JP3528910B2 - How to lay the deck plate - Google Patents

How to lay the deck plate

Info

Publication number
JP3528910B2
JP3528910B2 JP34079798A JP34079798A JP3528910B2 JP 3528910 B2 JP3528910 B2 JP 3528910B2 JP 34079798 A JP34079798 A JP 34079798A JP 34079798 A JP34079798 A JP 34079798A JP 3528910 B2 JP3528910 B2 JP 3528910B2
Authority
JP
Japan
Prior art keywords
deck plate
beams
unitized
deck
small
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP34079798A
Other languages
Japanese (ja)
Other versions
JP2000160843A (en
Inventor
敏治 川口
義浩 横山
嘉章 竹村
陽成 西山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Corp
Original Assignee
Shimizu Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Corp filed Critical Shimizu Corp
Priority to JP34079798A priority Critical patent/JP3528910B2/en
Publication of JP2000160843A publication Critical patent/JP2000160843A/en
Application granted granted Critical
Publication of JP3528910B2 publication Critical patent/JP3528910B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Description

【発明の詳細な説明】 【0001】 【発明の属する技術分野】本発明は、例えば鉄骨造等か
らなる建造物の床を形成する際に用いて好適なデッキプ
レートの敷設方法に関するものである。 【0002】 【従来の技術】従来、床を形成するための型枠あるいは
床板として用いられる鋼製のデッキプレートは、以下の
ようにして敷設するのが一般的であった。図5に示すよ
うに、柱1および大梁2,小梁3を設置した後に、所定
枚数のデッキプレート4を敷き詰め、各デッキプレート
4を大梁2,小梁3に溶接していた。 【0003】また、デッキプレート4と小梁3,3とを
一体にユニット化する工法も用いられている。この工法
では、小梁3,3間に配置されるデッキプレート4Aを
一体にユニット化しておき、これを大梁2A,2Bに接
合する。この後、両側の小梁3,3とその外側の大梁2
C,2Dとの間の部分に、従来と同様、複数枚のデッキ
プレート4B,4Cを敷き詰めて溶接していた。 【0004】この他にも、デッキプレート4と小梁3,
3だけでなく、大梁2をもユニット化する工法もある。
これは、互いに隣接する二本の大梁2A,2B間に配置
されるデッキプレート4および小梁3,3を、これら大
梁2A,2Bに予め一体化してユニット化しておく工法
であり、先行して立設した柱1と大梁2C,2Dとの間
にユニット化したものを吊り込み、これを接合するもの
である。 【0005】 【発明が解決しようとする課題】しかしながら、上述し
たような従来のデッキプレートの敷設方法には、以下の
ような問題が存在する。まず、多数枚のデッキプレート
4を敷き詰める工法では、その敷き込みと溶接に手間と
時間がかかる。 【0006】また、デッキプレート4Aと小梁3,3と
をユニット化する工法では、二本の小梁3,3間のデッ
キプレート4Aしかユニット化することができない。こ
れは二本の小梁3,3の両側の部分のデッキプレート4
B,4Cまでをユニット化すると、この部分のデッキプ
レート4B,4Cが小梁3から片持ち状態で張り出すこ
とになってしまうからである。このため二本の小梁3の
両外側の部分は従来工法と同様に多数枚のデッキプレー
ト4B,4Cを敷き込まなければならず、施工に手間が
かかるという問題を完全に解決できるものではない。 【0007】デッキプレート4と大梁2A,2Bまでも
ユニット化した工法では、このユニットに隣接するスパ
ンで、大梁2A,2Bがすでに設置されることになるた
め、ユニット施工は1スパンおきにしか行うことができ
ず、完全なユニット工法とは言えず、また、施工の複雑
化をも招いていた。 【0008】本発明は以上のような点を考慮してなされ
たもので、デッキプレートの敷設を効率良く行うことの
できるデッキプレートの敷設方法を提供することを課題
とする。 【0009】 【課題を解決するための手段】請求項1に係る発明は、
デッキプレートの敷設方法であって、複数本の梁によっ
て囲まれる部分に配置される少なくとも一対の小梁と
当該一対の小梁間に敷設されるデッキプレートと、前記
一対の小梁から大梁方向に張り出したデッキプレートと
を予めユニット化しておき、複数本の柱と、互いに隣接
する前記柱間に架設される梁とを設けた後に、前記一対
の小梁から大梁方向に張り出したデッキプレートの端部
を着脱自在に挟み込んで保持する吊り治具で前記ユニッ
を吊り上げ、次いで吊り上げた前記ユニットを複数本
の前記梁によって囲まれる部分にセットした後、前記吊
り治具を前記ユニットから取り外し、しかる後に前記小
梁とデッキプレートを前記梁に本接合することを特徴と
している。 【0010】このように吊り治具でデッキプレートの端
部を挟み込んで保持することにより、1スパン分のデッ
キプレートをユニット化することができる。また、デッ
キプレートに小梁を一体に取り付けておくことにより、
小梁のユニット化を図ることができる。しかも、大梁は
ユニット化されておらず、従って互いに隣接するスパン
も同様にユニット化できる。 【0011】 【0012】 【0013】 【発明の実施の形態】以下、本発明に係るデッキプレー
トの敷設方法およびそれに用いる吊り治具の実施の形態
の一例を、図1ないし図4を参照して説明する。 【0014】図1ないし図4の各図において、符号10
は建造物の躯体を構成する鉄骨鉄筋コンクリート造の
柱、11は鉄骨からなる大梁(梁)、12は鉄骨からな
る小梁、13は鋼製のデッキプレート、14は吊り治具
をそれぞれ示している。 【0015】図1に示すように、4本の柱10と、これ
らの柱10間に架設された大梁11,11,…とによっ
て囲まれる1スパン分の空間には、例えば二本の小梁1
2が架設され、さらにこれら大梁11および小梁12の
上面にデッキプレート13が敷き詰められている。 【0016】このデッキプレート13はその施工に対し
てユニット化が図られており、例えば、両端部が二本の
大梁11A,11B上に載置される部分までがユニット
化されており、これに直交する方向においては、吊り込
み時に四方の柱10との干渉を防ぐよう、二本の大梁1
1C,11Dよりも所定寸法内側の部分までがユニット
化されている(図1中、太線Aで囲まれた部分)。 【0017】図2に示すように、吊り治具14は、フレ
ーム15と、このフレーム15に備えられてデッキプレ
ート13を保持する保持部材(保持部)16とから構成
されている。 【0018】フレーム15は、デッキプレート13の端
部よりも外方に張り出す長さを有した二本一対のチャン
ネル材17を有している。各チャンネル材17の端部に
は、チャンネル材17の長さ方向に延在する長穴18が
形成されている。 【0019】一方、図2および図3に示すように、保持
部材16は、二本のチャンネル材17と直交する方向に
延在し、断面L字状のアングル材19と、このアングル
材19の下面に一体に設けられた断面L字状の保持部2
0とから形成されており、アングル材19の所定位置に
形成された切り欠き19aにチャンネル材17を通すよ
うになっている。そして、アングル材19の底面にはボ
ルト穴21が形成されており、チャンネル材17と保持
部材16のアングル材19とは、長穴18とボルト穴2
1に挿通させたボルト22と、これに装着されたナット
23,24によって一体に締結されている。これらのナ
ット23,24を互いに締め込んだり緩めたりすること
によって、ボルト22を長穴18の範囲内で移動させ
て、任意の位置でチャンネル材17に対する保持部材1
6の位置決めを行うことができるようになっている。つ
まり、この保持部材16はデッキプレート13の端部に
対し接近・離間する方向に移動可能となっており、しか
も任意の位置で固定できるようになっているのである。 【0020】次に、このような吊り治具14を用いたデ
ッキプレート13の敷設方法について説明する。 【0021】まず、図4に示すように、デッキプレート
13と二本の小梁12とを一体に溶接してユニット化し
ておく。 【0022】そして、吊り治具14の両側の保持部材1
6でデッキプレート13の端部を挟み込み、これによっ
てデッキプレート13のユニットを保持する。そして、
これを吊りフレーム25を介してクレーン26等の揚重
手段で吊り上げる。 【0023】一方、柱10と大梁11は先行して建て込
んでおき、吊り込んだデッキプレート13のユニットを
大梁11A,11B上にセットする。そして、ユニット
の小梁12の両端部と、大梁11C,11Dとを、ボル
ト、ジョイントプレート等(図示なし)を用いて所定の
位置で仮締めした後、保持部材16を外方へスライドさ
せデッキプレート13の端部から解放する。 【0024】なお、この吊り治具14は次のユニットの
吊り込みに転用する。 【0025】この後、図1に示したように、小梁12を
大梁11C,11Dに対して本締めした後、大梁11
A,11B,11C,11Dにデッキプレート13を溶
接する。これによってデッキプレート13の設置が完了
するので、この後は残りの隙間の部分のみ従来工法と同
様に所定枚数のデッキプレート27を敷き込み、これを
大梁11および小梁12に溶接する。これによって1ス
パン分のデッキプレート13の敷き込みが完了するの
で、この後は他のスパンも同様にして施工を行っていけ
ばよい。 【0026】上述したデッキプレート敷設方法によれ
ば、1スパン分の大部分のデッキプレート13と小梁1
2とをユニット化することができるので施工の手間を省
くことができ、工期短縮化を図ることができる。また、
これと同時に高所作業が大幅に減るので作業安全性を向
上させることができる。また、小梁12とデッキプレー
ト13とをユニット化する構成としたので、大梁11ま
でがユニット化されているわけではなく、隣接するスパ
ンにおいても同様にユニット化することが可能である。
従って、施工を同様の作業の繰り返しで連続的に行うこ
とができ、これによる効率化を図ることもできる。 【0027】また、吊り治具14の保持部材16がフレ
ーム15に対して移動自在に設けられているので、吊り
治具14のデッキプレート13に対する着脱が非常に容
易であり、最小限の盛替時間で吊り治具14を転用する
ことができ、これによっても施工の効率化が図られる。 【0028】なお、上記実施の形態において、柱10を
鉄骨鉄筋コンクリート造としたが、もちろん鉄骨造等で
あっても良い。また、ユニット化するデッキプレート1
3自体の構成については何ら限定する意図はなく、例え
ば波形の鋼板でも良いし、平板状でも良いし、さらには
他の工夫を盛り込んだもの等であっても良い。また、ユ
ニット化するデッキプレート13の範囲や形状について
も上記実施の形態に何ら限定されるものではなく、適宜
他の構成が採用可能である。 【0029】これ以外にも、本発明の主旨を逸脱しない
範囲内であれば、いかなる構成を採用しても良く、また
上記したような構成を適宜選択的に組み合わせたものと
しても良いのは言うまでもない。 【0030】 【発明の効果】以上説明したように、請求項1に係るデ
ッキプレートの敷設方法によれば、吊り治具で小梁から
大梁方向に張り出したデッキプレートの端部を挟み込ん
で保持することにより、1スパン分のデッキプレートを
ユニット化することができる。したがって、デッキプレ
ートの取り付けに要する手間と時間を省くことができ、
工期短縮化を図ることができる。これと同時に、高所作
業が大幅に減るので作業安全性を向上させることができ
る。また、デッキプレートに小梁を一体に取り付けてお
くことにより、小梁のユニット化を図ることができる。
しかも、大梁までユニット化されているわけではなく、
隣接するスパンにおいても同様にユニット化することが
可能である。従って、施工を同様の作業の繰り返しで連
続的に行うことができ、これによる効率化を図ることも
できる。 【0031】
BACKGROUND OF THE INVENTION [0001] [Technical Field of the Invention The present invention is, for example, those related to the laying how suitable deck plates used in forming the floor of a building consisting of steel construction, etc. is there. 2. Description of the Related Art Conventionally, a steel deck plate used as a formwork or floorboard for forming a floor has generally been laid as follows. As shown in FIG. 5, after the columns 1, the girders 2, and the girders 3 were installed, a predetermined number of deck plates 4 were spread, and each deck plate 4 was welded to the girders 2 and the girders 3. [0003] A construction method is also used in which the deck plate 4 and the beams 3, 3 are integrally unitized. In this method, the deck plate 4A disposed between the small beams 3, 3 is unitized integrally, and this is joined to the large beams 2A, 2B. After this, the small beams 3 on both sides and the large beam 2 outside
A plurality of deck plates 4B and 4C were spread and welded to the portion between C and 2D as in the conventional case. [0004] In addition, a deck plate 4 and small beams 3,
There is also a construction method in which not only 3 but also the girders 2 are unitized.
This is a method in which the deck plate 4 and the small beams 3, 3 arranged between two adjacent girders 2A, 2B are integrated with the girders 2A, 2B in advance to form a unit. The unitized one is suspended between the upright pillar 1 and the girders 2C, 2D, and joined. [0005] The present Invention is to Solve However, the laying how the conventional deck plate as described above, there are the following problems. First, in the method of laying a large number of deck plates 4, it takes time and effort to lay and weld. In the method of uniting the deck plate 4A and the beams 3, 3, only the deck plate 4A between the two beams 3, 3 can be unitized. This is the deck plate 4 on both sides of the two beams 3
If units B and 4C are unitized, the deck plates 4B and 4C in this portion will protrude from the small beams 3 in a cantilever state. For this reason, a large number of deck plates 4B and 4C must be laid on both outer portions of the two small beams 3 in the same manner as in the conventional construction method, and the problem that the construction is troublesome cannot be completely solved. . In the construction method in which the deck plate 4 and the girders 2A and 2B are also unitized, the girders 2A and 2B are already installed in the span adjacent to this unit, so that the unit construction is performed only every other span. It could not be said to be a complete unit construction method, and the construction was complicated. [0008] The present invention has been made in view of the points mentioned above, and to provide a laying how the deck plate that can be efficiently laying deck plate. Means for Solving the Problems The invention according to claim 1 is:
A method of laying a deck plate, wherein at least one pair of small beams arranged in a portion surrounded by a plurality of beams ,
A deck plate laid between the pair of small beams,
A deck plate projecting from the pair of small beams in the direction of the girder is unitized in advance, and after providing a plurality of columns and beams to be bridged between the adjacent columns, the pair is formed.
The units in the hanging jig for holding removably sandwiching by the end of the deck plate which protrudes girder direction from the beams of
After setting the lifted unit to a portion surrounded by the plurality of beams, the lifting jig is removed from the unit , and then the small beam and the deck plate are permanently joined to the beam. It is characterized by. [0010] By sandwiching and holding the end of the deck plate with the hanging jig in this manner, the deck plate for one span can be unitized. Also, by attaching small beams integrally to the deck plate,
The beam can be unitized. Moreover, the girder is not unitized, and therefore, the spans adjacent to each other can be similarly unitized. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of a deck plate laying method according to the present invention and a hanging jig used therein will be described below with reference to FIGS. 1 to 4. explain. In each of FIGS.
Is a steel reinforced concrete column constituting a building frame, 11 is a large beam (beam) made of steel, 12 is a small beam made of steel, 13 is a steel deck plate, and 14 is a hanging jig. . As shown in FIG. 1, for example, two small beams are provided in a space for one span surrounded by four columns 10 and large beams 11, 11,. 1
2 and a deck plate 13 is spread over the upper surfaces of the girders 11 and the small beams 12. The deck plate 13 is unitized with respect to its construction. For example, both ends of the deck plate 13 are placed on two beams 11A and 11B. In the orthogonal direction, two large beams 1 are used to prevent interference with the four pillars 10 when suspended.
1C and 11D are unitized up to a portion inside a predetermined dimension (a portion surrounded by a thick line A in FIG. 1). As shown in FIG. 2, the suspending jig 14 includes a frame 15 and a holding member (holding portion) 16 provided on the frame 15 for holding the deck plate 13. The frame 15 has a pair of two channel members 17 having a length extending beyond the end of the deck plate 13. At the end of each channel member 17, an elongated hole 18 extending in the length direction of the channel member 17 is formed. On the other hand, as shown in FIGS. 2 and 3, the holding member 16 extends in a direction perpendicular to the two channel members 17 and has an angle member 19 having an L-shaped cross section. L-shaped cross-section holder 2 integrally provided on the lower surface
0, and the channel material 17 is passed through a notch 19 a formed at a predetermined position of the angle material 19. A bolt hole 21 is formed on the bottom surface of the angle member 19, and the channel member 17 and the angle member 19 of the holding member 16 are connected to the elongated hole 18 and the bolt hole 2.
The bolt 22 is inserted into the nut 1 and the nuts 23 and 24 attached thereto. By tightening or loosening these nuts 23 and 24 with each other, the bolt 22 is moved within the range of the elongated hole 18, and the holding member 1 for the channel member 17 is located at an arbitrary position.
6 can be positioned. In other words, the holding member 16 is movable in a direction approaching / separating from the end of the deck plate 13, and can be fixed at an arbitrary position. Next, a method of laying the deck plate 13 using such a hanging jig 14 will be described. First, as shown in FIG. 4, the deck plate 13 and the two small beams 12 are integrally welded to form a unit. Then, the holding members 1 on both sides of the hanging jig 14
At 6, the end of the deck plate 13 is sandwiched, thereby holding the unit of the deck plate 13. And
This is lifted by a lifting means such as a crane 26 via a suspension frame 25. On the other hand, the pillar 10 and the girder 11 are built in advance, and the suspended unit of the deck plate 13 is set on the girder 11A, 11B. Then, both ends of the small beam 12 of the unit and the large beams 11C and 11D are temporarily tightened at predetermined positions using bolts, joint plates and the like (not shown), and then the holding member 16 is slid outward to deck. Release from the end of the plate 13. The hanging jig 14 is used for hanging the next unit. Thereafter, as shown in FIG. 1, after the small beam 12 is fully tightened to the large beams 11C and 11D,
The deck plate 13 is welded to A, 11B, 11C, and 11D. As a result, the installation of the deck plate 13 is completed. Thereafter, a predetermined number of deck plates 27 are laid in the remaining gap portions in the same manner as in the conventional method, and are welded to the large beams 11 and the small beams 12. This completes the laying of the deck plate 13 for one span, and thereafter, the other spans may be similarly constructed. According to the deck plate laying method described above, most of the deck plate 13 and the small beam 1 for one span are provided.
2 can be unitized, so that the labor for construction can be saved and the construction period can be shortened. Also,
At the same time, work at high places is greatly reduced, so that work safety can be improved. In addition, since the small beam 12 and the deck plate 13 are configured as a unit, the large beam 11 is not necessarily unitized, and it is possible to similarly unitize adjacent spans.
Therefore, the construction can be performed continuously by repeating the same operation, and the efficiency can be improved. Further, since the holding member 16 of the hanging jig 14 is provided so as to be movable with respect to the frame 15, it is very easy to attach / detach the hanging jig 14 to / from the deck plate 13 and to minimize the refilling. The hanging jig 14 can be diverted in a short time, thereby also increasing the efficiency of construction. In the above embodiment, the column 10 is made of a steel-framed reinforced concrete, but may be of a steel frame or the like. Deck plate 1 to be unitized
There is no intention to limit the configuration of 3 itself, for example, it may be a corrugated steel plate, a flat plate shape, or a configuration incorporating other devices. Also, the range and shape of the deck plate 13 to be unitized are not limited to the above-described embodiment at all, and other configurations can be appropriately adopted. Other than this, any configuration may be adopted as long as it does not depart from the gist of the present invention, and it is needless to say that the above-described configurations may be appropriately selectively combined. No. As described above, according to the method for laying a deck plate according to the first aspect, the suspension jig is used to remove the small beam.
By sandwiching and holding the end of the deck plate projecting in the direction of the girder, the deck plate for one span can be unitized. Therefore, the labor and time required for mounting the deck plate can be saved,
The construction period can be shortened. At the same time, work at high places is greatly reduced, so that work safety can be improved. In addition, by attaching the beams to the deck plate integrally, the beams can be unitized.
Moreover, the girders are not unitized,
Units can be similarly formed in adjacent spans. Therefore, the construction can be continuously performed by repeating the same work, and the efficiency can be improved. [0031]

【図面の簡単な説明】 【図1】 本発明に係るデッキプレートの敷設方法およ
びそれに用いる吊り治具の一例を示す平面図である。 【図2】 前記吊り治具の一部を示す斜視図である。 【図3】 同吊り治具の一部を示す立面図である。 【図4】 同吊り治具でデッキプレートを吊り込んでい
る状態を示す立面図である。 【図5】 従来のデッキプレートの敷設方法の例を示す
平面図である。 【符号の説明】 10 柱 11 大梁(梁) 12 小梁 13 デッキプレート 14 吊り治具 15 フレーム 16 保持部材(保持部)
BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a plan view showing an example of a method of laying a deck plate according to the present invention and a hanging jig used for the method. FIG. 2 is a perspective view showing a part of the hanging jig. FIG. 3 is an elevation view showing a part of the hanging jig. FIG. 4 is an elevation view showing a state where the deck plate is suspended by the suspension jig. FIG. 5 is a plan view showing an example of a conventional deck plate laying method. [Description of Signs] 10 Column 11 Large beam (beam) 12 Small beam 13 Deck plate 14 Hanging jig 15 Frame 16 Holding member (holding portion)

───────────────────────────────────────────────────── フロントページの続き (72)発明者 西山 陽成 東京都港区芝浦一丁目2番3号 清水建 設株式会社内 (56)参考文献 特開 昭49−68521(JP,A) 実開 昭64−26679(JP,U) (58)調査した分野(Int.Cl.7,DB名) E04G 21/14 - 21/22 E04B 5/40 ──────────────────────────────────────────────────続 き Continuation of front page (72) Inventor Yosei Nishiyama 1-3-2 Shibaura, Minato-ku, Tokyo Shimizu Corporation (56) References JP-A-49-68521 (JP, A) 64-26679 (JP, U) (58) Fields investigated (Int. Cl. 7 , DB name) E04G 21/14-21/22 E04B 5/40

Claims (1)

(57)【特許請求の範囲】 【請求項1】 デッキプレートの敷設方法であって、 複数本の梁によって囲まれる部分に配置される少なくと
も一対の小梁と、当該一対の小梁間に敷設されるデッキ
プレートと、前記一対の小梁から大梁方向に張り出した
デッキプレートとを予めユニット化しておき、 複数本の柱と、互いに隣接する前記柱間に架設される梁
とを設けた後に、前記一対の小梁から大梁方向に張り出
したデッキプレートの端部を着脱自在に挟み込んで保持
する吊り治具で前記ユニットを吊り上げ、 次いで吊り上げた前記ユニットを複数本の前記梁によっ
て囲まれる部分にセットした後、前記吊り治具を前記
ニットから取り外し、しかる後に前記小梁とデッキプレ
ートを前記梁に本接合することを特徴とするデッキプレ
ートの敷設方法。
(57) A laying method of Claims 1] deck plate, the less is disposed in a portion surrounded by a plurality of beams
Also a pair of small beams and a deck laid between the pair of small beams
After a plate and a deck plate projecting from the pair of small beams in the direction of the large beam are unitized in advance, and after providing a plurality of columns and beams to be bridged between the adjacent columns, , Protruding from the pair of small beams in the direction of the girder
The lifting of the unit with the hanging jig for holding an end portion of the deck plate removably clamped in, then after setting the portion surrounded with the unit lifting by said beam a plurality of the said lifting jig Yoo
A method of laying down a deck plate, comprising removing the knit from the knit , and then afterwards permanently joining the beam and deck plate to the beam.
JP34079798A 1998-11-30 1998-11-30 How to lay the deck plate Expired - Fee Related JP3528910B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP34079798A JP3528910B2 (en) 1998-11-30 1998-11-30 How to lay the deck plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP34079798A JP3528910B2 (en) 1998-11-30 1998-11-30 How to lay the deck plate

Publications (2)

Publication Number Publication Date
JP2000160843A JP2000160843A (en) 2000-06-13
JP3528910B2 true JP3528910B2 (en) 2004-05-24

Family

ID=18340386

Family Applications (1)

Application Number Title Priority Date Filing Date
JP34079798A Expired - Fee Related JP3528910B2 (en) 1998-11-30 1998-11-30 How to lay the deck plate

Country Status (1)

Country Link
JP (1) JP3528910B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106193621A (en) * 2016-07-28 2016-12-07 龙信建设集团有限公司 Fabricated construction superimposed sheet string hangs construction method

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100818863B1 (en) * 2007-01-05 2008-04-02 이창남 Lift and installing method of preassembled truss decks at ground level
JP6589290B2 (en) * 2015-02-19 2019-10-16 日本製鉄株式会社 Deck composite floor structure
CN113216646A (en) * 2021-06-10 2021-08-06 中冶建工集团重庆钢结构有限公司 Assembling method of pipe truss
CN114274108B (en) * 2021-12-10 2023-05-16 中国一冶集团有限公司 Railing part rapid Assembly bed-jig device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106193621A (en) * 2016-07-28 2016-12-07 龙信建设集团有限公司 Fabricated construction superimposed sheet string hangs construction method

Also Published As

Publication number Publication date
JP2000160843A (en) 2000-06-13

Similar Documents

Publication Publication Date Title
JP3528910B2 (en) How to lay the deck plate
JP2004116059A (en) Method of building corrugated steel plate web bridge
JP3826352B2 (en) Assembling the deck unit
JP7490550B2 (en) Lifting jig and disassembly method
JPH01290853A (en) Composite floor board using deck plate
JP3828641B2 (en) Column and beam connection structure
JP2004137885A (en) Connector for long material and its connecting structure
JP2688613B2 (en) Stringed beam floor structure
JP4122409B2 (en) Anchor bolt fixing structure and anchor bolt fixing method
JPH0673203U (en) Beam-column joint structure
JP7219574B2 (en) Plumbing adjustment jig and plumbing adjustment method
JPH07243205A (en) Scaffolding device
JP4421420B2 (en) Columnar structure construction method and suspension jig
JP3550504B2 (en) Joining members of long materials and their connection structure
JPH07127174A (en) Method of unsupported construction of reinforced concrete slab
JP2600411Y2 (en) Column-beam joint structure
JPH0539645A (en) Connecting method for pillar and horizontal member
JP4072726B2 (en) Precast concrete panel mounting structure and mounting method
JP2004239049A (en) Precast slab and method for joining the same
JP2000017642A (en) Working method for pile head portion of diagonally assembled pile
JP2023067236A (en) Slab base structure before concrete placement, reinforced concrete slab structure, method of constructing slab base structure before concrete placement, and method of constructing reinforced concrete slab structure
JP2006132261A (en) Method of reinforcing reinforced concrete rod member, and device for reinforcing the same
JPH04185851A (en) Beam for structure
JPH03156048A (en) Joining construction of steel pipe column and slab in flat slab construction
JPH0152538B2 (en)

Legal Events

Date Code Title Description
TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20040127

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20040217

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees