Scaffold support device and scaffold device in bridge structure

Info

Publication number
JP2002061116A
JP2002061116A JP2000248351A JP2000248351A JP2002061116A JP 2002061116 A JP2002061116 A JP 2002061116A JP 2000248351 A JP2000248351 A JP 2000248351A JP 2000248351 A JP2000248351 A JP 2000248351A JP 2002061116 A JP2002061116 A JP 2002061116A
Authority
JP
Japan
Prior art keywords
horizontal
structural member
frame
scaffold
scaffolding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2000248351A
Other languages
Japanese (ja)
Other versions
JP3386785B2 (en
Inventor
Hideaki Okubo
英明 大久保
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BRIDGE ENGINEERING KK
Bridge Engineering Co Ltd
Original Assignee
BRIDGE ENGINEERING KK
Bridge Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BRIDGE ENGINEERING KK, Bridge Engineering Co Ltd filed Critical BRIDGE ENGINEERING KK
Priority to JP2000248351A priority Critical patent/JP3386785B2/en
Publication of JP2002061116A publication Critical patent/JP2002061116A/en
Application granted granted Critical
Publication of JP3386785B2 publication Critical patent/JP3386785B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)
  • Movable Scaffolding (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a scaffold support device for accurately and firmly supporting a scaffold frame for performing inspection and painting work of a bridge structure and a scaffold device for constructing a stable scaffold by using this scaffold support device. SOLUTION: This scaffold support device is composed of a horizontal support frame composed of straight shape steel having the specific length and both side fixing frames composed of shape steel of bending at a right angle, the horizontal support frame is placed at the central part on a horizontal structural member such as a truss lower chord member and an upper chord member of a bridge structure, both side fixing frames are respectively allowed to abut to both side surfaces of the horizontal structural member, and are integrally fixed by bolts in a state of receiving both side part under surfaces of the horizontal support frame on the horizontal rod part, and both studs of the scaffold frame are fixed to and supported by both side end parts of the horizontal support frame in this scaffold support device projecting to both outsides from the horizontal structural member.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は橋梁構造物の点検作
業や塗装等の補修作業を行う際に、該橋梁構造物の水平
構造部材に装着する足場支持装置と、この足場支持装置
を用いた足場装置に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a scaffold support device mounted on a horizontal structural member of a bridge structure when performing inspection work or repair work such as painting of the bridge structure, and the scaffold support device. The present invention relates to a scaffold device.

【0002】[0002]

【従来の技術】従来から、吊橋等の橋梁構造物における
床版下方のトラス構造物の点検や塗装等の補修作業を行
う場合には、その点検や補修を行うための足場を組み立
てているが、この足場は、地面に支持させることができ
る地上における高層建物の外壁工事などとは異なってト
ラス構造物における水平構造部材に支持させなければな
らず、そのため、図9に示す足場装置が一般的に採用さ
れている。
2. Description of the Related Art Conventionally, when a truss structure under a floor slab of a bridge structure such as a suspension bridge is inspected or repaired such as painting, a scaffold for inspecting and repairing the truss structure has been assembled. However, this scaffold must be supported by horizontal structural members of a truss structure unlike the outer wall construction of a high-rise building on the ground that can be supported on the ground, and therefore, the scaffold device shown in FIG. 9 is generally used. Has been adopted.

【0003】即ち、この足場装置は、水平構造部材B上
に約2m程度の鋼製パイプ31を該水平構造部材Bに直交
状態に配してその長さ方向の中央部分を載置したのち、
鉄線32を水平構造部材Bと鋼製パイプ31とに巻き付けて
結着することにより鋼製パイプ31を水平構造部材Bに固
着してなる足場支持部A'を形成し、この足場支持部A'を
水平構造部材Bに長手方向に一定間隔毎に配置すると共
に水平構造部材Bから両側に突出した各足場支持部A'に
おける鋼製パイプ31の両側端部にクランプ33により足場
枠Cの両側脚柱34、34の下端を固着し且つこれらの両側
脚柱34、34の上端部間に水平杆35を連結することにより
門形状の足場枠Cを形成し、この足場枠Cを上方に複数
枠、順次継ぎ足すことによって所定高さの建枠を組み立
て、さらに、水平構造部材Bの長手方向に隣接する足場
枠C、Cの脚柱間を繋ぎ材40によって連結したのち、隣
接する足場枠C、Cの上端水平杆35、35の両側部上にそ
れぞれ足場板36、36を架設することによって構成されて
いる。
That is, in this scaffolding device, a steel pipe 31 of about 2 m is disposed on a horizontal structural member B in a state orthogonal to the horizontal structural member B, and a central portion in a longitudinal direction thereof is placed.
An iron wire 32 is wound around the horizontal structural member B and the steel pipe 31 and bound to form a scaffolding support A ′ formed by fixing the steel pipe 31 to the horizontal structural member B, and the scaffolding support A ′ is formed. Are disposed on the horizontal structural member B at regular intervals in the longitudinal direction, and both ends of the scaffold frame C are clamped by clamps 33 at both end portions of the steel pipe 31 in each of the scaffolding support portions A ′ projecting to both sides from the horizontal structural member B. A gate-shaped scaffolding frame C is formed by fixing the lower ends of the pillars 34, 34 and connecting a horizontal rod 35 between the upper ends of the two side pillars 34, 34. Then, a building frame having a predetermined height is assembled by successively adding, and furthermore, after connecting the pillars of the scaffold frames C, C adjacent in the longitudinal direction of the horizontal structural member B with the connecting material 40, the adjacent scaffold frames C Scaffolding plates 36, 36 are erected on both sides of upper horizontal bars 35, 35 of C, respectively. It is constituted by the.

【0004】また、上記水平構造部材Bの下方にこの水
平構造部材Bの点検や塗装作業等を行うための足場板36
を配設するには、上記各足場支持部A'を構成している鋼
製パイプ31の両側端部からチエーン等の索条37、37を吊
設したのち、水平構造部材Bの長手方向に隣接する索条
37、37の下端間を支持パイプ38により連結し、互いに平
行に配設された左右の支持パイプ38、38間上に足場架設
用パイプ39を水平構造部材Bの長手方向に所定間隔毎に
横架させて水平構造部材Bの長手方向に隣接する足場架
設用パイプ39、39間に足場板36を架設している。
A scaffold plate 36 for inspecting and painting the horizontal structural member B is provided below the horizontal structural member B.
In order to dispose, the ropes 37, 37 such as chains are hung from both side ends of the steel pipe 31 constituting each of the scaffold support portions A ', and then, in the longitudinal direction of the horizontal structural member B. Adjacent cable
The lower ends of 37, 37 are connected by a support pipe 38, and a scaffold erection pipe 39 is laid at predetermined intervals in the longitudinal direction of the horizontal structural member B between the left and right support pipes 38, 38 arranged in parallel with each other. The scaffold plate 36 is erected between the scaffold erection pipes 39 adjacent to the horizontal structural member B in the longitudinal direction.

【0005】[0005]

【発明が解決しようとする課題】しかしながら、このよ
うな足場装置によれば、足場枠Cを支持するための足場
支持部A'は、鋼製パイプ31を水平構造部材Bに直交状態
に配してその長さ方向の中央部分を鉄線32の巻着によっ
て水平構造部材Bに固定されているため、鋼製パイプ31
を水平構造部材Bの長さ方向に対して直交する方向に正
確に向けた状態で固定することは困難であり、そのた
め、各足場支持部A'上に立設した足場枠C、Cを互いに
平行に正対させることができなくなって繋ぎ材40等によ
る組立作業時にそれを補正しながら行なわなければなら
ず、作業が煩雑化して多大な時間と労力を要することに
なる。
However, according to such a scaffolding device, the scaffolding support portion A 'for supporting the scaffolding frame C has the steel pipes 31 arranged perpendicular to the horizontal structural member B. The central portion in the longitudinal direction of the steel pipe 31 is fixed to the horizontal structural member B by winding an iron wire 32, so that the steel pipe 31
It is difficult to fix in a state where it is accurately oriented in the direction orthogonal to the length direction of the horizontal structural member B, and therefore, the scaffold frames C, C erected on the respective scaffold support portions A ′ are mutually connected. It is no longer possible to face each other in parallel, and it is necessary to correct it during the assembling work using the connecting members 40 and the like, which complicates the work and requires much time and labor.

【0006】さらに、鉄線32の巻着による鋼製パイプ31
の固定では、固定後においてもガタツキや横振れ、さら
には水平構造部材Bを支点とする上下方向の揺れが発生
して不安定な取付構造となり、そのため、足場枠C等の
組立時には上記不安定要素の補正と共に補強部材や繋ぎ
材を取付けながら組立作業を行わなければならず、例え
ば、水平構造部材Bの両側面上端部に沿って横振れ防止
用パイプ41を添接し、この横振れ防止用パイプ41を足場
支持部A'を構成した上記鋼製パイプ31の下面に適宜な連
結金具42によって固定する等の作業を行わねばならず、
足場組立作業に長期間を必要とする上その費用も高騰す
るという問題点があった。さらにまた、足場の解体、撤
去作業時においてもその作業に多大な時間と労力を必要
とする。
Further, a steel pipe 31 formed by winding an iron wire 32
In the case of fixing the scaffold frame C or the like, unstable mounting occurs due to rattling and lateral vibration even after fixing, and furthermore, vertical swinging with the horizontal structural member B as a fulcrum. It is necessary to perform the assembly work while attaching the reinforcing member and the connecting member together with the correction of the elements. For example, the horizontal vibration preventing pipe 41 is attached along the upper end of both sides of the horizontal structural member B, and the horizontal vibration preventing pipe 41 is attached. Work such as fixing the pipe 41 to the lower surface of the steel pipe 31 constituting the scaffolding support portion A 'with an appropriate connection fitting 42 must be performed,
There has been a problem that the scaffold assembling operation requires a long period of time and the cost thereof also rises. Furthermore, when dismantling and removing the scaffold, the work requires a great deal of time and labor.

【0007】また、水平構造部材Bの下方にこの水平構
造部材Bの点検や塗装作業等を行うための足場板36を配
設する場合においても、水平構造部材Bに対する鉄線32
の巻着による鋼製パイプ31の固定では上述したような不
安定要素が発生し、上記と同様な問題点が発生する。
Further, when a scaffold plate 36 for inspecting the horizontal structural member B or performing a painting operation is provided below the horizontal structural member B, the iron wire 32 for the horizontal structural member B is also required.
When the steel pipe 31 is fixed by winding, the above-described unstable element occurs, and the same problem as described above occurs.

【0008】本発明は上記のような問題点に鑑みてなさ
れたもので、その目的とするところは、足場枠を正確且
つ強固に定着、支持し得ると共に組立や解体が円滑且つ
能率よく行える橋梁構造物における足場支持装置とこの
足場支持装置を用いた足場装置を提供するにある。
SUMMARY OF THE INVENTION The present invention has been made in view of the above problems, and an object of the present invention is to provide a bridge which can fix and support a scaffold frame accurately and firmly and which can be assembled and dismantled smoothly and efficiently. An object of the present invention is to provide a scaffold support device for a structure and a scaffold device using the scaffold support device.

【0009】[0009]

【課題を解決するための手段】上記目的を達成するため
に、本発明の足場支持装置は、請求項1に記載したよう
に、長手方向の両側部に複数個のボルト取付孔を穿設し
且つ両側端部に足場枠取付部を設けている一定長さの形
鋼からなる水平支持フレームと、垂直杆部の上端に水平
杆部を一体に設けて正面逆L字状に形成し且つ水平杆部
に上記水平支持フレームのボルト取付孔に対応させてボ
ルト取付孔を穿設していると共に垂直杆部の下端部に連
結孔を穿設している形鋼からなる固定フレームとからな
り、上記水平支持フレームの長手方向の中央部下面を橋
梁構造物の水平構造部材の上面に支持させると共に、上
記固定フレームを水平構造部材の両側に配してこれらの
垂直杆部を水平構造部材の両側面に受止させ且つそれぞ
れの水平杆部を水平構造部材の上面から両側方に突出す
る上記水平支持フレームの両側下面に対向させて上記ボ
ルト取付孔間をボルトにより連結し、さらに、水平構造
部材の下面から下方に突出する上記両側固定フレームの
垂直杆部の下端部に設けた上記連結孔間を連結部材によ
って一体に連結してなる構造としている。
In order to achieve the above object, a scaffolding support device according to the present invention has a plurality of bolt mounting holes formed on both sides in the longitudinal direction. And a horizontal support frame made of shaped steel having a fixed length provided with scaffolding frame mounting portions at both side ends, and a horizontal rod portion integrally provided at an upper end of the vertical rod portion to form a front inverted L-shape and A fixed frame made of a shaped steel having a rod portion with a bolt mounting hole corresponding to the bolt mounting hole of the horizontal support frame and a connecting hole at a lower end portion of the vertical rod portion, The lower surface of the center portion in the longitudinal direction of the horizontal support frame is supported on the upper surface of the horizontal structural member of the bridge structure, and the fixed frame is disposed on both sides of the horizontal structural member, and these vertical rods are disposed on both sides of the horizontal structural member. Face and hold each horizontal rod The bolt mounting holes are connected by bolts to oppose lower surfaces on both sides of the horizontal support frame projecting to both sides from the upper surface of the structural member, and furthermore, the vertical sides of the fixed frames projecting downward from the lower surface of the horizontal structural member The connecting holes provided at the lower end of the rod portion are integrally connected by a connecting member.

【0010】上記足場支持装置において、請求項2に係
る発明は、上記水平支持フレームの両側部に穿設してい
るボルト取付孔と上記固定フレームの水平杆部に穿設し
ているボルト取付孔との少なくとも一方を橋梁構造物の
水平構造部材の幅方向に長い長孔に形成していることを
特徴としている。
In the above scaffold support device, the invention according to claim 2 is characterized in that a bolt mounting hole drilled on both sides of the horizontal support frame and a bolt mounting hole drilled in the horizontal rod portion of the fixed frame. At least one of them is formed as a long hole elongated in the width direction of the horizontal structural member of the bridge structure.

【0011】また、請求項3に係る発明は足場装置であ
って、橋梁構造物における水平構造部材の上面に一定長
さの形鋼よりなる水平支持フレームの長手方向の下面中
央部を支持させると共に、水平構造部材から両側方に突
出した該支持フレームの両側部下方に逆L字状に形成し
た形鋼からなる左右一対の固定フレームを配してこれら
の固定フレームにおける垂直杆部を水平構造部材の両側
面に受止させる一方、これらの垂直杆部の上端部に連設
した水平杆部を上記水平構造部材から両側方に突出した
水平支持フレームの両側部にそれぞれボルトにより固着
し且つ水平構造部材の下面から下方に突出する上記両側
固定フレームの垂直杆部の下端部間を連結部材によって
一体に連結して足場支持装置を構成し、この足場支持装
置を上記水平構造部材に長手方向に一定間隔毎に装着す
ると共に各足場支持装置の水平支持フレームの両側端部
上に門形状の足場枠の左右脚柱をそれぞれ立設、定着さ
せ且つこの足場枠を上方に向かって複数枠、順次継着す
ることにより所定高さの建枠を組立て、さらに、水平構
造部材の長手方向に隣接する足場枠の脚柱間を繋ぎ材に
よって連結すると共に足場枠の上端水平杆部の両側部上
にそれぞれ両側足場板を順次架設してなる構造としてい
る。
According to a third aspect of the present invention, there is provided a scaffolding device, wherein a central portion of a lower surface in a longitudinal direction of a horizontal support frame made of a section steel having a fixed length is supported on an upper surface of a horizontal structural member in a bridge structure. A pair of left and right fixed frames made of a shaped steel formed in an inverted L-shape are disposed below both sides of the support frame protruding to both sides from the horizontal structural member, and the vertical rod portions of these fixed frames are arranged in a horizontal structural member. And the horizontal rods connected to the upper ends of the vertical rods are fixed by bolts to both sides of a horizontal support frame protruding to both sides from the horizontal structural member. The lower end portions of the vertical rod portions of the both-side fixed frames protruding downward from the lower surface of the member are integrally connected by a connecting member to form a scaffold support device, and the scaffold support device is connected to the horizontal structure. At the same time, the left and right pillars of the gate-shaped scaffold frame are erected and fixed on both side ends of the horizontal support frame of each scaffold support device, and the scaffold frame is directed upward. A plurality of frames are assembled in succession to assemble a building frame having a predetermined height, and furthermore, connecting the pillars of the scaffolding frames adjacent in the longitudinal direction of the horizontal structural member with a connecting material, The scaffolds on both sides are sequentially erected on both sides.

【0012】この足場装置において、請求項4に係る発
明は、橋梁構造物における上下に一定間隔を存して互い
に平行に配設されている上下水平構造部材に上記構造の
足場支持装置を装着し、これらの上下足場支持装置間に
足場枠を組立ててなる建枠の上下端部を支持させた構造
を有している。
In this scaffolding device, the invention according to claim 4 is characterized in that the scaffolding support device having the above-mentioned structure is mounted on upper and lower horizontal structural members which are arranged parallel to each other at a certain interval vertically in a bridge structure. The upper and lower ends of a building frame formed by assembling a scaffold frame between these upper and lower scaffold support devices are supported.

【0013】[0013]

【作用】橋梁構造物における上下に一定の間隔を存して
互いに平行に配設されているトラス上下弦材等からなる
水平構造部材において、点検や塗装等の作業を行いたい
水平構造部材に上記足場支持装置を長手方向に一定間隔
毎に装着、固定する。この装着は、一定長さの形鋼から
なる水平支持フレームを水平構造部材の長手方向に直交
する方向に向けてその中央部下面を水平構造部材上に載
置すると共に水平構造部材の両側面に同じく正面逆L字
状に形成している形鋼からなる固定フレームの垂直杆部
を当接させ、これらの両側固定フレームの上端水平杆部
上に水平構造部材の上面から両側方に突出した上記水平
支持フレームの両側部下面を対向させてボルト取付孔を
合致させる。
[Function] A horizontal structural member, such as a truss upper and lower chord member, which is disposed parallel to each other at a certain interval above and below a bridge structure, and is to be inspected and painted, etc. The scaffold support device is mounted and fixed at regular intervals in the longitudinal direction. This mounting is performed by placing a horizontal support frame made of a shaped steel of a fixed length in a direction perpendicular to the longitudinal direction of the horizontal structural member, placing the lower surface of the central portion on the horizontal structural member, and attaching the horizontal support frame to both side surfaces of the horizontal structural member. The vertical rods of the fixed frame made of shaped steel, also formed in an inverted L-shape in front, are brought into contact with each other, and project from the upper surface of the horizontal structural member to both sides on the upper horizontal rod of these fixed frames. The lower surfaces of both sides of the horizontal support frame are opposed to each other so that the bolt mounting holes are aligned.

【0014】そうすると、水平支持フレームは定規等を
用いることなく、その両側部下面を水平構造部材の両側
面上端部から外側方に延びている両側の固定フレームの
水平杆部に合わせるだけで、簡単且つ正確に水平構造部
材の長手方向に対して直交する方向に配置され、この状
態にして、水平支持フレームの両側部を固定フレームの
水平杆部にボルトによって一体に連結すると共に、水平
構造部材の下面から下方に突出する両側固定フレームの
垂直杆部の下端部間を連結部材によって一体に連結すれ
ば、水平支持フレームは上記姿勢でもって強固に且つ安
定した状態で水平構造部材に固定され、固定後において
もガタツキや横振れ等が生じる虞れはない。
In this case, the horizontal support frame can be easily formed without using a ruler or the like by simply aligning the lower surfaces of the both sides with the horizontal rod portions of the fixed frames on both sides extending outward from the upper ends of both sides of the horizontal structural member. And it is arranged exactly in the direction perpendicular to the longitudinal direction of the horizontal structural member, and in this state, both sides of the horizontal support frame are integrally connected to the horizontal rod portion of the fixed frame by bolts, and If the lower ends of the vertical rod portions of the both-side fixed frames projecting downward from the lower surface are integrally connected by a connecting member, the horizontal support frame is firmly and stably fixed to the horizontal structural member in the above-mentioned posture, and fixed. There is no danger of rattling or lateral vibration occurring later.

【0015】この水平支持フレームの水平構造部材に対
する装着作業時において、請求項2に記載したように、
水平支持フレームの両側部に穿設しているボルト取付孔
と固定フレームの水平杆部に穿設しているボルト取付孔
との少なくとも一方を橋梁構造物の水平構造部材の幅方
向に長い長孔に形成しておくことによって、水平構造部
材の幅が多少異なっていてもその幅寸法に応じて水平支
持フレームの装着が可能となると共に、その装着作業も
容易に行える。
At the time of attaching the horizontal support frame to the horizontal structural member, as described in claim 2,
A long hole extending in the width direction of the horizontal structural member of the bridge structure, wherein at least one of the bolt mounting hole formed in both sides of the horizontal support frame and the bolt mounting hole formed in the horizontal rod portion of the fixed frame is formed. Thus, even if the width of the horizontal structural member is slightly different, the horizontal support frame can be mounted according to the width, and the mounting operation can be easily performed.

【0016】こうして、足場支持装置を橋梁構造物にお
ける水平構造部材に長手方向に一定間隔毎に装着したの
ち、この足場支持装置の水平支持アームの両側端足場枠
取付部に足場枠の左右両脚柱を固定、支持させる。この
時、水平支持フレームは上述したように、水平構造部材
の長さ方向に対して直交する方向に正確且つ強固に固定
されているので、前後、即ち、水平構造部材の長手方向
に隣接する足場枠は正確に正対し、足場枠間の継ぎ材等
による組立作業が容易に能率よく行える。
After the scaffold support device is mounted on the horizontal structural member of the bridge structure at regular intervals in the longitudinal direction, the left and right pillars of the scaffold frame are attached to the scaffold frame mounting portions at both ends of the horizontal support arm of the scaffold support device. Is fixed and supported. At this time, since the horizontal support frame is accurately and firmly fixed in the direction orthogonal to the length direction of the horizontal structural member as described above, the scaffolds adjacent to the front and rear, that is, the longitudinal direction of the horizontal structural member, The frames are accurately faced, and the assembling work using the joint material between the scaffold frames can be easily and efficiently performed.

【0017】また、橋梁構造物における上下に一定の間
隔を存して互いに平行に配設されているトラス上下弦材
からなる水平構造部材間に足場装置を組立てるには、ま
ず、下側の水平構造部材に上記足場支持装置を上記同様
にして長手方向に一定間隔毎に装着、固定したのち、各
足場支持装置の水平支持フレームの両側端足場枠取付部
両側端部上に門形状の足場枠の左右脚柱をそれぞれ立
設、定着させる。
In order to assemble the scaffolding device between horizontal structural members made of truss upper and lower chord members which are arranged parallel to each other at a certain interval vertically in the bridge structure, first, a lower horizontal After attaching the scaffold support device to the structural member at regular intervals in the longitudinal direction in the same manner as described above and fixing the scaffold support device, a gate-shaped scaffold frame is provided on both side end portions of the horizontal scaffold frame mounting portion of each horizontal support frame of each scaffold support device. Erect and fix the left and right pillars respectively.

【0018】次いで、各足場枠は上方に向かって複数
枠、順次継着することにより所定高さの建枠に組立て、
さらに、前後に隣接する足場枠の上端水平杆部の両側部
上にそれぞれ両側足場板を順次架設することによって足
場装置を構築するものである。この場合、請求項4に記
載したように、上記水平構造部材の上方の上側水平構造
部材にも足場支持装置を装着しておき、この足場支持装
置に所定高さまで組立てた上記建枠の上端部を支持させ
れば、安定した強固な足場装置を組立てることができ
る。
Next, each scaffold frame is assembled into a building frame of a predetermined height by sequentially joining a plurality of frames upward,
Further, a scaffolding device is constructed by sequentially arranging both side scaffolding plates on both side portions of the upper end horizontal rod portion of the front and rear adjacent scaffolding frames. In this case, as described in claim 4, a scaffold support device is also attached to the upper horizontal structural member above the horizontal structural member, and the upper end of the building frame assembled to the scaffold support device to a predetermined height. , A stable and strong scaffolding device can be assembled.

【0019】[0019]

【発明の実施の形態】次に、本発明の具体的な実施の形
態を図面について説明する。図1、図2において、Aは
橋梁構造物の床版下方のトラス構造物におけるトラス上
弦材、或いは中弦材、下弦材からなる断面中空矩形状の
水平構造部材Bに装着して後述する足場枠を支持するた
めの足場支持装置であって、水平構造部材Bの幅寸法の
3〜4倍程度の長さを有する上向きに開口した溝形鋼か
らなる直状の水平支持フレーム1と、山形鋼を正面逆L
字状に屈折、形成した左右一対の固定フレーム2、2と
からなる。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Next, specific embodiments of the present invention will be described with reference to the drawings. In FIGS. 1 and 2, A is a scaffold which is attached to a horizontal structural member B having a hollow rectangular cross section composed of a truss upper chord material, a middle chord material, and a lower chord material in a truss structure below a floor slab of a bridge structure. A scaffold support device for supporting a frame, comprising: a straight horizontal support frame 1 made of upwardly-opening channel steel having a length of about 3 to 4 times the width of a horizontal structural member B; Reverse steel L
It consists of a pair of left and right fixed frames 2, 2 bent and formed in a letter shape.

【0020】上記水平支持フレーム1はその平坦な底片
部1aにおける長手方向の中央部下面を水平構造部材B上
に直交状態に載置した時において、該水平構造部材Bか
ら外側方に突出する両側部に、長手方向に一定間隔毎に
該水平支持フレーム1の長手方向に長い長孔からなる複
数個のボルト取付孔3を穿設している。さらに、この水
平支持フレーム1の長手方向の両側端部は足場枠取付部
1'に形成されてあり、この足場枠取付部1'における底片
部1aの両長辺縁から上方に突設した壁面片1b、1bには、
長手方向に一定間隔毎に固定用孔4が穿設されている。
The horizontal support frame 1 has both sides projecting outward from the horizontal structural member B when the lower surface of the central portion of the flat bottom portion 1a in the longitudinal direction is placed on the horizontal structural member B in an orthogonal state. A plurality of bolt mounting holes 3 each having a long hole in the longitudinal direction of the horizontal support frame 1 are formed in the portion at regular intervals in the longitudinal direction. Further, both ends in the longitudinal direction of the horizontal support frame 1 are provided with scaffolding frame mounting portions.
1 'is formed on the wall pieces 1b, 1b projecting upward from both long side edges of the bottom piece 1a in the scaffold frame mounting portion 1'.
The fixing holes 4 are formed at regular intervals in the longitudinal direction.

【0021】一方、上記固定フレーム2は、水平構造部
材Bの縦幅よりも僅かに長い垂直杆部2aの上端に、この
垂直杆部2aに対して外側方に向かって直角に屈折した水
平杆部2bの基端を一体に連設してなり、垂直杆部2aは直
角に屈折してなる山形鋼における帯板形状の一半片2a'
を水平構造部材Bの側面に面接触状態に当接、受止させ
るように形成していると共に水平構造部材Bの下端から
下方に突出する下端部における該一半片2a' にボルト連
結孔5を穿設している。また、水平杆部2bはその水平面
を形成している一半片2b' の平坦な上面で上記水平支持
フレーム1の底片部1aの下面を支持するように形成さ
れ、該一半片2b' に水平支持フレーム1の底片部1aに設
けている複数個のボルト取付孔3に対応させて長手方向
に長い長孔からなる複数個のボルト取付孔6を長手方向
に一定間隔に穿設している。なお、これらの水平支持フ
レーム1の両側部と固定フレーム2の水平杆部2bとに設
けているボルト取付孔3、6は、両方を長孔に形成する
ことなく、少なくともいずれか一方を長孔に形成してお
けばよい。
On the other hand, the fixed frame 2 is provided at the upper end of a vertical rod portion 2a slightly longer than the vertical width of the horizontal structural member B with a horizontal rod bent at right angles outwardly with respect to the vertical rod portion 2a. The base end of the portion 2b is integrally connected, and the vertical rod portion 2a is a strip-shaped half 2a 'of angle iron that is bent at a right angle.
Is formed so as to abut against and receive the side surface of the horizontal structural member B in a surface contact state, and a bolt connection hole 5 is formed in the one half 2a 'at the lower end protruding downward from the lower end of the horizontal structural member B. Has been drilled. The horizontal rod 2b is formed so as to support the lower surface of the bottom piece 1a of the horizontal support frame 1 on the flat upper surface of the half 2b 'forming the horizontal plane. A plurality of bolt mounting holes 6 composed of long holes elongated in the longitudinal direction are formed at regular intervals in the longitudinal direction corresponding to the plurality of bolt mounting holes 3 provided in the bottom piece 1a of the frame 1. The bolt mounting holes 3 and 6 provided on both side portions of the horizontal support frame 1 and the horizontal rod portion 2b of the fixed frame 2 do not have to be both elongated holes. It may be formed in advance.

【0022】固定フレーム2を形成している垂直杆部2a
と水平杆部2bとの上記一半片2a' 、2b' の幅は水平支持
フレーム1の底片部1aと略同一幅に形成されていると共
に水平杆部2bの長さは水平構造部材Bから突出させる水
平支持フレーム1の側部の長さと同等、若しくは図3に
示すように短く形成されている。なお、垂直杆部2aと水
平杆部2bとは、一定長さを有する一本の山形鋼を直角に
屈折させることにより形成してもよく、或いは、別々に
形成して溶接等によって直角に固着させた構造としてお
いてもよい。また、上記水平支持フレーム1と固定フレ
ーム2とは、それぞれ溝形鋼と山形鋼から形成する以
外、両者を溝形鋼又は山形鋼から形成しておいてもよ
く、さらには断面矩形状の鋼製角パイプから形成してお
いてもよい。
The vertical rod 2a forming the fixed frame 2
The width of the half pieces 2a ', 2b' of the horizontal rod 2b is substantially the same as the width of the bottom piece 1a of the horizontal support frame 1, and the length of the horizontal rod 2b projects from the horizontal structural member B. The horizontal support frame 1 is formed to have a length equal to the length of the side portion or to be shorter as shown in FIG. Note that the vertical rod portion 2a and the horizontal rod portion 2b may be formed by bending a single angled steel having a fixed length at a right angle, or may be formed separately and fixed at a right angle by welding or the like. It may be a structure in which it is performed. Further, the horizontal support frame 1 and the fixed frame 2 may be formed from a channel steel or an angle iron, instead of being formed from a channel steel and an angle iron, respectively. It may be formed from a square pipe.

【0023】図中、7、7aは水平支持フレーム1の底片
部1aに設けているボルト取付孔3と固定フレーム2の水
平杆部2bに設けているボルト取付孔3間に挿通して、水
平支持フレーム1と固定フレーム2とを一体に連結させ
るためのボルトと該ボルトに螺合させるナットであり、
8は左右一対の固定フレーム2、2の下端部間を連結す
るための長尺ボルト8aとナット8bからなる連結部材であ
る。なお、これらの固定フレーム2には垂直杆部2aと水
平杆部2bとを一体に連結した補強部材9が設けられてい
る。この補強部材9としては、図3に示すように、直杆
状のものであってもよい。
In the figure, reference numerals 7 and 7a are inserted between the bolt mounting holes 3 provided in the bottom piece 1a of the horizontal support frame 1 and the bolt mounting holes 3 provided in the horizontal rod 2b of the fixed frame 2 so as to be horizontal. A bolt for integrally connecting the support frame 1 and the fixed frame 2 and a nut screwed to the bolt;
Reference numeral 8 denotes a connecting member including a long bolt 8a and a nut 8b for connecting the lower ends of the pair of fixed frames 2 and 2 on the left and right. The fixed frame 2 is provided with a reinforcing member 9 integrally connecting the vertical rod 2a and the horizontal rod 2b. As shown in FIG. 3, the reinforcing member 9 may be a straight rod.

【0024】このように構成した足場支持装置Aを上記
水平構造部材Bに装着するには、水平支持フレーム1を
水平構造部材Bの長手方向に直交する方向に向けてその
底片部1aの長手方向の中央部下面を水平構造部材B上に
載置すると共に、水平構造部材Bの両側面に正面逆L字
状に形成している固定フレーム2、2における垂直杆部
2a、2aの一半片2a' の平坦な垂直面を当接させると共に
これらの固定フレーム2、2を前後方向(水平構造部材
Bの長手方向)にその当接位置を移動調整して水平構造
部材Bの両側面上端から外側方に延設するこれらの両固
定フレーム2、2の水平杆部2b、2bの一半片2b' の平坦
な水平面上に水平構造部材Bから外側方に突出している
上記水平支持フレーム1の両側部におけるボルト取付孔
3を設けている底片部1aの下面を面接触状態に重ね合わ
せる。
In order to mount the scaffold support device A thus constructed on the horizontal structural member B, the horizontal support frame 1 is oriented in the direction perpendicular to the longitudinal direction of the horizontal structural member B in the longitudinal direction of the bottom piece 1a. Of the fixed frames 2 and 2 having an inverted L-shaped front surface formed on both sides of the horizontal structural member B with the lower surface of the central portion of the horizontal frame placed on the horizontal structural member B.
The flat vertical surfaces of the halves 2a 'of the fixed frames 2a, 2a are brought into contact with each other, and the positions of the fixed frames 2, 2 are moved and adjusted in the front-rear direction (the longitudinal direction of the horizontal structural member B) to adjust the horizontal structural members. B projecting outward from the horizontal structural member B on a flat horizontal surface of a half 2b 'of the horizontal rods 2b, 2b of the fixed frames 2, 2 extending outward from the upper ends of both side surfaces of B. The lower surfaces of the bottom pieces 1a provided with the bolt mounting holes 3 on both sides of the horizontal support frame 1 are overlapped in a surface contact state.

【0025】そうすると、水平構造部材Bの両側面上端
から外側方に向かって直角に延出する固定フレーム2、
2の水平杆部2b、2b同士が水平構造部材Bに直交する線
上に自動的に配置され、且つこれらの水平杆部2b、2bの
一半片2b' の上面が水平支持フレーム1の平坦な水平面
を形成している底片部1aの下面に面接触状態に重ね合わ
されることになって水平支持フレーム1は定規等を用い
ることなく、簡単且つ正確に水平構造部材Bの長手方向
に対して直交する方向に配置される。
Then, the fixed frame 2 extending perpendicularly outward from the upper ends of both side surfaces of the horizontal structural member B,
The two horizontal rods 2b, 2b are automatically arranged on a line orthogonal to the horizontal structural member B, and the upper surface of one half 2b 'of these horizontal rods 2b, 2b is placed on a flat horizontal surface of the horizontal support frame 1. The horizontal support frame 1 is simply and accurately orthogonal to the longitudinal direction of the horizontal structural member B without using a ruler, etc. Placed in the direction.

【0026】この状態にして互いに合致した水平支持フ
レーム1のボルト取付孔3と固定フレーム2、2におけ
る水平杆部2b、2bのボルト取付孔6間にボルト7を挿通
し、ナット7aを螺締することによって水平構造部材Bの
上面にその中央部を横架状態に載置した水平支持フレー
ム1と水平構造部材Bの両側面にその垂直杆部2a、2aを
挟持状態で当接させている両側固定フレーム2、2とを
一定に連結する。この際、上記水平支持フレーム1に設
けているボルト取付孔3と固定フレーム2の水平杆部2b
に設けているボルト取付孔6との少なくとも一方を水平
構造部材Bの幅方向に長い長孔に形成しているので、水
平構造部材Bの幅寸法の大小にもかかわらず、水平支持
フレーム1とこれらの固定フレーム2、2を水平構造部
材Bに装着することができる。
In this state, the bolt 7 is inserted between the bolt mounting holes 3 of the horizontal support frame 1 and the bolt mounting holes 6 of the horizontal rods 2b, 2b of the fixed frames 2, 2 which match each other, and the nut 7a is screwed. As a result, the horizontal support frame 1 whose central portion is placed on the upper surface of the horizontal structural member B in a horizontal state and the vertical rod portions 2a, 2a are brought into contact with both side surfaces of the horizontal structural member B in a sandwiched state. The two fixed frames 2 are fixedly connected to each other. At this time, the bolt mounting hole 3 provided in the horizontal support frame 1 and the horizontal rod portion 2b of the fixed frame 2
At least one of the bolt mounting holes 6 provided in the horizontal support member 1 is formed as a long hole elongated in the width direction of the horizontal structural member B. These fixed frames 2 and 2 can be mounted on the horizontal structural member B.

【0027】さらに、水平構造部材Bの両側面下端から
下方に突出している両側固定フレーム2、2の垂直杆部
2a、2aの下端部間を、一方の垂直杆部2aの下端部に設け
ているボルト連結孔5から連結部材8である長尺ボルト
8aを挿通してその先端部を他方の垂直杆部2aの下端部に
設けているボルト連結孔5に挿通させ、ナット8bを螺締
することによって両側固定フレーム2、2をその垂直杆
部2b、2bが水平構造部材Bの両側面に当接、受止された
状態で一体に連結させる。
Further, the vertical rod portions of the fixed frames 2, 2 projecting downward from the lower ends of both side surfaces of the horizontal structural member B.
A long bolt, which is a connecting member 8, is provided between the lower end portions of 2 a and 2 a through a bolt connecting hole 5 provided at a lower end portion of one of the vertical rod portions 2 a.
8a, the leading end of which is inserted into the bolt connection hole 5 provided at the lower end of the other vertical rod 2a, and the nuts 8b are screwed so that the fixed frames 2, 2 on both sides are connected to the vertical rod 2b. , 2b abut against both side surfaces of the horizontal structural member B and are integrally connected in a received state.

【0028】なお、水平支持フレーム1の下面中央部を
直接、水平構造部材Bの上面に載置すると、水平構造部
材Bの上面の微細な凹凸面によって水平支持フレーム1
がその凹凸面を支点として上下にグラツキが生じる虞れ
がある場合には、図3に示すように、水平構造部材Bの
上面両側部に、上面が平滑な水平面に形成している一定
高さのH形鋼からなるスペーサ部材10、10を載置してお
き、このスペーサ部材10、10上に水平支持フレーム1の
下面中央部を架設状態に載置することが望ましい。
When the central portion of the lower surface of the horizontal support frame 1 is directly placed on the upper surface of the horizontal structural member B, the horizontal support frame 1 has a fine uneven surface on the upper surface of the horizontal structural member B.
However, when there is a possibility that the upper and lower surfaces of the horizontal structural member B may have unevenness as a fulcrum, as shown in FIG. It is preferable that the spacer members 10 and 10 made of H-shaped steel are placed in advance, and the lower surface central portion of the horizontal support frame 1 is placed on the spacer members 10 and 10 in a state of being bridged.

【0029】このように、両側固定フレーム2、2を水
平構造部材Bの両側面にその垂直杆部2a、2aを全面的に
当接させた状態でその水平杆部2b、2bを水平支持フレー
ム1の両側部下面に重ね合わせてボルト・ナット7、7a
により一体に連結していると共に水平構造部材Bの下方
から突出した両側固定フレーム2、2の垂直杆部2a、2a
の下端部間をボルト・ナット8a、8bからなる連結部材8
によって締め付け状態に連結しているので、水平支持フ
レーム1と両側固定フレーム2、2はガタツキや横振れ
などが生じることなく水平支持フレーム1を水平構造部
材Bに対して直交させて状態で水平構造部材Bに正確に
且つ強固に固着させた構造とすることができる。
As described above, the horizontal rods 2b, 2b are connected to the horizontal support frame 2 with the vertical rods 2a, 2a entirely abutting on both side surfaces of the horizontal structural member B. Bolts and nuts 7, 7a superimposed on the lower surface on both sides of 1
The vertical rods 2a, 2a of the fixed frames 2, 2 protruding from below the horizontal structural member B
Connecting member 8 composed of bolts and nuts 8a and 8b
Since the horizontal support frame 1 and the fixed frames 2 on both sides are connected to each other in a tightened state, the horizontal support frame 1 is perpendicular to the horizontal structural member B without rattling or lateral vibration. The structure can be accurately and firmly fixed to the member B.

【0030】なお、両側固定フレーム2、2の垂直杆部
2b、2bの下端部間は上記長尺ボルト8からなる連結部材
によることなく、両端部がボルトによって垂直杆部2b、
2bの下端部に連結可能な一定長さの連結部材であっても
よい。また、水平構造部材Bの両側面が該水平構造部材
Bの捩れ等によって垂直面になっていない場合には、両
側固定フレーム2の垂直杆部2b、2bと水平構造部材Bの
両側面との間に調整部材(図示せず)を介在させて該調
整部材を介して水平構造部材Bの両側面に固定フレーム
2の垂直杆部2bが垂直に配設されるように補正するもの
である。このような調整部材としては、固定フレーム
2、2の垂直杆部2b、2bの対向面に自在継手を介して傾
動自在に取付けた当て板を用いることができ、該当て板
を水平構造部材Bの傾斜した側面にその傾斜度に応じて
傾動させて当接させることによって垂直杆部2bを垂直状
態にして水平構造部材Bの側面に受止させることができ
る。
The vertical rods of the fixed frames 2, 2 on both sides
2b, between the lower end portions of the vertical rod portion 2b, both ends are bolts without the connecting member consisting of the long bolt 8
A connecting member of a fixed length that can be connected to the lower end of 2b may be used. Further, when both side surfaces of the horizontal structural member B are not vertical due to the twist of the horizontal structural member B, etc., the vertical rod portions 2b, 2b of the both-side fixed frame 2 and the both side surfaces of the horizontal structural member B An adjustment member (not shown) is interposed therebetween so that the vertical rod portion 2b of the fixed frame 2 is vertically arranged on both side surfaces of the horizontal structural member B via the adjustment member. As such an adjusting member, it is possible to use a backing plate which is attached to the opposing surfaces of the vertical rods 2b, 2b of the fixed frames 2, 2 via a universal joint so as to be tiltable. The vertical rod portion 2b can be brought into a vertical state and received by the side surface of the horizontal structural member B by tilting and contacting the inclined side surface according to the degree of inclination.

【0031】また、水平構造部材Bは断面中空矩形状の
構造部材以外に、I形鋼やH形鋼からなる場合において
も上記足場支持装置Aを装着することができる。即ち、
I形鋼からなる水平構造部材Bにおいては、その平坦な
上面に上述したように水平支持フレーム1の平坦な下面
を載置させる一方、固定フレーム2ではその垂直杆部2
b、2bの上下端部をI形鋼の上下フランジ部の端面に架
設状態で当接、受止させればよく、H形鋼からなる水平
構造部材Bにおいては、その両側フランジ部の上端面に
水平支持フレーム1の中央部下面を架設状態で載置させ
る一方、固定フレーム2ではその垂直杆部2b、2bを両側
フランジ部の平坦な垂直面に上記同様にして当接、受止
させればよい。
The horizontal scaffolding support device A can be mounted even when the horizontal structural member B is made of an I-shaped steel or an H-shaped steel in addition to the structural member having a hollow rectangular cross section. That is,
In the horizontal structural member B made of I-shaped steel, the flat lower surface of the horizontal support frame 1 is placed on the flat upper surface as described above, while the vertical rod portion 2 is mounted on the fixed frame 2.
The upper and lower ends of the b and 2b may be brought into contact with and received by the upper and lower flanges of the I-shaped steel in the state of being bridged. On the other hand, the lower surface of the central portion of the horizontal support frame 1 is placed in a state of being erected, while the vertical rods 2b, 2b of the fixed frame 2 are brought into contact with and received by the flat vertical surfaces of both side flanges in the same manner as described above. I just need.

【0032】このように水平構造部材Bに装着された足
場支持装置Aによって、例えば、橋梁構造物における上
弦材である水平構造部材Bの下方に該水平構造部材Bの
点検や塗装作業を行うための足場板11を架設した足場枠
Cを吊支するには、図4、図5に示すように、足場支持
装置Aを水平構造部材Bの長さ方向に一定間隔毎に装着
して各足場支持装置Aにおける水平支持フレーム1の両
側端部の足場枠取付部1'に足場枠Cにおける一定長さの
鋼管からなる両側脚柱12、12の上端部を固定金物13を用
いて固定する。
The scaffolding support device A mounted on the horizontal structural member B in this manner performs inspection and painting work of the horizontal structural member B below the horizontal structural member B, for example, the upper chord member in a bridge structure. In order to suspend the scaffold frame C on which the scaffold plate 11 is mounted, as shown in FIGS. 4 and 5, the scaffold support device A is mounted at regular intervals in the length direction of the horizontal structural member B, and The upper ends of both side pillars 12, 12 made of a steel pipe of a fixed length in the scaffolding frame C are fixed to the scaffolding frame mounting portions 1 ′ at both side ends of the horizontal supporting frame 1 in the supporting device A using fixing hardware 13.

【0033】この場合、脚柱12の上端部を固定金物13に
よって被覆し、この固定金物13を足場枠取付部1'に設け
ている固定用孔4にボルトによって固着すると共に水平
支持フレーム1の両側端部から上方に突出した脚柱12の
上端部をクランプ14の一半クランプ部によって掴持さ
せ、この一半クランプ部と直交する該クランプ14の他半
クランプ部で前後に隣接する水平支持フレーム1、1の
両側端部上に水平構造部材Aの長手方向に平行に配設し
ている鋼管よりなる支持梁部材15を掴持させることによ
って水平支持フレーム1に脚柱13を吊支させ、さらに、
両側脚柱13、13の下端部間に横架部材16の両側端部を架
設状態に固定することにより足場枠Cを構成する。
In this case, the upper end of the pillar 12 is covered with a fixing metal 13, and the fixing metal 13 is fixed to a fixing hole 4 provided in the scaffolding frame mounting portion 1 ′ with a bolt and the horizontal supporting frame 1 is fixed. The upper end of the pedestal 12 protruding upward from both side ends is gripped by one half clamp of the clamp 14, and the other half clamp of the clamp 14 orthogonal to the one half clamp is adjacent to the front and rear adjacent horizontal support frame 1. 1. A pillar 13 is suspended from the horizontal support frame 1 by holding a support beam member 15 made of a steel pipe disposed in parallel with the longitudinal direction of the horizontal structural member A on both side end portions of the horizontal support member 1. ,
The scaffolding frame C is formed by fixing both side ends of the horizontal member 16 between the lower ends of the both side pillars 13 and 13 in a bridged state.

【0034】上記横架部材16の両側端部はクランプ14'
によって両脚柱13、13の下端部に連結されていると共
に、水平構造部材Bの下方両側に互いに平行な連結杆1
7、17をそれぞれ配してこれらの連結杆17、17を適宜な
固定金具によって足場枠Cの両側脚柱13、13の下端に固
着し、この両側連結杆17、17上に上記横架部材16の両側
端部を支持させている。そして、前後に隣接する横架設
部材16、16の両側部間上に足場板11を架設状態に取付け
た構造としている。なお、この足場支持装置Aにおいて
は、水平支持フレーム1を一定長さの山形鋼から形成し
ている。
Both ends of the horizontal member 16 are clamped 14 '.
The connecting rods 1 are connected to the lower ends of the two pillars 13 and 13 and are parallel to each other on both lower sides of the horizontal structural member B.
7 and 17, respectively, and these connecting rods 17 and 17 are fixed to the lower ends of both side pillars 13 and 13 of the scaffolding frame C with appropriate fixing brackets. 16 sides are supported. Further, the scaffold plate 11 is mounted in a state of being bridged between both side portions of the laterally extending members 16 adjacent to each other in front and rear. In this scaffold support device A, the horizontal support frame 1 is formed from a fixed-length angle steel.

【0035】図6は上記足場支持装置Aの別な利用形態
を示すもので、足場支持装置Aの水平支持フレーム1の
両側足場枠取付部1'、1'を利用して、電動ゴンドラ足場
D、Dを吊支してなるものである。
FIG. 6 shows another use form of the scaffold support device A. The electric gondola scaffold D is provided by using the scaffold frame mounting portions 1 ', 1' on both sides of the horizontal support frame 1 of the scaffold support device A. , D are suspended.

【0036】次に、図7、図8は上記足場支持装置Aを
基礎としてこの足場支持装置Aの上方に構築した足場装
置Eを示すもので、足場支持装置Aはトラス構造物にお
けるトラス下弦材からなる水平構造部材Bに上記同様に
して長手方向に一定間隔毎に装着、固定されてあり、各
足場支持装置Aの水平支持フレーム1の両側端部によっ
て形成している足場枠取付部1'、1'上にジャッキ金物1
8、18を設置し、これらのジャッキ金物18、18を足場枠
取付部1'、1'に穿設している固定用孔4を使用してボル
トにより固定している。
FIGS. 7 and 8 show a scaffolding device E constructed above the scaffolding supporting device A based on the scaffolding supporting device A. The scaffolding supporting device A is a truss lower chord member of a truss structure. A frame mounting portion 1 ′ which is mounted and fixed to the horizontal structural member B made of the above at regular intervals in the longitudinal direction in the same manner as described above, and is formed by both side ends of the horizontal support frame 1 of each scaffold support device A. , 1 'on jack hardware 1
8 and 18 are installed, and these jack hardware 18 and 18 are fixed by bolts using fixing holes 4 drilled in the scaffold frame mounting portions 1 'and 1'.

【0037】そして、各足場支持装置Aに設置された上
記左右のジャッキ金物18、18に正面門形状に形成してい
る足場枠Cの両脚柱12、12の下端を定着させることによ
って両脚柱12、12を左右のジャッキ金物18、18上に立
設、固定している。なお、足場枠Cとしては、予め、両
脚柱12、12の上端部間に支持杆19の両端を一体に連設し
てなる鳥居枠等の門形状の足場枠Cであってもよく、或
いは、両脚柱12、12の上端部間に水平杆部19の両端部を
クランプ14によって連結、固着して門形状に形成した足
場枠Cであってもよい。
The lower ends of the two pillars 12, 12 of the scaffold frame C formed in a front gate shape are fixed to the left and right jack hardware 18, 18 installed on each scaffold support device A, thereby fixing the two pillars 12, , 12 are erected and fixed on the left and right jack hardware 18, 18. The scaffold frame C may be a gate-shaped scaffold frame C such as a torii frame in which both ends of the support rod 19 are integrally connected between the upper ends of the two pillars 12 and 12 in advance, or Alternatively, a scaffold frame C formed in a gate shape by connecting and fixing both ends of the horizontal rod portion 19 between the upper end portions of the two pillars 12 and 12 with the clamps 14 may be used.

【0038】このように、各足場支持装置Aの水平支持
フレーム1の両側端部にジャッキ金物18、18を固定し、
このジャッキ金物18、18上に立設、固定した上記足場枠
Cを一階層としてこれらの足場枠C上に次の足場枠Cを
順次、上方に向かって継着することによって多階層の足
場枠Cからなる建枠を組立て、さらに、水平構造部材B
の長手方向(前後方向)に隣接する全ての足場枠Cの脚
柱12の上端部間を鋼管からなる継ぎ材20によって連結す
ると共にブレース21をX字状に配してその両端部を前後
足場枠C、Cの対向する脚柱12、12に固定し、前後に一
定間隔を存して立設しているこれらの足場枠C、Cの水
平支持杆部19、19における両側部上に足場板11を順次、
架設、固定することによって足場装置Eを構成してい
る。
In this manner, the jack hardware 18, 18 is fixed to both ends of the horizontal support frame 1 of each scaffold support device A,
The above-mentioned scaffolding frames C which are erected and fixed on the jack hardware 18, 18 are used as one layer, and the next scaffolding frames C are successively connected to these scaffolding frames C in the upward direction, thereby forming a multi-layered scaffolding frame. C, and a horizontal structural member B
The upper ends of the pillars 12 of all the scaffold frames C adjacent to each other in the longitudinal direction (front-back direction) are connected by a joining material 20 made of a steel pipe, and the braces 21 are arranged in an X-shape, and both ends thereof are connected to the front-back scaffold The scaffolds are fixed to the opposing pillars 12, 12 of the frames C, C, and are erected at predetermined intervals in the front and rear. Board 11 sequentially,
The scaffolding device E is configured by erection and fixing.

【0039】上記足場枠Cにおいて、水平支持杆部19が
両脚柱12、12の上端部間にクランプ等の連結金具により
取付けられている場合には、該水平支持杆部19の両端部
を上記継ぎ材20上に受止させた構造としている。なお、
継ぎ材20も脚柱12にクランプ等の連結金具によって固着
されている。また、この継ぎ材20は上記ジャッキ金物1
8、18上に定着している一階層の足場枠Cの脚柱下端部
間にも設けておくこのが望ましい。
In the scaffolding frame C, when the horizontal support rod 19 is attached between the upper ends of the two pillars 12 and 12 by connecting metal fittings such as clamps, both ends of the horizontal support rod 19 are connected to each other. It is structured to be received on the joining material 20. In addition,
The joint member 20 is also fixed to the pillar 12 by a connection fitting such as a clamp. In addition, this joining material 20 is
It is desirable to provide it also between the lower ends of the pillars of the scaffolding frame C of one layer fixed on 8 and 18.

【0040】上記足場装置Eの最上階層の足場枠Cは、
一階層の足場枠Cを支持した上記足場支持装置Aを取付
けている水平構造部材Bの上方の水平構造部材B'に連
結、支持させている。その支持構造は、この上側水平構
造部材B'にも下側の上記水平構造部材Bに装着、固定し
ている各足場支持装置Aの垂直上方に対応させて足場支
持装置Aを長手方向に一定間隔毎に装着、固定し、これ
らの足場支持装置Aの水平支持フレーム1における足場
枠取付部1’に最上階層の足場枠Cの両脚柱12、12の上
端部を固定金物13に挿通、支持させた状態で該固定金物
13を足場枠取付部1'に設けている固定用孔4にボルトに
よって固着している。
The scaffolding frame C on the top layer of the scaffolding device E is
The above-mentioned scaffold support device A supporting the scaffold frame C of one layer is connected to and supported by a horizontal structural member B ′ above a horizontal structural member B to which the scaffold support device A is attached. The supporting structure is such that the scaffold support device A is fixed in the longitudinal direction in correspondence with the upper horizontal structure member B ′ and vertically above each of the scaffold support devices A mounted and fixed to the lower horizontal structure member B. Attach and fix at every interval, and insert the upper ends of the two pillars 12 and 12 of the topmost scaffolding frame C into the scaffolding frame mounting portion 1 ′ of the horizontal supporting frame 1 of the scaffolding supporting device A and support the fixing hardware 13. The fixed hardware
13 is fixed to a fixing hole 4 provided in the scaffold frame mounting portion 1 'by a bolt.

【0041】なお、足場支持装置Aを構成している水平
支持フレーム1や両側固定フレーム2、2を水平構造物
B'に固定する方法は上記と同様であるので、その説明を
省略する。また、上記実施例においては、足場支持装置
Aの水平支持フレーム1における足場枠取付部1'として
ジャッキ金物18等の固定用孔4を設けた構造としている
が、一定高さの連結用ピンを突設しておき、このピンに
一階層の足場枠Cにおける両脚柱12、12の下端部を被嵌
させて螺子等により固定させるように構成しておいても
よい。
The horizontal support frame 1 and the fixed frames 2 on both sides constituting the scaffold support device A are connected to a horizontal structure.
The method of fixing to B 'is the same as described above, and a description thereof will be omitted. Further, in the above-described embodiment, the fixing hole 4 for the jack hardware 18 or the like is provided as the scaffolding frame mounting portion 1 'in the horizontal support frame 1 of the scaffolding supporting device A. It may be configured so as to protrude, and to fit the lower ends of the two pillars 12, 12 of the one-level scaffolding frame C to this pin and fix it with screws or the like.

【0042】[0042]

【発明の効果】以上のように本発明の橋梁構造物におけ
る足場支持装置によれば、長手方向の両側部に複数個の
ボルト取付孔を穿設し且つ両側端部に足場枠取付部を設
けている一定長さの形鋼からなる水平支持フレームと、
垂直杆部の上端に水平杆部を一体に設けて正面逆L字状
に形成し且つ水平杆部に上記水平支持フレームのボルト
取付孔に対応させてボルト取付孔を穿設していると共に
垂直杆部の下端部に連結孔を穿設している形鋼からなる
固定フレームとからなるので、不使用時にはこれらの水
平支持フレームと固定フレームとをユニットとして整然
と保管しておくことができるばかりでなく、使用時にお
いても運搬或いは作業現場での取扱いが容易となる。
As described above, according to the scaffold support device for a bridge structure of the present invention, a plurality of bolt mounting holes are formed on both sides in the longitudinal direction, and the scaffold frame mounting portions are provided on both side ends. A horizontal support frame made of shaped steel of a certain length,
A horizontal rod portion is integrally provided at the upper end of the vertical rod portion to form an inverted L-shaped front surface, and a bolt mounting hole is formed in the horizontal rod portion corresponding to the bolt mounting hole of the horizontal support frame. Since it consists of a fixed frame made of shaped steel with a connecting hole drilled at the lower end of the rod, these horizontal support frames and fixed frames can be stored neatly as a unit when not in use. In addition, even during use, transportation or handling at a work site becomes easy.

【0043】さらに、橋梁構造物の水平構造部材に形鋼
からなる上記水平支持フレームを水平構造部材の長手方
向に直交する方向に向けてその中央部下面を水平構造部
材上に載置すると共に水平構造部材の両側面に正面逆L
字状に形成している形鋼からなる上記固定フレームの垂
直杆部を当接させ、これらの両側固定フレームの上端水
平杆部上に水平構造部材の上面から両側方に突出した上
記水平支持フレームの両側部下面を対向させてボルト取
付孔を合致させるだけで、水平支持フレームを簡単且つ
正確に水平構造部材の長手方向に対して直交する方向に
配置することができる。この際、水平支持フレームや両
側固定フレームは形鋼から形成されているので、水平支
持フレームを水平構造部材上に安定した状態で載置させ
ることができると共に水平支持フレームの両側部下面と
固定フレームの水平杆部とを面接触状態に合わせること
ができ、ボルトによる連結作業が円滑に行えると共に両
者を強固に且つ安定した状態で連結、一体化させること
ができる。
Further, the horizontal support frame made of shaped steel is placed on the horizontal structural member of the bridge structure in a direction perpendicular to the longitudinal direction of the horizontal structural member. Front inverted L on both sides of structural member
The vertical support of the fixed frame made of a shaped steel formed in the shape of a letter is brought into contact with the horizontal support frame protruding from the upper surface of the horizontal structural member to both sides on the upper horizontal rod of the fixed frames on both sides. The horizontal support frame can be simply and accurately arranged in the direction perpendicular to the longitudinal direction of the horizontal structural member only by making the lower surfaces of both sides face each other and aligning the bolt mounting holes. At this time, since the horizontal support frame and the fixed frames on both sides are formed from shaped steel, the horizontal support frame can be stably mounted on the horizontal structural member, and the lower surfaces of both sides of the horizontal support frame and the fixed frame can be fixed. The horizontal rod portion can be adjusted to a surface contact state, and the connecting operation with the bolt can be performed smoothly, and both can be connected and integrated in a strong and stable state.

【0044】この状態にして、水平支持フレームの両側
部を固定フレームの水平杆部にボルトによって一体に連
結すると共に水平構造部材の下面から下方に突出する両
側固定フレームの垂直杆部の下端部間を連結部材によっ
て一体に連結すれば、水平支持フレームは上記姿勢でも
って強固に且つ正確に安定した状態で水平構造部材に固
定することができ、その組立作業も何等の熟練を要する
ことなく容易に且つ精度よく行えると共に組立費用が低
減し、その上、固定後においてもガタツキや横振れ等が
生じる虞れはない。
In this state, both sides of the horizontal support frame are integrally connected to the horizontal rods of the fixed frame by bolts, and between the lower ends of the vertical rods of the fixed frames projecting downward from the lower surface of the horizontal structural member. Can be fixed to the horizontal structural member firmly and accurately and stably in the above posture by the connecting member, and the assembling work can be easily performed without any skill. In addition, the assembly can be performed with high accuracy and the assembly cost can be reduced. In addition, there is no possibility that rattling or lateral runout will occur even after fixing.

【0045】さらに、請求項2に係る発明によれば、上
記水平支持フレームの両側部に穿設しているボルト取付
孔と上記固定フレームの水平杆部に穿設しているボルト
取付孔との少なくとも一方を橋梁構造物の水平構造部材
の幅方向に長い長孔に形成しているので、上記水平構造
部材の幅が多少異なっていてもその幅寸法に応じて水平
支持フレームを容易に且つ正確に装着することができ
る。
Further, according to the second aspect of the present invention, the bolt mounting holes formed in both sides of the horizontal support frame and the bolt mounting holes formed in the horizontal rod of the fixed frame are formed. Since at least one of the horizontal structural members of the bridge structure is formed as a long hole in the width direction, even if the width of the horizontal structural member is slightly different, the horizontal support frame can be easily and accurately adjusted according to the width dimension. Can be attached to

【0046】また、上記足場支持装置を用いた足場装置
によれば、請求項3に記載したように、足場支持装置を
水平構造部材に長手方向に一定間隔毎に装着すると共に
各足場支持装置の水平支持フレームの両側端部上に門形
状の足場枠の左右脚柱をそれぞれ立設、定着させ且つこ
の足場枠を上方に向かって複数枠、順次継着することに
より所定高さの建枠を組立て、さらに、水平構造部材の
長手方向に隣接する足場枠の脚柱間を繋ぎ材によって連
結すると共に足場枠の上端水平杆部の両側部上にそれぞ
れ両側足場板を順次架設してなる構造としているので、
足場支持装置の水平支持アームは上述したように、水平
構造部材の長さ方向に対して直交する方向に正確且つ強
固に固定されているので、前後、即ち、水平構造部材の
長手方向に隣接する足場枠を正確に正対させることがで
き、足場枠の組立作業や足場枠間の継ぎ材等による組立
作業が容易に能率よく行える。
According to the scaffolding device using the scaffolding support device, as described in claim 3, the scaffolding support device is mounted on the horizontal structural member at regular intervals in the longitudinal direction. The left and right pillars of the gate-shaped scaffolding frame are respectively erected and fixed on both side ends of the horizontal support frame, and a plurality of the scaffolding frames are sequentially joined upward to form a building frame having a predetermined height. Assembling, furthermore, as a structure in which the pillars of the scaffolding frame adjacent in the longitudinal direction of the horizontal structural member are connected by a connecting member, and both side scaffolding plates are sequentially laid on both side portions of the upper horizontal rod portion of the scaffolding frame. Because
As described above, the horizontal support arm of the scaffolding support device is accurately and firmly fixed in a direction orthogonal to the length direction of the horizontal structural member, so that it is adjacent to the front and rear, that is, in the longitudinal direction of the horizontal structural member. The scaffolding frame can be accurately faced, and the assembling work of the scaffolding frame and the assembling work with the joint material between the scaffolding frames can be easily and efficiently performed.

【0047】その上、形鋼よりなる水平支持フレームは
同じく形鋼よりなる両側固定フレームによって上述した
ように水平構造部材上に強固に且つ正確に固着され、こ
の水平支持フレームの平坦な上面の両側端部上に門形状
の足場枠の左右脚柱をそれぞれ立設、定着させているの
で、この足場枠から上方に向かって順次足場枠を継着す
ることにより組立てられた足場装置は、足場支持装置の
水平支持フレーム上に強固に安定した状態で立設,定着
し、台風等の強風によっても転倒や崩壊が生じることな
く、橋梁構造物の塗装や点検等の保守作業を円滑に能率
よく行えて作業時間の短縮を図ることができる。また、
使用後における解体、撤去作業も容易に行える。
In addition, the horizontal support frame made of shaped steel is firmly and accurately fixed on the horizontal structural member as described above by the two-sided fixing frame also made of shaped steel, and the two sides of the flat upper surface of this horizontal support frame are provided. Since the left and right pillars of the gate-shaped scaffolding frame are erected and fixed on the end, the scaffolding device assembled by sequentially joining the scaffolding frames upward from this scaffolding frame provides a scaffolding support. Stands and stands firmly and stably on the horizontal support frame of the equipment. Maintenance work such as painting and inspection of bridge structures can be performed smoothly and efficiently without falling or collapsing even by strong winds such as typhoons. Thus, the working time can be reduced. Also,
Disassembly and removal work after use can be easily performed.

【0048】さらに、請求項4に係る発明によれば、上
記水平構造部材の上方の上側水平構造部材にも足場支持
装置を装着しておき、この足場支持装置に所定高さまで
組立てた上記建枠の上端部を支持させるものであるか
ら、一層安定した強固な足場装置を組立てることができ
る。
According to the fourth aspect of the present invention, the scaffold support device is also mounted on the upper horizontal structural member above the horizontal structural member, and the building frame assembled to the scaffold support device to a predetermined height. Since the upper end portion is supported, a more stable and strong scaffolding device can be assembled.

【図面の簡単な説明】[Brief description of the drawings]

【図1】足場支持装置の分解斜視図、FIG. 1 is an exploded perspective view of a scaffold support device,

【図2】水平構造部材に装着した状態の正面図、FIG. 2 is a front view of a state in which it is mounted on a horizontal structural member.

【図3】足場支持装置の変形例を示す正面図、FIG. 3 is a front view showing a modification of the scaffold support device,

【図4】足場枠を吊支した状態の簡略正面図、FIG. 4 is a simplified front view of a state where a scaffold frame is suspended,

【図5】その簡略側面図、FIG. 5 is a simplified side view thereof,

【図6】電動ゴンドラ足場を吊支した状態の簡略正面
図、
FIG. 6 is a simplified front view of a state where the electric gondola scaffold is suspended,

【図7】足場装置の簡略正面図、FIG. 7 is a simplified front view of a scaffold device,

【図8】その簡略側面図、FIG. 8 is a simplified side view thereof,

【図9】従来例を示す簡略正面図。FIG. 9 is a simplified front view showing a conventional example.

【符号の説明】[Explanation of symbols]

A 足場支持装置 B 水平構造部材 C 足場枠 E 足場装置 1 水平支持フレーム 1' 足場枠取付部 2 固定フレーム 2a 垂直杆部 2b 水平杆部 3、6 ボルト取付孔 8 連結部材 11 足場枠 12 脚柱 20 継ぎ材 Reference Signs List A Scaffolding support device B Horizontal structural member C Scaffolding frame E Scaffolding device 1 Horizontal supporting frame 1 'Scaffolding frame mounting part 2 Fixed frame 2a Vertical rod part 2b Horizontal rod part 3, 6 Bolt mounting hole 8 Connecting member 11 Scaffolding frame 12 Pillar 20 Splice

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】 長手方向の両側部に複数個のボルト取付
孔を穿設し且つ両側端部に足場枠取付部を設けている一
定長さの形鋼からなる水平支持フレームと、垂直杆部の
上端に水平杆部を一体に設けて正面逆L字状に形成し且
つ水平杆部に上記水平支持フレームのボルト取付孔に対
応させてボルト取付孔を穿設していると共に垂直杆部の
下端部に連結孔を穿設している形鋼からなる固定フレー
ムとからなり、上記水平支持フレームの長手方向の中央
部下面を橋梁構造物の水平構造部材の上面に支持させる
と共に、上記固定フレームを水平構造部材の両側に配し
てこれらの垂直杆部を水平構造部材の両側面に受止させ
且つそれぞれの水平杆部を水平構造部材の上面から両側
方に突出する上記水平支持フレームの両側下面に対向さ
せて上記ボルト取付孔間をボルトにより連結し、さら
に、水平構造部材の下面から下方に突出する上記両側固
定フレームの垂直杆部の下端部に設けた上記連結孔間を
連結部材によって一体に連結してなることを特徴とする
橋梁構造物における足場支持装置。
1. A horizontal support frame made of a fixed-length section steel having a plurality of bolt mounting holes formed on both sides in a longitudinal direction and a scaffolding frame mounting portion provided on both side ends, and a vertical rod portion. A horizontal rod portion is integrally provided at the upper end of the horizontal support frame to form an inverted L-shape. The horizontal rod portion has a bolt mounting hole corresponding to the bolt mounting hole of the horizontal support frame. A fixed frame made of a shaped steel having a connection hole formed at a lower end thereof, wherein a lower surface of a central portion in a longitudinal direction of the horizontal support frame is supported on an upper surface of a horizontal structural member of a bridge structure; Are disposed on both sides of the horizontal structural member so that these vertical rods are received on both side surfaces of the horizontal structural member, and the respective horizontal rods protrude from the upper surface of the horizontal structural member to both sides. Above bolt mounting facing the bottom The holes are connected by bolts, and the connecting holes provided at the lower ends of the vertical rods of the both-side fixed frames projecting downward from the lower surface of the horizontal structural member are integrally connected by a connecting member. A scaffold support device for a bridge structure.
【請求項2】 水平支持フレームの両側部に穿設してい
るボルト取付孔と固定フレームの水平杆部に穿設してい
るボルト取付孔との少なくとも一方を橋梁構造物の水平
構造部材の幅方向に長い長孔に形成していることを特徴
とする請求項1に記載の橋梁構造物における足場支持装
置。
2. The width of a horizontal structural member of a bridge structure, wherein at least one of a bolt mounting hole formed in both sides of a horizontal support frame and a bolt mounting hole formed in a horizontal rod portion of a fixed frame is provided. The scaffold support device for a bridge structure according to claim 1, wherein the scaffold support device is formed as a long hole extending in a direction.
【請求項3】 橋梁構造物における水平構造部材の上面
に一定長さの形鋼よりなる水平支持フレームの長手方向
の下面中央部を支持させると共に、水平構造部材から両
側方に突出した該支持フレームの両側部下方に逆L字状
に形成した形鋼からなる左右一対の固定フレームを配し
てこれらの固定フレームにおける垂直杆部を水平構造部
材の両側面に受止させる一方、これらの垂直杆部の上端
部に連設した水平杆部を上記水平構造部材から両側方に
突出した水平支持フレームの両側部にそれぞれボルトに
より固着し且つ水平構造部材の下面から下方に突出する
上記両側固定フレームの垂直杆部の下端部間を連結部材
によって一体に連結して足場支持装置を構成し、この足
場支持装置を上記水平構造部材に長手方向に一定間隔毎
に装着すると共に各足場支持装置の水平支持フレームの
両側端部上に門形状の足場枠の左右脚柱をそれぞれ立
設、定着させ且つこの足場枠を上方に向かって複数枠、
順次継着することにより所定高さの建枠を組立て、さら
に、水平構造部材の長手方向に隣接する足場枠の脚柱間
を繋ぎ材によって連結すると共に足場枠の上端水平杆部
の両側部上にそれぞれ両側足場板を順次架設しているこ
とを特徴とする橋梁構造物における足場装置。
3. A horizontal support frame made of a fixed length of steel is supported on the upper surface of a horizontal structural member of a bridge structure, and a central portion of the lower surface in the longitudinal direction of the horizontal support frame is protruded to both sides from the horizontal structural member. A pair of left and right fixed frames made of a shaped steel formed in an inverted L-shape are arranged below both sides of the horizontal frame so that the vertical rods in these fixed frames are received on both side surfaces of the horizontal structural member. The horizontal rod portion connected to the upper end of the horizontal fixing member is fixed to each side portion of the horizontal support frame projecting to both sides from the horizontal structural member by bolts, and projects downward from the lower surface of the horizontal structural member. The lower end portions of the vertical rod portions are integrally connected by a connecting member to form a scaffolding support device, and this scaffolding support device is mounted on the horizontal structural member at regular intervals in the longitudinal direction and each The left and right pillars of the gate-shaped scaffold frame are respectively erected and fixed on both side ends of the horizontal support frame of the scaffold support device, and the scaffold frame is upwardly framed by a plurality of frames,
A building frame of a predetermined height is assembled by sequentially joining, further connecting the pillars of the scaffold frame adjacent in the longitudinal direction of the horizontal structural member with a connecting material, and on both sides of the upper end horizontal rod portion of the scaffold frame. A scaffolding device for a bridge structure, characterized in that scaffolding plates on both sides are sequentially erected on each of them.
【請求項4】 橋梁構造物における上下に一定間隔を存
して互いに平行に配設されている上下水平構造部材に足
場支持装置を装着し、これらの上下足場支持装置間に足
場枠を組立ててなる建枠の上下端部を支持させているこ
とを特徴とする請求項3に記載の橋梁構造物における足
場装置。
4. A scaffolding support device is mounted on upper and lower horizontal structural members of a bridge structure which are arranged in parallel at predetermined intervals in the vertical direction, and a scaffold frame is assembled between the upper and lower scaffolding support devices. The scaffolding device for a bridge structure according to claim 3, wherein upper and lower ends of the building frame are supported.
JP2000248351A 2000-08-18 2000-08-18 Scaffolding support device and scaffold device in bridge structure Expired - Lifetime JP3386785B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000248351A JP3386785B2 (en) 2000-08-18 2000-08-18 Scaffolding support device and scaffold device in bridge structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000248351A JP3386785B2 (en) 2000-08-18 2000-08-18 Scaffolding support device and scaffold device in bridge structure

Publications (2)

Publication Number Publication Date
JP2002061116A true JP2002061116A (en) 2002-02-28
JP3386785B2 JP3386785B2 (en) 2003-03-17

Family

ID=18738275

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000248351A Expired - Lifetime JP3386785B2 (en) 2000-08-18 2000-08-18 Scaffolding support device and scaffold device in bridge structure

Country Status (1)

Country Link
JP (1) JP3386785B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101890963A (en) * 2010-07-08 2010-11-24 中铁二院工程集团有限责任公司 Variable-height continuous steel truss girder railway bridge inspection vehicle
CN108643038A (en) * 2018-04-12 2018-10-12 株洲时代新材料科技股份有限公司 Check device and inspection method for truss bridge

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104343084B (en) * 2014-11-14 2016-04-13 武桥重工集团股份有限公司 The trackless lower edge inspection trolley of a kind of steel purlin bridge
CN110835889B (en) * 2019-12-20 2021-04-20 招商局重庆交通科研设计院有限公司 Single-column pier type viaduct reinforcing device
KR102149464B1 (en) * 2020-02-07 2020-08-31 주식회사 선진곤도라 Apparatus for fixing of gondola

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101890963A (en) * 2010-07-08 2010-11-24 中铁二院工程集团有限责任公司 Variable-height continuous steel truss girder railway bridge inspection vehicle
CN108643038A (en) * 2018-04-12 2018-10-12 株洲时代新材料科技股份有限公司 Check device and inspection method for truss bridge

Also Published As

Publication number Publication date
JP3386785B2 (en) 2003-03-17

Similar Documents

Publication Publication Date Title
JP3386785B2 (en) Scaffolding support device and scaffold device in bridge structure
JP3027130B2 (en) Assembly structure of hanging scaffold
JP2924659B2 (en) Construction method of assembling scaffold
KR200213539Y1 (en) Frame of safety workbench
JP3420187B2 (en) Scaffolding unit and scaffolding device in bridge structure
JP2001049623A (en) H-steel arm scaffolding and method for constructing the same
JP2612435B2 (en) Overhead crane
JP2617740B2 (en) Formwork equipment
JP3120301U (en) Morning glory construction member of panel type suspension scaffold
CN219726154U (en) A bed-jig for truss is assembled
JP3103294B2 (en) Pillar steel frame, jig used for the connection, and steel frame connection method
JP3211768U (en) Wall tether support member
JP7409780B2 (en) Hanging equipment for hanging scaffolds and hanging scaffolding
JPH0447300Y2 (en)
JP2001107555A (en) Scaffold for steel column
JP2009162044A (en) Temporary hut structure
JP3420188B2 (en) Scaffolding device for skewed structural members in bridge structures
JP2724909B2 (en) Frame scaffold assembly method and frame scaffold
JP2004060313A (en) Timbering for bridge
JP2924649B2 (en) Assembly type scaffold for construction
JP2707435B2 (en) Assembling roof shingles for temporary buildings
JPH0740029Y2 (en) Work scaffold mounting jig to steel column
JP2020176455A (en) Exterior panel support structure and exterior panel support method
JP2523167Y2 (en) Stage equipment
JP2023084500A (en) tent frame

Legal Events

Date Code Title Description
TRDD Decision of grant or rejection written
R150 Certificate of patent or registration of utility model

Ref document number: 3386785

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090110

Year of fee payment: 6

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090110

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100110

Year of fee payment: 7

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100110

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110110

Year of fee payment: 8

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110110

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120110

Year of fee payment: 9

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120110

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130110

Year of fee payment: 10

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130110

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140110

Year of fee payment: 11

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term