JPH10306445A - Steel-pipe pile mounting device - Google Patents
Steel-pipe pile mounting deviceInfo
- Publication number
- JPH10306445A JPH10306445A JP11559097A JP11559097A JPH10306445A JP H10306445 A JPH10306445 A JP H10306445A JP 11559097 A JP11559097 A JP 11559097A JP 11559097 A JP11559097 A JP 11559097A JP H10306445 A JPH10306445 A JP H10306445A
- Authority
- JP
- Japan
- Prior art keywords
- pipe pile
- pile
- steel pipe
- steel
- jig
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
Description
【0001】[0001]
【発明の属する技術分野】本発明は、鋼管杭を所定の位
置に設置するための鋼管杭設置装置に関する。The present invention relates to a steel pipe pile setting device for setting a steel pipe pile at a predetermined position.
【0002】[0002]
【従来の技術】近年、線路上空の有効利用を図るために
駅の真上に駅ビルを建設したり、鉄道の立体交差化に伴
う直上高架化工事や線路近接の高架橋の構築等が多くな
っている。これ等の場合、線路に近接した建設工事の施
工性や列車走行の安全確保等の観点から、掘削工事を少
なくするため地中梁のない建築物や構築物が望ましいと
されている。これは1柱1杭構造であって、従来一部で
実施されており、地中梁を造るための仮土留め、掘削、
路面覆工等が不要になる。2. Description of the Related Art In recent years, a station building has been constructed just above a station in order to effectively use the sky above a track, an elevated work directly above the railway due to an overpass of a railway, and a viaduct close to the track have been increased. ing. In these cases, from the viewpoint of workability of construction work close to the railroad track and ensuring safety of train running, it is considered that a building or a building without underground beams is desirable in order to reduce excavation work. This is a one-column, one-pile structure, which has been implemented in a part of the past.
Road lining is not required.
【0003】[0003]
【発明が解決しようとする課題】建築物や構築物の構造
形式が鋼管柱を鋼管杭に埋め込む「鋼管差し込み工法」
である場合には、鋼管杭の精度がそのまま上部構造の建
築物や構築物の精度に反映されるため、多数の鋼管杭を
所定の位置に設置することが重要視される。しかしなが
ら、従来は鋼管杭の位置(水平、上下共)をmm単位の
精度で制御・管理する技術は存在しなかった。そこで、
本発明は、簡単な構成により鋼管杭を所定の位置に高精
度に設置できるようにした鋼管杭設置装置を提供するこ
とを目的とする。[Problems to be Solved by the Invention] "Steel pipe insertion method" in which a steel pipe pillar is embedded in a steel pipe pile as a structural type of a building or a structure
In the case of, since the accuracy of the steel pipe pile is directly reflected on the accuracy of the building or the structure of the upper structure, it is important to install a large number of steel pipe piles at predetermined positions. However, conventionally, there is no technology for controlling and managing the position (both horizontal and vertical) of the steel pipe pile with an accuracy of mm unit. Therefore,
SUMMARY OF THE INVENTION It is an object of the present invention to provide a steel pipe pile installation apparatus that can easily install a steel pipe pile at a predetermined position with a simple configuration.
【0004】[0004]
【課題を解決するための手段】この目的を達成するため
の具体的手段として、本発明は、杭孔を囲むようにして
地上の所定位置に設置する下架台と、この下架台の上部
の所定位置に設置する上架台と、鋼管杭を吊り下げて前
記上架台の上方から前記杭孔に落とし込む吊り込み用治
具と、この鋼管杭の上部を前記上架台の上に仮固定する
かんざし等の支持材と、この仮固定の時に前記吊り込み
用治具を外し、PC鋼棒を介して前記鋼管杭に取り付け
られる吊下式の杭固定用治具とを備え、この杭固定用治
具により前記鋼管杭を更に落とし込むと共に、杭固定用
治具を前記上架台の上にかんざし等の支持材を介して固
定することで鋼管杭を所定位置に設置できるようにした
鋼管杭設置装置を要旨とする。又、この鋼管杭設置装置
において、上架台の上部に、鋼管杭の落とし込みをガイ
ドする複数個の可倒式ガイド装置が取り付けられたこ
と、PC鋼棒に対する杭固定用治具の取付位置を調整す
ることにより、鋼管杭が所定の埋め込み位置となるよう
に予め設定したこと、を要旨とする。SUMMARY OF THE INVENTION As a specific means for achieving this object, the present invention relates to a lower mount which is installed at a predetermined position on the ground so as to surround a pile hole, and a lower mount provided at a predetermined position above the lower mount. An upper mount to be installed, a hanging jig for suspending a steel pipe pile and dropping it into the pile hole from above the upper mount, and a supporting material such as a hairpin for temporarily fixing an upper portion of the steel pipe pile on the upper mount. And a suspending jig for fixing the hanging pipe, which is attached to the steel pipe pile via a PC steel rod at the time of the temporary fixing, and the steel pipe is fixed by the jig for fixing the pile. The gist of the present invention is a steel pipe pile installation device in which a pile is further dropped, and a pile fixing jig is fixed on the upper pedestal via a supporting member such as a hairpin so that the steel pipe pile can be installed at a predetermined position. Also, in this steel pipe pile installation device, a plurality of retractable guide devices for guiding the drop of the steel pipe pile were mounted on the upper pedestal, and the mounting position of the pile fixing jig to the PC steel rod was adjusted. By doing so, the gist is that the steel pipe pile is set in advance so as to be at a predetermined embedding position.
【0005】[0005]
【発明の実施の形態】以下、本発明の実施の形態を添付
図面に基づいて詳説する。図1(イ) 〜(ト) は、本発明に
係る鋼管杭設置装置を用いて鋼管杭を設置する工程を示
すもので、先ず(イ) は架台セット工程であり、下架台1
と上架台2とを杭孔3を取り囲むようにして地上の所定
位置に設置する。Embodiments of the present invention will be described below in detail with reference to the accompanying drawings. 1 (a) to 1 (g) show a process of installing a steel pipe pile using the steel pipe pile installation device according to the present invention. First, FIG. 1 (a) shows a gantry setting process, and FIG.
And the upper gantry 2 are installed at a predetermined position on the ground so as to surround the pile hole 3.
【0006】前記下架台1は、図2(イ) 、(ロ) に示すよ
うに鋼材1aにより枠状に形成されると共に、上部にサ
ポート材1bが2本平行に差し渡して取り付けられ、上
面の4隅部には吊下用のフック1cがそれぞれ取り付け
られている。As shown in FIGS. 2A and 2B, the lower gantry 1 is formed in a frame shape by a steel material 1a, and two support members 1b are attached to the upper portion thereof by being extended in parallel. Hanging hooks 1c are attached to the four corners, respectively.
【0007】前記上架台2は、図3(イ) に示すように鋼
材2aによりほぼ井桁状に形成され、各辺の上面中央部
には可倒式ガイド装置4が取り付けられ、4隅部には吊
下用のフック2bがそれぞれ取り付けられている。As shown in FIG. 3A, the upper gantry 2 is formed of a steel material 2a in a substantially girder shape, and a collapsible guide device 4 is mounted at the center of the upper surface of each side, and at the four corners. Have hanging hooks 2b attached thereto.
【0008】可倒式ガイド装置4は、図3(ロ) のように
鋼材2aの上面にブラケット4aが固定され、このブラ
ケット4aに支持筒4bがピン4cを介して枢支され、
その支持筒4bの先端部にローラ4dが取り付けられて
いる。前記支持筒4bを上架台2の内側に向けて倒す
と、4つのローラ4dにより囲まれる円の直径が後記す
る鋼管杭5の外径と略等になっている。即ち、これ等の
ローラ4dは、鋼管杭5を落とし込む際にその外面に接
触し、回転してガイド作用をなすものである。As shown in FIG. 3B, a bracket 4a is fixed to the upper surface of a steel member 2a, and a support cylinder 4b is pivotally supported on the bracket 4a via a pin 4c.
A roller 4d is attached to the tip of the support cylinder 4b. When the support cylinder 4b is tilted toward the inside of the upper base 2, the diameter of a circle surrounded by the four rollers 4d is substantially equal to the outer diameter of a steel pipe pile 5 described later. That is, these rollers 4d come into contact with the outer surface when the steel pipe pile 5 is dropped and rotate to perform a guide action.
【0009】このように構成された下架台1と上架台2
は、いずれもクレーン等で吊り下げて動かし、下架台1
は前記杭孔3に対応させて所定位置に、上架台2は下架
台1に対応させて所定位置にそれぞれ設置される(図
4)。The lower frame 1 and the upper frame 2 configured as described above.
Are all suspended by a crane or the like and moved.
Are installed at predetermined positions corresponding to the pile holes 3, and the upper gantry 2 is installed at a predetermined position corresponding to the lower gantry 1 (FIG. 4).
【0010】次に、図1(ロ) のように鋼管杭5を吊り込
み用治具6で吊り下げる。この吊り込み用治具6は、図
5に示すように下部に一対のチェーン6aを有し、この
チェーン6aの下端部を鋼管杭5の上側部に取り付けら
れた吊り金具7にそれぞれ取り付け、上部のフック6b
をクレーン等で吊持するようになっている。Next, as shown in FIG. 1B, the steel pipe pile 5 is hung by a jig 6 for hanging. The hanging jig 6 has a pair of chains 6a at the lower part as shown in FIG. 5, and the lower end of the chain 6a is attached to the hanging metal fitting 7 attached to the upper part of the steel pipe pile 5, respectively. Hook 6b
Is suspended by a crane or the like.
【0011】そして、図1(ハ) のように前記鋼管杭5を
上架台2の上方から挿入し、杭孔3内に落とし込む。こ
の時、前記のように各ローラ4dを倒して鋼管杭5の落
とし込み位置を規制すると共に、ガイド作用により円滑
且つ確実な落とし込みを行う。Then, as shown in FIG. 1C, the steel pipe pile 5 is inserted from above the upper gantry 2 and dropped into the pile hole 3. At this time, the roller 4d is tilted down as described above to regulate the dropping position of the steel pipe pile 5, and a smooth and reliable dropping is performed by the guide action.
【0012】この落とし込みにより鋼管杭5の吊り金具
7が上架台2の上面に接近したら、図1(ニ) のように上
架台2の上面にかんざし等の支持材8を差し渡し、吊り
金具7を受止することにより鋼管杭5を吊持状態で仮固
定する。When the hanging bracket 7 of the steel pipe pile 5 approaches the upper surface of the upper gantry 2 by this dropping, a supporting member 8 such as a hairpin is inserted over the upper surface of the upper gantry 2 as shown in FIG. By receiving, the steel pipe pile 5 is temporarily fixed in a suspended state.
【0013】この仮固定時に、鋼管杭5の吊り金具7か
らチェーン6aを外して吊り込み用治具6を退避させ、
図1(ホ) のように鋼管杭5の側部にPC鋼棒9を取り付
ける。At the time of the temporary fixing, the chain 6a is detached from the hanging metal 7 of the steel pipe pile 5, and the hanging jig 6 is retracted.
As shown in FIG. 1 (e), a PC steel rod 9 is attached to the side of the steel pipe pile 5.
【0014】PC鋼棒9の取り付けは、図6に示すよう
に鋼管杭5の上側部に取り付けられたブラケット10に
PC鋼棒9の下端部を挿通し、そのねじ部9aにナット
11を螺合しブラケット10の下面に締着する。このP
C鋼棒9は対向位置に2本取り付ける。前記ねじ部9a
は、PC鋼棒9の全長に亙って設けておく方が好まし
い。As shown in FIG. 6, the lower end of the PC steel rod 9 is inserted into a bracket 10 attached to the upper part of the steel pipe pile 5, and the nut 11 is screwed into the screw portion 9a. And fastened to the lower surface of the bracket 10. This P
Two C steel bars 9 are attached to the opposing positions. The screw portion 9a
Is preferably provided over the entire length of the PC steel rod 9.
【0015】図6において、12は鋼材で形成された吊
下式の杭固定治具であり、上部にPC鋼棒9の取付部1
2aを有すると共に、その下方に通孔12bがそれぞれ
開けられ、両端部には吊下用のフック12cが取り付け
られている。In FIG. 6, reference numeral 12 denotes a suspension-type pile fixing jig formed of a steel material.
2a, through holes 12b are respectively opened below, and hanging hooks 12c are attached to both ends.
【0016】この杭固定治具12の通孔12b及び取付
部12aに前記PC鋼棒9の上端部を挿通し、そのねじ
部9aに蝶ナット13を螺合し取付部12aの上面に締
着することで、杭固定治具12をPC鋼棒9の上端部に
取り付ける。その際、杭固定治具12の取付位置を調整
して、図1(ヘ) のように鋼管杭5の天端と杭固定治具1
2の下面との間隔Lが所定の寸法となるように予め設定
する。これは最終的に鋼管杭5の設置位置を決定するた
めの準備であり、mm単位で正確に調整することが可能
である。The upper end of the PC steel bar 9 is inserted into the through hole 12b and the mounting portion 12a of the pile fixing jig 12, and a wing nut 13 is screwed into the screw portion 9a and fastened to the upper surface of the mounting portion 12a. Then, the pile fixing jig 12 is attached to the upper end of the PC steel bar 9. At this time, the mounting position of the pile fixing jig 12 is adjusted, and the top end of the steel pipe pile 5 and the pile fixing jig 1 are adjusted as shown in FIG.
2 is set in advance so as to have a predetermined distance L from the lower surface. This is preparation for finally determining the installation position of the steel pipe pile 5, and can be accurately adjusted in mm units.
【0017】この後、杭固定治具12を僅かに上昇させ
て前記上架台2から支持材8を取り外し、図1(ト) のよ
うに杭固定治具12により鋼管杭5を更に杭孔3内に落
とし込み、杭固定治具12が上架台2の上面に接近した
ら、上架台2の上面にかんざし等の支持材8を再度差し
渡し、杭固定治具12を受止することにより鋼管杭5を
吊持状態で固定する。Thereafter, the pile fixing jig 12 is slightly raised to remove the support member 8 from the upper gantry 2, and the steel pipe pile 5 is further moved by the pile fixing jig 12 as shown in FIG. When the pile fixing jig 12 approaches the upper surface of the upper gantry 2, the supporting member 8 such as a hairpin is again inserted into the upper surface of the upper gantry 2, and the steel pipe pile 5 is received by receiving the pile fixing jig 12. Fix in a suspended state.
【0018】鋼管杭5を固定すると、図7のように前記
鋼管杭5の天端と杭固定治具12の下面との間隔Lが予
め設定されていることから、鋼管杭5の埋め込み位置つ
まり地上から鋼管杭5の天端までの所定距離Sが確保さ
れることになる。When the steel pipe pile 5 is fixed, the space L between the top end of the steel pipe pile 5 and the lower surface of the pile fixing jig 12 is preset as shown in FIG. A predetermined distance S from the ground to the top of the steel pipe pile 5 is secured.
【0019】最後に、図示は省略したが鋼管杭5の周囲
にモルタル等を充填し、その固化後に前記蝶ナット13
を緩めてPC鋼棒9から杭固定治具12を取り外して退
避させる。Finally, although not shown, the periphery of the steel pipe pile 5 is filled with mortar or the like, and after solidification thereof, the wing nut 13 is formed.
And the pile fixing jig 12 is removed from the PC steel bar 9 and retracted.
【0020】このようにして、多数の鋼管杭5を所定の
位置に埋め込むことができ、鋼管杭5が例えばソイルセ
メント合成鋼管杭の場合には、図8(イ) に示すようにC
FT鋼管柱Pを鋼管杭5に差し込んで埋め込むことがで
きる。In this manner, a large number of steel pipe piles 5 can be embedded at predetermined positions. When the steel pipe pile 5 is, for example, a soil cement composite steel pipe pile, as shown in FIG.
The FT steel pipe column P can be inserted and embedded in the steel pipe pile 5.
【0021】尚、鋼管差し込み工法において、杭全長を
鋼管杭5にしないで、図8(ロ) のように杭頭のみ鋼管K
で補強する場合もあるが、そのいずれにも適用が可能で
ある。又、本発明は、一般の鋼管杭施工に展開すること
ができ、鋼管杭設置の精度は向上し、品質確保が確実に
なる。In the steel pipe insertion method, the pile length is not changed to the steel pipe pile 5, but only the pile head is steel pipe K as shown in FIG.
Although there is a case where it is reinforced by the method, it can be applied to any of them. Further, the present invention can be applied to general steel pipe pile construction, the accuracy of steel pipe pile installation is improved, and quality assurance is ensured.
【0022】[0022]
【発明の効果】以上説明したように、本発明によれば、
きわめて簡単な構成により鋼管杭を所定の位置に高精度
に設置でき、特に1柱1杭構造の建築物や構築物に最適
な技術であり、その施工に採用することで精度は容易に
確保でき、手間コストも省ける等の優れた効果を奏す
る。As described above, according to the present invention,
With a very simple configuration, steel pipe piles can be installed at a predetermined position with high precision. This is the most suitable technology for buildings and structures with one pillar and one pile structure. The accuracy can be easily secured by adopting the construction. It has excellent effects such as saving labor time.
【図1】(イ) 〜(ト) は、本発明に係る鋼管杭設置装置を
用いた鋼管杭設置工程を順に示すそれぞれ説明図であ
る。FIGS. 1A to 1G are explanatory diagrams sequentially showing a steel pipe pile installation process using a steel pipe pile installation apparatus according to the present invention.
【図2】下架台を示すもので、(イ) は平面図、(ロ) は立
面図である。FIGS. 2A and 2B show a lower frame, wherein FIG. 2A is a plan view and FIG. 2B is an elevation view.
【図3】上架台を示すもので、(イ) は平面図、(ロ) はそ
のA−A線拡大断面図である。FIGS. 3A and 3B show an upper gantry, wherein FIG. 3A is a plan view, and FIG.
【図4】下架台と上架台のセット状態を示す平面図であ
る。FIG. 4 is a plan view showing a set state of a lower mount and an upper mount.
【図5】吊り込み用治具で鋼管杭を吊り下げた状態を示
す概略斜視図である。FIG. 5 is a schematic perspective view showing a state where a steel pipe pile is suspended by a suspension jig.
【図6】鋼管杭にPC鋼棒及び杭固定治具を取り付ける
状態を示す概略斜視図である。FIG. 6 is a schematic perspective view showing a state where a PC steel rod and a pile fixing jig are attached to a steel pipe pile.
【図7】鋼管杭の固定状態を示す概略立面図である。FIG. 7 is a schematic elevation view showing a fixed state of the steel pipe pile.
【図8】(イ) 、(ロ) は鋼管差し込み工法を示すそれぞれ
説明図である。FIGS. 8A and 8B are explanatory views showing a steel pipe insertion method.
1…下架台 2…上架台 3…杭孔 4…可倒式ガイド装置 5…鋼管杭 6…吊り込み用治具 7…吊り金具 8…支持材 9…PC鋼棒 10…ブラケット 11…ナット 12…杭固定治具 13…蝶ナット DESCRIPTION OF SYMBOLS 1 ... Lower gantry 2 ... Upper gantry 3 ... Pile hole 4 ... Retractable guide device 5 ... Steel pipe pile 6 ... Hanging jig 7 ... Hanging metal fitting 8 ... Supporting material 9 ... PC steel rod 10 ... Bracket 11 ... Nut 12 … Pile fixing jig 13… Wing nut
───────────────────────────────────────────────────── フロントページの続き (72)発明者 塩川 英世 東京都港区芝浦一丁目2番3号 清水建設 株式会社内 (72)発明者 塩屋 俊幸 東京都港区芝浦一丁目2番3号 清水建設 株式会社内 ──────────────────────────────────────────────────続 き Continuing on the front page (72) Inventor Hideyo Shiokawa 1-3-2 Shibaura, Minato-ku, Tokyo Shimizu Corporation (72) Inventor Toshiyuki Shioya 1-3-2 Shibaura, Minato-ku, Tokyo Shimizu Corporation Inside the corporation
Claims (3)
置する下架台と、この下架台の上部の所定位置に設置す
る上架台と、鋼管杭を吊り下げて前記上架台の上方から
前記杭孔に落とし込む吊り込み用治具と、この鋼管杭の
上部を前記上架台の上に仮固定するかんざし等の支持材
と、この仮固定の時に前記吊り込み用治具を外し、PC
鋼棒を介して前記鋼管杭に取り付けられる吊下式の杭固
定用治具とを備え、この杭固定用治具により前記鋼管杭
を更に落とし込むと共に、杭固定用治具を前記上架台上
にかんざし等の支持材を介して固定することで鋼管杭を
所定位置に設置できるようにした鋼管杭設置装置。1. A lower gantry installed at a predetermined location on the ground so as to surround a pile hole, an upper gantry installed at a predetermined location above the lower gantry, and a steel pipe pile suspended from above the upper gantry. A jig for dropping into the hole, a support material such as a hairpin for temporarily fixing the upper part of the steel pipe pile on the upper gantry, and removing the jig for hanging at the time of the temporary fixation, the PC
A hanging-type pile fixing jig attached to the steel pipe pile via a steel rod, and further dropping the steel pipe pile with the pile fixing jig, and placing the pile fixing jig on the upper gantry. A steel pipe pile installation device capable of mounting a steel pipe pile at a predetermined position by fixing the support via a supporting member such as a hairpin.
イドする複数個の可倒式ガイド装置が取り付けられた請
求項1記載の鋼管杭設置装置。2. The steel pipe pile installation device according to claim 1, wherein a plurality of retractable guide devices for guiding dropping of the steel pipe pile are attached to an upper portion of the upper mount.
を調整することにより、鋼管杭が所定の埋め込み位置と
なるように予め設定した請求項1又は2記載の鋼管杭設
置装置。3. The steel pipe pile installation device according to claim 1, wherein the steel pipe pile is set in advance to a predetermined embedding position by adjusting the mounting position of the pile fixing jig to the PC steel rod.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP11559097A JP3616894B2 (en) | 1997-05-06 | 1997-05-06 | Steel pipe pile installation device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP11559097A JP3616894B2 (en) | 1997-05-06 | 1997-05-06 | Steel pipe pile installation device |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH10306445A true JPH10306445A (en) | 1998-11-17 |
JP3616894B2 JP3616894B2 (en) | 2005-02-02 |
Family
ID=14666377
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP11559097A Expired - Fee Related JP3616894B2 (en) | 1997-05-06 | 1997-05-06 | Steel pipe pile installation device |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP3616894B2 (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2015124475A (en) * | 2013-12-25 | 2015-07-06 | 株式会社竹中工務店 | Earth retaining wall and construction method of earth retaining wall |
JP2021530634A (en) * | 2018-07-30 | 2021-11-11 | サイペム エス.アー.SAIPEM s.a. | How to install a tubular metal pile on rocky ground |
CN113944172A (en) * | 2021-11-12 | 2022-01-18 | 上海建工五建集团有限公司 | Construction method for controlling straightness and verticality of large-size PC construction method combined pile |
CN114000515A (en) * | 2021-11-12 | 2022-02-01 | 上海建工五建集团有限公司 | Construction method of combined pile in PC construction method and special positioning sleeve |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102747747B (en) * | 2012-05-24 | 2014-05-28 | 中国建筑第八工程局有限公司 | Construction method for installing underground lattice column |
-
1997
- 1997-05-06 JP JP11559097A patent/JP3616894B2/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2015124475A (en) * | 2013-12-25 | 2015-07-06 | 株式会社竹中工務店 | Earth retaining wall and construction method of earth retaining wall |
JP2021530634A (en) * | 2018-07-30 | 2021-11-11 | サイペム エス.アー.SAIPEM s.a. | How to install a tubular metal pile on rocky ground |
US11603639B2 (en) | 2018-07-30 | 2023-03-14 | Saipem S.A. | Method for installing a tubular metal pile in rocky soil |
CN113944172A (en) * | 2021-11-12 | 2022-01-18 | 上海建工五建集团有限公司 | Construction method for controlling straightness and verticality of large-size PC construction method combined pile |
CN114000515A (en) * | 2021-11-12 | 2022-02-01 | 上海建工五建集团有限公司 | Construction method of combined pile in PC construction method and special positioning sleeve |
Also Published As
Publication number | Publication date |
---|---|
JP3616894B2 (en) | 2005-02-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205857384U (en) | A kind of wide-span cylindrical reticulated shell seal bootr booth structure | |
CN109914260A (en) | Four, double ribs encircle vaulted beam method without steel truss is twisted | |
JP2001115421A (en) | Construction method for temporary bridge and pier | |
CN102926554B (en) | Steel hanging seat shuttering supporting and construction method thereof | |
JPH10306445A (en) | Steel-pipe pile mounting device | |
JP2768282B2 (en) | Bridge construction method | |
CN108729640A (en) | A kind of supporting rack of assembled architecture cantilevered plate and overhanging method of plate installation | |
JP2004190450A (en) | Wagen form device for box girder with strut, strut support device and construction method of box girder with strut | |
CN211173080U (en) | Early-dismantling formwork support frame connecting device for building construction | |
CN208363650U (en) | The mounting bracket of prefabricated components, the precast wall body containing the bracket | |
CN211250705U (en) | A stand-up device for prefabricated pier stud template of assembled bridge | |
CN107806015B (en) | A kind of unit construction bridge beam flange plate formwork for placing concrete system and construction method | |
JP2001115422A (en) | Dismantling method of supporting for form fixed to concrete slab | |
JP2630623B2 (en) | Anchor bolt installation method and anchor bolt support device used for it | |
CN112681732A (en) | Supporting system of assembled composite membrane shell beam and construction method thereof | |
CN112459504A (en) | Aerated concrete wallboard installation method | |
JP2000320142A (en) | Device and method for reinforcement assembly in construction work | |
JP3265401B2 (en) | Slip form equipment | |
CN113931071B (en) | Prefabricated box girder wet joint attached construction platform and construction method thereof | |
JPH0531631B2 (en) | ||
JP2002021097A (en) | Installation method for leg member of tower type structure and device used therefor | |
JPH1161812A (en) | Plumbing device of steel column | |
CN219260736U (en) | Temporary support frame for steel structure bridge construction | |
CN204040495U (en) | A kind of suspension fixing support rack of high-order cast-in fixing bolt | |
CN219176396U (en) | Flexible film hanging device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A977 | Report on retrieval |
Effective date: 20040903 Free format text: JAPANESE INTERMEDIATE CODE: A971007 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Effective date: 20041005 Free format text: JAPANESE INTERMEDIATE CODE: A01 |
|
A61 | First payment of annual fees (during grant procedure) |
Effective date: 20041026 Free format text: JAPANESE INTERMEDIATE CODE: A61 |
|
R150 | Certificate of patent (=grant) or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
LAPS | Cancellation because of no payment of annual fees |