JP2006318331A - System for work man-hour estimation and personnel allocation, and its method - Google Patents
System for work man-hour estimation and personnel allocation, and its method Download PDFInfo
- Publication number
- JP2006318331A JP2006318331A JP2005142135A JP2005142135A JP2006318331A JP 2006318331 A JP2006318331 A JP 2006318331A JP 2005142135 A JP2005142135 A JP 2005142135A JP 2005142135 A JP2005142135 A JP 2005142135A JP 2006318331 A JP2006318331 A JP 2006318331A
- Authority
- JP
- Japan
- Prior art keywords
- work
- man
- hour
- worker
- hours
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims description 25
- 238000011156 evaluation Methods 0.000 claims abstract description 44
- 238000012545 processing Methods 0.000 claims abstract description 12
- 238000007726 management method Methods 0.000 claims description 31
- 238000004364 calculation method Methods 0.000 claims description 25
- 238000013468 resource allocation Methods 0.000 claims description 20
- 230000000007 visual effect Effects 0.000 claims description 2
- 238000011161 development Methods 0.000 abstract description 6
- 238000010586 diagram Methods 0.000 description 8
- 230000003068 static effect Effects 0.000 description 4
- 230000008520 organization Effects 0.000 description 2
- 238000012937 correction Methods 0.000 description 1
- 238000013523 data management Methods 0.000 description 1
- 238000012827 research and development Methods 0.000 description 1
Images
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
本発明は、新規作業に対して、過去の実績より適切な作業工数を見積り、人材のスキルと照合することにより、最適な人材を適用するための作業見積および人材割当システム、ならびにその方法に関する。 The present invention relates to a work estimation and human resource allocation system for applying an optimal human resource by estimating an appropriate work man-hour from a past performance for a new work and collating it with the human resource skill, and a method thereof.
従来から、新規作業に対して、その進捗度合や作業の成果などを管理する提案は存在したが、作業工数を見積もったり、適当な人材を割当てる提案は少なかった。
その中で、人材の割当て方法を提案したものとしては、例えば、特開平11−288435号公報(特許文献1参照)に記載の『人材割当支援システム』がある。
この支援システムは、入出力処理部と、プロジェクト目標の情報の入力を受付け、それらの情報の管理を行うプロジェクト情報管理部と、各人材の経験した機能項目、その機能項目への適合度、新規プロジェクトへの参加可能期間などを蓄積する人材情報管理部と、新規プロジェクトの各機能項目に対する人材の総合的な適合度を算出する適合度算出部と、プロジェクト全体における人材割当ての適合度、つまりプロジェクトで期待できる成果の見積り値を利用して算出する人材適合度算出部と、新規プロジェクト情報データベースと、過去に実施されたプロジェクトに関する情報を蓄積するプロジェクト情報データベースと、人材情報データベースとから構成される。
Conventionally, there have been proposals for managing the degree of progress and results of work for new work, but there have been few proposals for estimating work man-hours and assigning appropriate human resources.
Among them, a human resource allocation method proposed is, for example, a “human resource allocation support system” described in Japanese Patent Application Laid-Open No. 11-288435 (see Patent Document 1).
This support system includes an input / output processing unit, a project information management unit that accepts input of project goal information and manages the information, function items experienced by each human resource, fitness to the function items, new Human resources information management department that accumulates the period of time that can participate in the project, fitness calculation section that calculates the overall fitness level of human resources for each function item of the new project, and the fitness level of human resource allocation in the entire project, that is, the project It consists of a human resource suitability calculation unit that calculates using the estimated value of the expected outcome, a new project information database, a project information database that stores information on projects that have been implemented in the past, and a human resource information database .
上記支援システムでは、新規プロジェクト情報を電子メールにより組織内の関連端末に送ると、組織内の各人材はこのプロジェクト情報を見て、必要に応じてプロジェクトへの参加希望を電子メールにより支援システムに送信する。人材情報管理部は、予め人材情報データベースに組織内の各人材について、人材名、経験のある機能項目、機能項目への適合度、経験したプロジェクトに関する情報、新規プロジェクトに参加加能な期間を示す空きスケジュールが設定される。ここで、適合度は、機能項目の研究・開発に従事した期間(経験)の長さを数値で表したものである。なお、適合度として、人材本人または上司により別途決定された機能項目の技術・作業への習熟度や能力の評価値を用いてもよい、と記載されている。選別は、新規プロジェクトデータベース内の実施スケジュールと、人材情報データベース内の空きスケジュールとを比較することにより行われる。 In the above support system, when new project information is sent to relevant terminals in the organization by e-mail, each human resource in the organization looks at this project information and, if necessary, requests to participate in the project to the support system by e-mail. Send. The Human Resources Information Management Department shows in advance the human resource name, experienced function items, suitability to functional items, information about experienced projects, and the period of participation in new projects in the personnel information database. A free schedule is set. Here, the degree of conformity is a numerical value representing the length of time (experience) engaged in the research and development of functional items. In addition, it is described that the proficiency level may be an evaluation value of skill level and ability of skill and work of function items separately determined by the person himself or his supervisor. The selection is performed by comparing the execution schedule in the new project database with the empty schedule in the human resource information database.
従来のシステムでは、開発作業において、プロジェクトマネージャーが作業者の能力や空き工数を考慮して、日程の調整を行うことができず、作業遅延が発生する問題が生じている。また、従来は、予め設定された階層関係によって目標を達成するための適合度算出を行っている。すなわち、静的な既存の評価基準を使用して適合度の算出を行っている。
しかしながら、本来望まれるのは、静的な既存の評価基準値を使用することなく、プロジェクトや開発チーム毎の特色を考慮して工数の見積りを行うことであって、プロジェクトを逐行するチームの過去の実績値と新規プロジェクトの作業量によって、チームの能力に依存した作業量を算出することが望ましい。また、個々の人材の過去の実績値と新規プロジェクトの細分化された作業の作要スキルにより、個々の人材の変動していく作業能力に柔軟に対応した人材の割当を行うことが望ましい。
In the conventional system, there is a problem that in the development work, the project manager cannot adjust the schedule in consideration of the worker's ability and the available man-hours, and the work delay occurs. Conventionally, the fitness calculation for achieving the target is performed based on a preset hierarchical relationship. That is, the fitness is calculated using existing static evaluation criteria.
However, what is originally desired is to estimate the man-hours in consideration of the characteristics of each project and development team without using static existing evaluation standard values. It is desirable to calculate the amount of work depending on the ability of the team based on the past performance values and the amount of work of the new project. In addition, it is desirable to assign human resources that flexibly correspond to the changing work ability of individual human resources, based on past performance values of individual human resources and subordinate work preparation skills of new projects.
(目的)
本発明の目的は、静的な既存の評価基準を用いることなく、プロジェクトや開発チーム毎の特色を考慮した工数の見積りを行うとともに、新規プロジェクトを登録する登録者の意図により決定された機能要素を用いて、過去の実績に基づきより的確な工数の見積りおよび適合した人材の割当が可能な作業工数見積および人材割当システムならびにその方法を提供することにある。
(the purpose)
The purpose of the present invention is to estimate the man-hours taking into account the characteristics of each project and development team without using static existing evaluation criteria, and to determine the functional elements determined by the registrant's intention to register a new project. It is an object to provide a work man-hour estimation and human resource allocation system and method capable of more accurately estimating man-hours and assigning suitable human resources based on past results.
本発明の作業工数見積および人材割当システムは、過去に行った類似作業を検索することにより、新規作業の工数を見積る機能を有し、また、作業者の空き工数や作業者のスキル情報を算出する機能を有し、新規作業の作業期間内で空き工数を持つ作業者の中から、作業に必要なスキルを持つ作業者を検索し、これを最適な作業担当者として人材を割当てる。 The work man-hour estimation and human resource allocation system of the present invention has a function of estimating man-hours for new work by searching for similar work done in the past, and also calculates the worker's vacant man-hour and worker skill information. The worker having the function to perform and having the manpower required for the work is searched from the workers having the available man-hours within the work period of the new work, and a human resource is assigned as the optimum worker.
すなわち、本発明の作業工数見積および人材割当システムは、登録された作業の評価基準を1次元単位で作成し、作成された情報を登録または変更し、管理する評価基準管理部と、新規のプロジェクトや作業の登録または更新する作業進捗管理部と、登録する作業の追加情報を検索キーとして、過去の作業に類似した作業が発生しているか否かを検索する作業見積処理部と、登録する作業の作業開始日および作業終了日より人材を必要とする作業期間を求め、該作業期間で作業が有効な作業者を検索し、該作業者が他に担当している作業がない場合には作業可能な工数があると判断し、ある場合には、計算式を用いて担当者に空き工数があるか否かを判断する空き工数検索部と、作業期間内に空き工数を持つ作業者の中から、最も登録作業に合致したスキルおよび経験を持っている者から作業担当者を選択し、空き工数のある作業者に対して、作業が必要とする作業工数を該作業担当者が満たすか否かを調べる人材適性見積部と、プロジェクトや作業の情報を次元単位で取り扱い、次元と次元内の作業項目に紐付きで保持する作業評価基準データベースと、登録されたプロジェクトおよび作業データを格納し、該プロジェクトを表現するための必要項目を格納する作業進捗データベースと、人材の名前と有効作業開始日と有効作業終了日の管理項目を保持する人材管理データベースとを有することを特徴としている。 That is, the work man-hour estimation and human resource allocation system of the present invention creates an evaluation standard for registered work in a one-dimensional unit, registers or changes the created information, and manages a new project. A work progress management unit that registers or updates tasks, a work estimation processing unit that searches whether additional work information to be registered is used as a search key, and whether or not a work similar to the past work has occurred, and a work to be registered The work period that requires human resources is obtained from the work start date and the work end date, and a worker who is active in the work period is searched. If there is no other work that the worker is in charge of, the work is performed. It is determined that there are available man-hours, and if there is, there is an empty man-hour search unit that determines whether the person in charge has free man-hours using a calculation formula, and among workers who have free man-hours within the work period. To the most registered work Select the person in charge from those who have the skills and experience that have been assigned, and evaluate the aptitude for human resources to check whether the person in charge of the work satisfies the work manpower required for the work for the worker with available man-hours. Department, project and work information in units of dimensions, a work evaluation standard database that holds the work items in the dimensions and dimensions linked to each other, and stores the registered project and work data, and expresses the project It is characterized by having a work progress database for storing necessary items and a human resource management database for holding management items for the names of human resources, effective work start dates, and effective work end dates.
本発明では、まずプロジェクトがどのような機能要素を持っているかを表現する機能情報として、評価基準データベースを設け、プロジェクトを表現していく。この機能要素は、目的な状況に応じて随時追加することを可能とし、従来と異なって各機能要素に対して人材適合率などの算出に用いる数値情報は含んでおらず、新規プロジェクトを登録する登録者の意図により決定された値を用いることで、より的確な工数見積りおよび適合した人材の割当てを可能とする。 In the present invention, first, an evaluation standard database is provided as function information expressing what functional elements the project has, and the project is expressed. This functional element can be added at any time according to the intended situation, and unlike the conventional case, it does not include numerical information used to calculate the human resource fit rate for each functional element, and registers a new project. By using a value determined according to the intention of the registrant, it is possible to estimate the man-hours more accurately and assign suitable human resources.
本発明によれば、静的な既存の評価基準を使用しないことで、過去の実績によるプロジェクトや開発チーム毎の特色を考慮した、最も現実的な工数の見積りおよび適合した人材の割当が可能になる。 According to the present invention, by not using existing static evaluation criteria, it is possible to estimate the most realistic man-hours and assign suitable human resources in consideration of the features of each past project and development team. Become.
以下、本発明の実施例を、図面により詳細に説明する。
図1は、本発明の一実施例に係る作業工数見積および人材割当システムの機能構成図である。
本実施例のシステム100は、図1に示すように、入出力処理部101、評価基準管理部102、作業進捗管理部103、作業見積処理部104、空き工数検索部105、人材適性見積部106、作業評価基準データベース107、作業進捗データベース108、および人材管理データベース109から構成される。
以下、各部101〜109の機能・動作について説明する。
Embodiments of the present invention will be described below in detail with reference to the drawings.
FIG. 1 is a functional configuration diagram of a work man-hour estimation and human resource allocation system according to an embodiment of the present invention.
As shown in FIG. 1, the
Hereinafter, functions and operations of the
(データ管理部(各データベースの内容))
図2は、図1における作業評価基準データベースで管理する評価基準のデータ項目例を示す図である。
作業評価基準データベース107は、プロジェクトや作業の情報を次元単位で取り扱い、さらに各次元にはプロジェクトや作業を表現するための作業項目を持っている。例えば、図2に示すように、次元としては、作業目的、業務、作業内容、顧客、案件、経理作業、・・などがあり、項目としては、1(要件定義),2(開発),3(調査),4(資料作成)・・などがある。
作業評価基準データベース107では、次元と次元内の作業項目を紐付けて保持しているだけで、作業工数の算出に必要な情報は持っていない。
(Data management department (contents of each database))
FIG. 2 is a diagram showing an example of data items of evaluation criteria managed by the work evaluation criteria database in FIG.
The work
In the work
図3は、図1における作業進捗データベースで管理する作業項目例を示す図である。
図3には、登録されたプロジェクトおよび作業データを格納する作業進捗データベース108のデータ項目が列挙されている。プロジェクトを表現するための必要項目として、作業番号、プロジェクト名、作業工数、作業開始日、作業終了日、実績開始日、実績終了日、実績対応率、実績工数、作業内容、顧客がある。
また、作業を表現するための必須項目は、プロジェクトを表現するための必須項目に加えて、親作業番号、作業名、担当作業、担当者、対応率の各情報を持っている。
FIG. 3 is a diagram showing an example of work items managed by the work progress database in FIG.
FIG. 3 lists data items in the
In addition to the essential items for expressing the project, the essential items for expressing the work have each information of the parent work number, the work name, the work in charge, the person in charge, and the response rate.
以下、各項目について説明する。作業番号は、プロジェクトや作業を管理するための一意な番号で、関連する親の作業との関連付けなどに用いられる情報である。親作業番号は、作業がどのプロジェクトおよび親作業から発生した作業であるかを表現する項目で、一階層上の作業を示すことでプロジェクト全体を管理することができる。プロジェクト名は、プロジェクトおよび作業が発生しているプロジェクトの名称である。作業名は、実作業を表現するための名称である。担当作業は、作業に対して最も大きな分類として表現する評価基準であり、この実データは作業評価基準データベース107で管理されているものから決定される。
Each item will be described below. The work number is a unique number for managing a project or work, and is information used for associating with a related parent work. The parent work number is an item expressing which project and work the work is generated from. The parent work number can be managed by indicating the work one level higher. The project name is the name of the project and the project in which work is occurring. The work name is a name for expressing the actual work. The work in charge is an evaluation standard expressed as the largest classification for the work, and this actual data is determined from those managed in the work evaluation
担当者は、作業を実際に行う担当者の事である。作業進捗情報は、作業担当者毎に登録されるため、同じ作業に複数の作業担当者がいた場合、新しい作業番号で作業情報を登録することとなる。対応率は、作業担当者が1ケ月当たりに対応する工数の割合を表現しており、実際には0〜1までの情報で表現される。作業工数は、作業における作業量を表現したもので、その数値は登録者および他作業からの参照により決定される。作業開始日は、作業の開始を予定した日付であり、作業終了日は作業の終了を予定した日付である。実績開始日・実績終了日は、担当者が実際に作業を開始した日付と完了した日付を表現している。実績対応率は、作業が完了した際に、作業者が実際に対応した量を1ケ月当たりで表現したものである。実績工数は実際に作業を完了して入力される情報で、通常1人の作業者が1ケ月間で行う基本作業量を10000とし、作業量を定義する。時作業工数は、作業を完了し、予定していた作業工数より修正した作業量を表している。 The person in charge is the person in charge who actually performs the work. Since the work progress information is registered for each person in charge of work, if there are a plurality of work persons in the same work, the work information is registered with a new work number. The response rate expresses the ratio of man-hours corresponding to the worker in charge per month, and is actually expressed by information from 0 to 1. The work man-hour expresses the work amount in the work, and the numerical value is determined by reference from the registrant and other work. The work start date is the date on which the work is scheduled to start, and the work end date is the date on which the work is scheduled to end. The actual start date and actual end date express the date when the person in charge actually started the work and the date when the work was completed. The actual response rate expresses the amount actually handled by the worker when the work is completed per month. The actual man-hour is information that is input after actually completing the work, and the basic work amount that one worker usually performs in one month is 10000, and the work amount is defined. The time work man-hour represents a work amount that has been completed and corrected from the planned work man-hours.
次に、プロジェクト情報および作業情報を表現する追加情報について説明する。
本実施例のシステムでは、プロジェクト情報や作業情報を表現する方法として、他の類似作業情報から検索して作成する機能を持っており、検索を行うための情報を表現するために作業評価基準を用いている。
この追加情報には数に制限がなく、作業評価基準データベース107より当てはまる項目を任意に選択することができる。
Next, additional information expressing project information and work information will be described.
In the system of this embodiment, as a method of expressing project information and work information, it has a function of searching and creating from other similar work information, and a work evaluation standard is used to express information for search. Used.
The number of additional information is not limited, and an applicable item can be arbitrarily selected from the work
図4は、図1における人材管理データベースの管理例を示す図である。
プロジェクトに係わる人材の情報を管理する人材管理データベース109の管理項目は、図4に示すように、人材の名前と、有効作業開始日および有効作業終了日から構成され、これまで作業に係わっている作業者の作業可能期間を管理している。ここで、有効作業終了日が空欄の‘−’となっているの人材に関しては、作業終了日が未定であることを意味し、現時点でも作業可能な人材として取り扱われる。すなわち、作業終了日が確定している人材については、次の作業に移ることが明確であるため、作業可能な人材として取り扱うことができない。本実施例の効率的な割当て方法は、作業内容が類似しており(適合率が高く)、かつ対応率(作業担当者が1ケ月当たりに対応する工数の割合)が高い人材が割当てられる。
FIG. 4 is a diagram showing a management example of the human resource management database in FIG.
As shown in FIG. 4, the management items of the human
(機能部(人材適性見積・空き工数検索))
入出力処理部101では、GUI(Graphical User Interface)を用いて、作業評価基準の追加登録、作業の登録、作業進捗の更新、人材管理情報の追加登録を行うことができる。そして、作業評価基準、作業進捗情報、人材管理情報の更新を行うことが可能である。
評価基準管理部102では、入出力処理部101のGUIを通して、図2にある評価基準を1次元単位で作成することを可能にしている。
また、作業進捗管理部103では、プロジェクトおよびプロジェクトに係わる作業情報を登録/更新することを可能にしている。
評価基準管理部102では、この作業評価基準の登録/変更が行われる。
入出力処理部101は、GUIの機能を持ち、作業進捗管理や評価基準管理などの情報入出力に用いられる。
作業進捗管理部103では、ユーザによりプロジェクトや作業の登録を行う。
(Function Department (Estimation of human resources aptitude / vacant man-hour search))
The input /
The evaluation
In addition, the work
The evaluation
The input /
The work
図5は、本発明の一実施例に係る作業工数算出のフローチャートである。
登録者は、まずプロジェクトおよび作業に関する必要情報として、プロジェクト名、作業名、担当作業、作業開始日、作業終了日を入力する(ステップ201,202)。次に、作業評価基準データベース107より評価基準一覧情報を読み出し、登録する作業を表現するための次元および項目を任意の数だけ選択していく(ステップ203)。
次に、作業工数を入力するが、作業工数の候補を過去に完了した類似作業より参照することができる。
FIG. 5 is a flowchart for calculating the work man-hour according to an embodiment of the present invention.
The registrant first inputs the project name, work name, assigned work, work start date, and work end date as necessary information regarding the project and work (
Next, although the work man-hour is input, the work man-hour candidates can be referred to from similar work completed in the past.
作業見積処理部104は、登録する作業の追加情報を検索キーとして、作業進捗データベース108より、過去の作業に類似した作業が発生しているか否か検索する(ステップ208)。検索は、まず予め検索キーとなる次元および項目に対して、次元間・次元内の作業項目間の優先順位を表すための工数関係式を定義する(ステップ206,207)。
図6は、次元間の関係を入力するダイアログであり、登録する作業に追加した全ての次元間で0〜1までの値で重み付けを行う。ここでは、一例として、作業内容を1とし、業務の重みを0.7、顧客の重みを0.5と定義している。重みは、どこに重点を置いて考慮するかを登録者が決定する。つまり、検索において、作業内容がヒットした場合を1とするのに対して、業務がヒットした場合には0.7、顧客がヒットした場合には0.5とする。
また、図7は、次元内の項目間の関係を入力するダイアログであり、作業に登録した項目の重みを1とし、その他の項目に対して0〜0.9までの値を追加していく。ここでは、一例として、修正項目の重みを0.7と定義している。
The work
FIG. 6 is a dialog for inputting a relationship between dimensions, and weighting is performed with a value from 0 to 1 between all dimensions added to the registered work. Here, as an example, the work content is defined as 1, the work weight is defined as 0.7, and the customer weight is defined as 0.5. The registrant decides where to place weights into consideration. That is, in the search, 1 is set when the work content is hit, whereas 0.7 is set when the work is hit and 0.5 is set when the customer is hit.
FIG. 7 is a dialog for inputting the relationship between items in the dimension. The weight of the item registered in the work is set to 1, and values from 0 to 0.9 are added to the other items. . Here, as an example, the weight of the correction item is defined as 0.7.
検索は、作業の追加情報より次元レベル(次元間の項目)でOR検索が行われ、次に次元内の項目についてOR検索が行われる(ステップ212)。検索結果は、類似作業一覧211として抽出される。検索結果が複数の場合には、検索時に登録しておいた関係式を用いて、図8に示す計算式を用いて作業適合率を求める(ステップ210)。図8に示すように、検索次元数ごとにOR検索が行われ、次元N評価割合は次元間の重み、次元項目の評価割合は次元内の重みに該当し、それぞれ1からの差と、(100/検索次元数)が掛け合わされ、100からこれらの積を差し引いたものが適合率となる。
作業適合率を求めた後、適合率が最も高い作業から順に、類似作業の候補として一覧表示される。作業登録者は、この一覧から、最も類似した作業を選択し、その作業にかかった実質作業工数を今回登録する作業の作業工数として適用することになる(ステップ213)。
In the search, an OR search is performed at the dimension level (items between dimensions) from the additional information of the work, and then an OR search is performed on items in the dimension (step 212). The search result is extracted as a
After obtaining the work relevance ratio, a list of similar work candidates is displayed in order from the work having the highest relevance ratio. The work registrant selects the most similar work from this list, and applies the actual work man-hour required for the work as the work man-hour of the work to be registered this time (step 213).
作業進捗表を完成させる最後の項目として、担当者および対応率がある。これは、空き工数検索部105と人材適性見積部106より、作業工数、作業開始日、作業終了日の情報を基に算出していく。
図9は、本発明の一実施例に係る作業期間内に作業者に空き工数があるか否かを検索する処理フローチャートである。
空き工数検索部105が起動すると、まず登録する作業の作業開始日および作業終了日より人材を必要とする作業期間を求める(ステップ312,313)。次に、人材管理データベース109より、この作業期間内で作業がプロジェクトチームに有効な作業者を検索する(ステップ314)。プロジェクトチームが作業期間内に存在する人材は、複数の異なる作業も行っている場合があるので、検索された作業者と作業期間をキーとして、作業者が期間内に他の作業を担当しているか否かを作業進捗データベース108より検索する(ステップ316)。
The last item to complete the work progress table is the person in charge and the response rate. This is calculated from the empty man-
FIG. 9 is a process flowchart for searching whether or not there is an empty man-hour for the worker within the work period according to one embodiment of the present invention.
When the empty man-
作業者が他に担当している作業がない場合には、作業可能な工数があると判断できるが、他に作業を担当している場合は、図10に示す計算式(空き対応率計算式320)により担当者に空き工数があるか否かを判断する(ステップ318)。作業の担当者は、作業期間内に空き工数を持つ作業者の中から、最も登録作業に合ったスキルおよび経験を持っている者から選択される。すなわち、作業者の空き対応率が0以上であれば、作業割当可能な人材として抽出される(ステップ321)。なお、図10の計算式において、αは有効作業期間表より作業期間が有効の者であり、βは複数件のうちの1件毎に計算する該当する件であり、Σはβ毎に計算した対応率の合計値である。括弧内の分数は1人のこの人材αに対して、登録作業期間に対して他の作業のうちのβをどれだけ行っているかの期間の割合であり、対応率は1ケ月に費す期間を1として例えば0.5とする値である。 If there is no other work that the worker is in charge of, it can be determined that there are man-hours that can be worked on, but if other work is in charge, the formula shown in FIG. 320), it is determined whether or not the person in charge has an empty man-hour (step 318). The person in charge of the work is selected from those who have free man-hours within the work period and those who have the skills and experience most suitable for the registered work. That is, if the worker availability ratio is 0 or more, it is extracted as a work assignable human resource (step 321). In the calculation formula of FIG. 10, α is a person whose work period is valid from the effective work period table, β is a corresponding case to be calculated for each of a plurality of cases, and Σ is calculated for each β. It is the total value of the corresponding rates. The fraction in parentheses is the ratio of the period of how much of the other work β is done for this human resource α for the registered work period, and the corresponding rate is the period spent in one month For example, the value is 0.5, for example.
図11は、本発明の一実施例に係る人材適性見積機能のフローチャートである。
ここでは試算式により、担当となった作業者の作業工数を見積り、必要作業工数を満たすか否かを求める。まず、ステップ402から408までのループで、作業者の全てに対して登録作業に対する適性値を求めた後、その適性値を考慮した作業期間内の作業工数を求める。次に、ステップ411から417までのループで、作業者の作業可能な工数が登録作業の工数を満たすか否かを判断した後、満たない場合には、必要工数分の作業者の対応率を算出する。
FIG. 11 is a flowchart of a human resource aptitude estimation function according to an embodiment of the present invention.
Here, the work man-hour of the worker who is in charge is estimated by a trial calculation formula, and it is determined whether or not the necessary work man-hour is satisfied. First, in a loop from
すなわち、人材適性見積部106が起動すると、空き工数人材情報(空き工数を持つ作業者の一覧、および、図10に示す作業者毎の空き対応率)403を入力して、作業者毎に適性値を検索していく(ステップ402)。次に、作業進捗データベース108にアクセスして、順次作業者α毎に情報を読み出し、図12に示す適性値の計算式406を用いて作業者αの登録作業βに対する適性値を求める(ステップ404)。なお、図12の適性値の計算式は、図8の適合率の式と類似した式であり、ただ括弧内で、同じ式にさらに項目ヒット率を掛け算している点だけ異なる。項目ヒット率とは、ヒットした同じ作業が過去3回存在する者の方が、過去1回存在する者より優先することを意味する係数である。
次に、求められた作業者の適性値409を基に、その適性値を考慮した作業期間内の作業工数を求める(ステップ407)。全部の作業者αについて求められた後に、作業者および適性値の一覧から、登録作業に割当てる作業者を選択する(ステップ410)。
That is, when the human resource
Next, based on the obtained
次に、登録作業の作業工数を満たすまで、登録作業の作業工数(残り作業工数)414を基に、作業者の作業可能な工数が登録作業の工数を満たすか否かを判断し(ステップ412)、満たす場合には、作業者の登録作業に対する対応率を空き工数分の対応率として登録する(ステップ413)。もし、作業工数を満たさない場合には、作業対応率計算式(図13の作業対応率算出式を参照)を用いて、登録作業の必要工数の作業者の対応率を算出する(ステップ416)。そして、割当てた作業者毎に作業進捗データベース108へ登録する(ステップ418)。このようにして、必要作業工数の満たない作業工数に関しては、空き工数のある作業者の中から次に割り当てる作業者を選択していく。 Next, it is determined whether or not the man-hour that can be worked by the worker satisfies the man-hour for registration work based on the man-hour for registration work (remaining work man-hour) 414 until the work man-hour for registration work is satisfied (step 412). In the case of satisfying, the response rate for the worker's registration work is registered as the response rate for the empty man-hour (step 413). If the work man-hour is not satisfied, the work correspondence rate calculation formula (see the work correspondence rate calculation formula in FIG. 13) is used to calculate the worker correspondence rate of the man-hour required for the registration work (step 416). . Then, each assigned worker is registered in the work progress database 108 (step 418). In this way, with respect to the work man-hours that do not satisfy the required work man-hours, the worker to be assigned next is selected from among the workers having free man-hours.
なお、図13に示すように、期間内の作業に対する作業工数は、月毎の基本作業工数と作業期間毎の空き工数率と作業適性率とを掛け合わせた数値であり、また、作業対応率の算出式は、2つに分けて計算しており、1)人材αの作業工数が期間内の作業に対する作業工数以上である場合には、人材αの作業対応率は空き工数率(当然、作業工数不足となるので、他の人材を探す)であり、2)人材αの作業工数が期間内の作業に対する作業工数に満たない場合には、人材αの作業対応率は基本作業工数に対する作業工数の比を作業適性率で割り算した値である。 As shown in FIG. 13, the work man-hours for work within a period is a value obtained by multiplying the basic work man-hours per month, the empty man-hour ratio for each work period, and the work suitability rate, and the work response rate. The calculation formula is divided into two: 1) If the work man-hour of the human resource α is equal to or greater than the work man-hour for the work within the period, the work correspondence rate of the human resource α is the free man-hour rate (of course, 2) If the work man-hours of the human resources α are less than the work man-hours for the work within the period, the work response rate of the human resources α is the work for the basic work man-hours. It is a value obtained by dividing the ratio of man-hours by the work aptitude rate.
図14は、次元ごとの作業と作業者のスキル範囲を示す3次元空間図である。
ここでは、業務の次元を例として、作業が係わる項目範囲と作業者の業務の次元で持つスキル範囲を視覚的に3次元で表現している。これは、グラフの縦軸を作業工数、横軸を次元項目としているが、登録する作業に関しては作業進捗で表現している項目と項目間の関係式で視覚的範囲を表現しており、また作業者に対しては、次元をキーとして検索されたこれまでの作業および作業内で表現している次元項目のヒット率をもとに横軸を表現している。このときの次元項目のヒット率は、図15に示した計算式を用いることにより、算出される。図14の3次元空間図において、線で囲まれた白の空間が人材Aの作業履歴によるスキル範囲であり、グレイの空間が次元毎の今回の作業範囲であるので、グレイの空間の範囲に白の空間の範囲がどれぐらいカバーしているかで、満たせるか否かを判断することができる。
また、これにより、過去にその人材がどのような作業を行ってきたか、どのような実績があるがが、次元単位に一目瞭然となり、判断材料として便利となる。
FIG. 14 is a three-dimensional space diagram showing the work for each dimension and the skill range of the worker.
Here, taking the business dimension as an example, the item range related to the work and the skill range possessed by the worker's business dimension are visually represented in three dimensions. In this graph, the vertical axis of the graph is the work man-hour and the horizontal axis is the dimension item, but for the work to be registered, the visual range is expressed by the relational expression between the item expressed by the work progress and the item, For the worker, the horizontal axis is expressed based on the previous work searched using the dimension as a key and the hit rate of the dimension item expressed in the work. The hit rate of the dimension item at this time is calculated by using the calculation formula shown in FIG. In the three-dimensional space diagram of FIG. 14, the white space surrounded by the line is the skill range based on the work history of the human resource A, and the gray space is the current work range for each dimension. It can be judged whether or not it can be satisfied by how much the range of the white space covers.
In addition, this makes it possible for the human resource to perform what kind of work in the past and what results have been obtained, but it becomes clear at a glance and is useful as a judgment material.
図15は、次元項目のヒット率計算式を示す図である。
この式は、図14における次元項目のヒット率を示す式であって、その人材に対して、プロジェクトが何件あるのか、作業期間をどれだけやったのか、対応率はどれだけか、等についてそれぞれを掛け合わせて、総合的にヒット率を見る式である。
FIG. 15 is a diagram illustrating a hit rate calculation formula for a dimension item.
This formula is a formula showing the hit rate of the dimension item in FIG. 14, and how many projects are there for the human resource, how long the work period has been done, what is the correspondence rate, etc. It is a formula that multiplies each and looks at the hit rate comprehensively.
100:作業工数見積および人材割当システム
101:入出力処理部
102:評価基準管理部
103:作業進捗管理部
104:作業見積処理部
105:空き工数検索部
106:人材適性見積部
107:作業評価基準データベース
108:作業進捗データベース
109:人材管理データベース
DESCRIPTION OF SYMBOLS 100: Work man-hour estimation and personnel allocation system 101: Input / output processing part 102: Evaluation reference management part 103: Work progress management part 104: Work estimation processing part 105: Empty man-hour search part 106: Personnel aptitude estimation part 107: Work evaluation reference Database 108: Work progress database 109: Human resource management database
Claims (9)
登録された作業の評価基準を1次元単位で作成し、作成された情報を登録または変更し、管理する評価基準管理部と、
新規のプロジェクトや作業を登録または更新する作業進捗管理部と、
登録する作業の追加情報を検索キーとして、過去の作業に類似した作業が発生しているか否かを検索する作業見積処理部と、
登録する作業の作業開始日および作業終了日より人材を必要とする作業期間を求め、該作業期間で作業が有効な作業者を検索し、該作業者が他に担当している作業がない場合には作業可能な工数があると判断し、他に担当している作業がある場合には、計算式を用いて担当者に空き工数があるか否かを判断する空き工数検索部と、
該作業期間内に空き工数を持つ作業者の中から、最も登録作業に合致したスキルおよび経験を持っている者から作業担当者を選択し、空き工数のある作業者に対して、作業が必要とする作業工数を該作業担当者が満たすか否かを調べる人材適性見積部と、
プロジェクトや作業の情報を次元単位で取り扱い、次元と次元内の作業項目に紐付きで保持する作業評価基準データベースと、
登録されたプロジェクトおよび作業データを格納し、該プロジェクトを表現するための必要項目を格納する作業進捗データベースと、
人材の名前と有効作業開始日と有効作業終了日の管理項目を保持する人材管理データベースと
を有することを特徴とする作業工数見積および人材割当システム。 In the work man-hour estimation and human resource allocation system that allocates the optimal human resources for new work by estimating work man-hours based on past results and comparing them with human resource skills,
An evaluation standard management unit that creates an evaluation standard for registered work in a one-dimensional unit, registers or changes the created information, and manages,
A work progress manager that registers or updates new projects and work,
Using the additional information of the work to be registered as a search key, a work estimation processing unit for searching whether a work similar to the past work has occurred,
When a work period that requires human resources is obtained from the work start date and work end date of the work to be registered, a worker who is effective in the work period is searched, and there is no other work that the worker is in charge of If there are other tasks in charge, the available man-hours search unit that determines whether the person in charge has available man-hours using a calculation formula,
From the workers with available man-hours within the work period, select the worker in charge from those who have the skills and experience that best match the registered work, and work is required for workers with available man-hours. A personnel aptitude estimation unit that checks whether or not the person in charge satisfies the work man-hour
A work evaluation standard database that handles project and work information in units of dimensions and holds the work items in the dimensions and associated with them,
A work progress database for storing the registered project and work data and storing necessary items for expressing the project;
A work man-hour estimation and human resource allocation system characterized by having a human resource management database that holds management items for the names of human resources, effective work start dates, and effective work end dates.
作業評価基準データベースにアクセスし、該データベースより評価基準一覧情報を読み出して、作業内容を表現していき、
表現した作業内容に対して、次元間および次元内の項目間の関係式を入力し、
登録する作業を表現するための次元および項目を該作業評価基準データベースから任意の数だけ選択し、
登録する作業の追加情報を検索キーとして、過去の作業に類似した作業が発生しているか否かを検索し、
検索結果が複数の場合、検索時に登録した関係式を用いて演算回路により作業適合率を算出し、
登録作業に最も適合している類似作業の実質作業工数を登録作業の作業工数として用いることを特徴とする作業工数見積および人材割当方法。 With the work progress management department, in the work man-hour estimation and human resource allocation method for obtaining work man-hours of work,
Access the work evaluation criteria database, read the evaluation criteria list information from the database, and express the work content,
Enter the relational expression between the dimensions and items in the dimension for the expressed work content,
Select an arbitrary number of dimensions and items for expressing the work to be registered from the work evaluation criteria database,
Using the additional information of the work to be registered as a search key, search for whether or not work similar to the past work has occurred,
If there are multiple search results, calculate the work relevance rate by the arithmetic circuit using the relational expression registered at the time of search,
A work man-hour estimation and human resource allocation method characterized in that a real work man-hour of a similar work most suitable for a registration work is used as a work man-hour for registration work.
前記次元間および次元内の項目間の関係式は、次元間および次元内の作業項目間の優先順位を示すための重み付けであり、
前記検索時に登録した関係式は、適合率=100−Σ{(100/検索次元数)×(1−次元N評価割合)×(1−次元項目の評価割合)}で表されることを特徴とする作業工数見積および人材割当方法。 In the work man-hour estimation and personnel allocation method according to claim 2,
The relational expression between the items between the dimensions and within the dimensions is a weight for indicating a priority between the work items between the dimensions and within the dimensions,
The relational expression registered at the time of the search is represented by: relevance ratio = 100−Σ {(100 / number of search dimensions) × (1-dimensional N evaluation ratio) × (1-dimensional item evaluation ratio)}. Work man-hour estimation and personnel allocation method.
登録する作業の作業開始日および作業終了日から、演算回路により人材を必要とする作業期間を算出し、
人材管理データベースにアクセスして、該作業期間内で作業が有効な作業者を検索して読み出し、
検索された作業者と該作業期間をキーとして、作業者が期間内に他の作業を担当しているか否かを、作業進捗データベースにアクセスして検索し、
作業者が他に担当している作業がない場合には、作業可能な工数があると判断し、
該作業者が他に担当している作業がある場合には、計算式で該担当者に空き工数があるか否かを判断し、
空き工数のある作業者に対して、作業が必要とする作業工数を担当者が満たすか否かを判断することを特徴とする作業工数見積および人材割当方法。 In the work man-hour estimation and human resource allocation method for searching whether or not the worker has free man-hours within the work period by the free man-hour search unit,
From the work start date and work end date of the work to be registered, calculate the work period that requires human resources by the arithmetic circuit,
Access to the human resource management database, search for and retrieve workers who are effective within the work period,
Using the searched worker and the work period as a key, search the work progress database to determine whether the worker is in charge of other work within the period,
If there is no other work that the worker is in charge of, determine that there are man-hours that can be worked on,
If there is other work that the worker is in charge of, determine whether the person in charge has available man-hours by the calculation formula,
A work man-hour estimation and human resource allocation method characterized by determining whether or not a person in charge satisfies a work man-hour required for work with respect to a worker having free man-hours.
前記計算式は、空き対応率=1−Σ{(作業βの作業期間/登録作業期間)×対応率}で表されることを特徴とする作業工数見積および人材割当方法。 In the work man-hour estimation and personnel allocation method according to claim 4,
The calculation formula is represented by: empty correspondence rate = 1−Σ {(work period of work β / registration work period) × correspondence rate}.
空き工数人材情報から、作業者毎に適性値を検索していき、
作業進捗データベースにアクセスして、作業者の作業工数を読み出し、演算回路を用いて作業者の登録作業に対する適性値の算出式により適性値を算出し、
適性値を考慮した作業期間内の作業工数を算出し、
作業者および適性値の一覧から登録作業に割当てる作業者を選択し、
登録作業の作業工数を満たすまで、作業者の作業可能な工数が登録作業の工数を満たすか否かを判断し、
作業者の登録作業に対する対応率を空き工数分の対応率として登録し、
作業対応率計算式を用いて、演算回路により登録作業の率要工数分の作業者の対応率を算出し、
割当てた作業者毎に該作業進捗データベースへ登録することを特徴とする作業工数見積および人材割当方法。 In the human resource aptitude estimation unit, the work man-hour estimation and the human resource allocation method for estimating the work man-hour of the worker who is in charge and calculating whether the required man-hour is satisfied or not,
Search the aptitude value for each worker from the empty manpower information,
Access the work progress database, read the work man-hours of the worker, calculate the aptitude value by the calculation formula of the aptitude value for the worker's registered work using the arithmetic circuit,
Calculate the work man-hours within the work period considering the aptitude value,
Select the worker to be assigned to the registered work from the list of workers and aptitude values,
Judge whether or not the man-hours that can be worked by the worker satisfy the man-hours for registration work until the work hours for registration work are met,
Register the response rate for the worker's registration work as the response rate for empty man-hours,
Using the work correspondence rate calculation formula, calculate the worker's correspondence rate for the number of man-hours required for registration work by the arithmetic circuit,
A work man-hour estimation and human resource assignment method, wherein each assigned worker is registered in the work progress database.
前記適性値の算出式は、100−Σ{(100/検索次元数)×(1−次元N評価割合)×(1−次元項目の評価割合)×項目ヒット率}で表わされ、
前記作業対応率計算式は、作業工数≧期間内の作業に対する作業工数のとき、空き工数率(作業工数不足となる)であり、
作業工数<期間内の作業に対する作業工数のとき、(作業工数/基本作業工数)÷作業適性率であることを特徴とする作業工数見積および人材割当方法。 In the work man-hour estimation and human resource allocation method according to claim 6,
The formula for calculating the aptitude value is represented by 100−Σ {(100 / number of search dimensions) × (1-dimensional N evaluation ratio) × (1-dimensional item evaluation ratio) × item hit ratio}.
The work correspondence rate calculation formula is an empty man-hour rate (the work man-hour is insufficient) when the work man-hour ≧ the work man-hour for the work within the period,
A work man-hour estimation and human resource allocation method characterized in that (work man-hour / basic work man-hour) / work aptitude rate when work man-hour <work man-hour for work within a period.
グラフの縦軸を作業工数、横軸を次元項目とし、登録する作業に関して作業進捗で表現している項目と項目間の関係式で視覚的範囲を表現し、
作業者に対しては次元をキーとして検索された過去の作業および作業内で表現している次元項目のヒット率をもとに横軸を表現することを特徴とする作業工数見積および人材割当方法。 In the work man-hour estimation and human resource allocation methods that visually represent the skill range of the work related item range and the worker's work dimension in three dimensions,
The vertical axis of the graph is the work man-hours, the horizontal axis is the dimension item, and the visual range is expressed by the relational expression between the items expressed by the work progress regarding the registered work,
A work man-hour estimation and human resource allocation method characterized in that the horizontal axis is expressed based on the past work searched for using the dimension as a key and the hit rate of the dimension items expressed in the work for the worker. .
前記次元項目のヒット率は、{(ヒット件数/作業件数)×Σ(作業期間N/有効作業期間)×(対応率/実績対応率)}で表わされることを特徴とする作業工数見積および人材割当方法。 In the work man-hour estimation and personnel allocation method according to claim 8,
The hit rate of the dimension item is represented by {(number of hits / number of work) × Σ (work period N / effective work period) × (correspondence rate / actual response rate)}. Assignment method.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2005142135A JP4275102B2 (en) | 2005-05-16 | 2005-05-16 | Work man-hour estimation and personnel allocation system and method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2005142135A JP4275102B2 (en) | 2005-05-16 | 2005-05-16 | Work man-hour estimation and personnel allocation system and method |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2006318331A true JP2006318331A (en) | 2006-11-24 |
JP4275102B2 JP4275102B2 (en) | 2009-06-10 |
Family
ID=37538936
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2005142135A Expired - Fee Related JP4275102B2 (en) | 2005-05-16 | 2005-05-16 | Work man-hour estimation and personnel allocation system and method |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP4275102B2 (en) |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000022873A (en) * | 1998-07-01 | 2000-01-21 | Ricoh Co Ltd | Composite function device |
JP2008134840A (en) * | 2006-11-28 | 2008-06-12 | Zuken Inc | Information processing unit, and method therefor |
JP2009223832A (en) * | 2008-03-18 | 2009-10-01 | Ricoh Co Ltd | Workflow management system |
JP2015075924A (en) * | 2013-10-09 | 2015-04-20 | 富士ゼロックス株式会社 | Entrusted operation management system and program |
JPWO2013128555A1 (en) * | 2012-02-27 | 2015-07-30 | 株式会社日立製作所 | Task management method and task management apparatus |
JP2018026069A (en) * | 2016-08-12 | 2018-02-15 | 富士通株式会社 | Information processing device, information processing system, information processing program, and information processing method |
JP2018028747A (en) * | 2016-08-16 | 2018-02-22 | 富士ゼロックス株式会社 | Information processing apparatus and program |
JP2019204243A (en) * | 2018-05-22 | 2019-11-28 | Nttテクノクロス株式会社 | Task management device and task management system |
CN111353692A (en) * | 2020-02-19 | 2020-06-30 | 浙江中智达科技有限公司 | Industrial device evaluation method and system |
KR102155787B1 (en) * | 2020-04-02 | 2020-09-15 | 주식회사 크라우드웍스 | Method for efficiently automatic updating of worker pool of crowdsourcing based project for artificial intelligence training data generation |
JP2021529359A (en) * | 2019-05-29 | 2021-10-28 | クラウドワークス インコーポレイテッドCrowdWorks, Inc. | Worker selection method based on the characteristics of the crowdsourcing infrastructure project |
-
2005
- 2005-05-16 JP JP2005142135A patent/JP4275102B2/en not_active Expired - Fee Related
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000022873A (en) * | 1998-07-01 | 2000-01-21 | Ricoh Co Ltd | Composite function device |
JP2008134840A (en) * | 2006-11-28 | 2008-06-12 | Zuken Inc | Information processing unit, and method therefor |
JP2009223832A (en) * | 2008-03-18 | 2009-10-01 | Ricoh Co Ltd | Workflow management system |
JPWO2013128555A1 (en) * | 2012-02-27 | 2015-07-30 | 株式会社日立製作所 | Task management method and task management apparatus |
JP2015075924A (en) * | 2013-10-09 | 2015-04-20 | 富士ゼロックス株式会社 | Entrusted operation management system and program |
JP2018026069A (en) * | 2016-08-12 | 2018-02-15 | 富士通株式会社 | Information processing device, information processing system, information processing program, and information processing method |
JP2018028747A (en) * | 2016-08-16 | 2018-02-22 | 富士ゼロックス株式会社 | Information processing apparatus and program |
JP2019204243A (en) * | 2018-05-22 | 2019-11-28 | Nttテクノクロス株式会社 | Task management device and task management system |
JP2021529359A (en) * | 2019-05-29 | 2021-10-28 | クラウドワークス インコーポレイテッドCrowdWorks, Inc. | Worker selection method based on the characteristics of the crowdsourcing infrastructure project |
JP7024092B2 (en) | 2019-05-29 | 2022-02-22 | クラウドワークス インコーポレイテッド | Worker selection method based on the characteristics of the crowdsourcing infrastructure project |
US11455583B2 (en) | 2019-05-29 | 2022-09-27 | Crowdworks Inc. | Method for selecting worker according to feature of project based on crowd sourcing |
CN111353692A (en) * | 2020-02-19 | 2020-06-30 | 浙江中智达科技有限公司 | Industrial device evaluation method and system |
KR102155787B1 (en) * | 2020-04-02 | 2020-09-15 | 주식회사 크라우드웍스 | Method for efficiently automatic updating of worker pool of crowdsourcing based project for artificial intelligence training data generation |
Also Published As
Publication number | Publication date |
---|---|
JP4275102B2 (en) | 2009-06-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP4275102B2 (en) | Work man-hour estimation and personnel allocation system and method | |
US7506302B2 (en) | System and methods for business process modeling | |
US9147177B2 (en) | Method and system for implementing a scoring mechanism | |
US8121885B2 (en) | Plan solver | |
US20040093584A1 (en) | Facilitating software engineering and management in connection with a software development project according to a process that is compliant with a qualitatively measurable standard | |
US20100121685A1 (en) | Method and System for Implementing a Ranking Mechanism | |
JP5130732B2 (en) | Review data processing method, review data evaluation method and apparatus | |
US20020026342A1 (en) | Multi-layer engine using generic controls for optimal routing scheme | |
JP2014191390A (en) | System and method for automatically assigning worker | |
JPH09190469A (en) | Schedule managing system | |
JP2006277060A (en) | Schedule preparation support system, schedule preparation method and program | |
JP6409416B2 (en) | Work management apparatus and program | |
Rinaldi et al. | Workforce scheduling incorporating worker skills and ergonomic constraints | |
US20180046969A1 (en) | Task execution support device, task execution support system, and non-transitory computer-readable storage medium | |
US20150242782A1 (en) | Interactive Planning Method And Tool | |
JP2018097741A (en) | Production management support device, production management support method, and production management support program | |
JP2021144756A (en) | Project plan formulation system | |
Valikoniene | Resource Buffers in Critical Chain Project Management | |
US9037582B2 (en) | Flexible hierarchy of grouping qualifications | |
US20140229228A1 (en) | Determining risk associated with a determined labor type for candidate personnel | |
JPH1086044A (en) | Worker's discretion utilization schedule planning method and device therefor | |
JP7546800B1 (en) | Patrol work sharing system and program | |
JP2024134533A (en) | Staffing support systems and programs | |
JP6604690B1 (en) | Decision support apparatus and program | |
US9082088B2 (en) | Dynamic assignment of qualification block to person |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20080228 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20080307 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20080507 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20081219 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20090210 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20090303 |
|
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20090303 |
|
R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120313 Year of fee payment: 3 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130313 Year of fee payment: 4 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130313 Year of fee payment: 4 |
|
S111 | Request for change of ownership or part of ownership |
Free format text: JAPANESE INTERMEDIATE CODE: R313111 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130313 Year of fee payment: 4 |
|
R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20140313 Year of fee payment: 5 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
LAPS | Cancellation because of no payment of annual fees |