JPH09317187A - Column erection adjusting jig - Google Patents

Column erection adjusting jig

Info

Publication number
JPH09317187A
JPH09317187A JP13647396A JP13647396A JPH09317187A JP H09317187 A JPH09317187 A JP H09317187A JP 13647396 A JP13647396 A JP 13647396A JP 13647396 A JP13647396 A JP 13647396A JP H09317187 A JPH09317187 A JP H09317187A
Authority
JP
Japan
Prior art keywords
erection
jack
piece
pillar
column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP13647396A
Other languages
Japanese (ja)
Other versions
JP3048924B2 (en
Inventor
Hirotoshi Ikeda
宏俊 池田
Hiroyuki Kaga
洋行 加賀
Takao Kanai
隆夫 金井
Atsunari Motooka
功成 本岡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Corp
Original Assignee
Taisei Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taisei Corp filed Critical Taisei Corp
Priority to JP8136473A priority Critical patent/JP3048924B2/en
Publication of JPH09317187A publication Critical patent/JPH09317187A/en
Application granted granted Critical
Publication of JP3048924B2 publication Critical patent/JP3048924B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a column erection adjusting jig increasing strength to operating force with the expansion of a jack with a simple construction in the column erection adjusting jig used for adding a new column vertically to the existing column. SOLUTION: Two splice plates 31 arranged by holding a column erection adjusting jig over up and down erection pieces 21 and 22 and bearing pieces 32 for bearing both ends in the expansion direction are formed together as a unit. Mounting members 43 are fixed to both ends in the expansion direction of a jack 4, and base sections 43a of them are so constructed that the end faces of the bearing pieces 32 are held in a contact state.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、既設の柱の上に新
設の柱を鉛直に継ぎ足すために使用される柱建て入れ調
整治具に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a column erection adjustment jig used to vertically add a new column to an existing column.

【0002】[0002]

【従来の技術】既設の柱の上に新設の柱を継ぎ足す方法
としては、例えば図9および10に示すように、先ず、
既設の柱eの側面上部と新設の柱aの側面下部に、エレ
クションピース(長手方向に沿って複数個のボルト穴を
形成した長方形の板)cを溶接しておく。新設の柱aの
エレクションピースcは二枚のスプライスプレート(上
下のエレクションピースを連結する板)bで挟んでこれ
らを上端一本のボルトで仮付けしてあり、この新設の柱
aをクレーンでつり込み、既設の柱eの上に乗せる。こ
のとき、二枚のスプライスプレートbで既設の柱eのエ
レクションピースcを挟み、各穴にボルトを通してナッ
トで締めつけることにより仮止めする。
2. Description of the Related Art As a method of adding a new column to an existing column, first, as shown in FIGS.
An erection piece (a rectangular plate having a plurality of bolt holes formed in the longitudinal direction) c is welded to the upper side surface of the existing column e and the lower side surface of the new column a. The erection piece c of the newly installed pillar a is sandwiched between two splice plates (plates that connect the upper and lower erection pieces) b, and these are temporarily attached with a bolt at the upper end. Suspend and put it on the existing pillar e. At this time, the erection piece c of the existing pillar e is sandwiched between the two splice plates b, and bolts are passed through the holes and tightened with nuts for temporary fixing.

【0003】ここで、上下のエレクションピースcの少
なくとも一方のボルト穴、またはスプライスプレートb
のボルト穴はバカ穴になっているため、ボルト締結後も
歪みワイヤロープ等による大きな力によって新設の柱の
位置および姿勢を調整することができる。
Here, at least one of the upper and lower erection pieces c has a bolt hole or a splice plate b.
Since the bolt hole of is a stupid hole, it is possible to adjust the position and posture of the newly installed column by a large force of the strained wire rope or the like even after the bolt is fastened.

【0004】また、図10に示すように、上下のエレク
ションピースc間に楔fをハンマーgで打ち込んで、新
設の柱aの鉛直度を調整して自立させた後にクレーンか
ら柱を外し、ここで新設の柱aの上部から図示しない歪
ワイヤロープを張ってその張力を調節しながら新設の柱
aの相対的な傾きを修正して鉛直となるようにする。こ
の状態で既設の柱eと新設の柱aとの間を溶接する。
Further, as shown in FIG. 10, a wedge f is hammered between the upper and lower erection pieces c by a hammer g to adjust the verticality of a newly installed pillar a so that the pillar a is self-supported, and then the pillar is removed from the crane. Then, a strained wire rope (not shown) is stretched from the upper part of the new column a to adjust the tension, and the relative inclination of the new column a is corrected so that it becomes vertical. In this state, the existing column e and the new column a are welded.

【0005】しかしながら、この方法では、歪ワイヤロ
ープを張って柱の傾きを調節するため、ロープを貼った
り撤去したりする作業が高所作業となるため安全性の点
で改善の余地があるとともに、このロープが他の作業の
邪魔になって作業効率が良くないという問題点があるた
め、歪ワイヤロープを使用しない方法も提案されてい
る。
However, in this method, since the strained wire rope is stretched to adjust the inclination of the column, the work of attaching and removing the rope is performed at a high place, and there is room for improvement in terms of safety. Since there is a problem that this rope interferes with other work and the work efficiency is not good, a method without using the strained wire rope has been proposed.

【0006】例えば、特公平6−80270号公報に
は、歪ワイヤロープの代わりにジャッキを使用する方法
が記載されており、この方法では、既設の柱と新設の柱
との間を、接合板を介してボルト・ナットにより仮止め
するとともに、ジャッキの伸縮方向両端は、前記接合板
とは別体のブラケットを介して各柱の側面に固定してい
る。このブラケットは、ジャッキ取付穴を先端に有する
板材を柱側面から突出させたものであり、ジャッキ上端
の伸縮軸先端とジャッキ下端にある取付穴と、ブラケッ
トのジャッキ取付穴とを合わせてこれらにピンを貫通さ
せることにより、両柱間にジャッキを取り付けている。
For example, Japanese Patent Publication No. 6-80270 discloses a method of using a jack instead of a strained wire rope. In this method, a joining plate is provided between an existing column and a new column. The jacks are temporarily fixed by bolts and nuts, and both ends in the expansion and contraction direction of the jack are fixed to the side surfaces of the columns through brackets that are separate from the joint plate. This bracket is made by projecting a plate material that has a jack mounting hole at the tip from the side of the pillar.Match the tip of the telescopic shaft at the top of the jack and the mounting hole at the bottom of the jack with the jack mounting hole of the bracket, The jack is attached between both pillars by passing through.

【0007】[0007]

【発明が解決しようとする課題】しかしながら、特公平
6−80270号公報に記載の方法において、前記ブラ
ケットは、ジャッキの伸縮に伴って作用する力に対する
強度について特に考慮された構造とはなっていなかっ
た。すなわち、前記ブラケットの構造では、ジャッキの
伸縮力がブラケットを介して柱に伝達される際に前記ピ
ンに負担がかかるという不具合がある。
However, in the method disclosed in Japanese Patent Publication No. 6-80270, the bracket does not have a structure in which the strength against the force acting with the expansion and contraction of the jack is particularly taken into consideration. It was That is, in the structure of the bracket, there is a problem that a load is applied to the pin when the expansion and contraction force of the jack is transmitted to the column via the bracket.

【0008】本発明は、このような点に着目してなされ
たものであり、既設の柱の上に新設の柱を鉛直に継ぎ足
すために使用される柱建て入れ調整治具において、簡単
な構造で、ジャッキの伸縮に伴って作用する力に対する
強度が高くなるものを提供することを課題とする。
The present invention has been made by paying attention to such a point, and a simple pillar-installing adjustment jig used to vertically add a new pillar to an existing pillar is simple. An object of the present invention is to provide a structure having a high strength against a force acting as the jack expands and contracts.

【0009】[0009]

【課題を解決するための手段】上記目的を達成するため
に、請求項1に係る発明は、既設の柱の側面上部に固定
される下側エレクションピースと、新設の柱の側面下部
に固定される上側エレクションピースと、各側面毎に上
下のエレクションピースに渡ってこれを挟んで配置され
る二枚のスプライスプレートと、上下のエレクションピ
ースの間隔を調整するジャッキと、スプライスプレート
の外側(板幅方向の柱側面とは反対側)に配置されて前
記ジャッキの伸縮方向両端を支持する支持ピースと、を
備え、前記支持ピースは、スプライスプレートまたはエ
レクションピースと一体化されているとともに、前記ジ
ャッキの両端部は支持ピースの端面に接触配置される接
触面を有することを特徴とする柱建て入れ調整治具を提
供する。
In order to achieve the above object, the invention according to claim 1 is a lower erection piece fixed to an upper part of a side surface of an existing pillar and a lower erection piece fixed to a lower part of a side surface of a new pillar. Upper erection piece, two splice plates that are sandwiched between the upper and lower erection pieces on each side, a jack that adjusts the spacing between the upper and lower erection pieces, and the outside (plate width) of the splice plate. A support piece that is disposed on the side opposite to the column side surface in the direction) and supports both ends in the expansion and contraction direction of the jack, the support piece being integrated with a splice plate or an erection piece, and (EN) Provided is a column erection adjusting jig, characterized in that both ends have contact surfaces arranged to contact the end surfaces of a support piece.

【0010】請求項2に係る発明は、既設の柱の側面上
部に固定される下側エレクションピースと、新設の柱の
側面下部に固定される上側エレクションピースと、各側
面毎に上下のエレクションピースに渡ってこれを挟んで
配置される二枚のスプライスプレートと、上下のエレク
ションピースの間隔を調整するジャッキと、スプライス
プレートの外側(板幅方向の柱側面とは反対側)に配置
されて前記ジャッキの伸縮方向両端を支持する支持ピー
スと、を備え、前記支持ピースは、スプライスプレート
およびエレクションピースに挟んで配置される取付ピー
スと一体化されているとともに、前記ジャッキの両端部
は支持ピースの端面に接触配置される接触面を有するこ
とを特徴とする柱建て入れ調整治具を提供する。
According to a second aspect of the present invention, a lower erection piece fixed to an upper portion of a side surface of an existing pillar, an upper erection piece fixed to a lower portion of a side surface of a new pillar, and upper and lower erection pieces for each side surface are provided. The two splice plates that are placed across it, the jack that adjusts the gap between the upper and lower erection pieces, and the splice plate that is placed outside (on the side opposite to the side surface of the column in the width direction) the aforesaid A supporting piece for supporting both ends of the jack in the expansion and contraction direction, the supporting piece being integrated with a mounting piece sandwiched between the splice plate and the erection piece, and both ends of the jack being the supporting piece of the supporting piece. Provided is a pillar erection adjusting jig having a contact surface arranged in contact with an end surface.

【0011】[0011]

【発明の実施の形態】以下、本発明の実施形態について
図面に基づいて説明する。図1は本発明の一実施形態に
相当する柱建て入れ調整治具を示す斜視図であり、図2
はこの柱建て入れ調整治具を柱に取付けた状態を示す正
面図である。
Embodiments of the present invention will be described below with reference to the drawings. 1 is a perspective view showing a pillar erection adjusting jig corresponding to an embodiment of the present invention.
[Fig. 3] is a front view showing a state in which this pillar erection adjusting jig is attached to a pillar.

【0012】これらの図に示すように、この柱建て入れ
調整治具は、既設の柱12の側面上部に固定される下側
エレクションピース22と、新設の柱11の側面下部に
固定される上側エレクションピース21と、各側面毎に
上下のエレクションピース21,22に渡ってこれを挟
んで配置される二枚のスプライスプレート31と、上下
のエレクションピース21,22の間隔を調整するジャ
ッキ4と、ジャッキ4の伸縮方向両端を支持する支持ピ
ース32と、で構成されている。
As shown in these drawings, the pillar erection adjustment jig includes a lower erection piece 22 fixed to the upper side surface of an existing pillar 12 and an upper erection piece 22 fixed to the lower side surface of a new pillar 11. An erection piece 21, two splice plates 31 arranged across the upper and lower erection pieces 21, 22 for each side surface, and a jack 4 for adjusting the interval between the upper and lower erection pieces 21, 22; Support pieces 32 that support both ends of the jack 4 in the expansion and contraction direction.

【0013】上下のエレクションピース21,22は、
従来と同様に、長方形の板材からなり、その長手方向に
沿って等間隔で三個のボルト穴21a,22aが形成さ
れている。
The upper and lower erection pieces 21 and 22 are
As in the conventional case, it is made of a rectangular plate material, and three bolt holes 21a, 22a are formed at equal intervals along the longitudinal direction thereof.

【0014】スプライスプレート31と支持ピース32
は、L型に切り出された板材3として一体に形成されて
いる。この板材3のLの縦棒部分に相当する長方形のス
プライスプレート31は、長さがエレクションピース2
1,22二枚分の長さより少し長く、上側エレクション
ピース21のボルト穴21aに対応する三個のボルト穴
3aと、下側エレクションピース22のボルト穴22a
に対応する三個の長穴3bとが形成されている。
Splice plate 31 and support piece 32
Are integrally formed as a plate member 3 cut out in an L shape. The rectangular splice plate 31 corresponding to the L vertical bar portion of the plate member 3 has a length of the erection piece 2
The bolt holes 22a of the lower erection piece 22 and the three bolt holes 3a of the upper erection piece 21 which are slightly longer than the lengths of the first and second 22 pieces.
Is formed with three elongated holes 3b.

【0015】そして、スプライスプレート31をなす長
方形の、長手方向端から二つのボルト穴3aが形成され
た部分の幅は外側(柱側と反対側)に拡げてあり、この
部分が支持ピース32となっている。この支持ピース3
2には、ボルト穴3aと並列に二つのボルト穴3cが形
成されている。
The width of the rectangular portion of the splice plate 31, in which the two bolt holes 3a are formed, extends outward (on the side opposite to the pillar side) from the end in the longitudinal direction. Has become. This support piece 3
Two bolt holes 3c are formed in 2 in parallel with the bolt holes 3a.

【0016】ジャッキ4は、上下に逆ネジを切った高ナ
ット41の両端にネジ軸42が螺合され、各ネジ軸42
の端面に、支持ピース32への取付部材43が固着され
たものである。この取付部材43は、一方の面の中心部
にネジ軸42の端面が固定された正方形の台部43a
と、その中心部から同じ幅で垂直に支持ピース32の長
さ分だけ延びた側板部43bと、ここから直角に折れ曲
がった爪部43cとで構成され、側板部43bには支持
ピース32のネジ穴3cに対応するネジ穴43dが形成
されている。なお、ジャッキ4の両端の爪部43cは、
互いに反対となる側に側板部43bから折れ曲がってい
る。また、台部43aのネジ軸42とは反対の面が、本
発明の接触面に相当する。
In the jack 4, screw shafts 42 are screwed onto both ends of a high nut 41 having a reverse screw thread cut up and down.
The attachment member 43 to the support piece 32 is fixed to the end surface of the. The mounting member 43 has a square base portion 43a in which the end surface of the screw shaft 42 is fixed to the center portion of one surface.
And a side plate portion 43b that extends vertically from the center portion by the length of the support piece 32 with the same width, and a claw portion 43c that is bent at a right angle from the side plate portion 43b. The side plate portion 43b has a screw of the support piece 32. A screw hole 43d corresponding to the hole 3c is formed. The claw portions 43c at both ends of the jack 4 are
The side plate portions 43b are bent on opposite sides. The surface of the base portion 43a opposite to the screw shaft 42 corresponds to the contact surface of the present invention.

【0017】したがって、柱建て入れの際には、既設の
柱12に新設の柱11を乗せた状態で、対応する上下の
エレクションピース21,22を、上下を逆に且つ支持
ピース32を柱から離れる側に配置した二枚の板材3で
挟み、例えば上側については一方の板材3側から、スプ
ライスプレート31のボルト穴3a、エレクションピー
ス21のボルト穴21a、スプライスプレート31の長
穴3bの順で貫通させたボルトの先端にナットを螺合さ
せ、下側については他方の板材3側から同じ順で貫通さ
せたボルトの先端にナットを螺合させることで、両板材
3のスプライスプレート31側を上下のエレクションピ
ース21,22に仮止めする。
Therefore, when installing a pillar, the corresponding upper and lower erection pieces 21 and 22 are turned upside down and the support piece 32 is removed from the pillar with the new pillar 11 placed on the existing pillar 12. It is sandwiched between two plate materials 3 arranged on the side away from each other. For example, for the upper side, from one plate material 3 side, the bolt hole 3a of the splice plate 31, the bolt hole 21a of the erection piece 21, and the elongated hole 3b of the splice plate 31 are arranged in this order. A nut is screwed on the tip of the penetrated bolt, and a nut is screwed on the tip of the bolt penetrated in the same order from the other plate 3 side on the lower side. Temporarily fix to the upper and lower erection pieces 21 and 22.

【0018】これと同時に、上下の取付部材43の台部
43aと爪部43cとの間に各板材3の支持ピース32
を嵌め込んで、支持ピース32が上側に配置された側
(図1の手前側の板材3)では支持ピース32の下端面
を台部43aの上面に、支持ピース32が下側に配置さ
れた側(図1の置く側の板材3)では支持ピース32の
上端面を台部43aの下面に、それぞれ接触させた状態
で、側板部43bのネジ穴43dと支持ピース32のネ
ジ穴3cとにボルトを貫通させ、その先端にナットを螺
合させることで、ジャッキ4を板材3の支持ピース32
に固定する。
At the same time, the support piece 32 of each plate member 3 is provided between the base portion 43a and the claw portion 43c of the upper and lower mounting members 43.
And the support piece 32 is arranged on the upper side (the plate material 3 on the front side in FIG. 1), the lower end surface of the support piece 32 is arranged on the upper surface of the base portion 43a, and the support piece 32 is arranged on the lower side. On the side (the plate member 3 on the side to be placed in FIG. 1), the upper end surface of the support piece 32 is brought into contact with the lower surface of the base portion 43a, and in the screw hole 43d of the side plate portion 43b and the screw hole 3c of the support piece 32. The jack 4 is inserted into the support piece 32 of the plate member 3 by passing the bolt therethrough and screwing the nut onto the tip of the bolt.
Fixed to.

【0019】この状態でジャッキ4の高ナット41を回
転すると、仮止めされているボルトがスプライスプレー
ト31の長穴3bで長手方向に移動するため、柱の各側
面における上下のエレクションピース21,22の間隔
を調整することができる。ここで、取付部材43の台部
43aと支持ピース32の端面とが面接触していること
と、二枚の板材3のスプライスプレート31とこれに挟
まれたエレクションピース21,22とを貫通する上下
各三本のボルトの存在によって、この実施形態の柱建て
入れ調整治具は、従来の構造と比較してジャッキ4の伸
縮に伴って作用する力に対する強度が高いものとなる。
また、この調整によって新設の柱11が既設の柱12の
上に鉛直に配置された時点で、スプライスプレート31
のボルトを本締めする。そして、この本締めが終われ
ば、直ちに(上下の柱の溶接前に)ジャッキ4を支持プ
レート32から外して他の柱の継ぎ足しに使用すること
ができる。
When the high nut 41 of the jack 4 is rotated in this state, the temporarily fixed bolt moves in the longitudinal direction in the elongated hole 3b of the splice plate 31, so that the upper and lower erection pieces 21 and 22 on each side surface of the pillar are moved. You can adjust the interval. Here, the base portion 43a of the mounting member 43 and the end surface of the support piece 32 are in surface contact with each other, and the splice plate 31 of the two plate members 3 and the erection pieces 21 and 22 sandwiched therebetween are penetrated. Due to the presence of the upper and lower three bolts, the pillar erection adjustment jig of this embodiment has a higher strength against the force acting as the jack 4 expands and contracts, as compared with the conventional structure.
Further, by this adjustment, when the newly installed pillar 11 is vertically arranged on the existing pillar 12, the splice plate 31
Fully tighten the bolt. Then, after the final tightening is completed, the jack 4 can be immediately removed (before welding the upper and lower columns) from the support plate 32, and the jack 4 can be used to add another column.

【0020】図3および4は、本発明の別の実施形態に
相当する柱建て入れ調整治具を示す斜視図およびその取
付け状態を示す正面図である。この実施形態では、エレ
クションピース21,22のボルト穴21a,22a形
成部分と同じ形状の取付ピース61を備え、この取付ピ
ース61に支持ピース62を一体化している。すなわ
ち、取付ピース61と支持ピース62を一体化した板材
6は、取付ピース61をなす長方形の長手方向中間部分
の幅を外側(柱側と反対側)に拡げた形状にしてあり、
この部分が支持ピース62となっている。この支持ピー
ス62には、ボルト穴61aと並列に一つのボルト穴6
2aが形成されている。
3 and 4 are a perspective view and a front view showing a mounting state of a pillar erection adjusting jig corresponding to another embodiment of the present invention. In this embodiment, a mounting piece 61 having the same shape as the bolt holes 21a and 22a forming portions of the erection pieces 21 and 22 is provided, and the supporting piece 62 is integrated with the mounting piece 61. That is, the plate member 6 in which the attachment piece 61 and the support piece 62 are integrated has a shape in which the width of the intermediate portion in the longitudinal direction of the rectangle forming the attachment piece 61 is expanded to the outside (the side opposite to the pillar side).
This portion serves as the support piece 62. This support piece 62 has one bolt hole 6 in parallel with the bolt hole 61a.
2a is formed.

【0021】そして、使用の際には、上下を反対に配置
した二枚のスプライスプレート5の間に、上下で各エレ
クションピース21,22と板材6を挟んで、スプライ
スプレート5のボルト穴3a、各エレクションピース2
1,22のボルト穴21a,22a、取付ピース61の
ボルト穴61a、スプライスプレート5の長穴3bを貫
通させたボルトの先端にナットを螺合させるとともに、
上下の支持ピース62の間にボルト穴62aを利用して
ジャッキ7を取り付ける。ここで、ジャッキ7は、図5
に示すように、前述のジャッキ4と同様に、上下に逆ネ
ジを切った高ナット71の両端にネジ軸72が螺合され
たものであるが、各ネジ軸72の端面に固着された支持
ピース62への取付部材73の構造は、前記ジャッキ4
の場合の取付部材43と異なるものである。
In use, the erection pieces 21 and 22 and the plate member 6 are vertically sandwiched between two splice plates 5 arranged upside down, and the bolt holes 3a of the splice plate 5 are Each erection piece 2
The nuts are screwed into the tips of the bolts penetrating the bolt holes 21a and 22a of 1 and 22, the bolt hole 61a of the mounting piece 61, and the elongated hole 3b of the splice plate 5, and
The jack 7 is attached between the upper and lower support pieces 62 using the bolt holes 62a. Here, the jack 7 is shown in FIG.
As shown in FIG. 4, similar to the jack 4 described above, a high nut 71 having a reverse thread cut up and down is screwed with screw shafts 72 at both ends, but a support fixed to the end surface of each screw shaft 72 is provided. The structure of the attachment member 73 to the piece 62 is the same as that of the jack 4
This is different from the mounting member 43 in the case of.

【0022】この取付部材73は、一方の面の中心部に
ネジ軸72の端面が固定された正方形の台部73aと、
その平行な二辺から垂直に支持ピース62の長さ分だけ
延びた二枚の側板部73bとで構成され、両側板部73
bには支持ピース62のネジ穴62aに対応するネジ穴
73cが形成されている。そして、取付部材73は、支
持ピース62のネジ穴62aおよび取付部材73のネジ
穴73cにボルトを貫通させたときに、支持ピース62
の端面が台部73aの内面に接触するようになってい
る。すなわち、台部73aの内面(ネジ軸72とは反対
の面)が、本発明の接触面に相当する。
The mounting member 73 has a square base 73a having the end surface of the screw shaft 72 fixed to the center of one surface thereof.
It is composed of two side plate portions 73b vertically extending from the two parallel sides by the length of the support piece 62.
A screw hole 73c corresponding to the screw hole 62a of the support piece 62 is formed in b. Then, when the bolt penetrates the screw hole 62a of the support piece 62 and the screw hole 73c of the mount member 73, the mounting member 73 is attached to the support piece 62.
The end surface of is contacted with the inner surface of the base 73a. That is, the inner surface of the base 73a (the surface opposite to the screw shaft 72) corresponds to the contact surface of the present invention.

【0023】したがって、この実施形態でも、前記実施
形態と同様に、ジャッキ7の伸縮で上下のエレクション
ピース21,22の間隔を調整する際に、取付部材73
の台部73aと支持ピース62の端面とが面接触してい
ることと、二枚のスプライスプレート5とエレクション
ピース21,22と板材6の取付ピース61とを貫通す
る上下各三本のボルトの存在によって、従来の構造と比
較してジャッキ4の伸縮に伴って作用する力に対する強
度が高いものとなる。また、この調整によって新設の柱
11が既設の柱12の上に鉛直に配置された時点で、ス
プライスプレート5のボルトを本締めすれば、直ちにジ
ャッキ7を支持プレート62から外すことができる。
Therefore, also in this embodiment, as in the case of the above-described embodiment, when the distance between the upper and lower erection pieces 21 and 22 is adjusted by expanding and contracting the jack 7, the mounting member 73 is used.
That the base 73a and the end face of the support piece 62 are in surface contact, and that the upper and lower three bolts that penetrate the two splice plates 5, the erection pieces 21 and 22 and the mounting piece 61 of the plate member 6 Due to the existence, the strength against the force acting with the expansion and contraction of the jack 4 is higher than that of the conventional structure. Further, by this adjustment, when the new column 11 is vertically arranged on the existing column 12, the bolts of the splice plate 5 can be fully tightened to immediately remove the jack 7 from the support plate 62.

【0024】これに加えて、この実施形態では、従来の
スプライスプレート5の形状を変えないでそのまま使用
できるため、コストを低減できる効果もある。図6は、
本発明の別の実施形態に相当する柱建て入れ調整治具の
取付け状態を示す正面図であり、この実施形態では、各
エレクションピース21,22の長手方向中間部分の幅
を外側(柱側と反対側)に拡げた形状にすることによっ
て、支持ピース62を各エレクションピース21,22
に一体化しており、上下各三本のボルトが貫通されるの
は、二枚のスプライスプレート5とエレクションピース
21,22になるが、その他の点については前述の図3
および4が示すものと同一である。
In addition to this, in this embodiment, since the shape of the conventional splice plate 5 can be used as it is, the cost can be reduced. FIG.
It is a front view which shows the attachment state of the pillar erection adjustment jig corresponding to another embodiment of the present invention. In this embodiment, the width of the longitudinal middle portion of each erection piece 21 and 22 is outside (to the pillar side). By forming the support piece 62 into the erection pieces 21, 22 by expanding the shape to the opposite side).
The three bolts are inserted through the upper and lower parts of the splice plate 5 and the erection pieces 21 and 22. However, other points are shown in FIG.
And 4 are the same.

【0025】したがって、前記効果に加えて、図3およ
び4が示す実施形態と比べて部品点数が少なくなる効果
がある。なお、本発明で使用可能なジャッキとしては、
前記各実施形態のようなネジ式のジャッキ4,7に限定
されず、例えば図7および8に示すように、油圧や空気
圧などの流体圧で伸縮するジャッキ8,9を用いてもよ
い。図7のジャッキ8は、伸縮方向両端面に図5と同様
の取付部材73が固定してあり、前記と同様に、この取
付部材73に対して支持ピース62がボルトで取り付け
られる。図8のジャッキ9は市販の油圧ジャッキであっ
て特に取付部材を固定していない例であり、ジャッキ9
の伸縮軸91の上板91aに上側の支持ピース62を乗
せ、ジャッキ9の基部92を下側の支持ピース62の上
に乗せている。この場合には、上板91aの上面および
基部92の下面が、本発明の接触面に相当する。
Therefore, in addition to the above-mentioned effects, there is an effect that the number of parts is reduced as compared with the embodiment shown in FIGS. In addition, as the jack that can be used in the present invention,
The jacks 4 and 7 are not limited to the screw type jacks 4 and 7 as in the above embodiments, and jacks 8 and 9 that expand and contract by fluid pressure such as hydraulic pressure or air pressure may be used as shown in FIGS. 7 and 8, for example. In the jack 8 of FIG. 7, mounting members 73 similar to those of FIG. 5 are fixed to both end surfaces in the expansion / contraction direction, and similarly to the above, the support piece 62 is mounted to the mounting members 73 with bolts. The jack 9 shown in FIG. 8 is a commercially available hydraulic jack in which the mounting member is not fixed.
The upper support piece 62 is placed on the upper plate 91a of the expansion / contraction shaft 91, and the base portion 92 of the jack 9 is placed on the lower support piece 62. In this case, the upper surface of the upper plate 91a and the lower surface of the base portion 92 correspond to the contact surface of the present invention.

【0026】[0026]

【発明の効果】以上説明したように、請求項1の発明に
よれば、既設の柱の上に新設の柱を鉛直に継ぎ足すため
に使用される柱建て入れ調整治具において、スプライス
プレートまたはエレクションピースと一体化されたジャ
ッキ取付用の支持ピースを備え、支持ピースの端面に接
触配置される接触面をジャッキの両端部に設けるという
簡単な構造で、柱建て入れ調整治具のジャッキの伸縮に
伴って作用する力に対する強度を高くすることができ
る。
As described above, according to the first aspect of the invention, in the pillar erection adjustment jig used to vertically add the new pillar to the existing pillar, the splice plate or Equipped with a jack mounting support piece that is integrated with the erection piece, and a simple structure in which the contact surfaces that come into contact with the end surface of the support piece are provided at both ends of the jack. It is possible to increase the strength with respect to the force acting along with.

【0027】請求項2の発明によれば、既設の柱の上に
新設の柱を鉛直に継ぎ足すために使用される柱建て入れ
調整治具において、スプライスプレートおよびエレクシ
ョンピースに挟んで配置される取付ピースに一体化され
たジャッキ取付用の支持ピースを備え、支持ピースの端
面に接触配置される接触面をジャッキの両端部に設ける
という簡単な構造で、柱建て入れ調整治具のジャッキの
伸縮に伴って作用する力に対する強度を高くすることが
できる。
According to the second aspect of the present invention, in the pillar erection adjusting jig used to vertically add the new pillar to the existing pillar, the pillar erection adjusting jig is arranged so as to be sandwiched between the splice plate and the erection piece. It has a support piece for jack mounting that is integrated with the mounting piece, and has a simple structure in which the contact surfaces that come into contact with the end surface of the support piece are provided at both ends of the jack. It is possible to increase the strength with respect to the force acting along with.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の一実施形態に相当する柱建て入れ調整
治具を示す斜視図である。
FIG. 1 is a perspective view showing a pillar erection adjustment jig corresponding to an embodiment of the present invention.

【図2】図1の柱建て入れ調整治具を柱に取付けた状態
を示す正面図である。
FIG. 2 is a front view showing a state in which the pillar erection adjustment jig of FIG. 1 is attached to a pillar.

【図3】本発明の別の実施形態に相当する柱建て入れ調
整治具を示す斜視図である。
FIG. 3 is a perspective view showing a pillar erection adjusting jig corresponding to another embodiment of the present invention.

【図4】図3の柱建て入れ調整治具を柱に取付けた状態
を示す正面図である。
FIG. 4 is a front view showing a state in which the pillar erecting adjustment jig of FIG. 3 is attached to a pillar.

【図5】図3の柱建て入れ調整治具に使用したジャッキ
を示す正面図である。
5 is a front view showing a jack used in the pillar erection adjusting jig of FIG. 3. FIG.

【図6】本発明の別の実施形態に相当する柱建て入れ調
整治具の取付状態を示す正面図である。
FIG. 6 is a front view showing a mounted state of a pillar erection adjustment jig corresponding to another embodiment of the present invention.

【図7】本発明に使用できるジャッキの一例を示す正面
図である。
FIG. 7 is a front view showing an example of a jack that can be used in the present invention.

【図8】本発明に使用できるジャッキの一例を示す正面
図である。
FIG. 8 is a front view showing an example of a jack that can be used in the present invention.

【図9】従来の柱建て入れ調整方法を示す正面図であ
る。
FIG. 9 is a front view showing a conventional pillar building adjustment method.

【図10】従来の柱建て入れ調整方法であって、図9の
次の段階を示す正面図である。
FIG. 10 is a front view showing the next stage of FIG. 9 in the conventional method for adjusting the pillar erection.

【符号の説明】 3 スプライスプレートと支持ピースとが一体化され
た板材 4 ジャッキ 5 スプライスプレート 6 取付ピースと支持ピースとが一体化された板材 7 ジャッキ 11 新設の柱 12 既設の柱 21 上側エレクションピース 22 下側エレクションピース 31 スプライスプレート 32 支持ピース 43a 台部(接触面) 61 取付ピース 62 支持ピース 73a 台部(接触面)
[Explanation of reference numerals] 3 plate material in which splice plate and supporting piece are integrated 4 jack 5 splice plate 6 plate material in which mounting piece and supporting piece are integrated 7 jack 11 new pillar 12 existing pillar 21 upper erection piece 22 Lower erection piece 31 Splice plate 32 Support piece 43a Stand (contact surface) 61 Mounting piece 62 Support piece 73a Stand (contact surface)

───────────────────────────────────────────────────── フロントページの続き (72)発明者 本岡 功成 東京都新宿区西新宿一丁目25番1号 大成 建設株式会社内 ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Inventor Issei Motooka 1-25-1 Nishishinjuku, Shinjuku-ku, Tokyo Taisei Corporation

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 既設の柱の側面上部に固定される下側エ
レクションピースと、新設の柱の側面下部に固定される
上側エレクションピースと、各側面毎に上下のエレクシ
ョンピースに渡ってこれを挟んで配置される二枚のスプ
ライスプレートと、上下のエレクションピースの間隔を
調整するジャッキと、スプライスプレートの外側に配置
されて前記ジャッキの伸縮方向両端を支持する支持ピー
スと、を備え、前記支持ピースは、スプライスプレート
またはエレクションピースと一体化されているととも
に、前記ジャッキの両端部は支持ピースの端面に接触配
置される接触面を有することを特徴とする柱建て入れ調
整治具。
1. A lower erection piece fixed to an upper portion of a side surface of an existing pillar, an upper erection piece fixed to a lower portion of a side surface of a new pillar, and an upper and lower erection piece for each side surface, and sandwiching the upper and lower erection pieces. And a support piece arranged outside the splice plate for supporting both ends of the jack in the expansion and contraction direction. Is a splice plate or an erection piece, and both ends of the jack have contact surfaces arranged to contact the end surfaces of the support pieces.
【請求項2】 既設の柱の側面上部に固定される下側エ
レクションピースと、新設の柱の側面下部に固定される
上側エレクションピースと、各側面毎に上下のエレクシ
ョンピースに渡ってこれを挟んで配置される二枚のスプ
ライスプレートと、上下のエレクションピースの間隔を
調整するジャッキと、スプライスプレートの外側に配置
されて前記ジャッキの伸縮方向両端を支持する支持ピー
スと、を備え、前記支持ピースは、スプライスプレート
およびエレクションピースに挟んで配置される取付ピー
スと一体化されているとともに、前記ジャッキの両端部
は支持ピースの端面に接触配置される接触面を有するこ
とを特徴とする柱建て入れ調整治具。
2. A lower erection piece fixed to an upper portion of a side surface of an existing pillar, an upper erection piece fixed to a lower portion of a side surface of a new pillar, and an upper and lower erection piece for each side surface, and sandwiching the upper and lower erection pieces. And a support piece arranged outside the splice plate for supporting both ends of the jack in the expansion and contraction direction. Is integrated with a mounting piece disposed between the splice plate and the erection piece, and both ends of the jack have contact surfaces arranged to contact the end surfaces of the support pieces. Adjustment jig.
JP8136473A 1996-05-30 1996-05-30 Adjustment jig for pillar Expired - Lifetime JP3048924B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP8136473A JP3048924B2 (en) 1996-05-30 1996-05-30 Adjustment jig for pillar

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP8136473A JP3048924B2 (en) 1996-05-30 1996-05-30 Adjustment jig for pillar

Publications (2)

Publication Number Publication Date
JPH09317187A true JPH09317187A (en) 1997-12-09
JP3048924B2 JP3048924B2 (en) 2000-06-05

Family

ID=15175951

Family Applications (1)

Application Number Title Priority Date Filing Date
JP8136473A Expired - Lifetime JP3048924B2 (en) 1996-05-30 1996-05-30 Adjustment jig for pillar

Country Status (1)

Country Link
JP (1) JP3048924B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002349071A (en) * 2001-05-24 2002-12-04 Dai Nippon Construction Erection adjusting tool for pillar and erecting method
JP2019099898A (en) * 2017-12-08 2019-06-24 日鉄住金工材株式会社 Metal foil manufacturing device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002349071A (en) * 2001-05-24 2002-12-04 Dai Nippon Construction Erection adjusting tool for pillar and erecting method
JP2019099898A (en) * 2017-12-08 2019-06-24 日鉄住金工材株式会社 Metal foil manufacturing device

Also Published As

Publication number Publication date
JP3048924B2 (en) 2000-06-05

Similar Documents

Publication Publication Date Title
KR100684707B1 (en) Apparatus for mounting anchor bolt
KR20090050778A (en) Steel beam assembly structure without welding
JP2000291262A (en) Erection piece for column erection and column erection method
JP3048924B2 (en) Adjustment jig for pillar
JP3712458B2 (en) Beam form support device
JP3103294B2 (en) Pillar steel frame, jig used for the connection, and steel frame connection method
JP2566470Y2 (en) Anchor bolt fixing device for construction
JP3528910B2 (en) How to lay the deck plate
JP3103290B2 (en) Pillar steel frame and steel frame connection method
JP4639012B2 (en) High-strength bolt joint structure of box-shaped cross section column and H-shaped cross section beam and its construction method
JP3934380B2 (en) Reinforcing device
JP2003184176A (en) Structure for joining column and beam together
KR20090010565A (en) Supporting structure of railing
JPH10109177A (en) Temporary windbreak device for welding steel skelton pillar
JP2001049623A (en) H-steel arm scaffolding and method for constructing the same
JP2002061116A (en) Scaffold support device and scaffold device in bridge structure
JP3343242B2 (en) Jig used to connect steel frames
JPH0868120A (en) Joint metal for wooden framework construction method
JP4038086B2 (en) Bracing unit mounting structure
JPH0736004Y2 (en) Hollow scaffolding support hardware
JPH0842002A (en) Connection method of c-shaped steel material and connection structure thereof
JP3079307B2 (en) Soundproof wall exterior plate fall prevention device
JP4116586B2 (en) Bracket for structure
JPH071426Y2 (en) Hollow scaffolding support hardware
JPH07243205A (en) Scaffolding device

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080324

Year of fee payment: 8

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090324

Year of fee payment: 9

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090324

Year of fee payment: 9

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 10

Free format text: PAYMENT UNTIL: 20100324

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110324

Year of fee payment: 11

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110324

Year of fee payment: 11

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 12

Free format text: PAYMENT UNTIL: 20120324

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130324

Year of fee payment: 13