JPH1121823A - Execution structure of central separation zone - Google Patents

Execution structure of central separation zone

Info

Publication number
JPH1121823A
JPH1121823A JP17379697A JP17379697A JPH1121823A JP H1121823 A JPH1121823 A JP H1121823A JP 17379697 A JP17379697 A JP 17379697A JP 17379697 A JP17379697 A JP 17379697A JP H1121823 A JPH1121823 A JP H1121823A
Authority
JP
Japan
Prior art keywords
block
blocks
median strip
base
construction structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP17379697A
Other languages
Japanese (ja)
Inventor
Yukio Takahashi
幸雄 高橋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HAYASHIYA CONCRETE KOGYO KK
Original Assignee
HAYASHIYA CONCRETE KOGYO KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HAYASHIYA CONCRETE KOGYO KK filed Critical HAYASHIYA CONCRETE KOGYO KK
Priority to JP17379697A priority Critical patent/JPH1121823A/en
Publication of JPH1121823A publication Critical patent/JPH1121823A/en
Pending legal-status Critical Current

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide the execution structure of a central separation zone which can shorten a term of work by far in comparison with a usual term and execute a work more simply and with an excellent outward appearance. SOLUTION: A hardened ground leveling layer 3 is executed in the execution area of a central separation zone, and flat plate-shaped foundation blocks 2 are spreadly provided on the ground leveling layer 3 along roadways on both sides in mutually parallel arrangement, and separation zone blocks 1 are arrangedly spread on each parallel foundation block 2. The adjacent foundation blocks 2 and the adjacent separation zone blocks are desirably mutually connected, and in addition, a joint between the foundation blocks 2 and a joint between the separation zone blocks are also desirable to be arranged at different positions.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】この発明は、道路における中
央分離帯の施工構造に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a construction structure of a median strip on a road.

【0002】[0002]

【従来の技術】従来の中央分離帯は、図10及び図11
で示すように施工されている。先ず両側の車道a,aの
間を当該車道a,aに沿って溝状に掘削し、この掘削部
分の底部には砕石や砂利を敷いて固めた整地層3を施工
した後、基礎コンクリート層70を打設する。
2. Description of the Related Art A conventional median strip is shown in FIGS.
It is constructed as shown by. First, a groove is excavated between the roads a, a on both sides along the roads a, a ground leveling layer 3 hardened by laying crushed stone or gravel is formed at the bottom of the excavated portion, and then the foundation concrete layer is formed. 70 is cast.

【0003】基礎コンクリート層70が凝固した後、こ
の基礎コンクリート層70の上に分離帯ブロック7,7
を所定の間隔離して平行に連続して敷設する。この際、
基礎コンクリート層70と各分離帯ブロック7との間に
は、砂とセメントを混ぜた空モルタル層を介在させる。
長さ方向に並ぶ分離帯ブロック7相互は目地モルタル7
2によって連結させる。平行な各分離帯ブロック7のそ
れぞれの車道a側の側部には、当該分離帯ブロック7と
平行に所定間隔離して型枠板73をそれぞれ設置し、各
分離帯ブロック7と前記型枠板73との間にほぼ均一な
厚みのエプロンコンクリート71を打設する。
[0003] After the foundation concrete layer 70 has solidified, a separator block 7, 7 is placed on the foundation concrete layer 70.
Are continuously laid in parallel with a predetermined interval. On this occasion,
An empty mortar layer containing a mixture of sand and cement is interposed between the foundation concrete layer 70 and each of the separation zone blocks 7.
Separation blocks 7 arranged in the longitudinal direction are jointed with mortar 7
Connect by two. Form plates 73 are respectively installed on the side portions of the respective parallel strip blocks 7 on the side of the road a in parallel with and separated from the separated strip blocks 7 by a predetermined distance. The apron concrete 71 having a substantially uniform thickness is cast between the apron concrete 71 and the apron concrete 73.

【0004】前記エプロンコンクリート71の上面はこ
てにより仕上げする。そして、エプロンコンクリート7
1が凝固したならば、型枠板73を取り外し、車道aと
各エプロンコンクリート71との間に図示しない砕石や
砂利を詰めて固め、その上に図示しないアスファルトな
どで覆っている。
[0004] The upper surface of the apron concrete 71 is finished with a trowel. And apron concrete 7
When 1 is solidified, the form plate 73 is removed, crushed stone or gravel (not shown) is packed between the roadway a and each apron concrete 71 and solidified, and then covered with asphalt (not shown).

【0005】[0005]

【発明が解決しようとする課題】前述した従来の中央分
離帯の施工構造によれば、基礎コンクリート層70が凝
固するまでに数日間(約一週間)、エプロンコンクリー
ト71が凝固するまでにさらに数日間(約一週間)要す
るので、長い工事期間が必要であった。また、基礎コン
クリート70やエプロンコンクリート71が凝固するま
では、適当な保護具でそれらのコンクリート打設領域を
囲み、それらが凝固するまで当該コンクリートを保護す
る必要があった。さらに、打設したコンクリート層は前
述のように凝固するまでに長時間を要し、その間車両通
行の妨げになるなどの問題があった。
According to the conventional construction structure of the median strip described above, several days (about one week) until the foundation concrete layer 70 solidifies, and several more days until the apron concrete 71 solidifies. Days (about one week), a long construction period was required. Until the foundation concrete 70 and the apron concrete 71 solidify, it is necessary to surround the concrete casting area with an appropriate protective device and protect the concrete until they solidify. Further, as described above, it takes a long time for the poured concrete layer to solidify, and during that time, there is a problem in that it hinders vehicle traffic.

【0006】この発明の目的は、従来の施工構造に比べ
て工事期間をはるかに短縮することができるとともに、
より簡単にかつ外観よく施工することができる中央分離
帯の施工構造を提供することにある。
An object of the present invention is to significantly shorten the construction period as compared with the conventional construction structure,
An object of the present invention is to provide a construction structure of a median strip which can be constructed more easily and with good appearance.

【0007】[0007]

【課題を解決するための手段】この発明による中央分離
帯の施工構造は、前述の目的を達成するために以下のよ
うに構成したものである。すなわち、この発明による請
求項1に記載の中央分離帯の施工構造は、中央分離帯の
施工領域に整地層3を施工し、前記整地層3の上に平板
状の基礎ブロック2を両側の車道に沿って平行に並べて
敷設し、前記平行な各基礎ブロック2の上に分離帯ブロ
ック1を並べて敷設したことを特徴としている。
The construction structure of the median strip according to the present invention is constructed as follows to achieve the above-mentioned object. That is, in the construction structure of the median strip according to claim 1 of the present invention, the leveling layer 3 is constructed in the construction area of the median strip, and the flat base block 2 is placed on the road leveling layer 3 on the leveling layer 3. And the separator blocks 1 are arranged and laid on each of the parallel basic blocks 2.

【0008】請求項2に記載の中央分離帯の施工構造
は、請求項1の施工構造において、前記基礎ブロック2
と前記分離帯ブロック1との間には砂とセメントとを混
ぜた空モルタル層4を介在させたことを特徴としてい
る。
[0008] The construction structure of the median strip according to claim 2 is the construction structure of claim 1, wherein the foundation block 2.
An empty mortar layer 4 in which sand and cement are mixed is interposed between the separator block 1 and the separator block 1.

【0009】請求項3に記載の中央分離帯の施工構造
は、請求項1又は2の施工構造において、基礎ブロック
2相互の継ぎ目と分離帯ブロック1相互の継ぎ目とを異
なる位置に配置したものである。
According to a third aspect of the present invention, in the construction of the first or second aspect, the seam between the base blocks 2 and the seam between the separation block 1 are arranged at different positions. is there.

【0010】請求項4に記載の中央分離帯の施工構造
は、請求項1〜3のいずれかに記載の施工構造におい
て、隣合う基礎ブロック2相互及び隣合う分離帯ブロッ
ク1相互を連結したことを特徴としている。ブロック
2,2相互又はブロック1,1相互を連結するには、例
えばブロックの両端部において、それらを成型するとき
に当該ブロックの側部にナットを埋め込んでおき、それ
らのブロックを並べるとき、隣合うブロック相互の端部
に座金を兼ねた連結板を介して前記ナットにボルトをネ
ジ締める。ただし、他の手段によって連結してもよい。
According to a fourth aspect of the present invention, there is provided the construction of the median strip according to any one of the first to third aspects, wherein the adjacent base blocks 2 and the adjacent divider blocks 1 are connected to each other. It is characterized by. In order to connect the blocks 2 and 2 or the blocks 1 and 1 to each other, for example, at the both ends of the block, a nut is embedded in the side of the block when molding them, and when arranging the blocks, it is adjacent. A bolt is screwed to the nut via a connecting plate also serving as a washer at the end of each matching block. However, they may be connected by other means.

【0011】請求項5に記載の中央分離帯の施工構造
は、請求項1〜4のいずれかに記載の施工構造におい
て、基礎ブロック2とその上の分離帯ブロック1とは一
方の少なくとも一部が他方へ嵌まっていることを特徴と
している。
According to a fifth aspect of the present invention, there is provided a construction of a median strip according to any one of the first to fourth aspects, wherein the base block 2 and the divider block 1 thereon are at least partially one of one. Are fitted to the other.

【0012】請求項6に記載の中央分離帯の施工構造
は、請求項1〜5のいずれかに記載の施工構造におい
て、中央分離帯の端部では、前記平行な基礎ブロック
2,2の端部は平面U字状の端部基礎ブロック2aによ
って連続させ、前記平行な分離帯ブロック1,1の端部
は前記端部基礎ブロック2aの上に敷設された平面U字
状の端部分離帯ブロック1aによって連続させたことを
特徴としている。
According to a sixth aspect of the present invention, in the construction structure of the median strip according to any one of the first to fifth aspects, at the end of the median strip, the end of the parallel base blocks 2 is provided. The ends are connected by a plane U-shaped end base block 2a, and the ends of the parallel separation block 1, 1 are flat U-shaped end separation bands laid on the end base block 2a. It is characterized by being continuous by the block 1a.

【0013】[0013]

【発明の実施の形態】図1〜図9を参照しながら、この
発明による中央分離帯の施工構造の好ましい実施形態を
説明する。 第1実施形態 図1〜図7には第1実施形態の中央分離帯の施工構造が
示されている。図1は中央分離帯の施工構造の要部を示
す部分斜視図、図2は図1の施工構造の部分拡大断面
図、図3は基礎ブロック相互の連結部の部分拡大断面
図、図4は連結部における埋め込みナットの拡大斜視
図、図5は分離帯ブロックの部分拡大斜視図、図6は中
央分離帯の端部の施工構造を示す部分平面図、図7は図
6の矢印A─Aに沿う部分断面図である。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS A preferred embodiment of a construction structure of a median strip according to the present invention will be described with reference to FIGS. First Embodiment FIGS. 1 to 7 show a construction structure of a median strip according to a first embodiment. 1 is a partial perspective view showing a main part of the construction structure of the median strip, FIG. 2 is a partially enlarged sectional view of the construction structure of FIG. 1, FIG. 3 is a partially enlarged sectional view of a connecting portion between the basic blocks, and FIG. FIG. 5 is a partially enlarged perspective view of the separation band block, FIG. 6 is a partial plan view showing the construction of the end of the central separation band, and FIG. 7 is an arrow AA in FIG. FIG.

【0014】図1及び図2のように、先ず車道a,aの
間の分離帯施工領域は車道aに沿っ平行な溝状に掘削さ
れ、掘削部分には砕石又は砂利を敷いて上面が平らにな
るように固めた整地層3を施工する。次いで、前述のよ
うに施工された整地層3の上面には、車道aに沿って互
いに平行するように平板状の基礎ブロック2が二列状に
並べて敷設する。隣合う基礎ブロック2相互の両端部
は、これらの基礎ブロック2を並べる際に長さ方向の両
側に面する部分において連結される。
As shown in FIGS. 1 and 2, first, a separation zone construction area between the roads a, a is excavated in a groove shape parallel to the road a, and crushed stone or gravel is laid on the excavated portion so that the upper surface is flat. The ground leveling layer 3 which is hardened so as to be constructed. Next, flat base blocks 2 are laid in two rows on the upper surface of the terrain layer 3 constructed as described above so as to be parallel to each other along the road a. Both end portions of the adjacent basic blocks 2 are connected at portions facing both sides in the length direction when the basic blocks 2 are arranged.

【0015】図3で拡大して示すように、各基礎ブロッ
ク2の両端部の両側に面する部分には、両側方へ向くよ
うに凹部50が形成され、この凹部50の底部には袋状
のナット51が埋め込まれている。このナット51の材
質は高密度ポリエチレンであり、その外周には周方向及
び長さ方向に補強リブ52が形成されている。そして、
基礎ブロック2相互を連結するときは、前記凹部50に
挿入された座金を兼ねる金属製の連結板5aを介して、
前記ナット51にボルト5をネジ込む要領で施工する。
As shown in an enlarged manner in FIG. 3, concave portions 50 are formed on both sides of both ends of each basic block 2 so as to face both sides. Nut 51 is embedded. The material of the nut 51 is high-density polyethylene, and a reinforcing rib 52 is formed on the outer periphery in the circumferential direction and the length direction. And
When connecting the basic blocks 2 to each other, a metal connecting plate 5a also serving as a washer inserted into the recess 50 is used.
The bolts 5 are screwed into the nuts 51.

【0016】前述のように敷設された基礎ブロック2の
上には、水を加えないで砂とセメントとを所定の割合で
混ぜた厚さ20mm程度の空モルタル層4が敷かれ、この
空モルタル層4の上には分離帯ブロック1が一列状に並
べた状態で敷設される。分離帯ブロック1を敷設する
と、前記空モルタル層4は分離帯ブロック1の重みによ
り10mm程度の厚さに圧縮される。前述のように、基礎
ブロック2の上に空モルタル層4を介在させて分離帯ブ
ロック1を敷設することにより、分離帯ブロック1の底
面の凹凸が調整されてその据わりがよくなる。すなわ
ち、分離帯ブロック1はプレキャスト材であって、天地
を逆にした状態で成型され、成型時に上になる底面が多
少凹凸になっているので、前記空モルタル層4を敷くこ
とにより分離帯ブロック1の底面の凹凸を調整してその
据わりをよくするのである。
On the foundation block 2 laid as described above, an empty mortar layer 4 having a thickness of about 20 mm in which sand and cement are mixed at a predetermined ratio without adding water is laid. The separator strips 1 are laid on the layer 4 in a state of being arranged in a line. When the separation band block 1 is laid, the empty mortar layer 4 is compressed to a thickness of about 10 mm by the weight of the separation band block 1. As described above, by laying the separation band block 1 on the base block 2 with the empty mortar layer 4 interposed therebetween, the unevenness on the bottom surface of the separation band block 1 is adjusted, and the standing is improved. That is, the separator block 1 is a precast material, is formed in a state where the top and bottom are reversed, and the bottom surface which becomes upper at the time of molding is slightly uneven. The unevenness of the bottom surface of 1 is adjusted to improve its installation.

【0017】各分離帯ブロック1には、図5のように図
3で示した基礎ブロック2におけると同様な位置に同様
な凹部50が形成され、この凹部50には同様な袋状の
ナット51がそれぞれ埋め込まれている。したがって分
離帯ブロック1相互は、基礎ブロック2相互と同様に連
結板5aとボルト5,5によって連結される。各分離帯
ブロック1の一端部上面には、鉤状に目地用切り欠き1
1が形成されており、分離帯ブロック1を前述のように
並べて敷設する際、前記目地用切り欠き11には、例え
ばポリプロピレン製の弾性多孔材料からなる目地材12
が詰められる。
As shown in FIG. 5, each separation strip block 1 is formed with a similar recess 50 at a position similar to that of the base block 2 shown in FIG. Are embedded respectively. Therefore, the separation strip blocks 1 are connected to each other by the connecting plates 5 a and the bolts 5, similarly to the base blocks 2. On the upper surface of one end of each separation strip block 1, a joint cutout 1
When the separation band blocks 1 are laid side by side as described above, the joint cutouts 11 are provided with joint materials 12 made of, for example, an elastic porous material made of polypropylene.
Is packed.

【0018】分離帯ブロック1と基礎ブロック2は同じ
平面形状,同じ平面サイズであり、各分離帯ブロック1
には、車道aに向かってエプロン部10が一体に形成さ
れている。基礎ブロック2相互の継ぎ目と分離帯ブロッ
ク1相互の継ぎ目は、異なる位置に配置されるように施
工され、好ましくは長さ方向に沿って互い違いに位置す
るように施工される。このような施工により、表面に表
れる分離帯ブロック1相互間に不陸(凹凸や段差)が生
じるのを防止することができる。基礎ブロック2,分離
帯ブロック1及び後述の端部基礎ブロック2a,端部分
離帯ブロック1aには、成型時に図示しない鉄筋が縦横
に配筋される。
The separation block 1 and the base block 2 have the same plane shape and the same plane size.
, An apron portion 10 is integrally formed toward the road a. The seams between the base blocks 2 and the seam blocks 1 are constructed so as to be arranged at different positions, and are preferably constructed so as to be staggered along the longitudinal direction. By such a construction, it is possible to prevent unevenness (unevenness or level difference) between the separation band blocks 1 appearing on the surface. Reinforcing bars (not shown) are arranged vertically and horizontally on the base block 2, the separation band block 1, and the end base blocks 2a and the end separation block 1a to be described later.

【0019】基礎ブロック2及び分離帯ブロック1の端
部に形成された凹部50へ埋め込まれているナット51
には、工場における保管や野積み保管中内部にホコリや
砂その他の異物が入るのを防止するため、図4のように
ネジキャップ5bによって蓋をしておくのが好ましい。
この実施形態においては、前記埋め込み状のナット51
は、小型クレーンやホイストを搭載した図示しない運搬
機により、各ブロック1,2を吊り下げて運搬したり移
動させたりするため、図示しないアイボルトやフックボ
ルトの取付部を兼ねている。
Nuts 51 embedded in recesses 50 formed at the ends of base block 2 and separator block 1
In order to prevent dust, sand and other foreign matter from entering the inside during storage in a factory or storage in a pile, it is preferable to cover with a screw cap 5b as shown in FIG.
In this embodiment, the embedded nut 51
Is used as a mounting part for eye bolts and hook bolts (not shown) because the blocks 1 and 2 are suspended and transported or moved by a transporter (not shown) equipped with a small crane or hoist.

【0020】中央分離帯は、車両がUターンしたりその
道路から他の道路へ移動したりする場合の便宜のため
に、所要の部分で所定長さ範囲にわたって途切れた状態
に施工される。このような場合には、図6及び図7で示
すように、前述の要領で平行状に連続敷設された基礎ブ
ロック2,2及び分離帯ブロック1,1相互の端部は、
断面形状及び断面サイズが各ブロック2,1と同じで、
平面U字状に成型された端部基礎ブロック2a及び端部
分離帯ブロック1aによってそれぞれ連続させる。すな
わち、端部基礎ブロック2aの端部両側面及び端部分離
帯ブロック1aの端部両側面には、基礎ブロック2の端
部両側面及び分離帯ブロック1の端部両側面と同様な凹
部50が形成され、当該凹部50の底部にはナット51
と同様な袋状のナットが埋め込まれている。したがっ
て、各基礎ブロック2,2の端部と端部基礎ブロック2
aのそれぞれ対応する端部、及び、各分離帯ブロック
1,1と端部分離帯ブロック1aのそれぞれ対応する端
部は、各連結板5aとボルト5,5によってそれぞれ連
結される。前記端部基礎ブロック2aは当該部分に施工
された整地層3の上に敷設され、端部基礎ブロック2a
の上には、空モルタル層4を介して端部分離帯ブロック
1aが敷設される。
The median strip is constructed in a state where the vehicle makes a U-turn or moves from the road to another road, and is cut off at a required portion over a predetermined length range. In such a case, as shown in FIG. 6 and FIG. 7, the ends of the base blocks 2 and 2 and the separation block 1, which are continuously laid in parallel in the manner described above,
The cross-sectional shape and cross-sectional size are the same as each block 2 and 1,
The end base block 2a and the end separator block 1a formed into a flat U shape are connected to each other. That is, the recess 50 similar to the both sides of the end of the base block 2 and the both sides of the end of the separator block 1 is provided on both sides of the end of the end base block 2a and both sides of the end of the separator strip block 1a. Is formed, and a nut 51 is provided at the bottom of the concave portion 50.
A bag-shaped nut similar to the above is embedded. Therefore, the end of each basic block 2, 2 and the end basic block 2
The corresponding end portions of a and the corresponding end portions of the separation strip blocks 1 and 1 and the end separation strip block 1a are connected by the connection plates 5a and the bolts 5 and 5, respectively. The end base block 2a is laid on the leveling layer 3 constructed in the relevant part, and the end base block 2a
On top of this, an end separator block 1a is laid via an empty mortar layer 4.

【0021】基礎ブロック2と端部基礎ブロック2aの
継ぎ目と、分離帯ブロック1と端部分離帯ブロック1a
の継ぎ目とを異なる位置に配置させるため、図7のよう
に端部基礎ブロック2aの端部は、端部分離帯ブロック
1aの端部よりも長く形成されている。端部分離帯ブロ
ック1aと端部基礎ブロック2aの円弧部突端には、各
ブロック2,1の凹部50のナット51と同様な構造の
袋状のナット6が外周向きに埋め込まれ、通常は前記ナ
ット6に図示しないネジキャップを被せておき、必要な
場合には、前記ネジキャップを外して前記ナット6へ図
示しないアイボルトやフックボルトを取り付け、当該ブ
ロック1a,2aを吊り下げて運搬することができるよ
うに構成されている。
The joint between the base block 2 and the end base block 2a, the separation block 1 and the end separation block 1a
7, the end of the end base block 2a is formed longer than the end of the end separator block 1a as shown in FIG. A bag-shaped nut 6 having the same structure as the nut 51 of the concave portion 50 of each of the blocks 2 and 1 is embedded in the arc-shaped protruding end of the end separation band block 1a and the end base block 2a in an outer circumferential direction. The nut 6 is covered with a screw cap (not shown). If necessary, the screw cap is removed, an eye bolt or a hook bolt (not shown) is attached to the nut 6, and the blocks 1a and 2a are suspended and transported. It is configured to be able to.

【0022】以上のように、基盤となる整地層3の上に
基礎ブロック2及び分離帯ブロック1を並べながら重ね
て平行に敷設し、端部基礎ブロック2a及び端部分離帯
ブロック1aにより、終端の基礎ブロック2,2及び終
端の分離帯ブロック1,1相互を連結することにより、
中央分離帯の施工の基本部分は完了する。その後、重な
っている各ブロック2,1の両側の掘削空間へ図示しな
い砕石や砂利を詰めて固め、車道a側の上面を図示しな
いアスファルトなどを盛って固めるとともに、平行な各
分離帯ブロック1,1の間に適当な高さのフェンスを施
工し、あるいは、両者間に生け垣などの植え込むことに
よって中央分離帯の施工はすべて完了する。
As described above, the base block 2 and the separation block 1 are arranged side by side on the leveling layer 3 serving as a base, and are laid in parallel with each other. The end block 2a and the end separation block 1a terminate the base block 2 and the separation band block 1a. By connecting the basic blocks 2 and 2 and the separation block 1 and 1 at the end,
The basic part of the construction of the median strip is completed. Thereafter, crushed stones and gravel (not shown) are packed into the excavation spaces on both sides of the overlapping blocks 2 and 1 and solidified, and the upper surface on the side of the roadway a is packed with asphalt and the like (not shown). The construction of the median strip is completed by constructing a fence of an appropriate height between the two or by implanting a hedge between the two.

【0023】前述の実施形態の施工構造によれば、施工
の際に生コンクリートの打設を要しないので、従来の施
工構造に比べて施工がはるかに簡単であるとともに、生
コンクリート打設部分の凝固期間を必要としないので、
従来の施工構造と比べて工期がはるかに短縮される。中
央分離帯の施工や補修工事を夜間に行う場合にも、ほと
んど一夜で完了させることができるとともに、生コンク
リート打設部分の保護養生などの作業を必要としない。
According to the construction structure of the above-described embodiment, it is not necessary to pour ready-mixed concrete at the time of construction. Since it does not require a coagulation period,
The construction period is much shorter than the conventional construction structure. Even when the construction and repair work of the median strip is performed at night, it can be completed almost overnight, and there is no need for work such as protection and curing of the ready-mixed concrete placing portion.

【0024】基礎ブロック2と分離帯ブロック1の長さ
を同じにし、これらを車道に沿って互い違いに配置した
ので、より施工し易く、かつ表側の分離帯ブロックの不
陸(凸凹や段差)が生じにくい。
Since the base block 2 and the separator block 1 have the same length and are arranged alternately along the roadway, the construction is easier and the unevenness (unevenness or step) of the front separator block is reduced. It is unlikely to occur.

【0025】隣合う基礎ブロック2相互及び隣合う分離
帯ブロック1相互を連結したので、例えばブロック2,
1を並べた状態で敷設しながら連結することによって、
既に敷設したブロック2,1が動きにくくなり、要領よ
くかつより円滑に施工することができる。各基礎ブロッ
ク2及び各分離帯ブロック1のナット51は、アイボル
トやフックボルト等の取付部を兼ねているので、前記ナ
ット51へアイボルトやフックボルトを取り付けること
により、各ブロック2,1の取扱いや運搬を容易し、そ
れらの敷設施工や撤去作業の際非常に便利である。ま
た、端部基礎ブロック2aや端部分離帯ブロック1aの
円弧部突端にナット6を埋め込んだので、前記ナット6
へアイボルトやフックボルトを取り付けることにより、
各ブロック2a,1aの取扱いや運搬を容易し、それら
の敷設施工や撤去作業の際非常に便利である。
Since the adjacent basic blocks 2 and the adjacent separation band blocks 1 are connected, for example,
By connecting while laying the 1 side by side,
The blocks 2 and 1 that have already been laid are less likely to move, so that the blocks can be constructed more smoothly and smoothly. The nuts 51 of each of the base blocks 2 and each of the separation band blocks 1 also serve as mounting portions for eye bolts, hook bolts, and the like. It is easy to transport and very convenient for laying and removing them. Further, since the nut 6 is embedded in the arc-shaped protruding end of the end base block 2a or the end separation block 1a, the nut 6
By attaching eyebolts and hook bolts,
The blocks 2a and 1a are easily handled and transported, and are very convenient for laying and removing the blocks.

【0026】従来の施工構造において、エプロンコンク
リート71を打設して上面をこて仕上げする際、モルタ
ル中の粒子が小さく比重の大きいセメントの部分が下層
に沈み易いので、表面が粗になって外観が劣る。これに
対し、この実施形態の分離帯ブロック1のようなプレキ
ャスト材は、その成型の際天地を逆にして成型され、粒
子の小さいセンメントの部分がより多く上面に表れるの
で、この実施形態の施工構造は従来の施工構造に比べ外
観がはるかに綺麗になる。
In the conventional construction structure, when the apron concrete 71 is cast and the upper surface is trowel-finished, the cement particles having small particles in the mortar and having a large specific gravity easily sink into the lower layer, so that the surface becomes rough. Poor appearance. On the other hand, the precast material such as the separator block 1 of this embodiment is molded upside down during molding, and more of the small particle portion appears on the upper surface. The structure is much cleaner in appearance than the conventional construction.

【0027】その他の実施形態 図8及び図9には他の実施形態が示されている。図7の
基礎ブロック2の上面には凹部20が形成され、この凹
部20内に空モルタル層4を敷き、その上に分離帯ブロ
ック1を並べて敷設すると、分離帯ブロック1が空モル
タル層4内にやや沈んでその底部が前記凹部20へ嵌ま
るように構成されている。図の基礎ブロック2の両側縁
22の高さはほぼ同じであって、空モルタル層4を前記
を凹部20に敷くときに、棒や板からなる図示しない引
きならしを両側縁22に接触させて引きならすことによ
り、空モルタル層4の上面を簡単かつ均一にならすこと
ができるようになっている。図9の実施形態の分離帯ブ
ロック1の底面には凹部13が形成され、基礎ブロック
2の上面には施工後に前記凹部13に嵌まるように凸部
21が形成されている。
Another Embodiment FIGS. 8 and 9 show another embodiment. A concave portion 20 is formed on the upper surface of the basic block 2 in FIG. 7. An empty mortar layer 4 is laid in the concave portion 20, and the separator block 1 is laid on the empty mortar layer 4. It is configured so that it sinks slightly and its bottom fits into the recess 20. The height of both side edges 22 of the basic block 2 in the figure is substantially the same, and when the empty mortar layer 4 is laid in the concave portion 20, a not-shown drawing made of a rod or a plate is brought into contact with the both side edges 22. The upper surface of the empty mortar layer 4 can be easily and uniformly leveled by smoothing. A recess 13 is formed on the bottom surface of the separator block 1 in the embodiment of FIG. 9, and a protrusion 21 is formed on the upper surface of the base block 2 so as to fit into the recess 13 after construction.

【0028】図8及び図9実施形態では、基礎ブロック
2とその上の分離帯ブロック1とが、一方が他方へ嵌ま
り合うようになっているので、分離帯ブロック1へ施工
中に側方より外力が加わった場合でも、分離帯ブロック
1と基礎ブロック2とがずれるのを防止することができ
る。
In the embodiment shown in FIGS. 8 and 9, one of the base block 2 and the separator block 1 on the base block 2 fits into the other. Even when more external force is applied, it is possible to prevent the separation block 1 and the base block 2 from shifting.

【0029】この発明による中央分離帯の施工構造にお
いては、基礎ブロック2とその上の分離帯ブロック1と
を連結するように構成することができる。連結の具体的
手段は、第1実施形態の場合とほぼ同様に構成すること
ができる。このように、基礎ブロック2とその上の分離
帯ブロック1とを互いに連結すれば、例えば基礎ブロッ
ク2と分離帯ブロック1とを重ねて並べた状態で敷設し
ながら、上下のブロック1,2相互を連結することによ
って、既に敷設した上下のブロック1,2が動きにくく
なり、一層要領よくかつ円滑に施工することができる。
In the construction structure of the median strip according to the present invention, it is possible to connect the foundation block 2 and the median strip block 1 thereon. The specific means of connection can be configured in substantially the same manner as in the first embodiment. As described above, if the base block 2 and the separator block 1 on the base block 2 are connected to each other, for example, while laying the base block 2 and the separator band block 1 in an overlapping state, By connecting, the upper and lower blocks 1 and 2 which have already been laid are less likely to move, and the construction can be performed more conveniently and smoothly.

【0030】この発明において、ブロック1相互又はブ
ロック2相互の連結手段は前述の構成に限定されない。
例えば、隣合うブロック1(又は2)相互が、凹凸によ
って嵌合している場合でも差し支えない。
In the present invention, the means for connecting the blocks 1 or 2 is not limited to the above-described structure.
For example, there is no problem even if the adjacent blocks 1 (or 2) are fitted by unevenness.

【0031】[0031]

【発明の効果】この発明による請求項1に記載の施工構
造によれば、施工の際に生コンクリートの打設を要しな
いので、従来の施工構造に比べて施工がはるかに簡単で
あるとともに、生コンクリート打設部分の凝固期間を必
要としないので、従来の施工構造に比べて工期がはるか
に短縮される。中央分離帯の施工や補修工事を夜間に行
う場合にも、ほとんど一夜で完了させることができると
ともに、生コンクリート打設部分の保護養生などの作業
を必要としない。従来の施工構造において、エプロンコ
ンクリート71を打設して上面をこて仕上げする際、粒
子が小さく比重の大きいセメントの部分が下層に沈み易
いので、上面が粗になって外観が劣る。これに対し、請
求項1における分離帯ブロック1のようなプレキャスト
材は、その成型の際天地を逆にして成型され、粒子の小
さいセンメントの部分がより多く上面に表れるので、こ
の実施形態の施工構造は従来の施工構造に比べ外観がは
るかに綺麗になる。
According to the construction structure according to the first aspect of the present invention, since it is not necessary to pour ready-mixed concrete at the time of construction, the construction is much simpler than the conventional construction structure. Since the solidification period of the ready-mixed concrete is not required, the construction period is much shorter than in the conventional construction. Even when the construction and repair work of the median strip is performed at night, it can be completed almost overnight, and there is no need for work such as protection and curing of the ready-mixed concrete placing portion. In the conventional construction structure, when the apron concrete 71 is cast and the upper surface is trowel-finished, a portion of cement having a small particle and a large specific gravity easily sinks in a lower layer, so that the upper surface is roughened and the appearance is inferior. On the other hand, the precast material such as the separator block 1 in claim 1 is molded upside down during molding, and a larger number of small particle portions appear on the upper surface. The structure is much cleaner in appearance than the conventional construction.

【0032】請求項2に記載の施工構造によれば、基礎
ブロック2と分離帯ブロック1との間に空モルタル層4
を介在させたので、プレキャスト材である分離帯ブロッ
ク1の底面に多少凹凸があってもその凹凸が吸収される
とともに、分離帯ブロック1の据わりがよくなる。
According to the construction structure of the second aspect, the empty mortar layer 4 is provided between the base block 2 and the separation block 1.
Therefore, even if there is some unevenness on the bottom surface of the separation band block 1 which is a precast material, the unevenness is absorbed and the separation band block 1 can be set well.

【0033】請求項3に記載の施工構造によれば、基礎
ブロック2相互の継ぎ目と分離帯ブロック1相互の継ぎ
目は、異なる位置に配置されるように施工されているの
で、分離帯ブロック1相互間に不陸(凹凸や段差)が生
じるのを防止し、体裁良く施工することができる。
According to the construction structure of the third aspect, the joint between the base blocks 2 and the joint between the separation band blocks 1 are constructed so as to be arranged at different positions. It is possible to prevent unevenness (unevenness or level difference) from occurring between them, and it is possible to carry out the work in a good format.

【0034】請求項4に記載の施工構造によれば、隣合
う基礎ブロック2相互及び隣合う分離帯ブロック1相互
を連結したので、例えばブロック2,1を並べた状態で
敷設しながら連結することによって、既に敷設したブロ
ック2,1が動きにくくなり、要領よくかつより円滑に
施工することができる。
According to the construction structure of the fourth aspect, since the adjacent base blocks 2 and the adjacent separation block 1 are connected to each other, for example, the blocks 2 and 1 are connected while being laid in a line. This makes it difficult for the already laid blocks 2 and 1 to move, so that the blocks 2 and 1 can be constructed satisfactorily and smoothly.

【0035】請求項5に記載の施工構造によれば、基礎
ブロック2とその上の分離帯ブロック1とを、一方の少
なくとも一部が他方へ嵌まり合うように構成したので、
施工中に分離帯ブロック1が側圧を受けてた場合でも、
基礎ブロック2と分離帯ブロックとがずれなくなる。
According to the construction structure of the fifth aspect, the base block 2 and the separator block 1 on the base block 2 are configured such that at least one of them fits into the other.
Even if the separator block 1 receives side pressure during construction,
The base block 2 and the separator block do not shift.

【0036】請求項6に記載の施工構造によれば、中央
分離帯の端部において、前記平行な基礎ブロック2,2
の端部は平面U字状の端部基礎ブロック2aによって連
続し、前記平行な分離帯ブロック1,1の端部は前記端
部基礎ブロック2aの上に敷設された平面U字状の端部
分離帯ブロック1aによって連続したので、端部を体裁
よく、容易かつ簡単に仕上げることができる。
[0036] According to the construction structure of the sixth aspect, at the end of the median strip, the parallel foundation blocks 2 and 2 are arranged.
Are connected by a flat U-shaped end base block 2a, and the ends of the parallel separation strip blocks 1, 1 are flat U-shaped ends laid on the end base block 2a. Since the end portion is continuous by the separation band block 1a, the end portion can be finished easily, easily and easily.

【図面の簡単な説明】[Brief description of the drawings]

【図1】第1実施形態の中央分離帯の施工構造の要部を
示す部分斜視図である。
FIG. 1 is a partial perspective view showing a main part of a construction structure of a median strip according to a first embodiment.

【図2】図1の施工構造の部分拡大断面図である。FIG. 2 is a partially enlarged sectional view of the construction structure of FIG.

【図3】図1の施工構造における基礎ブロック相互の連
結部の部分拡大断面図である。
FIG. 3 is a partially enlarged cross-sectional view of a connecting portion between foundation blocks in the construction structure of FIG. 1;

【図4】図1の施工構造におけるブロック相互の連結部
における埋め込みナットの拡大斜視図である。
FIG. 4 is an enlarged perspective view of an embedded nut in a connection portion between blocks in the construction structure of FIG. 1;

【図5】図1の施工構造における分離帯ブロックの部分
拡大斜視図である。
FIG. 5 is a partially enlarged perspective view of a divider block in the construction structure of FIG. 1;

【図6】中央分離帯の端部の施工構造を示す部分平面図
である。
FIG. 6 is a partial plan view showing the construction structure at the end of the median strip.

【図7】図6の矢印A─Aに沿う部分断面図である。FIG. 7 is a partial sectional view taken along arrow AA of FIG. 6;

【図8】他の実施形態において、基礎ブロックと分離帯
ブロックとの重なり状態を示す側面図である。
FIG. 8 is a side view showing an overlapping state of a base block and a separator block in another embodiment.

【図9】さらに他の実施形態において、基礎ブロックと
境界ブロックとの重なり状態の他の例を示す側面図であ
る。
FIG. 9 is a side view showing another example of the overlapping state of the basic block and the boundary block in still another embodiment.

【図10】従来の中央分離帯の施工状態の部分断面図で
ある。
FIG. 10 is a partial sectional view of a conventional median strip in an installed state.

【図11】従来の中央分離帯の施工構想を示す部分斜視
図である。
FIG. 11 is a partial perspective view showing a construction concept of a conventional median strip.

【符号の説明】[Explanation of symbols]

1 分離帯ブロック 1a 端部分離帯ブロック 10,10a エプロン部 11,11a 目地用切り欠き部 12 目地材 13 凹部 2 基礎ブロック 2 端部基礎ブロック 20 凹部 21 凸部 3 整地層 4 空モルタル層 5 ボルト 5a 連結板 5b ネジキャップ 50 凹部 51 ナット 52 補強リブ 6 ナット 7 分離帯ブロック 70 基礎コンクリート層 71 エプロンコンクリート 72 目地モルタル 73 型枠板 a 車道 DESCRIPTION OF SYMBOLS 1 Separation zone block 1a End separation zone block 10,10a Apron part 11,11a Joint cutout part 12 Joint material 13 Concave part 2 Basic block 2 End part basic block 20 Concave part 21 Convex part 3 Leveling layer 4 Empty mortar layer 5 Bolt 5a Connecting plate 5b Screw cap 50 Recess 51 Nut 52 Reinforcement rib 6 Nut 7 Separator block 70 Basic concrete layer 71 Apron concrete 72 Joint mortar 73 Form plate a Roadway

Claims (6)

【特許請求の範囲】[Claims] 【請求項1】 中央分離帯の施工領域に整地層3を施工
し、前記整地層3の上に平板状の基礎ブロック2を両側
の車道に沿って平行に並べて敷設し、前記平行な各基礎
ブロック2の上に分離帯ブロック1を並べて敷設したこ
とを特徴とする、中央分離帯の施工構造。
1. A leveling layer 3 is constructed in a construction area of a median strip, and flat foundation blocks 2 are laid on the leveling layer 3 in parallel along roadways on both sides thereof. A construction structure for a median strip, wherein the divider blocks 1 are arranged and laid on the block 2.
【請求項2】 前記基礎ブロック2と前記分離帯ブロッ
ク1との間には砂とセメントとを混ぜた空モルタル層4
を介在させたことを特徴とする、請求項1に記載の中央
分離帯の施工構造。
2. An empty mortar layer 4 containing a mixture of sand and cement between the base block 2 and the separator block 1.
The construction structure of the median strip according to claim 1, wherein an intermediate member is interposed.
【請求項3】 基礎ブロック2相互の継ぎ目と分離帯ブ
ロック1相互の継ぎ目とを異なる位置に配置したことを
特徴とする、請求項1又は2に記載の中央分離帯の施工
構造。
3. The construction structure of a median strip according to claim 1, wherein the joint between the base blocks 2 and the joint between the divider blocks 1 are arranged at different positions.
【請求項4】 隣合う基礎ブロック2相互及び隣合う分
離帯ブロック1相互を連結したことを特徴とする、請求
項1〜3のいずれかに記載の中央分離帯の施工構造。
4. The construction structure of a central divider according to claim 1, wherein adjacent basic blocks 2 and adjacent divider blocks 1 are connected to each other.
【請求項5】 基礎ブロック2とその上の分離帯ブロッ
ク1とは一方の少なくとも一部が他方へ嵌まっている、
請求項1〜4のいずれかに記載の中央分離帯の施工構
造。
5. The base block 2 and the separator block 1 thereon have at least one part fitted into the other,
The construction structure of the median strip according to any one of claims 1 to 4.
【請求項6】 中央分離帯の端部において、前記平行な
基礎ブロック2,2の端部は平面U字状の端部基礎ブロ
ック2aによって連続させ、前記平行な分離帯ブロック
1,1の端部は前記端部基礎ブロック2aの上に敷設さ
れた平面U字状の端部分離帯ブロック1aによって連続
させたことを特徴とする、請求項1〜5のいずれかに記
載の中央分離帯の施工構造。
6. At the end of the median strip, the ends of the parallel base blocks 2, 2 are connected by a plane U-shaped end base block 2a, and the ends of the parallel base blocks 1, 1 are closed. 6. The median strip according to any of claims 1 to 5, characterized in that the sections are connected by a flat U-shaped end strip block 1a laid on the end base block 2a. Construction structure.
JP17379697A 1997-06-30 1997-06-30 Execution structure of central separation zone Pending JPH1121823A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP17379697A JPH1121823A (en) 1997-06-30 1997-06-30 Execution structure of central separation zone

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP17379697A JPH1121823A (en) 1997-06-30 1997-06-30 Execution structure of central separation zone

Publications (1)

Publication Number Publication Date
JPH1121823A true JPH1121823A (en) 1999-01-26

Family

ID=15967326

Family Applications (1)

Application Number Title Priority Date Filing Date
JP17379697A Pending JPH1121823A (en) 1997-06-30 1997-06-30 Execution structure of central separation zone

Country Status (1)

Country Link
JP (1) JPH1121823A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100618199B1 (en) * 2006-05-16 2006-09-06 (주) 한백종합기술공사 Median strip with vegetaion function and wiring and piping part
JP2021110169A (en) * 2020-01-13 2021-08-02 トヨタ自動車株式会社 Sidewalk-roadway boundary block

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100618199B1 (en) * 2006-05-16 2006-09-06 (주) 한백종합기술공사 Median strip with vegetaion function and wiring and piping part
JP2021110169A (en) * 2020-01-13 2021-08-02 トヨタ自動車株式会社 Sidewalk-roadway boundary block

Similar Documents

Publication Publication Date Title
JPH1121823A (en) Execution structure of central separation zone
JP2504690B2 (en) Underground water tank
JP2859139B2 (en) Construction structure of pedestrian road boundary block and pedestrian road boundary
JPH0258606A (en) Repair of median strip and fender block used therefor
EP0039555B1 (en) Roadway paving
JPH0614201U (en) Overhang walkway block and overhang walkway structure using it
JPH0826522B2 (en) Curb formwork
JPH08184016A (en) Execution method of concrete guardrail and mold for concrete guardrail
JPH0248484Y2 (en)
JP2767379B2 (en) Basic construction method of free slope gutter
US20050178294A1 (en) System for recycling wet concretre into precast structures and structures formed thereby
JP2773024B2 (en) Groove structure with lid and groove lid forming method
JPH0444702Y2 (en)
JPS6124562Y2 (en)
JPH0258607A (en) Repair of median strip and fender block used therefor
JPH1181209A (en) Composite wooden brick of wooden material and concrete
JPH0327044Y2 (en)
JPH078561Y2 (en) Natural stone paving stones
JP2723789B2 (en) Concrete block and its laying method
JPH0721170B2 (en) Road curb molding method
JPH11280008A (en) Precast paving floor board and manufacture thereof
JPH07224438A (en) Stable constructing method for large-sized precast retaining wall
JP2001090005A (en) Pavement structure
JP3037169U (en) Concrete block
JPH08269974A (en) Permanent form block for protection of slope face and manufacture of the block

Legal Events

Date Code Title Description
A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20041221

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20050426