JPH10227024A - Concrete structure constructing formwork device and concrete structure constructing method - Google Patents

Concrete structure constructing formwork device and concrete structure constructing method

Info

Publication number
JPH10227024A
JPH10227024A JP2999797A JP2999797A JPH10227024A JP H10227024 A JPH10227024 A JP H10227024A JP 2999797 A JP2999797 A JP 2999797A JP 2999797 A JP2999797 A JP 2999797A JP H10227024 A JPH10227024 A JP H10227024A
Authority
JP
Japan
Prior art keywords
concrete
concrete structure
bolt
molding
level
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2999797A
Other languages
Japanese (ja)
Other versions
JP3081897B2 (en
Inventor
Masanori Iwakura
正則 岩倉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
IWAKURA KOMUTEN KK
Original Assignee
IWAKURA KOMUTEN KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by IWAKURA KOMUTEN KK filed Critical IWAKURA KOMUTEN KK
Priority to JP09029997A priority Critical patent/JP3081897B2/en
Publication of JPH10227024A publication Critical patent/JPH10227024A/en
Application granted granted Critical
Publication of JP3081897B2 publication Critical patent/JP3081897B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide such a formwork device as being capable of easily adjusting a molding formwork in horizontal in a short time to mold a concrete wail face, and a concrete structure constructing method. SOLUTION: A concrete structure constructing formwork device 100 has C-bolts 1 connected to at least two of plural anchor bolts embedded in an existing concrete structure at preset spaces in the cross direction, a connection beam 2 mounted on the C-bolts 1, level jacks 3 provided at both ends of the connection beam 2 in a vertically adjustable manner, a molding formwork 4 to mold a concrete wall face carried on the level jacks 3 and plural terminal materials 5 provided with insertion-holes to be freely engaged/disengaged with/ from and fixed to the C-bolts 1, extended upward and downward to the outside of the molding form 4 and fixed thereto at preset spaces in the horizontal direction. With the vertical adjustment of the level jacks 3, the horizontal degree of the molding formwork 4 is adjusted.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、ダム、砂防ダム、
水路及び法面等のコンクリート構造物を構築する際に使
用するコンクリート製造物施工用型枠装置及びその装置
を使用して連続的にコンクリート層を打設してコンクリ
ート構造物を施工する工法に関するものである。
TECHNICAL FIELD The present invention relates to a dam, a sabo dam,
Formwork equipment for concrete product construction used when constructing concrete structures such as waterways and slopes, and a method of constructing concrete structures by continuously casting concrete layers using the equipment It is.

【0002】[0002]

【従来の技術】従来より、ダム等のコンクリート構造物
を施工する場合に使用する構造物成形型枠としては、種
々のものが知られているが、その中でも図5及び図6に
示すように、左右方向に間隔をおいて配置された複数の
縦材118における上半部の外側にわたって上下方向に
間隔をおいて配置された複数の横材119を溶接等によ
り固着し、且つ各縦材118における上半部の内側にわ
たって型枠120を固着すると共に、作業足場を121
を各縦材118の下端部にわたって固定し、さらに各縦
材118の下部に取付けられた雌ねじ部材122にジャ
ッキボルト123を螺合すると共に、各縦材118の中
間部にシーボルト101を挿嵌し、各縦材118の上部
にはダミーボルトを挿嵌し各々をナット等により緊締
し、また各縦材118の上端部に吊金具124を固定し
た構造の構造用成形型枠125が一般的に知られてい
る。
2. Description of the Related Art Conventionally, as a structure forming form used when constructing a concrete structure such as a dam, various types are known, and among them, as shown in FIGS. A plurality of horizontal members 119 arranged at intervals in the vertical direction over the outside of the upper half of the plurality of vertical members 118 arranged at intervals in the left-right direction are fixed by welding or the like. The formwork 120 is secured over the inside of the upper half of
Is fixed over the lower end of each longitudinal member 118, a jack bolt 123 is screwed into a female screw member 122 attached to a lower part of each longitudinal member 118, and a sea bolt 101 is inserted into an intermediate portion of each longitudinal member 118. In general, a structural mold 125 having a structure in which a dummy bolt is inserted into the upper part of each vertical member 118 and tightened with a nut or the like, and a hanging fitting 124 is fixed to the upper end of each vertical member 118. Are known.

【0003】即ち、この種の構造物成形型枠125の作
業工程としては、前記型枠120の内側に打設したコン
クリート126が硬化したのち、ケーブルクレーンまた
は型枠移設箇所に搬入した簡易クレーンにおける複数の
吊上用フックを前記吊金具124に係合し、前記クレー
ンにより構造物成形型枠125を支持したのち、作業員
が作業足場121に乗ってシーボルト101及びダミー
ボルト102とを緊締しているナット等を弛緩方向に回
動してアンカーボルト127から離脱し、且つジャッキ
ボルト123を張る方向に回動して下位のコンクリート
から128から離反させ、それを再びケーブルクレーン
等により吊り上げて次のコンクリート打設位置まで引上
げる。そして構造物成形型枠125を宙吊り状態のまま
で測量用計器等を使用して水平位置を定め、その水平位
置に沿うように作業員が構造物成形型枠125の位置調
整を行う。続いて作業員が宙吊り状態の構造物成形型枠
125を既設のコンクリート層に埋設されたアンカーボ
ルト127に螺合されたシーボルト101に緊締する。
以後上述した作業工程を繰り返してコンクリート構造物
を施工するのである。
[0003] That is, as a working process of this type of structure forming mold 125, a concrete crane cast inside the mold 120 is hardened and then a cable crane or a simple crane carried into a mold transfer place. After engaging a plurality of lifting hooks with the hanging metal fittings 124 and supporting the structure forming form 125 by the crane, the worker gets on the work platform 121 and tightens the sea bolts 101 and the dummy bolts 102. The nut or the like is turned in the loosening direction to separate from the anchor bolt 127, and is turned in the direction in which the jack bolt 123 is stretched to separate from the lower concrete from the lower concrete 128. Pull up to concrete placement position. Then, with the structure forming mold 125 suspended in the air, a horizontal position is determined by using a measuring instrument or the like, and an operator adjusts the position of the structure forming mold 125 along the horizontal position. Subsequently, the worker tightens the suspended structure forming form 125 to the sea bolt 101 screwed to the anchor bolt 127 embedded in the existing concrete layer.
Thereafter, the above-described operation steps are repeated to construct the concrete structure.

【0004】[0004]

【発明が解決しようとする課題】しかしながら、構造物
成形型枠125は大型で重量があるため(約800キロ
グラム)、作業員が迅速に水平に設置することは大変困
難であり作業時間の遅延となる原因となっていた。ま
た、構造物成形型枠125を硬化後のコンクリート層か
ら脱型するときは上述したように、ケーブルクレーン等
のワイヤーロープ等により構造物成形型枠125を支持
した後に、シーボルト101に緊締されているナット等
を弛緩するが、この際に構造物成形型枠125の重量に
よりワイヤーロープの緩みが一気に落下するのでその付
近で作業している作業員にとって大変危険であるという
問題があった。さらに、ケーブルクレーンは構造物成形
型枠125を吊り上げたまま確実に固定するまで必要と
されるので、その間ケーブルクレーンは他の作業等もで
きないため、作業時間の遅延と経済的にも無駄が多いと
いう問題があった。
However, since the structure forming form 125 is large and heavy (about 800 kilograms), it is very difficult for the worker to quickly and horizontally install it, and the work time is delayed. Had become a cause. When the structure forming mold 125 is released from the hardened concrete layer, as described above, the structure forming form 125 is supported by a wire rope or the like of a cable crane or the like, and then tightened by the sea bolt 101. However, there is a problem in that, at this time, the looseness of the wire rope falls at a stretch due to the weight of the structure forming mold 125, which is extremely dangerous for an operator working in the vicinity. Further, since the cable crane is required until the structure forming form 125 is securely lifted and fixed, the cable crane cannot perform other work or the like during that time, so that the work time is delayed and there is much waste economically. There was a problem.

【0005】本発明は、上記の事情に鑑みてなされたも
ので、その解決すべき課題は、上述した従来の構造用型
枠が具備する問題点を解決することであり、その目的は
コンクリート壁面を成形するための成形用型枠を容易に
短時間に水平に調整することができるコンクリート構造
物施工用型枠装置とコンクリート構造物を施工する工法
を提供することである。
SUMMARY OF THE INVENTION The present invention has been made in view of the above circumstances, and a problem to be solved is to solve the above-mentioned problems of the conventional structural formwork. It is an object of the present invention to provide a concrete structure construction form apparatus and a construction method for constructing a concrete structure, which can easily and horizontally adjust a molding form for molding a concrete.

【0006】[0006]

【課題を解決するための手段】以上を解決するために、
本各発明の採った手段は、実施形態において使用する符
号を付して説明すると、まず、請求項1記載の発明は、
既設のコンクリート構造物に横方向へ所定間隔を隔てて
埋設される複数のアンカーボルトのうち少なくとも2本
に連結するシーボルト1と、前記シーボルト1に架設す
る連結桁2と、前記連結桁2の両端に設けられた上下調
整可能なレベルジャッキ3と、前記レベルジャッキ3に
担持するコンクリート壁面を成形するための成形用型枠
4と、前記シーボルト1に挿脱自在且つ固定可能な挿通
孔12を備えると共に前記成形用型枠の外側に向かって
上下方向に延在し水平方向に所定間隔を隔てて固設する
複数の縦端材5と、を備えたコンクリート構造物施工用
型枠装置100であって、前記レベルジャッキ3の上下
移動調整によって前記成形用型枠4の水平度を調整する
ようにした。
Means for Solving the Problems To solve the above,
Means adopted by each of the present invention will be described with reference numerals used in the embodiments. First, the invention according to claim 1 is:
A sea bolt 1 connected to at least two of a plurality of anchor bolts buried in the existing concrete structure at predetermined intervals in the lateral direction, a connecting girder 2 spanning the sea bolt 1, and both ends of the connecting girder 2 A level jack 3 which can be adjusted up and down, a molding frame 4 for molding a concrete wall surface carried on the level jack 3, and an insertion hole 12 which can be inserted into and removed from the sea bolt 1. And a plurality of vertical end members 5 extending vertically to the outside of the molding form and fixed at predetermined intervals in the horizontal direction. Thus, the levelness of the molding die 4 is adjusted by adjusting the vertical movement of the level jack 3.

【0007】次に、請求項2に係る発明のコンクリート
構造物施工用型枠装置100は、請求項1に係る発明の
コンクリート構造物施工用型枠装置100を構成する縦
端材5を、その上端部に挿脱自在且つ固定可能に取付け
られるアンカーボルト埋設用のダミーボルト6と、前記
縦端材5の下端部を挿脱自在且つ固定可能に取付けられ
る縦端材傾き調整用のジャッキボルト7とを備えたもの
とした。
Next, the concrete structure forming apparatus 100 according to the second aspect of the present invention provides a concrete structure forming form apparatus 100 according to the first aspect of the present invention. An anchor bolt embedding dummy bolt 6 detachably and fixedly attached to an upper end portion, and a vertical end member inclination adjusting jack bolt 7 detachably and fixably attached to a lower end portion of the vertical end member 5. And was provided.

【0008】次に、請求項3に係る発明は、既設のコン
クリート構造物に横方向に間隔をおいて埋設された複数
のアンカーボルトの少なくとも2本に前記シーボルト1
を固定する工程と、前記シーボルト1を固定したのちに
前記レベルジャッキ3が設けられた連結桁2を前記シー
ボルト1に架設する工程と、前記連結桁2を前記シーボ
ルト1に架設したのちに前記成形用型枠4を前記レベル
ジャッキ3に担持する共に前記縦端材5に設けられた挿
通孔12に前記シーボルト1を挿通して固定する工程
と、前記成形用型枠4を前記レベルジャッキ3に担持す
る共に前記縦端材5に設けられた挿通孔12に前記シー
ボルト1を挿通して固定したのちに前記レベルジャッキ
3の上下調整によって前記成形用型枠4の水平度を調整
する工程と、前記成形用型枠4の水平度を調整したのち
に前記成形用型枠4の内側にコンクリートを打設し、該
コンクリートを養生硬化後に前記コンクリート構造物施
工用型枠装置100を脱型し、前記コンクリート構造物
施工用型枠装置100を昇降手段を介して次のコンクリ
ート打設位置まで引上げる工程とからなり、前記各工程
を順次繰り返して連続的にコンクリート層を打設してコ
ンクリート構造物を施工する工法とした。
Next, the invention according to claim 3 is characterized in that at least two of the plurality of anchor bolts buried in the existing concrete structure with a space therebetween in the lateral direction are provided with the sea bolt 1.
Fixing the seam 1, mounting the connecting girder 2 provided with the level jack 3 on the seabolt 1 after fixing the seabolt 1, and forming the connecting girder 2 on the seabolt 1 and then forming A step of supporting the forming form 4 on the level jack 3 and inserting and fixing the sea bolt 1 into an insertion hole 12 provided in the vertical end member 5; and attaching the forming form 4 to the level jack 3. A step of adjusting the horizontality of the molding form 4 by vertically adjusting the level jack 3 after inserting and fixing the sea bolt 1 in an insertion hole 12 provided in the vertical end member 5 while carrying the same; After adjusting the level of the molding form 4, concrete is poured inside the molding form 4, and after the concrete is cured and hardened, the concrete structure construction form apparatus 100. Demolding, and pulling up the concrete structure forming form device 100 to the next concrete pouring position via the elevating means. The above steps are sequentially repeated to continuously cast a concrete layer. To construct concrete structures.

【0009】[0009]

【発明の実施の形態】本発明に係るコンクリート構造物
施工用型枠装置及びコンクリート構造物を施工する工法
の実施の形態を、実施例に基いてさらに詳細に説明する
が、これは代表的な例を示したものであり、その要旨を
越えない限り、以下の実施例により本発明が限定される
ものでない。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Embodiments of a formwork apparatus for constructing a concrete structure and a method of constructing a concrete structure according to the present invention will be described in more detail with reference to examples. This is an example, and the present invention is not limited by the following examples unless it exceeds the gist of the present invention.

【0010】図1及び図2に示すように、本発明の実施
例のコンクリート構造物施工用型枠装置100は、既設
のコンクリート構造物30に横方向へ所定間隔を隔てて
埋設する複数のアンカーボルト31のうち少なくとも2
本に固定するシーボルト1と、該シーボルト1に架設す
る連結桁2と、該連結桁2の両端に設けられた上下調整
可能なレベルジャッキ3と、該レベルジャッキ3に担持
するコンクリート壁面を成形するための成形用型枠4
と、シーボルト1に挿脱自在且つ固定可能な挿通孔12
を備えると共に成形用型枠4の外側に向かって上下方向
に延在し水平方向に所定間隔を隔てて固設する複数の縦
端材5と、該縦端材5の下端部に折り畳み自在の作業足
場32とによって基本構成されたものである。
As shown in FIGS. 1 and 2, a concrete structure forming apparatus 100 according to an embodiment of the present invention includes a plurality of anchors embedded in an existing concrete structure 30 at predetermined intervals in a lateral direction. At least two of the bolts 31
A sea bolt 1 to be fixed to a book, a connecting girder 2 erected on the sear bolt 1, a level jack 3 provided at both ends of the connecting girder 2, which can be adjusted up and down, and a concrete wall surface carried on the level jack 3 are formed. For forming 4
And an insertion hole 12 that can be inserted into and removed from the sea bolt 1
A plurality of vertical end members 5 extending in the vertical direction toward the outside of the forming mold frame 4 and fixed at predetermined intervals in the horizontal direction, and foldable at the lower end of the vertical end members 5. It is basically configured by the work scaffold 32.

【0011】前記シーボルト1は、既設のコンクリート
構造物30に横方向に所定の間隔を隔てて連続して埋設
された複数のアンカーボルト31に螺合して緊締される
ものであり一般に周知の形状のものである。そしてこの
複数のアンカーボルト31のうち少なくとも2本にシー
ボルト1が緊締され、これに連結桁2が架設されてい
る。
The sea bolt 1 is screwed and fastened to a plurality of anchor bolts 31 continuously embedded in the existing concrete structure 30 at predetermined intervals in the lateral direction, and has a generally known shape. belongs to. The sea bolt 1 is tightened to at least two of the plurality of anchor bolts 31, and the connecting girder 2 is installed on the sea bolt 1.

【0012】前記連結桁2は、図1及び図3に示すよう
に、一定断面形状の鋼材等によりL字形状に形成された
ものであり、既設のコンクリート面に当接する面のその
両端部にはシーボルト1が挿通される挿通孔12が形成
されている。その挿通孔12にうち一方の形状は横方向
に広い楕円形状に形成されている。これにより既設コン
クリート層に横方向に所定間隔を隔てて連続して緊締さ
れているシーボルト1の間隔に若干の違いがある場合で
も対応することが可能となる。そして前記既設のコンク
リート面に当接する面の上縁端部から直角方向に突出す
る面が形成されており、その面の両端部には後述するレ
ベルジャッキ3が上下位置調整可能なように螺合される
レベルジャッキ回動孔13が設けられている。
As shown in FIGS. 1 and 3, the connecting girder 2 is formed in an L-shape by a steel material or the like having a constant cross-sectional shape. Has an insertion hole 12 through which the seabolt 1 is inserted. One of the insertion holes 12 is formed in an elliptical shape that is wide in the horizontal direction. This makes it possible to cope with a case where there is a slight difference in the interval between the sea bolts 1 that are continuously tightened in the existing concrete layer at predetermined intervals in the lateral direction. A surface projecting perpendicularly from the upper edge of the surface abutting the existing concrete surface is formed, and a level jack 3 to be described later is screwed to both ends of the surface so that the vertical position can be adjusted. A level jack rotation hole 13 is provided.

【0013】前記レベルジャッキ3は、図3及び図4に
示すように、上述した連結桁2の両端部に形成されてい
るレベルジャッキ回動孔13に各々上下移動調整自在に
螺合されており、各々のレベルジャッキ3により後述す
る成形用型枠4を担持している。レベルジャッキ3の形
状はねじ形状に形成され、その上端部には成形用型枠4
を保持可能なようにさら形状に形成された保持部14が
設けられている。レベルジャッキ3の下端部には四角形
状に形成された係合部15が形成されており、この係合
部15に一般的に周知であるラチェットレンチを係合さ
せて回動させることによりレベルジャッキ3の上下位置
を調整するように構成してある。これにより、成形用型
枠4を水平に調整することが可能となる。
As shown in FIGS. 3 and 4, the level jacks 3 are screwed into level jack rotating holes 13 formed at both ends of the connecting beam 2 so as to be vertically movable. Each of the level jacks 3 carries a molding form 4 to be described later. The shape of the level jack 3 is formed in a screw shape, and a molding frame 4 is formed at an upper end thereof.
The holding portion 14 is formed in a further shape so as to be able to hold the sheet. At the lower end of the level jack 3, an engagement portion 15 formed in a quadrangular shape is formed, and a generally well-known ratchet wrench is engaged with the engagement portion 15 and rotated to rotate the level jack. 3 is configured to adjust the vertical position. This makes it possible to adjust the molding form 4 horizontally.

【0014】前記成形用型枠4は、木材等の材料で矩形
形状に形成されたコンクリート壁面成形板16とそのコ
ンクリート壁面成形板16に所定間隔を隔てて左右両端
部に固着される縦方向支持部材17と、この縦方向支持
部材17間に所定間隔で且つ縦方向支持部材17に直交
するように固着された複数の横方向支持部材18とによ
り構成されているものである。縦端材5の上端寄り箇所
から挿脱自在且つ固定可能に取付けられるアンカーボル
ト埋設用のダミーボルト6は、コンクリート壁面成形板
16に形成された孔に挿通されて既設のコンクリート層
に埋設されたアンカーボルト31に嵌挿される。従っ
て、コンクリート壁面成形板16の材料を木材にしたこ
とによりダミーボルト6の挿通する孔の加工が容易に行
うことが可能となる。但し、その材料を木材等に限定す
るものでなく、例えば、周知のメタルフォームあるいは
合成樹脂素材等から成型されるコンクリート壁面成形板
が例示できる。また成形用型枠4の上端部には吊り金具
19が設けられている。
The molding frame 4 includes a concrete wall forming plate 16 made of a material such as wood and formed in a rectangular shape, and a vertical supporting member fixed to the left and right ends of the concrete wall forming plate 16 at predetermined intervals. It is composed of a member 17 and a plurality of horizontal support members 18 fixed between the vertical support members 17 at predetermined intervals and orthogonal to the vertical support members 17. An anchor bolt embedding dummy bolt 6, which is detachably and fixably attached from a position near the upper end of the vertical end member 5, is inserted into a hole formed in the concrete wall forming plate 16 and is embedded in the existing concrete layer. It is inserted into the anchor bolt 31. Therefore, the hole for inserting the dummy bolt 6 can be easily processed by using wood as the material of the concrete wall forming plate 16. However, the material is not limited to wood or the like, and for example, a concrete wall molding plate molded from a well-known metal foam or synthetic resin material can be exemplified. In addition, a hanging bracket 19 is provided at an upper end portion of the molding frame 4.

【0015】前記縦端材5は、一対のコ字形状に形成さ
れた鋼材をシーボルト等を挿通させるための間隔を隔て
て背中合わせに対向するようにプレート等により溶接さ
れて形成されたものである。これにより、後述するシー
ボルト等を挿脱する箇所を自由に設定することができる
ため、あらゆる作業状況の変化に対応することが可能と
なる。そして縦方向に所定間隔を隔てて配置された複数
の縦端材5における上半部の内側にわたって成形用型枠
4に固着されている。
The vertical end members 5 are formed by welding a pair of U-shaped steel members with a plate or the like so as to face each other back to back with an interval for inserting a seabolt or the like. . Accordingly, a place where a later-described seabolt or the like is inserted / removed can be freely set, so that it is possible to cope with any change in work conditions. The plurality of vertical end members 5 arranged at predetermined intervals in the vertical direction are fixed to the forming mold 4 over the inside of the upper half.

【0016】前記縦端材5には、その上端寄り箇所に挿
脱自在且つ固定可能に取付けられるアンカーボルト埋設
用のダミーボルト6と、成形用型枠4よりも下部に位置
し且つ縦端材5の略中間箇所に挿脱自在且つ固定可能な
アンカーボルト埋設用のシーーボルト1と、縦端材5の
下端寄り部箇所を挿脱自在且つ固定可能に取付けられる
縦端材5の傾き調整用のジャッキボルト7と、縦端材5
の下端部に折り畳み自在な作業足場32を備えている。
The vertical end member 5 includes a dummy bolt 6 for embedding an anchor bolt which is removably and fixedly attached to a position near the upper end thereof, and a vertical end member which is located below the forming frame 4 and is lower than the forming die frame 4. An anchor bolt which can be inserted and removed and fixed at a substantially intermediate portion of the anchor member 5, and an inclination adjustment of the vertical end member 5 which is attached to the lower end portion of the vertical end member 5 so as to be detachable and fixable. Jack bolt 7 and vertical scrap 5
Is provided with a work platform 32 which can be folded at the lower end.

【0017】前記作業足場32は、図2に示すように、
縦端材5の下端寄り箇所の側部に固定位置調整可能に支
持され作業内容に応じて変更可能に構成されているもの
である。
The work scaffold 32 is, as shown in FIG.
It is supported on the side of the vertical end member 5 near the lower end so that the fixed position can be adjusted, and is configured to be changeable according to the work content.

【0018】次に、かかる構成からなるコンクリート構
造物施工用型枠装置100を使用してコンクリート構造
物を施工する工法について説明する。
Next, a method of constructing a concrete structure using the concrete structure constructing formwork apparatus 100 having the above-described configuration will be described.

【0019】先ず、最初に図1及び図2に示すように、
既設のコンクリート構造物30に横方向へ所定間隔を隔
てて埋設する複数のアンカーボルト31にシーボルト1
を固定する。
First, as shown in FIGS. 1 and 2,
A plurality of anchor bolts 31 buried in the existing concrete structure 30 at predetermined intervals in the horizontal direction are provided with sea bolts 1.
Is fixed.

【0020】次に、レベルジャッキ3が両端に設けられ
た連結桁2を、その両端に形成された各々の挿通孔12
にシーボルト1に架設するように挿通させる。
Next, the connecting girder 2 provided with the level jacks 3 at both ends is inserted into the respective insertion holes 12 formed at both ends thereof.
Into the seabolt 1 so as to be installed.

【0021】次に、成形用型枠4に設けられた吊り金具
19にケーブルクレーン等又は型枠移設箇所に搬入した
簡易クレーンにおける複数の吊り上げ用フックを前記吊
り金具19に係合し、前記クレーン等により成形用型枠
4を吊り上げた後、図1及び図4に示すように、レベル
ジャッキ3に担持するように載置すると共に前記縦端材
5に前記シーボルト1に設けられた挿通孔12に挿通さ
れるように配置する。このとき、測量用計器等で水平度
を測定してその水平位置を決める。そして、連結桁2の
両端に設けられたレベルジャッキ3の下端部にラチェッ
トレンチを係合させて回動させることにより成形用型枠
4の水平位置が調整される。また、成形用型枠4は、前
記レベルジャッキに担持するように載置されるので、水
平位置を調整するときに前記クレーン等で吊り下げたま
まの状態で作業をする必要もなく、クレーン等を他の作
業に使用することが可能となるため、作業時間の短縮と
経済的にも有効的となる。
Next, a plurality of lifting hooks of a cable crane or the like or a simple crane carried to the transfer point of the mold are engaged with the hanging fitting 19 provided on the forming mold 4 by engaging with the hanging fitting 19. After the mold 4 is lifted by the above method, it is placed on the level jack 3 so as to be supported by the level jack 3 as shown in FIGS. It is arranged so that it can be inserted through. At this time, the horizontality is measured with a measuring instrument or the like to determine the horizontal position. Then, the ratchet wrench is engaged with the lower ends of the level jacks 3 provided at both ends of the connecting girder 2 and rotated to adjust the horizontal position of the molding form 4. Further, since the molding form 4 is placed so as to be carried on the level jack, there is no need to work while being suspended by the crane or the like when adjusting the horizontal position. Can be used for other work, so that work time can be reduced and it is economically effective.

【0022】次に、前記シーボルト等に座金20を通
し、ナット21を緊締させない程度に螺合させる。そし
て、縦端材5に挿通され固定されているジャッキボルト
7を回動させて成形用型枠4のコンクリート施工面が既
設のコンクリート層面と同一直線上となるように各縦端
材5の傾きを調整したのち、前記ナット21を緊締させ
る。
Next, the washer 20 is passed through the seabolt or the like, and the nut 21 is screwed to such an extent that the nut 21 is not tightened. Then, the jack bolts 7 inserted and fixed to the vertical end members 5 are rotated, and the inclination of each vertical end member 5 is adjusted so that the concrete construction surface of the molding form 4 is on the same straight line as the existing concrete layer surface. Is adjusted, the nut 21 is tightened.

【0023】以上のように、既設のコンクリート層に設
置されたコンクリート構造物施工用装置100の内側に
コンクリートを打設する。
As described above, concrete is cast inside the concrete structure construction apparatus 100 installed on the existing concrete layer.

【0024】前記打設したコンクリートが養生硬化した
後、前記吊り金具19にケーブルクレーンの吊り上げ用
フックに係合したのち、作業員が作業足場32に乗って
シーボルト1及びダミーボルト6に緊締されているナッ
ト等を弛緩する。このとき、成形用型枠4及び各縦端材
5はレベルジャッキ3に担持されているため、成形用型
枠4の重量によりワイヤーロープの緩みが一気に落下し
てその付近で作業している作業員が怪我をすることを防
止するのである。
After the cast concrete has cured and hardened, the hanging hook 19 is engaged with a lifting hook of a cable crane. Loosen any nuts that are present. At this time, since the forming mold 4 and each vertical end member 5 are supported by the level jack 3, the looseness of the wire rope drops at a stretch due to the weight of the forming mold 4, and the work in the vicinity is performed. It prevents personnel from getting injured.

【0025】続いて、作業員がシーボルト1等を弛緩方
向に回動させてアンカーボルト31から離脱させると共
に下位のコンクリートから離反させて次の上位になるコ
ンクリート施工予定面までケーブルクレーン等で上昇さ
せる。そして前述の操作を反復して行ってコンクリート
層を最下部から順次積み上げられるようにしてコンクリ
ート構造物を構築していくのである。
Subsequently, the worker turns the sea bolt 1 or the like in the loosening direction to separate it from the anchor bolt 31 and separates it from the lower concrete and raises it with the cable crane or the like to the next upper concrete construction scheduled surface. . Then, the above-described operation is repeated to build a concrete structure so that the concrete layers can be sequentially stacked from the bottom.

【0026】このように、本実施例に係るコンクリート
構造物施工用装置100は、複数のアンカーボルトのう
ち少なくとも2本に連結するシーボルト1と、前記シー
ボルト1に架設する連結桁2と、前記連結桁2の両端に
設けられた上下調整可能なレベルジャッキ3と、前記レ
ベルジャッキ3に担持するコンクリート壁面を成形する
ための成形用型枠4と、前記シーボルト1に挿脱自在且
つ固定可能な挿通孔12を備えると共に前記成形用型枠
の外側に向かって上下方向に延在し水平方向に所定間隔
を隔てて固設する複数の縦端材5と、を備えたものであ
る。
As described above, the concrete structure construction apparatus 100 according to the present embodiment includes the sea bolt 1 connected to at least two of the plurality of anchor bolts, the connection girder 2 installed on the sea bolt 1, and the connection Up and down adjustable level jacks 3 provided at both ends of the girder 2, a molding form 4 for molding a concrete wall surface carried on the level jack 3, and an insertable / removable / fixable insert to / from the seabolt 1. And a plurality of vertical end members 5 which are provided with holes 12 and extend in the vertical direction toward the outside of the molding frame and are fixed at predetermined intervals in the horizontal direction.

【0027】したがって、各レベルジャッキ3の上下位
置を調整することにより成形用型枠4の水平度を容易に
調整することが可能となる。また、成形用型枠4は、前
記レベルジャッキ3に担持するように載置されるので、
水平度を調整するときでもケーブルクレーン等で吊り下
げたままの状態で作業をする必要もなく、クレーン等を
他の作業に使用することが可能となるため、作業時間の
短縮と経済的にも有効的に利用することが可能となる。
さらに、打設したコンクリートが養生し硬化したのちに
コンクリート構造物施工用装置100を脱型する作業に
おいて、前記吊り金具19にケーブルクレーンの吊り上
げ用フックに係合したのち、作業員が作業足場32に乗
ってシーボルト1及びダミーボルト6に緊締されている
ナット等を弛緩した際でも、成形用型枠4及び各縦端材
5はレベルジャッキ3に担持されているので、成形用型
枠4の重量によりワイヤーロープの緩みが一気に落下し
てその付近で作業している作業員が怪我をすることを防
止することができる。さらに加えて、本実施例では、成
形用型枠4を構成するコンクリート壁面成形板16の材
料を木材にしたことによりダミーボルト6の挿通する孔
の加工が容易に行うことが可能となる。
Therefore, by adjusting the vertical position of each level jack 3, the horizontality of the molding frame 4 can be easily adjusted. Further, since the molding form 4 is placed so as to be supported by the level jack 3,
Even when adjusting the level, there is no need to work while suspended with a cable crane or the like, and the crane etc. can be used for other work. It can be used effectively.
Further, in the operation of removing the concrete structure construction apparatus 100 after the cast concrete has cured and hardened, the worker engages the lifting hook of the cable crane with the hanging metal fitting 19, and then the worker operates the work platform 32. Even when the nut or the like fastened to the sea bolt 1 and the dummy bolt 6 is loosened, the molding frame 4 and each vertical end member 5 are supported by the level jack 3. It is possible to prevent the looseness of the wire rope from dropping at a stretch due to the weight, and prevent the worker working in the vicinity from being injured. In addition, in this embodiment, since the material of the concrete wall forming plate 16 constituting the forming frame 4 is made of wood, it is possible to easily process the hole through which the dummy bolt 6 is inserted.

【0028】尚、本実施例は、本発明に係るコンクリー
ト構造物施工用型枠装置100を一つ使用してコンクリ
ート構造物を施工する工法を説明したが、コンクリート
構造物施工用型枠装置100を複数使用して大型のコン
クリート構造物を施工する際でも、前述した内容と実質
的に同一の作用効果が得られることが自明であるため、
叙上の説明を援用する。
In this embodiment, a method of constructing a concrete structure using one concrete formwork apparatus 100 according to the present invention has been described. It is obvious that even when constructing a large concrete structure using a plurality of the same, it is possible to obtain substantially the same operation and effect as described above,
The above description is cited.

【0029】[0029]

【発明の効果】以上詳述した通り、請求項1の発明にお
いては、上記実施形態において例示したように、このコ
ンクリート構造物施工用型枠装置は、コンクリート壁面
を成形するための成形用型枠を容易に短時間に水平に調
整することできると共に構造用型枠の設置及び脱型に使
用されるケーブルクレーン等の使用時間を短縮させ且つ
作業員の安全性を向上させることができるという優れた
効果を奏するものである。
As described in detail above, according to the first aspect of the present invention, as exemplified in the above embodiment, this formwork apparatus for constructing a concrete structure includes a forming formwork for forming a concrete wall surface. Can be easily and horizontally adjusted in a short time, and the use time of a cable crane or the like used for installation and removal of a structural form can be shortened and the safety of workers can be improved. It is effective.

【0030】請求項2の発明は、請求項1の発明に係る
コンクリート構造物施工用型枠装置を使用することによ
り、コンクリート壁面を成形するための成形用型枠を容
易に短時間に水平に調整することできると共に構造用型
枠の設置及び脱型に使用されるケーブルクレーン等の使
用時間を短縮させ且つ作業員の安全性を向上させること
ができるという優れた効果を奏するものである。
According to a second aspect of the present invention, by using the concrete structure-forming formwork apparatus according to the first aspect of the present invention, a forming formwork for forming a concrete wall surface can be easily and horizontally placed in a short time. The present invention has an excellent effect of being able to adjust, reduce the use time of a cable crane or the like used for installing and removing the structural formwork, and improve the safety of workers.

【図面の簡単な説明】[Brief description of the drawings]

【図1】コンクリート構造物施工用型枠装置の実施例を
示す正面図である。
FIG. 1 is a front view showing an embodiment of a formwork device for constructing a concrete structure.

【図2】コンクリート構造物施工用型枠装置の実施例を
示す縦断側面図である。
FIG. 2 is a longitudinal sectional side view showing an embodiment of a formwork apparatus for constructing a concrete structure.

【図3】コンクリート構造物施工用型枠装置を構成する
レベルジャッキが設けられた連結桁の実施例を示す正面
図である。
FIG. 3 is a front view showing an embodiment of a connecting girder provided with a level jack constituting a formwork apparatus for constructing a concrete structure.

【図4】コンクリート構造物施工用型枠装置の実施例を
示す一部拡大縦断側面図である。
FIG. 4 is a partially enlarged longitudinal side view showing an embodiment of a formwork apparatus for constructing a concrete structure.

【図5】従来の構造物成形型枠の使用状態を示す縦断側
面図である。
FIG. 5 is a vertical sectional side view showing a use state of a conventional structure forming mold.

【図6】従来の構造物成形型枠の使用状態を示す正面図
である。
FIG. 6 is a front view showing a use state of a conventional structure forming mold.

【符号の説明】[Explanation of symbols]

100 コンクリート構造物施工用型枠装置 1 シーボルト 2 連結桁 3 レベルジャッキ 4 成形用型枠 5 縦端材 6 ダミーボルト 7 ジャッキボルト 12 挿通孔 13 レベルジャッキ回動孔 14 保持部 15 係合部 16 コンクリート壁面成形板 17 縦方向支持部材 18 横方向支持部材 19 吊り金具 20 座金 30 既設のコンクリート構造物 31 アンカーボルト 32 作業足場 REFERENCE SIGNS LIST 100 Formwork apparatus for construction of concrete structure 1 Seabolt 2 Connecting girder 3 Level jack 4 Forming form 5 Vertical end material 6 Dummy bolt 7 Jackbolt 12 Insertion hole 13 Level jack rotation hole 14 Holding part 15 Engagement part 16 Concrete Wall forming plate 17 Longitudinal support member 18 Lateral support member 19 Hanging fitting 20 Washer 30 Existing concrete structure 31 Anchor bolt 32 Work scaffold

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】既設のコンクリート構造物に横方向に所定
間隔を隔てて埋設された複数のアンカーボルトのうち少
なくとも2本に連結するシーボルトと、 前記シーボルトに架設する連結桁と、 前記連結桁の両端部に設けられた上下調整可能なレベル
ジャッキと、 前記レベルジャッキに担持するコンクリート壁面を成形
するための成形用型枠と、 前記シーボルトに挿脱自在且つ固定可能な挿通孔を備え
ると共に前記成形用型枠の外側に上下方向に延在し水平
方向に所定間隔を隔てて固設する複数の縦端材と、を備
え、 前記レベルジャッキの上下移動調整によって前記成形用
型枠の水平度を調整することを特徴とするコンクリート
構造物施工用型枠装置。
1. A sea bolt connected to at least two of a plurality of anchor bolts buried at a predetermined interval in a lateral direction in an existing concrete structure; a connecting girder erected on the sea bolt; Up and down adjustable level jacks provided at both ends, a molding form for molding a concrete wall surface carried on the level jack, and an insertion hole which can be inserted into and removed from the sea bolt and can be fixed, and And a plurality of vertical end members extending vertically and fixed at predetermined intervals in the horizontal direction outside of the forming mold, and adjusting the vertical movement of the level jack to adjust the level of the forming mold. A formwork apparatus for concrete structure construction characterized by adjusting.
【請求項2】前記縦端材は、その上端部に挿脱自在且つ
固定可能に取付けられるアンカーボルト埋設用のダミー
ボルトと、前記縦端材の下端部を挿脱自在且つ固定可能
に取付けられる縦端材傾き調整用のジャッキボルトとを
備えたことを特徴とする請求項1記載のコンクリート構
造物施工用型枠装置。
2. The vertical end member has a dummy bolt for embedding an anchor bolt detachably and fixedly attached to an upper end thereof, and a lower end of the vertical end member is detachably and fixedly attached. 2. The formwork device for constructing a concrete structure according to claim 1, further comprising a jack bolt for adjusting the inclination of the vertical scrap.
【請求項3】既設のコンクリート構造物に横方向へ間隔
をおいて埋設された複数のアンカーボルトの少なくとも
2本に前記シーボルトを連結する工程と、 前記シーボルトを固定したのちに前記レベルジャッキが
設けられた連結桁を前記シーボルトに架設する工程と、 前記連結桁を前記シーボルトに架設したのちに前記成形
用型枠を前記レベルジャッキに担持する共に前記縦端材
に設けられた挿通孔に前記シーボルトを挿通して固定す
る工程と、 前記成形用型枠を前記レベルジャッキに担持する共に前
記縦端材に設けられた挿通孔に前記シーボルトを挿通し
て固定したのちに前記レベルジャッキの上下調整によっ
て前記成形用型枠の水平度を調整する工程と、 前記成形用型枠の水平度を調整したのちに前記成形用型
枠の内側にコンクリートを打設し、該コンクリートを養
生硬化後に前記コンクリート構造物施工用型枠装置を脱
型し、前記コンクリート構造物施工用型枠装置を昇降手
段を介して次のコンクリート打設位置まで引上げる工程
とからなり、前記各工程を順次繰り返して連続的にコン
クリート層を打設してコンクリート構造物を施工する工
法。
3. A step of connecting the sea bolt to at least two of a plurality of anchor bolts buried in an existing concrete structure with a space therebetween in a lateral direction, and the level jack is provided after fixing the sea bolt. Erection of the connecting girder on the seabolt, and after supporting the connecting girder on the sievebolt, supporting the molding form by the level jack and inserting the searing into the insertion hole provided in the vertical end member. And fixing the molding form by supporting the molding frame on the level jack and inserting and fixing the sea bolts in the insertion holes provided in the vertical end member, and then adjusting the level jack up and down. A step of adjusting the levelness of the molding form; and, after adjusting the levelness of the molding form, concrete inside the molding form. Casting and concrete, after curing and curing the concrete, demolding the concrete structure construction form device, and pulling up the concrete structure construction form device to the next concrete placement position via lifting means. And constructing a concrete structure by continuously laying a concrete layer by sequentially repeating the above steps.
JP09029997A 1997-02-14 1997-02-14 Formwork device for concrete structure construction and method of constructing concrete structure Expired - Fee Related JP3081897B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP09029997A JP3081897B2 (en) 1997-02-14 1997-02-14 Formwork device for concrete structure construction and method of constructing concrete structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP09029997A JP3081897B2 (en) 1997-02-14 1997-02-14 Formwork device for concrete structure construction and method of constructing concrete structure

Publications (2)

Publication Number Publication Date
JPH10227024A true JPH10227024A (en) 1998-08-25
JP3081897B2 JP3081897B2 (en) 2000-08-28

Family

ID=12291579

Family Applications (1)

Application Number Title Priority Date Filing Date
JP09029997A Expired - Fee Related JP3081897B2 (en) 1997-02-14 1997-02-14 Formwork device for concrete structure construction and method of constructing concrete structure

Country Status (1)

Country Link
JP (1) JP3081897B2 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003064869A (en) * 2001-08-27 2003-03-05 Okabe Co Ltd Concrete form construction method and form device
JP2006316581A (en) * 2005-05-16 2006-11-24 Kunimoto Co Ltd Scaffolding board support device
CN106677135A (en) * 2016-12-29 2017-05-17 中国人民解放军63926部队 Underground gallery movable wood beam plywood formwork trolley
CN107012837A (en) * 2017-04-24 2017-08-04 安徽水安建设集团股份有限公司 Stop gate siding track installation method under the conditions of small space

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101818564B (en) * 2010-06-04 2011-10-05 中建三局建设工程股份有限公司 Adjustable hanger system

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003064869A (en) * 2001-08-27 2003-03-05 Okabe Co Ltd Concrete form construction method and form device
JP2006316581A (en) * 2005-05-16 2006-11-24 Kunimoto Co Ltd Scaffolding board support device
JP4651450B2 (en) * 2005-05-16 2011-03-16 株式会社国元商会 Scaffolding plate support device
CN106677135A (en) * 2016-12-29 2017-05-17 中国人民解放军63926部队 Underground gallery movable wood beam plywood formwork trolley
CN107012837A (en) * 2017-04-24 2017-08-04 安徽水安建设集团股份有限公司 Stop gate siding track installation method under the conditions of small space

Also Published As

Publication number Publication date
JP3081897B2 (en) 2000-08-28

Similar Documents

Publication Publication Date Title
JP5065179B2 (en) Formwork device
KR20190056120A (en) Cantilever bracket for bridger
KR101812230B1 (en) Installation of temporary apparatus for curtain wall and temporary apparatus for curtain wall
JP3081897B2 (en) Formwork device for concrete structure construction and method of constructing concrete structure
JP5637480B2 (en) Dismantling method of support for slab construction in pile pier construction
JPH07247695A (en) Construction method for high structure and construction device used therefor
KR101978599B1 (en) Apparatus for fixing gangform to the wall
AU2003240022B2 (en) An erection unit for a building floor slab and the erection method thereof
KR100812262B1 (en) Device for preventing falling of gangform and method for constructing reinforced concrete structure using the same
KR20030016032A (en) A method of constructing climbing bracket
CN114368696A (en) Pre-buried construction method for tower crane wall-attached wall-connecting piece
JPH07259049A (en) Concrete block for revetment
JP2563887B2 (en) Precast concrete board manufacturing method
JP2815043B2 (en) Lift-up foam device
JP2000160834A (en) Step-up construction of concrete caisson
CN216920426U (en) Positioning tool for steam turbine foundation embedded part
JP7503512B2 (en) Construction method for floating structures
JPH07259332A (en) Method of driving insert for separator in semi-processed good precast concrete slab
KR100916807B1 (en) Locker fixing apparatus for adjusting height of a mold
KR100385808B1 (en) Mold device for second lining wall operation of vertical tunnel and operation method by using a mold device
JP3368360B2 (en) How to install a packer plate for equipment installation
JPH0648046Y2 (en) Unit for piping
EP1719857A2 (en) Apparatus, assembly and method for the support of formwork for storey floors.
JP3339676B2 (en) Hanging bracket for concrete formwork
JP6427468B2 (en) Concrete filling method

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees