able to. If the method for avoiding underground obstacles according to the present invention is carried out using the earth retaining device, it is not necessary to work in a dangerous place without earth retaining even when avoiding an underground obstacle. Since it does not pass under the middle obstacle, it can be used even when the underground obstacle is at a deep position, and furthermore, it has excellent effects such as simple construction of the earth retaining device and little additional cost.

【0025】従来より、埋設物を埋設する工事におい
て、矢板を打ち込む古典的な方法に較べて土留装置を使
用することの優位性は当業者間において十分認識されて
いるが、地中障害物の多さがネックとなって現状では都
市部での工事に殆ど土留装置が利用されていない。しか
し、本発明の土留装置とその土留装置による地中障害物
の回避工法の開発により、地中障害物の多い都市部にお
いても土留装置を使用することが可能になり、都市部に
おける管などの埋設工事の工期が飛躍的に短縮できる。
Conventionally, in the work of burying a buried object, the advantage of using the earth retaining device as compared with the classical method of driving a sheet pile is well recognized by those skilled in the art. Due to the bottleneck, the earth retaining device is hardly used for construction work in urban areas. However, with the development of the retaining device of the present invention and a method of avoiding underground obstacles by using the retaining device, it is possible to use the retaining device even in an urban area where there are many underground obstacles. The construction period of burial work can be significantly reduced.

【図面の簡単な説明】[Brief description of the drawings]

【図1】 土留装置の断面図である。FIG. 1 is a sectional view of a retaining device.

【図2】 (a)〜(c)は土留装置の側面図である。FIGS. 2A to 2C are side views of the earth retaining device.

【図3】 地中障害物の回避工法1を説明する断面図で
ある。
FIG. 3 is a cross-sectional view illustrating a method 1 for avoiding an underground obstacle.

【図4】 地中障害物の回避工法1を説明する断面図で
ある。
FIG. 4 is a cross-sectional view illustrating an underground obstacle avoidance method 1.

【図5】 地中障害物の回避工法1を説明する断面図で
ある。
FIG. 5 is a cross-sectional view illustrating an underground obstacle avoidance method 1.

【図6】 地中障害物の回避工法2を説明する断面図で
ある。
FIG. 6 is a cross-sectional view illustrating a method 2 for avoiding an underground obstacle.

【図7】 地中障害物の回避工法2を説明する断面図で
ある。
FIG. 7 is a cross-sectional view illustrating an underground obstacle avoidance method 2.

【図8】 地中障害物の回避工法2を説明する断面図で
ある。
FIG. 8 is a cross-sectional view illustrating a method 2 for avoiding an underground obstacle.

【図9】 他の実施形態による回避工法の断面図であ
る。
FIG. 9 is a cross-sectional view of an avoidance method according to another embodiment.

【図10】 (a)〜(c)は従来の回避工法を説明す
る断面図である。
FIGS. 10A to 10C are cross-sectional views illustrating a conventional avoidance method.

【符号の説明】[Explanation of symbols]

P …地中障害物 X …埋設物 W1…通常作業領域 W2…回避作業領域 V …溝 1 …移動式土留装置 2 …矢板ユニット 4 …連結部材 5 …補助連結部材 P ... underground obstacle X ... buried object W1 ... normal work area W2 ... avoidance work area V ... groove 1 ... movable earth retaining device 2 ... sheet pile unit 4 ... connecting member 5 ... auxiliary connecting member

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 左右の矢板ユニットを連結部材で連結す
るとともにその矢板ユニット間の後方下部に管などの埋
設物を接続するための通常作業領域を形成し、さらに外
部の駆動手段又は自己の推進手段で溝内を移動するよう
にした移動式土留装置において、 矢板ユニット間の前方下部であって前記通常作業領域の
水平延長線上に着脱又は移動自在な補助連結部材を配設
し、その補助連結部材を外すか又は移動させることによ
り矢板ユニット間の前方下部に前記通常作業領域と矢板
ユニットの先端外部に通じる回避作業領域を形成するよ
うにしたことを特徴とする移動式土留装置。
An ordinary working area for connecting left and right sheet pile units with a connecting member and connecting a buried object such as a pipe to a lower rear portion between the sheet pile units, and further using external driving means or self-propelling. A movable earth retaining device adapted to move in a groove by means, wherein a detachable or movable auxiliary connecting member is disposed at a lower front part between sheet pile units and on a horizontal extension line of the normal working area, and the auxiliary connecting member is provided. A movable earth retaining device wherein a normal work area and an avoidance work area communicating with the outside of the tip of the sheet pile unit are formed in a lower front part between sheet pile units by removing or moving a member.
【請求項2】 請求項1記載の移動式土留装置を使用
し、次の〜の要件を備えてなることを特徴とする移
動式土留装置による地中障害物の回避工法。 地中障害物と交差するようにしてパワーシャベルなど
を使って埋設物用の溝を掘削する。 矢板ユニット間に補助連結部材を取り付けた状態で移
動式土留装置を前記溝の中で移動させ、地中障害物の直
前で止める。 停止状態で矢板ユニット間から補助連結部材を外すか
又は移動させて移動式土留装置の回避作業領域を開放す
る。 通常作業領域にある埋設物に次の埋設物をつなぎ合わ
せ、最終的に埋設物が回避作業領域を貫くようにする。 地中障害物の後ろに移動式土留装置が入る長さの溝を
掘り進める。 移動式土留装置を溝から引き抜いて地中障害物の上を
越えさせ、先に掘り進めた溝の中に降ろす。 移動式土留装置の前方下部に補助連結部材を戻して回
避作業領域を閉じる。 通常作業領域を使って埋設物をつなぎ合わせ、さらに
溝を掘り進めながら移動式土留装置を前進させる。
2. A method of avoiding underground obstacles by using a mobile earth retaining device, comprising using the mobile earth retaining device according to claim 1 and satisfying the following requirements. Excavate a trench for a buried object using a power shovel or the like so as to cross an underground obstacle. With the auxiliary connecting member attached between the sheet pile units, the movable earth retaining device is moved in the groove and stopped just before the underground obstacle. In the stopped state, the auxiliary connecting member is removed or moved from between the sheet pile units to open the avoidance work area of the movable earth retaining device. The next buried object is joined to the buried object in the normal work area so that the buried object finally passes through the avoidance work area. Dig a ditch long enough to accommodate a mobile retaining device behind an underground obstacle. The mobile earth retaining device is pulled out of the ditch, over the underground obstacle, and lowered into the previously dug ditch. The avoidance work area is closed by returning the auxiliary connecting member to the lower front part of the movable earth retaining device. The buried objects are connected using the normal work area, and the mobile retaining device is advanced while further digging a trench.
JP09187819A 1997-06-27 1997-06-27 Mobile earth retaining device and method of avoiding underground obstacles using the earth retaining device Expired - Fee Related JP3075397B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP09187819A JP3075397B2 (en) 1997-06-27 1997-06-27 Mobile earth retaining device and method of avoiding underground obstacles using the earth retaining device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP09187819A JP3075397B2 (en) 1997-06-27 1997-06-27 Mobile earth retaining device and method of avoiding underground obstacles using the earth retaining device

Publications (2)

Publication Number Publication Date
JPH1121894A true JPH1121894A (en) 1999-01-26
JP3075397B2 JP3075397B2 (en) 2000-08-14

Family

ID=16212800

Family Applications (1)

Application Number Title Priority Date Filing Date
JP09187819A Expired - Fee Related JP3075397B2 (en) 1997-06-27 1997-06-27 Mobile earth retaining device and method of avoiding underground obstacles using the earth retaining device

Country Status (1)

Country Link
JP (1) JP3075397B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104060615A (en) * 2014-06-05 2014-09-24 江苏省华建建设股份有限公司 Construction method utilizing newly-built supporting structure of foundation pit to eliminate underground obstacle

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104060615A (en) * 2014-06-05 2014-09-24 江苏省华建建设股份有限公司 Construction method utilizing newly-built supporting structure of foundation pit to eliminate underground obstacle

Also Published As

Publication number Publication date
JP3075397B2 (en) 2000-08-14

Similar Documents

Publication Publication Date Title
JPH0517946A (en) Excavating device for underground continuous wall
JPH07173835A (en) Excavator for underground continuous wall
JP3075397B2 (en) Mobile earth retaining device and method of avoiding underground obstacles using the earth retaining device
JPS6120118Y2 (en)
JPH08319618A (en) Civil engineering work device, excavator, sheathing device and civil engineering work method
KR101940812B1 (en) excavation method using propulsion of caisson
JPH0357248B2 (en)
JPH02274918A (en) Method of avoiding crossing buried thing in construction with open shield machine and open shield machine used therefor
JP6170408B2 (en) CD machine and CD machine installation stand
JP6842592B1 (en) Messel shield device and open pit construction method using it
JPH0248686B2 (en) DODOMEHOHOOYOBISONOSOCHI
JP2000110477A (en) Tunnel excavating device
JP6665326B1 (en) How to bury a sheet pile
JP2759445B2 (en) How to build underground structures
JPH08338022A (en) Method for movable type cut and cover earth-retaining construction and device therefor
JPH1046579A (en) Earth retaining work execution device and earth retaining method
JP2761516B2 (en) Circular sewer burial method by open shield and shield machine using it
JP3254614B2 (en) Excavator and control method thereof
JPH02161024A (en) Excavator with crane
JPH09156881A (en) Crane for pipe burying construction
JPH06336723A (en) Earth retaining device
JPS63125729A (en) Excavator for construction of underground continuous wall with movable guide
JPH0557031U (en) Middle folding new open shield machine
JPH01284694A (en) Open blade drilling machine and its reaction supporting device
JPS63161217A (en) Excavation work

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees