JPH11213035A - Research and development supporting method - Google Patents

Research and development supporting method

Info

Publication number
JPH11213035A
JPH11213035A JP1466298A JP1466298A JPH11213035A JP H11213035 A JPH11213035 A JP H11213035A JP 1466298 A JP1466298 A JP 1466298A JP 1466298 A JP1466298 A JP 1466298A JP H11213035 A JPH11213035 A JP H11213035A
Authority
JP
Japan
Prior art keywords
development
theme
developer
research
man
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP1466298A
Other languages
Japanese (ja)
Inventor
Kanji Kunisawa
寛治 國澤
Yoshimi Takimoto
芳実 瀧本
Sakuo Kamata
策雄 鎌田
Yoshimitsu Nakamura
良光 中村
Kunishige Watanabe
邦重 渡辺
Taishin Sugiyama
泰臣 杉山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Panasonic Electric Works Co Ltd
Original Assignee
Matsushita Electric Works Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Matsushita Electric Works Ltd filed Critical Matsushita Electric Works Ltd
Priority to JP1466298A priority Critical patent/JPH11213035A/en
Publication of JPH11213035A publication Critical patent/JPH11213035A/en
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

PROBLEM TO BE SOLVED: To efficiently manage and control research and development themes. SOLUTION: The RD supporting method is constituted of a step A for registering development manhour to be charged by developers, a step B for regitering developers' names in each engineering field necessary for the RD, a step C for registering manhour used by developers in each already researched and developed theme, a step D for estimating development manhour required for the research and development of an objective theme to be newly researched and developed in each engineering field, a step E for judging whether new development manhour for the objective theme can be obtained or not from the data registered in the steps A to C and the development manhour estimated in each engineering field in the step D, and an interactive examination step H for determining how to allocate developers to the objective theme and how to release developers from the already developed theme when the development manhour is obtained. Consequently judgment whether new development manhour for the objective theme can be obtained or not and the allocation of developers to the objective theme can easily be executed.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は研究開発テーマの運
営管理に関するものである。
The present invention relates to the management of research and development themes.

【0002】[0002]

【従来の技術】研究開発テーマの運営、管理の一つの業
務として、新たに研究開発すべきテーマが発生した際
に、そのテーマを実施するかどうか、実施する場合は開
発者をどのように割り当てるかを判断する業務がある。
このような業務を支援するシステムがあれば効率的よく
最適な判断が行える。例えば特開平8−44779号公
報に示された「勤務表作成支援装置」では、与えられた
作業に対して人員を配置するために、配置結果をグラフ
ィカルに表示するシステムが提案されているが、上記判
断をする場合は、開発者に負荷し得る時間や開発者の習
熟度等を考慮した判断が必要であり、上記のようなシス
テムでは十分な判断が行なえない。
2. Description of the Related Art As one of the operations of management and management of a research and development theme, when a new theme to be researched and developed is generated, whether or not to implement the theme and, if so, how to assign a developer. There is a business to judge.
If there is a system that supports such work, the most appropriate decision can be made efficiently. For example, in the “work schedule creation support device” disclosed in Japanese Patent Application Laid-Open No. H8-44779, a system for graphically displaying an arrangement result in order to arrange personnel for a given work has been proposed. When making the above determination, it is necessary to make a determination in consideration of the time that can be imposed on the developer, the proficiency of the developer, and the like, and the above-described system cannot make a sufficient determination.

【0003】[0003]

【発明が解決しようとする課題】本発明が解決しようと
する課題は、開発の意志決定が行い易い支援ツールを提
供することであり、これにより研究開発テーマの効率的
運営、管理ができる。
A problem to be solved by the present invention is to provide a support tool that makes it easy to make a development decision, thereby enabling efficient management and management of a research and development theme.

【0004】[0004]

【課題を解決するための手段】請求項1による研究開発
支援方法では、研究開発において、開発者に負荷し得る
開発工数を登録しておく段階Aと、研究開発に必要な技
術分野毎の開発者名を登録しておく段階Bと、既に研究
開発を行っているテーマ毎に開発者がかけている開発工
数とを登録しておく段階Cと、新たに研究開発すべき対
象テーマの研究開発に必要とされる開発工数を技術分野
別に見積もる段階Dと、前記A,B,Cで登録されたデ
ータと、Dの技術分野別に見積もられた開発工数とか
ら、対象テーマヘの新たな開発工数が得られるかどうか
の判断をする段階Eと、得られる場合に開発者の対象テ
ーマヘの割り付け及び既開発テーマからの解除をどのよ
うに行うかの対話的検討段階Hとから研究開発支援方法
を構成する。新たに研究開発すべき対象テーマについ
て、対象テーマヘの新たな開発工数が得られるかどうか
の判断と、得られる場合の対象テーマヘの開発者の割り
当てが容易に行える。
In the R & D support method according to the first aspect, in the R & D, a stage A in which development man-hours that can be loaded on a developer is registered, and a development for each technical field required for the R & D. Stage B to register the name of the developer, stage C to register the development man-hours for each theme that has already been researched and developed, and research and development of the target theme to be newly researched and developed. D for estimating the development man-hour required for each technical field, and the development man-hour for the target theme from the data registered in A, B, and C, and the development man-hour estimated for each technical field of D A method of supporting R & D from the stage E of determining whether or not the project can be obtained, and the interactive study stage H of how to assign the developer to the target theme and release from the already developed theme when it is obtained. Constitute. For a new target theme to be researched and developed, it is easy to determine whether new development man-hours can be obtained for the target theme and, if so, to assign a developer to the target theme.

【0005】請求項2による研究開発支援方法では、請
求項1において、技術分野をスキルとする。新たに研究
開発すべき対象テーマについて、対象テーマの開発に必
要なスキルの面から、対象テーマヘの新たな開発工数が
得られるかどうかの判断と、得られる場合の対象テーマ
ヘの開発者の割り当てが容易に行える。請求項3による
研究開発支援方法では、技術分野を同様の技術を有する
開発者から構成される部署とする。新たに研究開発すべ
き対象テーマについて、対象テーマの開発に必要な部署
の面から、対象テーマヘの新たな開発工数が得られるか
どうかの判断と、得られる場合の対象テーマヘの開発者
の割り当てが容易に行える。
[0005] In the R & D support method according to claim 2, in claim 1, the technical field is a skill. For the target themes to be newly researched and developed, in terms of the skills required to develop the target themes, it is necessary to determine whether new development man-hours can be obtained for the target theme and, if so, to assign developers to the target theme. Easy to do. In the R & D support method according to the third aspect, the technical field is a department composed of developers having the same technology. For the target themes to be newly researched and developed, it is necessary to determine whether new development man-hours can be obtained for the target theme from the viewpoint of the department necessary for the development of the target theme, and if so, assign developers to the target theme. Easy to do.

【0006】請求項4による研究開発支援方法では、請
求項1において、段階Aの研究開発において、開発者に
負荷し得る開発工数を複数レベルで登録しておく。開発
者の業務内容が考慮され、より最適な対象テーマヘの開
発者の割り当てが行える。請求項5による研究開発支援
方法では、請求項1において、段階Bの研究開発に必要
な技術分野毎の開発者名の登録を、その技術分野を有す
る開発者名とともに開発者の習熟度を併せて登録する。
開発者の習熟度が考慮され、より最適な対象テーマヘの
開発者の割り当てが行える。
In the R & D support method according to the fourth aspect, in the first aspect, in the R & D at the stage A, development man-hours that can be loaded on the developer are registered at a plurality of levels. Considering the developer's work content, it is possible to assign a developer to a more optimal target theme. In the R & D support method according to the fifth aspect, in the first aspect, the registration of the developer name for each technical field required for the research and development in the step B is performed together with the name of the developer having the technical field and the proficiency level of the developer. To register.
Considering the proficiency of developers, developers can be assigned to more optimal target themes.

【0007】請求項6による研究開発支援方法では、請
求項5において、習熟度を開発に必要な時間に比例した
指数で表わす。工数の精度が上がり、より最適な対象テ
ーマヘの開発者の割り当てが行える。請求項7による研
究開発支援方法では、請求項2において、段階Bの研究
開発に必要なスキル毎の開発者名の登録を、開発者の有
する複数のスキルについて順序付けをして行う。開発者
の優先度付き習熟度が考慮され、より最適な対象テーマ
ヘの開発者の割り当てが行える。
In the R & D support method according to the sixth aspect, in the fifth aspect, the proficiency level is represented by an index proportional to the time required for development. The man-hour accuracy is improved, and developers can be assigned to more optimal target themes. In the R & D support method according to claim 7, in claim 2, the registration of the developer name for each skill required for the research and development in the step B is performed by ordering a plurality of skills possessed by the developer. The prioritized proficiency of developers is taken into account, and developers can be assigned to more optimal target themes.

【0008】請求項8による研究開発支援方法では、請
求項lにおいて、段階Cの研究開発を行っているテーマ
毎に開発者がかけている開発時間の登録は複数月の平均
値により行う。精度の高い工数実績データが得られ、よ
り最適な対象テーマヘの開発者の割り当てが行える。請
求項9による研究開発支援方法では、請求項1におい
て、段階Cの研究開発を行っているテーマ毎に開発者が
かけている開発時間の登録とともに、テーマ毎の重要度
を併せて登録する。既テーマの一部を遅延させる場合
に、より最適な遅延対象テーマの選択が行え、より最適
なテーマ運営が行える。
[0008] In the research and development support method according to claim 8, in claim 1, the registration of the development time taken by the developer for each theme for which the research and development is being performed in the stage C is performed by an average value of a plurality of months. Highly accurate man-hour performance data can be obtained, and developers can be assigned to more optimal target themes. In the R & D support method according to the ninth aspect, in the first aspect, the importance of each theme is also registered together with the registration of the development time spent by the developer for each theme for which the research and development in the stage C is performed. When delaying a part of the existing theme, more optimal theme to be delayed can be selected, and more optimal theme management can be performed.

【0009】請求項10による研究開発支援方法では、
請求項8において、クラス分けは緊急度に応じて分けら
れたものとする。既テーマの一部を遅延させる場合に、
各テーマの緊急度を考慮した遅延対象テーマの選択が行
え、より最適なテーマ運営が行える。請求項11による
研究開発支援方法では、請求項1において、段階Cの研
究開発を行っているテーマ毎に開発者がかけている開発
時間の登録を開発者毎のスケジュール管理システムから
のデータの抽出により行う。実績工数入力作業が効率化
され、研究開発業務全体の開発効率が上がる。
[0009] In the research and development support method according to claim 10,
In claim 8, it is assumed that the classification is made according to the urgency. If you want to delay some of the existing themes,
The theme to be delayed can be selected in consideration of the urgency of each theme, and more optimal theme management can be performed. In the R & D support method according to the eleventh aspect, in the first aspect, the registration of the development time used by the developer for each theme for which the research and development in the stage C is performed is extracted from the schedule management system for each developer. Performed by Efficiency in inputting actual man-hours increases the development efficiency of the entire R & D work.

【0010】請求項12による研究開発支援方法では、
請求項1又は請求項8において、段階Cの研究開発を行
っているテーマ毎に開発者がかけている開発時間の登録
を開発業務(企画、設計、コーディング・・・)に別け
て行う。わずかな追加入力により、各テーマの運用管理
法見直しのために有用である各テーマ内の開発段階別工
数実績データが得られ、研究開発業務全体の開発効率が
上がる。
[0010] In the research and development support method according to claim 12,
In claim 1 or claim 8, the registration of the development time assigned by the developer for each theme of conducting the research and development in the stage C is performed separately for the development work (planning, design, coding...). With a small amount of additional input, man-hour performance data by development stage within each theme, which is useful for reviewing the operation management method of each theme, is obtained, and the development efficiency of the entire R & D work is increased.

【0011】請求項13による研究開発支援方法では、
請求項12において、詳細開発業務と、登録用に分類さ
れている開発業務の対応表が用意されており、登録画面
上で詳細開発業務を選択すると対応する登録用開発業務
が自動的に登録される。開発段階別工数実績作業が効率
化され、研究開発業務全体の開発効率が上がる。請求項
14による研究開発支援方法では、請求項12におい
て、出社時刻、退社時刻、各テーマの開発工数を入力す
ると、テーマ開発工数以外の工数が自動的に計算され登
録される。開発者の業務効率化を図るために有用なデー
タである各開発者のテーマ関連以外の業務の工数実績デ
ータの入力作業が効率化され、研究開発業務全体の開発
効率が上がる。
[0011] In the R & D support method according to claim 13,
In Claim 12, a correspondence table of the detailed development work and the development work classified for registration is prepared, and when the detail development work is selected on the registration screen, the corresponding registration development work is automatically registered. You. The number of man-hours in each development stage is increased, and the development efficiency of the entire R & D work is increased. In the R & D support method according to the fourteenth aspect, in the twelfth aspect, when the start time, the leaving time, and the development man-hour of each theme are input, man-hours other than the theme development man-hour are automatically calculated and registered. The work of inputting man-hours actual data of work other than the theme-related work of each developer, which is useful data for improving the work efficiency of the developer, is made more efficient, and the development efficiency of the entire R & D work is increased.

【0012】請求項15による研究開発支援方法では、
請求項1において、段階Cのデータからテーマ毎の開発
工数合計を出力する。各テーマの運用管理法見直しと、
新たに研究開発すべきテーマの工数見積り法見直しが行
え、研究開発業務全体の開発効率が上がる。請求項16
による研究開発支援方法では、請求項1において、段階
Dの開発工数の見積りを、対象テーマに必要なスキルと
開発期間とスキル毎の月当りの開発工数の見積りから構
成する。既テーマと対象テーマの開発工数についての関
係がわかりやすくなり、対象テーマヘの新たな開発工数
が得られるかどうかの判断と、得られる場合の対象テー
マヘの開発者の割り当てがより効率的に行える。
[0012] In the research and development support method according to claim 15,
In Claim 1, the total number of development steps for each theme is output from the data of Step C. Review the operation management method for each theme,
The method for estimating man-hours for a theme to be newly researched and developed can be reviewed, and the development efficiency of the entire R & D work increases. Claim 16
In the R & D support method according to the present invention, in claim 1, the estimation of the development man-hour in the stage D is composed of the skill required for the target theme, the development period, and the estimation of the development man-hour per skill. The relationship between the development man-hours of the existing theme and the target theme can be easily understood, so that it is possible to more efficiently determine whether or not a new development man-hour for the target theme can be obtained, and if so, assign a developer to the target theme.

【0013】請求項17による研究開発支援方法では、
請求項1において、研究開発の事業的な貢献度に関する
データも登録する。事業的な貢献度を考慮した上で対象
テーマヘの新たな開発工数が得られるかどうかの判断が
行え、より最適なテーマ運営が行える。請求項18によ
る研究開発支援方法では、請求項17において、現行テ
ーマの遅れによる見込損失を登録データとする。既テー
マの一部を遅延させる場合に経営面を考慮した遅延対象
テーマの選択が行え、より最適なテーマ運営が行える。
[0013] In the R & D support method according to claim 17,
In claim 1, data on the degree of business contribution of R & D is also registered. It is possible to determine whether new development man-hours for the target theme can be obtained in consideration of the degree of business contribution, and more optimal theme management can be performed. In the R & D support method according to claim 18, in claim 17, the expected loss due to the delay of the current theme is used as registration data. When delaying some of the existing themes, the delay target theme can be selected in consideration of the management aspect, and more optimal theme management can be performed.

【0014】請求項19による研究開発支援方法では、
請求項1において、スキル別に対象テーマを担当する開
発者と開発工数を入力し、開発者毎に習熟度により修正
した開発工数を求め、その研究開発テーマにかかる全開
発工数を求め、一方、段階Dの対象テーマの研究開発に
必要とされる開発工数見積りを標準の習熟度の開発者で
行い、前記全開発工数と見積りした開発工数とを対比し
て表示する。新たに研究開発すべき対象テーマヘの開発
者の割り当てを試行錯誤により行う際に、必要な工数が
得られているかどうかわかりやすくなり、最適な対象テ
ーマヘの開発者の割り当てがより効率的に行える。
[0014] In the R & D support method according to claim 19,
In Claim 1, a developer who is in charge of a target theme and a development man-hour are input for each skill, a development man-hour is corrected for each developer based on a skill level, and a total development man-hour for the R & D theme is calculated. Estimation of development man-hours required for research and development of the target theme of D is performed by a developer with a standard skill level, and the total development man-hours and the estimated development man-hours are displayed in comparison. When assigning a developer to a target theme to be newly researched and developed by trial and error, it becomes easy to see whether the required man-hours are obtained, and the developer can be more efficiently assigned to the optimal target theme.

【0015】請求項20による研究開発支援方法では、
請求項1において、開発者の工数実績表を残業申告書と
兼用する。開発者の開発業務以外の業務が効率化され、
研究開発業務全体の開発効率が上がる。請求項21によ
る研究開発支援方法では、請求項1において、段階A,
B,Cで登録されたデータと、段階Dの技術分野別に見
積もられた開発工数とから、対象テーマヘの新たな開発
工数が得られるかどうかの判断を行う段階Eと、登録さ
れた前記技術分野毎の開発者名と、テーマ毎に開発者が
かけている開発時間とから前記技術分野別に開発者とテ
ーマ別の開発時間との関係を表示する段階Fと、表示さ
れた関係から対象テーマへの開発者の割り当て及び既開
発テーマからの解除をどのように行うかの判断を対話的
に下す。新たに研究開発すべき対象テーマヘの開発者の
割り当てを行う際に、試行錯誤による検討を行え、より
最適な対象テーマヘの開発者の割り当てが行える。
In the R & D support method according to claim 20,
In claim 1, the man-hour performance table of the developer is also used as an overtime report. Work other than the developer's development work is streamlined,
The development efficiency of the entire R & D work increases. In the research and development support method according to claim 21, the method according to claim 1, wherein steps A,
A step E of determining whether a new development man-hour for the target theme can be obtained from the data registered in B and C and the development man-hour estimated for each technical field in the step D; A stage F for displaying the relationship between the developer and the development time for each theme according to the technical field from the developer name for each field and the development time spent by the developer for each theme; Interactively determine how to assign developers to and release from existing themes. When assigning a developer to a target subject to be newly researched and developed, a trial and error study can be performed, and a more optimal assignment of a developer to the target theme can be performed.

【0016】請求項22による研究開発支援方法では、
請求項21において、段階Fの表示は未来の所定の時期
における前記スキル別に開発者とテーマ別の開発時間と
の関係を表示が可能とする。各開発者の未来の工数も考
慮され、より最適な対象テーマヘの開発者の割り当てが
行える。請求項23による研究開発支援方法では、請求
項21において、段階Fの表示にその開発者のその開発
テーマにおける重要度を表示する。既テーマを一部開発
担当者の工数を先延ばしさせる場合に、開発者のそのテ
ーマでの重要度が考慮され、より最適な各テーマヘの開
発者の割り当てが行える。
[0016] In the R & D support method according to claim 22,
The display of the step (F) according to claim 21, wherein a relationship between a developer and a development time for each theme can be displayed for each skill at a predetermined time in the future. In consideration of the future man-hours of each developer, more optimal assignment of the developer to the target theme can be performed. In the R & D support method according to claim 23, in claim 21, the importance of the developer in the development theme is displayed in the display of step F. In the case of delaying the man-hours of the developers in charge of some of the existing themes, the importance of the developers in the theme is considered, and the developers can be more optimally assigned to each theme.

【0017】請求項24による研究開発支援方法では、
請求項23において、段階Fの表示にその開発者のその
開発テーマにおける工数の割合を表示する。既テーマを
一部開発担当者の工数を先延ばしさせる場合に、開発者
のそのテーマでの重要度が充当時間の面から考慮される
ことになり、より最適な各テーマヘの開発者の割り当て
が行える。
In the R & D support method according to claim 24,
In claim 23, the display of the step F displays the ratio of the man-hour of the developer in the development theme. If some of the existing themes are postponed by the developers, the importance of the developers in that theme will be considered in terms of appropriation time, and a more optimal assignment of developers to each theme will be considered. I can do it.

【0018】請求項25による研究開発支援方法では、
請求項24において、工数の割合には、習熟度による重
み付けを行って求める。既テーマを一部開発担当者の工
数を先延ばしさせる場合に、開発者のそのテーマでの重
要度がより習熟度により換算された充当時間の面から考
慮され、より最適な各テーマヘの開発者の割り当てが行
える。
In the R & D support method according to claim 25,
In claim 24, the ratio of man-hours is obtained by performing weighting based on proficiency. When postponing the man-hours of the developers in charge of some of the existing themes, the importance of the developers in that theme is taken into account in terms of the appropriation time converted by the proficiency level, and the more appropriate developer for each theme Can be assigned.

【0019】請求項26による研究開発支援方法では、
請求項21において、関係の表示とともに、対象テーマ
の研究開発を行った場合の人件費の増加を、登録した研
究開発に開発者がかけ得る時間の複数レベルを基に算
出、表示する。既テーマの一部を遅延させる場合に、人
件費を考慮した遅延対象テーマの選択が行え、より最適
なテーマ運営が行える。
According to the R & D support method of claim 26,
In claim 21, together with the display of the relationship, the increase in labor costs when the research and development of the target theme is performed is calculated and displayed based on a plurality of levels of time that the developer can spend on the registered research and development. When delaying some of the existing themes, the delay target theme can be selected in consideration of labor costs, and more optimal theme management can be performed.

【0020】請求項27による研究開発支援方法では、
請求項21において、段階Fの表示のテーマが重要度分
けされたものであり、重要度ごとに色表示を変えた表示
とする。新たに研究開発すべき対象テーマヘの開発者の
割り当てを行う際に、試行錯誤による検討が容易に行え
ることになり、最適な対象テーマヘの開発者の割り当て
がより効率的に行える。
[0020] In the R & D support method according to claim 27,
In claim 21, the display theme of the stage F is classified according to importance, and the display is changed in color display for each importance. When assigning a developer to a target subject to be newly researched and developed, examination by trial and error can be easily performed, and a developer can be efficiently assigned to an optimal target theme.

【0021】請求項28による研究開発支援方法では、
請求項1において、開発者の対象テーマヘの割り付け及
び既開発テーマからの解除の候補を、あらかじめ指定し
た条件にしたがって求める。新たに研究開発すべき対象
テーマヘの開発者の割り当てを行う際に、割り当ての候
補が自動的に計算され、最適な対象テーマヘの開発者の
割り当てがより効率的に行える。
[0021] In the R & D support method according to claim 28,
In claim 1, a candidate for assignment to a target theme by a developer and release from a developed theme is obtained in accordance with a condition specified in advance. When assigning a developer to a target theme to be newly researched and developed, candidates for assignment are automatically calculated, and the developer can be optimally assigned to an optimal target theme.

【0022】請求項29による研究開発支援方法では、
請求項28において、割付候補開発者は合計工数が少な
い者から順次選ぶ。新たに研究開発すべき対象テーマヘ
の開発者の割り当てを行う際に、合計工数の面から割り
当ての候補が自動的に計算され、最適な対象テーマヘの
開発者の割り当てがより効率的に行える。請求項30に
よる研究開発支援方法では、請求項28において、割付
候補開発者は担当テーマの重要度が低い者から順次選
ぶ。新たに研究開発すべき対象テーマヘの開発者の割り
当てを行う際に、既に開発を行っているテーマの重要度
の面から割り当ての候補が自動的に計算され、最適な対
象テーマヘの開発者の割り当てがより効率的に行える。
[0022] In the R & D support method according to claim 29,
In claim 28, the allocation candidate developers are sequentially selected from those having a smaller total man-hour. When assigning a developer to a target subject to be newly researched and developed, candidates for assignment are automatically calculated from the viewpoint of the total man-hours, so that the optimal assignment of the developer to the target subject can be performed more efficiently. In the R & D support method according to claim 30, in claim 28, the allocation candidate developers sequentially select the assigned subjects from those having the lower importance. When assigning a developer to a target theme to be newly researched and developed, the assignment candidates are automatically calculated from the viewpoint of the importance of the theme already being developed, and the developer is assigned to the optimal target theme. Can be performed more efficiently.

【0023】請求項31による研究開発支援方法では、
請求項28において、割付候補開発者は担当テーマの重
要度が低く、担当テーマ内での重要度が低い者から順次
選ぶ。新たに研究開発すべき対象テーマヘの開発者の割
り当てを行う際に、既に開発を行っているテーマの重要
度の面、及びそのテーマに対する開発者の重要度の面か
ら割り当ての候補が自動的に計算され、最適な対象テー
マヘの開発者の割り当てがより効率的に行える。
According to the R & D support method of claim 31,
In claim 28, the allocation candidate developers sequentially select the assigned theme from those whose importance is low and whose importance within the assigned theme is low. When assigning a developer to a target theme to be newly researched and developed, candidates for assignment are automatically determined based on the importance of the theme already under development and the importance of the developer to that theme. Calculated and more efficient assignment of developers to the optimal target theme.

【0024】[0024]

【発明の実施の形態】本発明の実施の形態の一例につい
て説明すると、図lは本発明の第1の実施例の説明図
で、請求項1,2,3,16,20,21,22に関す
るものである。研究開発テーマ運営管理責任者は、新た
に研究開発すべきと考えられるテーマが発生した場合
に、そのテーマを実施するかどうか、実施する場合は開
発者をどのように割り当てるかを判断する際に、図1の
ような研究開発支援システムを用い、 (1) 新たに研究開発すべき対象テーマの研究開発に必要
とされる開発工数をスキル別に見積もる (2) 対象テーマヘの新たな開発工数が得られるかどうか
を研究開発支援システムを利用して求める。 (3) 得られる場合は、開発者の対象テーマヘの割り付け
及び既開発テーマからの解除をどのように行うかを研究
開発支援システムを利用して対話的に検討する。 (4) 対象テーマを実施するかどうか、実施する場合は、
開発者の対象テーマヘの割り付け及び既開発テーマから
の解除をどのように行うかについて決定する。 という手順で実施する。研究開発システムでの処理プロ
トコルを図2に示す。研究開発支援システムには、開発
者に負荷し得る時間(開発工数)が登録されているテー
ブル、研究開発に必要なスキル毎の開発者名が登録され
ているテーブル、既に研究開発を行っているテーマ毎に
開発者がかけている開発工数が登録されているテーブル
があり、対象テーマの見積もり工数の入力に対して、そ
の工数が得られるかどうかを演算処理により求めて表示
したり、研究開発テーマ運用管理責任者が対象テーマへ
の開発者の割り付け及び既開発テーマからの解除をどの
ように行うかを試行錯誤により検討するために入力され
た各種条件に対する演算結果を表示したりする。また、
各テーブル内のデータは登録部を通じて更新される。
DESCRIPTION OF THE PREFERRED EMBODIMENTS An example of the embodiment of the present invention will be described. FIG. 1 is an explanatory view of the first embodiment of the present invention, and claims 1, 2, 3, 16, 20, 20, 21, and 22. It is about. When a new theme is deemed to be required for R & D, the person in charge of R & D theme management decides whether to implement the theme and, if so, how to assign a developer. Using the R & D support system shown in Fig. 1, (1) Estimate the number of development man-hours required for R & D for a new target theme by skill. (2) Obtain new development man-hours for the target theme. Using the R & D support system. (3) If obtained, interactively examine how to assign developers to target themes and release them from existing themes using the R & D support system. (4) Whether or not to implement the target theme,
Decide how to assign the developer to the target theme and release from the already developed theme. The procedure is as follows. FIG. 2 shows a processing protocol in the R & D system. In the R & D support system, a table in which the time that can be imposed on the developer (development man-hours) is registered, a table in which the developer name for each skill required for R & D is registered, and the R & D has already been performed There is a table in which the development man-hours assigned by the developers are registered for each theme. For the input of the estimated man-hours for the target theme, it is calculated and displayed as to whether or not the man-hours can be obtained. The result of calculation for various conditions input is displayed in order for the theme operations manager to examine, by trial and error, how to assign a developer to the target theme and release from the already developed theme by trial and error. Also,
The data in each table is updated through the registration unit.

【0025】ここでスキルとは各開発者が所有する専門
技術であり、機械設計、電子回路設計などが挙げられ
る。図3(a)は開発者に負荷し得る時間(開発工数)が
登録されているテーブルの例、図3(b)は研究開発に必
要なスキル毎の開発者名が登録されているテーブルの
例、図3(c)は既に研究開発を行っているテーマ毎に開
発者がかけている開発工数が登録されているテーブルの
例である。ここでは、開発工数は月単位で表現されてい
る。
Here, the skill is a specialized technique owned by each developer, and includes a mechanical design, an electronic circuit design, and the like. FIG. 3A shows an example of a table in which time (development man-hours) that can be applied to a developer is registered, and FIG. 3B shows a table in which developer names for each skill required for R & D are registered. For example, FIG. 3C is an example of a table in which the number of development man-hours that the developer has applied is registered for each theme for which research and development has already been performed. Here, the development man-hours are expressed on a monthly basis.

【0026】図4は研究開発支援システムから新たに研
究開発すべき対象テーマの研究開発に必要とされる開発
工数が得られるかどうかを求めた場合の画面の例であ
る。新たに研究開発すべき対象テーマの研究開発に必要
とされる開発工数の見積もりは、スキル別に月単位で表
現し、これを研究開発支援システムに入力すると、新た
に研究開発すべき対象テーマの研究開発に必要とされる
開発工数が得られるかどうかが求められる。
FIG. 4 shows an example of a screen when the R & D support system asks whether the number of development steps required for R & D of a target subject to be newly researched and developed can be obtained. Estimation of the development man-hours required for R & D of a target subject to be newly researched and developed is expressed on a monthly basis for each skill and entered into the R & D support system. It is required that the development man-hours required for development can be obtained.

【0027】対象テーマヘの新たな開発工数が得られる
かどうかについては、各スキル毎に、開発者に対象テー
マの工数を新たに付加することにより得られる場合と、
現テーマを中断または中止して対象テーマの工数を付加
することにより得られる場合の二通りがある。後者の場
合、開発者は例えば安全推進の会議等のようにテーマ以
外の業務も行っており(図3(c)の「その他」の工
数)、一人の開発者が対象テーマのために充当できる最
大の工数は負荷し得る時間から「その他」の工数を除い
たものとなる。
Whether a new man-hour for the target theme can be obtained is obtained by adding a new man-hour for the target theme to the developer for each skill,
There are two cases in which it can be obtained by suspending or canceling the current theme and adding the man-hour of the target theme. In the latter case, the developer is also engaged in tasks other than the theme, such as a safety promotion meeting (“man-hours” in “Others” in FIG. 3 (c)), and one developer can use the task for the target theme. The maximum number of man-hours is obtained by excluding "other" man-hours from the loadable time.

【0028】図4では各スキル毎に、 (1) 各開発者毎に負荷し得る時間から現工数を引いたも
のの、全開発者についての合計 (2) 各開発者毎に負荷し得る時間から「その他」の工数
を引いたものの、全開発者についての合計 を表示するとともに、それらが見積もり工数より大きけ
れば「可」、小さければ「否」を表示する。また総合欄
に、対象テーマの全スキルについて「可」である場合は
「可」、そうでない場合は「否」を表示する。これによ
り、研究開発支援システムから新たに研究開発すべき対
象テーマの研究開発に必要とされる開発工数が得られる
かどうかが求められる。
In FIG. 4, for each skill, (1) the time that can be loaded for each developer is subtracted from the current man-hours, but the total for all developers (2) the time that can be loaded for each developer Although the man-hours for "Others" are subtracted, the total for all developers is displayed, and if they are larger than the estimated man-hours, "OK" is displayed, and if they are smaller than the estimated man-hours, "NO" is displayed. In addition, "OK" is displayed in the comprehensive column if all the skills of the target theme are "OK", and "NO" otherwise. In this way, it is required whether or not the development man-hour required for the research and development of the target theme to be newly researched and developed can be obtained from the research and development support system.

【0029】研究開発支援システムから新たに研究開発
すべき対象テーマの研究開発に必要とされる開発工数が
得られる場合は、開発者にその工数をどのように割り当
てるかを決める必要があるが、本実施例ではそのための
検討を研究開発支援システムと対話的に行うための手段
を提供している。図5はその画面の例である。新たに研
究開発すべき対象テーマの研究開発に必要なスキル名を
入力することにより、そのスキルを所有している全開発
者の現在のテーマ別開発工数が表示される。なお、本実
施例については、スキルの代わりに、同様の技術を有す
る開発者から構成される部署とすることも考えられる。
また、図6のように、開発者の工数実績表を残業申告書
と兼用することにより、開発者の開発業務以外の業務が
効率化され、研究開発業務全体の開発効率が上がる。
When the development man-hour required for the research and development of a target subject to be newly researched and developed can be obtained from the R & D support system, it is necessary to determine how to assign the man-hour to the developer. This embodiment provides a means for conducting an examination for that purpose interactively with the R & D support system. FIG. 5 is an example of the screen. By inputting the skills required for the research and development of the target theme to be newly researched and developed, the current development man-hours by theme for all developers who own the skill are displayed. In this embodiment, instead of the skill, a department composed of developers having the same technology can be considered.
In addition, as shown in FIG. 6, by using the developer's man-hours performance table also as an overtime report, work other than the developer's development work is made more efficient, and the development efficiency of the entire R & D work is increased.

【0030】また、図7のように、各開発者の現在のテ
ーマ別開発工数の代わりに未来の所定の時期におけるテ
ーマ別開発工数とすることもできるようにしておくこと
で、新たに研究開発すべき対象テーマを実施するかどう
か、実施する場合は開発者の対象テーマへの割り付け及
び既開発テーマからの解除をどのように行うかの判断を
より精度よく行える。なお、未来の所定の時期における
テーマ別開発工数は、各テーマの開発計画等から開発者
等が予測するものとする。
Further, as shown in FIG. 7, by making it possible to use the development man-hours by theme at a predetermined time in the future instead of the development man-hours by theme of each developer, the research and development is newly performed. It is possible to more accurately determine whether or not to execute the target theme to be performed, and if so, how to assign the developer to the target theme and release from the already developed theme. The development man-hours for each theme at a predetermined time in the future are to be predicted by a developer or the like from the development plan of each theme.

【0031】図8は本発明の第2の実施例の説明図で請
求項4に関するものである。第1の実施例において、開
発者に負荷し得る時間(開発工数)が登録されているテ
ーブルを、図8のように開発者に負荷し得る時間(開発
工数)を複数レベルで登録する形式とする。開発者毎の
事情を考慮した負荷し得る時間の設定が行え、より最適
な対象テーマヘの開発者の割り当てが行える。
FIG. 8 is an explanatory view of a second embodiment of the present invention and relates to claim 4. In the first embodiment, a table in which the time (development man-hours) that can be loaded on the developer is registered is a table in which the time (development man-hours) that can be loaded on the developer is registered at a plurality of levels as shown in FIG. I do. A loadable time can be set in consideration of the circumstances of each developer, and a more optimal assignment of a developer to a target theme can be performed.

【0032】図9(a)は第3の実施例の説明図で請求項
5に関するもの、図9(b)は第4の実施例の請求項で請
求項6に関するものである。第1の実施例において、段
階Bの研究開発に必要なスキル毎の開発者名の登録を、
図9(a)のように、そのスキルを有する開発者名ととも
に開発者の習熟度を併せて登録する。一方、図9(b)の
ように習熟度を開発に必要な時間に比例した時間係数と
対応させる。
FIG. 9 (a) is an explanatory view of the third embodiment and relates to claim 5, and FIG. 9 (b) is a claim of the fourth embodiment and relates to claim 6. In the first embodiment, the registration of the developer name for each skill required for the research and development in the stage B is performed as follows.
As shown in FIG. 9A, the proficiency of the developer is registered together with the name of the developer having the skill. On the other hand, as shown in FIG. 9B, the proficiency is associated with a time coefficient proportional to the time required for development.

【0033】この場合、第1の実施例の(1),(2)に対応
するものは (1') 各開発者毎に負荷し得る時間から現工数を引いた
ものに時間係数をかけたものの、全開発者についての合
計 (2') 各開発者毎に負荷し得る時間から「その他」の工
数を引いたものに時間係数をかけたものの、全開発者に
ついての合計 となる。新たに研究開発すべき対象テーマを実施するか
どうか、実施する場合は、開発者の対象テーマへの割り
付け及び現開発テーマからの解除をどのように行うかの
判断をより精度よく行える。
In this case, those corresponding to (1) and (2) of the first embodiment are as follows: (1 ') The time coefficient is multiplied by subtracting the current man-hour from the time that can be loaded for each developer. However, the total for all developers (2 ') The total for all developers is obtained by subtracting the "man-hours" from the time that can be loaded for each developer and multiplying by the time factor. Whether or not to implement a new target theme to be researched and developed, and if so, how to assign the developer to the target theme and release from the current development theme can be determined more accurately.

【0034】図9(c)は第11の実施例の説明図で請求
項19に関するものである。新たに研究開発すべき対象
テーマを実施するために、開発者の対象テーマヘの割り
付けを行う際に、スキル別に対象テーマを担当する開発
者と開発工数を研究開発支援システムに入力すると、開
発者毎に習熟度により換算した開発工数と、割り当てら
れた全開発者の合計と表示する。これにより、割り付け
をどのように行うかの検討が容易に(すなわち効率的
に)、精度よく行える。
FIG. 9C is an explanatory view of the eleventh embodiment and relates to claim 19. When assigning developers to target themes in order to implement new target themes to be researched and developed, enter the developers in charge of the target themes and development man-hours by skill into the R & D support system. And the total number of all the developers assigned to it, and the number of development steps converted according to the proficiency level. As a result, how to perform the allocation can be easily (ie, efficiently) and accurately performed.

【0035】図10は第5の実施例の説明図で請求項7
に関するものである。第1の実施例において、図10
(a)のように段階Bの研究開発に必要なスキル毎の開発
者名の登録を、開発者の有する複数のスキルについて順
序付けをして行い、この順序を図10(b)にように表示
する。この例ではテーマdddではスキルA2100を
持つAAAが充当しているが、AAAにとってはスキル
A2100は2番目のスキルであるので、AAAのテー
マdddへの工数を削除するという判断が研究開発テー
マ運用管理責任者によってなされる。既存テーマの解除
を行う際に、割り当てを開発者の優先度付き習熟度を考
慮して行うことができ、より最適な対象テーマへの開発
者の割り当てが行える。
FIG. 10 is an explanatory view of the fifth embodiment.
It is about. In the first embodiment, FIG.
As shown in (a), the registration of the developer name for each skill required for the research and development in stage B is performed by ordering a plurality of skills possessed by the developer, and this order is displayed as shown in FIG. 10 (b). I do. In this example, the theme ddd is assigned by AAA having skill A2100, but for AAA, the skill A2100 is the second skill. Made by the responsible person. When canceling the existing theme, the assignment can be performed in consideration of the proficiency with priority of the developer, and the developer can be more optimally assigned to the target theme.

【0036】図11は第6の実施例の説明図で請求項8
に関するものである。第1の実施例において、段階Cの
研究開発を行っているテーマ毎に開発者がかけている開
発時間の登録を複数月の平均値により行えるようにす
る。工数データが平滑化されることにより精度上がり、
より最適な対象テーマヘの開発者の割り当てが行える。
図12は第7の実施例の説明図で、請求項9,10,2
7に関するものである。第1の実施例において、図12
(a)のように、段階Cの研究開発を行っているテーマ毎
に開発者がかけている開発時間を登録とともに、テーマ
毎の重要度を併せて登録し、図12(b)のように、開発
者のテーマ別工数を表示する際に、各テーマの下に重要
度を表記する。これにより、既テーマの一部を遅延させ
る場合に、テーマの重要度を考慮した遅延対象テーマ選
択の検討が容易に行え、より最適なテーマ運営が行え
る。テーマの重要度としては、そのテーマの緊急度等が
考えられる。また、各テーマの下に重要度を表記する代
わりに、重要度と表示色の対応表(図12(c))を用い
て重要度を色分けして表示することにより、遅延対象テ
ーマ選択の検討が更に容易に行える。
FIG. 11 is an explanatory view of the sixth embodiment.
It is about. In the first embodiment, the registration of the development time used by the developer for each theme for which the research and development of the stage C is being performed can be performed by an average value of a plurality of months. The accuracy is improved by smoothing the man-hour data,
Developers can be assigned to more optimal target themes.
FIG. 12 is an explanatory view of the seventh embodiment.
7. In the first embodiment, FIG.
As shown in FIG. 12 (b), the development time spent by the developer is registered for each theme for which the research and development of stage C is being performed, and the importance of each theme is also registered, as shown in FIG. 12 (b). When displaying the man-hours by the theme of the developer, the importance is described below each theme. Thus, when a part of the existing theme is delayed, the selection of the delay target theme can be easily performed in consideration of the importance of the theme, and more optimal theme management can be performed. As the importance of the theme, the urgency of the theme or the like can be considered. In addition, instead of displaying the importance under each theme, the importance is displayed in different colors by using a correspondence table of the importance and the display color (FIG. 12C), so that the delay target theme can be selected. Can be performed more easily.

【0037】図13及び図14は第8の実施例の説明図
で請求項11に関するものである。第1の実施例におい
て、段階Cの研究開発を行っているテーマ毎に開発者が
かけている開発時間の登録を各開発者の手入力の代わり
に、各開発者のスケジュール管理システム(図13参
照)からの自動転記(図14参照)により行う。実績工
数入力業務が効率化され、研究開発業務全体の開発効率
が上がる。
FIGS. 13 and 14 are explanatory views of the eighth embodiment, which relates to claim 11. In the first embodiment, instead of manual input of each developer, a schedule management system of each developer is used to register the development time used by each developer for the theme of conducting the research and development at the stage C (FIG. 13). (See FIG. 14). Efficiency of the actual man-hour input work is improved, and the development efficiency of the entire R & D work is increased.

【0038】図15〜図17は第9の実施例の説明図で
請求項12,13,14に関するものである。第1又は
第8の実施例において、段階Cの研究開発を行っている
テーマ毎に開発者がかけている開発時間の登録を、図1
5のように開発業務(企画、設計、コーディング…・)
に別けて行う。わずかな追加入力により、各テーマの運
用管理法見直しのために有用である各テーマ内の開発段
階別工数実績データが得られ、研究開発業務全体の開発
効率が上がる。ここで、詳細開発業務と、登録用に分類
されている開発業務の対応表(図16参照)を用意し、
登録画面上で詳細開発業務を選択すると対応する登録用
開発業務が自動的に登録されるようにすると、開発段階
別工数実績作業が効率化され、研究開発業務全体の開発
効率が上がる。また、図17のように、出社時刻、退社
時刻、各テーマの開発工数を入力すると、テーマ開発工
数以外の工数が自動的に計算ざれ登録されるようにする
と、開発者の業務効率化を図るために有用なデータであ
る各開発者のテーマ関連以外の業務の工数実績データ
(図3(c)その他)の入力作業が効率化され、研究開発
業務全体の開発効率が上がる。
FIGS. 15 to 17 are explanatory views of the ninth embodiment, which relate to claims 12, 13 and 14. In the first or eighth embodiment, the registration of the development time used by the developer for each theme for which the research and development in the stage C is performed is shown in FIG.
Development work like 5 (planning, design, coding ...)
Perform separately. With a small amount of additional input, man-hour performance data by development stage within each theme, which is useful for reviewing the operation management method of each theme, is obtained, and the development efficiency of the entire R & D work is increased. Here, a correspondence table (see FIG. 16) between the detailed development work and the development work classified for registration is prepared.
When the detailed development work is selected on the registration screen, the corresponding development work for registration is automatically registered, so that the man-hour actual work for each development stage is made more efficient, and the development efficiency of the entire R & D work is increased. In addition, as shown in FIG. 17, when a start time, a departure time, and a development man-hour of each theme are input, man-hours other than the theme development man-hour are automatically calculated and registered, thereby improving the work efficiency of the developer. Therefore, the work of inputting the man-hour result data (others in FIG. 3 (c)) of each developer other than the theme-related work, which is useful data, is made more efficient, and the development efficiency of the entire R & D work is increased.

【0039】図18は第10の実施例の説明図で請求項
15に関するものである。段階Cのデータから月々の各
テーマ毎の開発工数合計を表示している。これにより、
各テーマの運用管理法見直しと、新たに研究開発すべき
テーマの工数見積り法見直しが行え、研究開発業務全体
の開発効率が上がる。図19及び図20は第12の実施
例の説明図で請求項23,24に関するものである。第
1の実施例において、段階Fの表示にその開発者のその
開発テーマにおける工数の割合(図20)を表示する
(図19)。既テーマについて一部開発担当者の工数を
先延ばしさせる場合に、開発者のそのテーマでの重要度
が考慮され、より最適な各テーマヘの開発者の割り当て
が行える。
FIG. 18 is an explanatory view of the tenth embodiment and relates to claim 15. From the data of stage C, the total number of development steps for each theme each month is displayed. This allows
A review of the operation management method for each theme and a review of the man-hour estimation method for themes to be newly researched and developed can improve the development efficiency of the entire R & D work. FIGS. 19 and 20 are explanatory views of the twelfth embodiment, and relate to claims 23 and 24. In the first embodiment, the ratio of the man-hour of the developer in the development theme (FIG. 20) is displayed on the display of the stage F (FIG. 19). When postponing the man-hours of some developers in relation to the existing theme, the importance of the developer in that theme is taken into consideration, and more optimal assignment of the developer to each theme can be performed.

【0040】図21は第13の実施例の説明図で請求項
25に関するものである。第12の実施例において工数
の割合には、習熟度による重み付けを行って求める。既
テーマを一部開発担当者の工数を先延ばしさせる場合
に、開発者のそのテーマでの重要度がより考慮され、よ
り最適な各テーマヘの開発者の割り当てが行える。図2
2は第14の実施例の説明図で請求項26に関するもの
である。第13の実施例において、関係の表示ととも
に、対象テーマの研究開発を行った場合の人件費の増加
を、登録した研究開発に開発者がかけ得る時間の複数レ
ベルを基に算出、表示する。既テーマの一部を遅延させ
る場合に、人件費を考慮した遅延対象テーマの選択が行
え、より最適なテーマ運営が行える。
FIG. 21 is an explanatory view of the thirteenth embodiment and relates to claim 25. In the twelfth embodiment, the ratio of man-hours is obtained by performing weighting based on the proficiency level. When postponing the man-hours of a developer in charge of a part of an existing theme, the importance of the developer in that theme is taken into consideration, and a more optimal assignment of the developer to each theme can be performed. FIG.
Reference numeral 2 denotes an explanatory view of the fourteenth embodiment, which relates to claim 26. In the thirteenth embodiment, together with the display of the relationship, the increase in the labor cost when the research and development of the target theme is performed is calculated and displayed based on a plurality of levels of the time that the developer can spend on the registered research and development. When delaying some of the existing themes, the delay target theme can be selected in consideration of labor costs, and more optimal theme management can be performed.

【0041】図23〜図26は第15の実施例の説明図
で請求項17,18,28,29,30,31に関する
ものである。ここでは、開発者の対象テーマヘの割り付
け及び開発テーマからの解除の候補を、あらかじめ指定
した条件にしたがって求める。これにより、最適な対象
テーマヘの開発者の割り当てがより効率的に行える。図
23及び図24では、割付候補開発者は合計工数が少な
い者から順次選ぶことを条件としている。図25及び図
26では、割付候補開発者は担当テーマの重要度が低
く、かつ、担当テーマ内での重要度が低い者から順次選
ぶことを条件としている。ここで、担当テーマ内での重
要度が低い者とは、第12の実施例の考え方を利用し、
開発テーマにおける工数の割合が低いものとする。ま
た、図25では、あらかじめ各テーマ毎に開発工数を削
除または減少させることにより、テーマを遅延させると
どれだけ利益が減少するかを工数1時間当たりで見積も
ったものを登録しておき、そのデータと割り当て結果か
ら利益減少見込み額を表示させる。研究開発運用管理責
任者はこれと対象テーマの早期実施による利益増加見積
もりとを比較し、対象テーマを実施するかどうか、実施
する場合、どのように割り付けをするかを判断する。事
業的な貢献度を考慮した、対象テーマヘの新たな開発工
数が得られるかどうかの判断が行え、より最適なテーマ
運営が行える。
FIGS. 23 to 26 are explanatory diagrams of the fifteenth embodiment, and relate to claims 17, 18, 28, 29, 30, 31. Here, candidates for assignment to the target theme and release from the development theme by the developer are obtained in accordance with conditions specified in advance. Thereby, the developer can be more efficiently assigned to the optimum target theme. In FIGS. 23 and 24, it is assumed that the allocation candidate developers are sequentially selected from those with a smaller total man-hour. In FIGS. 25 and 26, the assignment candidate developer is provided on condition that the assigned theme is low in importance and is sequentially selected from those with low importance in the assigned theme. Here, a person with low importance in the theme in charge is used by using the concept of the twelfth embodiment,
It is assumed that the ratio of man-hours in the development theme is low. Further, in FIG. 25, by deleting or reducing the development man-hour for each theme in advance, an estimate of how much profit is reduced if the theme is delayed is registered per man-hour, and the data is registered. And display the expected profit decrease amount from the allocation result. The R & D operations manager compares this with the estimate of the profit increase due to the early implementation of the target theme, and determines whether or not to implement the target theme and how to allocate it. It is possible to judge whether new development man-hours for the target theme can be obtained in consideration of the degree of business contribution, and more optimal theme management can be performed.

【0042】[0042]

【発明の効果】以上のように請求項1の発明において
は、各開発者の負荷し得る開発工数、所有スキル、現開
発工数と、新たに研究開発すべき対象テーマの研究開発
に必要とされるスキル別開発工数を考慮して、対象テー
マヘの新たな開発工数が得られるかどうかの判断するこ
とと、得られる場合の対象テーマヘの開発者の割り当て
ることが容易に行える。
As described above, according to the first aspect of the present invention, the development man-hours, possession skills, current development man-hours that each developer can load, and the research and development of the target theme to be newly researched and developed are required. It is easy to determine whether a new development man-hour for the target theme can be obtained in consideration of the development man-hours for each skill, and to assign a developer to the target theme when it can be obtained.

【0043】請求項2の発明により、新たに研究開発す
べき対象テーマについて、対象テーマの開発に必要なス
キルの面から、対象テーマヘの新たな開発工数が得られ
るかどうかの判断と、得られる場合の対象テーマヘの開
発者の割り当てが容易に行える。請求項3の発明によ
り、新たに研究開発すべき対象テーマについて、対象テ
ーマの開発に必要な部署の面から、対象テーマヘの新た
な開発工数が得られるかどうかの判断と、得られる場合
の対象テーマヘの開発者の割り当てが容易に行える。
According to the second aspect of the present invention, for a target theme to be newly researched and developed, it is determined whether or not a new man-hour for the development of the target theme can be obtained in view of the skills required for developing the target theme. In this case, developers can be easily assigned to the target theme. According to the third aspect of the present invention, it is determined whether or not a new development man-hour can be obtained for a target theme to be newly researched and developed in terms of a department required for the development of the target theme, and if the target man-hour can be obtained. Developers can be easily assigned to themes.

【0044】請求項4の発明により、開発者の業務内容
を考慮することができ、より最適な対象テーマヘの開発
者の割り当てが行える。請求項5の発明により、開発者
の習熟度を考慮することができ、より最適な対象テーマ
ヘの開発者の割り当てが行える。請求項6の発明によ
り、開発者の習熟度を考慮した工数が得られ、より最適
な対象テーマヘの開発者の割り当てが行える。
According to the fourth aspect of the present invention, it is possible to consider the contents of work of the developer, and to allocate the developer to a more optimal target theme. According to the fifth aspect of the present invention, the skill of the developer can be considered, and the developer can be more optimally assigned to the target theme. According to the sixth aspect of the present invention, man-hours in consideration of the skill level of the developer can be obtained, and the developer can be more optimally assigned to the target theme.

【0045】請求項7の発明により、開発者の優先度付
き習熟度を者慮することができ、より最適な対象テーマ
ヘの開発者の割り当てが行える。請求項8の発明によ
り、工数データが平滑化されることにより精度上がり、
より最適な対象テーマヘの開発者の割り当てが行える。
請求項9の発明により、既テーマの一部を遅延させる場
合に、テーマの重要度を考慮することができ、より最適
な遅延対象テーマの選択が行え、より最適なテーマ運営
が行える。
According to the seventh aspect of the present invention, it is possible to consider the proficiency with priority of the developer, and to allocate the developer to a more optimal target theme. According to the invention of claim 8, accuracy is improved by smoothing the man-hour data,
Developers can be assigned to more optimal target themes.
According to the ninth aspect of the invention, when a part of the existing theme is delayed, the importance of the theme can be considered, more optimal theme to be delayed can be selected, and more optimal theme management can be performed.

【0046】請求項10の発明により、既テーマの一部
を遅延させる場合に、各テーマの緊急度を考慮した遅延
対象テーマの選択が行え、より最適なテーマ運営が行え
る。請求項11の発明により、実績工数入力作業が効率
化され、研究開発業務全体の開発効率が上がる。請求項
12の発明により、わずかな追加入力により、各テーマ
の運用管理法見直しのために有用である各テーマ内の開
発段階別工数実績データが得られ、研究開発業務全体の
開発効率が上がる。
According to the tenth aspect, when a part of the existing theme is delayed, the theme to be delayed can be selected in consideration of the urgency of each theme, and more optimal theme management can be performed. According to the eleventh aspect of the present invention, the actual man-hour input work is made more efficient, and the development efficiency of the entire R & D work is increased. According to the twelfth aspect of the present invention, by a small additional input, man-hour actual result data for each development stage in each theme, which is useful for reviewing the operation management method of each theme, can be obtained, and the development efficiency of the entire R & D work can be increased.

【0047】請求項13の発明により、開発段階別工数
実績作業が効率化され、研究開発業務全体の開発効率が
上がる。請求項14の発明により、開発者の業務効率化
を図るために有用なデータである各開発者のテーマ関連
以外の業務の工数実績データの入力作業が効率化され、
研究開発業務全体の開発効率が上がる。
According to the thirteenth aspect of the present invention, the number of man-hours in each development stage is increased, and the development efficiency of the entire R & D work is increased. According to the invention of claim 14, the work of inputting the man-hour actual data of the work other than the theme-related work of each developer, which is useful data for improving the work efficiency of the developer, is improved,
The development efficiency of the entire R & D work increases.

【0048】請求項15の発明により、追加充当時間実
績データに基づく、各テーマの運用管理法見直しと、新
たに研究開発すべきテーマの工数見積り法見直しが行
え、研究開発業務全体の開発効率が上がる。請求項16
の発明により、既テーマと対象テーマの開発工数につい
ての関係がわかりやすくなり、対象テーマヘの新たな開
発工数が得られるかどうかの判断と、得られる場合の対
象テーマヘの開発者の割り当てがより効率的にに行え
る。
According to the fifteenth aspect, it is possible to review the operation management method of each theme and the method of estimating the man-hours of the theme to be newly researched and developed based on the actual data of the additional allocation time, thereby improving the development efficiency of the entire research and development work. Go up. Claim 16
Makes it easier to understand the relationship between the development man-hours of the existing theme and the target theme, and it is more efficient to determine whether new development man-hours can be obtained for the target theme and, if so, to assign developers to the target theme. Can be done

【0049】請求項17の発明により、事業的な貢献度
を考慮した、対象テーマヘの新たな開発工数が得られる
かどうかの判断が行え、より最適なテーマ運営が行え
る。請求項18の発明により、既テーマの一部を遅延さ
せる場合に、経営面を考慮した遅延対象テーマの選択が
行え、より最適なテーマ運営が行える。請求項19の発
明により、新たに研究開発すべき対象テーマヘの開発者
の割り当てを試行錯誤で行う際に、必要な工数が得られ
ているかどうかわかりやすくなり、最適な対象テーマヘ
の開発者の割り当てがより効率的に行える。
According to the seventeenth aspect, it is possible to determine whether a new development man-hour for the target theme can be obtained in consideration of the degree of business contribution, and more optimal theme management can be performed. According to the eighteenth aspect, when a part of the existing theme is delayed, the delay target theme can be selected in consideration of the management aspect, and more optimal theme management can be performed. According to the invention of claim 19, when assigning a developer to a target subject to be newly researched and developed by trial and error, it becomes easy to determine whether a required man-hour is obtained, and a developer is assigned to an optimal target subject. Can be performed more efficiently.

【0050】請求項20の発明により、開発者の開発業
務以外の業務が効率化され、研究開発業務全体の開発効
率が上がる。請求項21の発明により、新たに研究開発
すべき対象テーマヘの開発者の割り当てがを行う際に、
試行錯誤による検討を行え、より最適な対象テーマヘの
開発者の割り当てが行える。
According to the twentieth aspect, work other than the developer's development work is made more efficient, and the development efficiency of the entire R & D work is increased. According to the invention of claim 21, when assigning a developer to a target theme to be newly researched and developed,
A trial-and-error study can be performed, and a developer can be assigned to a more optimal target theme.

【0051】請求項22の発明により、各開発者の未来
の工数も考慮され、より最適な対象テーマヘの開発者の
割り当てが行える。請求項23の発明により、既テーマ
を一部開発担当者の工数を先延ばしさせる場合に、開発
者のそのテーマでの重要度が考慮され、より最適な各テ
ーマヘの開発者の割り当てが行える。
According to the twenty-second aspect of the present invention, the future man-hours of each developer are also taken into consideration, and a more optimal assignment of the developer to the target theme can be performed. According to the twenty-third aspect of the present invention, in the case where the man-hour of the person in charge of the development is postponed for a part of the existing theme, the importance of the developer in the theme is considered, and the developer can be more optimally assigned to each theme.

【0052】請求項24の発明により、既テーマを一部
開発担当者の工数を先延ばしさせる場合に、開発者のそ
のテーマでの重要度が考慮され、より最適な各テーマヘ
の開発者の割り当てが行える。請求項25の発明によ
り、既テーマを一部開発担当者の工数を先延ばしさせる
場合に、開発者のそのテーマでの重要度がより考慮さ
れ、より最適な各テーマヘの開発者の割り当てが行え
る。
According to the twenty-fourth aspect of the present invention, when the man-hour of the developer in charge of a part of the existing theme is postponed, the importance of the developer in the theme is considered, and the developer is more optimally assigned to each theme. Can be performed. According to the invention of claim 25, in the case where the man-hour of the developer in charge of a part of the existing theme is postponed, the importance of the developer in the theme is considered more, and the developer can be more optimally assigned to each theme. .

【0053】請求項26の発明により、既テーマの一部
を遅延させる場合に、人件費を考慮した遅延対象テーマ
の選択が行え、より最適なテーマ運営が行える。請求項
27の発明により、新たに研究開発すべき対象テーマヘ
の開発者の割り当てを行う際に、試行錯誤による検討を
容易に行えるようになり、最適な対象テーマヘの開発者
の割り当てがより効率的に行える。
According to the twenty-sixth aspect, when a part of the existing theme is delayed, the delay target theme can be selected in consideration of the labor cost, and more optimal theme management can be performed. According to the invention of claim 27, when assigning a developer to a target subject to be newly researched and developed, examination by trial and error can be easily performed, and assignment of a developer to an optimal target theme is more efficient. Can be done.

【0054】請求項28の発明により、新たに研究開発
すべき対象テーマヘの開発者の割り当てを行う際に、割
り当ての候補が自動的に計算され、最適な対象テーマヘ
の開発者の割り当てがより効率的に行える。請求項29
の発明により、新たに研究開発すべき対象テーマヘの開
発者の割り当てを行う際に、合計工数の面から割り当て
の候補が自動的に計算され、最適な対象テーマヘの開発
者の割り当てがより効率的に行える。
According to the twenty-eighth aspect of the present invention, when assigning a developer to a target theme to be newly researched and developed, candidates for assignment are automatically calculated, and the assignment of a developer to an optimal target theme is more efficient. Can be done Claim 29
According to the invention of the present invention, when assigning a developer to a target theme to be newly researched and developed, assignment candidates are automatically calculated in terms of total man-hours, and the assignment of a developer to the optimal target theme is more efficient. Can be done.

【0055】請求項30の発明により、新たに研究開発
すべき対象テーマヘの開発者の割り当てを行う際に、既
に開発を行っているテーマの重要度の面から割り当ての
候補が自動的に計算され、最適な対象テーマヘの開発者
の割り当てがより効率的に行える。請求項31の発明に
より、新たに研究開発すべき対象テーマヘの開発者の割
り当てを行う際に、既に開発を行っているテーマの重要
度の面、及びそのテーマに対する開発者の重要度の面か
ら割り当ての候補が自動的に計算され、最適な対象テー
マヘの開発者の割り当てがより効率的に行える。
According to the invention of claim 30, when assigning a developer to a target subject to be newly researched and developed, candidates for assignment are automatically calculated in view of the importance of the theme which has already been developed. In addition, the developer can be more efficiently allocated to the optimal target theme. According to the invention of claim 31, when assigning a developer to a target theme to be newly researched and developed, from the viewpoint of the importance of the theme already being developed and the importance of the developer to the theme, Allocation candidates are automatically calculated, and the allocation of developers to the optimal target theme can be performed more efficiently.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の第1の実施例のブロック回路図であ
る。
FIG. 1 is a block circuit diagram of a first embodiment of the present invention.

【図2】同上のフローチャートである。FIG. 2 is a flowchart of the same.

【図3】同上の説明図である。FIG. 3 is an explanatory diagram of the above.

【図4】同上の説明図である。FIG. 4 is an explanatory diagram of the above.

【図5】同上の説明図である。FIG. 5 is an explanatory diagram of the above.

【図6】同上の説明図である。FIG. 6 is an explanatory diagram of the above.

【図7】同上の説明図である。FIG. 7 is an explanatory diagram of the above.

【図8】第2の実施例の説明図である。FIG. 8 is an explanatory diagram of a second embodiment.

【図9】第3、第4、第11の実施例の説明図である。FIG. 9 is an explanatory diagram of the third, fourth, and eleventh embodiments.

【図10】同上の実施例の説明図である。FIG. 10 is an explanatory diagram of the embodiment.

【図11】第6の実施例の説明図である。FIG. 11 is an explanatory diagram of a sixth embodiment.

【図12】第7の実施例の説明図である。FIG. 12 is an explanatory diagram of a seventh embodiment.

【図13】第8の実施例の説明図である。FIG. 13 is an explanatory diagram of an eighth embodiment.

【図14】同上の説明図である。FIG. 14 is an explanatory diagram of the above.

【図15】第9の実施例の説明図である。FIG. 15 is an explanatory diagram of a ninth embodiment.

【図16】同上の説明図である。FIG. 16 is an explanatory diagram of the above.

【図17】同上の説明図である。FIG. 17 is an explanatory diagram of the above.

【図18】第10の実施例の説明図である。FIG. 18 is an explanatory diagram of the tenth embodiment.

【図19】第12の実施例の説明図である。FIG. 19 is an explanatory diagram of a twelfth embodiment.

【図20】同上の説明図である。FIG. 20 is an explanatory diagram of the above.

【図21】第13の実施例の説明図である。FIG. 21 is an explanatory diagram of a thirteenth embodiment.

【図22】第14の実施例の説明図である。FIG. 22 is an explanatory diagram of a fourteenth embodiment.

【図23】第15の実施例の説明図である。FIG. 23 is an explanatory diagram of a fifteenth embodiment.

【図24】同上の説明図である。FIG. 24 is an explanatory diagram of the above.

【図25】同上の説明図である。FIG. 25 is an explanatory diagram of the above.

【図26】同上の説明図である。FIG. 26 is an explanatory diagram of the above.

─────────────────────────────────────────────────────
────────────────────────────────────────────────── ───

【手続補正書】[Procedure amendment]

【提出日】平成10年7月13日[Submission date] July 13, 1998

【手続補正1】[Procedure amendment 1]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】請求項19[Correction target item name] Claim 19

【補正方法】変更[Correction method] Change

【補正内容】[Correction contents]

【手続補正2】[Procedure amendment 2]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】0005[Correction target item name] 0005

【補正方法】変更[Correction method] Change

【補正内容】[Correction contents]

【0005】請求項2による研究開発支援方法では、請
求項1において、技術分野を開発者が所有する専門技術
(スキル)とする。新たに研究開発すべき対象テーマに
ついて、対象テーマの開発に必要なスキルの面から、対
象テーマヘの新たな開発工数が得られるかどうかの判断
と、得られる場合の対象テーマヘの開発者の割り当てが
容易に行える。請求項3による研究開発支援方法では、
技術分野を同様の技術を有する開発者から構成される部
署とする。新たに研究開発すべき対象テーマについて、
対象テーマの開発に必要な部署の面から、対象テーマヘ
の新たな開発工数が得られるかどうかの判断と、得られ
る場合の対象テーマヘの開発者の割り当てが容易に行え
る。
[0005] In the R & D support method according to the second aspect, in the first aspect, the technical field in which the technical field is owned by the developer.
(Skill) . For the target themes to be newly researched and developed, in terms of the skills required to develop the target themes, it is necessary to determine whether new development man-hours can be obtained for the target theme and, if so, to assign developers to the target theme. Easy to do. In the research and development support method according to claim 3,
The technical field is a department composed of developers with similar technologies. For new themes to be researched and developed,
From the aspect of the department required for the development of the target theme, it is easy to determine whether or not new development man-hours can be obtained for the target theme and, if so, to assign a developer to the target theme.

【手続補正3】[Procedure amendment 3]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】0006[Correction target item name] 0006

【補正方法】変更[Correction method] Change

【補正内容】[Correction contents]

【0006】請求項4による研究開発支援方法では、請
求項1において、段階Aの研究開発において、開発者に
負荷し得る開発工数を複数レベルで登録しておく。開発
者の事情が考慮され、より最適な対象テーマヘの開発者
の割り当てが行える。請求項5による研究開発支援方法
では、請求項1において、段階Bの研究開発に必要な技
術分野毎の開発者名の登録を、その技術分野を有する開
発者名とともに開発者の習熟度を併せて登録する。開発
者の習熟度が考慮され、より最適な対象テーマヘの開発
者の割り当てが行える。
In the R & D support method according to the fourth aspect, in the first aspect, in the R & D at the stage A, development man-hours that can be loaded on the developer are registered at a plurality of levels. In consideration of the circumstances of the developers, it is possible to allocate the developers to a more optimal target theme. In the R & D support method according to the fifth aspect, in the first aspect, the registration of the developer name for each technical field required for the research and development in the step B is performed together with the name of the developer having the technical field and the proficiency level of the developer. To register. Considering the proficiency of developers, developers can be assigned to more optimal target themes.

【手続補正4】[Procedure amendment 4]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】0014[Correction target item name] 0014

【補正方法】変更[Correction method] Change

【補正内容】[Correction contents]

【0014】請求項19による研究開発支援方法では、
請求項1において、技術分野別に対象テーマを担当する
開発者と開発工数を入力し、開発者毎に習熟度により修
正した開発工数を求め、その研究開発テーマにかかる全
開発工数を求め、一方、段階Dの対象テーマの研究開発
に必要とされる開発工数見積りを標準の習熟度の開発者
で行い、前記全開発工数と見積りした開発工数とを対比
して表示する。新たに研究開発すべき対象テーマヘの開
発者の割り当てを試行錯誤により行う際に、必要な工数
が得られているかどうかわかりやすくなり、最適な対象
テーマヘの開発者の割り当てがより効率的に行える。
[0014] In the R & D support method according to claim 19,
In claim 1, a developer who is in charge of a target theme and a development man-hour are input for each technical field , a development man-hour is corrected for each developer by skill level, and a total development man-hour related to the research and development theme is obtained. The development man-hours required for the research and development of the target theme of Stage D are estimated by a developer with a standard skill level, and the total development man-hours and the estimated development man-hours are displayed in comparison. When assigning a developer to a target theme to be newly researched and developed by trial and error, it becomes easy to see whether the required man-hours are obtained, and the developer can be more efficiently assigned to the optimal target theme.

【手続補正5】[Procedure amendment 5]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】0024[Correction target item name] 0024

【補正方法】変更[Correction method] Change

【補正内容】[Correction contents]

【0024】[0024]

【発明の実施の形態】本発明の実施の形態の一例につい
て説明すると、図lは本発明の第1の実施例の説明図
で、請求項1,2,3,16,20,21,22に関す
るものである。研究開発テーマ運営管理責任者は、新た
に研究開発すべきと考えられるテーマが発生した場合
に、そのテーマを実施するかどうか、実施する場合は開
発者をどのように割り当てるかを判断する際に、図1の
ような研究開発支援システムを用い、(1) 新たに研究開
発すべき対象テーマの研究開発に必要とされる開発工数
をスキル別に見積もる(2) 対象テーマヘの新たな開発工
数が得られるかどうかを研究開発支援システムを利用し
て求める。(3) 得られる場合は、開発者の対象テーマヘ
の割り付け及び既開発テーマからの解除をどのように行
うかを研究開発支援システムを利用して対話的に検討す
る。(4) 対象テーマを実施するかどうか、実施する場合
は、開発者の対象テーマヘの割り付け及び既開発テーマ
からの解除をどのように行うかについて決定する。とい
う手順で実施する。研究開発システムでの処理フロー
図2に示す。研究開発支援システムには、開発者に負荷
し得る時間(開発工数)が登録されているテーブル、研
究開発に必要なスキル毎の開発者名が登録されているテ
ーブル、既に研究開発を行っているテーマ毎に開発者が
かけている開発工数が登録されているテーブルがあり、
対象テーマの見積もり工数の入力に対して、その工数が
得られるかどうかを演算処理により求めて表示したり、
研究開発テーマ運用管理責任者が対象テーマへの開発者
の割り付け及び既開発テーマからの解除をどのように行
うかを試行錯誤により検討するために入力された各種条
件に対する演算結果を表示したりする。また、各テーブ
ル内のデータは登録部を通じて更新される。
DESCRIPTION OF THE PREFERRED EMBODIMENTS An example of the embodiment of the present invention will be described. FIG. 1 is an explanatory view of the first embodiment of the present invention, and claims 1, 2, 3, 16, 20, 20, 21, and 22. It is about. When a new theme is deemed to be required for R & D, the person in charge of R & D theme management decides whether to implement the theme and, if so, how to assign a developer. Using the R & D support system shown in Fig. 1, (1) Estimate the number of development man-hours required for R & D of a new target theme by skill. (2) Obtain new development man-hours for the target theme. Using the R & D support system. (3) If obtained, interactively examine how to assign developers to target themes and release them from existing themes using the R & D support system. (4) Decide whether to implement the target theme, and if so, how to assign the developer to the target theme and release from the already developed theme. The procedure is as follows. FIG. 2 shows a processing flow in the R & D system. In the R & D support system, a table in which the time that can be imposed on the developer (development man-hours) is registered, a table in which the developer name for each skill required for R & D is registered, and the R & D has already been performed There is a table in which the development man-hours that the developer is applying for each theme is registered,
For the input of the estimated man-hours of the target theme, whether or not the man-hours can be obtained is calculated and displayed,
Display the calculation results for various conditions entered in order for the person in charge of R & D theme operation and management to examine by trial and error how to assign developers to the target theme and release from the already developed theme by trial and error . The data in each table is updated through the registration unit.

【手続補正6】[Procedure amendment 6]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】0035[Correction target item name] 0035

【補正方法】変更[Correction method] Change

【補正内容】[Correction contents]

【0035】図10は第5の実施例の説明図で請求項7
に関するものである。第1の実施例において、図10
(a)のように段階Bの研究開発に必要なスキル毎の開発
者名の登録を、開発者の有する複数のスキルについて順
序付けをして行い、この順序を図10(b)にように表示
する。この例ではテーマfffではスキルA2100を
持つAAAが充当しているが、AAAにとってはスキル
A2100は2番目のスキルであるので、AAAのテー
fffへの工数を削除するという判断が研究開発テー
マ運用管理責任者によってなされる。既存テーマの解除
を行う際に、割り当てを開発者の優先度付き習熟度を考
慮して行うことができ、より最適な対象テーマへの開発
者の割り当てが行える。
FIG. 10 is an explanatory view of the fifth embodiment.
It is about. In the first embodiment, FIG.
As shown in (a), the registration of the developer name for each skill required for the research and development in stage B is performed by ordering a plurality of skills possessed by the developer, and this order is displayed as shown in FIG. 10 (b). I do. In this example, AAA having skill A2100 is appropriated for theme fff , but for AAA, since skill A2100 is the second skill, the determination to delete the man-hour for AAA's theme fff is determined by R & D theme operation management. Made by the responsible person. When canceling the existing theme, the assignment can be performed in consideration of the proficiency with priority of the developer, and the developer can be more optimally assigned to the target theme.

【手続補正7】[Procedure amendment 7]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】0044[Correction target item name] 0044

【補正方法】変更[Correction method] Change

【補正内容】[Correction contents]

【0044】請求項4の発明により、開発者の事情を考
慮することができ、より最適な対象テーマヘの開発者の
割り当てが行える。請求項5の発明により、開発者の習
熟度を考慮することができ、より最適な対象テーマヘの
開発者の割り当てが行える。請求項6の発明により、開
発者の習熟度を考慮した工数が得られ、より最適な対象
テーマヘの開発者の割り当てが行える。
According to the fourth aspect of the present invention, the situation of the developer can be considered, and the developer can be more optimally assigned to the target theme. According to the fifth aspect of the present invention, the skill of the developer can be considered, and the developer can be more optimally assigned to the target theme. According to the sixth aspect of the present invention, man-hours in consideration of the skill level of the developer can be obtained, and the developer can be more optimally assigned to the target theme.

【手続補正8】[Procedure amendment 8]

【補正対象書類名】図面[Document name to be amended] Drawing

【補正対象項目名】図26[Correction target item name] FIG. 26

【補正方法】変更[Correction method] Change

【補正内容】[Correction contents]

【図26】 FIG. 26

───────────────────────────────────────────────────── フロントページの続き (72)発明者 中村 良光 大阪府門真市大字門真1048番地松下電工株 式会社内 (72)発明者 渡辺 邦重 大阪府門真市大字門真1048番地松下電工株 式会社内 (72)発明者 杉山 泰臣 大阪府門真市大字門真1048番地松下電工株 式会社内 ──────────────────────────────────────────────────続 き Continuing on the front page (72) Inventor Yoshimitsu Nakamura 1048 Kazumasa Kadoma, Osaka Prefecture Matsushita Electric Works Co., Ltd. 72) Inventor Yasuomi Sugiyama 1048 Kazuma Kadoma, Kadoma City, Osaka Inside Matsushita Electric Works, Ltd.

Claims (31)

【特許請求の範囲】[Claims] 【請求項1】 研究開発において、開発者に負荷し得る
開発工数を登録しておく段階A、研究開発に必要な技術
分野毎の開発者名を登録しておく段階B、既に研究開発
を行っているテーマ毎に開発者がかけている開発工数と
を登録しておく段階C、新たに研究開発すべき対象テー
マの研究開発に必要とされる開発工数を技術分野別に見
積もる段階D、前記A,B,Cと登録されたデータと、
Dの技術分野別に見積もられた開発工数とから対象テー
マヘの新たな開発工数が得られるかどうかの判断をする
段階E、得られる場合に開発者の対象テーマヘの割り付
け及び既開発テーマからの解除をどのように行うかの対
話的検討段階Hとからなることを特徴とする研究開発支
援方法。
1. In research and development, a stage A in which development man-hours that can be imposed on a developer is registered, a stage B in which a developer name for each technical field required for the research and development is registered, a stage in which the research and development has already been performed. Step C for registering the development man-hours that the developer is applying for each theme, and Step D for estimating the development man-hours required for R & D of the target theme to be newly researched and developed for each technical field. , B, C registered data,
Stage E, in which it is determined whether new development man-hours for the target theme can be obtained from the development man-hours estimated for each technical field in D. If so, the developer is assigned to the target theme and released from the already developed theme. And a dialogue examination stage H on how to perform research and development.
【請求項2】 技術分野を開発者が所有する専門技術と
することを特徴とする請求項1記載の研究開発支援方
法。
2. The research and development support method according to claim 1, wherein the technical field is a specialized technique owned by the developer.
【請求項3】 技術分野を同様の技術を有する開発者か
ら構成される部署とすることを特徴とする請求項1記載
の研究開発支援方法。
3. The research and development support method according to claim 1, wherein the technical field is a department composed of developers having the same technology.
【請求項4】 段階Aの研究開発において、開発者に負
荷し得る開発工数を複数レベルで登録しておくことを特
徴とする請求項1記載の研究開発支援方法。
4. The research and development support method according to claim 1, wherein in the research and development in the stage A, development man-hours that can be imposed on the developer are registered at a plurality of levels.
【請求項5】 段階Bの研究開発に必要な技術分野毎の
開発者名の登録を、その技術分野を有する開発者名とと
もに開発者の習熟度を併せて登録することを特徴とする
請求項1記載の研究開発支援方法。
5. The method according to claim 1, wherein the registration of the developer name for each technical field required for the research and development in the step B is registered together with the name of the developer having the technical field together with the proficiency level of the developer. 1. The research and development support method according to 1.
【請求項6】 習熟度が開発に必要な時間に比例した指
数となっていることを特徴とする請求項3記載の研究開
発支援方法。
6. The research and development support method according to claim 3, wherein the proficiency is an index proportional to the time required for development.
【請求項7】 段階Bの研究開発に必要なスキル毎の開
発者名の登録を、開発者の有する複数のスキルについて
順序付けをして行うことを特徴とする請求項2記載の研
究開発支援方法。
7. The research and development support method according to claim 2, wherein the registration of the developer name for each skill required for the research and development in the stage B is performed by ordering a plurality of skills possessed by the developer. .
【請求項8】 段階Cの研究開発を行っているテーマ毎
に開発者がかけている開発時間の登録は複数月の平均値
により行うことを特徴とする請求項1記載の研究開発支
援方法。
8. The research and development support method according to claim 1, wherein the registration of the development time used by the developer for each of the themes in which the research and development in the stage C is performed is performed by an average value of a plurality of months.
【請求項9】 段階Cの研究開発を行っているテーマ毎
に開発者がかけている開発時間の登録とともに、テーマ
毎の重要度を併せて登録することを特徴とする請求項1
記載の研究開発支援方法。
9. The method according to claim 1, further comprising: registering the development time spent by the developer for each theme for which the research and development in the stage C is being performed, and registering the importance of each theme.
R & D support method described.
【請求項10】 クラス分けは緊急度に応じて分けられ
たものであることを特徴とする請求項9記載の研究開発
支援方法。
10. The research and development support method according to claim 9, wherein the classification is performed according to the degree of urgency.
【請求項11】 段階Cの研究開発を行っているテーマ
毎に開発者がかけている開発時間の登録を開発者毎のス
ケジュール管理システムからのデータの抽出により行う
ことを特徴とする請求項1記載の研究開発支援方法。
11. The method according to claim 1, wherein the registration of the development time assigned by the developer for each of the themes for which the research and development of the stage C is performed is performed by extracting data from the schedule management system for each developer. R & D support method described.
【請求項12】 段階Cの研究開発を行っているテーマ
毎に開発者がかけている開発時間の登録を開発業務に別
けて行うことを特徴とする請求項1または8記載の研究
開発支援方法。
12. The research and development support method according to claim 1, wherein the registration of the development time that the developer spends for each of the themes in which the research and development in the stage C is performed is performed separately for the development work. .
【請求項13】 詳細開発業務と、登録用に分類されて
いる開発業務の対応表が用意されており、登録画面上で
詳細開発業務を選択すると対応する登録用開発業務が自
動的に登録されることを特徴とする請求項12記載の研
究開発支援方法。
13. A correspondence table of detailed development work and development work classified for registration is prepared. When a detailed development work is selected on the registration screen, the corresponding registration development work is automatically registered. 13. The research and development support method according to claim 12, wherein:
【請求項14】 出社時刻、退社時刻、各テーマの開発
工数を入力すると、テーマ開発工数以外の工数が自動的
に計算され登録されることを特徴とする請求項12記載
の研究開発支援方法。
14. The research and development support method according to claim 12, wherein when a start time, a departure time, and a development man-hour of each theme are input, man-hours other than the theme development man-hour are automatically calculated and registered.
【請求項15】 段階Cのデータから、テーマ毎の開発
工数合計を出力することを特徴とする請求項1記載の研
究開発支援方法。
15. The research and development support method according to claim 1, wherein a total number of development steps for each theme is output from the data in step C.
【請求項16】 段階Dの開発工数の見積りを、対象テ
ーマに必要な技術分野と、開発期間と、技術分野毎の月
当りの開発工数の見積りからなるとを特徴とする請求項
1記載の研究開発支援方法。
16. The research according to claim 1, wherein the estimation of the development man-hour in the step D includes the technical field required for the target theme, the development period, and the estimation of the development man-hour per month for each technical field. Development support method.
【請求項17】 研究開発の事業的な貢献度に関するデ
ータも登録することを特徴とする請求項1記載の研究開
発支援方法。
17. The research and development support method according to claim 1, further comprising the step of registering data relating to the business contribution of the research and development.
【請求項18】 現行テーマの遅れによる見込損失を登
録データとすることを特徴とする請求項17記載の研究
開発支援方法。
18. The research and development support method according to claim 17, wherein an expected loss due to a delay of the current theme is used as registration data.
【請求項19】 スキル別に対象テーマを担当する開発
者と開発工数を入力し、開発者毎に習熟度により修正し
た開発工数を求め、その研究開発テーマにかかる全開発
工数を求め、一方、段階Dの対象テーマの研究開発に必
要とされる開発工数見積りを標準の習熟度の開発者で行
い、前記全開発工数と見積りした開発工数とを対比して
表示することを特徴とする請求項1記載の研究開発支援
方法。
19. A developer who is in charge of a target theme for each skill and a development man-hour are inputted, a development man-hour is corrected for each developer by skill level, and a total development man-hour for the R & D theme is obtained. 2. The method according to claim 1, wherein the development man-hours required for research and development of the target theme of D are estimated by a developer having a standard proficiency, and the total man-hours and the estimated development man-hours are displayed in comparison. R & D support method described.
【請求項20】 開発者の工数実績表を残業申告書と兼
用することを特徴とする請求項1記載の研究開発支援方
法。
20. The research and development support method according to claim 1, wherein the man-hour performance table of the developer is also used as an overtime report.
【請求項21】 段階A,B,Cで登録されたデータ
と、段階Dの技術分野別に見積もられた開発工数とか
ら、対象テーマヘの新たな開発工数が得られるかどうか
の判断を行う段階Eと、登録された前記技術分野毎の開
発者名と、テーマ毎に開発者がかけている開発時間とか
ら前記技術分野別に開発者とテーマ別の開発時間との関
係を表示する段階Fと、表示された関係から対象テーマ
への開発者の割り付け及び既開発テーマからの解除をど
のように行うかの判断を対話的に下すことを特徴とする
請求項1記載の研究開発支援方法。
21. A step of judging whether new development man-hours for the target theme can be obtained from the data registered in steps A, B, and C and the development man-hours estimated for each technical field in step D. E, a step F of displaying the relationship between the developer and the theme-specific development time for each of the technical fields from the registered developer name for each of the technical fields and the development time for each theme. 2. The research and development support method according to claim 1, wherein the determination of how to assign the developer to the target theme from the displayed relationship and release the developer from the already developed theme is made interactively.
【請求項22】 段階Fの表示は未来の所定の時期にお
ける前記スキル別に開発者とテーマ別の開発時間との関
係を表示Gが可能としたことを特徴とする請求項21記
載の研究開発支援方法。
22. The research and development support according to claim 21, wherein the display of the step F enables the display G to show the relationship between the developer and the development time by the theme for each skill at a predetermined time in the future. Method.
【請求項23】 段階Fの表示にその開発者のその開発
テーマにおける重要度を表示することを特徴とする請求
項21記載の研究開発支援方法。
23. The research and development support method according to claim 21, wherein the importance of the developer in the development theme is displayed in the display of the step F.
【請求項24】 段階Fの表示にその開発者のその開発
テーマにおける工数の割合を表示することを特徴とする
請求項23記載の研究開発支援方法。
24. The research and development support method according to claim 23, wherein the display of the step F displays the ratio of the man-hour of the developer in the development theme.
【請求項25】 工数の割合には、習熟度による重み付
けを行って求めることを特徴とする請求項24記載の研
究開発支援方法。
25. The research and development support method according to claim 24, wherein the ratio of man-hours is obtained by performing weighting based on proficiency.
【請求項26】 関係の表示とともに、対象テーマの研
究開発を行った場合の人件費の増加を、登録した研究開
発に開発者がかけ得る時間の複数レベルを基に算出、表
示することを特徴とする請求項21記載の研究開発支援
方法。
26. A method for calculating and displaying an increase in labor costs when research and development of a target theme is performed based on a plurality of levels of time that a developer can spend on registered research and development, together with the display of the relationship. 22. The research and development support method according to claim 21, wherein:
【請求項27】 段階Fの表示のテーマが重要度分けさ
れたものであり、重要度ごとに色表示を変えた表示とす
ることを請求項21記載の特徴とする研究開発支援方
法。
27. The research and development support method according to claim 21, wherein the display theme of the stage F is classified according to importance, and the display is changed in color display for each importance.
【請求項28】 開発者の対象テーマヘの割り付け及び
開発テーマからの解除の候補を、あらかじめ指定した条
件にしたがって求めることを特徴とする請求項1記載の
研究開発支援方法。
28. The research and development support method according to claim 1, wherein candidates for assignment to the target theme and release from the development theme by the developer are obtained according to conditions specified in advance.
【請求項29】 割付候補開発者は合計工数が少ない者
から順次選ぶことを特徴とする請求項28記載の研究開
発支援方法。
29. The research and development support method according to claim 28, wherein the allocation candidate developers are sequentially selected from those with a smaller total man-hour.
【請求項30】 割付候補開発者は担当テーマの重要度
が低い者から順次選ぶことを特徴とする請求項28記載
の研究開発支援方法。
30. The research and development support method according to claim 28, wherein the allocation candidate developers are sequentially selected from those whose importance of the assigned theme is low.
【請求項31】 割付候補開発者は担当テーマの重要度
が低く、担当テーマ内での重要度が低い者から順次選ぶ
ことを特徴とする請求項28記載の研究開発支援方法。
31. The research and development support method according to claim 28, wherein the assignment candidate developers sequentially select the assigned theme developers in descending order of importance within the assigned theme.
JP1466298A 1998-01-27 1998-01-27 Research and development supporting method Pending JPH11213035A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1466298A JPH11213035A (en) 1998-01-27 1998-01-27 Research and development supporting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1466298A JPH11213035A (en) 1998-01-27 1998-01-27 Research and development supporting method

Publications (1)

Publication Number Publication Date
JPH11213035A true JPH11213035A (en) 1999-08-06

Family

ID=11867438

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1466298A Pending JPH11213035A (en) 1998-01-27 1998-01-27 Research and development supporting method

Country Status (1)

Country Link
JP (1) JPH11213035A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002109161A (en) * 2000-10-03 2002-04-12 Konami Computer Entertainment Yokyo Inc System for supporting personnel distribution
JP2003122921A (en) * 2001-10-09 2003-04-25 Nippon Soken Holdings:Kk Job assignment management system and method
WO2005048147A1 (en) * 2003-11-13 2005-05-26 Hitachi, Ltd. Result management device
JP2005222474A (en) * 2004-02-09 2005-08-18 Fuji Xerox Co Ltd Multiplex work support device, multiplex work support method, and program therefor
JP2006244000A (en) * 2005-03-02 2006-09-14 Toshiba Corp Process management device and process management program
JP2008059368A (en) * 2006-08-31 2008-03-13 Ricoh Co Ltd Workflow management system, workflow management method, workflow management program, and recording medium
JP2014115852A (en) * 2012-12-10 2014-06-26 Hitachi Systems Ltd Staff assignment server, method, and program

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002109161A (en) * 2000-10-03 2002-04-12 Konami Computer Entertainment Yokyo Inc System for supporting personnel distribution
JP2003122921A (en) * 2001-10-09 2003-04-25 Nippon Soken Holdings:Kk Job assignment management system and method
WO2005048147A1 (en) * 2003-11-13 2005-05-26 Hitachi, Ltd. Result management device
JP2005222474A (en) * 2004-02-09 2005-08-18 Fuji Xerox Co Ltd Multiplex work support device, multiplex work support method, and program therefor
JP2006244000A (en) * 2005-03-02 2006-09-14 Toshiba Corp Process management device and process management program
JP2008059368A (en) * 2006-08-31 2008-03-13 Ricoh Co Ltd Workflow management system, workflow management method, workflow management program, and recording medium
US8155988B2 (en) 2006-08-31 2012-04-10 Ricoh Company, Ltd. Workflow management including determination if a requestor is in charge of tasks
JP2014115852A (en) * 2012-12-10 2014-06-26 Hitachi Systems Ltd Staff assignment server, method, and program

Similar Documents

Publication Publication Date Title
US20200143310A1 (en) Simulator Device
US6044354A (en) Computer-based product planning system
US6546506B1 (en) Technique for automatically generating a software test plan
US20040093584A1 (en) Facilitating software engineering and management in connection with a software development project according to a process that is compliant with a qualitatively measurable standard
US20040098291A1 (en) Apparatus and method for visualizing resource consumption
US8484060B2 (en) Project estimating system and method
US20030018952A1 (en) System and method to estimate resource usage for a software development project
JPH09190469A (en) Schedule managing system
KR100778966B1 (en) Global document creation system including administrative server computer
WO2006093632A2 (en) Project management software
US20120179512A1 (en) Change management system
US20150242782A1 (en) Interactive Planning Method And Tool
JP2006318331A (en) System for work man-hour estimation and personnel allocation, and its method
US20180046969A1 (en) Task execution support device, task execution support system, and non-transitory computer-readable storage medium
JPH11213035A (en) Research and development supporting method
US11983528B2 (en) System and method for automated simulation of releases in agile environments
JPH07287730A (en) Device for supporting allocation of work
US11823097B2 (en) Process management support system, process management support method, and process management support program
JPH1086044A (en) Worker's discretion utilization schedule planning method and device therefor
Sauer Using design rationales for agile documentation
US20140229228A1 (en) Determining risk associated with a determined labor type for candidate personnel
Sandkuhl et al. Organizational adoption of capability management
JPH11245819A (en) Vehicle operating plan preparing device
JP4040735B2 (en) Work man-hour estimation device
JPH08320855A (en) Method and system for evaluating system introduction effect

Legal Events

Date Code Title Description
A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20031224