JPH0950304A - Automatic plan generation device - Google Patents

Automatic plan generation device

Info

Publication number
JPH0950304A
JPH0950304A JP20192895A JP20192895A JPH0950304A JP H0950304 A JPH0950304 A JP H0950304A JP 20192895 A JP20192895 A JP 20192895A JP 20192895 A JP20192895 A JP 20192895A JP H0950304 A JPH0950304 A JP H0950304A
Authority
JP
Japan
Prior art keywords
master
lot
time
schedule
processing time
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP20192895A
Other languages
Japanese (ja)
Inventor
Naoyuki Atsumi
直幸 渥美
Mitsuya Maeda
光矢 前田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FDK Corp
Original Assignee
FDK Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FDK Corp filed Critical FDK Corp
Priority to JP20192895A priority Critical patent/JPH0950304A/en
Publication of JPH0950304A publication Critical patent/JPH0950304A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Abstract

PROBLEM TO BE SOLVED: To instantaneously make a production plan according to the actual results at work sites and based on the remaining processing time that is estimated and grasped from the results stored in a result master. SOLUTION: The results at work sites are inputted via a result collection device 3, and these result information are stored in real time in a result master 21. The lot input time is taken out by referring to the master 21 and in response to a schedule production instruction, and the remaining processing time is calculated by subtracting (present time - lot input time) from the processing time that is taken out of a process master 22. When this remaining time exists, an estimated schedule is automatically produced as the corresponding processing time. In regard of a new input lot, a schedule is automatically produced from the present time based on the processing time that is taken out of the master 22. These two schedules are added together and a new schedule is produced. In such a way, an accurate schedule is automatically produced based on the latest result information.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、実績情報をもとに計画
表を自動生成する計画自動生成装置に関するものであ
る。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an automatic plan generation device for automatically generating a plan table based on actual record information.

【0002】[0002]

【従来の技術】従来、薄膜ヘッド製造などの複数の工程
を順次経て製品を製造するときの日程計画は、現場から
各工程の生産状況を聴取し、人手によって計画立案を行
っていた。
2. Description of the Related Art Conventionally, when a product is manufactured through a plurality of processes such as manufacturing of a thin film head, the schedule is manually prepared by listening to the production status of each process from the site.

【0003】[0003]

【発明が解決しようとする課題】従来は上述したように
複数の工程における生産計画について、現場の生産状況
を聴取して人手によって立案していたために下記のよう
な問題があった。
Conventionally, as described above, a production plan in a plurality of processes is manually drafted by listening to the production situation at the site, so that there are the following problems.

【0004】(1) 生産計画の立案の際に、現場から
生産状況を聴取していたために、誤った実績が報告さ
れ、これをもとに誤った生産計画を立案してしまう問題
があった。
(1) When the production plan is drafted, since the production situation is heard from the site, there is a problem that an erroneous performance is reported and an erroneous production plan is drafted based on this. .

【0005】(2) 人手によって生産計画の立案を行
っていたために、多大の時間が必要となり、計画が作成
された時点で既に古い無駄な生産計画に成りがちである
という問題があった。
(2) Since a production plan is manually drafted, a lot of time is required, and there is a problem that an old and wasteful production plan tends to be already formed when the plan is created.

【0006】(3) 生産計画を作成するサイクルは、
従来は人手によって行うために1週間に2回位で、この
サイクルでは突発的な事故や進捗の遅れに即座に対応し
た計画を作成できないという問題があった。
(3) The cycle for creating a production plan is
Conventionally, it is performed twice a week because it is done manually, and there is a problem in this cycle that it is not possible to create a plan that immediately responds to sudden accidents and delays in progress.

【0007】本発明は、これらの問題を解決するため、
現場の進捗状況を実績から予測して把握し当該予測をも
とに生産計画を立案し、現場の実績をもとに即時に生産
計画の立案を可能にすることを目的としている。
The present invention solves these problems.
The purpose is to predict the progress situation of the site from the actual results, to make a production plan based on the prediction, and to make a production plan immediately based on the actual results of the site.

【0008】[0008]

【課題を解決するための手段】図1を参照して課題を解
決するための手段を説明する。図1において、実績マス
タ21は、ロットの生産開始時のロット番号、投入時
間、工程コードからなる実績情報を収集して格納するも
のである。
[Means for Solving the Problems] Means for solving the problems will be described with reference to FIG. In FIG. 1, the actual result master 21 collects and stores actual result information including a lot number at the start of production of a lot, an input time, and a process code.

【0009】予測手段14は、実績マスタ21に収集さ
れている実績情報中の各ロット番号のロットの投入時間
および現時刻から残り処理時間を予測するものである。
日程表作成手段15は、予測手段14によって予測され
た残り処理時間などをもとに日程表や月単位の計画表な
どを作成するものである。
The predicting means 14 predicts the remaining processing time from the loading time and the current time of the lot of each lot number in the performance information collected in the performance master 21.
The schedule creation unit 15 creates a schedule, a monthly schedule, etc. based on the remaining processing time and the like predicted by the prediction unit 14.

【0010】[0010]

【作用】本発明は、図1に示すように、実績マスタ21
にロットの生産開始時のロット番号、投入時間、工程コ
ードからなる実績情報を収集して格納しておき、予測手
段14が実績マスタ21に収集されている実績情報中の
各ロット番号のロットの投入時間および現時刻から残り
処理時間を予測し、日程表作成手段15が各ロットの予
測された残り処理時間、および新規投入されたロットの
現時刻をもとに日程表や月単位の計画表を自動生成する
ようにしている。
The present invention, as shown in FIG.
The performance information including the lot number at the start of production of the lot, the input time, and the process code is collected and stored, and the prediction unit 14 stores the lot number of each lot number in the performance information collected in the performance master 21. The remaining processing time is predicted from the input time and the current time, and the schedule creation means 15 schedules or plans the month based on the predicted remaining processing time of each lot and the current time of the newly input lot. Is automatically generated.

【0011】また、計画表作成指示に対応して、予測手
段14が実績マスタ21に収集されている実績情報中の
各ロット番号のロットの投入時間と現時刻から残り処理
時間を予測し、日程表作成手段15が各ロットの残り処
理時間をもとに日程表や月単位の計画表を自動生成する
ようにしている。
Further, in response to the schedule table preparation instruction, the prediction means 14 predicts the remaining processing time from the input time and the current time of the lot of each lot number in the performance information collected in the performance master 21, and the schedule The table creating means 15 automatically creates a schedule table and a monthly planning table based on the remaining processing time of each lot.

【0012】従って、現場の進捗状況の実績を実績マス
タ21に収集して保存しておき、この実績マスタ21に
保存した実績情報から残り処理時間を予測して把握し、
当該予測をもとに生産計画を立案することにより、現場
の実績をもとに即時に正確な生産計画(日程表、月単位
の計画表など)を立案することが可能となる。
Therefore, the actual results of the progress situation at the site are collected and saved in the actual result master 21, and the remaining processing time is predicted and grasped from the actual result information saved in the actual result master 21,
By making a production plan based on the forecast, it becomes possible to immediately make an accurate production plan (schedule, monthly schedule, etc.) based on the actual results at the site.

【0013】[0013]

【実施例】次に、図1から図7を用いて本発明の実施例
の構成および動作を順次詳細に説明する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Next, the construction and operation of an embodiment of the present invention will be sequentially described in detail with reference to FIGS.

【0014】図1は、本発明の1実施例構成図を示す。
図1において、実績収集装置3は、現場に配置したPC
(パソコン)などの端末であって、実績入力31などか
ら構成されるものである。
FIG. 1 is a block diagram showing one embodiment of the present invention.
In FIG. 1, the performance collection device 3 is a PC installed on site.
It is a terminal such as a (personal computer) and is composed of a result input 31 and the like.

【0015】実績入力31は、ロットの製造を開始しよ
うとするときにロット番号、投入時間(システムが自動
的に入力)、工程コードなどの情報(ロットNo、投入
時間、工程コードなど)を入力するものである。これら
入力された情報(ロットNo、投入時間、工程コードな
ど)は、工程管理装置2に転送され、実績マスタ21に
リアルタイムに収集されて蓄積される。
The actual result input 31 inputs information such as lot number, input time (the system automatically inputs), process code and the like (lot number, input time, process code, etc.) when starting production of a lot. To do. The input information (lot number, input time, process code, etc.) is transferred to the process management apparatus 2, and is collected and accumulated in the result master 21 in real time.

【0016】工程管理装置2は、各工程の作業の進捗状
況を管理するものであって、ここでは、各工程からの情
報(ロットNo、投入時間、工程コードなど)を収集し
て蓄積マスタ21に蓄積したり、この蓄積マスタ21に
蓄積した実績情報を処理装置1に転送して予測し自動生
成された日程表などを日程表マスタ23に格納して管理
したりなどするものであり、蓄積マスタ21、工程マス
タ22、日程表マスタ23、日程表24、各種レポート
25、履歴情報26、計画/実行差異レポート27、お
よびその他レポート28などのレポートからなるもので
ある。
The process management device 2 manages the progress of the work of each process. Here, the information (lot number, input time, process code, etc.) from each process is collected and accumulated master 21. Or to store the result information accumulated in the accumulation master 21 to the processing device 1 to predict and automatically store a schedule or the like stored in the schedule master 23 for management. The report includes a master 21, a process master 22, a schedule master 23, a schedule 24, various reports 25, history information 26, a plan / execution difference report 27, and other reports 28.

【0017】実績マスタ21は、実績収集装置3から各
工程の実績を収集して蓄積するものであって、ロットあ
るいは新規投入のロットの投入時間、ロットNo、工程
コードなどを後述する図3の実績マスタ21に示すよう
に収集して蓄積するものである。この実績マスタ21に
は、各工程からロットあるいは新規投入のロットの製造
開始時に自動的に投入時間、ロットNo、工程コードが
収集されて現状の実績情報としてリアルタイムに収集さ
れて蓄積されるため、常に最新の実績情報が蓄積される
こととなる。
The actual result master 21 collects and accumulates the actual results of each process from the actual result collecting device 3, and the input time, lot number, process code, etc. of a lot or a newly input lot are shown in FIG. It is collected and accumulated as shown in the record master 21. Since the actual time master 21 automatically collects the injection time, the lot number, and the process code at the start of manufacturing a lot or a newly introduced lot from each process, and collects and accumulates them in real time as current performance information, The latest performance information will always be accumulated.

【0018】工程マスタ22は、工程名(工程コード)
に対応づけて当該工程の作業を行うのに必要な処理時
間、および使用する機械IDなどを登録したものである
(図4参照)。
The process master 22 is a process name (process code)
The processing time required to perform the work of the process, the machine ID to be used, and the like are registered in association with (see FIG. 4).

【0019】日程表マスタ23は、日程表を保存するも
のであって、実績マスタ21に蓄積されている実績情報
をもとに、処理装置1が各工程毎に残りの処理時間を予
測して各工程毎にその残り処理時間を設定した日程表や
月単位の計画表を格納するものである。この日程表マス
タ23は、後述する図5に示すように、ロットNoに対
応づけて日付、時間、工程名(B、Cなど)を設定した
ものである。
The schedule master 23 stores the schedule, and the processor 1 predicts the remaining processing time for each process based on the performance information accumulated in the performance master 21. The schedule table in which the remaining processing time is set for each process and the monthly planning table are stored. As shown in FIG. 5, which will be described later, the schedule table master 23 has date, time, and process names (B, C, etc.) set in association with lot numbers.

【0020】日程表24は、日程表マスタ23に格納さ
れている日程表を表示あるいは印字したものである。各
種レポート25は、日程表マスタ23および実績マスタ
21を参照し、目的に合わせて編集して作成した各種レ
ポートであって、履歴情報26、計画/実行差異レポー
ト27、その他のレポート28などからなるものであ
る。
The schedule 24 is a display or print of the schedule stored in the schedule master 23. The various reports 25 are various reports created by referring to the schedule master 23 and the actual results master 21 and edited according to the purpose, and include history information 26, a plan / execution difference report 27, and other reports 28. It is a thing.

【0021】履歴情報26は、過去の履歴を実績マスタ
21を参照して取り出して編集し見易くしたものであ
る。例えばあるロット001の過去から現在までの作業
状況を見やすくまとめた情報である。
The history information 26 is obtained by extracting the past history with reference to the performance master 21 and editing it to make it easier to see. For example, it is information that summarizes the work status of a lot 001 from the past to the present in an easy-to-see manner.

【0022】計画/実行差異レポート27は、処理装置
1によって作成された日程表と、実績マスタ21に蓄積
された実績情報とを比較し、その差異を見やすく編集し
たレポートである。これにより、実績情報をもとに予測
手段14によって予測した残り処理時間をもとにし作成
した日程表による計画と、実際の実績情報とを比較し、
日程表による計画の差異を見やすく編集して表示など
し、日程表の評価を行うことが可能となる。
The plan / execution difference report 27 is a report in which the schedule created by the processing apparatus 1 is compared with the record information accumulated in the record master 21 and the difference is easily edited. As a result, the plan based on the schedule created based on the remaining processing time predicted by the prediction means 14 based on the actual result information is compared with the actual actual result information,
It becomes possible to evaluate the schedule by easily editing and displaying the differences in the schedule according to the schedule.

【0023】その他のレポート28は、目的に合わせて
蓄積マスタ21および日程表マスタ23をもとに編集し
て作成したレポートである。処理装置1は、実績マスタ
21から実績情報の転送を受け、この実績情報をもとに
予測して日程表や月単位の計画表などを自動生成するも
のであって、仕掛マスタ11、機械マスタ12、日程表
マスタ13、予測手段14、および日程表作成手段15
などから構成されるものである。
The other reports 28 are reports created by editing the accumulation master 21 and the schedule master 23 according to the purpose. The processing device 1 receives the transfer of the performance information from the performance master 21, automatically predicts based on the performance information, and automatically generates a schedule table, a monthly plan table, and the like. 12, schedule master 13, forecasting means 14, and schedule creation means 15
It is composed of etc.

【0024】仕掛マスタ11は、仕掛中のロットNoに
対応づけて予測した残り処理時間、工程コードなどを登
録して記憶するものである(図7参照)。機械マスタ1
2は、機械ID(グループID)に対応づけて使用する
機械IDを予め登録したものである(図6参照)。
The work-in-progress master 11 registers and stores the remaining processing time, the process code, etc. predicted in association with the lot No. in process (see FIG. 7). Machine master 1
A machine ID 2 is registered in advance in association with a machine ID (group ID) (see FIG. 6).

【0025】日程表マスタ13は、日程表作成手段15
によって作成された日程表や月単位の計画表を登録する
ものである(図5参照)。予測手段14は、実績マスタ
21から転送を受けた実績情報をもとに、残り処理時間
を予測するものである。この予測は、例えば工程マスタ
に設定されている当該工程にかかる処理時間より、(現
時刻から投入時刻を引いたもの)を減算し、残りの処理
時間として予測するようにしている。
The schedule table master 13 is a schedule table creating means 15
The schedule table and monthly plan table created by are registered (see FIG. 5). The predicting means 14 predicts the remaining processing time based on the record information transferred from the record master 21. In this prediction, for example, (the current time minus the input time) is subtracted from the processing time of the process set in the process master, and the remaining processing time is predicted.

【0026】日程表作成手段15は、予測手段14によ
って予測された工程毎の残り処理時間をもとに、日単位
の日程表、あるいは月単位の計画表などを作成するもの
である(図5参照)。
The schedule creation means 15 creates a daily schedule or a monthly plan based on the remaining processing time for each process predicted by the prediction means 14 (FIG. 5). reference).

【0027】次に、図2のフローチャートに示す順序に
従い、図1の構成の動作を詳細に説明する。図2は、本
発明の動作説明フローチャートを示す。
Next, the operation of the configuration of FIG. 1 will be described in detail according to the order shown in the flowchart of FIG. FIG. 2 shows a flowchart for explaining the operation of the present invention.

【0028】図2において、S1は、実績を入力する。
これは、図1の実績収集装置3の実績入力31から実績
を入力する。例えばロットの作業を開始するときに、右
側に記載したように、 ・投入時間: ・ロットNo: ・工程コード: ・その他: を入力する。ここで、投入時間は、ロットNoを投入し
た投入時の時間を入力(システムが自動的に入力)す
る。ロットNoは、仕掛のロットNoを入力、あるいは
新規のロットNoを入力する。工程コードは、仕掛のロ
ットNoあるいは新規のロットNoについて、作業を行
う工程のコードを入力する。これら投入時間、ロットN
o、工程コードなどは、実績情報として、後述する図3
の実績マスタ21に図示のように、ロットNoに対応づ
けて投入時間、工程コードとして蓄積する。
In FIG. 2, S1 inputs the actual result.
This inputs the actual result from the actual result input 31 of the actual result collection device 3 of FIG. For example, when starting the work of a lot, enter the following: ・ Input time: ・ Lot No: ・ Process code: ・ Others: as described on the right side. Here, as the input time, the time at the time of inputting the lot number is input (the system automatically inputs it). For the lot number, the in-process lot number is input or a new lot number is input. As the process code, the code of the process in which the work is performed is input for the lot number of the work in process or the new lot number. Input time, lot N
o, process code, etc. are shown in FIG.
As shown in the actual result master 21 of FIG.

【0029】S2は、日程表の作成指示を行う。これ
は、右側に記載したように、例えば ・作成期間:1週間 ・新規投入ロット: の指示する。ここで、作成期間は、日程表を作成する期
間(1週間)である。新規投入ロットは、新規に投入し
たロットについて日程表を作成することである。
In step S2, an instruction to create a schedule is given. As described on the right side, this is indicated, for example, by: ・ Preparation period: 1 week ・ New input lot: Here, the creation period is a period (one week) in which the itinerary is created. Newly input lot is to create a schedule for a newly input lot.

【0030】S3は、ロットの投入時間から現時刻まで
の予測し、仕掛マスタ11に格納する。これは、既に作
業を開始した仕掛ロットについて、図3の実績マスタ2
1を参照して残りの処理時間の有無、および残りの処理
時間があるときはその残りの処理時間を算出する。例え
ばロットNo“001”のロットは、図3の実績蓄積マ
スタ21を参照して ・ロットNo:001 ・投入時間 :95年5月31日 13時00分 ・工程コード:100 と判明したので、 工程コード“100”をもとに図4の工程マスタ2
2を参照して処理時間“2時間”を取り出す。
In step S3, the time from the lot loading time to the current time is predicted and stored in the in-process master 11. This is for the work-in-process lot that has already started work
With reference to 1, the presence / absence of the remaining processing time, and when there is the remaining processing time, the remaining processing time is calculated. For example, for the lot of lot No. “001”, refer to the result accumulation master 21 in FIG. 3. Lot No: 001 • Input time: May 31, 1995 13:00 • Process code: 100 Based on the process code “100”, the process master 2 of FIG.
The processing time "2 hours" is extracted with reference to 2.

【0031】 投入時間から現時刻までに経過した時
間を求める。例えば現時刻が14時00分とすると、 経過時間=現時刻“14時00分”−投入時間“13時
00分”=1時間00分 と求める。
The time elapsed from the input time to the current time is calculated. For example, assuming that the current time is 14:00, the elapsed time = current time "14:00" -input time "13:00" = 1 hour 00 is calculated.

【0032】 で処理時間は“2時間”であるの
で、で現在までに処理した時間は“1時間00分”で
あるので、残りの処理時間は、 残りの処理時間=処理に要する処理時間−(現時刻−投入時間) =2時間 −(14時00分−13時00分) =1時間 と算出できる。即ち、残りの処理時間は、1時間と予測
できたこととなる。このようにして予測した情報を、図
7の仕掛マスタ11に図示の下記のように格納して保存
する。
Since the processing time is “2 hours”, the processing time up to the present is “1 hour 00 minutes”, so the remaining processing time is: remaining processing time = processing time required for processing− (Current time-input time) = 2 hours- (14: 00-13: 00) = 1 hour. That is, the remaining processing time could be predicted to be 1 hour. The information thus predicted is stored and saved in the in-process master 11 in FIG. 7 as shown below.

【0033】 ロットNo 残り処理時間 工程コード 001 1.00時間 100 S4は、仕掛ロットの現時刻から計画および新規投入ロ
ットの現時刻からの計画を自動生成する。これは、ロッ
トについては、現時刻からの計画、即ちS3で予測した
ロットの場合には、現時間から残り処理時間が“1時
間”という計画を立案する。一方、新規投入ロットにつ
いては、現時刻から、例えば処理時間が2時間かかる工
程のものであれば、現時刻から2時間という計画を立
案、例えば後述する図5の日程表マスタ13に設定され
ているように立案する。尚、計画の立案時には、工程で
使用する機械が空いていなと計画できないので、後述す
る図6の機械マスタ12を参照して空いている機械を使
用など既知の計画の手法を使う。
Lot No. Remaining processing time Process code 001 1.00 hours 100 S4 automatically generates a plan from the current time of the in-process lot and a plan from the current time of the new input lot. For this lot, a plan is made from the current time, that is, in the case of the lot predicted in S3, a plan that the remaining processing time is "1 hour" from the current time is prepared. On the other hand, for a newly input lot, if the process takes 2 hours from the current time, for example, a plan of 2 hours from the current time is drafted, and is set in, for example, the schedule master 13 in FIG. 5 described later. Plan to be At the time of planning, it is not possible to plan if the machine used in the process is not available, so a known planning method such as using an available machine is used with reference to the machine master 12 of FIG.

【0034】以上によって、実績収集装置3から実績を
入力させて実績マスタ21に現状の実績情報をリアルタ
イムに蓄積し、日程表作成指示に対応して、蓄積マスタ
21を参照して、ロットの投入時間を取り出し、残り処
理時間を工程マスタ22から取り出した処理時間−(現
時刻−ロットの投入時間)として求め、この残り処理時
間があるときに当該残り処理時間として予測した日程表
を自動作成し、更に、新規投入ロットについては現時刻
から工程マスタ2から取り出した処理時間で日程表を自
動作成し、両者を合わせ図5の日程表を作成する。これ
により、最新の実績情報をもとに正確な日程表を自動作
成することが可能となる。
As described above, the actual result information is input from the actual result collection device 3 and the actual result information is accumulated in the actual result master 21 in real time, and the lot master is input in response to the schedule preparation instruction by referring to the accumulation master 21. The time is taken out, and the remaining processing time is obtained as the processing time taken from the process master 22- (current time-lot input time), and when there is this remaining processing time, a schedule table predicted as the remaining processing time is automatically created. Further, for a newly input lot, a schedule is automatically created at the processing time taken out from the process master 2 from the current time, and both are combined to create the schedule of FIG. This makes it possible to automatically create an accurate itinerary based on the latest performance information.

【0035】図3は、本発明の実績マスタ例を示す。こ
の実績マスタ21は、既述したように、実績収集装置3
の実績入力31によって入力された最新の実績情報を蓄
積したものである。実績マスタ21には、図示の下記の
ようにロットNoに対応づけて投入時間、工程コードを
蓄積する。
FIG. 3 shows an example of the result master of the present invention. As described above, the achievement master 21 has the achievement collecting device 3
The latest performance information input by the performance input 31 is stored. The actual time master 21 stores the charging time and the process code in association with the lot number as shown below.

【0036】 ロットNo 投入時間 工程コード 001 95/5/31 13:00 100 図4は、本発明の工程マスタ例を示す。この工程マスタ
22は、既述した図示の下記のように、工程名(工程コ
ード)に対応づけて処理に要する処理時間、処理に使用
する機械ID(使用する機械のグループID)、その他
を登録する。
Lot No. Input Time Process Code 001 95/5/31 13:00 100 FIG. 4 shows an example of the process master of the present invention. The process master 22 registers the processing time required for the process, the machine ID used for the process (group ID of the machine used), and the like in association with the process name (process code) as described below. To do.

【0037】 工程名(工程コード) 処理時間 機械ID その他 A(100) 2 A’ B(101) 3 B’ C(102) 4 C’ 図5は、本発明の日程表マスタ例を示す。この日程表マ
スタ13は、既述した図示の下記のように、ロットNo
に対応づけて立案した日単位の計画を設定する。
Process Name (Process Code) Processing Time Machine ID Others A (100) 2 A ′ B (101) 3 B ′ C (102) 4 C ′ FIG. 5 shows an example of a schedule master of the present invention. This itinerary master 13 is assigned the lot number as shown in the figure below.
Set up a daily plan that has been planned in association with.

【0038】 5/31 6/1 ロットNo 8 14 20 2 8 14 20 001 B C 002 A B C ここで、ロットNoは、ロットNoおよび新規投入のロ
ットNoである。5/31は、5月31日である。その
下の8、14、20は、その日の時刻、8時、14時、
20時である。B、Cなどは、工程名である。例えば
“B”には、ロットNo“001”のロットを、5月3
1日の8時に投入する旨の日程表を表す(8時に投入し
た後、当該“B”は、図4の工程マスタ22のBを参照
して処理時間が2時間であるので、10時には終わると
予測されるが、この日程表では投入時間のみを設定して
判り易くしている。内部的には、予測した10時以降に
次の処理を開始するように割り当てている)。
5/31 6/1 Lot No. 8 14 20 2 8 8 14 20 001 B C 002 A B C Here, the lot No. is the lot No. and the lot No. newly input. May 31st is May 31st. Below that, 8, 14, 20 are the time of the day, 8 o'clock, 14 o'clock,
It's 20:00. B, C, etc. are process names. For example, for “B”, the lot with the lot number “001” is set on May 3
Shows the schedule for the input at 8:00 on the day (After inputting at 8:00, the processing time for "B" is 2 hours with reference to B of the process master 22 in FIG. 4, so the processing ends at 10:00. However, in this itinerary, only the charging time is set to make it easy to understand. Internally, the next process is started after the predicted 10:00).

【0039】図6は、本発明の機械マスタ例を示す。こ
の機械マスタ12は、図示の下記のように、機械ID
(同じ工程で使用できる機械のグループID)に対応づ
けて使用できる機械ID(個別ID)を登録する。
FIG. 6 shows an example of a machine master of the present invention. This machine master 12 has a machine ID as shown below.
A machine ID (individual ID) that can be used is registered in association with (a group ID of machines that can be used in the same process).

【0040】 機械ID(グループID) 機械ID(個別ID) A’ A−1、A−2 B’ B−1、B−2、B−3 C’ C−1 この機械マスタ12を設けたことにより、日程表マスタ
13に設定した工程Aのときに使用する機械ID
“A’”について、当該機械ID“A’”のグループに
属する使用していない機械ID“A−2”などを割り当
てる。
Machine ID (Group ID) Machine ID (Individual ID) A ′ A-1, A-2 B ′ B-1, B-2, B-3 C ′ C-1 This machine master 12 is provided. Machine ID used in process A set in schedule master 13
For "A '", an unused machine ID "A-2" or the like belonging to the group of the machine ID "A'" is assigned.

【0041】図7は、本発明の仕掛マスタ例を示す。図
7の(a)は、仕掛マスタ例を示す。この仕掛マスタ1
1は、既述した図示の下記のように、ロットNoに対応
づけて残り処理時間、工程コードを登録し、ロットの残
り処理時間を管理するものである。
FIG. 7 shows an example of an in-process master of the present invention. FIG. 7A shows an example of an in-process master. This in-process master 1
1, the remaining processing time and the process code are registered in association with the lot number to manage the remaining processing time of the lot as described below.

【0042】 ロットNo 残り処理時間 工程コード 001 1.0時間 100 図7の(b)は、マスタ作成手順を示す。ここで、□の
内部は、工程コードを表し、ロットNo“001”が工
程コード“100”、“101”、“102”・・・と
いう工程を経て製造される工程順序を表す。
Lot No. Remaining processing time Process code 001 1.0 hours 100 FIG. 7B shows a master creation procedure. Here, the inside of the square represents the process code, and the lot No. "001" represents the process sequence of manufacturing through the process code "100", "101", "102" ....

【0043】この例では、 ロットNo:001 投入時間 95/5/31 13:00 工程コード:100 のロットについて、 現時刻 95/5/31 14:00 のときに、工程コード“100”における残り処理時間
の算出は、図示の下記のように求める。
In this example, lot No: 001 input time 95/5/31 13:00 process code: 100 lot, remaining at process code "100" at the current time 95/5/31 14:00. The processing time is calculated as shown below.

【0044】 残り処理時間=工程マスタの処理時間−(現時刻−投入時間) =2時間 −(14時00分−13時00分) =1時間 と求まる。従って、図7の(a)の残り処理時間の欄に
“1時間”と設定する。
Remaining processing time = process master processing time− (current time−input time) = 2 hours− (14: 00−13: 00) = 1 hour Therefore, "1 hour" is set in the column of the remaining processing time in (a) of FIG.

【0045】尚、工程マスタの処理時間は、図4の工程
マスタ22の工程コード“100”の処理時間“2”
(割り当てる機械は“A’”のグループに属する機械I
D“B−1”、“B−2”、“B−3”のうちの空いて
いる機械(図6参照))を取り出す。
The process time of the process master is the process time "2" of the process code "100" of the process master 22 of FIG.
(The assigned machine is a machine I belonging to the "A '" group.
D Take out the empty machine (see FIG. 6) of "B-1", "B-2", and "B-3").

【0046】[0046]

【発明の効果】以上説明したように、本発明によれば、
現場の進捗状況の実績を実績マスタ21に収集して保存
しておき、この実績マスタ21に保存した実績から残り
処理時間を予測して把握し、当該予測をもとに生産計画
を立案する構成を採用しているため、現場の実績をもと
に即時に生産計画(日程表、月単位の計画表など)を立
案することができる。これらにより、 (1) 実績収集装置3によってリアルタイムに実績情
報を収集して実績マスタ21に蓄積し、従来の人手によ
る実績報告のミスなどの発生がなく、正確かつ迅速に実
績情報をもとに実績を反映した生産計画を立案すること
が可能となった。
As described above, according to the present invention,
A configuration that collects and saves the actual results of the on-site progress in the actual result master 21, predicts and grasps the remaining processing time from the actual results saved in the actual result master 21, and makes a production plan based on the prediction. Since it adopts, it is possible to make a production plan (schedule, monthly schedule, etc.) immediately based on the actual results at the site. As a result, (1) The actual result information is collected in real time by the actual result collecting device 3 and accumulated in the actual result master 21. Accurate and promptly based on the actual result information without the occurrence of mistakes in the conventional actual result report. It is now possible to make a production plan that reflects the actual results.

【0047】(2) 実績収集装置3から各ロット毎の
最新の実績情報を収集して実績マスタ21に蓄積し、各
ロット毎の実績情報をもとに残りの処理時間を予測し当
該残り処理時間を反映したロットの生産計画(日程表な
ど)を自動作成しているため、最新のロット毎の実績情
報から予測した残り処理時間を反映した現状に合致する
生産計画を自動作成することが可能となる。
(2) The latest performance information for each lot is collected from the performance collection device 3 and accumulated in the performance master 21, and the remaining processing time is predicted based on the performance information for each lot, and the remaining processing is performed. Since a lot production plan (schedule, etc.) that reflects the time is automatically created, it is possible to automatically create a production plan that matches the current situation that reflects the remaining processing time predicted from the latest performance information for each lot. Becomes

【0048】(3) 実績情報をもとに生産計画を自動
作成しているため、従来の生産計画の立案サイクルが週
2度であったものが、いつでも即時に製品の進捗に見合
った生産計画を自動作成することが可能となった。
(3) Since the production plan is automatically created based on the performance information, the conventional production plan drafting cycle was twice a week. However, the production plan is always immediately commensurate with the progress of the product. It became possible to automatically create.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の1実施例構成図である。FIG. 1 is a configuration diagram of an embodiment of the present invention.

【図2】本発明の動作説明フローチャートである。FIG. 2 is a flowchart explaining the operation of the present invention.

【図3】本発明の実績マスタ例である。FIG. 3 is an example of a result master of the present invention.

【図4】本発明の工程マスタ例である。FIG. 4 is an example of a process master of the present invention.

【図5】本発明の日程表マスタ例である。FIG. 5 is an example of a schedule table master of the present invention.

【図6】本発明の機械マスタ例である。FIG. 6 is an example of a machine master of the present invention.

【図7】本発明の仕掛マスタ例である。FIG. 7 is an example of an in-process master of the present invention.

【符号の説明】[Explanation of symbols]

1:処理装置 11:仕掛マスタ 12:機械マスタ 13:日程表マスタ 14:予測手段 15:日程表作成手段 2:工程管理装置 21:実績マスタ 22:工程マスタ 23:日程表マスタ 24:日程表 25:各種レポート 26:履歴情報 27:計画/実行差異レポート 28:その他のレポート 3:実績収集装置 31:実績入力 1: Processing device 11: Work master 12: Machine master 13: Schedule master 14: Prediction means 15: Schedule creation means 2: Process management device 21: Actual master 22: Process master 23: Schedule master 24: Schedule 25 : Various reports 26: Historical information 27: Planning / execution difference report 28: Other reports 3: Actual collection device 31: Actual input

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】ロットの生産開始時のロット番号、投入時
間、工程コードからなる実績情報を収集して格納する実
績マスタと、 この実績マスタに収集されている実績情報中の各ロット
番号のロットの投入時間および現時刻から残り処理時間
を予測する予測手段と、 上記各ロットの残り処理時間、および新規に投入された
ロットの現時刻をもとに計画表を自動生成する作成手段
とを備えたことを特徴とする計画自動生成装置。
1. A performance master that collects and stores performance information including lot numbers at the start of production of lots, input times, and process codes, and a lot of each lot number in the performance information collected in the performance master. Prediction means for predicting the remaining processing time from the input time and the current time of the lot, and a creating means for automatically generating a planning table based on the remaining processing time of each lot and the current time of the newly introduced lot. A plan automatic generation device characterized in that
【請求項2】計画表作成指示に対応して、上記予測手段
が上記実績マスタに収集されている実績情報中の各ロッ
ト番号のロットの投入時間および現時刻から残り処理時
間を予測し、上記作成手段が各ロットの残り処理時間を
もとに計画表を自動生成することを特徴とする請求項1
記載の計画自動生成装置。
2. The remaining processing time is predicted from the input time and the current time of the lot of each lot number in the performance information collected in the performance master by the prediction means in response to the plan table creation instruction, The production means automatically produces a plan table based on the remaining processing time of each lot.
Automatic plan generation device described.
【請求項3】上記計画表が日単位の日程表あるいは月単
位の計画表としたことを特徴とする請求項1あるいは請
求項2記載の計画自動生成装置。
3. The automatic plan generating apparatus according to claim 1, wherein the plan table is a daily schedule table or a monthly plan table.
JP20192895A 1995-08-08 1995-08-08 Automatic plan generation device Pending JPH0950304A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP20192895A JPH0950304A (en) 1995-08-08 1995-08-08 Automatic plan generation device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP20192895A JPH0950304A (en) 1995-08-08 1995-08-08 Automatic plan generation device

Publications (1)

Publication Number Publication Date
JPH0950304A true JPH0950304A (en) 1997-02-18

Family

ID=16449121

Family Applications (1)

Application Number Title Priority Date Filing Date
JP20192895A Pending JPH0950304A (en) 1995-08-08 1995-08-08 Automatic plan generation device

Country Status (1)

Country Link
JP (1) JPH0950304A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20010011837A (en) * 1999-07-30 2001-02-15 정선종 Automated process planning method
JP2001282346A (en) * 2000-04-03 2001-10-12 Class Technology Co Ltd System and method for managing production and computer readable recording medium with production management program stored
JP2002032114A (en) * 2000-07-18 2002-01-31 Idemitsu Petrochem Co Ltd Information transfer method and computer readable recording medium recorded with program for executing the method
JP2003337610A (en) * 2002-05-20 2003-11-28 Yamatake Corp Production management system equipped with lot-tracing function
KR100473066B1 (en) * 2002-03-25 2005-03-09 주식회사 에코시안 Method for splitting and allocation ratio setting of life cycle assessment
WO2018155718A1 (en) * 2017-02-27 2018-08-30 丸市倉庫株式会社 Information processing system

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20010011837A (en) * 1999-07-30 2001-02-15 정선종 Automated process planning method
JP2001282346A (en) * 2000-04-03 2001-10-12 Class Technology Co Ltd System and method for managing production and computer readable recording medium with production management program stored
JP2002032114A (en) * 2000-07-18 2002-01-31 Idemitsu Petrochem Co Ltd Information transfer method and computer readable recording medium recorded with program for executing the method
KR100473066B1 (en) * 2002-03-25 2005-03-09 주식회사 에코시안 Method for splitting and allocation ratio setting of life cycle assessment
JP2003337610A (en) * 2002-05-20 2003-11-28 Yamatake Corp Production management system equipped with lot-tracing function
WO2018155718A1 (en) * 2017-02-27 2018-08-30 丸市倉庫株式会社 Information processing system
JPWO2018155718A1 (en) * 2017-02-27 2019-11-21 丸市倉庫株式会社 Information processing system
JP2021036474A (en) * 2017-02-27 2021-03-04 丸市倉庫株式会社 Information processing system

Similar Documents

Publication Publication Date Title
JP2746264B2 (en) Work management method and management device
US6714829B1 (en) Dual path scheduling method
JPH09153090A (en) Method and device for forming working process production plan
JPS6226510A (en) Process plan information processor
JPH0950304A (en) Automatic plan generation device
JPH1034499A (en) Capacity information gathering method for production facility and production control system
JPH11120248A (en) System and method for scheduling production
JP2000214905A (en) Work management supporting device
CN111882693A (en) Information processing method and device for employee outwork, electronic equipment and medium
JPS63150140A (en) Operation plan preparing device
JPH06348720A (en) Production development control display device
JPH10261012A (en) Construction plan support system
JPH06176032A (en) System and method for production control
JPH077286B2 (en) Flow shop production system simulation device
JPH0373257A (en) Production scheduling device
JPH10320038A (en) Plant document processing system
JPH02310703A (en) Process managing device
JPS63312050A (en) Production condition forecasting type production control system
JPH06101005B2 (en) Machining process plan creation device for individual production
JPH10134040A (en) Managing method for time scale and time expression display device
JP2007272497A (en) Progress management system of business process
JPH064539A (en) Patrol support system
JP2005267521A (en) Method and system for placing nurse
JP2008305308A (en) Device for creating production planning
JP2000222029A (en) Management device of operation information and recording medium