JPH09302654A - Construction method and device for driving steel pipe pile - Google Patents

Construction method and device for driving steel pipe pile

Info

Publication number
JPH09302654A
JPH09302654A JP11883996A JP11883996A JPH09302654A JP H09302654 A JPH09302654 A JP H09302654A JP 11883996 A JP11883996 A JP 11883996A JP 11883996 A JP11883996 A JP 11883996A JP H09302654 A JPH09302654 A JP H09302654A
Authority
JP
Japan
Prior art keywords
steel pipe
sheet pile
pipe sheet
hole hammer
diameter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP11883996A
Other languages
Japanese (ja)
Other versions
JP3165997B2 (en
Inventor
Kenji Kuroiwa
憲二 黒岩
Keiji Kawahara
圭司 河原
Chiaki Urushima
千明 宇留島
Sadayuki Nakamuro
貞幸 中室
Tsuyoshi Hirokawa
強士 廣川
Hirosuke Yokoyama
弘介 横山
Takeshi Hayashi
猛 林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Kansai Electric Power Co Inc
Mitsubishi Materials Corp
Yokoyama Kiso Kohji Co Ltd
Original Assignee
Kajima Corp
Kansai Electric Power Co Inc
Mitsubishi Materials Corp
Yokoyama Kiso Kohji Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp, Kansai Electric Power Co Inc, Mitsubishi Materials Corp, Yokoyama Kiso Kohji Co Ltd filed Critical Kajima Corp
Priority to JP11883996A priority Critical patent/JP3165997B2/en
Publication of JPH09302654A publication Critical patent/JPH09302654A/en
Application granted granted Critical
Publication of JP3165997B2 publication Critical patent/JP3165997B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

PROBLEM TO BE SOLVED: To set digging and boring ranges to be closer to an outer diameter of a steel pipe pile than in the case of a conventional replacement construction method, and perform placement of a steel pipe pile in one process simultaneously with digging and boring without providing a process of replacement by good quality soil at favorable precision without using large-scaled temporarily installed facilities. SOLUTION: An applied down-the-hole hammer 1 is of such a type that a bit part 1a can be diameter-enlarged, the down-the-hole hammer 1 and a rod 4 installed on a pile driver 2 are inserted into a steel pipe pile 6, the bit part 1a of the down-the hole hammer 1 protruded from a tip of the steel pipe pile 6 is diameter-enlarged, and after diameter-enlarging, the steel pipe pile 6 is put on the down-the-hole hammer 1, so boring and driving are started by the down-the-hole hammer 1. After completion of boring, the bit part la is diameter-contracted, and the rod 4 inside the steel pipe pile 6 and the down- the-hole hammer 1 are pulled up.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、建設工事における
鋼管矢板の打設工法および装置に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method and apparatus for driving a steel pipe sheet pile in construction work.

【0002】[0002]

【従来の技術】砂礫、転石、捨石、コンクリート中での
締切工事、土留壁工事における鋼管矢板の打設工事、急
傾斜地盤および水中の硬質地盤、岩盤等における鋼管矢
板土留壁、締切、護岸、構台、桟橋工事等の鋼管矢板の
打設工事で、パイルハンマー、油圧(空圧)ハンマー、
バイブロハンマー等の各種ハンマーで鋼管矢板を直接そ
のままの地盤に打撃することがある。
2. Description of the Related Art Gravel, boulder, rubble, shut-off work in concrete, placing steel pipe sheet pile in earth retaining wall construction, steep ground and hard ground in water, steel pipe sheet pile retaining wall in rock, etc. Pile hammer, hydraulic (pneumatic) hammer, steel pipe sheet pile construction work such as gantry and pier construction
A steel pipe sheet pile may be hit directly on the ground as it is with various hammers such as a vibro hammer.

【0003】このようなハンマーで直接打撃した場合、
礫地盤や転石等があると、打撃により鋼管矢板の変形、
破損を生じ、打設が不可能となるおそれがある。
When directly hit with such a hammer,
If there is gravel ground or boulders, the steel pipe sheet pile will be deformed by impact,
It may be damaged and make it impossible to place it.

【0004】そこで現在の工法としては、全旋回式ケー
シング圧入機と、ハンマークラブバケット、重垂式チゼ
ル、ダウンザホールハンマー等の併用によって削孔を行
い、良質土砂に置換え、これをラップしながら壁状に連
続施工後、その改良した場所に鋼管矢板を打設してい
る。この場合の良質土砂に置換えのための掘削径は当然
鋼管矢板の径よりもかなり大きい径となる。
Therefore, the current construction method is to use a fully swiveling casing press-fitting machine in combination with a hammer club bucket, a heavy hanging chisel, down the hole hammer, etc. to replace it with good quality earth and sand and wrap it to form a wall. After continuous construction, steel pipe sheet piles are placed at the improved location. In this case, the excavation diameter for replacing with good quality soil will be much larger than the diameter of the steel pipe sheet pile.

【0005】[0005]

【発明が解決しようとする課題】かかる従来の置替え工
法では、急傾斜地盤や水深の大きい湖床、河床、海底地
盤等での施工では、置替え改良工事を行うための全旋回
式ケーシング圧入機の設置架台などを初めとして非常に
大規模な仮設設備を必要とし、また、ケーシング建込み
による置換えのラップ施工精度の確保が難しい。
According to the conventional replacement method as described above, in the case of construction on a steeply sloping ground, a lake bed with a large water depth, a river bed, a seabed ground, etc., a fully swivel casing press-fit for replacement replacement work is performed. It requires very large-scale temporary equipment such as the installation base of the machine, and it is difficult to secure the accuracy of the lapping work for replacement by building the casing.

【0006】本発明の目的は前記従来例の不都合を解消
し、従来の置替え工法の場合と比べて掘削・削孔範囲が
鋼管矢板外径に近接させることができ、しかも、良質土
砂に置換える工程を経ずに掘削・削孔と同時に1工程で
鋼管矢板の打設を大掛かりの仮設設備を用いずとも精度
良く行うことができる鋼管矢板の打設工法および装置を
提供することにある。
The object of the present invention is to eliminate the disadvantages of the above-mentioned conventional example, to make the excavation / drilling area closer to the outer diameter of the steel pipe sheet pile, as compared with the case of the conventional replacement method, and to replace it with good quality sand. It is an object of the present invention to provide a steel pipe sheet pile construction method and device capable of accurately performing steel pipe sheet piles in one step simultaneously with excavation / drilling without using a large-scale temporary equipment.

【0007】[0007]

【課題を解決するための手段】本発明は前記目的を達成
するため、鋼管矢板の打設工法としては、使用するダウ
ンザホールハンマーはビット部が拡径可能なものとし、
杭打機に装着したダウンザホールハンマー及びロッドを
鋼管矢板内に挿入し、鋼管矢板の先端からでるダウンザ
ホールハンマーのビット部を拡径し、拡径後は鋼管矢板
をダウンザホールハンマーにあずけ、ダウンザホールハ
ンマーで削孔打設を開始し、削孔完了後、ビット部を縮
径して鋼管矢板内部のロッドおよびダウンザホールハン
マーを引き上げることができる。また、鋼管矢板は先端
部に硬質地盤の場合、超硬ビットを取付けた継手を有
し、継手相互の接続で先行打設鋼管矢板をガイドに後行
の鋼管矢板を精度よく、容易に打設できるものである。
In order to achieve the above object, the present invention provides a method for driving a steel pipe sheet pile, wherein the down-the-hole hammer used has a bit part whose diameter can be expanded.
Insert the down-the-hole hammer and rod attached to the pile driver into the steel pipe sheet pile, expand the bit part of the down-the-hole hammer that comes out from the tip of the steel pipe sheet pile, and after expanding the diameter, insert the steel pipe sheet pile into the down-the-hole hammer and cut with the down-the-hole hammer. After the hole driving is started and the drilling is completed, the diameter of the bit part can be reduced to pull up the rod inside the steel pipe sheet pile and the down the hole hammer. In the case of hard ground at the tip of the steel pipe sheet pile, it has a joint with a carbide bit attached, and by connecting the joints with each other, the following steel pipe sheet piles can be accurately and easily driven with the preceding steel pipe sheet pile as a guide. It is possible.

【0008】鋼管矢板の打設装置としては、ビット部を
拡径可能なものとし、さらに、ビット部上方に該ビット
部縮径時の径より径の大きな係止部を設けたダウンザホ
ールハンマーと、このダウンザホールハンマーが挿入す
る鋼管矢板の先端内側に前記ダウンザホールハンマーの
係止部よりも鋼管矢板の内径を小さくするような先端リ
ングを設けている。また、鋼管矢板は先端部に超硬ビッ
トを取付けた継手を設けることによって容易に打設する
ことができる。
As a device for driving a steel pipe sheet pile, the diameter of the bit portion can be increased, and further, a down-the-hole hammer having a locking portion having a diameter larger than the diameter when the diameter of the bit portion is reduced is provided above the bit portion. A tip ring is provided inside the tip of the steel pipe sheet pile into which the down-the-hole hammer is inserted so as to make the inner diameter of the steel pipe sheet pile smaller than the locking portion of the down-the-hole hammer. Further, the steel pipe sheet pile can be easily driven by providing a joint having a cemented carbide bit attached to the tip thereof.

【0009】請求項1記載の本発明によれば、ビット部
を拡径したダウンザホールハンマーで鋼管矢板外径より
僅かに大きい径を削孔し、これにより鋼管矢板の先端抵
抗および周辺摩擦を小さくして削孔と同時に鋼管矢板の
打設を行うことができる。
According to the first aspect of the present invention, a down-the-hole hammer having an enlarged bit portion is used to drill a diameter slightly larger than the outer diameter of the steel pipe sheet pile, thereby reducing the tip resistance and peripheral friction of the steel pipe sheet pile. Steel pipe sheet pile can be placed at the same time as drilling.

【0010】請求項2および請求項4記載の本発明によ
れば、継手相互の接続で先行打設鋼管矢板をガイドに精
度良く後行鋼管矢板を打設でき、しかも、継手先端部の
超硬ビットで地山、岩等を切崩し、および、先行打設鋼
管矢板の継手内の根固めモルタル等の切削、除去を行う
ことができる。
According to the present invention as set forth in claims 2 and 4, it is possible to accurately drive the trailing steel pipe sheet pile with the leading steel pipe sheet pile as a guide by connecting the joints to each other, and further, the cemented carbide at the tip of the joint is used. It is possible to cut ground, rocks, etc. with a bit, and to cut and remove root-setting mortar etc. in the joint of the pre-cast steel pipe sheet pile.

【0011】請求項3記載の本発明によれば、前記作用
に加えて、鋼管矢板に設けた先端リングはダウンザホー
ルハンマーの削孔位置ずれの防止を行い、先行鋼管矢板
の継手部に対するハンマービットによる破損を防ぐとと
もに、ハンマーの振動打撃力を鋼管矢板に直接伝達し、
削孔と打込みとを確実に同時に行うことができる。
According to the third aspect of the present invention, in addition to the above-mentioned action, the tip ring provided on the steel pipe sheet pile prevents the down-the-hole hammer from shifting the drilling position, and the hammer bit for the joint portion of the preceding steel pipe sheet pile is used. While preventing damage, the hammer's vibrational impact force is transmitted directly to the steel pipe sheet pile,
Drilling and driving can be performed reliably at the same time.

【0012】[0012]

【発明の実施の形態】以下、図面にもとづいて本発明の
実施の形態を詳細に説明する。図1〜図7は本発明の鋼
管矢板の打設工法の1実施形態を示す各工程の側面図で
ある。
Embodiments of the present invention will be described below in detail with reference to the drawings. 1 to 7 are side views of respective steps showing one embodiment of a method for driving a steel pipe sheet pile according to the present invention.

【0013】先に本発明の鋼管矢板の打設装置について
説明すると、図2、図3中1はエアー駆動の打撃機であ
るダウンザホールハンマーで、これはクローラ式の杭打
機2に装着した駆動装置(オーガーマシン)3から吊り
下げる。
The steel pipe sheet pile driving apparatus of the present invention will be described first. In FIGS. 2 and 3, reference numeral 1 denotes a down-the-hole hammer, which is an air driven hammer, which is mounted on a crawler type pile driver 2. Suspend from the device (auger machine) 3.

【0014】そして図2に示すようにダウンザホールハ
ンマー1は削孔ロッド4の先端に配設され、図10〜図12
に示すようにビット部1aは掘削ビット5を多数植設し
た三枚の水平な羽根状体が写真機の絞りを構成するよう
に相重ねる中心部に隙間を設けるか否かで、縮径状態か
ら拡径可能なものとした。
As shown in FIG. 2, the down-the-hole hammer 1 is arranged at the tip of the boring rod 4, and is shown in FIGS.
As shown in Fig. 3, the bit portion 1a is in a reduced diameter state depending on whether or not a gap is provided in the central portion where three horizontal blade-shaped bodies in which a large number of excavation bits 5 are planted overlap to form a diaphragm of a camera. Therefore, the diameter can be expanded.

【0015】図11はビット部1aの縮小状態であり、図
12は拡径状態であり、駆動装置3の回転力を削孔ロッド
4を介してダウンザホールハンマー1に伝える際に右に
回転させることで拡径状態となり、左に回転させること
で縮径状態となる。
FIG. 11 shows a reduced state of the bit portion 1a.
Reference numeral 12 denotes a diameter expansion state. When transmitting the rotational force of the driving device 3 to the down the hole hammer 1 via the drilling rod 4, it is rotated to the right to be a diameter expansion state, and to the left to be a diameter reduction state. Become.

【0016】さらに、図8、図9に示すようにダウンザ
ホールハンマー1はビット部1aの上方で削孔ロッド4
との間に該ビット部1aの縮径時の径より径の大きな係
止部9を設けた。
Further, as shown in FIGS. 8 and 9, the down-the-hole hammer 1 has a drilling rod 4 above the bit portion 1a.
An engaging portion 9 having a diameter larger than the diameter of the bit portion 1a when the diameter of the bit portion 1a is reduced is provided between and.

【0017】6はダウンザホールハンマー1および削孔
ロッド4が挿通可能な鋼管矢板で、図13〜図15に示すよ
うに断面L字形のアングル材を相互に閉じるように間隔
を存して向き合わせた雌継手7aと断面L字形のアング
ル材を相互に逆向きにして開くように合わせた雄継手7
bとをそれぞれ左右側部で長手方向に向かうように設け
ている。
Reference numeral 6 denotes a steel pipe sheet pile through which the down-the-hole hammer 1 and the hole-drilling rod 4 can be inserted, and as shown in FIGS. 13 to 15, angle members having an L-shaped cross section are opposed to each other with a gap therebetween. A male joint 7 in which the female joint 7a and the angle member having an L-shaped cross section are arranged so as to open in opposite directions.
b and b are provided so as to face the longitudinal direction on the left and right side portions, respectively.

【0018】また、これら雌継手7a、雄継手7bは先
端部に超硬ビット8を取付けた。この超硬ビット8の部
分も継手を構成するものであり、雌継手7a、雄継手7
bは形状を異とするビットである。
Further, the female joint 7a and the male joint 7b are provided with a cemented carbide bit 8 at their tips. The portion of the carbide bit 8 also constitutes a joint, and includes a female joint 7a and a male joint 7
b is a bit having a different shape.

【0019】これに加えて、鋼管矢板6の先端内側に前
記ダウンザホールハンマー1の係止部9の外径よりも鋼
管矢板の内径を小さくするような先端リング10を設け
た。
In addition to this, a tip ring 10 is provided inside the tip of the steel pipe sheet pile 6 so that the inner diameter of the steel pipe sheet pile is smaller than the outer diameter of the locking portion 9 of the down-the-hole hammer 1.

【0020】次に前記打設を用いて行う本発明の鋼管矢
板の打設工法について説明する。まず、図1に示すよう
に仮受架台11に鋼管矢板6をクローラクレーン12を用い
て吊込みを行い、頭部で仮受けをする。
Next, the method for driving the steel pipe sheet pile according to the present invention, which is carried out by using the driving, will be described. First, as shown in FIG. 1, the steel pipe sheet pile 6 is hung on the temporary receiving stand 11 by using the crawler crane 12, and is temporarily received by the head.

【0021】図2に示すように杭打機2を用いて、杭打
機2に装着したダウンザホールハンマー1及び削孔ロッ
ド4を前記仮受けした鋼管矢板6内に挿入する。この時
にはハンマーのビット部1aは図8に示すように縮径し
た状態である。
As shown in FIG. 2, using the pile driver 2, the down-the-hole hammer 1 and the drilling rod 4 mounted on the pile driver 2 are inserted into the temporarily received steel pipe sheet pile 6. At this time, the bit portion 1a of the hammer is in a reduced diameter state as shown in FIG.

【0022】図3に示すように杭打機2の補巻ワイヤー
13で鋼管矢板6を吊上げ、かつ、駆動装置(オーガーマ
シン)3、削孔ロッド4、ダウンザホールハンマー1を
同時に巻上げ、鋼管矢板6の先端から出たビット部1a
を拡径する。
As shown in FIG. 3, the auxiliary winding wire for the pile driver 2
The steel pipe sheet pile 6 is lifted by 13, and the driving device (auger machine) 3, the boring rod 4, and the down the hole hammer 1 are simultaneously wound up, and the bit portion 1a protruding from the tip of the steel pipe sheet pile 6
Expand the diameter.

【0023】図4に示すように拡径後は鋼管矢板6をあ
ずけ、オーガー側で鋼管矢板6を吊上げる。
As shown in FIG. 4, after expanding the diameter, the steel pipe sheet pile 6 is arranged and the steel pipe sheet pile 6 is lifted up on the auger side.

【0024】図5に示すように鋼管矢板6を所定の場所
に移動し、建込みを行い、図6に示すように打設場所の
杭芯を出し、両側に導材14をセットし、鋼管の傾きに注
意しながら削孔打設を開始する。
As shown in FIG. 5, the steel pipe sheet pile 6 is moved to a predetermined place and installed, and as shown in FIG. 6, the pile core at the driving place is taken out, and the conductors 14 are set on both sides of the steel pipe. Start drilling while paying attention to the inclination of.

【0025】この場合、図13〜図15に示すように先行打
設した鋼管矢板6に対して後行打設する鋼管矢板6は雌
継手7aと雄継手7bとの係合で先行打設した鋼管矢板
6をガイドに打設できる。
In this case, as shown in FIG. 13 to FIG. 15, the steel pipe sheet pile 6 which is subsequently driven with respect to the steel pipe sheet pile 6 which was previously driven is previously driven by the engagement of the female joint 7a and the male joint 7b. The steel pipe sheet pile 6 can be driven into the guide.

【0026】なお、図14中αはダウンザホールハンマー
1での掘削範囲を示すが、前記雌継手7aと雄継手7b
はこの範囲から突出する。前記雌継手7a、雄継手7b
の先端部に設けた超硬ビット8は前記ダウンザホールハ
ンマー1での掘削範囲から外れた部分の地山、岩等の切
崩し、および、先行打設した鋼管矢板の継手内の根固め
モルタル等の切削、除去を行う。
In FIG. 14, α indicates the range of excavation by the down the hole hammer 1, but the female joint 7a and the male joint 7b.
Protrudes from this range. The female joint 7a and the male joint 7b
Carbide bit 8 provided at the tip of the shredder cuts rocks, rocks, etc., out of the excavation range with the down-the-hole hammer 1, and mortar hardening etc. in the joint of the steel pipe sheet pile that was previously cast. Cut and remove.

【0027】図7に示すように、削孔完了後、ダウンザ
ホールハンマー1及び削孔ロッド4を逆転し、ビット部
1aを縮径して鋼管矢板6の内部から削孔ロッド4およ
びダウンザホールハンマー1を引き上げる。
As shown in FIG. 7, after the boring is completed, the down-the-hole hammer 1 and the boring rod 4 are reversed, and the bit portion 1a is reduced in diameter to remove the boring rod 4 and the down-the-hole hammer 1 from the inside of the steel pipe sheet pile 6. Pull up.

【0028】図示は省略するがかかる引き上げ後、根固
めモルタルを地上より鋼管矢板内に圧送して打設し、ま
た、雌継手7aと雄継手7bの継手部内は洗浄、清掃後
ポリパイプを用いて止水剤注入袋を挿入し、この注入袋
内に有孔塩ビパイプを挿入し、塩ビパイプ口元より混合
ウレタン液を流し込み、口元まで充填することになり、
止水を行う。
Although not shown in the drawing, after the pulling up, the rooting mortar is pressure-fed from the ground into the steel pipe sheet pile and placed, and the insides of the joints of the female joint 7a and the male joint 7b are cleaned and cleaned using a poly pipe. Insert a waterproofing agent injection bag, insert a perforated PVC pipe into this injection bag, pour the mixed urethane liquid from the mouth of the PVC pipe, and fill up to the mouth,
Stop water.

【0029】[0029]

【発明の効果】以上述べたように本発明の鋼管矢板の打
設工法および装置は、従来の置替え工法の場合と比べて
掘削・削孔範囲が鋼管矢板外径に近接させることがで
き、しかも、良質土砂に置換える工程を経ずに掘削・削
孔と同時に1工程で鋼管矢板の打設を大掛かりの仮設設
備を用いずとも精度良く行うことができるものである。
As described above, in the steel pipe sheet pile driving method and apparatus of the present invention, the excavation / drilling range can be made closer to the steel pipe sheet pile outer diameter than in the case of the conventional replacement construction method. In addition, the steel pipe sheet pile can be accurately placed in one step at the same time as excavation and drilling without the step of replacing with high quality soil without using a large-scale temporary equipment.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の鋼管矢板の打設工法の1実施形態を示
す第1工程の縦断側面図である。
FIG. 1 is a vertical sectional side view of a first step showing an embodiment of a steel pipe sheet pile driving method of the present invention.

【図2】本発明の鋼管矢板の打設工法の1実施形態を示
す第2工程の縦断側面図である。
FIG. 2 is a vertical cross-sectional side view of a second step showing an embodiment of the method for placing a steel pipe sheet pile according to the present invention.

【図3】本発明の鋼管矢板の打設工法の1実施形態を示
す第3工程の縦断側面図である。
FIG. 3 is a vertical cross-sectional side view of a third step showing an embodiment of the steel pipe sheet pile driving method of the present invention.

【図4】本発明の鋼管矢板の打設工法の1実施形態を示
す第4工程の縦断側面図である。
FIG. 4 is a vertical sectional side view of a fourth step showing an embodiment of the method for driving a steel pipe sheet pile according to the present invention.

【図5】本発明の鋼管矢板の打設工法の1実施形態を示
す第5工程の縦断側面図である。
FIG. 5 is a vertical cross-sectional side view of a fifth step showing an embodiment of the method for placing a steel pipe sheet pile according to the present invention.

【図6】本発明の鋼管矢板の打設工法の1実施形態を示
す第6工程の縦断側面図である。
FIG. 6 is a vertical cross-sectional side view of a sixth step showing an embodiment of the steel pipe sheet pile driving method of the present invention.

【図7】本発明の鋼管矢板の打設工法の1実施形態を示
す第7工程の縦断側面図である。
FIG. 7 is a vertical cross-sectional side view of a seventh step showing an embodiment of the steel pipe sheet pile driving method of the present invention.

【図8】図3のA部の拡大で、縮径時の縦断側面図であ
る。
FIG. 8 is an enlarged side view of the portion A of FIG. 3 when the diameter is reduced.

【図9】図3のA部の拡大で、拡径時の縦断側面図であ
る。
9 is an enlarged side view of the portion A of FIG. 3 when the diameter is enlarged.

【図10】使用するダウンザホールハンマーの一部切欠
いた側面図である。
FIG. 10 is a partially cutaway side view of the down the hole hammer used.

【図11】使用するダウンザホールハンマーの縮径時の
底面図である。
FIG. 11 is a bottom view of the down-the-hole hammer used when the diameter is reduced.

【図12】使用するダウンザホールハンマーの拡径時の
底面図である。
FIG. 12 is a bottom view of the down-the-hole hammer used when expanding the diameter.

【図13】鋼管矢板の打設状態を示す平面図である。FIG. 13 is a plan view showing a driving state of a steel pipe sheet pile.

【図14】鋼管矢板の継手の詳細を示す平面図である。FIG. 14 is a plan view showing details of a joint of a steel pipe sheet pile.

【図15】鋼管矢板の打設状態を示す側面図である。FIG. 15 is a side view showing a driving state of a steel pipe sheet pile.

【符号の説明】[Explanation of symbols]

1…ダウンザホールハンマー 1a…ビット部 2…杭打機 3…駆動装置 4…削孔ロッド 5…掘削ビット 6…鋼管矢板 7a…雌継手 7b…雄継手 8…超硬ビット 9…係止部 10…先端リング 11…仮受架台 12…クローラク
レーン 13…補巻ワイヤー 14…導材
1 ... Down the hole hammer 1a ... Bit part 2 ... Pile driver 3 ... Drive device 4 ... Drilling rod 5 ... Drilling bit 6 ... Steel pipe sheet pile 7a ... Female joint 7b ... Male joint 8 ... Carbide bit 9 ... Locking part 10 ... Tip ring 11… Temporary receiving stand 12… Crawler crane 13… Auxiliary winding wire 14… Conducting material

フロントページの続き (72)発明者 黒岩 憲二 大阪府大阪市西区阿波座一丁目3番15号 鹿島建設株式会社関西支店内 (72)発明者 河原 圭司 大阪府大阪市西区阿波座一丁目3番15号 鹿島建設株式会社関西支店内 (72)発明者 宇留島 千明 大阪府大阪市西区阿波座一丁目3番15号 鹿島建設株式会社関西支店内 (72)発明者 中室 貞幸 大阪府大阪市西区阿波座一丁目3番15号 鹿島建設株式会社関西支店内 (72)発明者 廣川 強士 大阪府大阪市北区中之島三丁目3番22号 関西電力株式会社内 (72)発明者 横山 弘介 兵庫県佐用郡佐用町山脇501 株式会社横 山基礎工事内 (72)発明者 林 猛 岐阜県安八郡神戸町大字横井字中新田1528 番地三菱マテリアル株式会社岐阜製作所内Front page continued (72) Inventor Kenji Kuroiwa 1-3-15 Awaza, Nishi-ku, Osaka City, Osaka Prefecture Kashima Construction Co., Ltd. Kansai Branch (72) Inventor Keiji Kawahara 1-3-15 Awaza, Nishi-ku, Osaka City, Osaka Kashima Construction Co., Ltd. Kansai Branch (72) Inventor Chiaki Urushima 1-3-15 Awaza, Nishi-ku, Osaka-shi, Osaka Kashima Construction Co., Ltd. Kansai Branch (72) Inventor Sadayuki Nakamuro 1-3, Awaza, Nishi-ku, Osaka-shi, Osaka No. 15 Kashima Construction Co., Ltd. in the Kansai branch (72) Inventor Takeshi Hirokawa 3-22 Nakanoshima 3-chome, Kita-ku, Osaka-shi, Osaka Prefecture Kansai Electric Power Co., Inc. (72) Inventor Kosuke Yokoyama Sayo-cho, Sayo-gun, Yamagata 501 Yokoyama Foundation Co., Ltd. (72) Inventor Takeshi Hayashi 1528, Nakashinda, Yokoi, Kobe-cho, Anpachi-gun, Gifu Prefecture Mitsubishi Materials Corporation Gifu Works

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】 使用するダウンザホールハンマーはビッ
ト部が拡径可能なものとし、杭打機に装着したダウンザ
ホールハンマー及びロッドを鋼管矢板内に挿入し、鋼管
矢板の先端からでるダウンザホールハンマーのビット部
を拡径し、拡径後は鋼管矢板をダウンザホールハンマー
にあずけ、ダウンザホールハンマーで削孔打設を開始
し、削孔完了後、ビット部を縮径して鋼管矢板内部のロ
ッドおよびダウンザホールハンマーを引き上げることを
特徴とする鋼管矢板の打設工法。
1. The down-the-hole hammer used has a bit part whose diameter can be expanded, and the down-the-hole hammer and rod mounted on a pile driver are inserted into the steel pipe sheet pile, and the bit part of the down-the-hole hammer protruding from the tip of the steel pipe sheet pile is used. After expanding the diameter, the steel pipe sheet pile is subjected to the down-the-hole hammer, the drilling operation is started with the down-the-hole hammer, and after completion of the drilling, the bit part is reduced in diameter to pull up the rod inside the steel pipe sheet pile and the down-the-hole hammer. A method for placing steel pipe sheet piles.
【請求項2】 鋼管矢板は先端部に超硬ビットを取付け
た継手を有し、継手相互の接続で先行打設鋼管矢板をガ
イドに後行の鋼管矢板を打設する請求項1記載の鋼管矢
板の打設工法。
2. The steel pipe sheet pile according to claim 1, wherein the steel pipe sheet pile has a joint having a carbide bit attached to the tip end thereof, and the joint steel pipe sheet pile is used to drive the trailing steel pipe sheet pile by using the pre-cast steel pipe sheet pile as a guide. Pile construction method for sheet pile.
【請求項3】 ビット部を拡径可能なものとし、さら
に、ビット部上方に該ビット部縮径時の径より径の大き
な係止部を設けたダウンザホールハンマーと、、このダ
ウンザホールハンマーが挿入する鋼管矢板の先端内側に
前記ダウンザホールハンマーの係止部よりも鋼管矢板の
内径を小さくするような先端リングを設けたことを特徴
とする鋼管矢板の打設装置。
3. A down-the-hole hammer in which the diameter of the bit portion is expandable, and further a locking portion having a diameter larger than the diameter when the diameter of the bit portion is reduced is provided above the bit portion, and this down-the-hole hammer is inserted. A steel pipe sheet pile setting device, wherein a tip ring is provided inside the tip of the steel pipe sheet pile so as to make the inner diameter of the steel pipe sheet pile smaller than the engaging portion of the down-the-hole hammer.
【請求項4】 鋼管矢板は先端部に超硬ビットを取付け
た継手を設ける請求項3記載の鋼管矢板の打設装置。
4. The steel pipe sheet pile placing apparatus according to claim 3, wherein the steel pipe sheet pile is provided with a joint having a cemented bit attached to a tip end portion thereof.
JP11883996A 1996-05-14 1996-05-14 Casting method and equipment for sheet piles Expired - Fee Related JP3165997B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP11883996A JP3165997B2 (en) 1996-05-14 1996-05-14 Casting method and equipment for sheet piles

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP11883996A JP3165997B2 (en) 1996-05-14 1996-05-14 Casting method and equipment for sheet piles

Publications (2)

Publication Number Publication Date
JPH09302654A true JPH09302654A (en) 1997-11-25
JP3165997B2 JP3165997B2 (en) 2001-05-14

Family

ID=14746438

Family Applications (1)

Application Number Title Priority Date Filing Date
JP11883996A Expired - Fee Related JP3165997B2 (en) 1996-05-14 1996-05-14 Casting method and equipment for sheet piles

Country Status (1)

Country Link
JP (1) JP3165997B2 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006342614A (en) * 2005-06-10 2006-12-21 Yokoyama Kiso Koji:Kk Protection method of floating structure foundation section
JP2011021374A (en) * 2009-07-15 2011-02-03 Tokunagagumi:Kk Sheet pile jacking method
JP2014051843A (en) * 2012-09-09 2014-03-20 Yokoyama Kiso Koji:Kk Steel pipe sheet pile installation method and steel pipe sheet pile joint
CN107119685A (en) * 2017-04-18 2017-09-01 中冶天工集团天津有限公司 A kind of broken pile device and its construction method for for Static pressure pile driver abolish pile crown
CN107268561A (en) * 2017-07-12 2017-10-20 尹俊 Load-bearing operation platform and its installation method waterborne
JP2018204257A (en) * 2017-06-01 2018-12-27 株式会社横山基礎工事 Ring-shaped tip metal and pile installation method by inner excavation using it

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006342614A (en) * 2005-06-10 2006-12-21 Yokoyama Kiso Koji:Kk Protection method of floating structure foundation section
JP2011021374A (en) * 2009-07-15 2011-02-03 Tokunagagumi:Kk Sheet pile jacking method
JP2014051843A (en) * 2012-09-09 2014-03-20 Yokoyama Kiso Koji:Kk Steel pipe sheet pile installation method and steel pipe sheet pile joint
CN107119685A (en) * 2017-04-18 2017-09-01 中冶天工集团天津有限公司 A kind of broken pile device and its construction method for for Static pressure pile driver abolish pile crown
JP2018204257A (en) * 2017-06-01 2018-12-27 株式会社横山基礎工事 Ring-shaped tip metal and pile installation method by inner excavation using it
CN107268561A (en) * 2017-07-12 2017-10-20 尹俊 Load-bearing operation platform and its installation method waterborne

Also Published As

Publication number Publication date
JP3165997B2 (en) 2001-05-14

Similar Documents

Publication Publication Date Title
JP6774132B1 (en) Construction method of steel pipe pile
JP6886717B2 (en) Construction method of steel pipe pile
CN111472356A (en) Larsen steel sheet pile sleeve obstacle clearing and pile pulling construction method
CN105019917B (en) Impact drilling type advanced jet grouting pipe shed construction device and construction method
JP6319935B2 (en) Tubing pile driving method
JPH09302654A (en) Construction method and device for driving steel pipe pile
JP4478348B2 (en) Steel pipe pile driving method and apparatus
JP2009068229A (en) Method of burying anchor for suspended structure
JP3806318B2 (en) Foundation pile construction method and apparatus
JP4074198B2 (en) How to remove existing piles
JP2003082663A (en) Pile driving equipment
CN112324441A (en) Construction method for removing underground shield segments by full-slewing drilling machine
JPS60119816A (en) Formation of continuous pile
JP4113305B2 (en) Ground obstruction removal method
JP2006009468A (en) Driving method of inner excavation type steel pipe sheet pile and the steel pipe sheet pile used therefor
JP4645091B2 (en) Expanded pile and construction method of the expanded pile
JP3221895B2 (en) Construction method of large-diameter underground wall body and excavation equipment for burying pipes
JP2006336408A (en) Ground excavating device and ground excavating method
JP3708795B2 (en) Casing placement method
JPS6229597B2 (en)
JP2006063526A (en) Expansive foot protection method using friction pile
JP2002047877A (en) Consolidation bit for impact type excavating method, and burying method for underground buried object using the same
JP2000080877A (en) Anti-pollution, muck receiving device for excavating device
JP2023077243A (en) Installation method for core material
JPH07158389A (en) Working face independence method in collapse bedrock tunnel

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20010206

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313117

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100309

Year of fee payment: 9

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100309

Year of fee payment: 9

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130309

Year of fee payment: 12

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130309

Year of fee payment: 12

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20160309

Year of fee payment: 15

LAPS Cancellation because of no payment of annual fees