JPH11210400A - Backup deck - Google Patents

Backup deck

Info

Publication number
JPH11210400A
JPH11210400A JP1600098A JP1600098A JPH11210400A JP H11210400 A JPH11210400 A JP H11210400A JP 1600098 A JP1600098 A JP 1600098A JP 1600098 A JP1600098 A JP 1600098A JP H11210400 A JPH11210400 A JP H11210400A
Authority
JP
Japan
Prior art keywords
belt conveyor
continuous belt
crushed material
continuous
backup deck
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP1600098A
Other languages
Japanese (ja)
Other versions
JP2967535B2 (en
Inventor
Yukio Yoshitomi
幸雄 吉富
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Corp
Original Assignee
Taisei Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taisei Corp filed Critical Taisei Corp
Priority to JP1600098A priority Critical patent/JP2967535B2/en
Publication of JPH11210400A publication Critical patent/JPH11210400A/en
Application granted granted Critical
Publication of JP2967535B2 publication Critical patent/JP2967535B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a backup deck which can facilitate the elongating operation of a continuous belt conveyor while effectively avoiding damage of the belt resulting from drop impact of debris. SOLUTION: A belt conveyor frame has a working surface approx. horizontal and long stretching to the front and rear and can run freely forward and backward while the forefront of a continuous belt conveyor 5a installed in a tunnel 1 is placed on the working surface. The belt conveyor frame (T-shape frame 5b) is integrally equipped with a second belt conveyor 5c' to transport debris crushed matter discharged from a working face and a hopper 5d which receives the debris and discharges it to the forefront part of the belt conveyor 5a.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、連続ベルトコンベ
アを用いたトンネル掘削において、切羽から排出されて
くるズリ破砕物が搬送される連続ベルトコンベアの先端
部を載置しつつ前後に走行自在であるバックアップデッ
キに関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a continuous belt conveyor for excavating tunnels using a continuous belt conveyor. About a backup deck.

【0002】[0002]

【従来の技術】従来の連続ベルトコンベアを用いたトン
ネル掘削は、例えば、切羽の手前であって連続ベルトコ
ンベアの前方に配備したクラッシャーやトンネルボーリ
ングマシンなどにより掘削ズリを破砕して均等な大きさ
に揃ったズリ破砕物とし、これを連続ベルトコンベアの
先端部に直接載せて当該連続ベルトコンベアにより坑口
まで搬送する、というものである。
2. Description of the Related Art In a conventional tunnel excavation using a continuous belt conveyor, for example, a crusher or a tunnel boring machine arranged in front of the face and in front of the continuous belt conveyor crushes the excavated waste to obtain an even size. And crushed materials are placed directly on the end of a continuous belt conveyor and transported to a wellhead by the continuous belt conveyor.

【0003】かかるトンネル掘削によれば、トンネル掘
削における掘削ズリ出しシステムとして、ダンプトラッ
クによる運搬に替えて、連続ベルトコンベアが用いられ
ているから、坑内の作業環境を改善することが可能であ
り、一方、当該連続ベルトコンベアが最大掘削延長時の
搬送を可能とする長さ寸法を有する無端状のベルトの余
りの部分を後端部のカセットに収容する構成になってい
ることから、段取り替えに際し当該部分を必要な長さ寸
法だけ順次延伸していくことが可能であり、これは急速
施工の要請に資するものである。
According to such tunnel excavation, a continuous belt conveyor is used as a system for excavating and shifting in a tunnel excavation instead of using a dump truck, so that the working environment in the mine can be improved. On the other hand, since the continuous belt conveyor has a configuration in which a surplus portion of an endless belt having a length dimension capable of being conveyed at the time of maximum excavation extension is accommodated in a cassette at a rear end portion, it is necessary to carry out a setup change. It is possible to sequentially stretch the portion by a required length dimension, which contributes to a request for rapid construction.

【0004】[0004]

【発明が解決しようとする課題】しかしながら、切羽か
ら排出されてくるズリ破砕物を直接前記連続ベルトコン
ベアの無端状のベルトで受けるという形式では、ズリ破
砕物の落下時の衝撃により当該ベルトの損傷が早められ
る不具合が生ずる。
However, in the type in which the crushed material discharged from the face is directly received by the endless belt of the continuous belt conveyor, the belt is damaged by the impact when the crushed material falls. Causes a problem that is accelerated.

【0005】例えば、ズリ破砕物中に混入する金属等の
落下時の衝撃により前記無端状のベルトの一箇所に切断
部分等の不具合が生じた場合であっても、連続ベルトコ
ンベアが切羽近傍の先端部から坑口に位置する後端部の
カセット部まで一体に構成されていることから、連続ベ
ルトコンベアの全体を停止させて修理をする必要があ
り、その間におけるズリ破砕物の搬送ができなくなり、
急速施工の要請に反することになるし、場合によっては
かなりの長さ寸法に亘ってそっくり取り換えなければな
らず、きわめて大がかりな取り換え作業が必要になって
しまう。
[0005] For example, even if a problem such as a cut portion occurs at one place of the endless belt due to an impact at the time of dropping of metal or the like mixed in the crushed material, the continuous belt conveyer may be in the vicinity of the face. Since it is configured integrally from the tip to the cassette at the rear end located at the wellhead, it is necessary to stop and repair the entire continuous belt conveyor, and it is not possible to transport the crushed material during that time.
This would be contrary to the demands of rapid construction, and in some cases would have to be replaced over a very long dimension, which would require a very large replacement.

【0006】一方、連続ベルトコンベアの延伸作業を構
成する作業のうち、ベルトの延伸作業が後端部のカセッ
トの利用により比較的容易に行い得るのに対し、当該ベ
ルトを回転自在に支持するベルトコンベア枠ユニットの
延伸作業は、重量のある先端部ユニット(先端部プーリ
ーを含む)のベルトコンベア枠ユニットに対する連結作
業などを連続ベルトコンベアの設置高さで行う必要があ
り、かなり面倒なものである。
On the other hand, among the operations constituting the continuous belt conveyor stretching operation, the belt stretching operation can be performed relatively easily by using a cassette at the rear end, while the belt for rotatably supporting the belt is supported. The extension work of the conveyor frame unit is quite troublesome because it is necessary to perform the connection work of the heavy end unit (including the end pulley) to the belt conveyor frame unit at the installation height of the continuous belt conveyor, and the like. .

【0007】そこで、本発明の目的は、ズリ破砕物の落
下時の衝撃によるベルトの損傷を有効に回避しながら、
連続ベルトコンベアの延伸作業の容易化の達成ができる
バックアップデッキを提供することにある。
[0007] Therefore, an object of the present invention is to effectively avoid damage to a belt due to an impact at the time of falling of a crushed scrap.
An object of the present invention is to provide a backup deck capable of achieving an easy stretching operation of a continuous belt conveyor.

【0008】[0008]

【課題を解決するための手段】上記目的を達成するため
に、本発明に係るバックアップデッキは、略水平で前後
に長い作業面を有し、かつ、当該作業面上にトンネル内
に配備された連続ベルトコンベアの先端部を載置しつつ
前後に走行自在であるベルトコンベア架台の上方に、切
羽から排出されるズリ破砕物を搬送する第2ベルトコン
ベア、及び当該ズリ破砕物を受けて前記連続ベルトコン
ベアの先端部に排出するホッパを一体に配設してなるこ
とを特徴としている。
In order to achieve the above object, a backup deck according to the present invention has a substantially horizontal, long front-to-back work surface, and is disposed in a tunnel on the work surface. A second belt conveyor for transporting the crushed material discharged from the face above the belt conveyor gantry that can move back and forth while placing the leading end of the continuous belt conveyor, and receiving the crushed material, It is characterized in that a hopper for discharging to the end of the belt conveyor is integrally provided.

【0009】即ち、本発明は、ズリ破砕物を第2ベルト
コンベア及びホッパを介在させたうえで連続ベルトコン
ベアに供給することにより、ズリ破砕物の落下時の衝撃
による連続ベルトコンベアのベルトの損傷の有効な回避
を実現し、一方、連続ベルトコンベアの先端部を略水平
で前後に長い作業面上に載置した状態で前後に走行自在
とすることにより、連続ベルトコンベアの延伸作業を容
易化しようとするものである。
That is, according to the present invention, the crushed material is supplied to the continuous belt conveyor with the second belt conveyor and the hopper interposed therebetween, so that the belt of the continuous belt conveyor is damaged by the impact when the crushed material falls. On the other hand, while the front end of the continuous belt conveyor can be moved back and forth while placed on a work surface that is approximately horizontal and long, so that the continuous belt conveyor can be easily extended. What you want to do.

【0010】このような技術的手段において、上記構成
要件を具備し、かつ、稼働時における連続ベルトコンベ
アを安定性よく支持できるものであればその構成、形式
などは問わないが、稼働時における水平性、安定性を担
保しようとする観点からすれば、アウトリガーを含むこ
とが好ましく、また、連続ベルトコンベアの延伸作業を
より容易かつ迅速にしようとする観点からすれば、切羽
側から反力を得て前方に走行するための牽引装置を含む
ことが好ましい。
[0010] In such technical means, any structure and type can be used as long as the above-mentioned constitutional requirements are satisfied and the continuous belt conveyor can be supported with good stability during operation. It is preferable to include an outrigger from the viewpoint of ensuring the performance and stability, and to obtain a reaction force from the face side from the viewpoint of easier and quicker stretching of the continuous belt conveyor. It is preferable to include a traction device for traveling forward.

【0011】[0011]

【発明の実施の形態】以下、添付図面に示す実施の形態
に基づいてこの発明を詳細に説明する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS The present invention will be described below in detail based on an embodiment shown in the accompanying drawings.

【0012】図1は、本発明に係るバックアップデッキ
の一実施の形態が適用されたトンネル掘削の作業状況を
示す概略側面図である。尚、本実施の形態では、発破工
法により、かつ、移動式クラッシャーを用いてトンネル
掘削を行う場合を説明するが、これに限られるものでは
なく、トンネルボーリングマシンなどの機械によるトン
ネル掘削工法にも適用可能である。
FIG. 1 is a schematic side view showing an operation state of tunnel excavation to which an embodiment of a backup deck according to the present invention is applied. In the present embodiment, a case where tunnel excavation is performed by a blasting method and using a mobile crusher will be described. However, the present invention is not limited to this, and a tunnel excavation method using a machine such as a tunnel boring machine may be used. Applicable.

【0013】同図において、符号1は、発破工法による
掘削がなされるトンネル、符号2は、このトンネル1の
最前部である切羽、符号3は、切羽2において発破によ
り破砕され発生した掘削ズリ、符号4は、掘削ズリ3を
破砕して均等な大きさにすると共に、クローラ走行体4
aを具備する移動式クラッシャーであって、掘削ズリを
破砕したズリ破砕物を排出位置まで搬送するクラッシャ
ーコンベア4b、このクラッシャーコンベア4bの後端
部に設けられ、金属類を吸着し除去するマグネット装置
4cを備えるもの、符号は5、この移動式クラッシャー
4から排出されるズリ破砕物を一旦受けてから定量化し
つつ連続ベルトコンベアに供給するバックアップデッキ
であって、略水平で前後に長い作業面を有し、かつ、当
該作業面上にトンネル1内に配備された連続ベルトコン
ベア5aの先端部を載置するベルトコンベア架台たるT
型架台5bの上方に、移動式クラッシャー4から排出さ
れるズリ破砕物を搬送する第2ベルトコンベア5c、及
び当該ズリ破砕物を受けて前記連続ベルトコンベア5a
の先端部に排出するホッパ5dを一体に配設してなるも
のを示している。
In FIG. 1, reference numeral 1 denotes a tunnel in which excavation is performed by a blasting method, reference numeral 2 denotes a face which is the foremost part of the tunnel 1, reference numeral 3 denotes an excavation chip that has been crushed by blasting in the face 2 and The reference numeral 4 indicates that the excavation waste 3 is crushed to have a uniform size,
a crusher conveyor 4b for transporting a crushed material obtained by crushing excavated waste to a discharge position, and a magnet device provided at the rear end of the crusher conveyor 4b for adsorbing and removing metals. Reference numeral 5 denotes a backup deck which is provided with a reference numeral 5 and is a backup deck which receives a crushed material discharged from the movable crusher 4 and then supplies the crushed material to a continuous belt conveyor while quantifying the same. And a belt conveyor base T on which the leading end of the continuous belt conveyor 5a provided in the tunnel 1 is placed on the work surface.
A second belt conveyor 5c for transporting crushed material discharged from the mobile crusher 4 above the mold stand 5b, and the continuous belt conveyor 5a receiving the crushed material.
A hopper 5d for discharging at the end of the hopper is integrally provided.

【0014】図2は、バックアップデッキ5の詳細を示
す側面図、図3は、図2におけるバックアップデッキ5
の断面詳細を示す矢視図(図3a:a−a断面矢視図、
図3b:b−b断面矢視図、図3c:c−c断面矢視
図:)である。
FIG. 2 is a side view showing details of the backup deck 5, and FIG. 3 is a view showing the backup deck 5 in FIG.
Arrow view showing the cross-sectional details of (FIG. 3a: aa cross-sectional arrow view,
Fig. 3b is a sectional view taken along arrow bb, and Fig. 3c is a sectional view taken along arrow cc.

【0015】これらの図において、符号11は、施工基
面上に敷設された軌道たるレール、符号12は、このレ
ール11上に車輪12aを介して載置され、T型架台5
bに対し一体に構成される構造用架台であって、H型
鋼、プレートなどの鋼材を加工してつくった傾斜部材1
2b、水平部材12c、垂直部材12dを剛接合してな
るもの、符号13は、連続ベルトコンベア5aの延伸作
業の際などに作業者13aが作業床として用いる作業足
場、符号14は、構造用架台12に一体に設けられ、バ
ックアップデッキ5に対し安定性が増大する荷重を付与
するコンクリートウエイト、符号15は、施工基面を押
圧することにより、コンクリートウエイト14と共に安
定性を高め、更に水平性を確保するアウトリガー、符号
16は、車輪12aの前後に設けられ、レール11から
の車輪12aの脱輪を防止するレールガイド、を示して
いる。
In these figures, reference numeral 11 denotes a rail which is a track laid on the construction base surface, and reference numeral 12 denotes a rail mounted on the rail 11 via wheels 12a.
a structural pedestal integrally formed with b, an inclined member 1 formed by processing a steel material such as an H-section steel or a plate;
2b, a horizontal member 12c, and a vertical member 12d are rigidly joined. Reference numeral 13 denotes a work scaffold used as a work floor by an operator 13a when extending the continuous belt conveyor 5a, and reference numeral 14 denotes a structural gantry. Reference numeral 15 is a concrete weight that is provided integrally with the backing deck 12 and applies a load for increasing the stability to the backup deck 5. The reference numeral 15 increases the stability together with the concrete weight 14 by pressing the construction base surface, and further increases the levelness. Outriggers 16 to be secured indicate rail guides provided before and after the wheels 12a to prevent the wheels 12a from coming off the rails 11.

【0016】即ち、本実施の形態に係るバックアップデ
ッキ5では、構造用架台12に対し、T型架台5b、第
2ベルトコンベア5c、ホッパ5d、車輪12a及びレ
ールガイド16が一体に設けられていることから、構造
用架台12を介してT型架台5bの上方に第2ベルトコ
ンベア5c及びホッパ5dが一体に配設されるようにな
っており、また、構造用架台12を介してT型架台5b
が走行自在に構成されている。
That is, in the backup deck 5 according to the present embodiment, the T-shaped gantry 5b, the second belt conveyor 5c, the hopper 5d, the wheels 12a, and the rail guide 16 are provided integrally with the structural gantry 12. For this reason, the second belt conveyor 5c and the hopper 5d are arranged integrally above the T-shaped frame 5b via the structural frame 12, and the T-shaped frame is mounted via the structural frame 12. 5b
Are configured to run freely.

【0017】一方、連続ベルトコンベア5aは、先端部
に先端部プーリー21を含み、かつ、T型架台5b上に
おいて前後に移動自在であるテールピース22と、坑口
に位置する後端部(図示外)に後端部プーリーを含むカ
セット(図示外)と、テールピース22とカセットとの
間に連結されるキャリアローラ及びリターンローラ23
を軸支する複数のベルトコンベア枠ユニット24と、先
端部プーリー21、及び後端部プーリー(図示外)の間
に張架されている無端状のゴムベルト25とから構成さ
れるものである。
On the other hand, the continuous belt conveyor 5a has a tip pulley 21 at the tip and a tail piece 22 which can move back and forth on the T-shaped pedestal 5b, and a rear end located at the wellhead (not shown). ) Includes a cassette (not shown) including a rear end pulley, and a carrier roller and a return roller 23 connected between the tail piece 22 and the cassette.
, A plurality of belt conveyor frame units 24 that support the shaft, an endless pulley 21, and an endless rubber belt 25 stretched between a rear end pulley (not shown).

【0018】他方、第2ベルトコンベア5cは、傾斜区
間及び水平区間を有し、先端部の2連プーリー26、適
宜間隔で配設されたキャリアローラ27及びリターンロ
ーラ28、及び後端部の駆動装置29を具備した後端部
プーリー30、更に傾斜区間と水平区間との変化点に配
設された中間部プーリー31の間において無端状のゴム
ベルト32を張架してなるものであり、2連プーリー2
6の後方近傍に排出位置から落下するズリ破砕物を内側
に設けられた図示しない格子枠(均等な大きさに揃った
ズリ破砕物が余裕をもって通過する程度の格子寸法のも
の)で一旦受けると共に第2ベルトコンベア5cのゴム
ベルト32に供給する受ホッパ33を有していて、傾斜
区間及び水平区間の最前部に主として傾斜区間における
ズリ破砕物の落下を防止する傾斜ガイド34を有してい
る。
On the other hand, the second belt conveyor 5c has an inclined section and a horizontal section, and has a double pulley 26 at a front end, a carrier roller 27 and a return roller 28 disposed at appropriate intervals, and a drive for a rear end. An endless rubber belt 32 is stretched between a rear end pulley 30 provided with a device 29 and an intermediate pulley 31 provided at a transition point between an inclined section and a horizontal section. Pulley 2
6. The waste crushed material falling from the discharge position near the rear of 6 is once received by a lattice frame (not shown) provided inside (a size of a grid such that the uniformly sized waste crushed material passes with a margin). It has a receiving hopper 33 for supplying to the rubber belt 32 of the second belt conveyor 5c, and has an inclined guide 34 at the forefront of the inclined section and the horizontal section, mainly for preventing the scrap crushed material from falling in the inclined section.

【0019】本実施の形態に係るT型架台5b(即ち、
T型架台5bに一体に構成される構造用架台12)は、
移動式クラッシャー4から反力を得て切羽2側に走行す
る牽引装置として、移動式クラッシャー4とバックアッ
プデッキ5との間を連結し、移動式クラッシャー4によ
る牽引力をバックアップデッキ5に伝達する牽引ワイヤ
ー41と、この牽引ワイヤー41をバックアップデッキ
5に固止する止め治具42と、先端が移動式クラッシャ
ー4に固止されたウインチワイヤー43を有し、かつ、
バックアップデッキ5の先端部に一体に設けられ、当該
ウインチワイヤー43を巻き取ることにより、移動式ク
ラッシャー4に向かって前方移動ができる電動ウインチ
44とから構成されるものを具備している。尚、本実施
の形態では、移動式クラッシャー4から反力を得ている
が、必ずしもこれに限定されるものでなく、例えば、ト
ンネルボーリングマシンや地山などから反力を得るよう
にしてもよい。
The T-type pedestal 5b according to the present embodiment (ie,
The structural frame 12) integrated with the T-shaped frame 5b is
A traction device that connects the movable crusher 4 and the backup deck 5 and transmits the traction force of the mobile crusher 4 to the backup deck 5 as a traction device that travels toward the face 2 by receiving a reaction force from the movable crusher 4. 41, a stop jig 42 for fixing the pulling wire 41 to the backup deck 5, a winch wire 43 having a tip fixed to the movable crusher 4, and
An electric winch 44 is provided integrally with the front end of the backup deck 5 and can move forward toward the movable crusher 4 by winding the winch wire 43. In the present embodiment, the reaction force is obtained from the mobile crusher 4, but the invention is not limited to this. For example, the reaction force may be obtained from a tunnel boring machine, a ground, or the like. .

【0020】尚、T型架台5b(即ち、T型架台5bに
一体に構成される構造用架台12)は、更に後端部に電
動ウインチ44と同様の機能を有するチルクライマー5
1を一体に具備しており、例えば、フック付プーリー5
2をレール11に固止し、これにチルクライマー51の
ワイヤー53先端を掛けわたし、かつ、当該後端部に固
止したうえで、当該ワイヤー53を巻き取ることにより
後方に走行ができるようになっている。
The T-shaped frame 5b (that is, the structural frame 12 integrated with the T-shaped frame 5b) further includes a chill climber 5 having the same function as the electric winch 44 at the rear end.
1 and a pulley 5 with a hook, for example.
2 is fixed to the rail 11, and the tip of the wire 53 of the chill climber 51 is hung on the rail 11, and is fixed to the rear end. Has become.

【0021】かかるバックアップデッキ5による連続ベ
ルトコンベアの延伸作業は、次のようなものである。
The stretching operation of the continuous belt conveyor by the backup deck 5 is as follows.

【0022】まず、切羽2の進行に伴い移動式クラッシ
ャー4が前方に自走し移動すると、バックアップデッキ
5は、当該移動式クラッシャー4から牽引ワイヤー41
を通じて反力を得て、前方に牽引されてレール11上を
走行する(バックアップデッキ5の前方移動は電動ウイ
ンチ44によるウインチワイヤー43の巻き取りによっ
て行ってもよい)。
First, when the movable crusher 4 moves forward by itself as the face 2 advances, the backup deck 5 moves the traction wire 41 from the movable crusher 4.
The backup deck 5 is pulled forward and travels on the rail 11 (the forward movement of the backup deck 5 may be performed by winding the winch wire 43 by the electric winch 44).

【0023】このとき、T型架台5b上に載置されてい
る連続ベルトコンベア5aの先端部は、連続ベルトコン
ベア5aがトンネル1内で固定されていることから、相
対的にはT型架台5b上に載置された状態を保持しつつ
後方にスライド移動していくことになり、その結果、T
型架台5bに対する当該先端部のかかり寸法が次第に短
くなる。
At this time, the tip of the continuous belt conveyor 5a placed on the T-shaped frame 5b is relatively fixed to the T-shaped frame 5b because the continuous belt conveyor 5a is fixed in the tunnel 1. It will slide backward while maintaining the state of being placed on the top, and as a result, T
The dimension of the front end portion with respect to the mold base 5b gradually decreases.

【0024】そして、当該先端部のかかり寸法が連続ベ
ルトコンベア5aをT型架台5b上に載置し得る限度に
達した時点で、連続ベルトコンベア5aの稼働を停止さ
せ、そのうえで、坑口において、後端部のカセットに収
容されているベルトうち、必要な長さ寸法だけを延伸さ
せる。
When the length of the leading end reaches the limit at which the continuous belt conveyor 5a can be placed on the T-shaped pedestal 5b, the operation of the continuous belt conveyor 5a is stopped. Of the belts stored in the end cassette, only the required length is stretched.

【0025】一方、バックアップデッキ5において、作
業足場13上の作業者13aがT型架台5b上でテール
ピース22とベルトコンベア枠ユニット24との間の連
結を解除し、テールピース22をゴムベルト25ごと前
方にスライド移動すると、延伸され弛んでいたゴムベル
ト25が先端部プーリー21と後端部プーリー(図示
外)との間で張架される。
On the other hand, in the backup deck 5, the worker 13a on the work scaffold 13 releases the connection between the tail piece 22 and the belt conveyor frame unit 24 on the T-shaped pedestal 5b, and the tail piece 22 is moved together with the rubber belt 25. When sliding forward, the stretched and loosened rubber belt 25 is stretched between the front end pulley 21 and the rear end pulley (not shown).

【0026】そして、作業者13aがテールピース22
とベルトコンベア枠ユニット24との間にできたスペー
スに新たなベルトコンベア枠ユニットを追加し連結する
と、連続ベルトコンベア5aの延伸作業が終了する。
Then, the worker 13a moves the tail piece 22
When a new belt conveyor frame unit is added to the space formed between the belt conveyor frame unit and the belt conveyor unit 24, the stretching operation of the continuous belt conveyor 5a is completed.

【0027】従って、かかる連続ベルトコンベア5aの
延伸作業によれば、従来は面倒であった連続ベルトコン
ベア5aの延伸作業を容易かつ迅速に行うことが可能に
なる。
Therefore, according to the stretching operation of the continuous belt conveyor 5a, the stretching operation of the continuous belt conveyor 5a, which is conventionally troublesome, can be performed easily and quickly.

【0028】次に、本実施の形態に係るバックアップデ
ッキ5の連続ベルトコンベアの稼働時における作用を図
1乃至図3を用いて説明する。
Next, the operation of the backup deck 5 according to the present embodiment during operation of the continuous belt conveyor will be described with reference to FIGS.

【0029】まず、切羽2において破砕された状態の掘
削ズリ3は、ホイールローダ(図示外)により移動式ク
ラッシャー4に積み込まれ、次いでこの移動式クラッシ
ャー4により破砕されて均等な大きさを有するズリ破砕
物になり、クラッシャーコンベア4bの先端部に載せら
れる。
First, the excavation waste 3 crushed by the face 2 is loaded on a movable crusher 4 by a wheel loader (not shown), and then crushed by the movable crusher 4 to have a uniform size. It becomes crushed material and is placed on the tip of the crusher conveyor 4b.

【0030】このズリ破砕物がクラッシャーコンベア4
bによって後端部まで搬送されると、ズリ破砕物中に混
入する金属類がマグネット装置4cにより吸着され除去
されることになり、これにより、鋭利な金属類が落下し
た衝撃でベルト部分、特に連続ベルトコンベア5aのゴ
ムベルト25に損傷を与える事態を回避することとして
いる。
This crushed material is used as the crusher conveyor 4
When the metal is conveyed to the rear end by b, the metals mixed in the crushed material are absorbed and removed by the magnet device 4c, whereby the sharp metal is dropped by the impact of the drop, particularly the belt portion, A situation in which the rubber belt 25 of the continuous belt conveyor 5a is damaged is avoided.

【0031】そして、金属類の除去されたズリ破砕物
は、後端部の排出位置でクラッシャーコンベア4bによ
る支持力が失われると、第2ベルトコンベア5cの受ホ
ッパ33の中に落下する。
The crushed material from which metals have been removed falls into the receiving hopper 33 of the second belt conveyor 5c when the supporting force of the crusher conveyor 4b is lost at the discharge position at the rear end.

【0032】すると、当該ズリ破砕物のうちの殆どすべ
ては、受ホッパ33の内側に設けられた前記格子枠に一
旦衝突してから、格子枠の夫々の枠内を通過しゴムベル
ト32上に落下することになり、衝撃がかなり少なくな
るというだけでなく、移動式クラッシャー4からのズリ
破砕物の排出量のムラが整えられることにもなる。
Then, almost all of the waste crushed material once collides with the lattice frame provided inside the receiving hopper 33, then passes through each frame of the lattice frame and falls on the rubber belt 32. As a result, not only the impact is considerably reduced, but also the unevenness in the amount of the scrap crushed material discharged from the mobile crusher 4 is adjusted.

【0033】そして、ある程度定量化されたズリ破砕物
は、ゴムベルト32の回動に従って第2ベルトコンベア
5cの後端部まで搬送された時点で、ゴムベルト32に
よる支持力が失われると、一体に配設されたホッパ5d
の中に落下する。
The scrap crushed material quantified to some extent is integrated when the supporting force of the rubber belt 32 is lost at the time when the rubber belt 32 rotates and is conveyed to the rear end of the second belt conveyor 5c. 5d hopper installed
Fall into

【0034】このとき、ホッパ5dは、受ホッパ33と
同様の機能を発揮し、かつ、落下するズリ破砕物もある
程度定量化され、しかも、格子枠を複数段設けているこ
とから、連続ベルトコンベア5aのゴムベルト25に対
するズリ破砕物の衝撃が概ねなくなり、また、ゴムベル
ト25上に供給されるズリ破砕物の排出量も定量化され
る。
At this time, the hopper 5d exhibits the same function as the receiving hopper 33, and the crushed debris that falls is quantified to some extent. Further, since the grid frame is provided in a plurality of stages, the continuous belt conveyor is provided. The impact of the crushed material on the rubber belt 25 of 5a is substantially eliminated, and the discharge amount of the crushed material supplied onto the rubber belt 25 is also quantified.

【0035】この後、定量化されたズリ破砕物は、連続
ベルトコンベア5aのゴムベルト25上に載置され、坑
口まで効率よく搬送される。
Thereafter, the quantified waste crushed material is placed on the rubber belt 25 of the continuous belt conveyor 5a, and is efficiently transported to the wellhead.

【0036】従って、本実施の形態に係るバックアップ
デッキ5によれば、略水平で前後に長い作業面を有し、
かつ、当該作業面上にトンネル1内に配備された連続ベ
ルトコンベア5aの先端部を載置しつつ前後に走行自在
であるT型架台5bの上方に、移動式クラッシャー4か
ら排出されるズリ破砕物を搬送する第2ベルトコンベア
5c、及び当該ズリ破砕物を受けて前記連続ベルトコン
ベア5aの先端部に排出するホッパ5dを一体に配設し
てなることとしたので、ズリ破砕物の落下時の衝撃によ
りゴムベルト25を損傷させ、大がかりな取り換え作動
が必要になる事態を招くことがなくなり、また、上述し
た連続ベルトコンベアの延伸作業の容易化をも実現され
ることになる。
Therefore, according to the backup deck 5 of the present embodiment, the work surface is substantially horizontal and has a long front and back work surface,
In addition, while the tip of a continuous belt conveyor 5a provided in the tunnel 1 is placed on the work surface, the crushing of the waste discharged from the mobile crusher 4 is performed above a T-shaped base 5b which can travel back and forth. Since the second belt conveyor 5c that conveys the objects and the hopper 5d that receives the crushed material and discharges the crushed material to the tip of the continuous belt conveyor 5a are integrally disposed, when the crushed material falls, The rubber belt 25 is not damaged by the impact of the above, and a situation in which a large replacement operation is required does not occur, and the above-described stretching operation of the continuous belt conveyor is also facilitated.

【0037】尚、本実施の形態では、ズリ破砕物の落下
時における衝撃を緩和し、当該ズリ破砕物の定量化を図
る手段として、受ホッパ33及びホッパ5d並びにその
内側に設けられた格子枠を用いることとしたが、これに
限られるものでなく、例えばフィーダ等の機械的手段を
用いてもよい。
In the present embodiment, as a means for reducing the impact of the crushed scraps at the time of falling and quantifying the crushed scraps, the receiving hopper 33 and the hopper 5d and the lattice frame provided inside thereof are used. However, the present invention is not limited to this, and mechanical means such as a feeder may be used.

【0038】[0038]

【発明の効果】以上説明したように、本発明に係るバッ
クアップデッキによれば、略水平で前後に長い作業面を
有し、かつ、当該作業面上にトンネル内に配備された連
続ベルトコンベアの先端部を載置しつつ前後に走行自在
であるベルトコンベア架台の上方に、クラッシャーから
排出されるズリ破砕物を搬送する第2ベルトコンベア、
及び当該ズリ破砕物を受けて前記連続ベルトコンベアの
先端部に排出するホッパを一体に配設してなることとし
たので、ズリ破砕物の落下時の衝撃による連続ベルトコ
ンベアのベルトの損傷を有効に回避しながら、連続ベル
トコンベアの延伸作業の容易化の達成が可能になる。
As described above, according to the backup deck according to the present invention, a continuous belt conveyor having a substantially horizontal work surface which is long in the front-rear direction and which is disposed in a tunnel on the work surface is provided. A second belt conveyor for transporting the crushed material discharged from the crusher, above a belt conveyor gantry that can move back and forth while mounting the tip end,
And a hopper that receives the crushed material and discharges the crushed material to the end of the continuous belt conveyor, so that damage to the belt of the continuous belt conveyor due to the impact when the crushed material falls is effective. In addition, the continuous belt conveyor can be easily stretched while avoiding the problem.

【0039】この場合において、アウトリガーを含むも
のとすれば、稼働時における水平性、安定性が担保さ
れ、また、切羽側から反力を得て前方に移動する移動装
置を含むものとすれば、更に連続ベルトコンベアの延伸
作業の容易化、迅速化が期待できることとなる。
In this case, if an outrigger is included, horizontality and stability during operation are ensured, and a moving device that moves forward by receiving a reaction force from the face side is provided. Further, it is expected that the stretching operation of the continuous belt conveyor can be facilitated and speeded up.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明に係るバックアップデッキの一実施の形
態が適用されたトンネル掘削状況を示す概略側面図であ
る。
FIG. 1 is a schematic side view showing a tunnel excavation state to which an embodiment of a backup deck according to the present invention is applied.

【図2】本実施の形態に係るバックアップデッキの詳細
を示す側面図である。
FIG. 2 is a side view showing details of the backup deck according to the embodiment.

【図3】本実施の形態に係るバックアップデッキの断面
詳細を示す矢視図である。
FIG. 3 is an arrow view showing a detailed cross section of the backup deck according to the present embodiment.

【符号の説明】[Explanation of symbols]

1…トンネル 2…切羽 3…掘削ズリ 4…移動式クラッシャー 4a…クローラ走行体 4b…クラッシャーコンベア 4c…マグネット装置 5…バックアップデッキ 5a…連続ベルトコンベア 5b…T型架台 5c…第2ベルトコンベア 5d…ホッパ 11…レール 12…構造用架台 12a…車輪 12b…傾斜部材 12c…水平部材 12d…垂直部材 13…作業足場 13a…作業者 14…コンクリートウエイト 15…アウトリガー 16…レールガイド 21…先端部プーリー 22…テールピース 23…キャリアローラ及びリターンローラ 24…ベルトコンベア枠ユニット 25…ゴムベルト 26…2連プーリー 27…キャリアローラ 28…リターンローラ 29…駆動装置 30…後端部プーリー 31…中間部プーリー 32…ゴムベルト 33…受ホッパ 34…傾斜ガイド 41…牽引ワイヤー 42…止め治具 43…ウインチワイヤー 44…電動ウインチ 51…チルクライマー 52…フック付プーリー 53…ワイヤー DESCRIPTION OF SYMBOLS 1 ... Tunnel 2 ... Face 3 ... Excavation scrap 4 ... Mobile crusher 4a ... Crawler traveling body 4b ... Crusher conveyor 4c ... Magnet device 5 ... Backup deck 5a ... Continuous belt conveyor 5b ... T-type gantry 5c ... Second belt conveyor 5d ... Hopper 11 ... Rail 12 ... Structural stand 12a ... Wheel 12b ... Inclination member 12c ... Horizontal member 12d ... Vertical member 13 ... Work scaffold 13a ... Worker 14 ... Concrete weight 15 ... Outrigger 16 ... Rail guide 21 ... Tip pulley 22 ... Tail piece 23 Carrier roller and return roller 24 Belt conveyor frame unit 25 Rubber belt 26 Double pulley 27 Carrier roller 28 Return roller 29 Driving device 30 Rear end pulley 31 Middle pulley 32 Rubber belt 33 ... Receiving hopper 34 ... Inclination guide 41 ... Towing wire 42 ... Stopper jig 43 ... Winch wire 44 ... Electric winch 51 ... Chill climber 52 ... Pulley with hook 53 ... Wire

─────────────────────────────────────────────────────
────────────────────────────────────────────────── ───

【手続補正書】[Procedure amendment]

【提出日】平成11年4月1日[Submission date] April 1, 1999

【手続補正1】[Procedure amendment 1]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】請求項1[Correction target item name] Claim 1

【補正方法】変更[Correction method] Change

【補正内容】[Correction contents]

【手続補正2】[Procedure amendment 2]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】0008[Correction target item name] 0008

【補正方法】変更[Correction method] Change

【補正内容】[Correction contents]

【0008】[0008]

【課題を解決するための手段】上記目的を達成するため
に、本発明に係るバックアップデッキは、略水平で前後
に長く、連続ベルトコンベアの延伸作業を行う作業面を
し、トンネル内に配備された連続ベルトコンベアの先
端部を、当該作業面上においてスライド移動可能に載置
しつつ前後に走行自在であるベルトコンベア架台の上方
に、切羽から排出されるズリ破砕物を搬送する第2ベル
トコンベア、及び当該ズリ破砕物を受けて前記連続ベル
トコンベアの先端部に排出するホッパを一体に配設して
なることを特徴としている。
To achieve the above object, according to the Invention The backup deck according to the present invention, rather long back and forth in a substantially horizontal, have a working surface subjected to the stretching working of the continuous belt conveyor, the tunnel The tip of the continuous belt conveyor provided in the above-mentioned work surface is slidably mounted on the work surface, and the crushed material discharged from the face is conveyed to a position above the belt conveyor gantry which can travel back and forth. It is characterized in that a two-belt conveyor and a hopper that receives the crushed material and discharges it to the tip of the continuous belt conveyor are integrally provided.

【手続補正3】[Procedure amendment 3]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】0038[Correction target item name] 0038

【補正方法】変更[Correction method] Change

【補正内容】[Correction contents]

【0038】[0038]

【発明の効果】以上説明したように、本発明に係るバッ
クアップデッキによれば、略水平で前後に長く、連続ベ
ルトコンベアの延伸作業を行う作業面を有し、トンネル
内に配備された連続ベルトコンベアの先端部を、当該作
業面上においてスライド移動可能に載置しつつ前後に走
行自在であるベルトコンベア架台の上方に、クラッシャ
ーから排出されるズリ破砕物を搬送する第2ベルトコン
ベア、及び当該ズリ破砕物を受けて前記連続ベルトコン
ベアの先端部に排出するホッパを一体に配設してなるこ
ととしたので、ズリ破砕物の落下時の衝撃による連続ベ
ルトコンベアのベルトの損傷を有効に回避しながら、連
続ベルトコンベアの延伸作業の容易化の達成が可能にな
る。
As described in the foregoing, according to the backup deck according to the present invention, rather long back and forth in a substantially horizontal, continuous base
Have a working surface subjected to the stretching working belt conveyor, the leading end of the continuous belt conveyor deployed within the tunnel, the operation
A second belt conveyor that conveys the crushed material discharged from the crusher above the belt conveyor gantry that can freely move back and forth while being slidably mounted on the work surface , and receiving the crushed material. Since the hopper that discharges to the end of the continuous belt conveyor is arranged integrally, it is possible to effectively avoid damage to the belt of the continuous belt conveyor due to the impact of the falling crushed material while falling. This facilitates the stretching operation.

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 略水平で前後に長い作業面を有し、か
つ、当該作業面上にトンネル内に配備された連続ベルト
コンベアの先端部を載置しつつ前後に走行自在であるベ
ルトコンベア架台の上方に、 切羽から排出されるズリ破砕物を搬送する第2ベルトコ
ンベア、及び当該ズリ破砕物を受けて前記連続ベルトコ
ンベアの先端部に排出するホッパを一体に配設してなる
ことを特徴とする、バックアップデッキ。
1. A belt conveyor gantry having a substantially horizontal, long front-to-back work surface, and capable of running back and forth while placing the tip of a continuous belt conveyor provided in a tunnel on the work surface. A second belt conveyor that conveys the crushed material discharged from the face, and a hopper that receives the crushed material and discharges the crushed material to the tip of the continuous belt conveyor. And backup deck.
【請求項2】 アウトリガーを含むことを特徴とする、
請求項1に記載のバックアップデッキ。
2. An outrigger, comprising:
The backup deck according to claim 1.
【請求項3】 切羽側から反力を得て前方に走行するた
めの牽引装置を含むことを特徴とする、請求項1又は請
求項2に記載のバックアップデッキ。
3. The backup deck according to claim 1, further comprising a traction device for traveling forward by obtaining a reaction force from the face side.
JP1600098A 1998-01-28 1998-01-28 Backup deck Expired - Lifetime JP2967535B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1600098A JP2967535B2 (en) 1998-01-28 1998-01-28 Backup deck

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1600098A JP2967535B2 (en) 1998-01-28 1998-01-28 Backup deck

Publications (2)

Publication Number Publication Date
JPH11210400A true JPH11210400A (en) 1999-08-03
JP2967535B2 JP2967535B2 (en) 1999-10-25

Family

ID=11904373

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1600098A Expired - Lifetime JP2967535B2 (en) 1998-01-28 1998-01-28 Backup deck

Country Status (1)

Country Link
JP (1) JP2967535B2 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001328722A (en) * 2000-05-18 2001-11-27 Taisei Corp Continuously conveying device
CN100419211C (en) * 2005-05-03 2008-09-17 山东科技大学 Stereo operation fast fragments discharging method in mine drifting
JP2011047209A (en) * 2009-08-27 2011-03-10 Ohbayashi Corp Tail-piece truck and method of extending continuous belt conveyor
CN104963720A (en) * 2015-07-09 2015-10-07 上海大屯能源股份有限公司 Complete device used for filling underground waste roadway through gangue
JP2022133560A (en) * 2021-03-02 2022-09-14 株式会社安藤・間 Muck conveyance system, and tunnel excavation method

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001328722A (en) * 2000-05-18 2001-11-27 Taisei Corp Continuously conveying device
JP4658286B2 (en) * 2000-05-18 2011-03-23 大成建設株式会社 Continuous transfer device
CN100419211C (en) * 2005-05-03 2008-09-17 山东科技大学 Stereo operation fast fragments discharging method in mine drifting
JP2011047209A (en) * 2009-08-27 2011-03-10 Ohbayashi Corp Tail-piece truck and method of extending continuous belt conveyor
CN104963720A (en) * 2015-07-09 2015-10-07 上海大屯能源股份有限公司 Complete device used for filling underground waste roadway through gangue
JP2022133560A (en) * 2021-03-02 2022-09-14 株式会社安藤・間 Muck conveyance system, and tunnel excavation method

Also Published As

Publication number Publication date
JP2967535B2 (en) 1999-10-25

Similar Documents

Publication Publication Date Title
JP2967535B2 (en) Backup deck
CN201106456Y (en) Rubber belt conveyor Self-loading-unloading and backheating self-moving device for digging tunnel
JP4972698B2 (en) Belt conveyor equipment
JPH1144182A (en) Moving frame and belt conveyor
JPH09273393A (en) Belt conveyor device
JP3838843B2 (en) Conveying method by stretching belt conveyor and stretching belt conveyor equipment
JP2873818B1 (en) Continuous belt conveyor support mechanism in tunnel excavation
JP2001020680A (en) Mobile belt conveyor
JPH07324594A (en) Conveyor device for continuous muck discharge in tunnel
JP2001280079A (en) Discharge processing method and device for excavating tunnel
JP3713556B2 (en) Tunnel widening equipment
US3834762A (en) Gate road dinting equipment
JP4493187B2 (en) Slipping method in tunnel construction
JP7469165B2 (en) Extension belt conveyor
JP4548904B2 (en) Method for projecting tunnel and hopper used in the method
JP4308370B2 (en) Soil removal system
JP3911648B2 (en) Sliding conveying method and belt conveyor
JP2002303099A (en) Belt conveyor system
JP2001233436A (en) Mobile belt conveyor
JP3897187B2 (en) Tunnel shear transfer device
KR102163299B1 (en) Bogie conveyor sediment handling device in NATM method tunnel
KR102175331B1 (en) Earthwork treatment device for excavation of road header in NATM TUNNEL
JP2022094192A (en) Tunnel debris conveying system and tunnel debris conveying method
JPH1144181A (en) Muck carrying method and self-traveling conveyor
JP2001079442A (en) Work vehicle

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090820

Year of fee payment: 10

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313114

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090820

Year of fee payment: 10

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090820

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100820

Year of fee payment: 11

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110820

Year of fee payment: 12

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110820

Year of fee payment: 12

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120820

Year of fee payment: 13

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120820

Year of fee payment: 13

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130820

Year of fee payment: 14

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term