- CN107806015B CN107806015B CN201710927841.0A CN201710927841A CN107806015B CN 107806015 B CN107806015 B CN 107806015B CN 201710927841 A CN201710927841 A CN 201710927841A CN 107806015 B CN107806015 B CN 107806015B
- Authority
- CN
- China
- Prior art keywords
- prefabricated
- support
- shaped
- construction
- bridge
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims abstract description 32
- 239000004567 concrete Substances 0.000 title claims abstract description 23
- 238000009415 formwork Methods 0.000 title claims abstract description 16
- 239000011178 precast concrete Substances 0.000 claims abstract description 15
- 239000011120 plywood Substances 0.000 claims abstract description 11
- 241001669679 Eleotris Species 0.000 claims abstract description 7
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 6
- 239000010959 steel Substances 0.000 claims abstract description 6
- 230000000717 retained Effects 0.000 claims description 3
- 238000003780 insertion Methods 0.000 claims description 2
- 238000000034 method Methods 0.000 abstract description 4
- XEEYBQQBJWHFJM-UHFFFAOYSA-N iron Chemical compound data:image/svg+xml;base64,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 data:image/svg+xml;base64,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 [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000004134 energy conservation Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
Abstract
The invention discloses a kind of unit construction bridge beam flange plate formwork for placing concrete systems, cast-in-place floorings including being located at prefabricated U-shaped back portion, prefabricated U-shaped beam bottom portion is supported equipped with bottom, top support plate is equipped with above cast-in-place floorings, it is fixed between top support plate and bottom support by split bolt, the top of prefabricated U-shaped beam side is equipped with precast concrete block, and top support plate is located on precast concrete block;Cast-in-place floorings free end bottom is equipped with plywood form, and bottom is adjustable stretching bracket, and plywood form and adjustable stretch are equipped with sleeper between bracket.Not only construction is simple, assembling and disassembling conveniently, and eliminate high altitude operation process to the solution of the present invention, it can be recycled, great deal of steel is saved, strong applicability is reduced and put into engineering cost, also guarantee construction safety simultaneously, operational safety and working efficiency are improved, labor intensity is reduced, every set template is all Ke Xunhuanliyong, it reduces costs, construction can be promoted.
Description
Technical field
The invention belongs to the mounting technique fields of Surfacing Construction platform in highways and streets, railway, and in particular to
A kind of unit construction bridge beam flange plate formwork for placing concrete system and construction method.
Background technique
Currently, construction project field shows construction with the quickening of China's urbanization progress and the decline of demographic dividend
Amount is big, quality requirement is high, human cost rises, energy conservation and environmental protection requires the features such as high, there is an urgent need to develop assembled architecture, realizes
The transition and upgrade and building industry of building industry modernize.Bridge flange plate formwork for placing concrete, mostly uses in the past and sets up scaffold,
If foundation bearing bottom will also be handled, not only safety, stability are poor, but also steel pipe and fashioned iron demand are larger, construction
It is at high cost;It needs a large amount of time and manpower again during setting up and dismantling scaffold, therefore it is cumbersome to construct, wastes engineering
Time, large labor intensity, working efficiency bottom.
Summary of the invention
The technical problems to be solved by the present invention are: providing a kind of unit construction bridge beam flange plate formwork for placing concrete system and applying
Work method.
In order to solve the above-mentioned technical problem, inventor obtains technical solution of the present invention by practice and summary, the present invention
A kind of unit construction bridge beam flange plate formwork for placing concrete system is disclosed, including prefabricated U-shaped beam and pre- above prefabricated U-shaped beam
Cover board processed further includes the cast-in-place floorings positioned at prefabricated U-shaped back portion, and prefabricated U-shaped beam bottom portion is supported equipped with bottom, described
It is equipped with top support plate above cast-in-place floorings, is fixed between the top support plate and bottom support by split bolt, it is described
The top of prefabricated U-shaped beam side is equipped with precast concrete block, and the top support plate is located on precast concrete block;It is described cast-in-place
Floorings free end bottom is equipped with plywood form, bottom be it is adjustable stretch bracket, the plywood form and adjustable
It stretches and is equipped with sleeper between bracket.
Preferably, the bottom support is channel steel.
Preferably, the adjustable stretching bracket, which is equipped with, stretches bridging.
The invention also discloses a kind of construction methods of unit construction bridge beam flange plate formwork for placing concrete system, including following step
It is rapid:
A1. it after formula beam lifting to be assembled is in place, is hung down from bridge floor by bottom support, split bolt need to be connected in advance;
A2. precast concrete block is placed above prefabricated U-shaped web, top support plate is placed in precast concrete
On block;
A3. by split bolt, top support plate and bottom support is linked to be entirety, strutting system is constituted, then installs
Prefabricated board between prefabricated U-shaped beam;
A4. in the hole adjustable stretching bracket insertion bottom support being drilled in advance, and can by two rows with bridging is stretched
Stretching bracket is adjusted to fix;
A5. it is stretched on holder jacking adjustable, sleeper and plywood form is installed, controlled by adjusting jacking height
Flange plate elevation;
A6. after the completion of bridge deck concrete plate pours, striking, precast concrete block will be retained in bridge deck concrete.
Preferably, in the step A when every piece of prefabricated board is prefabricated, both ends be respectively arranged two it is suitable with split bolt diameter
Semicircle, upper casing is covered on split bolt, top support plate and bottom support are linked to be entirety across semicircle orifice.
Compared with prior art, the present invention can obtain following technical effect:
Not only construction is simple, assembling and disassembling conveniently, and eliminate high altitude operation process to the solution of the present invention, and can recycle makes
With saving great deal of steel, strong applicability is reduced and put into engineering cost, while also guaranteeing construction safety, improves operational safety
And working efficiency, labor intensity is reduced, every set template is all Ke Xunhuanliyong, reduces costs, can promote construction.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below
There is attached drawing needed in technical description to be briefly described, it should be apparent that, those of ordinary skill in the art are come
It says, without creative efforts, is also possible to obtain other drawings based on these drawings.
Fig. 1 is a kind of unit construction bridge beam flange plate formwork for placing concrete architectural schematic;
Fig. 2 is Section A-A schematic diagram.
Specific embodiment
In order to make the objectives, technical solutions, and advantages of the present invention clearer, with reference to embodiments, to the present invention
It is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, it is not used to
Limit the present invention.
With reference to the accompanying drawing and specific embodiment is further described application principle of the invention.
Embodiment 1
As shown in Figs. 1-2, a kind of unit construction bridge beam flange plate formwork for placing concrete system, including prefabricated U-shaped beam 10 and be located at
The prefabricated cover board 9 of 10 top of prefabricated U-shaped beam further includes the cast-in-place floorings 11 positioned at 10 top of prefabricated U-shaped beam, the prefabricated U
10 bottom of type beam is equipped with bottom support 1, is equipped with top support plate 4,4 He of top support plate above the cast-in-place floorings 11
It is fixed between bottom support 1 by split bolt 3, the top of 10 side of prefabricated U-shaped beam is equipped with precast concrete block 5, described
Top support plate 4 is located on precast concrete block 5;The 11 free end bottom of cast-in-place floorings is equipped with plywood form 7, bottom
Portion is adjustable stretching bracket 2, and the plywood form 7 and adjustable stretch are equipped with sleeper 6 between bracket 2.
Wherein: the bottom support 1 is channel steel;The adjustable stretching bracket 2, which is equipped with, stretches bridging 8.
The present embodiment further includes a kind of construction method of unit construction bridge beam flange plate formwork for placing concrete system, including following step
It is rapid:
A1. it after formula beam lifting to be assembled is in place, is hung down from bridge floor by bottom support 1, split bolt 3 need to be connected in advance;
A2. precast concrete block 5 is placed above 10 web of prefabricated U-shaped beam, top support plate 4 is placed in prefabricated mixed
On solidifying soil block 5;
A3. by split bolt 3, top support plate 4 and bottom support 1 is linked to be entirety, strutting system is constituted, then pacifies
Fill prefabricated board between prefabricated U-shaped beam 10;
A4. adjustable stretching bracket 2 is inserted into the hole that bottom support 1 is drilled in advance, and will be two rows of with bridging 8 is stretched
The adjustable bracket 2 that stretches is fixed;
A5. it is stretched on 2 jacking of bracket adjustable, sleeper 6 and plywood form 7 is installed, come by adjusting jacking height
Control flange plate elevation;
A6. after the completion of bridge deck concrete plate pours, striking, precast concrete block 5 will be retained in bridge deck concrete.
Wherein: in the step A3 when every piece of prefabricated board is prefabricated, both ends be respectively arranged two it is suitable with 3 diameter of split bolt
Semicircle, upper casing is covered on split bolt 3, top support plate 4 and bottom support 1 are linked to be entirety across semicircle orifice.
It is obvious to a person skilled in the art that invention is not limited to the details of the above exemplary embodiments, Er Qie
In the case where without departing substantially from spirit or essential attributes of the invention, the present invention can be realized in other specific forms.Therefore, no matter
From the point of view of which point, the present embodiments are to be considered as illustrative and not restrictive, and the scope of the present invention is by appended power
Benefit requires rather than above description limits, it is intended that all by what is fallen within the meaning and scope of the equivalent elements of the claims
Variation is included within the present invention.
In addition, it should be understood that although this specification is described in terms of embodiments, but not each embodiment is only wrapped
Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should
It considers the specification as a whole, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art
The other embodiments being understood that.
Claims (5)
1. a kind of unit construction bridge beam flange plate formwork for placing concrete system, including prefabricated U-shaped beam (10) and it is located at prefabricated U-shaped beam (10)
The prefabricated cover board (9) of top further includes the cast-in-place floorings (11) at the top of prefabricated U-shaped beam (10), it is characterised in that: described
Prefabricated U-shaped beam (10) bottom is equipped with bottom support (1), is equipped with top support plate (4) above the cast-in-place floorings (11), described
It is fixed by split bolt (3) between top support plate (4) and bottom support (1), it is set at the top of prefabricated U-shaped beam (10) side
Have precast concrete block (5), the top support plate (4) is located on precast concrete block (5);The cast-in-place floorings (11) are certainly
Plywood form (7) are equipped with by end bottom, bottom be it is adjustable stretch bracket (2), the plywood form (7) and adjustable
It stretches and is equipped with sleeper (6) between bracket (2).
2. a kind of unit construction bridge beam flange plate formwork for placing concrete system according to claim 1, it is characterised in that: the bottom
It is channel steel that portion, which supports (1),.
3. a kind of unit construction bridge beam flange plate formwork for placing concrete system according to claim 1, it is characterised in that: it is described can
It adjusts and stretches bracket (2) equipped with stretching bridging (8).
4. a kind of construction party of unit construction bridge beam flange plate formwork for placing concrete system according to claim 1-3
Method, it is characterised in that: the following steps are included:
A1. it after formula beam lifting to be assembled is in place, is hung down from bridge floor by bottom support (1), split bolt (3) need to be connected in advance;
A2. precast concrete block (5) are placed above prefabricated U-shaped beam (10) web, top support plate (4) is placed in prefabricated
On concrete block (5);
A3. by split bolt (3), top support plate (4) and bottom support (1) is linked to be entirety, constitute strutting system, then
Prefabricated board between prefabricated U-shaped beam (10) is installed;
A4. by adjustable stretching bracket (2) insertion bottom support (1) hole for being drilled in advance, and with stretching bridging (8) by two
Row fixes adjustable stretch bracket (2);
A5. it is stretched on bracket (2) jacking adjustable, sleeper (6) and plywood form (7) is installed, by adjusting jacking height
To control flange plate elevation;
A6. after the completion of bridge deck concrete plate pours, striking, precast concrete block (5) will be retained in bridge deck concrete.
5. a kind of construction method of unit construction bridge beam flange plate formwork for placing concrete system according to claim 4, feature
Be: in the step A3 when every piece of prefabricated board is prefabricated, two and split bolt (3) diameter comparable half are respectively arranged in both ends
Circle, puts on casing on split bolt (3), passes through semicircle orifice for top support plate (4) and bottom support (1) and is linked to be entirety.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710927841.0A CN107806015B (en) | 2017-10-09 | 2017-10-09 | A kind of unit construction bridge beam flange plate formwork for placing concrete system and construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710927841.0A CN107806015B (en) | 2017-10-09 | 2017-10-09 | A kind of unit construction bridge beam flange plate formwork for placing concrete system and construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107806015A CN107806015A (en) | 2018-03-16 |
CN107806015B true CN107806015B (en) | 2019-03-22 |
Family
ID=61584112
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710927841.0A Active CN107806015B (en) | 2017-10-09 | 2017-10-09 | A kind of unit construction bridge beam flange plate formwork for placing concrete system and construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107806015B (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101591887A (en) * | 2008-05-30 | 2009-12-02 | 上海宝冶建设有限公司 | Method for hoisting elevated railway prefabricated U-shaped beam |
KR20120057021A (en) * | 2010-11-26 | 2012-06-05 | 한국건설기술연구원 | Precast end segmet girder for continuous bridge, girder making method and bridge construction method using the same |
CN103174095A (en) * | 2013-03-18 | 2013-06-26 | 中国建筑第八工程局有限公司 | Box girder concrete pouring structure with rear-expanding flanges and construction method thereof |
KR101652758B1 (en) * | 2016-02-17 | 2016-09-01 | 이엔이건설주식회사 | Drainage apparatus for bridge using cover plate with drainage wing and the construction method therefor |
CN206052554U (en) * | 2016-08-17 | 2017-03-29 | 中国建筑第六工程局有限公司 | A kind of Construction Supporting System for square twin columns great cantilever bent cap |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2014146076A1 (en) * | 2013-03-15 | 2014-09-18 | Pbc International Inc. | Composite action support structures |
-
2017
- 2017-10-09 CN CN201710927841.0A patent/CN107806015B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101591887A (en) * | 2008-05-30 | 2009-12-02 | 上海宝冶建设有限公司 | Method for hoisting elevated railway prefabricated U-shaped beam |
KR20120057021A (en) * | 2010-11-26 | 2012-06-05 | 한국건설기술연구원 | Precast end segmet girder for continuous bridge, girder making method and bridge construction method using the same |
CN103174095A (en) * | 2013-03-18 | 2013-06-26 | 中国建筑第八工程局有限公司 | Box girder concrete pouring structure with rear-expanding flanges and construction method thereof |
KR101652758B1 (en) * | 2016-02-17 | 2016-09-01 | 이엔이건설주식회사 | Drainage apparatus for bridge using cover plate with drainage wing and the construction method therefor |
CN206052554U (en) * | 2016-08-17 | 2017-03-29 | 中国建筑第六工程局有限公司 | A kind of Construction Supporting System for square twin columns great cantilever bent cap |
Also Published As
Publication number | Publication date |
---|---|
CN107806015A (en) | 2018-03-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103967050B (en) | Construction system of subway station | |
CN102877418B (en) | Stentless urban bridge anti-collision guardrail construction method and cradle vehicle and gun carrier thereof | |
CN104060629B (en) | The superimposed wall construction method in covered back-digging subway station and portable side wall formwork jumbo | |
CN106702910B (en) | A kind of main girder construction technique of the double rope face low-pylon cable-stayed bridges of double tower | |
CN101876184B (en) | Construction method of expansion joint of pool | |
CN101839061A (en) | Unilateral formwork erecting system of cast-in-site concrete arc outer wall body and construction method thereof | |
CN101858057B (en) | Method for rapidly mounting reinforced concrete crash barrier steel form | |
CN104963289B (en) | A kind of abnormity pier stud mass concrete overall time pouring construction method | |
CN102392536B (en) | Construction method for long-span hanging vestibule type template support system | |
CN202090605U (en) | Tool type floor evenness and floor slab negative reinforcement protecting layer control device | |
CN201635388U (en) | Unilateral supporting formwork system for cast-in-place concrete arc outer wall | |
CN103334379B (en) | A kind of construction method for anti-collision guard rail for highways overhanging portion | |
CN105386778A (en) | Tunnel underground excavation and lining construction trolley and tunnel underground excavation and lining construction method | |
CN106869489A (en) | Super High Core Walls Structure level and vertical synchronous construction top module system and construction method | |
CN107119715B (en) | A kind of application method of pipe gallery entirety mould bases | |
CN102787560B (en) | Integrated construction method of support of large cantilevered capping beam and vertical column | |
CN103498425B (en) | One completely knocks down multifunctional assembled bearing bracket structure and construction method thereof | |
CN104074142A (en) | Box beam cast-in-place support whole-horizontal-moving construction method | |
CN105839784B (en) | Assembled jacking type construction techniques | |
CN102733615B (en) | Unsymmetrical integral lifting construction method | |
CN101210418A (en) | Non-floor-bracket construction method for suspension bridge tower frame cross beam | |
CN108049656B (en) | Reverse chimney dismantling device and method | |
CN105908777A (en) | Comprehensive pipe gallery sliding mold and application method thereof | |
CN104790676A (en) | Rapid leveling and alignment device and method for installation of prefabricated wallboards | |
CN103352428A (en) | Suspension bridge cable bent tower beam non-support construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |