JP3713556B2 - Tunnel widening equipment - Google Patents
Tunnel widening equipment Download PDFInfo
- Publication number
- JP3713556B2 JP3713556B2 JP2002083415A JP2002083415A JP3713556B2 JP 3713556 B2 JP3713556 B2 JP 3713556B2 JP 2002083415 A JP2002083415 A JP 2002083415A JP 2002083415 A JP2002083415 A JP 2002083415A JP 3713556 B2 JP3713556 B2 JP 3713556B2
- Authority
- JP
- Japan
- Prior art keywords
- protector
- gantry
- extending
- tunnel
- protrusion
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Description
【0001】
【発明の属する技術分野】
本発明は、山脈や丘を貫通する既設の山岳トンネルの拡幅工事に用いられる、前記トンネル内に通路を確保するためのプロテクタと、前記トンネルの覆工の破砕およびその周囲地盤の掘削に用いられる装置を据え付けるための、前記プロテクタ上に載置される架台とを含むトンネル拡幅工事用設備に関する。
【0002】
【従来の技術】
狭小な既設山岳トンネルの拡幅を図るべく、機械装置や発破を用いて既設トンネルの覆工の破砕およびその周囲地盤の掘削を行った後、その破砕、掘削跡に既設トンネルより大きい断面を有する新たなトンネルを構築し、これにより既設トンネルを新たなトンネルに置き換えることが行われている。
【0003】
従来、既設トンネルの覆工の破砕およびその周囲地盤の掘削に際し、既設トンネル内に歩行者、車両等の通行を確保するための通行路を確保するためのプロテクタと、ブレーカ、切断機、穿孔機等からなる破砕・掘削装置および必要に応じて掘削後のトンネル壁面処理のための吹付けマニュピュレータのような吹付用装置が据え付けられる架台であってプロテクタ上にその伸長方向へ走行可能に載置された架台とを備えるトンネル拡幅工事用設備が提案されている(特開2000−328871)。
【0004】
これによれば、プロテクタ上で架台をその伸長方向へ移動させることにより、既設トンネルの破砕、掘削、吹き付け等の作業箇所をトンネルの軸線方向へ順次移動させることができる。
【0005】
トンネルの破砕、掘削、吹き付け等の作業は、架台をプロテクタ上に静止させる間に行われる。前記従来の設備にあっては、さらに、架台に設けられプロテクタの側方を下方へ伸びる複数の脚部と、各脚の下端部に取り付けられたアウトリガーとを備え、架台はアウトリガーの伸長動作によりトンネルの路面上に支持され、プロテクタに対する静止状態を維持される。
【0006】
ところで、前記従来の設備にあっては、架台から伸びる脚部がトンネル空間内における作業スペース、特にプロテクタの側方の作業スペースを狭めるという問題があり、また、プロテクタの側方の作業スペースに置かれる資材、ずり運搬用のベルトコンベヤ、ずり運搬車両等が前記脚部の進行の障害となり、プロテクタ上における架台の円滑な進行が妨げられる場合があった。
【0007】
【発明が解決しようとする課題】
したがって、本発明の目的は、拡幅対象である既設山岳トンネル内空間をより有効に活用し得るトンネル拡幅工事用設備を提供することにある。
【0008】
【課題を解決するための手段】
本発明に係るトンネル拡幅工事用設備は、拡幅される既設山岳トンネル内に配置され通行路を規定する頂部および両側部を有するプロテクタと、該プロテクタ上にその伸長方向へ走行可能に載置された、前記トンネルの覆工の破砕およびその周囲地盤の掘削に用いられる装置が据え付けられる架台と、前記プロテクタに前記架台を解除可能に固定する固定手段とを備える。
【0009】
前記固定手段は、前記プロテクタの各側部に設けられその伸長方向へ伸びる1又は複数の突起と、前記架台に設けられ前記突起を抱き込むように伸びる伸長部と、前記プロテクタの突起及び前記架台の伸長部間に配置されかつ前記突起及び前記架台のいずれか一方に支持された、上下方向へ伸びる複数のジャッキとからなるものとすることができる。
【0010】
好ましくは、前記プロテクタがその頂部とその各側部とに連なる斜め下方へ伸びる肩部を有し、また前記架台の伸長部が前記プロテクタの肩部に沿って伸びる傾斜部分を備える。また、前記架台がその各伸長部から水平に伸びる張出部を備えるものとすることができる。
【0011】
本発明に係る設備は、さらに、前記架台に支持され該架台に沿って伸びるベルトコンベヤを含むものとすることができる。前記ベルトコンベヤは、好ましくは、前記トンネルの覆工の破砕及びその周囲地盤の掘削によって生じたずりを運搬するために使用されるトラックの全長より長い長さ寸法を有する。さらに好ましくは、前記ベルトコンベヤの一部が残りの一部に対して揺動可能である。
【0012】
【発明の作用および効果】
本発明によれば、拡幅される山岳トンネル内に設置されるプロテクタに対し、該プロテクタ上を走行可能である架台を解除可能に固定する固定手段を設けたことから、前記トンネルの破砕、掘削等の作業の際、前記架台が移動、傾斜等しないようにこれを前記プロテクタに静止状態に保持することができる。このため、前記従来の設備におけるプロテクタ側方の脚及びアウトリガーの存在とこれに伴うプロテクタ側方の作業スペースの狭小化、作業スペースに置かれる資材、ずり運搬車両等による架台の進行障害等とを解消し、また前記作業スペースにおけるずり運搬車両の円滑な進行を確保することができる。
【0013】
前記固定手段は、前記プロテクタの各側部に設けられた突起と、前記架台に設けられ前記突起を抱き込むように伸びる伸長部と、前記突起及び前記伸長部間に配置されかつ前記突起及び前記架台のいずれか一方に支持された、上下方向へ伸びる複数のジャッキとからなるものとするときは、前記ジャッキの伸長動作による該ジャッキの両端部の前記突起及び前記伸長部に対する圧接、及びその収縮動作による前記圧接の解除により、前記プロテクタに対する前記架台の固定及びその解除を容易かつ確実に行うことができる。
【0014】
また、前記ジャッキの収縮動作により移動可能状態におかれた前記架台は、その移動の間に傾きが生じたとき、前記突起又は伸長部と前記ジャッキとの相互接触により、その傾きが矯正され、また過剰な傾斜の発生が防止される。前記架台下の作業スペースは、前記突起および前記伸長部の高さ位置をより上位におくことにより、より広いものとすることができる。
【0015】
前記プロテクタにその頂部からその側部に連なる、斜め下方に伸びる肩部を設け、また、前記架台の伸長部に、前記プロテクタの肩部に沿って伸びる傾斜部分を設けるときは、前記架台の上方により大きい作業スペースを確保することができる。
【0016】
前記架台の伸長部から水平に伸びる張出部を設けるときは、前記トンネル覆工の破砕及びその周囲地盤の掘削の作業のための作業床の面積を増大することができる。
【0017】
前記架台にベルトコンベヤを支持するときは、前記プロテクタの側方の作業スペースを規定するトンネル内路面上へのベルトコンベヤの設置を不要とし、これにより前記作業スペースをより有効に活用することができる。
【0018】
前記トンネルの拡幅工事により生じたずりは、前記プロテクタ上の架台に支持された前記ベルトコンベヤを介して、前記プロテクタの側方の作業スペースで待機するずり搬送車両であるトラックに搬送することができる。前記ベルトコンベヤは、トラックの上方位置に配置されかつその長さ寸法がトラックの全長より長いことから、ずりの一時的な集積又は堆積場所から、少なくとも1台のトラックの長さを越えた場所にずりを搬送することができる。このため、トラックの待機台数を複数として、ずりの堆積場所から遠いトラックから近い方のトラックに順にずりを搬送し、積み込むことができる。
【0019】
これにより、1台のトラックの積込み量を超える多量のずりが発生した場合にあってもずりの搬出処理を遅滞なく円滑に行うことができる。また、前記作業スペースを出入りするトラックと前記プロテクタ内の通行車両との交通整理については、一時に出入りするトラックの台数を複数に設定することにより、その回数を減らし、トラックの入れ替えに要する時間を節減することができる。その結果、既設山岳トンネルの拡幅工事により生じるずりの搬出能率を高めることができる。
【0020】
前記ベルトコンベヤの一部を残りの一部に対して揺動可能とするときは、前記一部が残りの一部と共に一直線に伸びる状態と、残りの一部に対して折れ曲がり下方に傾斜する状態とすることができる。一直線に伸びる状態下ではその下方を作業スペースとして利用することができる。また、前記傾斜状態下におくときは、前記ベルトコンベヤ上へのずりの載置作業を容易にすることができる。
【0021】
【発明の実施の形態】
図1を参照すると、馬蹄形の既設の山岳トンネル10と、該トンネルの拡幅のために新たに構築される、既設トンネル10より大きい断面を有する馬蹄形の新たなトンネル12とが、それぞれ、想像線と実線とで示されている。
【0022】
新たなトンネル12は、既設トンネル10の覆工(図示せず)を破砕し、さらにその周囲地盤14を掘削した後、その掘削壁面に沿って構築される。既設トンネル10の覆工の破砕およびその周囲地盤14の掘削(発破による掘削を含む)並びに新トンネル12の構築は、既設トンネル10の一端(後方端)からその他端(前方端)に向けて段階的に行われる。なお、図示の周囲地盤14は、トンネル10の他端側に残る未掘削のものを示す。
【0023】
既設トンネル10の覆工の破砕およびその周囲地盤14の掘削の箇所並びにその近傍における通行人や一般車両の通行及びその安全を確保するため、既設トンネル10内に通行路を規定するプロテクタ16が配置されている。また、プロテクタ16上には、前記破砕および掘削に使用される後記破砕・掘削装置を設置するための架台18が載置されている。プロテクタ16及び架台18、並びに後記固定手段30,34,40は、トンネル拡幅工事用設備を構成する。
【0024】
図示のプロテクタ16は全体に逆U字形の横断面形状を有し、その頂部20および両側部22が、既設トンネル10の軸線方向に関して、前記破砕・掘削箇所およびその前後に亘って伸びている(図2で見て左方が前方)。
【0025】
図示のプロテクタ16は、さらに、その頂部20とその各側部22とに連なりかつ斜め下方へ伸びる肩部24を有する。このような肩部24を有しない、互いに直交する頂部および両側部とからなるプロテクタとすることも可能であるが、肩部24を設けるときは、これを設けないときに現れる角部が存しないため、プロテクタ16の上方により広い作業空間を得ることができる。
【0026】
プロテクタ16は既設トンネル10内の路面26上に配置され、トンネル10の壁面(覆工壁面)との間に作業スペースとしての側方空間28が存する。図示の例では、プロテクタ16はトンネル10の横断方向におけるほぼ中央部に位置するが、必要に応じて、前記中央部以外の位置におかれる。
【0027】
プロテクタ16は、その各側部(より詳細には各側部の内外両側面のうちの外側の面)22に、その伸長方向へ連続して伸びる突条からなる1の突起30を有する。
【0028】
突起30は、プロテクタの側部22のより上位の位置に配置することが望ましい。これにより、突起30とほぼ同じ高さ位置を占めることとなる、架台18に設けられた後記伸長部34の下方に、より広い側方空間28を得ることができ、ここに工事資材や機器、後記トラック50,52、シャフローダ54等を配置することができ、また、これらは架台18の移動の障害とならない。図示の例では、突起30は肩部24の直下に位置する。
【0029】
突起30は、連続して伸びる1の突条からなるものに代えて、例えば、断続して伸びる複数の突条からなるものとすることができる。また、前記突条の横断面形状は任意に定めることができる。図示の例では、矩形の横断面形状を有する。
【0030】
プロテクタ16は、前記破砕および掘削の進行(前進)に合わせて、路面26上をトンネルの軸線方向へ移動される。この移動のため、図示の例では、路面26上に1対のレール(図示せず)が敷かれ、プロテクタの両側部22下に両レール上を走行可能の複数対の車輪(図示せず)が設けられる。
【0031】
架台18は、プロテクタ16の頂部20上にあってこれと相対する板状の本体32と、本体32に連なる一対の伸長部34とを有する。両伸長部34は、それぞれ、プロテクタの両側部22に位置する突起30を抱き込むように、本体32から下方へ伸びている。
【0032】
好ましくは、さらに、両伸長部34からそれぞれ水平に張り出す一対の張出部36を有する。これによれば、側方空間28の上方に、架台18上における前記装置の設置スペースおよびその操作スペースの増大を図ることができる。
【0033】
架台18は、プロテクタ16上をその長手方向へ走行可能である。このため、図示の例では、プロテクタの頂部20に設けられその伸長方向へ伸びる2条のレール35上を転動可能である複数の車輪37が、架台の本体32に回転可能に支承されている。
【0034】
架台の伸長部34は、プロテクタの突起30を抱き込み、これを受け入れる凹所38を有する。凹所38は、架台18の伸長方向へ伸びかつプロテクタの側部22に向けて開放している。
【0035】
伸長部34とプロテクタの突起30との間、すなわち伸長部の凹所38にはその伸長方向へ互いに間隔をおいて複数のジャッキ40が配置されている。より詳細には、各ジャッキ40は、伸長部34の下部と突起30との間に上下に向けて配置されかつ伸長部34に支持されている。ジャッキ40は、油圧ジャッキのような液圧ジャッキ、スクリュージャッキ等からなる。ジャッキ40は、プロテクタの突起30及び架台の伸長部34と共に、架台18をプロテクタ16に解除固定するための固定手段をなす。
【0036】
収縮状態にある図示のジャッキ40を突起30に当接するまで伸長動作させると、ジャッキ40の上下両端が伸長部34と突起30とに圧接し、実質的に、架台18をプロテクタ16に固定することができる。この固定により、架台18をプロテクタ16上に傾斜、移動等しない静止状態に保持することができ、この間に後記破砕・掘削装置を用いての既設トンネル10の破壊、周囲地盤の掘削作業、あるいはさらにその後の吹き付け作業を安定的に行うことができる。
【0037】
他方、収縮状態におかれたジャッキ40の下で、すなわち前記固定を解除した状態において、プロテクタ16上における架台18の移動を可能とすることができる。ジャッキ40は、架台16の移動時にこれが傾くときにプロテクタの突起30に当たり、架台16の傾斜を制限する作用をなす。
【0038】
ジャッキ40は、図示の例に代えて、プロテクタの突起30に取り付け、該突起から垂下するようにしてもよい。
【0039】
図示の架台18にあっては、伸長部34が、プロテクタの両肩部24の上方をこれに沿って伸びる傾斜部分42を有する。
【0040】
架台18の各伸長部に傾斜部分42を設けた結果、プロテクタに肩部24を設けることによって得られた前記プロテクタ上方の広い作業空間の狭小化を回避することができる。ただし、傾斜部分42を有しない架台、すなわち本体32と伸長部34とが互いに直交する架台を使用することは任意である。
【0041】
架台の本体22および各張出部36上には、既設トンネル10の覆工の破砕、その周囲地盤14の掘削、周囲地盤14中への装薬等を行うために用いられるブレーカ、切断機、穿孔機等からなる破砕・掘削装置、あるいはこれらに加えて吹付けマニュピュレータのような吹付用装置(図示せず)が据え付けられる。前記破砕・掘削装置は架台18上での作業員による操作により、その前方に位置する前記覆工および地盤14に対して破砕・掘削作用を及ぼす。
【0042】
この破砕・掘削作用により生じた破砕片および掘削片(以下、これらを総称して「ずり」という。)は、その一部が架台18上に落下し、また、他の一部が、プロテクタ16の両側方、すなわちプロテクタ16と前記破砕・掘削作用により現れた新設トンネル12の壁面との間の側方空間28を落下する。架台18上のずりは、人為的に、各側方空間28に落とされ、各側方空間28を規定する新旧両トンネル10,12の底面上に堆積する。
【0043】
架台18の各張出部36の下部には前記ずりを搬送するためのベルトコンベヤ48が吊持、支持されている。
【0044】
各側方空間28は、また、ベルトコンベヤ48で搬送されたずりを受け取り、これを満載してトンネル12外に搬出するためのダンプカーのようなトラック50,52のための走行用スペースを提供する。張出部36に支持されたベルトコンベヤ48は、前記トラックの全高すなわちその天井面より高い上方位置にあり、この上方位置から前記トラックの荷台上にずりを放出、落下させることができる。
【0045】
各側方空間28の底面に落下し、堆積した前記ずりは、側方空間28に導入することができる例えばシャフローダ54を用いて、ベルトコンベヤ48上に載置することができる。シャフローダ54は前記ずりを掬い集め、さらにベルトコンベヤ48上に移送する機能を有する。
【0046】
図示のベルトコンベヤ48は、架台の張出部36に固定され該張出部に沿って伸びる第1のコンベヤ部56と、該第1のコンベヤ部に連結された第2のコンベヤ部58とからなる。前記ずりは、第2のコンベヤ部58から第1のコンベヤ部56へ搬送される。
【0047】
第2のコンベヤ部58は、その後端部において、第1のコンベヤ部56の前端部に枢着され、架台18を横断する方向へ伸びる軸60の周りに揺動可能である。第2のコンベヤ部56は、また、その前端部において、チェーンブロック62を介して、架台の張出部36に吊持されている。
【0048】
第2のコンベヤ部58は、チェーンブロック62を作動させてそのチェーンを巻き上げることにより、これが張出部36下において水平状態となるまで、図2に示す傾斜状態から時計方向へ揺動させることができる。水平状態下においては、その下方領域を作業空間として利用することができる。
【0049】
また、チェーンブロック62のチェーンを繰り出すことにより、第2のコンベヤ部58を前記水平状態から反時計方向へ揺動させ、前記傾斜状態にすることができる。シャフローダ54からの前記ずりの受け取りは、この傾斜状態において行う。
【0050】
なお、第2のコンベヤ部58を揺動可能としないで、第1のコンベヤ部56と同様に、架台の張出部36にこれに沿って伸びるように固定することもできる。第2のコンベヤ部58を非揺動のものとした場合、および第2のコンベヤ部58を前記水平状態に維持した場合のいずれにおいても、第2のコンベヤへ部58のずりの載置は可能である。ずりの載置は、適当な機械的手段を使用して行うことができる。
【0051】
第2のコンベヤ部58は、シャフローダ54から受け取ったずりを第1のコンベヤ部56の前端部上まで運び、第1のコンベヤ部56は受け取ったずりをその後端部から側方空間28に放出する。
【0052】
放出されたずりは、第1のコンベヤ部56下に予め待機しているトラック52の荷台上に落下する。このトラック52の後方には他のトラック50が同様に待機している。
【0053】
ベルトコンベヤ48はその全長、すなわち第1および第2の両コンベヤ部56,58の合計長さが、前方位置のトラック52の全長より長いものに設定されている。このため、トラック52の前方位置から、該トラックを越えて、その後方位置で待機するトラック50までのずりの移送が可能である。他のトラック52へのずりの載置は、ずりで満載のトラック50を後方へ移動した跡に他のトラック52を移動させて行う。
【0054】
空荷状態の複数台のトラックを待機させておけば、1台のトラックの積込み量を超える多量のずりが発生した場合であっても、余裕を持ってずりを受け取りかつ円滑に搬出することができる。
【0055】
満載後のトラック50は、他のトラック52が満載になるのを待って、トラック52と共に一時にプロテクタの側方空間28外に移動させることができる。これにより、側方空間28外へのトラックの移動を1台ずづ行う場合と比べて、側方空間28外における一般車両に対する交通整理の回数を少なくすることができる。
【0056】
ベルトコンベヤ48の全長はより長いものに設定することができる。これによれば、さらに多くの台数のトラックを側方空間28に待機させ、より多くの台数を越える距離にわたるずりの移送が可能である。例えば、ベルトコンベヤの全長を2台分のトラックの長さより長いものに設定すれば、2台の待機トラックの後方で待機する1台のトラックにずりを移送し、満載後、その前方のトラックに対し順次ずりを移送することができる。なお、ベルトコンベヤ48の全長を増大するときは、これに応じて、ベルトコンベヤ48を支持する架台18の長さ寸法をより大きいものに設定する必要がある。
【0057】
図示の例では、トラックが走行可能である側方空間28がプロテクタ16の両側に設けられ、これに合わせて、ベルトコンベヤ48が架台の両側の張出部36に支持されているが、いずれか一方の側方空間28が比較的狭いときは、他方の側方空間28に関してのみ、ベルトコンベヤ48を配置することができる。
【図面の簡単な説明】
【図1】本発明に係るトンネル拡幅工事用設備の正面図である。
【図2】本発明に係るトンネル拡幅工事用設備の側面図である。
【符号の説明】
10 既設の山岳トンネル
12 新たなトンネル
14 周囲地盤
16,18 プロテクタ及び架台(トンネル拡幅工事用設備)
24,42 プロテクタの肩部及び架台の傾斜部分
28 トンネル内プロテクタの側方空間
30,34,40 突起、伸長部及びジャッキ(固定手段)
36 架台の張出部
48,56,58 ベルトコンベヤ、その第1のベルトコンベヤ部及びその第2のベルトコンベヤ部[0001]
BACKGROUND OF THE INVENTION
The present invention is used for widening an existing mountain tunnel that penetrates a mountain range or a hill, and is used for crushing the tunnel lining and excavating the surrounding ground, and a protector for securing a passage in the tunnel. The present invention relates to a facility for widening a tunnel including a gantry placed on the protector for installing the device.
[0002]
[Prior art]
In order to widen a narrow existing mountain tunnel, after crushing the lining of the existing tunnel and excavating the surrounding ground using machinery and blasting, the crushing and excavation site has a new cross section that is larger than the existing tunnel. A new tunnel is constructed, and the existing tunnel is replaced with a new tunnel.
[0003]
Conventionally, a protector, breaker, cutting machine, drilling machine for securing a passage for securing pedestrians, vehicles, etc. in the existing tunnel when crushing the lining of the existing tunnel and excavating the surrounding ground It is a mount on which a spraying device such as a spraying manipulator for processing the tunnel wall surface after excavation is installed, and is mounted on a protector so as to be able to travel in its extending direction. There has been proposed a tunnel widening facility equipped with a mounted base (Japanese Patent Laid-Open No. 2000-328871).
[0004]
According to this, by moving the gantry in the extending direction on the protector, it is possible to sequentially move work points such as crushing, excavation, and blowing of the existing tunnel in the axial direction of the tunnel.
[0005]
Operations such as tunnel crushing, excavation, and spraying are performed while the gantry rests on the protector. The conventional equipment further includes a plurality of legs provided on the pedestal and extending downward on the side of the protector, and an outrigger attached to the lower end of each leg. It is supported on the road surface of the tunnel and is kept stationary with respect to the protector.
[0006]
By the way, the conventional equipment has a problem that the leg portion extending from the gantry narrows the work space in the tunnel space, particularly the work space on the side of the protector, and is placed in the work space on the side of the protector. Materials to be scraped, belt conveyors for shear transport, shear transport vehicles, and the like become obstacles to the progress of the legs, and the smooth progress of the mount on the protector may be hindered.
[0007]
[Problems to be solved by the invention]
Accordingly, an object of the present invention is to provide a tunnel widening facility that can more effectively utilize the space in an existing mountain tunnel that is to be widened.
[0008]
[Means for Solving the Problems]
A tunnel widening construction facility according to the present invention is placed in an existing mountain tunnel to be widened, and is mounted on a protector having a top portion and both side portions that define a passageway, and can travel in the extending direction on the protector. A gantry on which a device used for crushing the tunnel lining and excavating the surrounding ground is installed, and a fixing means for releasably fixing the gantry to the protector.
[0009]
The fixing means includes one or a plurality of protrusions provided on each side portion of the protector and extending in the extending direction; an extension portion provided on the mount and extending so as to embrace the protrusion; the protrusion of the protector and the mount And a plurality of jacks that are arranged between the extending portions and are supported by one of the protrusion and the gantry and extend in the vertical direction.
[0010]
Preferably, the protector has a shoulder portion extending obliquely downward from the top portion and each side portion thereof, and the extension portion of the gantry includes an inclined portion extending along the shoulder portion of the protector. Moreover, the said mount frame shall be equipped with the overhang | projection part extended horizontally from each extension part.
[0011]
The facility according to the present invention may further include a belt conveyor supported by the frame and extending along the frame. The belt conveyor preferably has a length dimension that is longer than the total length of the truck used to carry the shear generated by crushing the tunnel lining and excavating the surrounding ground. More preferably, a part of the belt conveyor is swingable with respect to the remaining part.
[0012]
Operation and effect of the invention
According to the present invention, the protector installed in the mountain tunnel to be widened is provided with the fixing means for releasably fixing the cradle that can run on the protector, so that the tunnel is crushed, excavated, etc. During the operation, the frame can be held stationary by the protector so that the pedestal does not move or tilt. For this reason, the presence of the legs and outriggers on the side of the protector in the conventional equipment and the accompanying reduction in the work space on the side of the protector, the materials placed in the work space, the progress of the pedestal due to the shear transport vehicle, etc. It is possible to eliminate this problem and to ensure the smooth progress of the shear transport vehicle in the work space.
[0013]
The fixing means includes a protrusion provided on each side of the protector, an extension provided on the pedestal and extending to embrace the protrusion, and disposed between the protrusion and the extension, and the protrusion and the When it is composed of a plurality of jacks that are supported by any one of the pedestals and extend in the vertical direction, the jacks are pressed against the protrusions and the extension parts at both ends by the extension operation of the jacks, and the contraction thereof. By releasing the pressure contact by operation, the frame can be fixed to the protector and released easily and reliably.
[0014]
In addition, when the pedestal placed in a movable state by the contraction operation of the jack is tilted during the movement, the tilt is corrected by mutual contact between the protrusion or the extension and the jack, In addition, excessive inclination is prevented from occurring. The work space under the gantry can be made wider by placing the height positions of the protrusions and the extension part higher.
[0015]
When the protector is provided with a shoulder extending from the top to the side thereof and extending obliquely downward, and when an inclined portion extending along the shoulder of the protector is provided at the extension of the mount, the top of the mount A larger working space can be secured.
[0016]
When an overhanging portion that extends horizontally from the extending portion of the gantry is provided, the area of the work floor for the operation of crushing the tunnel lining and excavating the surrounding ground can be increased.
[0017]
When the belt conveyor is supported on the gantry, it is not necessary to install a belt conveyor on the road surface in the tunnel that defines the working space on the side of the protector, thereby making it possible to use the working space more effectively. .
[0018]
The shear generated by the widening work of the tunnel can be transported to a truck which is a shear transport vehicle waiting in a work space on the side of the protector via the belt conveyor supported by a mount on the protector. . The belt conveyor is located above the track and has a length dimension that is longer than the total length of the track, so that the belt conveyor is located at a location beyond the length of at least one track from the temporary accumulation or deposition location of the shear. The shear can be conveyed. For this reason, it is possible to transport and load the slurries in order from a truck far from the position where the sludge is accumulated, to a truck closer to the truck, where a plurality of trucks are waiting.
[0019]
As a result, even when a large amount of slip exceeding the loading amount of one truck occurs, the carry-out processing of the slip can be smoothly performed without delay. In addition, regarding the traffic control between the trucks entering and exiting the work space and the passing vehicles in the protector, the number of trucks entering and exiting at a time can be set to a plurality, thereby reducing the number of times and the time required for the replacement of the trucks. You can save. As a result, it is possible to increase the efficiency of carrying out the shear generated by the widening work of the existing mountain tunnel.
[0020]
When a part of the belt conveyor is swingable with respect to the remaining part, the part extends in a straight line with the remaining part, and the part is bent and inclined downward with respect to the remaining part. It can be. Under a straight line, the lower part can be used as a work space. Further, when placed in the inclined state, it is possible to facilitate the work of placing the shear on the belt conveyor.
[0021]
DETAILED DESCRIPTION OF THE INVENTION
Referring to FIG. 1, a horseshoe-shaped existing
[0022]
The
[0023]
In order to ensure the passage of the lining of the existing
[0024]
The illustrated
[0025]
The illustrated
[0026]
The
[0027]
The
[0028]
It is desirable to arrange the
[0029]
The
[0030]
The
[0031]
The
[0032]
Preferably, it further has a pair of overhang |
[0033]
The
[0034]
The
[0035]
A plurality of
[0036]
When the illustrated
[0037]
On the other hand, the
[0038]
Instead of the illustrated example, the
[0039]
In the illustrated
[0040]
As a result of providing the
[0041]
On the
[0042]
Part of the crushed pieces and excavated pieces (hereinafter collectively referred to as “slip”) generated by the crushing and excavating action fall on the
[0043]
A
[0044]
Each
[0045]
The above-mentioned shear that falls and accumulates on the bottom surface of each
[0046]
The illustrated
[0047]
The
[0048]
The
[0049]
Further, by feeding out the chain of the
[0050]
It should be noted that the
[0051]
The
[0052]
The released shear falls on the loading platform of the
[0053]
The
[0054]
If multiple trucks that are in an unloaded state are placed on standby, even if a large amount of slip occurs that exceeds the loading amount of a single truck, it is possible to receive the slip with sufficient margin and carry it out smoothly. it can.
[0055]
The fully loaded
[0056]
The overall length of the
[0057]
In the illustrated example, the
[Brief description of the drawings]
FIG. 1 is a front view of a tunnel widening facility according to the present invention.
FIG. 2 is a side view of the tunnel widening facility according to the present invention.
[Explanation of symbols]
10 Existing
24, 42 Shoulder part of the protector and
36
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2002083415A JP3713556B2 (en) | 2002-03-25 | 2002-03-25 | Tunnel widening equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2002083415A JP3713556B2 (en) | 2002-03-25 | 2002-03-25 | Tunnel widening equipment |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2003278478A JP2003278478A (en) | 2003-10-02 |
JP3713556B2 true JP3713556B2 (en) | 2005-11-09 |
Family
ID=29231206
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2002083415A Expired - Lifetime JP3713556B2 (en) | 2002-03-25 | 2002-03-25 | Tunnel widening equipment |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP3713556B2 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104847393A (en) * | 2015-06-02 | 2015-08-19 | 北京首尔工程技术有限公司 | Mobile tunnel supporting structure and tunnel construction method implemented under protection effect of mobile tunnel supporting structure |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108661685B (en) * | 2018-05-14 | 2020-02-14 | 贵州大学 | Temporary tunnel supporting device convenient to deploy and detach |
JP7266774B2 (en) * | 2020-04-28 | 2023-05-01 | 国立研究開発法人土木研究所 | Reconstruction method of existing road tunnel lining and equipment used therefor |
CN117449864B (en) * | 2023-12-22 | 2024-03-05 | 洛阳高飞桥隧机械股份有限公司 | Tunnel widening driving protection construction device and tunnel widening construction method |
-
2002
- 2002-03-25 JP JP2002083415A patent/JP3713556B2/en not_active Expired - Lifetime
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104847393A (en) * | 2015-06-02 | 2015-08-19 | 北京首尔工程技术有限公司 | Mobile tunnel supporting structure and tunnel construction method implemented under protection effect of mobile tunnel supporting structure |
CN104847393B (en) * | 2015-06-02 | 2016-09-28 | 北京首尔工程技术有限公司 | A kind of tunnel moves the method for tunnel construction under supporting construction and protection thereof |
Also Published As
Publication number | Publication date |
---|---|
JP2003278478A (en) | 2003-10-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104564050B (en) | Equipment for heading and anchoring parallel operation construction | |
US6729464B2 (en) | Mine conveying system | |
JP7036311B2 (en) | Slip transport and ventilation equipment in the tunnel | |
US4150853A (en) | Method of strip mining | |
CA2653449A1 (en) | Mobile crusher unit | |
JP3713556B2 (en) | Tunnel widening equipment | |
JP6537397B2 (en) | Method of carrying out shear in tunnel excavation work and mobile stage used therefor | |
WO1999054049A1 (en) | A mineral breaker apparatus | |
JP3706878B2 (en) | Expansion method for existing tunnels | |
JPH08170486A (en) | Tunnel excavated muck carry-out gantry | |
KR102254532B1 (en) | Vertical soil transfer device of urban NATM method | |
US4396313A (en) | Method of forming flooring in tunnels | |
JP6549411B2 (en) | Floor construction method of shield tunnel | |
EP0989285A1 (en) | Tunneling device | |
JP2967535B2 (en) | Backup deck | |
JP3856301B2 (en) | Expansion method of existing tunnel using mobile work platform | |
JP3803036B2 (en) | Rail for construction in tunnel excavation | |
KR102175331B1 (en) | Earthwork treatment device for excavation of road header in NATM TUNNEL | |
WO1995022481A1 (en) | Crawler type slope travelling machine and track thereof | |
JP3151116B2 (en) | Tunnel excavation method and gantry used for this method | |
JPH11210382A (en) | Continuous belt conveyor supporting mechanism in tunnel excavation | |
KR102163299B1 (en) | Bogie conveyor sediment handling device in NATM method tunnel | |
CN210622850U (en) | Mine transportation system | |
JP6917113B2 (en) | Belt conveyor line lifting device | |
CN210686052U (en) | Underground roadway interchange transportation structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20041228 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20050510 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20050802 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20050804 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 3713556 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20080902 Year of fee payment: 3 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090902 Year of fee payment: 4 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090902 Year of fee payment: 4 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090902 Year of fee payment: 4 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100902 Year of fee payment: 5 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110902 Year of fee payment: 6 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110902 Year of fee payment: 6 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110902 Year of fee payment: 6 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110902 Year of fee payment: 6 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120902 Year of fee payment: 7 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120902 Year of fee payment: 7 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130902 Year of fee payment: 8 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
S533 | Written request for registration of change of name |
Free format text: JAPANESE INTERMEDIATE CODE: R313533 |
|
R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
S531 | Written request for registration of change of domicile |
Free format text: JAPANESE INTERMEDIATE CODE: R313531 |
|
R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
S531 | Written request for registration of change of domicile |
Free format text: JAPANESE INTERMEDIATE CODE: R313531 |
|
R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
EXPY | Cancellation because of completion of term |