JPH10204997A - Cable dome erecting method - Google Patents

Cable dome erecting method

Info

Publication number
JPH10204997A
JPH10204997A JP1237797A JP1237797A JPH10204997A JP H10204997 A JPH10204997 A JP H10204997A JP 1237797 A JP1237797 A JP 1237797A JP 1237797 A JP1237797 A JP 1237797A JP H10204997 A JPH10204997 A JP H10204997A
Authority
JP
Japan
Prior art keywords
dome
bundle
cable
diagonal
length
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP1237797A
Other languages
Japanese (ja)
Inventor
Takatsugu Yoshida
隆次 吉田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Obayashi Corp
Original Assignee
Obayashi Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Obayashi Corp filed Critical Obayashi Corp
Priority to JP1237797A priority Critical patent/JPH10204997A/en
Publication of JPH10204997A publication Critical patent/JPH10204997A/en
Pending legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To provide a cable dome which assures a small tension applied to each diagonal in the erecting operation, facilitates control of the tightening works, and enables quick execution of works. SOLUTION: A cable dome includes struts 4 whose tops are attached to the intersection of main cables 3 arranged in the radial and circumferential directions or in the form of lattice, when viewed on the plan, wherein the struts 4 are supported by tying the bottom of each struct 4 by a diagonal 5 to the top of another strut 4 positioned nearer the end part adjacent to the first named strut 4. The constituent members are primarily assembled in the condition that only part of each diagonal 5 is elongated from the design length, and each provisionally installed rope 10 having a certain length is attached to the top of each strut 4, while the other ends of the provisional ropes 10 are gathered, and the gathering end is lifted by a crane 12, and the members are installed in their specified positions approximately so that a dome shape is generated, and with this condition held, the diagonals 5 are tightened into the specified length and fixed. Thus the skeleton of the dome is erected in the normal position, and then the ropes 10 are removed.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、ケーブルドームを
構成する各部材の地組み後に、急速施工によりドーム形
状に立ち上げできるようにしたケーブルドームの施工方
法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of constructing a cable dome which can be quickly raised into a dome shape after laying members constituting the cable dome.

【0002】[0002]

【従来の技術】例えば放射状のケーブルドームの施工方
法としては、図6〜図8に示す従来技術が知られてい
る。このケーブルドームは、円形に構築された壁部1の
内側中央部に配置されたセンターテンションリング2
と、このテンションリング2から放射状に広がるメイン
ケーブル3と、このメインケーブル3に上端を連結され
た複数の束材4と、束材4の下端とその外側の束材4の
上端とを結ぶ斜材5と、各束材4の下端を円周方向に結
ぶ図示しないリングケーブルを備えており、図6に示す
ように前記各部材を地組みした状態から、図7に示すよ
うに、最外端の束材4の上端とその内側の束材4aの下
端に固着した斜材5に外側に引張力を与えて束材4を上
昇させ、引続きその内側の束材4aの斜材5に同一の引
張力を与える作業を繰返すことによって、最終的に図8
に示すドーム形状の骨組6を完成させていた。
2. Description of the Related Art As a method of constructing a radial cable dome, for example, the prior art shown in FIGS. 6 to 8 is known. This cable dome is provided with a center tension ring 2 disposed at a central portion inside a wall 1 constructed in a circular shape.
A main cable 3 radiating from the tension ring 2, a plurality of bundles 4 having upper ends connected to the main cable 3, and an oblique connection between a lower end of the bundle 4 and an upper end of the bundle 4 outside the main cable 3. A material 5 and a ring cable (not shown) connecting the lower ends of the bundles 4 in the circumferential direction are provided. From the state in which the members are assembled as shown in FIG. A pulling force is applied to the outside of the slant 5 fixed to the upper end of the bundle 4 at the end and the lower end of the bundle 4a on the inner side to raise the bundle 4, and subsequently, the same as the slant 5 of the inner bundle 4a. By repeating the operation of applying the tensile force of FIG.
Has been completed.

【0003】[0003]

【発明が解決しようとする課題】しかしながら、以上の
施工方法にあっては、斜材で全体の荷重を支えつつ、順
次ドーム形状に順次立ち上げていく作業のため、斜材の
緊張作業を制御することが困難であり、各部均等なテン
ションとするための調整が難しく、施工に時間がかかる
欠点があった。
However, in the above-mentioned construction method, the work of tensioning the diagonal material is controlled because the diagonal material supports the entire load and is sequentially raised in a dome shape. It is difficult to adjust the tension of each part, and it takes a long time to perform the construction.

【0004】本発明は、以上の欠点を解決するものであ
って、その目的は、立ち上げ作業時において、各斜材に
加わるテンションが小さく、緊張作業の制御を容易に行
え、急速施工を可能としたケーブルドームの施工方法を
提供するものである。
The present invention solves the above-mentioned drawbacks. An object of the present invention is to reduce the tension applied to each diagonal member during a start-up operation, to easily control a tension operation, and to enable rapid construction. And a method for constructing a cable dome.

【0005】[0005]

【課題を解決するための手段】以上の目的を達成するた
め、本発明は、平面上、放射方向と円周方向に、または
格子状に配置されたメインケーブルの交点に上端を取付
けた束材の下端と、当該束材に隣接する端部寄りの束材
の上端とを斜材でつなぐとともに、各束材の下端を円周
方向に結ぶリングケーブルでつないで束材を支持する形
式のケーブルドームにおいて、前記斜材または前記リン
グケーブルの全部または一部を設計長さより長くした状
態で前記各部材を地組みした後、前記各束材の上端に所
定長さの仮設ロープを取付け、各仮設ロープの他端側を
一カ所ないし数カ所に集合し、この集合端を吊上げ手段
により吊上げ、前記各部材を概ね所定の位置に架設して
ドーム状となし、この状態を保持しつつ前記前記設計長
さより長くした斜材またはリングケーブルを所定長さに
緊張して固定することにより、ドームを正規の位置に組
立て、その後、仮設ロープを撤去することを特徴とする
ものである。
SUMMARY OF THE INVENTION In order to achieve the above object, the present invention provides a bundling material having an upper end attached to an intersection of main cables arranged on a plane, in a radial direction and a circumferential direction, or in a grid. Cable that connects the lower end of the bundle and the upper end of the bundle near the end adjacent to the bundle with a diagonal material, and that connects the lower ends of the bundles with a ring cable that connects in the circumferential direction to support the bundle. In the dome, after assembling the members with all or a part of the diagonal member or the ring cable being longer than a design length, a temporary rope having a predetermined length is attached to an upper end of each bundle, and The other end of the rope is gathered at one or several places, the gathered end is lifted by lifting means, and the respective members are erected at substantially predetermined positions to form a dome shape, and the design length is maintained while maintaining this state. Oblique longer than Or by fixing by tensioned ring cables to length, assembled dome normal position, then, is characterized in that removing the temporary rope.

【0006】したがって、本発明方法にあっては、仮設
ロープで吊上げた状態では、斜材に全体の荷重が加わる
ことがなく、各束材を垂直に立てるだけの緊張作業なの
で、テンションの制御を簡単に行えることができる。そ
して、仮設ロープの撤去によって荷重が斜材に預けら
れ、その状態でドーム形状を保持しつつ自立する。
Therefore, in the method of the present invention, in the state of being suspended by the temporary rope, the entire load is not applied to the diagonal material, and the tension work is only required to stand each bundle material vertically. It can be done easily. Then, by removing the temporary rope, the load is deposited on the diagonal material, and in this state, the load becomes independent while maintaining the dome shape.

【0007】[0007]

【発明の実施の形態】以下、本発明の好ましい実施の形
態につき、添付図面を参照して詳細に説明する。図1〜
図3は、本発明を放射状ケーブルドームの施工に適用し
た場合の施工手順を示すものである。なお、ドームを構
成する各部材は従来とほぼ同様なので、同一部材には同
一符号を用いて説明し、新たに付加された部分にのみ異
なる符号を用いて説明する。
Preferred embodiments of the present invention will be described below in detail with reference to the accompanying drawings. Figure 1
FIG. 3 shows a construction procedure when the present invention is applied to construction of a radial cable dome. Since the members forming the dome are almost the same as those in the related art, the same members will be described using the same reference numerals, and only the newly added portions will be described using different reference numerals.

【0008】図において、このケーブルドームは、従来
とほぼ同様に、円形に構築された壁部1の内側中央部に
配置されたセンターテンションリング2と、このテンシ
ョンリング2から放射状に広がるメインケーブル3と、
このメインケーブル3に上端を連結された複数の束材4
と、束材4の下端とその外側の束材4の上端とを結ぶ斜
材5と、各束材4の下端を円周方向に結ぶ図示しないリ
ングケーブルとを備えたものであり、図1に示すよう
に、各部材を地組みする作業は従来と全く同じである。
In the figure, the cable dome includes a center tension ring 2 disposed at a central portion inside a wall 1 constructed in a circular shape and a main cable 3 radiating from the tension ring 2 in a radial manner, as in the prior art. When,
A plurality of bundles 4 whose upper ends are connected to the main cable 3
1, a diagonal member 5 connecting the lower end of the bundle 4 and the upper end of the outer bundle 4 and a ring cable (not shown) connecting the lower end of each bundle 4 in the circumferential direction. As shown in (1), the work of assembling each member is exactly the same as the conventional one.

【0009】但し、斜材5の一部のみを設計長さより長
くした状態で各部材を地組みする点が従来とは異なり、
また地組み作業時点で各束材4の上端にワイヤロープ1
0の一端を連結しておく。
However, unlike the conventional method, each member is laid in a state where only a part of the diagonal member 5 is longer than the design length.
In addition, a wire rope 1
0 is connected at one end.

【0010】次いで、図2に示すように、クローラクレ
ーン12のフックブロック12aに仮設のワイヤロープ
10の他端側を玉掛けし、巻き上げると、各部材はその
連結形態を保ったままケーブルドームの骨組6の完成状
態と同様な形状に吊上げられる。
Next, as shown in FIG. 2, the other end of the temporary wire rope 10 is slung on the hook block 12a of the crawler crane 12 and rolled up. 6 is lifted in the same shape as the completed state.

【0011】この吊上げ状態においては、設計長さより
長くした一部の斜材5は、斜材5がケーブルである場合
は斜材5が緩んだ状態になっており、斜材5が剛直な棒
状部材である場合には、最終的には垂直の姿勢になるべ
き束材4が傾いている。そこで、この状態において、そ
の一部の斜材5をほぼ設計長さになるまで緊張もしくは
短縮することにより、正規のケーブルドーム形状に矯正
する。緊張もしくは短縮する手段としては、ターンバッ
クル、ねじスピンドル、ジャッキなどがある。斜材5が
ロープである場合には、斜材5の材端となる位置に設け
た滑車に巻き付けた斜材5自信のロープ端部余長部をウ
インチで緊張することもできる。この時点では、ケーブ
ルドーム全体が仮設のワイヤロープ10に吊られている
ため、各部材には大きな荷重がかかっておらず、緊張も
しくは短縮する作業は比較的容易である。かくしてこれ
らの手段のいずれかにより緊張もしくは短縮された一部
の斜材5を固定する。
In this suspended state, some of the diagonal members 5 longer than the designed length are in a loosened state when the diagonal members 5 are cables, and the diagonal members 5 are rigid rod-shaped. In the case of a member, the bundle 4 that is to be finally in a vertical posture is inclined. Therefore, in this state, a part of the diagonal member 5 is corrected to a regular cable dome shape by being tensioned or shortened until the length becomes substantially the designed length. Means for tensioning or shortening include turnbuckles, screw spindles, jacks, and the like. When the diagonal member 5 is a rope, the extra length of the rope end of the diagonal member 5 wrapped around a pulley provided at a position to be the end of the diagonal member 5 can be tensioned by a winch. At this point, since the entire cable dome is suspended on the temporary wire rope 10, a large load is not applied to each member, and the work of tensioning or shortening is relatively easy. Thus, a portion of the diagonal member 5 that has been tensioned or shortened by any of these means is fixed.

【0012】但し、本施工方法では荷重が加わらない状
態で緊張作業を行うため、荷重が加わった場合の初期伸
び量を考慮した緊張長さに設定することが必要であり、
予めその伸び量を考慮した長さで緊張作業を行うか、あ
るいは所期形状よりも高い位置に吊上げてることによっ
てこの種の問題を解決できる。
However, in this construction method, since the tension work is performed in a state where no load is applied, it is necessary to set the tension length in consideration of the initial elongation when the load is applied,
This kind of problem can be solved by performing a tensioning operation in advance with a length in consideration of the amount of elongation or by lifting the tensioner at a position higher than the desired shape.

【0013】その後、ワイヤロープの引張力を緩めなが
ら、順次斜材5に荷重を預ければ、斜材5は初期の伸び
量分だけ伸びた状態で荷重を分担し、完全にケーブルド
ーム形状を保持する。その後フックブロック12aより
各ワイヤロープ10を掛け外しワイヤロープ10そのも
のも撤去することで、図3に示すようにケーブルドーム
の骨組6が完成する。
After that, if the load is sequentially deposited on the diagonal member 5 while the pulling force of the wire rope is reduced, the diagonal member 5 bears the load in a state of being extended by the initial elongation amount, and completely retains the shape of the cable dome. I do. Thereafter, each wire rope 10 is hung and removed from the hook block 12a, and the wire rope 10 itself is also removed, thereby completing the frame 6 of the cable dome as shown in FIG.

【0014】なお、この種のケーブルドームは一般に大
規模な建物であり、図示のごとく一台のクローラクレー
ン12だけではその規模の点から吊上げられない場合が
多い。したがって、このような場合には、例えば図4に
示すように、複数台のクローラクレーン12を用いて荷
重を分担しながら、一斉に吊上げ作業を行えばよい。
Incidentally, this kind of cable dome is generally a large-scale building, and as shown in the drawing, it is often impossible to lift the cable dome from the viewpoint of its scale with only one crawler crane 12. Therefore, in such a case, as shown in FIG. 4, for example, a plurality of crawler cranes 12 may be used to carry out the lifting operation at the same time while sharing the load.

【0015】あるいは、例えば図5に示すように、複数
のタワーポスト14あるいはタワークレーンを建物内側
に仮設状態に立設し、これにワイヤロープ10を吊下げ
支持することによって、各部材を吊上げることもでき
る。
Alternatively, as shown in FIG. 5, for example, a plurality of tower posts 14 or tower cranes are temporarily erected inside the building, and the wire ropes 10 are suspended and supported by the tower posts 14 or tower cranes, thereby lifting each member. You can also.

【0016】さらに、以上の実施の形態では、本発明の
施工方法を放射状ケーブルドームに適用した場合を示し
たが、格子状のケーブルドームに適用することも可能で
あることは勿論である。
Further, in the above embodiment, the case where the construction method of the present invention is applied to a radial cable dome has been described. However, it is needless to say that the construction method can be applied to a lattice-like cable dome.

【0017】また、前記設計長さより長くする部材を、
斜材5に替え、リングケーブルの全部または一部として
もよい。
Further, the member which is longer than the design length is
Instead of the diagonal member 5, all or a part of the ring cable may be used.

【0018】[0018]

【発明の効果】以上の説明により明らかなように、本発
明によるケーブルドームの施工方法にあっては、これの
骨組を構成する各部材を予め仮設用ロープで吊上げ、ド
ーム形状を保った状態で斜材の緊張作業を行うため、従
来の斜材を順次緊張しながらドーム形状に立ち開ける従
来の施工方法に比べて、各斜材に加わるテンションが小
さく、緊張作業の制御を容易に行え、急速施工が可能と
なる利点がある。
As is apparent from the above description, in the method of constructing a cable dome according to the present invention, each member constituting the skeleton is suspended in advance by a temporary rope, and the dome shape is maintained. Compared to the conventional construction method in which the diagonal material is tensioned, the tension applied to each diagonal material is small, and the tensioning work can be controlled easily and quickly There is an advantage that construction is possible.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の施工方法における地組み段階を示す説
明用断面図である。
FIG. 1 is an explanatory sectional view showing a laying stage in a construction method of the present invention.

【図2】同仮設ロープによる吊上げ状態を示す説明用断
面図である。
FIG. 2 is an explanatory cross-sectional view showing a state of being lifted by the temporary rope.

【図3】同完成状態を示す説明用断面図である。FIG. 3 is an explanatory sectional view showing the completed state.

【図4】複数のクローラクレーンを用いた吊上げ状態を
示す説明用断面図である。
FIG. 4 is an explanatory sectional view showing a lifting state using a plurality of crawler cranes.

【図5】複数のタワーポストを用いた吊上げ状態を示す
説明用断面図である。
FIG. 5 is an explanatory cross-sectional view illustrating a lifting state using a plurality of tower posts.

【図6】従来の施工方法における地組み段階を示す説明
用断面図である。
FIG. 6 is an explanatory cross-sectional view showing a laying stage in a conventional construction method.

【図7】同立ち上げ過程を示す説明用断面図である。FIG. 7 is an explanatory sectional view showing the start-up process.

【図8】同完成状態を示す説明用断面図である。FIG. 8 is an explanatory sectional view showing the completed state.

【符号の説明】[Explanation of symbols]

3 メインケーブル 4 束材 5 斜材 6 ケーブルドーム(の骨組) 10 仮設用ワイヤロープ 12 クローラクレーン(吊上げ手段) 14 タワーポスト(吊上げ手段) 3 Main cable 4 Bundle material 5 Diagonal material 6 Cable dome (frame) 10 Temporary wire rope 12 Crawler crane (lifting means) 14 Tower post (lifting means)

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 平面上、放射方向と円周方向に、または
格子状に配置されたメインケーブルの交点に上端を取付
けた束材の下端と、当該束材に隣接する端部寄りの束材
の上端とを斜材でつなぐとともに、各束材の下端を円周
方向に結ぶリングケーブルでつないで束材を支持する形
式のケーブルドームにおいて、 前記斜材または前記リングケーブルの全部または一部を
設計長さより長くした状態で前記各部材を地組みした
後、 前記各束材の上端に所定長さの仮設ロープを取付け、 各仮設ロープの他端側を一カ所ないし数カ所に集合し、
この集合端を吊上げ手段により吊上げ、前記各部材を概
ね所定の位置に架設してドーム状となし、 この状態を保持しつつ前記前記設計長さより長くした斜
材またはリングケーブルを所定長さに緊張して固定する
ことにより、ドームを正規の位置に組立て、 その後、仮設ロープを撤去することを特徴とするケーブ
ルドームの施工方法。
1. A lower end of a bundle having an upper end attached to an intersection of main cables arranged on a plane, in a radial direction and a circumferential direction, or in a lattice, and a bundle near an end adjacent to the bundle. A cable dome of a type that connects the upper end of the bundle with a diagonal material and supports the bundle by connecting the lower end of each bundle with a ring cable that ties the circumference of the bundle, wherein all or a part of the diagonal material or the ring cable After assembling the members in a state longer than the design length, a temporary rope of a predetermined length is attached to the upper end of each bundle, and the other end of each temporary rope is assembled at one place or several places,
The assembly end is lifted by lifting means, and the respective members are erected at substantially predetermined positions to form a dome shape. While maintaining this state, a diagonal member or a ring cable longer than the design length is tensioned to a predetermined length. A cable dome construction method characterized by assembling the dome at a regular position by fixing the cable dome, and then removing the temporary rope.
JP1237797A 1997-01-27 1997-01-27 Cable dome erecting method Pending JPH10204997A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1237797A JPH10204997A (en) 1997-01-27 1997-01-27 Cable dome erecting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1237797A JPH10204997A (en) 1997-01-27 1997-01-27 Cable dome erecting method

Publications (1)

Publication Number Publication Date
JPH10204997A true JPH10204997A (en) 1998-08-04

Family

ID=11803592

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1237797A Pending JPH10204997A (en) 1997-01-27 1997-01-27 Cable dome erecting method

Country Status (1)

Country Link
JP (1) JPH10204997A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102400560A (en) * 2011-08-03 2012-04-04 浙江东宸建设控股集团有限公司 Method for forming and mounting spherical-rib annular cable dome structure by stretching ridge cable once
JP2017057582A (en) * 2015-09-14 2017-03-23 株式会社ドクター中松創研 Inexpensive stadium shortening construction period and making maintenance cost low
CN107034992A (en) * 2017-06-07 2017-08-11 山东建筑大学 A kind of band winds up the Geiger dome structure and construction forming method of stiffening ring bar

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102400560A (en) * 2011-08-03 2012-04-04 浙江东宸建设控股集团有限公司 Method for forming and mounting spherical-rib annular cable dome structure by stretching ridge cable once
JP2017057582A (en) * 2015-09-14 2017-03-23 株式会社ドクター中松創研 Inexpensive stadium shortening construction period and making maintenance cost low
CN107034992A (en) * 2017-06-07 2017-08-11 山东建筑大学 A kind of band winds up the Geiger dome structure and construction forming method of stiffening ring bar
CN107034992B (en) * 2017-06-07 2019-10-18 山东建筑大学 A kind of band winds up the Geiger dome structure and construction forming method of stiffening ring bar

Similar Documents

Publication Publication Date Title
JP3426339B2 (en) Construction method of large building with dome roof
JPH10204997A (en) Cable dome erecting method
JPH06101274A (en) Method of constructing roof of cable dome
JP4401985B2 (en) Hollow tower construction method and hollow tower construction formwork
JP2002129748A (en) Lifting method for long span roof
CN210976318U (en) Beam string mounting structure of spoke type beam string structure roof
JP2946074B2 (en) Large roof erection method
JPH10325182A (en) Construction method of dome-shaped roof
CN114776035B (en) Construction method of oblique spoke type cable truss structure
JP3218523B2 (en) Dismantling method of frame of outer curing coating
JPH0821101A (en) Construction method of roof structural body
JPH0718743A (en) Construction method for large span domelike roof
JPH09144197A (en) Method for constructing roof of stadium
JP2004324214A (en) Construction method for roof frame of structure
JP3040715B2 (en) Stadium roof construction method
JP7281936B2 (en) Elevating method of derrick device for assembly work of steel tower
JP2001059271A (en) Construction method of dome-like roof
JPH09279518A (en) King post used for cable trussed bridge and erection method thereof
JPH06248615A (en) Erection of arched bridge
JP2572642B2 (en) Scaffolding disassembly method
JP3017461B2 (en) Construction method of the inspection walkway inside the tower
JPH0489939A (en) Large span truss erecting method
JPH0460038A (en) Constructing method of large span dome roof
JPH06127889A (en) Flexible climbing method of crane
CN117127824A (en) Assembled steel structure composite floor system and installation method thereof